Bronx Community Board Four District Manager's Report for February

Total Page:16

File Type:pdf, Size:1020Kb

Bronx Community Board Four District Manager's Report for February Bronx Community Board Four District Manager’s Report for February & March 2008 Submitted by: José Rodriguez, District Manager FEBRUARY On February 13th Ms. Ezell and Ms. Saunders and I attended the Mayor’s PlaNYC Workshop on neighborhood parking. The Focus of the workshop was centered on the Yankee Stadium area of our district. The following Data collection method was used in preparation for the workshop. 4,542 vehicles were surveyed in the study area. The focus area was from 165th Street to the North, 150th Street to the South, The Major Deegan Expressway/Exterior Street to the West and Morris Avenue‐ Concourse Village East to the East. The data collection found the following statistics. 18% of vehicles that were surveyed in the AM period were still there in the PM period. Among the total available residential spots 85% were occupied in the AM period. 97%percent were occupied in the PM period and 96% were occupied in the Saturday period. Lastly, about 35% of spaces turn over every hour across all time periods. The workshop also focused on Residential Parking Permits. The Following options were presented as possible initiatives. Option A 8‐24 Hour Permit‐Only Parking‐permits required to park on residential streets during hours that RPP is in effect eight to twenty‐four hours. Option B 1‐2 hour Permit Only Parking‐permit required to park on a residential street during hours that RPP is in effect one to two hours per day, staggered on each side of the street. Option C8‐24 Hour Residential Parking Permit plus $ 8 a day Fee‐permit required to park on a residential street during hours that RPP is in effect eight to twenty‐four hours. Option D 1‐2 Hour Permit Only Parking plus $8 a day Fee‐permit required to park on a residential street during hours that RPP is in effect one to two hours per day, staggered on each side of the street. Please note that the above mentioned will be discussed at length at tonight’s meeting. On February 15th The Macombs Dam Park/Yankee Stadium Project Briefing Parks and Recreation Project Updates Ballfield in West Bronx‐The site has demobilized for the Winter and once the weather warms up to a consistent 50 degrees, Parks will begin to lay down the ballfield. The field’s anticipated opening is the spring. 1 District Manager’s Report-Jose Rodriguez, District Manager Ballfield at PS 29 ‐Parks expects this field to be open at the start of its Spring permit season. Macombs Dam Park will be constructed in two phases. The construction of the 1st phase will be complete in Spring 09. The 2nd phase will be constructed by Spring 2010. Ruppert Place ‐the plaza will be open by Fall 2011. Heritage Field construction will be completed in the Fall of 2011. The Bronx Terminial Market Waterfront Park should be open in the Winter of 2009‐2010. Parks is expected to start construction on the shell of Building J in April, and the interior in the Fall of 08. They expect this building to earn a Silver LEED certificate. River Avenue Parks are slated to be completed in Spring 08. Mullaly Park North should be completed in June 08. Mullaly Park South should be completed in the Spring of 09. Local Street Planting Initiative‐the next planting season will begin on March 15th and is expected that plantings of 1,000 trees will be done this Spring season. Community Concerns regarding Yankee’s Home Opener are as follows. Illegal parking on Sidewalks and plazas‐Suggestions: place parade barriers NYPD indicated that summonses will be issued and vehicles will be towed and will work with the Yankee organization and local parking lots to assist in fan parking. Local garages have upgraded their signage to direct fans in the most efficient way. In addition, DOT will work to ensure that they update signage directing fans to the correct lots On February 20th District Service Cabinet Meeting the following agencies and groups were in attendance. DEP 44th PCT. DOS DOT DPR DOH FDNY NYS Comptroller’s Office Senator Ruth Hassell‐Thompson’s Office Bronx District Attorney’s Office NYCTA‐MTA DOHMH Samaritan Village The following are the minutes from the DSC on February 20th. Mr. Jose Rodriguez opened the meeting at 9:45 am and asked everyone to review the minutes. If there are no objections/corrections, minutes were adopted. He then introduced Ms. D. Lee Ezell, Board Chair. Ms. Ezell welcomed everyone to the DSC meeting and then officially and formally introduced the new District Manager, Mr. Jose Rodriguez. A round of applause was given to Mr. Rodriguez on his appointment. She asked the agencies for their assistance in welcoming him in his new position while fostering his relations with representatives. Mr. Rodriguez thanked Ms. Ezell for the kind words. He also thanked Ms. Thompson for her assistance and help in organizing his first DSC meeting. Agenda ITEM #'s: 2 District Manager’s Report-Jose Rodriguez, District Manager DEPARTMENT OF ENVIRONMENTAL PROTECTION Ms. Eleftheria Ardizzone, Community Coordinator for Bronx DEP, reported that the agency has enhanced their services requests that are sent to the Boards on a monthly basis. DEP deals with sewer issues, water and noise. There are currently no capital projects in Board 4. NYPD 44TH PRECINCT MONTHLY ACTIVITY REPORT Mr. Rodriguez informed everyone that there is a new Commanding Officer at the 44th Precinct, he introduced and welcomed Deputy Inspector Dermot Shea to the district. Deputy Inspector Shea said a few words and looks forward to working with everyone. DEPARTMENT OF SANITATION Superintendent David Martin explained that Supt. Corbin is off today and he introduced himself and stated that there is nothing to report at this time. In reference to the DOHMH Rodent Initiative, he stated that DOS is working with DOHMH on this initiative. DEPARTMENT OF TRANSPORTATION Commissioner Constance Moran, Bronx/DOT, welcomed Jose Rodriguez to his new position and she also welcomed D.I. Shea, whom she has worked very closely with in the past. Reconstruction of the Grand Concourse – Commissioner Moran introduced the new liaison for the project, Ms. Melissa Johnson. She is available at the Field Office located on the Grand Concourse for any questions or concerns. They were scheduled to re‐open the southbound service lane on 161st Street at the end of March however; it will open earlier on March 20th. The project will be totally complete in November 2008, which is 361 days earlier than expected. They are near the end of the project; planting will start in the spring. All decorative street lights have been completed. 161st Street Underpass – The work on the underpass is 96% complete. Punch work to be done including stained of the underpass walls. The paint used for the underpass will be anti graffiti, it is stained then a coating is put on it. The colors are green and blue and have been approved by the Art Commission. It is a quick process to do and there is no need to close the underpass to do it. Commissioner Moran spoke about a joint site visit with various City agencies on Plimpton Avenue re: resident’s complaint of buses. It appears to be a roadway issue. 153rd Street Bridge – they are preparing the bid documents now and will come before the Board for a presentation. DEPARTMENT OF PARKS AND RECREATION Mr. Frank McMorrow, Park Manager, distributed information on the Bronx Speak Up to be held on Saturday, February 23rd from 1:00pm‐5:00pm at Lehman College. Update on construction projects in District 4 – ball field at West Bronx Recreation Center will be available in the Spring, they still have to put down the astro turf (synthetic field) when weather permits. Mullaly Park is on schedule with expected completion in June. The Yankee construction project is moving along. Mr. McMorrow reported that there is a special tree planting project in CB#4 for tree replacement. This program is to replace the trees lost from Macombs Park and the planting is going on schedule; 2,173 trees were planted in 2007. 1,294 trees planted for the Fall and they are looking to plant at least 1,000 trees every season, with a 4‐year contract for the tree planting. ITEM #4‐REPORT FROM THE NYC DEPARTMENT OF HEALTH & MENTAL HYGIENE DEPARTMENT OF HOMELESS SERVICES Mr. Randy Quezada, Director of Community Relations/DHS, stated that his agency is chartered with the task, on the behalf of the City; they have asked the agency to end homelessness by the time the Mayor leaves office. They seek to prevent homelessness where possible and provide shelter where needed. 3 District Manager’s Report-Jose Rodriguez, District Manager The City operates under the Facto Right to Shelter, which came about through litigation and monitored closely by the State and the courts. They have expanded their homeless prevention program, it started in six community districts due to success of the pilot program, and it has now been expanded citywide. He noted that anyone who is experiencing a housing crisis and have not yet been evicted, they should contact the DHS or a home base provider. The program has a 97% success rate in preventing homelessness. DHS provides shelter for single adults and families. Single adults coming into the shelter system do so through the intake center at 30th Street in Manhattan. Women intake centers are located in Bronx, Brooklyn and Queens available 24/7 and can access information by calling 311. Families entering the shelter system has an eligibility process that requires them to show where they have lived for the past two years and it has to be determined that they don’t have anywhere else to go.
Recommended publications
  • Bronx Civic Center
    Prepared for New York State BRONX CIVIC CENTER Downtown Revitalization Initiative Downtown Revitalization Initiative New York City Strategic Investment Plan March 2018 BRONX CIVIC CENTER LOCAL PLANNING COMMITTEE Co-Chairs Hon. Ruben Diaz Jr., Bronx Borough President Marlene Cintron, Bronx Overall Economic Development Corporation Daniel Barber, NYCHA Citywide Council of Presidents Michael Brady, Third Avenue BID Steven Brown, SoBRO Jessica Clemente, Nos Quedamos Michelle Daniels, The Bronx Rox Dr. David Goméz, Hostos Community College Shantel Jackson, Concourse Village Resident Leader Cedric Loftin, Bronx Community Board 1 Nick Lugo, NYC Hispanic Chamber of Commerce Milton Nuñez, NYC Health + Hospitals/Lincoln Paul Philps, Bronx Community Board 4 Klaudio Rodriguez, Bronx Museum of the Arts Rosalba Rolón, Pregones Theater/Puerto Rican Traveling Theater Pierina Ana Sanchez, Regional Plan Association Dr. Vinton Thompson, Metropolitan College of New York Eileen Torres, BronxWorks Bronx Borough President’s Office Team James Rausse, AICP, Director of Planning and Development Jessica Cruz, Lead Planner Raymond Sanchez, Counsel & Senior Policy Manager (former) Dirk McCall, Director of External Affairs This document was developed by the Bronx Civic Center Local Planning Committee as part of the Downtown Revitalization Initiative and was supported by the NYS Department of State, NYS Homes and Community Renewal, and Empire State Development. The document was prepared by a Consulting Team led by HR&A Advisors and supported by Beyer Blinder Belle,
    [Show full text]
  • NYC Park Crime Stats
    1st QTRPARK CRIME REPORT SEVEN MAJOR COMPLAINTS Report covering the period Between Jan 1, 2018 and Mar 31, 2018 GRAND LARCENY OF PARK BOROUGH SIZE (ACRES) CATEGORY Murder RAPE ROBBERY FELONY ASSAULT BURGLARY GRAND LARCENY TOTAL MOTOR VEHICLE PELHAM BAY PARK BRONX 2771.75 ONE ACRE OR LARGER 0 00000 00 VAN CORTLANDT PARK BRONX 1146.43 ONE ACRE OR LARGER 0 01000 01 ROCKAWAY BEACH AND BOARDWALK QUEENS 1072.56 ONE ACRE OR LARGER 0 00001 01 FRESHKILLS PARK STATEN ISLAND 913.32 ONE ACRE OR LARGER 0 00000 00 FLUSHING MEADOWS CORONA PARK QUEENS 897.69 ONE ACRE OR LARGER 0 01002 03 LATOURETTE PARK & GOLF COURSE STATEN ISLAND 843.97 ONE ACRE OR LARGER 0 00000 00 MARINE PARK BROOKLYN 798.00 ONE ACRE OR LARGER 0 00000 00 BELT PARKWAY/SHORE PARKWAY BROOKLYN/QUEENS 760.43 ONE ACRE OR LARGER 0 00000 00 BRONX PARK BRONX 718.37 ONE ACRE OR LARGER 0 01000 01 FRANKLIN D. ROOSEVELT BOARDWALK AND BEACH STATEN ISLAND 644.35 ONE ACRE OR LARGER 0 00001 01 ALLEY POND PARK QUEENS 635.51 ONE ACRE OR LARGER 0 00000 00 PROSPECT PARK BROOKLYN 526.25 ONE ACRE OR LARGER 0 04000 04 FOREST PARK QUEENS 506.86 ONE ACRE OR LARGER 0 00000 00 GRAND CENTRAL PARKWAY QUEENS 460.16 ONE ACRE OR LARGER 0 00000 00 FERRY POINT PARK BRONX 413.80 ONE ACRE OR LARGER 0 00000 00 CONEY ISLAND BEACH & BOARDWALK BROOKLYN 399.20 ONE ACRE OR LARGER 0 00001 01 CUNNINGHAM PARK QUEENS 358.00 ONE ACRE OR LARGER 0 00001 01 RICHMOND PARKWAY STATEN ISLAND 350.98 ONE ACRE OR LARGER 0 00000 00 CROSS ISLAND PARKWAY QUEENS 326.90 ONE ACRE OR LARGER 0 00000 00 GREAT KILLS PARK STATEN ISLAND 315.09 ONE ACRE
    [Show full text]
  • Macombs Dam Park Seeks Upkeep $$
    Feb. 23-29, 2012 To Advertise Call: 718-615-2520 Eldercare Online: www.yournabe.com Free inside today TODAY nity classifieds s 26,29,31 Business Opps Pg 31 Instruction Pgs 27-29,31 Merchandise Pg 31 Free Inside: p Wanted • Financing / Loans • Career Training • Garage / Yard Sales The Bronx’s elp Wanted • Business For Sale • Education Services • Merchandise Wanted elp Wanted • Misc. Business Opps • Tutoring • Merchandise For Sale • And More • And More • And More d Pg 30 Real Estate Pg 32 Services Pg 32 Automotive Pg 32 l, Commercial • Rentals • Beauty Care • Autos For Sale ntial Services • Properties For Sale • Handymen • Autos Wanted • Open Houses • Home Improvement • And More ovement • Commercial RE • And More torage • And More To Place Your Ad Call 718-615-2520 DICAL ➤ MEDICAL ➤ MEDICAL ➤ MEDICAL ➤ SALES 12 pages of 8-page Elder Care Number One P WANTED HELP WANTED HELP WANTED HELP WANTED HELP WANTED SALES OPPORTUNITIES Dental Assistant RN's, LPN's, BEAUTY Dist. for PAUL Dialysis Nurses/ Techs & MITCHELL, seeks exp'd, Orthodontist Office aggressive, self-motivated Psych Techs (With Exp) sales rep to service salons Work experience and references required, in Bronx. Est. territory. tification a plus. Must be highly energized, For Lincoln, Metropolitan & Kings Sal/Comm. PT, 3 days m player with positive attitude and excellent County Hospitals, Woodhull 914-921-1555 x 106 ustomer service and communication skills. Medical Center & multiple full Salary based on experience. Health, service clinics in Manhattan. Call 401k benefits available.
    [Show full text]
  • Harlem River Waterfront
    Amtrak and Henry Hudson Bridges over the Harlem River, Spuyten Duvyil HARLEM BRONX RIVER WATERFRONT MANHATTAN Linking a River’s Renaissance to its Upland Neighborhoods Brownfied Opportunity Area Pre-Nomination Study prepared for the Bronx Council for Environmental Quality, the New York State Department of State and the New York State Department of Environmental Conservation with state funds provided through the Brownfield Opportunity Areas Program. February 2007 Acknowledgements Steering Committee Dart Westphal, Bronx Council for Environmental Quality – Project Chair Colleen Alderson, NYC Department of Parks and Recreation Karen Argenti, Bronx Council for Environmental Quality Justin Bloom, Esq., Brownfield Attorney Paula Luria Caplan, Office of the Bronx Borough President Maria Luisa Cipriano, Partnership for Parks (Bronx) Curtis Cravens, NYS Department of State Jane Jackson, New York Restoration Project Rita Kessler, Bronx Community Board 7 Paul S. Mankiewicz, PhD, New York City Soil & Water Conservation District Walter Matystik, M.E.,J.D., Manhattan College Matt Mason, NYC Department of City Planning David Mojica, Bronx Community Board 4 Xavier Rodriguez, Bronx Community Board 5 Brian Sahd, New York Restoration Project Joseph Sanchez, Partnership for Parks James Sciales, Empire State Rowing Association Basil B. Seggos, Riverkeeper Michael Seliger, PhD, Bronx Community College Jane Sokolow LMNOP, Metro Forest Council Shino Tanikawa, New York City Soil and Water Conservation District Brad Trebach, Bronx Community Board 8 Daniel Walsh, NYS Department of Environmental Conservation Project Sponsor Bronx Council for Environmental Quality Municipal Partner Office of Bronx Borough President Adolfo Carrión, Jr. Fiscal Administrator Manhattan College Consultants Hilary Hinds Kitasei, Project Manager Karen Argenti, Community Participation Specialist Justin Bloom, Esq., Brownfield Attorney Paul S.
    [Show full text]
  • American Society of Landscape Architects Medal of Excellence Nominations C/O Carolyn Mitchell 636 Eye Street, NW Washington, DC 20001-3736
    AMERICAN SOCIETY OF American Society of Landscape Architects LANDSCAPE ARCHITECTS Medal of Excellence Nominations NEW YORK 205 E 42nd St, 14th floor c/o Carolyn Mitchell New York, NY 10017 636 Eye Street, NW 212.269.2984 Washington, DC 20001-3736 www.aslany.org Re: Nomination of Central Park Conservancy for Landscape Architects Medal of Excellence Dear Colleagues: I am thrilled to write this nomination of the Central Park Conservancy for the Landscape Architects Medal of Excellence. The Central Park Conservancy (CPC) is a leader in park management dedicated to the preserving the legacy of urban parks and laying the foundations for future generations to benefit from these public landscapes. Central Park is a masterpiece of landscape architecture created to provide a scenic retreat from urban life for the enjoyment of all. Located in the heart of Manhattan, Central Park is the nation’s first major urban public space, attracting millions of visitors, both local and tourists alike. Covering 843 acres of land, this magnificent park was designated as a National Historic Landmark in 1963 and as a New York City Scenic Landmark in 1974. As the organization entrusted with the responsibility of caring for New York’s most important public space, the Central Park Conservancy is founded on the belief that citizen leadership and private philanthropy are key to ensuring that the Park and its essential purpose endure. Conceived during the mid-19th century as a recreational space for residents who were overworked and living in cramped quarters, Central Park is just as revered today as a peaceful retreat from the day-to-day stresses of urban life — a place where millions of New Yorkers and visitors from around the world come to experience the scenic beauty of one of America’s greatest works of art.
    [Show full text]
  • Charges & Payments Reservations Notes Notes
    Bronx Permits Office FACILITY PERMIT Ranaqua Permit #: 496448 1 Bronx River Parkway Status: Approved Bronx, NY 10462 Agent: Yolanda Alford (718) 430-1848 Date: 8/28/2019 If you suspect that a field is not being used during regularly permitted hours or is being misused please call 311 PSAL 44-36 Vernon Blvd, 4th Fl Approval Long Island City NY 11101 Boro. Commissioner / Permit Coordinator Date: 08/28/2019 Date / User: 07/08/2019, Michelle Young Direct Phone: (718) 707-4200 Phone: (718) 707-4205 Email: [email protected] DISCLAIMER Notice to All Park Users: Smoking will not be allowed within parks and beaches. No Alcoholic Beverages Permitted, No Vehicles Permitted In Parks, Ball fields - No Double Parking Allowed, No Unauthorized Vendors, No BBQ Except In Designated Parks/Areas, Field/Court Must Be Cleaned Up After Use, Parks Is Not Responsible For Equipment Left Behind, No Drugs & No Alcohol Permitted inside park area, No Amplified sound Permitted CHARGES & PAYMENTS DESCRIPTION PARK/FACILITY UNIT FEE QTY TOTAL CHARGES REFUNDS & CREDITS PAYMENTS BALANCE DUE $0.00 $0.00 $0.00 $0.00 RESERVATIONS Event Name: Fall 19 - Soccer (Bronx 3 ADD ON) Attendance: 0 Boro: Bronx Event Type: Sport - Youth Facility: Harris Park: Soccer-01 Sub Type: Soccer -Regulation DATES RESERVED TIME HRS DATES RESERVED TIME HRS Friday - 09/06/2019 03:00 PM to 06:00 PM 3:0 Monday - 09/09/2019 03:00 PM to 06:00 PM 3:0 Thursday - 10/10/2019 03:00 PM to 06:00 PM 3:0 Total Dates: 3 Total Hours 9 hours and 0 minutes NOTES Event Name: Fall 19 - Soccer (Bronx 3 ADD ON)
    [Show full text]
  • Jt Cleary Replaces Fender Systems at Ny's 127-Year-Old
    JOB STORY By Carol Shobrook JT CLEARY REPLACES FENDER SYSTEMS AT NY’S 127-YEAR-OLD BRIDGE New York, NY 28 Pile Buck Magazine | Vol.34 No.2 2018 | pilebuck.com pilebuck.com | Vol.34 No.2 2018 | Pile Buck Magazine 29 JOB STORY ew York City can a major truck connection Robert Macombs built a bridge was constructed and never be accused between upper Manhattan dam at the site with state named after the dam that of not getting and the Bronx, and also as permission in 1814 to power once operated there. its money’s a route from Manhattan to a grist mill. A bridge was JT Cleary was contracted N worth out of Yankee Stadium. Completed built as part of the structure. to replace the existing ma- infrastructure. in 1890 for $1.3 million dol- Eventually, the dam and rine fender systems attached Take, for example, the long lars, it is one of the three bridge were torn down in an to the 127-year-old rock crib suffering and neglected oldest bridges in New York act of civil disobedience by supporting the fender sys- 127-year-old Macombs Dam City, surpassed only by the citizens frustrated with its tem. The first phase of the Bridge over the Harlem Brooklyn Bridge and the obstruction of navigation. project involved grouting River, which still serves as Washington Bridge. Later, in 1890 the current the existing, unstable crib 30 Pile Buck Magazine | Vol.34 No.2 2018 | pilebuck.com JOB STORY system and was performed issues, which were overcome under a separate contract by by custom fabrication.
    [Show full text]
  • Macombs Dam Historic Swing Bridge Seismic Retrofit Value Engineering Study, Bronx, NY—City of New York, Office of Management & Budget (OMB) Project Background
    Macombs Dam Historic Swing Bridge Seismic Retrofit Value Engineering Study, Bronx, NY—City of New York, Office of Management & Budget (OMB) Project Background. Opened to traffic in 1895 and designated a New York City landmark in 1992, The Macombs Dam Bridge is a through-truss swing bridge that spans the Harlem River linking the boroughs of the Bronx and Manhattan. It is the major vehicular route from Manhattan to the new Yankee Stadium, opened in 2009. In addition to crossing the Harlem River, the Macombs Dam Bridge crosses the Major Deegan Expressway, Metro North and CSX railroad tracks, and the parking lot for the Bronx Terminal Market. The 2,540-foot bridge features 78 spans of various types including a 1,362-foot long steel viaduct over West 155th Street; a 415-foot long center swing span with 150 feet of horizontal clearance through the two navigable channels and 28 feet of vertical clearance in the closed position; a 220-foot camelback truss; and several ramps and approaches. A two-stage electric engine powers the swing span. The substructure consists of steel column bents, concrete columns, and masonry piers. The center span rests on a center pier and can swing open to permit boat traffic through one of the two navigable channels. The foundation of the Manhattan pier was sunk on a pneumatic caisson to rock, as was the foundation of the center pier. The Bronx pier was built on rock also, but in an open sheet-pile dam, and from that point across the swamp to 161st Street the plans called for pile foundations.
    [Show full text]
  • Draft Harlem River Watershed and Natural Resources Management Plan for the Bronx 2018
    Draft Harlem River Watershed and Natural Resources Management Plan for the Bronx 2018 Prepared by: NYC Parks Natural Resources Group Table of Contents Glossary..................................................................................................................................... 2 Introduction ................................................................................................................................ 3 Key Stakeholders ................................................................................................................... 3 Other Planning Efforts ............................................................................................................ 6 Vision & Goals ........................................................................................................................ 8 Watershed Characterization ....................................................................................................... 9 Geology & Soils .....................................................................................................................10 History of Land Use Changes ................................................................................................11 Land Use and Zoning ............................................................................................................14 Community Demographics ....................................................................................................14 Hydrology ..............................................................................................................................15
    [Show full text]
  • 2015 City Council District Profiles
    M A N H AT TA N / BRONX CITY COUNCIL DISTRICT 14 0 ¼15 ½ Mile 2015 City CouncilW 170 ST District Profiles 10 BATHGATE W 8 162 ST WASHINGTON HEIGHTS E 167 ST CONCOURSE HUDSON RIVER W HIGH 29 MC CLELLAN ST 157 ST BRIDGE VE A VE A R CLAREMONT E VILLAGE 18 LL ON E 166 ST TE GT VE HIN 10 A BROADWAY 16 AS 4 W GRANT W 14 5 ST MORRISANIA High Bridge 8 Concourse Village CONCOURSE T VILLAGE S HAMILTON Y E 163 ST L Mott Haven HEIGHTS 5 6 L KE Longwood VE A Port Morris ECT P E 153 ST S East Harlem MANHATTANVILLE E 156 ST O MELROSE R 17 P Randall’s Island W W H 135 ST ITTIER S 9 GERARDAVE 12 E 148 ST T 7 VE E 147 ST 30 A E 146 ST E 149 ST MOTT HAVEN E 145 ST CANAL PLACE HUNTS AVE E 144 ST NDALL MORRIS POINT RA 8 E 143 ST 3 17 LONGWOOD VE A VE 3 E 135 ST A 25 E 138 ST VE HARLEM BRUCKNER BLVD A MORNINGSIDE HEIGHTS HARLEM RIVER WILLIS AVE E 125 ST VE VIELE W A 11 11 3 ST CYPRESS VE A 24 W X 26 E 132 ST 11 ST ANN’S 0 ST NO LE 21 PORT 20 15 MORRIS W 103 ST 28 14 MANHATTAN VALLEY E 116 ST LEXINGTON AVE 16 HARLEM MEER EAST HARLEM 8 E 109 ST Randall’s Legend E 111 ST 1 EAST RIVER W 96 ST Island E 107 ST E 110 ST 6 22 7 1/4 Mile E 106 ST 5 AVE 9 E 105 ST CENTRAL RDWater City Council Districts FDR DR PARK AVE Pollution 3 AVE T 27 Ward’s Control S MADISON AVE n Island Plant 22 WE City, State, and JACQELINE E 1021 AVEST ConEdison Federal Parkland ARK KENNEDY 31 Plant ONASSIS 2 AVE E 99 ST n RESERVOIR TRAL P CARNEGIE HILL Playgrounds EN 20 C E23 96 ST 13 A 2 VE n 21 A Schoolyards-to-Playgrounds VE 4 n Community Gardens HELL 21 ST GATE 19 5 27 ST 21 n ASTORIA Swimming Pools YORKVILLE 24 l A 8 Yankee Stadium 16 ParkVE 23 Marx Brothers Plgd Recreation Centers THE Parkland 27 AVE l LAKE 1 Randall’s Island Park Garages/LotsNUE 17 Willis Playground 24 Pulaski ParkSTEINWAY UPPER EAST SIDE Public Plazas 2 Wards Island Park 9 East River Esplanade 18 Lot 25 People’s Park • • l 3 St.
    [Show full text]
  • 2017 Cityparks Track and Field Schedule / Locations July 5 - August 9, 2017
    2017 CityParks Track and Field Schedule / Locations July 5 - August 9, 2017 Betsy Head Playground, Strauss St. bet. Livonia Ave. & Dumont Ave. Brooklyn M/W Ages 5-8, 9:30am - 10:30am Betsy Head Playground, Strauss St. bet. Livonia Ave. & Dumont Ave. Brooklyn M/W Ages 9-17, 10:30am - 12:00pm Linden Park, Vermont St. Bet. Linden Blvd. & Stanley Ave. Brooklyn T/TH Ages 5-8, 9:30am -10:30am Linden Park, Vermont St. Bet. Linden Blvd. & Stanley Ave. Brooklyn T/TH Ages 9-17, 10:30am - 12:00pm Astoria Park, Astoria Park South & 18th St. Queens M/W Ages 5-8, 9:30am - 10:30am Astoria Park, Astoria Park South & 18th St. Queens M/W Ages 9-17, 10:30am - 12:00pm Juniper Valley, Lutheran Ave. btwn Juniper Blvd. N and 71st St. Queens T/TH Ages 5-8, 9:30am - 10:30am Juniper Valley, Lutheran Ave. btwn Juniper Blvd. N and 71st St. Queens T/TH Ages 9-17, 10:30am - 12:00pm Forest Park, Myrtle Ave. & Woodhaven Blvd. Queens M/W Ages 5-8, 9:30am - 10:30am Forest Park, Myrtle Ave. & Woodhaven Blvd. Queens M/W Ages 9-17, 10:30am - 12:00pm Detective Keith Williams, 173rd & 105th St. Queens T/TH Ages 5-8, 9:30am - 10:30am Detective Keith Williams, 173rd & 105th St. Queens T/TH Ages 9-17, 10:30am - 12:00pm Baisley Pond Park Baisley Blvd. and 134th Ave. Queens M/W Ages 5-8, 9:30am - 10:30am Baisley Pond Park Baisley Blvd. and 134th Ave. Queens M/W Ages 9-17, 10:30am - 12:00pm Thomas Jefferson, E.
    [Show full text]
  • Reach 6-Northwest Bronx
    REACH 6-NORTHWEST BRONX Location: Harlem and Hudson Rivers from Yonkers city line to Macombs Dam Bridge Upland Neighborhoods: Riverdale, Spuyten Duyvil, Kingsbridge, Marble Hill, University Heights, Morris Heights, Highbridge Neighborhood Strategies Reachwide South of University Heights Bridge 4.b • Implement creation of Putnam Greenway along • Study redevelopment potential for residential or existing rail right-of-way and identify opportunities parkland to connect to Roberto Clemente State Park to create continuous connections from Westchester to the south and the Regatta Park to the north. County to Port Morris. • Explore opportunities for boat launch based on the criteria described in the Citywide Strategy. Hudson River Waterfront 1 • Support the study and the implementation of Hudson Depot Place / Harlem River Promenade 5 River Greenway Link providing bicycle and pedestrian connectivity from Manhattan to Yonkers with access • Improve access to waterfront by creating upland to the waterfront. connections with appropriate crossings. • Work with NY Central Railroad to provide safe access • Explore public recreational opportunities on City- to Hudson River shoreline. owned site and on privately owned site. • Mitigate stormwater eroding Riverdale Park slopes. • Restore the shoreline from the Highbridge to Roberto • Develop long-term sediment removal maintenance Clemente State Park. plan with DEP Bluebelt program. Highbridge 5.a Spuyten Duyvil 2 • Develop access point to Manhattan through rehab of • Restore shoreline at unmanaged open space at the Highbridge. mouth of Harlem River adjacent to Spuyten Duyvil train station. Ped. Bridge over Major Deegan at 161st St. 6 Marble Hill 3 • Improve connectivity to Mill Pond Park over the Major Deegan pedestrian bridge by removing barriers • Coordinate with DEP in long term plan to daylight impeding pedestrian crossing.
    [Show full text]