(To Be Published in the Gazette of India, Part-II, and Section 3, Sub
Total Page:16
File Type:pdf, Size:1020Kb
Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist. Howrah, West Bengal Form 1 (I) BASIC INFORMATION Sl. Item Detail No. 1. Name of the projects/s Amendment of Environmental Clearance for expansion of Steel Plant (F. No. J-11011/432/2008-IA II (I), dated 26th July, 2012). 2. S. No. in the schedule Item 3(a), Category A of the Schedule of the EIA Notification 2006. 3. Proposed capacity / area / length / tonnage / to / be handled / command area / lease area / number of wells to be drilled, The following table mention about the units for which Environmental clearance (as mentioned above) was granted (column 2 & 3). The table also indicates the units that have been installed (column 2 & 4) and the those units (column 2 & 5) which will not be installed at all, S. Product / Unit Units Units Installed Units, not to be No. (E.C. No. J- installed 11011/432/2008- IA II (I), dated 26th July, 2012) (1) (2) (3) (4) (5) 1 Mini Blast Furnace 1x350 m3 - 1x350 m3 2 Sinter Plant 1x36 m2 - 1x36 m2 3 Steel Melting Shop Electrical Arc Furnace - Electrical Arc – 1x70 T with Ladle Furnace – 1x70 T Furnace 1x70 T, Billet with Ladle Furnace Caster 1x4 Strand & 1x70 T, Billet Caster CCM 1x4 Strand & CCM 4 Ferro Alloy Plant 2x9 MVA - 2x9 MVA 5 Captive Power 10 MW - 10 MW Plant (7 MW from BF gas & (7 MW from BF gas & 3 MW from AFBC) 3 MW from AFBC) 6 Rolling Mill 0.45 MTPA 0.162 MTPA installed - and balance 0.288 MTPA to be installed 7 Induction Furnace 2 x 10 T with Billet 2 x10 T with Billet Caster - Caster (1 x 4 Strand Continuous Billet Caster) Total Area: All the units are operating within the existing plant premises measuring 12.69 Hectares (31.37 acres). Page-1 Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist. Howrah, West Bengal 4. New/ Expansion/Modernization Expansion 5. Existing Capacity/ Area etc. Existing Units are: Induction Furnace (2x8 T, 1x6 T, 2x10 T) – 1,94,400 TPA Billets/ Ingots. Rolling Mill – 1,62,000 TPA CTD & TMT Bars Reheating Furnace – 45 T/hr Producer Gas Plant – 28350 cu.m/month 6. Category of Projects i.e. ‘A’ or A ‘B’ 7. Does it attract the general No condition? If yes, please specify. 8. Does it attract the general No condition? If yes, please specify. 9. Location Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, District Howrah, West Bengal Latitude – 22°28'40.93"N Longitude – 88° 00'54.88"E Plot/survey / Khasra No. Dag No. 93,104, 112,117, 119,141,144, 146, 105, 112, 142, 144 & 145 Village Kulgachia Tehsil Sreerampur District Howrah State West Bengal 10. Nearest railway Station/airport Kulgachia Railway station – 1.0 km (approx.) in along with distance in kms. SE direction. Netaji Subhash Chandra Bose International Airport, Kolkata: Around 48 km from the project site in NE direction. 11. Nearest Town, city, District Nearest Town – Howrah (about 32 km) in NE Headquaters along with direction. distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Tulsiberia Gram Panchayat Corporation, Local body P.S. Ulubaria, District Howrah, West Bengal, (complete postal addresses Pin-713336. with telephone nos. to be given) 13. Name of the applicant M/s Shri Badrinarain Alloys & Steels Limited 14. Registered Address M/s Shri Badrinarain Alloys & Steels Limited 6/2 Moira Street, Halwasiya Mansion, 4th Floor, Kolkata – 700 017 Page-2 Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist. Howrah, West Bengal 15. Address for correspondence : Name Shri Avinash Chandra Gupta Designation Managing Director (Owner/Partner/CEO) Address M/s Shri Badrinarain Alloys & Steels Limited 6/2 Moira Street, Halwasiya Mansion, 4th Floor, Kolkata-700017 Pin Code 700 017 E-mail [email protected] Telephone No. (033) 2289 5450 / 5451 Fax No. (033) 4062 0145 16. Details of Alternative Sites NA examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects No 18. Whether separate application Not Applicable of interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. No (a) The Forest (conversation) Act, No 1980? (b) The Wildlife No (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any No Government Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and/or land in which the projects is purpose to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the court, if any and its relevance with the proposed project. Page-3 Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist. Howrah, West Bengal * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) Page-4 Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist. Howrah, West Bengal (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) Details thereof (with approximate Information / Checklist Yes / S. No. quantities / rates, wherever possible) with confirmation No source of information data 1.1 Permanent or temporary Yes All the units (in operation and about to change in land use, land be installed) will be set up within the cover or topography including existing plant premises of 12.69 increase in intensity of land Hectares (31.37 acres). The land is use (with respect to local generally flat and does not come under land use plan) flood zone. Said plot of land is reformed / developed from its existing land use. This project has been developed following a land use plan, which is made taking into consideration relevant guidelines / stipulations of the concerned Authorities. Moreover, the planning of the project, development of green belt and other landscape on the project site would enhance the aesthetics of the area. Site clearing and preparation activities Clearance of existing land, 1.2 Yes involved removal of scanty vegetation on vegetation and buildings? the plant site. 1.3 Creation of new land uses? Yes The expansion project is developed following a planned land-use plan. Best attempts were made to create minimum disturbance to the existing land-use of the neighborhood. However, a positive change in the land uses due to the expansion project is expected. Pre-construction 1.4 investigations e.g. bore Yes Soil test has been carried out. houses, soil testing? The civil works for the construction and development of the project include bulk earthworks, construction of factory shed, 1.5 Construction works? Yes internal roads and parking areas, drainage system, underground and overhead tanks etc. is almost completed. 1.6 Demolition works? No - Temporary sites used for Suitable temporary accommodation for 1.7 construction works or Yes workers will be made within the project housing of construction site for construction of 0.288 MTPA Page-5 Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist. Howrah, West Bengal workers? Rolling Mill. All above ground construction activities Above ground buildings, Yes are almost completed. Construction structures or earthworks 1.8 activities for 0.288 MTPA Rolling Mill will including linear structures, be done shortly. cut and fill or excavations Underground works including 1.9 No - mining or tunneling? 1.10 Reclamation works? No - 1.11 Dredging? No - 1.12 Offshore structures? No - 1.13 Production and Yes Expansion project scenario for EC manufacturing processes? amendment is already presented in Sl. No. 3 under basic information. All construction materials will be handled Facilities for storage of goods through site store within the project 1.14 Yes or materials? boundary for installation of 0.288 MTPA Rolling Mill. The plant is designed as a zero discharge plant. The water is recirculated through cooling and treatment. The entire wastewater is recycled for various purposes inside the plant. Domestic wastewater is being treated in Facilities for treatment or septic tank followed by soak pit system. 1.15 disposal of solid waste or Yes liquid effluents? Slag from Induction Furnaces is being used for Land filling / Road Construction purpose. End cuts, scales and scraps from CCM is being used in the Induction Furnaces. End cuts and missed rolls is being used in the Induction Furnaces. Most of the workers is employed from Facilities for long term nearby villages. Additional manpower 1.16 housing of operational No requirement for 0.288 MTPA Rolling Mill workers? will be fulfilled from the nearby villages. Page-6 Shri Amendment of Environmental Clearance for expansion of Steel Plant at Badrinarain Alloys Tulsiberia Road, Village : Kulgachia, P.S. Uluberia, Mouza Sreerampur, FORM - I & Steels Limited Dist.