Srep Investment Plan for Uganda Proposed Decision

Total Page:16

File Type:pdf, Size:1020Kb

Srep Investment Plan for Uganda Proposed Decision SREP/SC.14/8 October 20, 2015 Meeting of the SREP Sub-Committee Washington D.C. Wednesday, November 11, 2015 Agenda Item 7 SREP INVESTMENT PLAN FOR UGANDA PROPOSED DECISION The SREP Sub-Committee, having reviewed document SREP/SC.14/8, SREP Investment Plan for Uganda, a) endorses the investment plan as a basis for the further development of the projects and programs foreseen in the plan and takes note of the request for USD 50 million in SREP funding.1 The Sub-Committee requests the Government of Uganda, in the further development of the proposed projects and programs, to take into account comments made at the meeting and any additional written comments submitted by Sub-Committee members by November 27, 2015, and to respond in writing to questions raised during the meeting and in subsequent written comments; b) reaffirms that all allocation amounts are indicative for planning purposes and that approval of funding will be on the basis of high quality investment plans and projects; c) approves USD 2.3 million as preparation grant for the project entitled, Decentralized Renewables Development Program (AfDB); d) approves USD 1.875 million as preparation grant for the project entitled, Wind Resource Map and Pilot-Wind Power Development Project (AfDB); e) takes note of the estimated budget of USD 420,000 for MDB project preparation and supervision services for the project entitled, Uganda: 130 MW Geothermal Development Program (AfDB), and approves USD 210,000 as a first tranche of funding for such services; f) takes note of the estimated budget of USD 150,000 for MDB project preparation and supervision services for the project entitled, Decentralized Renewables Development Program (AfDB), and approves USD 75,000 as a first tranche of funding for such services; and g) takes note of the estimated budget of USD 150,000 for MDB project preparation and supervision services for the project entitled, Wind Resource Map and Pilot-Wind Power Development Program (AfDB), and approves USD 75,000 as a first tranche of funding for such services. 1 USD 300,000 in SREP funding has already been approved for the development of the investment plan. TELEGRAMS: ENERMIN TELEPHONE: 230243,235895,230926 MINISTRY OF ENERGY AND GENERAL LINE: 234733/257863/349010 MINERAL DEVELOPMENT FAX: 230220/234732/ 349342 E-MAIL: [email protected] P. O. BOX 7270, IN ANY CORRESPONDENCE ON KAMPALA. THIS SUBJECT PLEASE QUOTE NO ADM/273/01 THE REPUBLIC OF UGANDA 16th October 2015 Mafalda Duarte Climate Investment Funds, Project Manager, CIF Administrative Unit Washington D. C. SUBMISSION OF UGANDAS SREP INVESTMENT PLAN I wish to submit for the consideration of the Climate investment Fund the Investment Plan for Scaling up Renewable Energy in Uganda. The Government of Uganda greatly appreciates the support provided by the CIF Administrative Unit as well as the Multilateral Development Banks in the Development of the SREP Investment Plan for Uganda. I hope the SREP subcommittee will endorse the Investment Plan so that additional energy is provided for the social economic development of Uganda. Uganda has priotised the development of the energy sector realising that energy is the driver of social economic development. The country’s development is guided by ‘’Vision 2040 for Uganda’’ which provides the development path and strategies to operationalise Uganda’s vision of becoming a modern and Prosperous country within 30 years. To realise this vision we shall need adequate and reliable energy. This Investment Plan for Scaling up Renewable Energy is therefore a critical step towards achieving our vision. The implementation of the Investment Plan will assist the Government of Uganda in meeting the country’s targets set in the Uganda’s Vision 2040 as well as contribute to meeting the targets set in our SE4ALL Action Agenda 2015. We believe the SREP support will be instrumental in helping to catalyze investment in projects of Geothermal Development, Solar PV Off-grid rural electrification, Solar PV On-grid Net Metering and in the development of wind mills. We look forwards to the support of SREP for this Investment Plan and to working with CIF and the Multilateral Development Banks to implement the projects outlined in the Investment Plan. James Baanabe FOR: PERMANENT SECRETARY 0A 0B © Nattanan726 | Fotolia © Atm2003 | Fotolia © Daniel Loncarevic | Fotolia © Dancorbould | Fotolia Design: Mounir BEN AMMAR Contents Acronyms v Map of Uganda vii Foreword viii Executive Summary 2 Introduction 2 Energy Sector 3 Renewable Energy 3 Constraints to Renewable Energy Deployment 4 SREP Program Description 5 Expected Impacts of SREP 5 Conclusions 6 Section 1 Country Context 8 Introduction 8 Section 2 Energy Sector 10 Overview 10 Electricity Supply and Demand 12 Electricity Generation 14 Electricity Transmission and Distribution Network 17 Electricity Tariffs 19 Electricity Feed-in Tariffs 21 Rural Electrification 24 Gender Inclusiveness in the Energy Sector 27 Section 3 National Energy Policy and Institutional Framework 29 National Policy and Vision 29 Energy Policy and Strategy Framework 30 SE4All 31 Institutional Framework 32 National Institutions 34 Role of Private Sector 35 Role of Development Partners 36 Role of Financial Sector in Financing Renewables 38 Section 4 Renewable Energy Sector 39 Renewable Energy Potential: Overview of Issues 39 i Legal and Regulatory Framework for the Promotion of Renewables 44 Matrix of Barriers to the Development of Renewables and Mitigation Measures 44 Section 5 Contribution of SREP to National Energy Roadmap 46 Section 6 Prioritization of Strategic Investment Areas 50 Priority Areas and Projects 52 Section 7 Program Description 53 Objectives of the SREP Program 53 Expected Impacts of SREP program 54 SREP Program Description 54 Section 8 Program Implementation Arrangement 57 Overall Supervising Entity and Implementing Entities and their roles 57 Organigram of Implementation Structure 58 Section 9 SREP Co-Benefits 59 Section 10 Financing Plan 61 Section 11 Environmental and Social Aspects 63 Environmental and Social Management Framework 64 Components of the Environment and Social Management Framework 64 Stakeholder Consultations 65 Responsibilities 65 Anticipated Environmental and Social Impacts 67 Section 12 Monitoring and Evaluation 69 General Features of the M&E System 69 Results Framework 70 Responsibilities and Monitoring and Evaluation Related Tasks 70 Managing Knowledge and Sharing Lessons Learnt 72 Section 13 Risk Assessment 73 ii Annex 1 Project Investment Concept Notes 77 Project 1: 130MW Geothermal Development Program 77 Project 2: Decentralized Renewables Development Program 85 Project 3: Wind Resource Map and Pilot Wind Power Development Program 94 Annex 2 Assessment of Country's Absorptive Capacity 100 Annex 3 Stakeholders Consultations 104 Annex 4 Rationale for SREP Ranking and Prioritization 114 Annex 5 External Consultations 118 Tables Table 1: Uganda's Energy Balance 13 Table 2: Distribution of Electricity Generation Sources 13 Table 3: Installed Electricity Generation Capacity as of 2014 15 Table 4: UETCL Transmission losses 2007-2014 18 Table 5: Ongoing Interconnection Projects 18 Table 6: Weighted Average Generation Tariff 20 Table 7: Electricity Tariffs per Categories 21 Table 8: Feed-in-Tariffs applicable for 2013 - 2016 22 Table 9: GETFIT Premium Payments under First Request for Proposals 23 Table 10: GETFIT Installed Capacities by Technology 23 Table 11: SE4ALL Uganda Goals with Set Targets 31 Table 12: Barriers and Measures Taken 45 Table 13: Scoring Summary 51 Table 14: Financial Plan 62 Table 15: Anticipated Environmental and Social Impacts 67 Table 16: SREP Results Framework 71 Table 17: Main Risks and Proposed Mitigation Measures 73 iii Figures Figure 1: Planned Generation Projections in MW (2015-2020) 16 Figure 2: Demand Supply Balance (source UETCL) 17 Figure 3: Uganda Transmission and Distribution Infrastructure 19 Figure 4: organigram of the the electricity supply industry change a The structure of MEMD 33 Figure 5: Least Cost Generation Development Plan 48 Figure 6: Projected Generations by Technology in MW (2015 – 2023) 49 Box Box 1: Lessons learnt from RESP 2001-2010 26 iv Acronyms AfDB African Development Bank NEMA National Environment Management Authority BST Bulk Supply Tariff NGO Non-Governmental Organization CIF Climate Investment Funds MoWE Ministry of Water & Environment ERA Electricity Regulatory O&M Operation & Maintenance Authority ERT Energy for Rural PACMECS Pader Abim Community Transformation Multipurpose Electricity Cooperative Society EU European Union PPA Power Purchase Agreement GDP Gross Domestic Product PPP Public-Private Partnership GET FiT Global Energy Transfer for PREEEP Promotion of Renewable Feed-in-Tariffs Energy and Energy Efficiency Program GHG Greenhouse Gas PRG Partial Risk Guarantee GIZ Deutsche Gesellschaft PSC Project Steering fur Internationale Committee Zusammenarbeit GoU Government of Uganda PV Photo Voltaic GRD Geothermal Resource R&D Research and Development Department HPP Hydro Power Project RAP Resettlement Action Plan ICEIDA Icelandic International RE Renewable Energy Development Agency ICS Institutional Cook Stoves REA Rural Electrification Agency IFC International Finance REB Rural Electrification Board Corporation IP Investment Plan REF Rural Electrification Fund IPP Independent Power REFiT Renewable Energy Feed in Producer Tariff JICA Japan International RESP Rural Electrification Cooperation Agency Strategy & Plan KfW Kreditanstalt für RETF Rural Electrification Trust Wiederaufbau
Recommended publications
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 82713-UG PROJECT APPRAISAL DOCUMENT ON A Public Disclosure Authorized PROPOSED SERIES OF IDA PARTIAL RISK GUARANTEES IN THE AMOUNT OF US$ 160 MILLION EQUIVALENT IN SUPPORT OF PROJECTS UNDER THE RENEWABLE ENERGY DEVELOPMENT PROGRAM IN THE REPUBLIC OF UGANDA February 20, 2014 Public Disclosure Authorized Africa Energy (AFTG1) Africa Region: Tanzania, Uganda and Burundi Country Unit (AFCE1) Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective January 31, 2014) Currency Unit = Uganda Shilling (UGX) 2,475 UGX = US$ 1 FISCAL YEAR July 1 – June 30 ABBREVIATIONS AND ACRONYMS BP Bank Procedure BST Bulk Supply Tariff CAS Country Assistance Strategy COD Commercial Operation Date DEG Entrepreneurial Development Cooperation – German DFI Development Finance Institution EAPP Eastern Africa Power Pool DRC Democratic Republic of Congo EPC Engineering, Procurement and Construction ERA Electricity Regulatory Authority ESAP Environment and Social Action Plan ESDP Electricity Sector Development Project ESIA Environmental and Social Impact Assessment ESMP Environmental and Social Management Plan ESMS Environmental and Social Management System ESRS Environmental and Social Review Summary EU European Union EUR Euro FM Financial Management FMO Entrepreneurial
    [Show full text]
  • Ministry of Health
    UGANDA PROTECTORATE Annual Report of the MINISTRY OF HEALTH For the Year from 1st July, 1960 to 30th June, 1961 Published by Command of His Excellency the Governor CONTENTS Page I. ... ... General ... Review ... 1 Staff ... ... ... ... ... 3 ... ... Visitors ... ... ... 4 ... ... Finance ... ... ... 4 II. Vital ... ... Statistics ... ... 5 III. Public Health— A. General ... ... ... ... 7 B. Food and nutrition ... ... ... 7 C. Communicable diseases ... ... ... 8 (1) Arthropod-borne diseases ... ... 8 (2) Helminthic diseases ... ... ... 10 (3) Direct infections ... ... ... 11 D. Health education ... ... ... 16 E. ... Maternal and child welfare ... 17 F. School hygiene ... ... ... ... 18 G. Environmental hygiene ... ... ... 18 H. Health and welfare of employed persons ... 21 I. International and port hygiene ... ... 21 J. Health of prisoners ... ... ... 22 K. African local governments and municipalities 23 L. Relations with the Buganda Government ... 23 M. Statutory boards and committees ... ... 23 N. Registration of professional persons ... 24 IV. Curative Services— A. Hospitals ... ... ... ... 24 B. Rural medical and health services ... ... 31 C. Ambulances and transport ... ... 33 á UGANDA PROTECTORATE MINISTRY OF HEALTH Annual Report For the year from 1st July, 1960 to 30th June, 1961 I.—GENERAL REVIEW The last report for the Ministry of Health was for an 18-month period. This report, for the first time, coincides with the Government financial year. 2. From the financial point of view the year has again been one of considerable difficulty since, as a result of the Economy Commission Report, it was necessary to restrict the money available for recurrent expenditure to the same level as the previous year. Although an additional sum was available to cover normal increases in salaries, the general effect was that many economies had to in all be made grades of staff; some important vacancies could not be filled, and expansion was out of the question.
    [Show full text]
  • Oil Palm Plantations in Forest Landscapes: Impacts, Aspirations and Ways Forward in Uganda
    Oil palm plantations in forest landscapes: impacts, aspirations and ways forward in Uganda Richard Ssemmanda and Michael Opige (eds.) This publication has been produced under the framework of the Green Livelihoods Alliance - Millieudefensie, IUCN-NL and Tropenbos International - funded under the ‘Dialogue and Dissent’ strategic partnership with the Ministry of Foreign Affairs of the Netherlands. The opinions and views expressed in this publication are the sole responsibility of the authors and do not necessarily reflect the opinions and views of Tropenbos International or its partners. Suggested citation: Ssemmanda R. and Opige M.O. (eds.). 2018. Oil palm plantations in forest landscapes: impacts, aspirations and ways forward in Uganda. Wageningen, the Netherlands: Tropenbos International ISBN: 978-90-5113-139-0 Additional editing by: Nick Pasiecznik and Hans Vellema Layout by: Juanita Franco Photos: Hans Vellema (Tropenbos International) Tropenbos International P.O. Box 232 6700 AE Wageningen The Netherlands E-mail: [email protected] Website: www.tropenbos.org Contents Overview Paradise lost, or found? The introduction of oil palm to Uganda’s tropical forest 5 islands in Lake Victoria – a review of experiences and proposed next steps Richard Ssemmanda, Michael Opige, Nick Pasiecznik & Hans Vellema Background reviews Land use changes (1990-2015) in Kalangala and 14 Buvuma districts, southern Uganda Grace Nangendo Environmental impacts of oil palm plantations in Kalangala 22 Mary Namaganda Impacts of oil palm on forest products and
    [Show full text]
  • Table of Contents Page Acknowledgments ……………………………………………………………………………
    Table of Contents Page Acknowledgments ……………………………………………………………………………. 3 Definitions and Acronyms ……………………………………………………………………. 4 Background and Goal of Interpretation ……………………………………………………….. 7 Overall Trip Purpose/Tasks …………………………………………………………………… 8 Trip Itinerary ………………………………………………………………………………….. 9 • Kasese Information Center ……………………………………………………………. 10 • Ruboni Community …………………………………………………………………… 13 • Kikorongo Women’s Community Tourism Project ………………………………… 16 • Queen Elizabeth National Park ………………………………………………………... 18 • Katwe Tourism Information Center (KATIC) ………………………………………… 20 • Echuya Central Forest Reserve Ecotourism Program ………………………………… 22 • Nkuringo Community …………………………………………………………………. 24 General Recommendations …………………………………………………………………… 27 • Interpretive Techniques ………………………………………………………………. 27 • Craft Shops/Merchandising …………………………………………………………… 27 • Pearls of Uganda ……………………………………………………………………… 28 • Training/Networking ………………………………………………………………….. 28 • Collaboration between the Forest Service and USAID-STAR …………………….… 28 • National Tourism Portal Website …………………………………………………….. 29 Appendices #1 ─ Merchandising …………………………………………………………………………… 30 #2 ─ Sales and Operations …………………………………………………………………….. 32 #3 ─ Design Guidelines ……………………………………………………………………….. 36 #4 ─ Visitor Contact Training …………………………………………………………………. 45 #5 ─ Creating a Site Plan ……………………………………………………………………. 48 #6 ─ Exhibition Accessibility …………………………………………………………………. 48 #7 ─ Kiosk or Exterior Wayside Exhibit (Photograph) ……………………………………….. 49 #8 ─ Visitor’s Center Gift
    [Show full text]
  • Chapter Three
    University of Birmingham Research Archive e-theses repository This unpublished thesis/dissertation is copyright of the author and/or third parties. The intellectual property rights of the author or third parties in respect of this work are as defined by The Copyright Designs and Patents Act 1988 or as modified by any successor legislation. Any use made of information contained in this thesis/dissertation must be in accordance with that legislation and must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the permission of the copyright holder. 2nd of 3 files Chapters 3 to 8 (page 62 to 265) of WALKING THE RIFT: ALFRED ROBERT TUCKER IN EAST AFRICA IDEALISM AND IMPERIALISM 1890 – 1911 by JOAN PLUBELL MATTIA A thesis submitted to The University of Birmingham For the degree of DOCTOR OF PHILOSOPHY Department of Theology School of Historical Studies The University of Birmingham 2007 62 CHAPTER THREE THE MARRIAGE QUESTION Arriving in Mombasa harbour on May 14, 1890, sick and weak from unsanitary food preparation on board the “Ethiopian,” Alfred Tucker, third bishop of the immense territory comprising the Diocese of Eastern Equatorial Africa (1890-1899), was greeted with the words, “Cotter dead” by Mr. Bailey, the missionary assigned to meet him. Tucker’s immediate response to this news of the loss of one of the Mombasa missionaries was to acknowledge “the intense anguish of my mind when with such tidings ringing in my ears and feeling physically weak and ill I set foot for the first time on the shores of Africa.”1 It would be far from the last death among the Church Missionary Society personnel in his twenty-one year episcopacy in East Africa but, with the history of death in the East African endeavour and the uncertainty of his own well-being so close at hand, the gravity of the greeting elicited the anxiety laden response recorded above.
    [Show full text]
  • A History of Ethnicity in the Kingdom of Buganda Since 1884
    Peripheral Identities in an African State: A History of Ethnicity in the Kingdom of Buganda Since 1884 Aidan Stonehouse Submitted in accordance with the requirements for the degree of Ph.D The University of Leeds School of History September 2012 The candidate confirms that the work submitted is his own and that appropriate credit has been given where reference has been made to the work of others. This copy has been supplied on the understanding that it is copyright material and that no quotation from the thesis may be published without proper acknowledgement. Acknowledgments First and foremost I would like to thank my supervisor Shane Doyle whose guidance and support have been integral to the completion of this project. I am extremely grateful for his invaluable insight and the hours spent reading and discussing the thesis. I am also indebted to Will Gould and many other members of the School of History who have ably assisted me throughout my time at the University of Leeds. Finally, I wish to thank the Arts and Humanities Research Council for the funding which enabled this research. I have also benefitted from the knowledge and assistance of a number of scholars. At Leeds, Nick Grant, and particularly Vincent Hiribarren whose enthusiasm and abilities with a map have enriched the text. In the wider Africanist community Christopher Prior, Rhiannon Stephens, and especially Kristopher Cote and Jon Earle have supported and encouraged me throughout the project. Kris and Jon, as well as Kisaka Robinson, Sebastian Albus, and Jens Diedrich also made Kampala an exciting and enjoyable place to be.
    [Show full text]
  • Ministry of Energy and Mineral Development
    THE REPUBLIC OF UGANDA Ministry of Energy and Mineral Development Energy and Mineral Development Sector Sector Development Plan 2015/16 – 2019/20 June 2015 Foreword The Energy and Mineral Development Sector Development Plan (EMDSDP) defines the sector development agenda for the next 05 (five) financial years from FY2015/16 to 2019/20. This plan is a culmination of a comprehensive sector review process grounded on a new National Planning Framework, the Vision 2040, the second National Development Plan (NDP II) and the various sector policies. The theme for the vision 2040 is, “a transformed Ugandan society from a peasant to a modern and a prosperous country with 30 years”. The theme for the second National Development Plan (NDP II) is “strengthening Uganda’s competitivesness for sustainable wealth creation, employment and inclusive growth”. In line with the vision 2040 and the NDP II theme, the Energy and Mineral Development (EMD) sector, through the Ministry of Energy and Mineral Development is set to continue implementing its prioirities under its mandate. The Ministry’s mandate is to: “Establish, promote the development, strategically manage and safeguard the rational and sustainable exploitation and utilization of energy and mineral resources for social and economic development”. The medium term priorities of the ministry are: - (i) increase electricity generation capacity and expand the transmission network; (ii) increase access to modern energy services through rural electrification and renewable energy development; (iii) promote and monitor petroleum exploration and development in order to achieve sustainable production of oil and gas resources; (iv) develop petroleum refining and pipeline transportation infrastructure; (v) streamline petroleum supply and distribution to promote free and fair competition in petroleum supply and marketing industry; and (vi) promote and regulate mineral exploration, development, production and value addition.
    [Show full text]
  • Your Lake Victoria Experience Starts Here!
    Menu Noted as one of the "World’s Best Secret Islands" by the BBC's travel and culture documentary "Lonely Planet", the Ssese Islands on Lake Victoria comprise of 84 small islands, the second largest of which is Bukasa. With very few inhabitants, Bukasa Island boasts many natural forests, grasslands, beaches, a natural waterfall with plunge pool and a unique tranquility surrounded by beautiful and interesting ora and fauna. The Serendipity Holiday Resort Welcomes You To Lake Victoria Set in over 100 acres of privately own land the Serendipity Holiday Resort is the perfect getaway for peace, tranquility, luxury and escapism. However, we also oer a whole range of activities from a variety of water sports through to nature walks, shing and safari excursions. Simply put, we cater for your requirements... Your Lake Victoria Experience Starts Here! Accommodation Island Beauty With a range of accommodation from luxury camping Breathtaking tranquility awaits you in the surrounding pods to exquisite African style self contained beauty and nature of Bukasa Island's beaches and apartments. Beach front or woodland locations and all forests. Flowers, plants, scenery and wildlife are all distributed to ensure privacy without compromising great natural attractions with a variety of birds and the beautiful views and surroundings... Read more... home to the Vervet Monkeys... Read more... Facilities Activities Menu All accommodation suites have a private shower (or Enjoy Bukasa Island nature walks, guided trails, quad bath in some cases), a TV with pre-loaded movies, trekking, Ssese Island excursions, jet skiing, banana series and music, plus a mini fridge, tea making boat rides, freedom yer exhilaration, the Seabreacher facilities and WiFi.
    [Show full text]
  • Planned Shutdown March 2021
    PLANNED SHUTDOWN FOR MARCH 2021 SYSTEM IMPROVEMENT AND ROUTINE MAINTENANCE REGION DAY DATE SUBSTATION FEEDER/PLANT PLANNED WORK DISTRICT AREAS & CUSTOMERS TO BE AFFECTED North Eastern Wednesday 03rd March 2021 UETCL Hoima Kinubi 33kV Creating h-p tee-off to install dropout fused isolator for direct Hoima Kibati TC, Kalyabuhire kibati t-off and line clearance Kampala West Wednesday 03rd March 2021 Kisugu 11kV and 33kV switchgear Routine Maintenance Kabalagala Kitaranga,Kiwafu,Meya Beach,Kemifa,Nabutiti,Wheeling Zone,Prayer Palace,Wonder world,Comrade bar,Galax FM,Seroma,Mutesasira zone,Internal East Africa University,Shell Kansanga,Elite supermarket,Saida Bumba, Olanya,Kadaga,Diplomatic hotel,Paradiso hotel,Internatiol Hospital Kampala,Kisugu church of Uganda,Zimwe road,Mukwano Apartment,Kabalagala Police station,Diposh bar,Kironde road,General Machinery,Bukasa, parts of Namuwongo, Seebo Green, Bukasa stone quarry,Musisi road,Water tank Hill,Muyenga Umeme mast,Benging Clinic,Muyenga High school, Muyenga chicken tonigt.Heritage International school, Kisugu ,Kibuli,Kikubamutwe,Kibuli mosque,CID Headquarters,Part of Police barracks,Namuwongo publication,Multiple Industry,Sure telecom switching station,Kakungulu Memorial,Kibuli sec sch,Green Hill Academy Kampala West Wednesday 03rd March 2021 Kisugu 11kV and 33kV Take-off MV Cable Inspection,Replacement of rotten structures & jumper Kabalagala Kitaranga,Kiwafu,Meya Beach,Kemifa,Nabutiti,Wheeling Zone,Prayer Palace,Wonder Structures, Lugogo repairs world,Comrade bar,Galax FM,Seroma,Mutesasira
    [Show full text]
  • Geology of Kibiro, Katwe and Buranga Geothermal Prospects of Uganda
    Proceedings of the 4th African Rift Geothermal Conference 2012 Nairobi, Kenya, 21-23 November 2012 Geology of Kibiro, Katwe and Buranga Geothermal Prospects of Uganda James Francis Natukunda Department of Geological Survey and Mines (DGSM), P.O. Box 9, Entebbe, Uganda. [email protected] Keywords: rifting, hot springs, fault permeability, geology The Buranga field is located at the NW end of the Rwenzori ABSTRACT massif near the base of Bwamba escarpment. The hot The three main Ugandan geothermal fields namely, Kibiro, springs emerge through Pleistocene sediments. Precambrian Katwe and Buranga are located in the western arm (the rocks underlie the sediments. The main rift fault strikes 450 Albertine Rift) of the East African Rift System (EARS). and dips 600-650. The three hot spring areas namely The general strike of the Albertine Rift is NE-SW. Mumbuga, Nyansimbe and Kagoro lie on a line striking 400 Geophysical surveys indicate 2500 to 3000m thickness of parallel to the main rift fault. Precambrian rocks form the Pleistocene sediments in the rift floor. northern half of the Rwenzori massif that strike 100-300 and consists of migmatites and gneisses. The sediments consist The Kibiro geothermal prospect, which is located at the of fine to medium-grained, poorly consolidated sands and Eastern escarpment of Albertine Rift is comprised of hot clays, some of which are coated with calcareous material. springs that emerge at the base of the escarpment at the The geothermal manifestations of Buranga field include intersection of three oblique faults. The escarpment forms a three hot spring areas with a maximum temperature of boundary between the old basement rocks (to the east) and 980C, travertine cones and some sulphur deposits at Kagoro the young sedimentary formation of the rift (to the west).
    [Show full text]
  • Office of the Auditor General
    THE REPUBLIC OF UGANDA OFFICE OF THE AUDITOR GENERAL ANNUAL REPORT OF THE AUDITOR GENERAL FOR THE YEAR ENDED 30TH JUNE 2014 VOLUME 2 CENTRAL GOVERNMENT ii Table Of Contents List Of Acronyms And Abreviations ................................................................................................ viii 1.0 Introduction .......................................................................................................................... 1 2.0 Report And Opinion Of The Auditor General On The Government Of Uganda Consolidated Financial Statements For The Year Ended 30th June, 2014 ....................... 38 Accountability Sector................................................................................................................... 55 3.0 Treasury Operations .......................................................................................................... 55 4.0 Ministry Of Finance, Planning And Economic Development ............................................. 62 5.0 Department Of Ethics And Integrity ................................................................................... 87 Works And Transport Sector ...................................................................................................... 90 6.0 Ministry Of Works And Transport ....................................................................................... 90 Justice Law And Order Sector .................................................................................................. 120 7.0 Ministry Of Justice And Constitutional
    [Show full text]
  • Uganda Electricity Transmission Company Limited (Uetcl) Providing a Reliable Backbone to National Economic Growth
    UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED (UETCL) PROVIDING A RELIABLE BACKBONE TO NATIONAL ECONOMIC GROWTH The Status of the Power Transmission Projects NAME/ AREA OF OBJECTIVES STATUS Nkenda - Fort Por- To evacuate the upcoming ◆ Supervision consultant Contract Kabulasoke-Kiboga- This project is needed urgently to ◆ Procurement of consultant for PROJECT tal-Hoima 220kV thermal power plant to be awarded to Ficthner Gmbh. Hoima 132kV evacuate surplus power technical Assessment, detailed lines (234km). located at Kabaale as well as ◆ EPC contract for construction of (187km). from the 9MW generated by Buse- design, ESIA and RAP and Supervi- PROJECTS UNDER IMPLEMENTATION power generated by the mini transmission line was awarded to KEC ruka and 5MW by Kinyara power sion EPC works ongoing. Bujagali Interconnec- Provision of adequate ◆ Project was concluded and commissioned hydros and co-generation International. Works are ongoing with plants to the National Grid. ◆ Funded by GoU. tion Project (Bujag- transmis- sion capacity to in 2012. power stations in the project 80% completion To provide transmission capacity ali-Kawanda 220kV, evacuate power generated area including Buseruka ◆ EPC contract for construction of to meet the growing demand and 75km; Kawanda-Mu- at Bujagali Hydro Power (Hydromax – 10MW), Muzizi Substations was awarded to Shan- improve power supply quality and tundwe 132kV, Station (HPS) to the exist- (40MW), Waki (5MW), dong Taikai Power Engineering Co. reliability in the districts of Hoima, 17km; Bujagali-Na- ing National grid. Kinyara (4-40) MW. Ltd. Works are ongoing with 70% Mityana and Mubende. lubaale 132kV, To improve power supply completion. Masaka – Mbarara ◆ To provide adequate transmission ◆ Procurement of Supervision 8km, Bujagali-Tororo quality, security, reliability and ◆ RAP Implementation ongoing with 220kV (135km).
    [Show full text]