SRK Consulting (US) Inc. Suite 520 - 1250 Lamoille Highway Elko, NV 89801 T: 775.753.4151 F: 775.753.4152
[email protected] www.srk.com Memo To: Kevin Hurrell Date: May 23, 2018 Company: Bureau of Land Management, BMDO From: Carrie A. Schultz Copy to: Val Sawyer, SRK Project #: 465900.090 Subject: Prospect Mountain Project – Water Resources Report 1 Introduction Gullsil, LLC (Gullsil) is proposing to conduct mineral exploration and underground mining activities on patented and unpatented mining claims in the Eureka Mining District, located about 3.5 miles southwest of the town of Eureka in Eureka County, Nevada. The proposed Prospect Mountain Project (Project) would be located on public land administered by the U.S. Bureau of Land Management (BLM) Battle Mountain District and on private land controlled by Gullsil as shown on Figure 1. Gullsil submitted to the BLM and Nevada Division of Environmental Protection (NDEP) Bureau of Mining Regulation and Reclamation a plan of operations entitled the Prospect Mountain Project Plan of Operations and Reclamation Permit Application (NVN-092893) referred to herein as the Plan (SRK 2017a). The claim block, shown on Figure 1, has been used as the Assessment Area for soils. 1.1 Existing and Authorized Operations Gullsil is presently authorized by the BLM to conduct mineral exploration activities on the Fourth of July claims under a Notice (NVN-094784) as shown on Figure 2. Up to seven drill hole locations and about 3,300 feet of new/bladed 12-foot wide drill roads have been identified for exploratory drilling on claims administered by the BLM in Section 34 of Township (T) 19 North (N), Range (R) 53 East (E) and Section 3 of T18N, R53E.