(For Use Only to Provide Instructions to Crown Law for Purpose of State
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Overview March 19 Ewen Maddock Dam Is One of Several Dams in South East Queensland Scheduled to Be Upgraded As Part of Our O
Overview March 19 Ewen Maddock Dam is one of several dams in South East Queensland scheduled to be upgraded as part of our ongoing Dam Improvement Program. The upgrade work is set to begin from July 2019 and will include strengthening the existing embankment and raising the dam wall to increase its floodwater capacity. Work is expected to take up to 18 months, subject to weather conditions and other unexpected delays. About the Dam Ewen Maddock Dam is part of the SEQ Water Grid – a connected network of dams, treatment plants, reservoirs and pipelines supplying drinking water to the region. The dam was constructed across Addlington Creek, a tributary of the Mooloolah River. Construction of the dam was completed in 1976 and the full supply level (FSL) was raised in 1982. Following the independent dam safety review in 2010, a number of improvements were identified at Ewen Maddock Dam and approved for delivery in two stages. In 2012, the stage one upgrade of the dam involved the installation of pressure relief wells into the foundation materials, and construction of a sand filter buttress and overlying weighting berm made of clay along the downstream embankment toe. In 2016, Seqwater engaged an engineering consultant to develop the second stage of the upgrade design. More than twenty-one options were identified during this process. About the Dam Safety Upgrade On 1 February 2019, the Minister for Natural Resources, Mines and Energy, Dr Anthony Lynham, announced the project will begin in 2019. The media release can be read here. http://statements.qld.gov.au/Statement/2019/2/1/20m-upgrade-work- for-ewen-maddock-dam The 2019 - 2020 stage two upgrade option will: • add sand filters to the existing earthfill embankment • raise the embankment height with a parapet wall, to increase flood capacity • strengthen the concrete spillway • raise the training walls of the spillway • install emergency outlets in the spillway to enable reservoir drawdown in the case of a dam safety incident. -
Seqwater Recreation Guide WAPPA
Wappa Dam RECREATION GUIDE seqwater.com.au About OUR VISION Wappa Dam To manage access to recreation Wappa Dam is located west of Yandina in the Sunshine Coast opportunities while protecting hinterland. The dam was constructed in 1963 on the South Maroochy natural resources and water quality. River and supplies drinking water to the interconnected supply network. The lake has a catchment area of approximately 69.7km2 and holds 4694 megalitres of water at full supply. Spillway Lookout The lookout at Jack Harrison Park located at Wappa Park Road, Kiamba, is a great place to view the dam when it is spilling. RECREATION REVIEW UPDATE Seqwater is committed to providing quality recreation facilities that everyone can enjoy. We wanted to know what the community thought of current facilities and what suggestions you had for the future, so in 2013 we started a full Recreation Review across our assets. We appreciate the efforts of everyone who took the time to participate in our workshops and online surveys. While we want to implement as many ideas as possible, Seqwater must remain committed to protecting our natural environment and minimising the risks to water quality. Some of the changes will be implemented at a later date, once further funding has been secured and all environmental impact analysis has been completed. Progress updates, along with details of the feedback received is available at seqwater.com.au/recreview. We value the unique status of the Jinibara People as the original owners and custodians of the land and water around Wappa Dam. 2 Wappa Dam RECREATION GUIDE Wappa Dam RECREATION GUIDE 3 Protecting our waterways & the environment We all need to do our part to ensure we keep our • cleaning and drying anything that came into waterways healthy. -
Seqwater's 22 October Submission / Response To
SEQWATER’S 22 OCTOBER SUBMISSION / RESPONSE TO QCA REQUEST OF 12 OCTOBER 12 October 2012 I hereby provide Seqwater with a further information request. Seqwater’s detailed responses to each item would be appreciated by COB 19 October 2012, please. Happy to discuss at any time noting the proposed due date of COB 19 October 2012 From: Colin Nicolson [mailto:[email protected]] Sent: Friday, 19 October 2012 1:10 PM To: Angus MacDonald Cc: George Passmore; Damian Scholz Subject: FW: Information Request 12 October 2012 Hello Angus Here are our responses to the above information request. QCA Question 1 - Cedar Pocket Stakeholders (Issues Arising (IA) Cedar Pocket 2012) submitted that more details were required regarding Seqwater’s proposed renewals expenditure [outlined in the NSP] on “electricity supply assets” in 2025-26 at $30,000. Please provide more details regarding this proposed expenditure. Seqwater Response to Item 1 The Assets in question are a property pole, meter box (excluding the meters), cabling and a distribution board. The renewal is scheduled based on the Seqwater “standard asset life” of 20 years for this type of equipment. It was installed in 2005 and will be 20 years old when the work is scheduled. The cost estimate is drawn from the estimated replacement costs as set out in Section 5.2.2 and Section 9 of the Irrigation Infrastructure Renewal Projections - 2013/14 to 2046/47 Report on Methodology. The renewal timing, will be reviewed on an ongoing basis so that it is only delivered when condition warrants. The scope and cost estimate will be reviewed prior to commencement of work to ensure the delivery is efficient. -
South East Queensland Floods January 2008
South East Queensland Floods January 2008 1 2 3 1. Roads flood in Jimboomba - Photo from ABC website. User submitted Ben Hansen 2. Roads flood in Rathdowney - Photo from ABC website. 3. The Logan River floods at Dulbolla Bridge, reaching its peak in the morning of January 5, 2008. The river's banks burst … isolating the town of Rathdowney. Photo from ABC website. Note: 1. Data in this report has been operationally quality controlled but errors may still exist. 2. This product includes data made available to the Bureau by other agencies. Separate approval may be required to use the data for other purposes. See Appendix 1 for DNRW Usage Agreement. 3. This report is not a complete set of all data that is available. It is a representation of some of the key information. Table of Contents 1. Introduction ................................................................................................................................................... 2 Figure 1.0.1 Peak Flood Height Map for Queensland 1-10 January 2008.................................................. 2 Figure 1.0.2 Peak flood Height Map for South East Queensland 1-10 January 2008 ................................ 3 Figure 1.0.3 Rainfall Map of Queensland for the 7 Days to 7th January 2008 ............................................ 4 2. Meteorological Summary.......................................................................................................................... 5 2.1 Meteorological Analysis....................................................................................................................... -
Schedule a - Urban Utilities High Level Water Restrictions
Schedule A - Urban Utilities High Level Water Restrictions This schedule details the way in which potable water from the Seqwater bulk water supply is permitted to be used after commencement of High Level Water Restrictions. For assistance with interpretation of this document please refer to the definition section at the end of this document. Category High Level Water Restrictions 1.1 Residential and non- Total ban on sprinklers. Hand-held hoses with a twist or trigger nozzle can be used for watering established residential premises gardens and lawns: a. Odd numbered properties Watering established gardens and lawns - 4am-8am and 4pm-8pm - Tuesday and Saturday (Note this does not include b. Even or un-numbered properties production and sale area - 4am-8am and 4pm-8pm irrigation for non-residential - Wednesday and Sunday consumers) Bucket or watering can may be used at any time. Only one hose at a time can be used at the property. The following are not permitted: ‐ Hoses without a twist or trigger nozzle ‐ Hoses which are not hand- held (e.g. left to run hooked in a tree). Category High Level Water Restrictions 1.2 Residential premises As per restriction item 1.1 Watering of gardens only for residents eligible for concession 1.3 Residential and non- Wasting water by way of leaking taps and plumbing fittings and overflowing containers or structures (including residential premises but not limited to pools, spas and rainwater tanks) and allowing water to flow onto roads, pathways and driveways during is prohibited. Water wastage 1.4 Residential and non- Sprinklers with a timer and hand- held hoses with a twist or trigger nozzle can be used for watering newly residential properties established gardens and lawns: Watering newly established a. -
Water for South East Queensland: Planning for Our Future ANNUAL REPORT 2020 This Report Is a Collaborative Effort by the Following Partners
Water for South East Queensland: Planning for our future ANNUAL REPORT 2020 This report is a collaborative effort by the following partners: CITY OF LOGAN Logo guidelines Logo formats 2.1 LOGO FORMATS 2.1.1 Primary logo Horizontal version The full colour, horizontal version of our logo is the preferred option across all Urban Utilities communications where a white background is used. The horizontal version is the preferred format, however due to design, space and layout restrictions, the vertical version can be used. Our logo needs to be produced from electronic files and should never be altered, redrawn or modified in any way. Clear space guidelines are to be followed at all times. In all cases, our logo needs to appear clearly and consistently. Minimum size 2.1.2 Primary logo minimum size Minimum size specifications ensure the Urban Utilities logo is reproduced effectively at a small size. The minimum size for the logo in a horizontal format is 50mm. Minimum size is defined by the width of our logo and size specifications need to be adhered to at all times. 50mm Urban Utilities Brand Guidelines 5 The SEQ Water Service Provider Partners work together to provide essential water and sewerage services now and into the future. 2 SEQ WATER SERVICE PROVIDERS PARTNERSHIP FOREWORD Water for SEQ – a simple In 2018, the SEQ Water Service Providers made a strategic and ambitious statement that represents decision to set out on a five-year journey to prepare a holistic and integrated a major milestone for the plan for water cycle management in South East Queensland (SEQ) titled “Water region. -
Fact Sheet Wivenhoe Dam
Fact sheet Wivenhoe Dam Wivenhoe Dam Wivenhoe Dam’s primary function is to provide a safe drinking Key facts water supply to the people of Brisbane and surrounding areas. It also provides flood mitigation. Name Wivenhoe Dam (Lake Wivenhoe) Watercourse Brisbane River The water from Lake Wivenhoe, the reservoir formed by the dam, is stored before being treated to produce drinking water Location Upstream of Fernvale and follows the water journey of source, store and supply. Catchment area 7020.0 square kilometres Length of dam wall 2300.0 metres Source Year completed 1984 Wivenhoe Dam is located on the Brisbane River in the Somerset Type of construction Zoned earth and rock fill Regional Council area. embankment Spillway gates 5 Water supply Full supply capacity 1,165,238 megalitres Wivenhoe Dam provides a safe drinking water supply for Flood mitigation 1,967,000 megalitres Brisbane, Ipswich, Logan, Gold Coast, Beaudesert, Esk, Gatton, Laidley, Kilcoy, Nanango and surrounding areas. The construction of the dam involved the placement of around 4 million cubic metres of earth and rock fill, and around 140,000 Wivenhoe Dam was designed and built as a multifunctional cubic metres of concrete in the spillway section. Excavation facility. The dam was built upstream of the Brisbane River, of 2 million cubic metres of earth and rock was necessary to 80 kilometres from Brisbane City. At full supply level, the dam construct the spillway. holds approximately 2,000 times the daily water consumption needed for Brisbane. The Brisbane Valley Highway was relocated to pass over the dam wall, while 65 kilometres of roads and a number of new Wivenhoe Dam, along with the Somerset, Hinze and North Pine bridges were required following construction of the dam. -
Obi Obi Creek Fencing & Revegetation (Macleod)
Projects 2014-15 Obi Obi Creek Fencing & Revegetation (Macleod) PROJECT PLAN Project No. 1415-006 This Project Plan has been prepared by: Mark Amos Project Manager Lake Baroon Catchment Care Group PO Box 567 Maleny, Qld, 4552 Phone (07) 5494 3775 Email [email protected] Website www.lbccg.org.au Disclaimer While every effort has been made to ensure the accuracy of this Project Plan, Lake Baroon Catchment Care Group makes no representations about the accuracy, reliability, completeness or suitability for any particular purpose and disclaims all liability for all expenses, losses, damages and costs which may be incurred as a result of the Plan being inaccurate or incomplete in any way. How to use this Plan This Plan is split into three distinct sections. The Summary (pp. 5-6) is a two page brief description of the project and includes details of the stakeholders, budgets, outputs and outcomes. The Project Plan (pp. 7-13) outlines the main details involved in implementing the project and in most cases should explain the project sufficiently. The Attachments (pp. 14-42) provides additional information to support the Project Plan. The various numbered Contents in the Project Plan directly correspond with the numbered sections in the Attachments and provides further information. Terms used in this Plan Lake Baroon and Baroon Pocket Dam are used interchangeably, although Lake Baroon is usually used when referring to the catchment and Baroon Pocket Dam refers to the dam as commercial water storage. PROJECT VERSIONS & APPROVALS Date Version/Description Result April 2014 Sunshine Coast Council Landholder Environment Grant Approved June 2014 November 2014 Draft LBCCG Project Proposal n/a 11/12/2014 Project presented to LBCCG Committee TBA (Minutes) Project Proposal forwarded to Seqwater for approval (email) TBA (A. -
40736 Open Space Strategy 2011 FINAL PROOF.Indd
58 Sunshine Coast Open Space Strategy 2011 Appendix 2: Detailed network blueprint The Sunshine Coast covers over 229,072 ha of land. It contains a diverse range of land forms and settings Existing including mountains, rural lands, rivers, lakes, beaches Local recreation park and diverse communities within a range of urban and District recreation park rural settings. Given the size and complexity of the Sunshine Coast open space, the network blueprint Sunshine Coast wide recreation park provides policy guidance for future planning. It addresses existing shortfalls in open space provision as Sports ground well as planning for anticipated requirements responding Amenity reserve to predicted growth of the Sunshine Coast. Environment reserve The network blueprint has been prepared based on three Conservation estate planning catchments to assist readers. Specific purpose sports The three catchments are: Urban Development Area Sunshine Coast wide – recreation parks, sports under ULDA Act 2007 grounds, specific purpose sports and significant Existing signed recreation trails recreation trails that provide a range of diverse and Regional Non-Urban Land Separating unique experiences for users from across the Sunshine Coast from Brisbane to Sunshine Coast. Caboolture Metropolitan Area Community hub District – recreation parks, sports grounds and Locality of Interest recreation trails that provide recreational opportunities boundary at a district level. There are seven open space planning districts, three rural and four urban. Future !( Upgrade local recreation park Local – recreation parks and recreation trails that !( Upgrade Sunshine Coast wide/ provide for the 32 ‘Localities of Interest’ within the district recreation park Sunshine Coast. !( Local recreation park The network blueprint for each catchment provides an (! District recreation park overview of current performance and future directions by category. -
Strategic Framework December 2019 CS9570 12/19
Department of Natural Resources, Mines and Energy Queensland bulk water opportunities statement Part A – Strategic framework December 2019 CS9570 12/19 Front cover image: Chinaman Creek Dam Back cover image: Copperlode Falls Dam © State of Queensland, 2019 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Hinze Dam Queensland bulk water opportunities statement Contents Figures, insets and tables .....................................................................iv 1. Introduction .............................................................................1 1.1 Purpose 1 1.2 Context 1 1.3 Current scope 2 1.4 Objectives and principles 3 1.5 Objectives 3 1.6 Principles guiding Queensland Government investment 5 1.7 Summary of initiatives 9 2. Background and current considerations ....................................................11 2.1 History of bulk water in Queensland 11 2.2 Current policy environment 12 2.3 Planning complexity 13 2.4 Drivers of bulk water use 13 3. -
Purified Recycled Water in the Lockyer Valley
Fact Sheet December 2012 Purified Recycled Water in the Lockyer Valley The water supply security of South East Queensland (SEQ) has recently been increased by the construction of the Western Corridor Recycled Water Scheme. The infrastructure of advanced wastewater treatment plants provides purified recycled water (PRW) to the SEQ Water Grid for indirect potable reuse of effluent from urban areas. With a maximum combined production capacity of 232 million litres of PRW a day, it is the third largest recycled water scheme in the world and the largest in the southern hemisphere. This additional water supply is critical during drought conditions but is underused in wet periods. The provision of recycled water in an environmentally Background sound and socially-equitable manner requires measured The Urban Water Security Research Alliance (the Alliance) understanding of the potential impacts on the region’s worked closely with the Queensland Water Commission, soils, groundwater system, environment (such as salinity the former Queensland Department of Environment and issues) and the economy. Therefore, a holistic framework Resource Management, WaterSecure (now Seqwater) and was required to inform an integrated water management the SEQ Water Grid Manager, as well as irrigators and the plan involving the use of PRW. This was achieved through farming community. a multi-tiered assessment incorporating environmental risk analysis, climate modelling, regulatory considerations and Together we explored the feasibility of providing agro-economics. approximately 20 million litres per year of PRW to supplement irrigation supplies in the Lockyer Valley, 80 km The environmental risks and benefits from the supply of PRW west of Brisbane. were the core subjects addressed by this research, using a combination of field research, water quality and quantity Alliance research explored whether the use of PRW can serve modelling , and unstructured stakeholder interviews. -
Darling Downs - DD1
Priority Agricultural Areas - Darling Downs - DD1 Legend Railway Regional Plans boundary Parcel boundary C o g o Lake and dam o n R i Priority Agricultural Area ver DD4 DD7 DD1 DD5 DD8 M a r a n o a DD2 DD3 DD6 DD9 R iv e r r ive e R onn Bal 02.25 4.5 9 13.5 18 Ej Beardmore Dam kilometres B a l o n To the extent permitted by law, The Department of State Development, n e Infrastructure and Planning gives no warranty in relation to the material or R i information contained in this data (including accuracy, reliability, v e r completeness or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage arising from its use. Priority Agricultural Areas - Darling Downs - DD2 Legend Bollon St George Railway Regional Plans boundary Parcel boundary Lake and dam Priority Agricultural Area DD4 DD7 Ba DD1 DD5 DD8 lo n n e R i v DD2 DD3 DD6 DD9 e r r e iv R n a rr Na Dirranbandi ive r lgo a R Cu r e v i R a 02.25 4.5 9 13.5 18 ar k h kilometres Bo To the extent permitted by law, The Department of State Development, Infrastructure and Planning gives no warranty in relation to the material or information contained in this data (including accuracy, reliability, Lake Bokhara completeness or suitability) and accepts no liability (including without limitation, Hebel liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage New South Wales arising from its use.