CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

FORM 1

(I) Basic Information

S.No Item Details 1 Name of the project/s Construction of Specialty Tower Block in Government Stanley Hospital, , – 600013. 2 S. No. in the schedule The project is categorized under Schedule 8 (a) “Building and Large Construction projects” of EIA Notification 2006 and its subsequent amendment. 3 Proposed capacity/ area / length / Proposed Built-up area is 26,256.08 Sq.m. tonnage to be handled / command Building wise area details are given in the area / lease area / number wells Conceptual Plan. to be drilled be. 4 New/ Expansion/Modernization New 5 Existing Capacity / Area etc Nil 6 Category of Project. 'A' or 'B' ‘B2’ Category 7 Does it attract the general NA condition? If 'yes, please specify. 8 Does it attract the specific NA condition? If 'yes, please specify Sq.m. 9 Location Plot/Survey/ Khasra No Survey No’s: 1762/2,3,4,5,6,7,8, 1763, 1764/11 and 12, 1792/1 Village Tahsildar Chennai State 10 Nearest railway station/airport Railway Station with Distance in kms. • Washermenpet Railway Station – 0.5 Km (NW) Airport • Chennai International Airport – 17.5 Km (SW) 11 Nearest Town, city, District • Tondiarpet – 2.31 K (NE) Headquarters along with distance in kms

1 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

12 Village Panchayat Zilla Parishad Corporation of Chennai, Municipal Corporation, Local body , (complete postal addresses with EVR Salai, Chennai – 600003. telephone nos. to be given 13 Name of the applicant The Dean 14 Registered Address and Hospital, 305 OSH Road, Royapuram, Chennai. Tamil Nadu – 600013. 15 Address of correspondence Name --- Designation(Owner/Partner/CEO) The Dean Stanley Medical College and Hospital Address Stanley Medical College and Hospital, 305 OSH Road, Roayapuram, Chennai. Tamil Nadu. Pin Code 600013. E-mail [email protected] Telephone No. 044 - 25281351 Fax No. 16 Details of Alternative sites No examined, if any. Location of these sites should be shown on a topo sheet 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted 19 If yes, date of submission - 20 If no, reason - 21 Whether the proposal involves Not Applicable approval / clearance under: if yes, details of the same and their status to be given (a)Forest (conservation) Act, 1980? (b)The Wild Life (Protection) Act 1972? (c)The CRZ Notification, 1991? 22 Whether there is any Government Yes. Order/ Policy relevant/ relating to the site?

2 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

23 Forest land involved (hectares) No 24 Whether there is any litigation Yes pending against the project and/ or land in which the project is propose to be set up? Name of the site Case No Orders / Directions of the court, if any and its relevance with the proposed project

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist Yes/No Details thereof (with confirmation approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No There will not be any change in the in land use, land cover or land use, land cover or topography topography including increase in as the site is categorized as intensity of land use (with Institutional Zone as per the respect to local land use plan) Development control rules of CMDA. Copy of Land Use Classification letter issued by CMDA is enclosed as Annexure II. 1.2 Clearance of existing land, Yes Minor clearance activities will be vegetation and buildings? carried out to remove the shrubs and weeds. 1.3 Creation of new land uses? No Land use of the proposed site comes under Institutional Zone (Refer Annexure I). 1.4 Pre-construction investigations Yes Geo technical investigation has e.g. bore houses, soil testing? been done to find the suitability of soil for providing for adequate foundations for the proposed structure (Refer Annexure IV). 1.5 Construction works? Yes Inside the proposed site, a small area will be utilized temporarily for construction of sheds for the

3 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

workers and materials. Water supply and sanitation facilities will be provided for them. Mostly workers will be deployed from local area only. 1.6 Demolition works? No No demolition works will be carried out as the land is vacant. 1.7 Temporary sites used for Yes Temporary sheds will be construction works or housing constructed for the storage of of construction workers? cement, sand and other materials during construction phase. 1.8 Above ground buildings, Yes Excavation works will be carried structures or earthworks out for foundation of the including linear structures, cut structures. Later on, the site will be and fill or excavations leveled. Thus the cut and fill process will be required to the minimum extent. 1.9 Underground works including No No underground works will be mining or tunneling? required as the proposed project is the construction of Residential buildings including commercial activities. 1.10 Reclamation works? No Only levelling of ground if required. 1.11 Dredging? No No need for dredging 1.12 Offshore structures? No Not required 1.13 Production and manufacturing No It’s a construction project. Hence processes? not applicable. 1.14 Facilities for storage of goods or No Temporary sheds will be materials? constructed for the storage of cement, sand and other materials during construction phase. 1.15 Facilities for treatment or Yes During construction phase the disposal of solid waste or liquid waste water generated will be effluents? disposed through existing sewer line of CMWSSB. During operation period - STP will be provided for treatment of sewage.

4 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

Biodegradable waste will be disposed using organic waste converter. Non biodegradable waste shall be disposed through authorized recyclers 1.16 Facilities for long term housing No There is no residential facility for of operational workers? operational workers as they will be deployed from local area. 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or No The existing infrastructure will be other transport infrastructure made use during construction and including new or altered routes operation phase. and stations, ports, airports etc? 1.19 Closure or diversion of existing No As construction works will be transport routes or within a specified area, there is no infrastructure leading to need for closure or diversion of changes in traffic movements? existing transport routes. The existing transport infrastructure will be made use of. 1.20 New or diverted transmission No Existing Transmission lines or pipe lines or pipelines? lines will be used without any diversionas per the requirements. 1.21 Impoundment, damming, No There will be no impoundment, culverting, realignment or other damming, culverting, realignment changes to the hydrology of or other changes to the hydrology watercourses or aquifers? of watercourses or aquifer. 1.22 Stream crossings? No No Stream crossings 1.23 Abstraction or transfers of water Yes No ground water will be form ground or surface waters? abstracted; water requirement will be sourced from Chennai Metropolitan water supply and Sewerage board. 1.24 Changes in water bodies or the No There shall be no changes in water land surface affecting drainage bodies or the land surface. The rain or run-off? water within the proposed development will be collected to the rain water harvesting trenches

5 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

along the boundary and the overflow will be collected in the exclusive sumps to be provided for collection of rain water. 1.25 Transport of personnel or Yes There will be temporary influx of materials for construction, construction labor and existing operation or decommissioning. roads will be used for transportation. 1.26 Long-term dismantling or No No long term works involved in the decommissioning or restoration proposed activity. works? 1.27 Ongoing activity during No Only temporary sheds will be built decommissioning which could for storing cement and other have an impact on the materials. So there will be no environment? decommissioning works.

1.28 Influx of people to an area in Yes During construction period few either temporarily or workers will be deployed locally permanently? 1.29 Introduction of alien species? No No such alien species are envisaged 1.30 Loss of native species or genetic No No loss of native species will occur diversity? as the site is plain 1.31 Any other actions? No Only eco-friendly activities like tree plantation will be undertaken

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 2.1 Land especially No There is no agricultural land. undeveloped or agricultural land users) (ha)

6 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

2.2 Water (expected source Yes Total water Requirement 144 KLD of & competing unit: KLD) which Domestic (110 KLD), flushing (75 KLD), Lab Operations and Laundry (34 KLD) will be made available through CMWSSB.

2.3 Minerals (MT) No Since the proposed project is the construction of Residential buildings there will be no usage of minerals. 2.4 Construction material Yes for proposed Material Units of Approx construction of 115 Description Measurement Qty residential apartment Cement bags 98880 – stone, aggregates, Sand cft 339018 sand / soil (expected Aggregate cft 197760 source – MT) Steel kg 1130061 Bricks pcs 5085277

2.5 Forests & No Usage of timber will be minimal timber(source– MT) 2.6 Energy including Yes Electricity will be availed from electricity and fuels TANGEDCO. Total Electric load for the (source, competing proposed project is 800 KVA. users) Unit: fuel (MT), energy (MW) 2.7 Any other natural Yes Efforts will be made to make use of natural resources (use lighting where-ever possible. appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist Yes/No Details thereof (with confirmation approximate quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, No No such materials will be required. which are hazardous (as per MSIHC rules) to human health

7 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No There will not be any occurrence of disease or affect disease vectors diseases as our activities are (e.g. insect or water borne confined to construction areas only diseases) 3.3 Affect the welfare of people e.g. No Employment will be given to local by changing living conditions? people thus the living standards of the people will get improved. 3.4 Vulnerable groups of people No There is no vulnerable group of who could be affected by the people who could be affected by the project e.g. hospital patients, project. children, the elderly etc. 3.5 Any other causes No Nil 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/No Details thereof (with confirmation approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No No Spoil, overburden or mine wastes wastes 4.2 Municipal waste (domestic and Yes During operation : (for Proposed or commercial wastes) development) Bio degradable Waste: 304.9 kg/day Non Bio degradable Waste: 320.145 kg/day Inert Waste: 137.205 kg/day Organic waste is disposed using Organic Waste Converter technology and Inorganic waste will be sent for recycling. 4.3 Hazardous wastes (as per No No Hazardous wastes shall be Hazardous Waste Management generated. Rules) 4.4 Other industrial process wastes No Not envisaged 4.5 Surplus product No Not applicable since this is construction project 4.6 Sewage sludge or other sludge Yes STP sludge of about 15 Kg/day from effluent treatment which will be filter pressed,

8 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

disinfected & used for gardening as manure. 4.7 Construction or demolition Yes Construction waste will be used in wastes land filling and in road pavements in the surrounding low lying areas. Wood and paper waste will be disposed through recyclers 4.8 Redundant machinery or No Most of the equipments used during equipment construction phase will be hired 4.9 Contaminated soils or other No There is no source for materials contamination of soils or other materials. 4.10 Agricultural wastes No Does not arise 4.11 Other solid wastes No No such waste

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr.)

S.No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 5.1 Emissions from combustion Yes The gaseous emissions are of fossil fuels from stationary expected from transport vehicles or mobile sources moving inside the project site. This will be minimized/ eliminated by slow movement of vehicles, hiring well maintained vehicles, planting trees and spraying water periodically. 5.2 Emissions from production No Does not arise since the proposed processes project is a Residential Development 5.3 Emissions from materials Yes Emissions like dust will arise handling including storage or during the transportation of transport materials and the dust will be controlled by slow movement of vehicles, covering the materials properly and by Periodical water spraying. 5.4 Emissions from construction Yes Apart from fugitive dust emissions, activities including plant and there will be emissions from

9 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

equipment concrete mixers, dozers, diesel pumps etc during construction. These equipments will be maintained properly to have minimum impact. 5.5 Dust or odors from handling Yes During construction phase the dust of materials including is suppressed by sprinkling water. construction materials, The dust barricades will be provided sewage and waste all around the project site. Proper sanitation measures to be taken within the site to remove odour problem 5.6 Emissions from incineration No There are no incineration activities of waste 5.7 Emissions from burning of No No such activities will be permitted waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No No emissions from any other sources sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

SI. Information/Checklist Yes/ Details thereof (with approximate No confirmation No quantities /rates, wherever possible) with source of information data 6.1 From operation of equipment Yes Workers will be given ear plugs in e.g. engines, ventilation plant, noisy area. Acoustic enclosures will crushers be provided for the D.G. set

6.2 From industrial or similar No Not Applicable processes 6.3 From construction or demolition Yes Noise levels in the range of 75-85 dB (A) will be generated occasionally during the construction activities. Workers in the noisy areas will be provided with earmuffs and earplugs. 6.4 From blasting or piling No Not Applicable 6.5 From construction or Yes During construction phase

10 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

operational traffic construction materials will be transported by road, through well maintained vehicles to control noise, vibration and emissions.

During operational phase traffic noise and emissions will be increased slightly that will be minimized by paving roads with asphalt/concrete, well maintained vehicles, slow movement of vehicles and by planting trees

6.6 From lighting or cooling systems No Adequate enclosures, tree plantations will be provided 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground, or into sewers surface waters, groundwater, coastal waters or the sea:

S.No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 7.1 From handling, storage, use or No There will be no handling of spillage of hazardous hazardous materials. materials. 7.2 From discharge of sewage or Yes Sewage generated will be treated in other effluents to water or the STP and excess treated will be land (expected mode and discharged into CMWSSB sewer line. place of discharge) Wastewater from operation theatres will be disinfected and then treated in the STP. 7.3 By deposition of pollutants No Emissions from operation of DG Sets emitted to air into the land or will be within the prescribed limits into water and negligible.

7.4 From any other sources No No other polluting sources exist

7.5 Is there a risk of long term No There will not be any long term build build up of pollutants in the up of pollutants in the environment environment from these

11 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

sources? from these sources

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.

S.No Information/Checklist Yes/No Details thereof (with confirmation approximate quantities /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires No -NA- etc from storage, handling, use or production of hazardous substances. 8.2 From any other causes No No risks from any other sources

8.3 Could the project be affected by No The area under study falls in Zone- natural disasters causing III according to the Indian Standard environmental damage (e.g. Seismic Zoning Map. The structure floods) was designed to be earthquake resistant. There will not be any long term build up of pollutants in the environment from these sources

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S.No Information/Checklist Yes/No Details thereof (with confirmation approximate quantities /rates, wherever possible) with source of information data 9.1 Lead to development of Yes Medical facilities for people from supporting. facilities, ancillary rural and urban areas of Tamil development or development Nadu. stimulated by the project which could have impact on the environment e.g. No

(roads, power supply, waste or waste• Supporting water treatment, infrastructure etc.) No

• housing development 12 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

No

• Extractive industries No 9.2 Lead• Supply to industriesafter-use of the site, No Not Applicable which could haven impact on the environment 9.3 Set a precedent for later Yes Organized developmental activity. developments 9.4 Have cumulative effects due to No -NA- proximity to other

(III) Environmental Sensitivity

S.No Area Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary 1 Areas protected under Yes National Park – 13.41 km international conventions, Chennai Harbor – 3.89 km national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes – 13.41 km sensitive for other water bodies, coastal zone, biospheres, ecological reasons - Wetlands, watercourses or mountains, forests 3 Areas used by protected, No Guindy National Park – 13.41 km important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or Yes – 4.91 km underground waters Covum River – 3.14 km – 9.82 km 5 State, National boundaries No No State, National boundaries 6 Routes or facilities used by the No The proposed site is in a residential public for access to recreation zone and Institutional zone

13 JUNE 2016

CONSTRUCTION OF SPECIALTY TOWER BLOCK IN GOVERNMENT STANLEY HOSPITAL FORM - I

or other tourist, pilgrim areas 7 Defense installations No Nil 8 Densely populated or built-up Yes The proposed Residential project is area located within Chennai City limits 9 Areas occupied by sensitive Yes Schools, temples, Churches, man-made land uses(hospitals, Mosques, health care facilities and schools, places of worship, residential buildings are seen within community facilities) the study area. Hospitals • General Hospital – 2.5 km • Medical College and Hospital – 4.5 km Community facilities • Central Railway station – 2.21 km • Railway station – 4.05 km 10 Areas containing important, No Marina Beach – 4.91 Km (S) high quality or scarce Guindy National Park – 12.35 Km resources(ground water (SW) resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to No Not applicable pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural No The area under study falls in Zone- hazard which could cause the III, according to the Indian Standard project to present Seismic Zoning Map. environmental problems (earthquakes, subsidence, landslides, erosion, flooding)