Format for Submission of Monthly Progress Report by the State of

Tamil Nadu

(Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019)

October 2020

Sl. Progress report submitted by Enclosures No. department 1. Commissionerate of Municipal Enclosed vide Annexure –I Administration (CMA) 2. Director of Town Panchayat (DTP) Enclosed vide Annexure –II 3. Department of Panchayat Raj and Enclosed vide Annexure –III Rural Development (DRD&PR) 4. Public Works Department Enclosed vide Annexure –IV PWD&WRD 5. Pollution Control Board Enclosed vide Annexure –V

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020) For the State of Tamil Nadu Month :October 2020 Overall status of the State: I. Total Population: Urban Population & Rural Population separately: 7,21,47,039 as per 2011 census II. Estimated Sewage Generation (MLD): 3636.16 MLD

III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing no. of STPs and Treatment Capacity (in 69 & 12 & MLD) 1616.6 260.8 2 Capacity Utilization of existing STPs 881.8 116.8 3 MLD of sewage being treated through Alternate 845 1.56 technology 4 Gap in Treatment Capacity in MLD 673.62 114.82 5 No. of Operational STPs 55 12 6 No. of Complying STPs 53 12 7 No. of Non-complying STPs 2 -

1. Details of each existing STP in the -CMWSSB No. Location Existing Capacity Operational Compliance Status of STP STP Being Status Capacity Utilized of STP 1 Nesapakkam STP 23 13 Operational Complied Zone - IV 2 Koyambedu STP 34 30 Operational Complied Zone - III 3 Kodungaiyur STP 80 65 Operational Complied Zone II 4 Kodungaiyur STP 80 56 Operational Complied Zone I

5 Perungudi STP 12 11 Operational Complied

1

Zone - V 6 Koyambedu STP 60 17 Operational Complied Zone - III 7 Kodungaiyur STP 110 97 Operational Complied Zone I& II 8 Nesapakkam STP 40 39 Operational Complied Zone - IV 9 Perungudi STP 54 50 Operational Complied Zone - V 10 Perungudi STP 60 44 Operational Complied Zone – V 11 Nesapakkam STP 54 43 Operational Complied Zone - IV 12 Koyambedu STP 120 60 Operational Complied Zone – III 13 Sholinganallur STP 18 5 Operational Complied Total 745 530

2. Details of each existing STP in the State & PRS -CMA Capacity Existing being Compliance Capacity of STP Utilized Operational Status of S. No Location (in MLD) (in MLD) Status of STP STP 70.00 35.00 Operational Comply 1 60.00 5.00 Operational Comply 2 10.28 7.50 Operational Comply 3 13.65 3.00 Operational Comply 1 STP (4mld) - Completed 36 MLD under 4 4.00 2.50 progress Comply 170.70 MLD (45.70 + 125.00) 5 MLD 38.00 Operational Comply

6 28.05 14.15 Under Renovation Comply 7 15.00 7.50 Operational Comply 8 12.25 6.00 Operational Comply 9 14.50 13.50 Operational Comply

2

10 2.20 1.80 Operational Comply (CMWSSB STP 11 Pallavapuram 115@Perungudi) Operational Comply 12 6.20 3.60 Operational Comply 13 9.44 2.10 Operational Comply 14 Thiruvannamalai 8.70 4.50 Operational Comply 15 - 2Nos 12.50 8.60 Operational Comply 16 11.04 2.00 Under Trial run Comply 17 Thirupathur 11.43 0.50 Under Trial run Comply 18 12.08 4.00 Operational Comply 19 3.99 3.72 Operational Comply 20 5.47 5.47 Operational Comply 21 Ramanathpuram 7.00 5.80 Operational Comply Theni- 22 Allinagaram 12.05 6.50 Operational Comply 23 4.86 3.50 Operational Comply 24 15.00 6.50 Operational Comply 25 12.34 7.80 Operational Comply 26 5.00 5.00 Operational Comply STP-1 9.63 4.50 Operational Comply Nagapattinam 27 STP-2 2.69 0.40 Operational Comply 28 Tiruvarur 6.92 4.10 Operational Comply 29 4.16 1.00 Operational Comply 30 10.62 4.00 Operational Comply 31 4.20 3.60 Operational Comply Udhagamandala 32 m 5.00 4.00 Operational Comply 33 Udumalaipet 7.81 3.50 Operational Comply 34 7.65 3.70 Operational Comply PRS (12 Nos) 35 58.00 58.00 Operational Comply Salem - Vellakuttai STP 13.00 7.00 Operational Comply Salem - 36 Anaimedu STP 6.00 3.00 Operational Comply Salem - Mankuttai STP 35.00 1.00 Operational Comply

3

Salem - Completed & Power 44.00 - connection to be - Vandipattai STP obtained 37 24.20 8.50 Operational Comply 38 50.55 18.50 Operational Comply STP-1 0.82 0.38 Opertional Comply Mettur STP-2 0.92 0.19 Opertional Comply 39 Mettur STP-3 5.45 2.40 Opertional Comply 40 17.00 12.00 Operational Comply 41 5.85 5.85 Operational Comply Total 49 nos 857.20 344.26 3. Details of each existing STP in the State-DTP No. Location Existing Capacity Operational Status Compliance STP Being of STP Status of STP Capacity Utilized 1 Mamallapuram TP 2.34 1.00 Operational Complied

2 Orathanadu TP 2.30 1.30 Operational Complied

3 Thiruchendur TP Non- 3.90 1.40 Operational Complied 4 Palanichettypatti TP Non 2.80 2.80 Operational Complied 5 Thirumazisai TP 3.00 1.00 Operational Complied

Septage Management 6 Karunguzhi 0.024 0.024 Operational Complied 7 Periyanaikanpalayam 0.03 0.03 Operational Complied

1. Details of under construction STPs in the Chennai-CMWSSB No. Location Capacity of Physical Status of I&D Completion the plant in Progress in % or House Timeline MLD sewer connections 1 Sholinganallur STP 54 80 Nil Dec 2020 2 Thiruvottriyur STP 31 100 Nil - 3 Kodungaiyur STP 120 31 Feb 2022 Zone - I Nil 4 Kodungaiyur STP Nil 120 33 Feb 2022 Zone - II 5 Nesapakkam STP 50 28 Nil Feb 2022

4

Zone - IV 6 Perungudi STP Nil 60 22 Feb 2022 Zone - V Total 435

2. Details of under construction STPs in the State & PRS-CMA Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections Alternate site to be identified & it will be 1 16.71 - - completed on Oct’22.

2 Avadi 36.00 80% - March-21 Coimbatore - Nanjudapuram 40.00 70% - Feb-21 3 Coimbatore – Kuruchi & 30.53 23% - Jan-22 4 16.00 70% - March-21 5 17.66 90% - Dec-20 6 11.25 83% - Dec-20 Work order issued & Design under scrutiny & it will be completed 7 21.85 - - on Dec’21. 8 Rameshwaram 4.08 35% - Dec’21 Collection system will be Completed on 9 6.96 100% - Dec’20 10 Saththur 4.65 67% - March-21 11 30.00 96% 3930 December’20 12 Tiruppur (3nos) 70.00 30% - March-22 13 Tuticorin 28.00 45% - March-21 14 Vellore 50.00 39% - March-21 PRS (4 Nos) Trichirapalli- 15 STP1 30.00 52% - July-21 Trichirapalli- STP2 37.00 35% - Aug-21 16 Sathiyamangalam 4.08 99% - Dec’20

5

Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections 17 Mettupalayam 8.65 82% - June- 21

Total (21 nos) 463.42

3. Details of under construction STPs in the State-DTP No. Location Capacity of Physical Status of I&D or Completion the plant in Progress in % House sewer Timeline MLD connections 1 Ulunderpettai TP 99% 3.15 6176 Dec-20 completed 2 Work in Sriperumbudur TP 80% 8.50 5028 progress completed March-21 3 Velankanni TP 100% 2.33 1320 Dec-20 completed 4 63% Thiruporur TP 4.02 3288 Mar-21 completed 5 Ponneri TP 30% 6.52 1132 Mar-21 completed 6 Manachanallur TP 95% 3671 6.41 Dec-20 7 S.Kannanur TP completed 1990

8 Vallam TP 97% 2.35 2967 Jan-21 completed 9 Perundurai TP 90% 3.14 3390 Jan-21 completed 10 Melachokanathapuram TP 40% 2.00 1270 May-21 completed

Septage Management 11 65% Mudukulathur TP 0.015 - Dec-20 completed 12 75% TP 0.015 - Dec-20 completed 13 20% Pennagaram TP 0.015 - Dec-20 completed 14 60% Kaveripattinam TP 0.015 - Dec-20 completed 15 70% Chengam TP 0.020 - Dec-20 completed 16 45% Kurumbalur TP 0.010 - Dec-20 completed

6

No. Location Capacity of Physical Status of I&D or Completion the plant in Progress in % House sewer Timeline MLD connections 17 25% TP 0.010 - Mar-21 completed 18 30% TP 0.015 - Jan-21 completed

1a.Details of proposed FSTPs in the State & PRS-CMA 49 Nos. of FSTPs are proposed & various of implementation. In which 5 Nos. of FSTPs falls under polluted river stretches (Cauvery- 1, Vasista -1, Sarabanga – 1 & Thamirabarani – 2.) S.No Progress Number of FSTPs 1 Completed / Nearing completion 6 2 Intermediate / Advanced stage 20 3 Initial stage/ Preparatory Stage 19 4 Tendering stage DPR 4 Total 49

1b.Details of proposed 2 STPs in the State & PRS-CMA No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed in Stage/ Under Tendering/ Completion MLD Work to be Awarded) 1 Sathiyamangalam 1.13 DPR Prepared - 2 Tirunelveli 34.00 Under DPR stage -

2a. Details of proposed STPs in the State-DTP No. Location Capacity Status of Project (at DPR Stage/ Under Tendering/ Likely Date of the STP Work to be Awarded) of proposed Completion in MLD 1 Mangadu DPR stage-Comprehensive UGSS in cluster A Opp to SWM, at with Mangadu Town Panchayat and 12 Village Town Pattur road Panchayat 2 Chitlapakkam Detailed project Report prepared under TNUISFL for cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 3 Madampakkam Detailed project Report prepared under TNUISFL for Sembakkam cluster basis with 13 local bodies(Fund

7

assistance from Project Development Grant Fund) 4 Peerkankaranai DPR has to be prepared through TNUISFL on cluster basis 5 Perungalathur DPR has to be prepared through TNUISFL on cluster basis

6 Thiruneermalai DPR as to be prepared through TNUISSL by cluster basis

2b. Details of proposed STPs/FSTPs in the PRS-(DTP)

Treatm ent Technol STP/F Status Status ogy STPs Designa STP/ Status of of of along S. capaci ted FSTP DPR DPR award with Remarks Name of the ULB ty in nodal No s Preparation appro of firm MLD/ Agency val tender complet KLD ion timeline s The DPR is under 1 TP - - DPR Stage - - PWD - preparation by WAPCOS/ PWD. 2 Sirugamani TP - - DPR Stage - - PWD - “ 3 Mohanur TP - - DPR Stage - - PWD - “ 4 Velur TP - - DPR Stage - - PWD - “ 5 Punjai Pugalur TP - - DPR Stage - - PWD - “ 6 Bhavani sagar TP - - DPR Stage - - PWD - “ 7 TP - - DPR Stage - - PWD - “ 8 Madathukulam TP - - DPR Stage - - PWD - “ 9 TP - - DPR Stage - - PWD - “ Tamilnadu Water Investment Company (M/s. TWIC) has been appointed as consultant 10 Poallampatty TP - - DPR Stage - - DTP - for preparation of DPR. The DPR will be expected to be ready by 31.12.2020 Pethanaickenpalay DTP “ 11 - - DPR Stage - - - am TP 12 Yethapur TP - - DPR Stage - - DTP - “ 13 Belur TP - - DPR Stage - - DTP - “ 14 Srivaikundam TP - - DPR Stage - - DTP - “ 15 Authoor TP - - DPR Stage - - DTP - “ 16 Eral TP - - DPR Stage - - DTP - “ Alwarthirunagari DTP “ 17 - - DPR Stage - - - TP Then Thiruperai DTP “ 18 - - DPR Stage - - - TP 19 Arumuganeri TP - - DPR Stage - - DTP - “ 20 Mukkudal TP - - DPR Stage - - DTP - “ 21 Gopalasamudram - - DPR Stage - - DTP - “

8

TP 22 Kallidaikurichi TP - - DPR Stage - - DTP - “ Cheranmahadevi DTP “ 23 - - DPR Stage - - - TP 24 Veeravanallur TP - - DPR Stage - - DTP - “ 25 Patthamadai TP - - DPR Stage - - DTP - “ 26 Mela Seval TP - - DPR Stage - - DTP - “ PWD The DPR is under 27 TP - - DPR Stage - - - preparation by WAPCOS/ PWD. 28 Thirukattupalli TP - - DPR Stage - - PWD - “ 29 Thiruvaiyaru TP - - DPR Stage - - PWD - “

IV. Details of Industrial Pollution-TNPCB: No. Details of Industries State PRS

1. No. of industries in the State: 46,401 7381 2. No. of water polluting industries in the 11,445 1770 State: 3. Quantity of effluent generated from the 2835.7 452.696 industries in MLD: 4. Quantity of Hazardous Sludge 929250 MT/A (2019- - generated from the Industries in TPD: 20) 5. Number of industrial units having 11,445 1770 ETPs: 6. Number of industrial units connected 1497 Nil to CETP: 7. Number and total capacity of ETPs - - (details of existing/ under construction / proposed) 8. Compliance status of the ETPs: 11,445 Industrial 1770 Industrial units having units having ZLD and ZLD and there is no there is no discharge discharge into the water into the water bodies bodies 9. Number and total capacity of CETPs Existing – 36, (details of existing/ under construction Capacity -87350 KLD / proposed) Proposed – 10 Proposed – 10,

9

Capacity 41 MLD Capacity 41 MLD 10 Status of compliance and operation of Details furnished below the CETPs

10a. Status of compliance and operation of the CETPs in the State-TNPCB S.No. Town No. of No. of Industrial Status of ETPs Status of CETPs industries industrial units Discharge (existing, under connected to (KLD) construction & CETP. proposed) 1 Trichy 1 7 201.4 Complying - 2 Dindigul 1 49 1517 Complying - 3 Perundurai 1 14 1000 Complying - 4 Ambur 1 49 1150 Complying - 5 Ambur 1 17 330 Complying - 6 Peranambut 1 36 600 Complying - 7 1 110 2000 Complying - 8 1 82 3600 Complying - 9 Ranipet 1 79 1875 Complying -

10 Ranipet 1 40 700 Complying - 11 1 36 600 Complying - 12 1 15 400 Complying - 13 1 144 3000 Not Complying - 14 Sivagangai 1 48 49.6 Not Complying - 15 Ambattur 1 211 200 Not Complying - 16 Tiruppur 1 75 7000 Complying - 17 Tiruppur 1 6 180 Complying - 18 Tiruppur 1 29 3555 Complying - 19 Tiruppur 1 12 3520 Complying - 20 Tiruppur 1 18 2750 Complying - 21 Tiruppur 1 60 4785 Complying - 22 Tiruppur 1 28 3748 Complying - 23 Tiruppur 1 69 10758 Complying - 24 Tiruppur 1 4 2250 Complying -

10

25 Tiruppur 1 17 4950 Complying - 26 Tiruppur 1 23 4500 Complying - 27 Tiruppur 1 12 2700 Complying - 28 Tiruppur 1 8 165 Complying - 29 Tiruppur 1 15 2750 Complying - 30 Tiruppur 1 15 2485 Complying - 31 Tiruppur 1 19 4500 Complying - 32 Tiruppur 1 25 3150 Complying - 33 Tiruppur 1 9 1350 Complying - 34 Perundurai 1 14 2681 Complying - 35 Kanchipuram 1 62 1500 Not complying - Under closure 36 1 40 850 Complying - Total 36 1497 87350

10b. Details of CETP under construction/tendering/proposed in the PRS-TNPCB

S.No. Town Name of CETPs CETP Whether CETP Status (DPR/ Capacit Complyi Proposed, if tendering/ y ng or not any under (MLD) construction/ ETC etc.) 01. Perundurai Sree Bhavani Dyeing Cluster 4 - Proposed CTE issued for a Development Limited, period upto Perundurai Taluk, 31.03.2024 02. Perundurai Kadayampatti Common Effluent 6.25 - Proposed CTE issued for a Treatment Plant Bhavani Private period upto Limited, Perundurai Taluk, Erode 31.03.2024 District 03. Perundurai Kadayampatti Common Reject 1.75 - Proposed CTE issued for a Management Systems Private period upto Limited (CRMS), Perundurai 31.03.2024 Taluk, Erode District

11

04. Erode Gangapuram Common Effluent 4.5 - Proposed CTE issued for a Treatment Plant Private Limited, period upto Erode Taluk, Erode District 31.03.2024 05. Erode Villarasampatti Common Effluent 4.5 - Proposed CTE issued for a Treatment Plant Private Limited, period upto Erode Taluk, Erode District 31.03.2024 06. Erode M/s. Suriyampalayam Common 4.2 - Proposed CTE issued for a Effluent Treatment Plant Private period upto Limited, Erode 31.03.2024 07. Erode M/s. Green Kalingarayan 5.8 - Proposed CTE issued for a Common Effluent Treatment period upto Plant Private Limited 31.03.2024 08. Erode M/s. Erode Common Effluent 2.0 - Proposed CTE issued for a Treatment Plant Private Limited period upto (CRMS) 31.03.2024 09 Kumarapalayam M/s. Kumarapalayam Green 5.0 - Proposed DPR approved Cauvery Dyeing Cluster, Kumarapalayam 10 Kumarapalayam M/s. Green Environmental 3.0 - Proposed DPR approved Association, & Kumarapalayam (CRMS) TOTAL - 10 CETP 41

V. Solid Waste Management: No. Solid Waste Management State PRS 1. Total number of Urban Local Bodies and their 13,188 48 Population 2. Current Municipal Solid Waste Generation 15666 1430.4 TPD 3. Number, installed capacity and utilization of Facilities No. 3208 451 existing MSW processing facilities in TPD Installed Capacity. 7825.23 1208 (bifurcated by type of processing eg- Waste to Utilization Capacity: 6137.23 911 Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc 4. Action plan to bridge gap between Installed Incinerators are proposed to Incinerators are Capacity and Current Utilization of processing install for processing non- proposed to install for

12

facilities (if Gap > 20%) recyclable dry waste in processing non- cluster basis recyclable dry waste in cluster basis 5. No. and capacity of C&D waste processing Nil Nil plants in TPD (existing, proposed and under construction) 6. Total no. of wards, 25145 1165 No. of wards having door to door collection 24699 1143 service, No. of wards practicing segregation at source 23658 1061 7. Details of MSW treatment facilities proposed Proposed-64, -- and under construction (no., capacity, and Capacity 86.57 TPD, technology) Technology: Micro Compositing, Organic Compositing, Recovery & Resource and Material

Resource Facility.

Under Construction-921, Under Construction-56, Capacity 913.1 TPD Capacity 196.5 TPD 8. No. and area (in acres) of uncontrolled garbage Nil Nil dumpsites and Sanitary Landfills. 9. No. and area (in acres) of legacy waste within CMA -1 No.(Erode), 19 CMA -1 No.(Erode) , 19 1km buffer of both side of the rivers acres - Biomining Work is acres - Biomining Work under progress. is under progress. 10. No. of drains falling into rivers and no. of drains Nil Nil having floating racks/screens installed to prevent solid waste from falling into the rivers

13

Status of ULB wise Management of Solid Waste-CMA & DTP ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD Facilities existing MSW Completion Timeline TPD facilities TPD CMA-135 6526 4318.23 4318.23 4318.23 948.67 TPD & 31.12.2020 DTP-528 2100 1819.21 3507 1814 51 TPD

VI . Bio-medical Waste Management: No. Bio-medical Waste State PRS Management 1. Total Bio-medical 70 T/D 8.3 T/D generation: 2. No. of Hospitals and Health 24,833 5571 Care Facilities: 3. Status of Treatment Facility/ Total 12 Nos One Facility M/s. Medicare CBMWTF: 8 Facility- Operation Enviro Systems, Thanjavur is in 1 Facility-Ready for operation which covers the Operation districts of Thanjavur, , 3 Facilities-Issued Closure Trichy, Nagapattinam, Pudukottai, Order by TNPCB for non- Perambalur, Ariyalur & compliance. Sivangangai. In addition 3 common Another Facility in M/s.Ramky facilities are under Energy and Environment Ltd, establishment in Salem is in operation which covers Gummidipoondi, and the districts of Salem, Namakkal, Tiruppur. Erode, Dharmapuri, krishnagiri & Karur.

VII. Hazardous Waste Management: No. Hazardous Waste Management State 1. Total Hazardous Waste generation 10,59,386 Ton/Annum (T/A) 2. No. of Industries generating 3961 units

14

Hazardous waste 3. Treatment Capacity of all TSDFs 2 Nos of Common TSDFs of M/s Tamil Nadu Waste Management Limited (TNWML) as below: 1. 1.TSDF Gummidipoondi Permitted land fillable hazardous waste in SLF- 1,00,000 T/A Permitted for Incineration of hazardous waste with incinerator of capacity-1.5 T/Hr. 2. 2.TSDF Viruthunagar 3. Permitted land fillable hazardous waste in SLF- 2,40,000 T/A 4. Avg. Quantity of Hazardous waste Land fillable hazardous waste- 90,296 T/A reaching the TSDFs and Treated Incinerable hazardous waste- 7312 T/A 5. Details of on-going or proposed TSDF A common TSDF is proposed by M/s.Tamilnadu Waste Management Limited (TNWML Unit-3) at Plot No. 141A, 142 and 143 & SF No. 726 (Part) of Balethottam Village, Pochampalli Taluk, Krishnagiri District for which CTE was granted under Water & Air Acts for Direct landfill of Hazardous waste-83 TPD & landfillable hazardous waste after treatment - 166 TPD.

VIII. Plastic Waste Management: Plastic Waste Management STATE PRS Total Plastic Waste generation (TPD) 637 124 Treatment/ Measures adopted for Recyclable/ Saleable plastics Recyclable/ Saleable reduction or management of plastic are been sold to authorized plastics are been sold to waste vendors authorized vendors Non- saleable plastics are Non- saleable plastics are been sent to cement factories been sent to cement and are used as a component factories and are used as a for laying roads component for laying roads Incinerators are proposed to Incinerators are proposed to install for processing non- install for processing non-

15

recyclable dry waste in cluster recyclable dry waste in basis cluster basis Sold to Plastic Waste Sold to Plastic Waste Recyclers, Recyclers, used in Road constructions used in Road constructions and sent to cement Industries and sent to cement for co-processing Industries for co-processing

IX. Details of Alternate Treatment Technology being adopted by the State/UT :

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment: Details furnished below:

No. of location Name of the Sl.No. Name of the ULB joining into Remarks river major canal/river 1 Cauvery 5 I&D Work DPR is under preparation 2 Cauvery Pallipalayam 7 I&D Work DPR is under preparation 3. Cauvery 3 I&D Work DPR is under preparation 4 Cauvery Bhavani 6 I&D Work DPR is under preparation 5 Tamirabarani 6 I&D Work DPR is under preparation 6 Tamirabarani Vickaramasingapuram 12 I&D Work DPR is under preparation 7 Vasista 3 I&D Work DPR is under preparation 8 Vasista Narasingapuram 3 I&D Work DPR is under preparation 9 Sarabanga Idappadi 22 I&D Work DPR is under preparation Total 67 Source:CMA

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: Nil XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

16

Latest water quality of the polluted river-TNPCB

Sl.No Name of the No of Status of River during Remarks . River Monitoring October 2020 Locations

1 Sarabanga 2 The subsurface water No flow quality meets the criteria.

2 Thirumanimutharu 2 The surface water quality BOD 9.6 mg/l does not meets the Faecal Coliform criteria, while sub-surface 320 MPN/100 ml in water meets the criteria. surface water.

3 Vasista 2 The surface water quality at BOD 7.5 mg/l Thullukkanur does not Faecal Coliform meet the criteria while sub- 2200 MPN/100 ml in surface water meets the surface water. criteria. 4 Cauvery 19 The surface water quality -- meets the criteria.

5 Bhavani 7 The surface water quality meets the criteria. --

6 Thamirabarani 12 The surface water quality meets the criteria. --

BOD Standard limits (mg/l) <3

XIV. Ground water regulation-PWD Name of the Ground water regulation River

Sarabanga For effective management of Ground Water, action is being initiated against Thirumanimutharu illegally operating water drawing companies as Per Honorable Madras High Vasista Court order passed under WP No.16299 / 2018. Totally 683 packaged drinking

17

Cauvery water firms who were illegally operating have been sealed and closed.

Bhavani A Comprehensive Groundwater (Management and Development) Act., to regulate Thamirabarani and Manage the extraction of Groundwater is under active consideration of the .

XV. Good irrigation practices being adopted by the State-PWD: Name of the River Good irrigation practices being adopted by the State

Sarabanga

Thirumanimutharu Awareness meeting are conducted under TNIAMP, ADB & State Funds. In Vasista some parts of the reach DRIP irrigation is practiced. Cauvery

Bhavani

Thamirabarani Village level awareness campaign are conducted periodically by PWD officials to adopt the crop rotation to have a good irrigation practices. Rehabilitation and modernization of Tanks, Anicuts and Supply channels are being carried out in TNIAMP project vide GO Ms No: 140 PW (WR 1) Dept Dt: 21.06.2017 for an amount of Rs.107.09 crores.

XVI. Rain Water Harvesting-PWD:

Name of the River Existing Ongoing Proposed Works Structure Works

Sarabanga 5 2 10-Recharge Wells

Thirumanimutharu 6 - 14-Recharge Wells

Vasista 16 - -

Cauvery 44 10 29

Bhavani 13 3 17

Thamirabarani 7 2 230 (Barrages 3 Nos at cost of Rs. 230 Crores.

18

Check dam 2 Nos at cost of Rs. 76 Crores, Artificial Recharge well 221 Nos and Recharge shaft 4 Nos at a cost of Rs. 88.496 Crores.)

TOTAL 91 17 300

XVII. Demarcation of Flood plain and removal of illegal encroachments - PWD: Name of the River Demarcation of Floodplain and removal of illegal encroachments

Sarabanga Drone Survey is to be conducted by WAPCOS during December 2020. DPR is under preparation under Nadanthai Vaazhi Cauvery for conducting the above Thirumanimutharu survey for identification of flood plain zones and area for afforestation to maintain Bio Diversity. The tentative cost of the DPR is Rs 2 crores. The DPR will be completed in December 2020. Encroachment if any identified during the survey will be evicted and other management works will be completed by March 2022 after rehabilitation and resettlement.

Vasista No Flood plains zones have been identified. No Encroachment has also been identified in the stretch. In case of any encroachments is reported in future by Revenue department, action will be taken for immediate eviction.

Cauvery Drone Survey is to be conducted by WAPCOS during December 2020. DPR is under preparation under Nadanthai Vaazhi Cauvery for conducting the above survey for identification of flood plain zones and area for afforestation to maintain Bio Diversity. The tentative cost of the DPR is Rs.20 crores. The DPR will be completed in December 2020. Encroachment if any identified during the survey will be evicted and other management works will be completed by March 2022 after rehabilitation and resettlement.

Bhavani Drone Survey is to be conducted by WAPCOS during December 2020. DPR is under preparation under Nadanthai Vaazhi Cauvery for conducting the above survey for identification of flood plain zones and area for afforastation to maintain Bio Diversity. The tentative cost of the DPR is Rs.2 crores. The DPR will be completed in December 2020. 55 Nos of encroachments are to be removed which belong to fishing community. Recommendations for alternate land has been sent to Secretary to

19

Government, Revenue department by Commissioner for Revenue administration vide letter No F.2/41632/2005/Dt.15.2.2006.

Thamirabarani To prepare comprehensive flood protection plan for Thamirabarani River Rs. 4.00 Lakhs has been alloted vide GO Ms. No. 37 Revenue (DMII) Department 9.02.2017. Estimate has been prepared for Rs. 4.00 Lakhs for the demarcation of Flood plain zone and steps are being taken for the protection and management of Flood plain Zones of Thamirabarani River. Moreover, in Tirunelveli Corporation, ProsopisJuliflora on the river stretches for a length of 10km from Vilagam to Naranammalpuram river bridge were removed at a cost of 140.00 lakhs vide GO(2D) No. 14 PW (P2) Dept Dated 8.03.2019 to restore the River course for a free flow of flood water.

XVIII. Maintaining minimum e-flow of river-PWD: Name of the River Maintaining minimum e-flow of river

Sarabanga This river is only a flood carrier. The sewage water enters in to the river in Edapaddi Municipality, Omalur Town Panchayat and Town Panchayat. The above treatment plants are proposed under Nadanthai Vaazhi Cauvery. DPR preparation is likely to the completed by December 2020. E flow will be maintained in this river after completion sewage treatment plants by March 2021. The treated water will flow as environmental flow.

Thirumanimutharu This river is only a flood carrier. The sewage water enters in to the river in Salem Corporation. Treatment plants have been proposed under NadanthaiVaazhi Cauvery. DPR preparation is to be completed by December 2020. E flow will be maintained in this river after completion of sewage treatment plants by March

2021, the treated water will flow as environmental flow.

Vasista This river is only a flood carrier. But the sewage water enters in to the river in Attur and Narasingapuram Municipality. After completion of sewage treatment plants in the above location, the treated water will flow as environment flow.

Cauvery is opened for irrigation from June 12th to January 28th based on availability of water every year. It is opened for drinking purpose in the remaining days. Usually a monthly minimum average E flow of 0.10 TMC is maintained. The E flow is maintained for more than 8 months. During the month of October an E Flow of 1059 mcm was maintained. Bhavani An E flow of 92718 cusecs (including Irrigation purpose) was maintained in the river Bhavani during the Month of October 2020. Thamirabarani Environmental flow (outflow) of Reservoir is 718 mm3 for the month of October 2020.

20

XIX. Plantation activities along the rivers-PWD: Name of the River Plantation activities along the Rivers

Sarabanga It is proposed to plant around 32,400 samplings under Nadanthai Vaazhi Cauvery for which DPR is under preparation. Plantation work will be completed in March 2021.

Thirumanimutharu It is proposed to plant around 42,000 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December2020. Plantation work will be completed in March 2021. Vasista There is no proposal at present.

Cauvery It is proposed to plant around 1,44,500 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December 2020. Plantation work will be completed in March 2021. Bhavani It is proposed to plant around 86,500 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December 2020. Plantation work will be completed in March 2021. Thamirabarani At present there is no proposal on plantation on the River Banks and investigation works are being taken to implement it by Forest Department.

XX. Development of biodiversity park - PWD: Name of the River Development of Biodiversity park

Sarabanga This is proposed to be taken up under Nadanthai Vaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by Thirumanimutharu WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022

Vasista There is no proposal at present.

Cauvery This is proposed to be taken up under NadanthaiVaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by Bhavani WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022. Thamirabarani At present there is no proposal on biodiversity parks on the encroached River stretches and investigation works are being taken to implement it.

21

XXI. Reuse of Treated Water - CMA: The policy for promotion of use of Treated Waste Water is prepared with a vision to maximize the collection & treatment of sewage generated and reuse of treated waste water on a sustainable basis, thereby reducing dependency on fresh water resources. Further, the policy promotes use of treated waste water as an economic resource. In this regard, Tamil Nadu Government has launched waste water reuse policy during December 2019. At present Memorandum of Understanding (MoU) has been executed between the ULB and the user agency for the re-use of secondary treated effluent water (STEW).

Name of the Quantity (in S. No Usage/ Purpose ULB MLD) 1 Nagapattinam 2.00 M/s KVK Power for cooling purpose

2 Dindugul 5.00 To maintain the TDS level of Tanners for Agro- forestry. 3 Tirunelveli 24.00 Nanguneri Special Economic Zone (SEZ) for Industries 4 Perambalur 3.00 MRF Industrial use 5 3.00 NTC Infra 6 Coimbatore 15.00 Agricultural use to farmers association 7 Pollachi 11.50 Agricultural use to farmers association 8 Chinnamannur 3.00 Agricultural use 9 Karur 7.00 Agricultural use 10 Arakkonam 7.00 MRF Industrial use Total 80.5

XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: River Bhavani

22

XXIII. Status of Preparation of Action Plan by the 13 Coastal States:

As per G.O. MS No.64 Environment and Forests (EC.2) Department dated 03.10.2020, action plan for the coastal and marine pollution will be prepared by the Department of Environment, Government of Tamil Nadu.

XXIV. Regulation of Mining Activities in the State/UT:

XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring: Nil

23

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Tamilnadu

Overall status of the CMA: I. Total Population : 1,67,05,001 II. Estimated Sewage Generation (MLD) : 1523.98

III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing no. of STPs and Treatment Capacity (in MLD) 49 Nos & 12Nos & 857.20 260.79 2 Capacity Utilization of existing STPs 344.26 116.82 3 MLD of sewage being treated through Alternate Nil technology 4 Gap in Treatment Capacity in MLD 666.78 114.82 5 No. of Operational STPs 37 nos 12 nos 6 No. of Complying STPs 37 nos 12 nos 7 No. of Non-complying STPs Nil

Details of each existing STP in the State & PRS Existing Capacity Capacity being of STP (in Utilized Operational Compliance S. No Location MLD) (in MLD) Status of STP Status of STP 70.00 35.00 Operational Comply 1 Coimbatore 60.00 5.00 Operational Comply 2 Vellore 10.28 7.50 Operational Comply 3 Dindigul 13.65 3.00 Operational Comply 1 STP (4mld) - Completed 36 MLD under 4 Avadi 4.00 2.50 progress Comply

1

170.70 MLD

(45.70 + 125.00) 5 Madurai MLD 38.00 Operational Comply Under 6 Thanjavur 28.05 14.15 Renovation Comply 7 Tiruppur 15.00 7.50 Operational Comply 8 Cuddalore 12.25 6.00 Operational Comply 9 Kanchipuram 14.50 13.50 Operational Comply 10 Maraimalai Nagar 2.20 1.80 Operational Comply (CMWSSB STP 11 Pallavapuram 115@Perungudi) Operational Comply 12 Tiruvallur 6.20 3.60 Operational Comply 13 Chidambaram 9.44 2.10 Operational Comply 14 Thiruvannamalai 8.70 4.50 Operational Comply 15 Viluppuram - 2Nos 12.50 8.60 Operational Comply Under Trial 16 Arakkonam 11.04 2.00 run Comply Under Trial 17 Thirupathur 11.43 0.50 run Comply 18 Bodinayakkanur 12.08 4.00 Operational Comply 19 Chinnamanur 3.99 3.72 Operational Comply 20 Periyakulam 5.47 5.47 Operational Comply 21 Ramanathpuram 7.00 5.80 Operational Comply 22 Theni-Allinagaram 12.05 6.50 Operational Comply 23 Dharmapuri 4.86 3.50 Operational Comply 24 Karur 15.00 6.50 Operational Comply 25 Krishnagiri 12.34 7.80 Operational Comply 26 Namakkal 5.00 5.00 Operational Comply Nagapattinam STP-1 9.63 4.50 Operational Comply Nagapattinam 27 STP-2 2.69 0.40 Operational Comply 28 Tiruvarur 6.92 4.10 Operational Comply 29 Ariyalur 4.16 1.00 Operational Comply 30 Pudukkottai 10.62 4.00 Operational Comply 31 Perambalur 4.20 3.60 Operational Comply

2

32 Udhagamandalam 5.00 4.00 Operational Comply 33 Udumalaipet 7.81 3.50 Operational Comply 34 Virudhunagar 7.65 3.70 Operational Comply PRS (12 Nos) 35 Tiruchirappalli 58.00 58.00 Operational Comply Salem - Vellakuttai STP 13.00 7.00 Operational Comply Salem - Anaimedu STP 6.00 3.00 Operational Comply Salem - Mankuttai 36 STP 35.00 1.00 Operational Comply Completed & Power Salem - Vandipattai connection to STP 44.00 - be obtained - 37 Tirunelveli 24.20 8.50 Operational Comply 38 Erode 50.55 18.50 Operational Comply Mettur STP-1 0.82 0.38 Opertional Comply Mettur STP-2 0.92 0.19 Opertional Comply 39 Mettur STP-3 5.45 2.40 Opertional Comply 40 Kumbakonam 17.00 12.00 Operational Comply 41 Mayiladuthurai 5.85 5.85 Operational Comply Total 49 nos 857.20 344.26

Details of under construction STPs in the State & PRS

Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections Alternate site to be identified & it will be 1 Ambur 16.71 - - completed on Oct’22.

2 Avadi 36.00 80% - March-21 Coimbatore - Nanjudapuram 40.00 70% - Feb-21 3 Coimbatore – Kuruchi & kuniyamuthur 30.53 23% - Jan-22

3

Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections 4 Karaikudi 16.00 70% - March-21 5 Nagercoil 17.66 90% - Dec-20 6 Pollachi 11.25 83% - Dec-20 WO order issued & Design under scrutiny & it will be completed 7 Rajapalayam 21.85 - - on Dec’21. 8 Rameshwaram 4.08 35% - Dec’21 Collection system will be Completed on 9 Rasipuram 6.96 100% - Dec’20 10 Saththur 4.65 67% - March-21 11 Tambaram 30.00 96% 3930 December’20 12 Tiruppur (3nos) 70.00 30% - March-22 13 Tuticorin 28.00 45% - March-21 14 Vellore 50.00 39% - March-21 PRS (4 Nos) Trichirapalli- 15 STP1 30.00 52% - July-21 Trichirapalli- STP2 37.00 35% - Aug-21 16 Sathiyamangalam 4.08 99% - Dec’20 17 Mettupalayam 8.65 82% - June- 21

Total (21 nos) 463.42

In addition to above, 49 no. of FSTPs are proposed & various of implementation. In which 5 no of FSTPs falls under polluted river stretches(Cauvery- 1no, Vasista -1 no, Sarabanga – 1 no & Thamirabarani – 2 nos.) S.No Progress Number of FSTPs 1 Completed / Nearing completion 6 2 Intermediate / Advanced stage 20 3 Initial stage/ Preparatory Stage 19 4 Tendering stage DPR 4 Total 49

4

Details of proposed STPs in the State (2 Nos) & PRS(2 Nos)

No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed in Stage/ Under Tendering/ Completion MLD Work to be Awarded) 1 Sathiyamangalam 1.13 DPR Prepared - 2 Tirunelveli 34.00 Under DPR stage -

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population: 135 ULBs &Population -1,67,05,001  Current Municipal Solid Waste Generation:6526 TPD& 1296 TPD  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc : Enclosed  Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) Nil  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction) : Nil  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source : Enclosed  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology) : Enclosed  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.Nil  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers- 1 no.(Erode)&19 acres – Biomining Work is under progress  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers – Nil. Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD facilities existing MSW Completion facilities Timeline

5

Enclosed X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

SI. Name of the Name of the ULB No. of Remarks No River location joining into major canal/ river

1 Cauvery Komarapalayam 5 I&D Work DPR under preparation

2 Cauvery Pallipalayam 7 I&D Work DPR under preparation

3 Cauvery Kulithalai 3 I&D Work DPR under preparation

4 Cauvery Bhavani 6 I&D Work DPR under preparation

5 Tamirabarani Ambasamudram 6 I&D Work DPR under preparation

6 Tamirabarani Vickaramasingapuram 12 I&D Work DPR under preparation

7 Vassista Attur 3 I&D Work DPR under preparation

8 Vassista Narasingapuram 3 I&D Work DPR under preparation

9 Sarabanga Idappadi 22 I&D Work DPR under preparation

XXI. Reuse of Treated Water: The policy for promotion of use of Treated Waste Water is prepared with a vision to maximise the collection & treatment of sewage generated and reuse of treated waste water on a sustainable basis, thereby reducing dependency on fresh water resources. Further, the policy promotes use of treated waste water as an economic resource. In this regard, Tamil Nadu Government has launched waste water reuse policy on December 2019. At present Memorandum of Understanding (MoU) has been executed between the ULB and the user agency for the re-use of secondary treated effluent water (STEW) .

S. Name of the Quantity (in Usage/ Purpose No ULB MLD)

6

1 Nagapattinam 2.00 M/s KVK Power for cooling purpose

2 Dindugul 5.00 To maintain the TDS level of Tanners as well for Agro- forestry.

3 Tirunelveli 24.00 Nanguneri SEZ for Industries

4 Perambalur 3.00 MRF Industrial use

5 Ramanathapuram 3.00 NTC Infra

6 Coimbatore 15.00 Agricultural use to farmers association

7 Pollachi 11.50 Agricultural use to farmers association

8 Chinnamannur 3.00 Agricultural use

9 Karur 7.00 Agricultural use

10 Arakkonam 7.00 MRF Industrial use

7

Commissionerate of Municipal Administration,Chennai Solid Waste Management Status Report SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Biomethanation S.No Name of ULB's Generated Windrow Compost Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) plant (MT) Service at source Capacity in Capacity in Capacity in Capacity Capacity No. No. No. No No. No. (MT) (MT) (MT) in MT in (MT) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 VELLORE REGION 1 Ambur 36 36 30 40 24 1 15 0 0 0 0 2 8 2 4.00 1 2 Arakkonam 36 36 34 28 13 0 0 0 0 0 0 4 16 4 1.00 1 3 Arcot 30 30 26 19 13 0 0 0 0 1 3 3 9 7 3.50 1 4 36 36 34 26 15 0 0 0 0 0 0 2 8 9 4.500 1 5 Ranipet 30 30 25 17 10 0 0 0 0 0 0 3 10 3 1.50 2 6 Thirupathur 36 36 30 30 18 0 0 0 0 0 0 5 12 12 6.00 0 7 Vaniyambadi 36 36 32 33 14 0 0 0 0 0 0 6 24 8 7.50 2 8 24 24 20 14 9 0 0 0 0 0 0 3 8 6 3.00 1 9 Jolarpet 18 18 16 10 9 0 0 0 0 0 0 1 4 1 3.00 1 10 Melvisharam 21 21 18 18 11 0 0 0 0 0 0 3 12 0 0.00 1 11 21 21 17 15 12 0 0 0 0 0 0 0 0 4 0.00 1 12 Thiruvannamalai 39 39 35 55 31 0 0 0 0 1 5 12 36 18 2.00 1 13 Arani 33 33 26 27 19 0 0 0 0 0 0 5 20 3 1.50 1 14 Thiruvathipuram 27 27 22 13 11 0 0 0 0 0 0 3 12 3 1.50 1 15 24 24 19 12 8 0 0 0 0 0 0 3 12.5 1 0.50 1 16 Villupuram 42 42 38 63 38 0 0 0 0 0 0 9 45 8 4.00 1 17 33 33 30 23 15 0 0 0 0 0 0 4 16 4 2.00 1 18 21 21 18 20 14 0 0 0 0 0 0 3 12 12 6.00 1 TOTAL 543 543 471 463 282 1 15 0 0 2 8 71 265 105 52 19 MADURAI REGION 19 Tirumangalam 27 27 25 24 14 0 0 0 0 0 0 3 12 14 2.00 0 20 27 27 24 17 10 0 0 0 0 0 0 1 4 6 2.00 0 21 24 24 15 10 6 0 0 0 0 0 0 1 5 0 0.00 1 22 33 33 30 33 18 1 8 1 2 0 0 2 8 9 2.00 1 23 Bodinayakanur 33 33 31 31 20 0 0 0 0 0 0 2 10 16 3.00 1 24 Chinnamanur 27 27 24 13 8 1 1 0 0 0 0 2 7 5 1.00 1 25 Cumbum 33 33 31 18 11 1 1.5 0 0 0 0 2 6 5 0.50 1 26 Gudalur 30 30 26 12 8 0 0 0 0 0 0 1 3 0 0.00 1 27 Periyakulam 21 21 16 16 10 1 6 1 2 0 0 0 0 3 0.36 1 28 Kodaikanal 27 22 18 11 9 1 1 0 0 0 0 0 0 4 0.23 0 29 36 36 31 41 19 1 4 0 0 1 5 1 10 5 2.00 1 0 0 0 0 0 0 1 2.0 30 27 27 22 15 11 9 0.50 1 0 0 0 0 0 0 3 7.5 31 Sivagangai 33 33 26 18 9 0 0 0 0 0 0 3 9 7 0.35 1 1 1 0 0 0 0 2 4 32 Karaikudi 36 36 34 48 28 22 4.00 2 0 0 0 0 0 0 4 16 33 21 21 19 15 16 0 0 0 0 0 0 4 12 7 1.50 0 34 Ramanathapuram 21 21 20 20 17 1 4 0 0 0 0 1 4 5 1.00 1 35 33 33 31 35 21 0 0 0 0 1 1 3 15 20 6.14 1 36 24 24 22 13 8 1 5.5 1 1 1 1 1 3 3 3.00 1 37 Keelakarai 18 18 15 18 11 1 0.20 0 0 0 0 1 5 2 1.00 0 TOTAL 531 526 458 408 254 10 32 3 5 3 7 38 142.0 142 31 15 TIRUPPUR REGION 38 Pollachi 36 36 31 32 25 0 0.00 1 1.00 1 5 5 21 13 6.5 2 SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Biomethanation S.No Name of ULB's Generated Windrow Compost Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) plant (MT) Service at source Capacity in Capacity in Capacity in Capacity Capacity No. No. No. No No. No. (MT) (MT) (MT) in MT in (MT) 39 Mettupalayam 33 31 29 22 12 0 0.00 0 0.00 1 3 2 8 3 1.5 1 40 21 20 16 4 3 1 1.20 0 0.00 0 0 0 0 1 0.5 0 41 Udumalpet 33 31 27 19 12 0 0.00 0 0.00 0 0 3 12 13 6.5 1 42 30 30 26 17 11 1 5.00 0 0.00 0 0 2 6 4 2.0 1 43 18 18 15 11 7 1 4.50 0 0.00 0 0 1 2 1 0.5 1 44 21 21 18 11 8 0 0.00 0 0.00 0 0 2 7.5 1 0.5 1 45 18 18 16 13 7 1 2.35 0 0.00 0 0 2 4 1 0.5 1 46 30 30 26 18 12 1 9.00 0 0.00 1 3 2 7 7 3.5 1 47 27 27 23 10 7 1 0.83 0 0.00 0 0 2 5 1 0.5 1 48 Bhavani 27 27 23 9 9 0 0.00 0 0.00 0 0 2 10 - - 1 49 Punjaipuliampatti 18 18 16 6 6 0 0.00 0 0.00 0 0 1 3 5 2.5 2 50 Udhagamandalam 36 34 29 32 25 0 0.00 0 0.00 1 5 6 15 - - 1 51 30 29 26 11 9 6 2.40 0 0.00 0 0 1 4 4 2.0 1 52 Gudalur 21 21 18 14 9 1 3.00 0 0.00 0 0 1 5 - - 1 53 21 17 17 3 3 1 2.50 0 0.00 0 0 0 0 - - 1 TOTAL 420 408 354 232 163 14 31 1 1 4 16 32 110 54 27 17 REGION 54 Chengalpattu 33 28 25 65 11 0 0 0 0 0 0 2 7 7 2.85 1 55 Kancheepuram 51 43 43 22 33 0 0 0 0 1 5 4 20 25 12.50 2 56 Madurantakam 24 22 19 7 3 0 0 0 0 0 0 1 5 1 1.00 1 57 Pallavapuram 42 38 30 104 52 0 0 0 0 1 5 7 27 21 19.00 1 58 Tambaram 39 35 27 90 49 0 0 0 0 0 0 8 32 19 10.00 2 59 18 18 18 13 7 0 0 0 0 0 0 2 8 2 1.00 2 60 Maraimalainagar 21 17 14 23 11 0 0 0 0 0 0 4 20.00 2 1.00 1 61 21 21 15 31 16 0 0 0 0 0 0 6 20 4 2.00 1 62 Sembakkam 15 15 15 24 12 0 0 0 0 0 0 2 10 7 6.00 1 63 Tiruvallur 27 27 19 24 11 0 0 0 0 0 0 2 9 17 6.50 3 64 Poonamallee 21 19 16 21 11 0 0 0 0 1 5 8 18.10 0 0.00 1 65 Tiruthani 21 18 18 12 6 0 0 0 0 1 5 2 6 0 0.00 1 66 18 18 11 15 11 0 0 0 0 0 0 7 26.85 10 1.50 1 67 Chidambaram 33 31 25 17 7 0 0 0 0 0 0 4 14.00 3 2.50 1 68 Cuddalore 45 37 31 33 24 0 0 0 0 0 0 3 20 10 3.80 1 69 30 22 22 13 6 0 0 0 0 0 0 1 2 8 4.00 1 70 33 28 21 17 9 0 0 0 0 0 0 2 8.00 4 3.00 2 71 33 30 24 24 10 0 0 0 0 0 0 2 7 6 4.00 1 TOTAL 525 466 393 553 287 0 0 0 0 4 20 67 260 146 81 24 THANJAVUR REGION 72 Kumbakonam 45 45 41 70 41 0 0.00 0 0.00 1 5 5 20 34 16.5 2 73 Pattukkotai 33 33 28 30 17 0 0.00 0 0.00 0 0 5 10 12 4 2 74 Nagappattinam 36 36 31 32 19 0 0.00 0 0.00 1 5 3 14 13 6.0 2 75 Mayiladuthurai 36 36 29 32 18 0 0.00 0 0.00 0 0 3 15 5 2.5 1 76 Sirkali 24 24 17 14 9 1 3.00 0 0.00 0 0 2 6 5 2 1 SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Biomethanation S.No Name of ULB's Generated Windrow Compost Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) plant (MT) Service at source Capacity in Capacity in Capacity in Capacity Capacity No. No. No. No No. No. (MT) (MT) (MT) in MT in (MT) 77 21 21 19 12 6 0 0.00 0 0.00 0 0 2 6 0 0 0 78 Tiruvarur 30 30 21 22 13 0 0.00 0 0.00 0 0 1 3 5 2.5 1 79 33 33 28 22 15 1 5.00 0 0.00 0 0 3 11 8 4 1 80 24 24 20 8 5 0 0.00 0 0.00 0 0 1 5 1 0.5 0 81 24 24 19 7 5 1 1.00 1 1.00 0 0 1 2 4 2.0 1 82 Pudukkottai 42 42 38 70 42 0 0.00 1 2.00 0 0 5 13 21 10.75 1 83 27 27 27 14 9 1 0.50 1 2.00 0 0 2 4 2 1 2 84 27 27 22 16 7 0 0.00 0 0.00 0 0 1 4 5 2.0 1 85 24 24 24 15 10 0 0.00 0 0.00 0 0 3 12 4 2 2 86 21 21 17 8 7 0 0.00 0 0.00 0 0 0 0 8 8.5 1 87 Perambalur 21 21 17 18 7 0 0.00 0 0.00 1 3 2 6 1 0.5 2 88 Ariyalur 18 18 16 14 8 0 0.00 0 0.00 0 0 1 5 5 2.5 1 89 21 21 18 11 9 0 0.00 0 0.00 0 0 1 2 2 0.5 1 TOTAL 507 507 432 415 245 4 10 3 5 3 13 41 138 135 68 22 TIRUNELVELI REGION 90 33 33 30 15 16 0 0.0 0.0 0.0 0 0 4 14 7 3.5 2 91 30 30 28 14 13 1 3.0 0.0 0.0 0 0 4 13 2 1.0 4 92 33 33 28 26 21 1 1.0 1.0 1.0 0 0 5 16 3 2.5 3 93 Puliangudi 33 33 26 18 11 1 2.2 0.0 0.0 0 0 4 12 1 0.5 3 94 24 24 22 6 8 1 0.5 1.0 1.0 0 0 3 6 2 0.5 1 95 Ambasamudram 21 21 19 9 9 0 0.0 0.0 0.0 0 0 3 9 5 1.0 1 96 V.K.Puram 21 21 20 14 13 1 3.0 0.0 0.0 0 0 4 11 0 0.0 1 97 36 36 34 26 21 0 0.0 0.0 0.0 0 0 5 18 6 4.0 3 98 Kayalpattinam 18 18 17 12 10 1 0.5 0.0 0.0 1 5 2 6 0 0.0 1 99 Kuzhithurai 21 21 19 7 4 0 0.0 0.0 0.0 0 0 1 4 1 0.5 1 100 24 24 22 8 5 0 0.0 0.0 0.0 1 1 1 3 3 2.0 1 101 P.Puram 21 21 17 7 4 0 0.0 0.0 0.0 0 0 1 4 1 0.5 1 102 Virudhunager 36 36 27 18 20 0 0.0 0.0 0.0 0 0 5 20 2 1.0 1 103 Rajapalayam 42 42 38 49 28 1 3.0 0.0 0.0 1 5 2 7 4 6.0 1 104 33 33 24 30 26 0 0.0 0.0 0.0 0 0 5 15 5 7.5 1 105 33 33 24 20 14 0 0.0 0.0 0.0 0 0 2 8 0 0.0 1 106 Aruppukottai 36 36 27 25 21 0 0.0 0.0 0.0 0 0 5 16 3 1.8 3 107 24 24 18 10 7 1 2.0 0.0 0.0 0 0 1 3 2 0.5 1 108 21 21 17 15 10 0 0.0 0.0 0.0 0 0 1 3 0 0.0 1 Total 540 540 455 330 259 8 15 2 2 3 11 58 188 47 33 31 SALEM REGION 109 Attur 33 33 33 12 10 0 0 0 0 0 0 4 12 4 0.388 1 110 Mettur 30 30 30 15 9 0 0 0 0 1 5 3 9 1 0.150 1 111 Idappadi 30 30 30 14 9 0 0 0 0 0 0 5 15 2 0.200 1 112 Narasingapuram 18 18 18 7.05 4 0 0 0 0 0 0 3 10 1 0.100 1 113 Namakkal 39 39 39 35 21 0 0 0 0 1 5 4 16 7 1.000 1 114 33 33 33 29 20 0 0 0 0 1 5 5 14 2 0.200 2 115 Rasipuram 27 27 27 14 10 0 0 0 0 0 0 1 5 3 0.300 1 116 2 5 1 Komarapalayam 33 33 33 15 14 0 0 0 0 0 0 1 0.150 SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Biomethanation S.No Name of ULB's Generated Windrow Compost Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) plant (MT) Service at source Capacity in Capacity in Capacity in Capacity Capacity No. No. No. No No. No. (MT) (MT) (MT) in MT in (MT) 117 Pallipalayam 21 21 21 12 7 0 0 0 0 1 5 1 2 0 0.000 1 118 1 1 1 Dhamapuri 33 33 33 22 15 0 0 0 0 0 3 0.270 0 4 16 119 Krishnagiri 33 33 33 17 13 0 0 0 0 0 0 4 16 3 0.270 1 120 Karur 48 48 48 71 45 0 0 0 0 1 5 10 40 2 0.175 3 121 Kulithalai 24 24 24 7 4 1 2.40 1 1.60 0 0 1 2 1 0.118 2 Total 402 402 402 270 181 1 2 1 1.60 5 25 48 163 30 12 17 Region Total 3468 3392 2965 2671 1670 38 105 10 15 24 100 355 1265 659 302 145 Corporations 122 Coimbatore 100 78 60 915 417 1 80 4 6 25 102 25 12.00 5 123 Madurai 100 100 70 630 336 1 4 20 100 24 11.00 0 124 Salem 60 60 54 350 203 0 0 0 0 2 8 26 130 20 7.00 4 125 Erode 60 57 54 158 86 0 0 2 11 25 90 23 11.00 1 126 Tirunelveli 55 52 47 170 74 2 7 41 97 4 8.00 3 127 Dindigul 48 48 35 92 57 1 10 2 7 9 45 16 8.00 0 128 Vellore 60 60 54 230 97 0 0 0 0 1 1 51 163 18 1.00 42 129 Thanjavur 51 48 48 106 56 2 7 3 15 14 7.00 0 130 Trichy 65 65 62 351 222 0 0 2 7 34 170 22 8.00 0 131 Tiruppur 60 54 42 410 234 2 12 28 140 25 10.00 6 132 Thoothkudi 60 60 60 175 80 16 73 12 6.00 0 133 Nagercoil 52 52 37 106 66 0 0 0 0 1 5 11 55 10 5.00 0 134 Hosur 45 45 45 72 43 0 0 0 0 1 10 11 43 14 5.00 1 135 Avadi 48 47 41 90 45 0 0 0 0 1 5 17 65 21 10.00 1 Total 864 826 709 3855 2016 1 10 1 80 23 89 317 1288 248 109.00 63 Grant Total 4332 4218 3674 6526 3686 39 115 11 95 47 189 672 2553 907 411.23 208 Commissionerate of Municipal Administration,Chennai Solid Waste Management Status Report SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Biomethanation S.No Name of ULB's Generated Windrow Compost Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) plant (MT) Service at source Capacity in Capacity in Capacity in Capacity Capacity No. No. No. No No. No. (MT) (MT) (MT) in MT in (MT) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 TIRUPPUR REGION 1 Mettupalayam 33 31 29 22 12 0 0.00 0 0.00 1 3 2 8 3 1.5 1 2 Gobichettipalayam 30 30 26 18 12 1 9.00 0 0.00 1 3 2 7 7 3.5 1 3 Sathyamangalam 27 27 23 10 7 1 0.83 0 0.00 0 0 2 5 1 0.5 1 4 Bhavani 27 27 23 9 9 0 0.00 0 0.00 0 0 2 10 - - 1 THANJAVUR REGION 5 Kumbakonam 45 45 41 70 41 0 0.00 0 0.00 1 5 5 20 34 16.5 2 6 Mayiladuthurai 36 36 29 32 18 0 0.00 0 0.00 0 0 3 15 5 2.5 1 TIRUNELVELI REGION 7 Ambasamudram 21 21 19 9 9 0 0.00 0 0.00 0 0 3 9 5 1.000 1 8 V.K.Puram 21 21 20 14 13 1 3.00 0 0.00 0 0 4 11 0 0.000 1 SALEM REGION 9 Attur 33 33 33 12 10 0 0 0 0 0 0 4 12 4 0.388 1 10 Mettur 30 30 30 15 9 0 0 0 0 1 5 3 9 1 0.150 1 11 Idappadi 30 30 30 14 9 0 0 0 0 0 0 5 15 2 0.200 1 12 Narasingapuram 18 18 18 7.05 4 0 0 0 0 0 0 3 10 1 0.100 1 13 Komarapalayam 33 33 33 15 14 0 0 0 0 0 0 2 5 1 0.15 1 14 Pallipalayam 21 21 21 12 7 0 0 0 0 1 5 1 2 0 0.000 1 15 Kulithalai 24 24 24 7 4 1 2.40 1 1.60 0 0 1 2 1 0.118 2 Corporations 16 Salem 60 60 54 350 203 0 0 0 0 2 8 26 130 20 7.00 4 17 Erode 60 57 54 158 86 0 0 2 11 25 90 23 11.00 1 18 Tirunelveli 55 52 47 170 74 2 7 41 97 4 8.00 3 19 Trichy 65 65 62 351 222 0 0 2 7 34 170 22 8.00 0 Grant Total 669 661 616 1296 763 4 15 1 2 13 54 168 627 134 61 25 Solid Waste management facility under construction Solid Waste management facility proposed

Whether DPR prepared Funding Sanctioned Tendering Process Work S.No Region/Corporatio Treatment Waste type Name of the ULBs Quantity of Quantity of Treatment Completed Order Remarks n Components % of progressive Target date of waste to be Status waste to be Components Issued with capacity completion completion Yes/No Status Yes/No Status Yes/No Status Yes/No treated (TPD) treated (TPD) with capacity TPD

Foundation work in Wet Waste Panruti 6 6 Progress 20% 31.12.2020 - - - - progress 1 Chengalpattu Dry Waste Anakaputhur 5 5 Progress 90% 31.12.2020 - - - - Nearing Completion Wet Waste 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dry Waste Idappadi Basement work in 6 10 45 31.12.2020 0 0 0 0 0 0 0 0 0 2 Salem progress Wet Waste 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Karur Tender Evaluation Dry Waste 0 0 0 0 0 25 25 Yes Yes 0 No 0 No stage 2 MCC Under Wet Waste 6 6 60% 31.12.2020 ------Tiruvarur Construction Dry Waste ------MCC Under 1 MCC 80% Wet Waste 5 5 31.12.2020 ------Pudukottai Construction 1 MCC LITIGATION Dry Waste ------3 Thanjavur Under Wet Waste 3.5 MCC 5TPD 20% 31.12.2020 - Thuvakudi Construction Dry Waste ------1 MCC Under Court Case & 1 Wet Waste 4.5 6 40% 31.01.2021 ------Jayanklondam MCC Under Construction Dry Waste ------Wet Waste - - - - - 4 MCC-4 No ------Proposal to be submit Melur Dry Waste ------Tub work under progress & Wet Waste 8 MCC -8 70 31.12.2020 ------Theni Allinagaram Flooring work under progress Dry Waste ------Physically Wet Waste 10 MCC -10 98 ------Bodinayakanur completed Dry Waste ------Wet Waste 3 MCC -3 Ciel level work 20 31.12.2020 ------Cumbum Dry Waste ------4 Maduarai civil work Wet Waste 5 MCC -5 95 ------Gudalur completed Dry Waste - - - - - 4 RCC- 4 No ------Proposal to be submit Finishing work Wet Waste 2 MCC-2 95 31.12.2020 ------under progress Kodaikanal Basement level Dry Waste 3 RCC-3 30 31.12.2020 ------under progress Wet Waste 4 MCC-4 To be commenced Court case ------Karaikudi Roof level work Dry Waste 3 RCC-3 70 31.12.2020 ------under progress Work under Wet Waste 12 MCC-12 60 31.12.2020 ------Ramanathapuram progress Dry Waste ------Wet Waste ------Plinth beam Mettupalayam Incinerator of 10TPD Dry Waste 4.5 10.0 completed, Brick 20% 31.01.2021 ------Capacity work in progress

Brick work in Wet Waste 3.0 3.0 60% 31.12.2020 ------1 MCC Work Valparai progress Dry Waste ------0 5 Tiruppur 1 RRC Work - Stopped Dry Waste Palladam - - - - - 2.0 5.0 No - Yes - - - - due to Court Case 1 MCC Work - Proposed Wet Waste - - - - - 0.5 3.0 No - Yes - No - No shifting of Site due to court case Dry Waste ------1 MCC Work & Compost Wet Waste 1.50 5.00 - - 1.5 5.0 - - Yes - - - - Gudalur Yard Work Dry Waste ------Wet Waste Tenkasi Incineration sanctioned Dry Waste 1.70 Incineration Yes Tender stage yes No No in cluster basis Wet Waste 1 MCC 3.00 Construction work 90% 31.12.2020 Kadayanallur 3.00 in progress Dry Waste Wet Waste Puliangudi

6 Tirunelveli Dry Waste Puliangudi Incineration sanctioned 3.16 Incineration Yes yes Yes LOA Issued No in cluster basis Wet Waste Dry Waste Ambasamudram Incineration sanctioned 0.80 Incineration Yes yes Yes LOA Issued No in cluster basis Wet Waste Dry Waste Vickramasingapuram Incineration sanctioned 3.43 Incineration Yes yes Yes LOA Issued No in cluster basis Wet Waste 2 nos of MCC 2 OCC and 1 6 Tirunelveli 7.00 7 MT MCC 10% 31.12.2020 5.48 Yes Yes No Land issue Rajapalayam under court case MCC Dry Waste Wet Waste 1 no of MCC 2.50 3 MT MCC 90% 15.12.2020 Sivakasi under court case Dry Waste Wet Waste 2 nos of MCC 6.32 7 MT MCC 15% 31.12.2020 Srivilliputhur under construction Dry Waste Wet Waste 1 MCC Under Court Case & 1 3.30 6 MT MCC 10% 31.12.2020 Sattur MCC Under Construction Dry Waste Wet Waste 3 nos of MCC 7.28 9 MT MCC 20% 31.12.2020 Thiruthangal under court case Dry Waste Under Wet Waste 9.00 12.00 70% 31.12.2020 Construction 7 Vellore region Pernampet Under Dry Waste 5.70 6.00 70% 31.12.2020 Construction Wet Waste 20 20 Under Construction 60% 31.3.2021 8 Salem Corporation Salem Corporation Dry Waste 147 25 Under Construction 50% 31.12.2020

Wet Waste 25 MCC Work in progress 75% 31.12.2020 Tirunelveli 9 Tirunelveli Corporation Corporation Dry Waste 10 Incinerator - - Yes - Yes LOA Issued No -

Wet Waste 20 20 4mcc in progress 5% 31.12.2020 10 Trichy Corporation Trichy Corporation Dry Waste 23 23 RRC in progress 99% Completed Erode 11 Dry Waste Erode 35 35 Fabrication 2% 31.12.2020 25 DPR under preparation MCC - 21 nos, MCC - 50%, OCC- 12 Madurai Wet Waste Madurai 130 Under Construction 31.01.2021 OCC-25 nos 45% 13 Coimbatore Wet Waste Coimbatore Under Construction 20% 31.01.2021 250 182 TPD 14 Incineration - Dindigul Dry Waste Dindigul 10 Under Construction 30% 31.12.2020 10 TPD 15 Thanjavur Wet Waste Thanjavur Under Construction 25% 31.12.2020 63 MCC - 55 TPD Name of the State : Tamilnadu Commissionerate of Municipal Administration Sewage Treatment Plant Utilization & House Service Connection details

Status Technolog Complianc Location of STP (Operational / y (UASB/ e Status with Coordinates Non- Actual Utilization of ASP/ OP/ (Comply/ (Latitute and Operational / Installed installed Capacity (in SBR/ MBR Use of treated Non- comp Longitude, if Date of Under No. of HSCs effected Capacity of upto MLD)upto / FAB sewage with /Patially S. No City / Town available) Commissioning Construction) upto Sep'20 upto Oct'20 STP (in MLD) Sep'20 Oct'20 Etc.,) Quantity Comply.) Remarks Ukkadam Lat : 10.98315765 2012 Operational 70.00 35.00 35.00 SBR Let out into the Lon : 76.97252296 Comply 1 Coimbatore 56586 59086 Ondiputhur Lat : 10.9871063 2017 Operational 60.00 5.00 5.00 SBR Let out into the Log : 77.001327 Noyyal river Comply Muthumandapam Let out into the 2 Vellore 12.932166 2015 Operational 9,014 9,067 10.28 7.50 7.50 ASP Comply Velavaadi Eri 79.135616 1)For dilution purpose (1MLD) 2)Irrigation 10.35°N, purpose 3 Dindigul 77.95°E 06.11.2013 Operational 13430 13450 13.65 3.00 3.00 ASP (0.5MLD) Comply 1) Operational 58.64 MLD 2) Under rejuvenation - 30 MLD in Amrut Phase II 3) Construction 61809 62144 58.00 58.00 58.00 WSP Koraiyar River Comply of 37 MLD STP - under Amrut Lat - 10.45'6" UGSS Phase II Long -78.39'32" (SBR 4 Tiruchirappalli 01.01.1987 Technology)

Paruthipattu 13.109258, 80.104765 1 STP (4mld) - Afforeststation Mukthapudupet Completed near mittanmall 13.149045, July 2017 (Partly 36 MLD under eri Coovam 5 Avadi 80.059462 commissioned) progress 2026 3061 4.00 2.00 2.50 SBR River Comply

Sakkimangalam Lat: 9.899924 Long: 78.190997 01.03.2011

Avaniyapuram 170.70 MLD Treated water Lat: 9.871233 (45.70 + let out into 6 Madurai Long: 78.10473 Operational 165414 165480 125.00) MLD 38 38 SBR Grass land Comply Vellakuttai - 11°39'14" N - 01.03.2018 Operational 78°10'12" E 4677 4727 13.00 6.00 7.00 ASP Comply Anaimedu - 11°39'42" N - 01.03.2019 Operational Treated water 78°9'52"E 1158 1208 6.00 3.00 3.00 MBBR let out into Comply 7 Salem Thirumanimuth aru River Status Technolog Complianc Location of STP (Operational / y (UASB/ e Status with Coordinates Non- Actual Utilization of ASP/ OP/ (Comply/ (Latitute and Operational / Installed installed Capacity (in SBR/ MBR Use of treated Non- comp Longitude, if Date of Under No. of HSCs effected Capacity of upto MLD)upto / FAB Treatedsewage water with /Patially S. No City / Town available) Commissioning Construction) upto Sep'20 upto Oct'20 STP (in MLD) Sep'20 Oct'20 Etc.,) letQuantity out into Comply.) Remarks 7 Salem Mankuttai - Thirumanimuth 11°40'7" N - 29.08.2020 Operational aru River 78°7'35"E 86 286 35.00 1.00 1.00 FAB Comply Vandipettai- 11°39'0" N - 78°8'33"E Civil Work Completed. EB to be obtained 44.00 - - FAB -

8.7568547 8 MLD let in to 8 Tirunelveli 77.6829877 2007 Operational 26223 26338 24.20 8.50 8.50 WSP water course Comply

10.78512 Under Under 9 Thanjavur 79.157975 26.02.2003 Renovation 23863 23880 28.05 14.15 14.15 ASP Rejunuvation Comply

o 11 08'02'N, 9/1/2009 Let into Noyyal 10 Tiruppur 77o24'45'E Operational 15617 15625 15.00 7.50 7.50 EASP river Comply

NL 11'20'18' 12/22/2018 11 Erode EL 77'44'22' Operational 17,950 18,100 50.55 18.5 18.5 MBBR Gardening Comply

Devanampattinam 11.753832 Kediliam River Comply 12 Cuddalore 79.780407 2016 Operational 14134 14134 12.25 6.00 6.50 ASP

Nathapettai 12.828724 1972 Renovated Nathapettai 13 Kanchipuram 79.722854 scheme -2011 April Operational 21934 21934 14.5 13.5 13.5 WSP Lake Comply

Adigalar salai Longtitude-80.03006 Latitude- 14 Maraimalai Nagar 12.79923 28.02.2011 Operational 4980 4989 2.2 1.8 1.8 EASP Ninnakarai Eri Comply

STP Perungudi @Perungudi Latitute: 12.9568105 (CMWSSB) Longitude: 115MLD Buckingam 15 Pallavapuram 80.2361331 2003 Operational 33180 33360 (CMWSSB STP - Perungudi) ASP canal Comply Sivam Nagar Latitute:13.12118 Irrigation 16 Tiruvallur Longitude:79.9259 17.2.2017 Operational 6698 6742 6.20 3.60 3.60 MBBR channel Comply Manalurpet Road Latitude- Let out in Olai 17 Thiruvannamalai 12.21663355 2014 Operational 12328 12328 8.70 4.50 4.20 ASP Yaru as per Comply Longitude- design 79.06861122 Kakuppam Treated Lat - 11.957374 effluent is Lon - 79.504349 discharged to 18 Viluppuram 26.06.2014 Operational 6109 6124 12.50 8.60 8.60 ASP Comply Erumanthangal Lake Lat - 11.944019 (Erumanthagal) Lon - 79.514268 through Status Technolog Complianc Location of STP (Operational / y (UASB/ e Status with Coordinates Non- Actual Utilization of ASP/ OP/ (Comply/ (Latitute and Operational / Installed installed Capacity (in SBR/ MBR Use of treated Non- comp Longitude, if Date of Under No. of HSCs effected Capacity of upto MLD)upto / FAB sewage with /Patially S. No City / Town available) Commissioning Construction) upto Sep'20 upto Oct'20 STP (in MLD) Sep'20 Oct'20 Etc.,) Quantity Comply.) Remarks The treated Silverpet Trial run sewage water Trial run in 19 Arakkonam 13.110069'N commenced from Operational 4756 5085 11.04 1.5 2.00 ASP Comply letout into near progress 79.698920'E 15.11.2019 by Thangal 20 Bodinayakkanur Lat - 10.0179204, 27.2.2019 Operational 10465 10465 12.08 4.00 4.00 ASP 3.00MLD Comply Lon - 77.3590704 Agriculture purpuse 21 Chinnamanur 01.04.2012 Operational 6490 6497 3.99 3.72 3.72 ASP 3.70 MLD. Comply Latitute-9.850333 The treated Longitude- effluent are 77.385067 being discharged with Chinnavaikal for agricultural purpose. 22 Periyakulam Latitude- 2017 Operational 2215 7249 5.47 5.47 5.47 ASP Agricultural Comply 10.1256415 Purpose Longitude- 77.561725 23 Ramanathpuram Kaluguoorani 06.11.2013 Operational 10312 10312 7.00 5.80 5.80 MASP Back water of Comply (Viilage) sea Lat :9.369763, Lon : 78.830838 24 Theni-Allinagaram Karuvelnayakan 08.06.2015 Operational 10370 10375 12.05 6.50 6.50 ASP 5.00 MLD of Comply Patti, Theni treated sewage ( Veeranayakan is disposing in Patti ) 9.999, 77.502 Thamaraikula m for Agricultural Purpose

Discharging 12`9`1.85`` into nearby 25 Dharmapuri Arasu78`10`50.14`` Colony, 05.07.2014 Operational 6000 6000 4.86 3.50 3.50 ASP river comlpy Panchama devi Village latitude : Discharging 10.97 997, into Irrigation 26 Karur Longitude: 30.04.2007 Operational 15221 15262 15.00 6.50 6.50 EAP channel Comply Derasamuthiram Eri Latitude 2 30'25.48" Discharging N and Longitude 78 into Deva 27 Krishnagiri 30'25.48" E 15.7.2017 Operational 6020 6020 12.34 7.80 7.80 ASP Dischargingsamuththram comlpy into road, Kosavampatti 28 Namakkal Namakkal 01.10.2014 Operational 9078 9239 5.00 5.00 5.00 ASP Eri Comply

Thangamapuripattin am 340 340 0.823 0.30 0.38 Latitude=11.47'37" Mettur STP-1 Longitude-77.49'07" Aug-19 Opertional ASP Discharging Comply into sewage 29 farm for Agriculture Purpose Status Technolog Complianc Location of STP (Operational / y (UASB/ e Status with Coordinates Non- Actual Utilization of ASP/ OP/ (Comply/ (Latitute and Operational / Installed installed Capacity (in SBR/ MBR Use of treated Non- comp Longitude, if Date of Under No. of HSCs effected Capacity of upto MLD)upto / FAB sewage with /Patially S. No City / Town available) Commissioning Construction) upto Sep'20 upto Oct'20 STP (in MLD) Sep'20 Oct'20 Etc.,) DischargingQuantity Comply.) Remarks into sewage 29 Salem Camp farm for 330 330 0.924 0.15 0.19 Latitude=11.47'20" Agriculture Mettur STP-2 Longitude-77.47'45'' Jan-19 Opertional ASP Purpose Comply

Komburankadu 3437 3508 5.452 2.40 2.40 Latitude :11.46'60'' Mettur STP-3 Longitude: 77.47'01" May-19 Opertional ASP Comply

10'58'22.09"N Irrigation 30 Kumbakonam 79'24'48.55" E 2009 Operational 19575 19582 17 12 12 ASP channel comply

Lat: 10.757905 Discharged into Devanathi Nagapattinam Long: 79.834479 27.02.2016 Operational 11867 11867 9.63 4.5 4.5 ASP river & comply 31 Proposed sale Lat: 10.822428 of treated effluent to Nagai Long: 79.844813 31.05.2019 Operational 834 834 2.69 0.4 0.4 EASP Powerplant comply

Let Out in Kekkarai Village - Odambokki NL 10º48'29" and River 3.40 32 Tiruvarur EL79º38'17" 01.10.2014 Operational 6081 6091 6.92 4.1 4.1 ASP MLD Comply

Disposal to sembodai it will Keezhapalur village. be used for 11◦04'06.9"N Agriculture 33 Ariyalur 79◦03'19.8"E 28.05.2020 Operational 1886 1906 4.16 1 1 ASP purpose. Comply

Latitute : 10'21'36'' North Discharging Longitude: 78'48'33' into Irrigation 34 Pudukkottai East 27.7.2016 Operational 14828 14913 10.62 4 4 ASP channel Comply

Latitute : 11.6'21" North Discharging Longitude: 79.40'22" into Irrigation 35 Mayiladuthurai East 01.01.2008 Operational 11151 11151 5.85 5.85 5.85 WSP channel Comply

Neduvasal road, Thuraimangalam To Kattuvaikal road. (Lat . cultivation 111410.9 N) purpose & 3.60 36 Perambalur Long. 7852 57. E) 06.11.2013 Operational 11542 11595 4.20 3.60 3.60 ASP MLD Comply Status Technolog Complianc Location of STP (Operational / y (UASB/ e Status with Coordinates Non- Actual Utilization of ASP/ OP/ (Comply/ (Latitute and Operational / Installed installed Capacity (in SBR/ MBR Use of treated Non- comp Longitude, if Date of Under No. of HSCs effected Capacity of upto MLD)upto / FAB sewage with /Patially S. No City / Town available) Commissioning Construction) upto Sep'20 upto Oct'20 STP (in MLD) Sep'20 Oct'20 Etc.,) Quantity Comply.) Remarks

Kasthooribai colony Disposal into 15.04.2000 Operational 16085 16097 5.00 4.00 4.00 ASP Comply - Latitude -11.408436 Grass land Longtitude - 37 Udhagamandalam 76.679469 Kurinjeri Latitude - 10.59812 Disposal into 30.06.2016 Operational 10856 10856 7.81 3.50 3.50 ASP Comply Longtitude - Kurunjeri Odai 38 Udumalaipet 77.25447

lat -9.5654 long- Disposal into 39 Virudhunagar 77.9603 19.10.2014 Operational 7210 7475 7.65 3.68 3.70 ASP Kowsika river Comply Proposed to discharge into Lat -11.421 Pasimuthan 40 Chidambaram Long- 79.6889 2020 Operational 1650 1812 9.44 2.1 2.10 ASP odai Comply Proposed to discharge Latitude - treated effluent Trial Run starts from 30.09.2020 12°29'.05.540" N through Longtitude - pipeline to 41 Thirupaththur 78°34'.25.101" E 2433 2650 11.43 0.50 0.5 ASP Vegalapuram Comply

Total 704357 709574 857.20 347.02 349.36 National Mission for Clean Ganga Format for submission of Monthly Progress Reportin the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Tamil Nadu (Chennai)

Overall status of the State: I. Total Population:Urban Population& Rural Population separately

II. Estimated Sewage Generation (MLD): 530

III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing no. of STPs and Treatment Capacity (in MLD) 745 2 Capacity Utilization of existing STPs 530 3 MLD of sewage being treated through Alternate 108 technology 4 Gap in Treatment Capacity in MLD Nil 5 No. of Operational STPs 13 6 No. of Complying STPs 13 7 No. of Non-complying STPs Nil

Details of each existing STP in the State& PRS No. Location Existing Capacity Operational Compliance Status of STP STP Being Status pH TSS COD BOD Capacity Utilized of STP 1 Nesapakkam 23 13 Operational 7.67 801 58 14 STP Zone - IV 2 Koyambedu 34 30 Operational 7.65 950 85 16 STP Zone - III 3 Kodungaiyur 80 65 Operational 7.55 1020 93 17 STP Zone II 4 Kodungaiyur 80 56 Operational 7.60 1015 95 16 STP Zone I 5 Perungudi STP 12 11 Operational 7.60 960 96 17 Zone - V 6 Koyambedu 60 17 Operational 7.65 930 85 15

1

STP Zone - III 7 Kodungaiyur 97 Operational 7.53 805 79 16 110 STP Zone I& II 8 Nesapakkam 39 Operational 7.57 776 74 15 40 STP Zone - IV 9 Perungudi STP 50 Operational 7.66 1060 90 13 54 Zone - V 10 Perungudi STP 44 Operational 7.64 1040 150 17 60 Zone – V 11 Nesapakkam 43 Operational 7.60 782 77 17 54 STP Zone - IV 12 Koyambedu 60 Operational 7.65 810 79 16 120 STP Zone – III 13 Sholinganallur 5 18 Operational STP Total 745 530

Details of under construction STPs in the State& PRS No. Location Capacity of the Physical Status of I&D or Completion plant in MLD Progress in House sewer Timeline % connections 1 Sholinganallur 80 Dec 2020 54 STP 2 Thiruvottriyur 100 31 STP 3 Kodungaiyur 31 Feb 2022 120 STP Zone - I 4 Kodungaiyur 33 Feb 2022 120 STP Zone - II 5 Nesapakkam 28 Feb 2022 50 STP Zone - IV 6 Perungudi STP 22 Feb 2022 60 Zone - V Total

Details of proposed STPs in the State& PRS

2

No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed Stage/ Under Tendering/ Completion in MLD Work to be Awarded)

Total

Details of proposed STPs in the State No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed Stage/ Under Tendering/ Completion in MLD Work to be Awarded)

Total

IV. Details of Industrial Pollution:  No. of industries in the State& PRS:  No. of water polluting industries in the State& PRS:  Quantity of effluent generated from the industries in MLD:  Quantity of Hazardous Sludge generated from the Industries in TPD:  Number of industrial units having ETPs in State & PRS:  Number of industrial units connected to CETP:  Number and total capacity of ETPs (details of existing/ under construction / proposed)  Compliance status of the ETPs:  Number and total capacity of CETPs (details of existing/ under construction / proposed)  Status of compliance and operation of the CETPs

Town No. of Industrial Status of ETPs Status of CETPs industries discharge (existing, under construction & proposed)

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population

3

 Current Municipal Solid Waste Generation(State & PRS)  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc(State & PRS)  Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%)(State & PRS)  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)(State & PRS)  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source (State & PRS)  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology)(State & PRS)  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers. Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD facilities existing MSW Completion facilities Timeline

Total

VI. Bio-medical Waste Management:  Total Bio-medical generation (State & PRS):  No. of Hospitals and Health Care Facilities:  Status of Treatment Facility/ CBMWTF:

VII. Hazardous Waste Management:  Total Hazardous Waste generation(State & PRS):

4

 No. of Industries generating Hazardous waste  Treatment Capacity of all TSDFs  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated  Details of on-going or proposed TSDF VIII. Plastic Waste Management:  Total Plastic Waste generation (State & PRS):  Treatment/ Measures adopted for reduction or management of plastic waste:

IX. Details of Alternate Treatment Technology being adopted by the State/UT

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XIV. Ground water regulation: XV. Good irrigation practices being adopted by the State: XVI. Rain Water Harvesting: XVII. Demarcation of Floodplain and removal of illegal encroachments: XVIII. Maintaining minimum e-flow of river: XIX. Plantation activities along the rivers: XX. Development of biodiversity park: XXI. Reuse of Treated Water: XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: XXIV. Regulation of Mining Activities in the State/UT: XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring

5

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

Directorate of Town Panchayats For the PRS

Overall status of the State: I. Total Population: Urban Population & Rural Population separately - 569217

II. Estimated Sewage Generation (MLD): 12.775 MLD

III. Details of Sewage Treatment Plant:

 Existing no. of STPs and Treatment Capacity (in MLD):  Capacity Utilization of existing STPs:  MLD of sewage being treated through Alternate technology:  Gap in Treatment Capacity in MLD:  No. of Operational STPs:  No. of Complying STPs:  No. of Non-complying STPs:

Details of each existing STP in the State

No. Location Existing STP Capacity Being Operational Status Compliance Capacity Utilized of STP Status of STP - - - - -

Details of under construction STPs in the State

No. Location Capacity of the Physical Status of I&D or Completion plant in MLD Progress in House sewer Timeline % connections - - - - -

1

IV. Details of proposed STPs/FSTPs in the State

Treatment STP/F Technolog Status Desig STPs Status of Status y along STP/ of nated S. Name of the capac DPR of DPR with firm FSTP award nodal Remarks No ULB ity in Preparati approv completio s of Agenc MLD/ on al n tender y KLD timelines

DPR DPR is under 1 Musiri TP - - - - PWD - preparation by Stage WAPCOS/ PWD. DPR PWD 2 Sirugamani TP - - - - - “ Stage DPR PWD 3 Mohanur TP - - - - - “ Stage DPR PWD 4 Velur TP - - - - - “ Stage Punjai Pugalur DPR PWD 5 - - - - - “ TP Stage Bhavani sagar DPR PWD 6 - - - - - “ TP Stage DPR PWD 7 Sirumugai TP - - - - - “ Stage Madathukulam DPR PWD “ 8 - - - - - TP Stage DPR PWD “ 9 Omalur TP - - - - - Stage Tamilnadu Water Investment Company (M/s. TWIC) has been Poallampatty DPR appointed as 10 - - - - DTP - TP Stage consultant for preparation of DPR. The DPR will be expected to be ready by 31.12.2020 Pethanaickenp DPR DTP “ 11 - - - - - alayam TP Stage DPR DTP “ 12 Yethapur TP - - - - - Stage DPR DTP “ 13 Belur TP - - - - - Stage Srivaikundam DPR DTP “ 14 - - - - - TP Stage DPR DTP “ 15 Authoor TP - - - - - Stage DPR DTP “ 16 Eral TP - - - - - Stage

2

Alwarthirunaga DPR DTP “ 17 - - - - - ri TP Stage Then DPR DTP “ 18 - - - - - Thiruperai TP Stage Arumuganeri DPR DTP “ 19 - - - - - TP Stage DPR DTP “ 20 Mukkudal TP - - - - - Stage Gopalasamudr DPR DTP “ 21 - - - - - am TP Stage Kallidaikurichi DPR DTP “ 22 - - - - - TP Stage Cheranmahade DPR DTP “ 23 - - - - - vi TP Stage Veeravanallur DPR DTP “ 24 - - - - - TP Stage Patthamadai DPR DTP “ 25 - - - - - TP Stage DPR DTP “ 26 Mela Seval TP - - - - - Stage DPR PWD DPR is under 27 Kuthalam TP - - - - - preparation by Stage WAPCOS/ PWD. Thirukattupalli DPR PWD “ 28 - - - - - TP Stage Thiruvaiyaru DPR PWD “ 29 - - - - - TP Stage

V. Details of Industrial Pollution:  No. of industries in the State:  No. of water polluting industries in the State:  Quantity of effluent generated from the industries in MLD:  Quantity of Hazardous Sludge generated from the Industries in TPD:  Number of industrial units having ETPs:  Number of industrial units connected to CETP:  Number and total capacity of ETPs (details of existing/ under construction / proposed)  Compliance status of the ETPs:  Number and total capacity of CETPs (details of existing/ under construction / proposed)  Status of compliance and operation of the CETPs

Town No. of Industrial Status of ETPs Status of CETPs industries discharge (existing, under construction & proposed)

3

VI. Solid Waste Management:

 Total number of Urban Local Bodies and their Population - 29  Current Municipal Solid Waste Generation – 125.73 MT  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc Total MSW generated - 125.73 TPD Total MSW processed - 109.47 TPD Gap in processing - 16.26 TPD

S.No Description Nos Installed Capacity MT Utilization Capacity TPD 1 Windrow & Vermi 43 402 110 Composting 2 De-Centralised 4 7 7 3 Bio-Gas / Bio- 3 6 6 Methanation 4 RRC 29 34 29

 Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) Incinerators & Pyrolysis Plant are proposed to install for processing non-recyclable dry waste in cluster basis  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source Total no. of wards - 465 Door to Door collection – 451 Source segregation – 414  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology) Incinerators & Pyrolysis Plant are proposed to install for processing non-recyclable dry waste in cluster basis.

4

 No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Plant Capacity of Proposed MSW generation in being processed MSW the existing MSW Facilities & TPD in TPD Facilities facilities Completion Timeline 1.windrow & Incinerators & Vermi 402 MT Pyrolysis Plant compost are proposed to 2.Decentralize d composting 7 MT install for 3. Biogas 6 MT processing non- Under recyclable dry 4.Incinerators construction will 29 125.73 109.47 waste in cluster & Pyrolysis be completed Plant before basis March2021

VII. Bio-medical Waste Management:  Total Bio-medical generation:  No. of Hospitals and Health Care Facilities:  Status of Treatment Facility/ CBMWTF:

VIII. Hazardous Waste Management:  Total Hazardous Waste generation:  No. of Industries generating Hazardous waste  Treatment Capacity of all TSDFs  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated  Details of on-going or proposed TSDF

IX. Plastic Waste Management:  Total Plastic Waste generation: 6 TPD  Treatment/ Measures adopted for reduction or management of plastic waste:

5

Recyclable/ Saleable plastics are been sold to authorized vendors Non- saleable plastics are been sent to cement factories and are used as a component for laying roads Incinerators & Pyrolysis Plant are proposed to install for processing non-recyclable dry waste in cluster basis

X. Details of Alternate Treatment Technology being adopted by the State/UT

XI. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

XII. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XIII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: XIV. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XV. Ground water regulation: XVI. Good irrigation practices being adopted by the State: XVII. Rain Water Harvesting: XVIII. Demarcation of Floodplain and removal of illegal encroachments: XIX. Maintaining minimum e-flow of river: XX. Plantation activities along the rivers: XXI. Development of biodiversity park: XXII. Reuse of Treated Water: XXIII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIV. Status of Preparation of Action Plan by the 13 Coastal States: XXV. Regulation of Mining Activities in the State/UT: XXVI. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring

6

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Tamil Nadu

Overall status of the State: I. Total Population: 9002309

II. Estimated Sewage Generation (MLD):452.18 MLD

III. Details of Sewage Treatment Plant:  Existing no. of STPs and Treatment Capacity (in MLD): 15 Nos (52.76 MLD)  Capacity Utilization of existing STPs: 7.50 MLD  MLD of sewage being treated through Alternate technology: 3 MLD (in situ treatment, FSTP)  Gap in Treatment Capacity in MLD: 399.42 MLD  No. of Operational STPs: 5  No. of Complying STPs: 3 (Mamallapuram, orathanadu ,Thirumazisai )  No. of Non-complying STPs: 2 (Thiruchendur, Palanichettipatti )

Details of each existing STP in the State

No. Location Existing Capacity Operational Status Compliance Status STP Being of STP of STP Capacity Utilized 1 Mamallapuram TP 2.34 1.00 Operational Complied

2 Orathanadu TP 2.30 1.30 Operational Complied

3 Thiruchendur TP 3.90 1.40 Operational Non- Complied

4 Palanichettypatti TP 2.80 2.80 Operational Non Complied

5 Thirumazisai TP 3.00 1.00 Operational Complied

Septage Management 6 Karunguzhi 0.024 0.024 Operational 7 Periyanaikanpalayam 0.03 0.03 Operational

1

Details of under construction STPs in the State

No. Location Capacity of Physical Status of I&D or Completion the plant in Progress in % House sewer Timeline MLD connections 1 Ulunderpettai TP 99% 3.15 6176 Dec-20 completed 2 Work in Sriperumbudur TP 80% 8.50 5028 progress completed March-21 3 Velankanni TP 100% 2.33 1320 Dec-20 completed 4 63% Thiruporur TP 4.02 3288 Mar-21 completed 5 Ponneri TP 30% 6.52 1132 Mar-21 completed 6 Manachanallur TP 95% 3671 6.41 Dec-20 7 S.Kannanur TP completed 1990

8 Vallam TP 97% 2.35 2967 Jan-21 completed 9 Perundurai TP 90% 3.14 3390 Jan-21 completed 10 Melachokanathapuram TP 40% 2.00 1270 May-21 completed

Septage Management 11 65% Mudukulathur TP 0.015 - Dec-20 completed 12 75% Jalakandapuram TP 0.015 - Dec-20 completed 13 20% Pennagaram TP 0.015 - Dec-20 completed 14 60% Kaveripattinam TP 0.015 - Dec-20 completed 15 70% Chengam TP 0.020 - Dec-20 completed 16 45% Kurumbalur TP 0.010 - Dec-20 completed 17 25% Pennadam TP 0.010 - Mar-21 completed 18 30% Alangayam TP 0.015 - Jan-21 completed

2

Details of proposed STPs in the State

No. Location Capacity of the Status of Project (at DPR Stage/ Under Likely Date of STP proposed Tendering/ Work to be Awarded) Completion in MLD 1 Mangadu DPR stage-Comprehensive UGSS in Opp to SWM, Poonamallee cluster A with Mangadu Town Panchayat and 12 Village Town at pattur road Panchayat 2 Chitlapakkam Detailed project Report prepared under TNUISFL for Sembakkam cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 3 Madampakkam Detailed project Report prepared under TNUISFL for Sembakkam cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 4 Peerkankaranai DPR has to be prepared through TNUISFL on cluster basis 5 Perungalathur DPR has to be prepared through TNUISFL on cluster basis 6 Thiruneermalai DPR as to be prepared through TNUISSL by cluster basis

IV. Details of Industrial Pollution:  No. of industries in the State:  No. of water polluting industries in the State:  Quantity of effluent generated from the industries in MLD:  Quantity of Hazardous Sludge generated from the Industries in TPD:  Number of industrial units having ETPs:  Number of industrial units connected to CETP:  Number and total capacity of ETPs (details of existing/ under construction / proposed)  Compliance status of the ETPs:  Number and total capacity of CETPs (details of existing/ under construction / proposed)  Status of compliance and operation of the CETPs

Town No. of Industrial Status of ETPs Status of CETPs industries discharge (existing, under construction & proposed)

3

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population - 528  Current Municipal Solid Waste Generation – 2100 MT  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc Total MSW generated - 2100 TPD Total MSW processed - 1819.21 TPD Gap in processing - 280.79 TPD

No Description Nos Installed Capacity (MT) Utilization Capacity (TPD) 1 Windrow & Vermi 735 2630 1026 Composting 2 De-Centralised 42 118 118 3 Bio-Gas / Bio- 20 167 167 Methanation 4 RRC 527 592 503

 Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) Incinerators are proposed to install for processing non-recyclable dry waste in cluster basis  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source Total no. of wards - 8288 Door to Door collection – 7956 Source segregation - 7459  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology) So far 3 Incinerators has been completed remaining 7 Nos are under progress. So far 2 Pyrolysis has been completed remaining 8 Nos are under progress. For remaining Town Panchayats Incinerators & Pyrolysis are been proposed to install for processing non-recyclable dry waste in cluster basis.  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers

4

 No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers

Status of ULB wise Management of Solid Waste

ULB Total Total Existing Plant Capacity of the Proposed MSW MSW MSW MSW existing MSW facilities Facilities & generation being Facilities Completion in TPD processed Timeline in TPD 2630 MT 1.Windrow & Vermi Incinerators are composting proposed to 2.Decentralized 118 MT install for Composting 3. Biogas 167 MT processing non-

Under construction recyclable dry 4.Incinerator will be completed waste in cluster 528 2100 1819 before March2021 basis Under construction 5.Pyrolysis will be completed before March2021

VI. Bio-medical Waste Management:  Total Bio-medical generation:  No. of Hospitals and Health Care Facilities:  Status of Treatment Facility/ CBMWTF:

VII. Hazardous Waste Management:  Total Hazardous Waste generation:  No. of Industries generating Hazardous waste  Treatment Capacity of all TSDFs  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated  Details of on-going or proposed TSDF

VIII. Plastic Waste Management  Total Plastic Waste generation: 120 TPD

5

 Treatment/ Measures adopted for reduction or management of plastic waste: Recyclable/ Saleable plastics are been sold to authorized vendors Non- saleable plastics are been sent to cement factories and are used as a component for laying roads Incinerators are proposed to install for processing non-recyclable dry waste in cluster basis

IX. Details of Alternate Treatment Technology being adopted by the State/UT

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XIV. Ground water regulation: XV. Good irrigation practices being adopted by the State: XVI. Rain Water Harvesting: XVII. Demarcation of Floodplain and removal of illegal encroachments: XVIII. Maintaining minimum e-flow of river: XIX. Plantation activities along the rivers: XX. Development of biodiversity park: XXI. Reuse of Treated Water: XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: XXIV. Regulation of Mining Activities in the State/UT: XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring

6

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Tamil Nadu

Overall status of the State: I. Total Population: Urban Population & Rural Population separately: 4,04,86,223 II. Estimated Sewage Generation (MLD): 1130

III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing no. of STPs and Treatment Capacity (in MLD) - - 2 Capacity Utilization of existing STPs - - 3 MLD of sewage being treated through Alternate 734 1.56 technology 4 Gap in Treatment Capacity in MLD(Grey water) 396 0 5 No. of Operational STPs - - 6 No. of Complying STPs - - 7 No. of Non-complying STPs - - *Gap will be addressed by construction of individual soakpit in phased manner, priority will be given to water body areas. Details of each existing STP in the State & PRS No. Location Existing STP Capacity Being Operational Status Compliance Capacity Utilized of STP Status of STP NIL Total

Details of under construction STPs in the State & PRS No. Location Capacity of the Physical Status of I&D or Completion plant in MLD Progress in House sewer Timeline % connections NIL Total

1

Details of proposed STPs in the State & PRS No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed Stage/ Under Tendering/ Completion in MLD Work to be Awarded) NIL Total

Details of proposed STPs in the State No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed Stage/ Under Tendering/ Completion in MLD Work to be Awarded) NIL Total

IV. Details of Industrial Pollution:  No. of industries in the State & PRS: 3802 & 0  No. of water polluting industries in the State & PRS: 3 & 0  Quantity of effluent generated from the industries in MLD: -  Quantity of Hazardous Sludge generated from the Industries in TPD: -  Number of industrial units having ETPs in State & PRS: 92 & 0  Number of industrial units connected to CETP:  Number and total capacity of ETPs (details of existing/ under construction / proposed)  Compliance status of the ETPs:  Number and total capacity of CETPs (details of existing/ under construction / proposed)  Status of compliance and operation of the CETPs

Town No. of Industrial Status of ETPs Status of CETPs industries discharge (existing, under construction & proposed)

V. Solid Waste Management:  Total number of Rural Local Bodies and their Population: 12525 Village Panchayats, Population 4,04,86,223  Current Municipal Solid Waste Generation (State & PRS): 1940 TPD & 8.666 TPD

2

 Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc (State & PRS) : 12525 & 31  Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) (State & PRS)  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction) (State & PRS)  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source (State & PRS) : 12525 Village Panchayats & 31 Village Panchayats.  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology) (State & PRS) MCC – 321&1  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills- nil  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers- nil  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers.

Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD facilities existing MSW Completion facilities Timeline

Total

VI. Bio-medical Waste Management:  Total Bio-medical generation (State & PRS):  No. of Hospitals and Health Care Facilities: 1458  Status of Treatment Facility/ CBMWTF:

VII. Hazardous Waste Management:  Total Hazardous Waste generation (State & PRS):  No. of Industries generating Hazardous waste

3

 Treatment Capacity of all TSDFs  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated  Details of on-going or proposed TSDF VIII. Plastic Waste Management:  Total Plastic Waste generation (State & PRS):  Treatment/ Measures adopted for reduction or management of plastic waste: Plastic Shredding units available at 1 per Districts provided under SWM Scheme.

IX. Details of Alternate Treatment Technology being adopted by the State/UT

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XIV. Ground water regulation: XV. Good irrigation practices being adopted by the State: XVI. Rain Water Harvesting: XVII. Demarcation of Floodplain and removal of illegal encroachments: XVIII. Maintaining minimum e-flow of river: XIX. Plantation activities along the rivers: XX. Development of biodiversity park: XXI. Reuse of Treated Water: XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: XXIV. Regulation of Mining Activities in the State/UT: XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring

4

Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) For the Month of October 2020 for TNPWD WRD InVasista River (Thathayampatti to T.Konagapadi)

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; The SG&SWRDC is having monitoring wells for observing water quality data for the areas Papanaickenpatti, Yethapur, Athur and . The analytical reports of the ground water analysis of these areas reveals that water quality is of the order of both good and moderate. The TDS values of these areas ranging between 336 to 1029 mg/L.

The State Ground and Surface Water Resources Data centre is having water quality data for lesser number of locations. Moreover this department is mainly concerned with the analysis of inorganic parameters and hence TDS is being used as a vital tool in determining the quality of water as Good, Moderate or poor quality. But to identify pollution in an area, the pollution parameters such as Dissolved Oxygen(DO), Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand (COD), Total Coliform, Faecal Coliform has to be measured. With the water quality data available in this Department, it can be inferred whether ground water of a particular area is suitable for drinking or not. Hence it is suggested that water samples may be collected along this river stretch and analysis may be performed for pollution parameters to identify the extent of pollution.

XIV. Ground water regulation:

 For effective management of Ground Water, action is being initiated against 1. Control of illegal illegally operating companies as Per Groundwater Honorable Madras High Court order Abstraction passed under WP No.16299 / 2018. Totally 683 packaged drinking water firms who were illegally operating have been sealed and closed.

 A Comprehensive Groundwater (Management and Development) Act., to regulate and Manage the extraction of Groundwater is under active consideration of the Government..

XV. Good irrigation practices being adopted by the State: Awareness meeting are conducted under TNIAMP, ADB & State Funds. In some parts of the reach DRIP irrigation is practiced.

XVI. Rain Water Harvesting: Existing Ongoing Proposed structure works works

16 ------

XVII. Demarcation of Floodplain and removal of illegal encroachments: No Flood plains zones have been identified. No Encroachment has also been identified in the stretch. In case of any encroachments reported in the future by Revenue department, action will be taken for immediateeviction.

XVIII. Maintaining minimum e-flow of river: This river is only a flood carrier. But the sewage water enters in to the river in Attur and Narasingapuram Municipality. After completion sewage treatment plants in the above location, the treated water will flow as environment flow.

XIX. Plantation activities along the rivers: There is no proposal at present XX. Development of biodiversity park: There is no proposal at present

Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) For the Month of October 2020 for TNPWD WRD InSarabanga River (Thathayampatti to T.Konagapadi)

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; The State Ground and Surface Water Resources Data Centre is having monitoring wells for observation of ground water quality inDanishpet, Omalur, Idaipadi, Thevur and Tharamangalamareas.While considering the Total dissolved solids of this stretch it is found to vary between 399mg/L to 1885 mg/L. Danishpet is having TDS of good quality whereas the rest of the places having TDS value in the range of moderate quality.

The State Ground and Surface Water Resources Data centre is having water quality data for the lesser number of locations. Moreover this department is mainly concerned with the analysis of inorganic parameters and hence TDS is being used as a vital tool in determining the quality of water as Good, Moderate or poor quality. But to identify pollution in an area, the pollution parameters such as Dissolved Oxygen(DO), Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand (COD), Total Coliform, Faecal Coliform have to be measured. With the water quality data available in this Department, it can be inferred whether ground water of a particular area is suitable for drinking or not. Hence it is suggested that surfacewater samples may be collected along this river stretch and analysis may be performed for pollution parameters to identify the extent of pollution.

XIV. Ground water regulation:

1. Control of illegal  For effective management of Ground Groundwater Water, action is being initiated against Abstraction illegally operating companies as Per Honorable Madras High Court order passed under WP No.16299 / 2018. Totally 683 packaged drinking water firms who were illegally operating have been sealed and closed.

 A Comprehensive Groundwater (Management and Development) Act., to regulate and Manage the extraction of Groundwater is under active consideration of the Government. XV. Good irrigation practices being adopted by the State: Awareness meeting are conducted under TNIAMP, ADB & State Funds. In some parts of the reach DRIP irrigation is practiced.

XVI. Rain Water Harvesting: Existing Ongoing Proposed structure works works

10 5 2 Recharge wells

XVII. Demarcation of Floodplain and removal of illegal encroachments: Drone Surveyto be conducted by WAPCOS during December 2020. A DPR is under preparationunder NadanthaiVaazhi Cauvery for conducting the above survey for identification of flood plain zonesand area for Afforastation to maintain Bio Diversity. The tentative cost of the DPR is around 2 crores. The DPR will be completed in December 2020.Encroachmentif any identified during the survey will be evicted and other management works will be completed by March 2022 after rehabilitation and resettlement.

XVIII. Maintaining minimum e-flow of river: This river is only a flood carrier. The sewage water enters in to the river in Edapaddi Municipality, Omalur Town Panchayat and Poolampatti Town Panchayat. The above treatment plants are proposed under NadanthaiVaazhi Cauvery. DPR preparation is likely to the completed by December 2020. E flow will be maintained in this river after completion sewage treatment plants by March 2021, as the treated water will flow as environmental flow.

XIX. Plantation activities along the rivers: It is proposed to plant around 32,400 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December2020. Plantation work will be completed in March 2021.

XX. Development of biodiversity park: This is proposed to be taken up under NadanthaiVaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022.

Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) For the Month of October 2020 for TNPWD WRD Reach: Sirumugai to Kalingarayan stretch in

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; The general distribution of ground water quality varies between Good to moderate level. Especially Nilgiris is having good quality water. The State Ground and Surface Water Resources Data centre is having water quality data for number of locations. Moreover this department is mainly concerned with the analysis of inorganic parameters and hence TDS is being used as a vital tool in determining the quality of water as Good, Moderate or poor quality. But to identify pollution in an area, the pollution parameters such as Dissolved Oxygen (DO), Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand(COD), Total Coliform, Faecal Coliform has to be measured. With the water quality data available in this Department, it can be inferred whether ground water of a particular area is suitable for drinking or not. Hence it is suggested that water samples may be collected along this river stretch and analysis may be performed for pollution parameters to identify the extent of pollution.

XIV. Ground water regulation:

1. Control of illegal Groundwater  For effective management of Ground Abstraction Water, action is being initiated against illegally operating companies as Per Honorable Madras High Court order passed under WP No.16299 / 2018. Totally 683 packaged drinking water firms who were illegally operating have been sealed and closed.  A Comprehensive Groundwater (Management and Development) Act., to regulate and Manage the extraction of Groundwater is under active consideration of the Government.NIL

XV. Good irrigation practices being adopted by the State: Awareness meeting are conducted under TNIAMP, ADB & State Funds. In some parts of the reach, DRIP irrigation is practiced.

XVI. Rain Water Harvesting:

Existing Ongoing Proposed structure works works

13 3 17

XVII. Demarcation of Floodplain and removal of illegal encroachments: Drone Survey to be conducted by WAPCOS during December 2020. A DPR is under preparationunder NadanthaiVaazhi Cauvery for conducting the above survey for identification of flood plain zonesand area for Afforastation to maintain Bio Diversity. The tentative cost of the DPR is around 2 crores. The DPR will be completed in December 2020. 55 nos of encroachments are to be removed which belong to fishing community. Recommendations for alternate land has been sent to Secretary to Government Revenue department by Commissioner for Revenue administration vide letter no F.2/41632/2005/Dt.15.2.2006.

XVIII. Maintaining minimum e-flow of river: An E flow of 92718 cusecs (including Irrigation purpose) was maintained in the river Bhavani during the Month of December 2020.

XIX. Plantation activities along the rivers: It is proposed to plant around 86,500 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December 2020. Plantation work will be completed in March 2021.

XX. Development of biodiversity park: This is proposed to be taken up under NadanthaiVaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022.

Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) for the Month of October 2020 for TNPWD WRD

Reach: Mettur to Mayiladuthuraistretch in Cauvery River

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; This river stretch comprises districts of Dharmapuri, Erode, Salem, Namakkal, Karur, Trichy, Cuddalore and Thanjavur. The State Ground water Department is having ground water quality data for the areasof Dharmapuri, Mettur, Bhavani, Salem, Paramathivelur, Namakkal, Kumarapalayam, Karur, Erode, Musiri, Trichy, Kulithalai, Thanjavur, Kumbakonam and Mayiladuthurai. While considering the TDS value of Dharmapuritaluk it is found to vary between 523 to 2096 mg/L and the quality of ground water lies between Moderate to poor. In case of Bhavaniriver the TDS values ranging between Good to moderate. While reviewing WQ data of Salem, the TDS values found to vary between 412 to 2845mg/L, the available ground water in Salem is having good, moderate and poor quality with major proportion moderate ground water. The water quality data of Namkkal shows the TDS values exceed even 6000mg/L in some places with wide distribution of moderate water quality. While reviewing the water quality data of Trichy and Musiri the water quality is found to vary between good and moderate in most of the places with very few places having poor quality. Most of the locations in Cuddalore and Thanjavur are having good quality water. Few places of Cuddalore having TDS of the order of 5000 to 6000mg/L. The State Ground and Surface Water Resources Data centre is having water quality data for lesser number of locations. Moreover this department is mainly concerned with the analysis of inorganic parameters and hence TDS is being used as a vital tool in determining the quality of water as Good, Moderate or poor quality. But to identify pollution in an area, the pollution parameters such as Dissolved Oxygen(DO), Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand (COD), Total Coliform, Faecal Coliform has to be measured. With the water quality data available in this Department, it can be inferred whether ground water of a particular area is suitable for drinking or not. Hence it is suggested that water samples may be collected along this river stretch and analysis may be performed for pollution parameters to identify the extent of pollution.

XIV. Ground water regulation:

 For effective management of Ground Water, action is being initiated against illegally operating companies as Per Control of illegal Honorable Madras High Court order 1. Groundwater passed under WP No.16299 / 2018. Abstraction Totally 683 packaged drinking water firms who were illegally operating have been sealed and closed.

 A Comprehensive Groundwater (Management and Development) Act., to regulate and Manage the extraction of Groundwater is under active consideration of the Government.

XV. Good irrigation practices being adopted by the State: Awareness meeting are conducted under TNIAMP, ADB & State Funds. In some parts of the reach DRIP irrigation is practiced.

XVI. Rain Water Harvesting: Existing Ongoing Proposed structure works works

44 10 29

XVII. Demarcation of Floodplain and removal of illegal encroachments: Drone Survey is proposed to be conducted by WAPCOS during December 2020. A DPR is under preparationunder NadanthaiVaazhi Cauvery for conducting the above survey for identification of flood plain zonesand area for afforestation to maintain Bio Diversity. The tentative cost of the DPR is around 20 crores. The DPR will be completed in December 2020. Encroachment if any identified during the survey will be evicted and other management works will be completed by March 2022 after rehabilitation and resettlement.

XVIII. Maintaining minimum e-flow of river: Mettur dam is opened for irrigation from June 12th to January 28th based on availability of water every year. It is opened for drinking purpose in the remaining days, During the monsoon period at flood time the maximum flood discharge in the river has been 284606 cusecs 0n 08.07.1961. Usually a monthly minimum average E flow of 0.10 TMC is maintained. The E flow is maintained for more than 8 months. During the month of October an E Flow of 1059 mcm was maintained.

XIX. Plantation activities along the rivers: It is proposed to plant around 1,44,500 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December 2020. Plantation work will be completed in March 2021.

XX. Development of biodiversity park: This is proposed to be taken up under NadanthaiVaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022 Monthly Progress Report for the Month of October 2020 Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) Reach: Pappankulam to Arumuganeri Stretch in ThamirabaraniRiver

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; In Tamiraparani stretch, this department is having water quality data for cheranmadevi, Thiruvidaimaruthur, Ambasamudram, Thirunelveli, Palayamkottai, and Ariyanaygipuram. The collected data shows the ground water quality of this stretch is having all three types of good, poor and moderate based on TDS. The State Ground and Surface Water Resources Data centre is having water quality data for lesser number locations. Moreover this department is mainly concerned with the analysis of inorganic parameters and hence TDS is used as a vital tool in determining the quality of water as Good, Moderate or poor quality. But to identify pollution in an area, the pollution parameters such as Dissolved Oxygen(DO), Biochemical Oxygen Demand(BOD), Chemical Oxygen Demand (COD), Total Coliform, Faecal Coliform has to be measured. With the water quality data available in this Department, it can be inferred whether ground water of a particular area is suitable for drinking or not. Hence it is suggested that surface water samples may be collected along the river stretches and analysis may be performed for pollution parameters to identify the extent of pollution.

XIV. Ground water regulation: Sl.No Activity to be Monthly Progress for the month of monitored September 2020  For effective management of Ground Water, action is being initiated against illegally operating companies as Per Control of illegal Honorable Madras High Court order 1. Groundwater passed under WP No.16299 / 2018. Abstraction Totally 683 packaged drinking water firms who were illegally operating have been sealed and closed.

 A Comprehensive Groundwater (Management and Development) Act., to regulate and Manage the extraction of Groundwater is under active consideration of the Government

XV. Good irrigation practices being adopted by the State: Village level awareness campaign were conducted periodically by PWD officials to adopt the crop rotation to have a good irrigation practices. Rehabilitation and modernization of Tanks, Anicuts and Supply channels are being carried out in TNIAMP project vide GO Ms No: 140 PW(WR 1) DeptDt: 21.06.2017 for an amount of Rs.107.09 crores.

XVI. Rain Water Harvesting: Existing Ongoing Proposed works structure works

230 7 2 (Barrages 3 nos at cost of Rs. 230 Crores. Check dam 2 nos at cost of Rs. 76 Crores, Artificial Recharge well 221 nos and Recharge shaft 4 nos at a cost of Rs. 88.496 Crores.)

XVII. Demarcation of Floodplain and removal of illegal encroachments: To prepare comprehensive flood protection plan for Thamirabarani River Rs. 4.00 Lakhs has been alloted vide GO Ms. No. 37 Revenue (DMII) Department 9.02.2017. Estimate has been prepared for Rs. 4.00 Lakhs for the demarcation of Flood plain zone and steps are being taken for the Protection and management of Flood plain Zones of Thamirabarani River. Moreover in Tirunelveli Corporation, ProsopisJuliflora on the river stretches for a length of 10km from Vilagam to Naranammalpuram river bridge were removed at a cost of 140.00 lakhs vide GO(2D) No. 14 PW (P2) Dept Dated 8.03.2019 to restore the River course for a free flow flood water.

XVIII. Maintaining minimum e-flow of river: Environmental flow (outflow) of papanasam Reservoir in 718 for the month of October 2020.

XIX. Plantation activities along the rivers: At present there is no proposal on plantation on the River Banks and investigation works are being taken to implement it by Forest Department.

XX. Development of biodiversity park: At present there is no proposal on biodiversity parks on the encroached River stretches and investigation works are being taken to implement it. Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) for the Month of October 2020 for TNPWD WRD

Reach: Salem to Papparapattiin Thirumanimutharu River

XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; For this stretch the SG& SWRDC having monitoring wells for observation ground water quality inSalem, , and palapattiareas. From the observed data it is inferred that the quality of water is in moderate level i.e in these places TDS value ranges between 500 to 2000mg/L

The State Ground and Surface Water Resources Data centre is having water quality data for lesser number of locations. Moreover this department is mainly concerned with the analysis of inorganic parameters and hence TDS is being used as a vital tool in determining the quality of water as Good, Moderate or poor quality. But to identify pollution in an area, the pollution parameters such as Dissolved Oxygen(DO), Biochemical Oxygen Demand(BOD), Chemical Oxygen Demand(COD), Total Coliform, Faecal Coliform has to be measured. With the water quality data available in this Department, it can be whether ground water of a particular area is suitable for drinking or not. Hence it is suggested that water samples may be collected along this river stretch and analysis may be performed for pollution parameters to identify the extent of pollution.

XIV. Ground water regulation:

 For effective management of Ground Water, action is being initiated against illegally operating companies as Per Control of illegal Honorable Madras High Court order passed under WP No.16299 / 2018. 1. Groundwater Totally 683 packaged drinking water Abstraction firms who were illegally operating have been sealed and closed.

 A Comprehensive Groundwater (Management and Development) Act., to regulate and Manage the extraction of Groundwater is under active consideration of the Government.

XV. Good irrigation practices being adopted by the State: Awareness meeting are conducted under TNIAMP, ADB & State Funds. In some parts of the reach DRIP irrigation is practiced.

XVI. Rain Water Harvesting: Existing Ongoing Proposed structure works works

14 6 ---- (Recharge well structures)

XVII. Demarcation of Floodplain and removal of illegal encroachments: Drone Survey to be conducted by WAPCOS during December 2020. A DPR is under preparationunder NadanthaiVaazhi Cauvery for conducting the above survey for identification of flood plain zonesand area for Afforastation to maintain Bio Diversity. The tentative cost of the DPR is around 2 crores. The DPR will be completed in December 2020. Encroachment if any identified during the survey will be evicted and other management works will be completed by March 2022 after rehabilitation and resettlement.

XVIII. Maintaining minimum e-flow of river: This river is only a flood carrier. The sewage water enters in to the river in Salem Corporation. Treatment plants have been proposed under NadanthaiVaazhi Cauvery. DPR preparation is likely to the completed by December 2020. E flow will be maintained in this river after completion sewage treatment plants by March 2021,as the treated water will flow as environmental flow.

XIX. Plantation activities along the rivers: It is proposed to plant around 42,000 samplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December2020. Plantation work will be completed in March 2021.

XX. Development of biodiversity park: This is proposed to be taken up under NadanthaiVaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022.

ANNEXURE BIOMEDICAL WASTE MANAGEMENT Bio-Medical S.No. Waste State Polluted River Stretch Management 1 Total Bio- Authorised 70 Salem 1.968 medical BMW T/day Namakkal 0.717 generation generation Dharmapuri 0.433 (TPD) qty: Erode 0.753 Avg. Actual 22 Karur 0.917 BMW T/day Trichy 0.850 Generation: Thanjavur 1.571 Nagapattinam 1.079 2 No. of 24833 Salem 1022 Hospitals and Namakkal 538 Health Care Dharmapuri 482 Facilities Erode 485 Karur 435 Trichy 996 Thanjavur 975 Nagapattinam 638 3 Status of In Tamil Nadu, there are 1. One Facility Treatment 12 CBMWTFs, out of M/s. Medicare Enviro Facility / which 8 facilities are in Systems, Thanjavur CBMWTFs operation, one facility is is in operation which ready for operation and covers the following three facilities at districts Thanjavur, Coimbatore, and Thiruvarur, Trichy, Ramanathapuram have Nagapattinam, been issued with closure Pudukottai, direction by TNPCB for Perambalur, Ariyalur non compliance of & Sivagangai. consent order conditions 2. Another Facility in and Bio Medical Waste M/s. Ramky Energy Management Rules, And Environment Ltd, 2016. The biomedical Salem is in operation wastes generated from which covers the the Health Care following districts Facilities attached to Salem, Namakkal, these three facilities Erode, Dharmapuri, which are under closure Krishnagiri & Karur. are sent to other CBMWTFs for further treatment and disposal. On an average, 70 Tons/day of bio-medical wastes are handled by these facilities. In addition, three common facilities are under establishment in Gummidipoondi, Hosur and Tiruppur Districts.

Total installed capacity of 9 CBMWTFs in Tamil Nadu which is in operation is 106.49 TPD (Incinerator & Autoclave)

List of common bio-medical waste treatment facilities (CBMWTFs) in Tamil Nadu

Name & Address of the S.No. Regions covered CBMWTFs 1. M/s. G. J. Multiclave () Pvt Part of Chennai & Kancheepuram Ltd, Thenmelpakkam, Districts Chengalpattu Taluk, Chengalpattu District. 2. M/s. Tamilnadu Waste Chennai (North), Part of Management Ltd., Kancheepuram, Tiruvallur, Cuddalore Taluk, and Villupuram Districts Chengalpattu District. 3. M/s. Medicare Enviro Systems, Thanjavur, Thiruvarur, Trichy, Sengipatti, Thanjavur Taluk, Nagapattinam, Pudukottai, . Perambalur, Ariyalur & Sivagangai Districts 4. M/s. Ken Bio Links Private Ltd., Vellore & Districts Kandipedu, Taluk, . 5. M/s. Society for Bio Medical Waste Nilgiris District Management, Udhagamandalam, The Nilgiris District. 6. M/s. Neat and Clean Service Ramanathapuram District Squad, Muthuvayal, Ramanathapuram District. 7. M/s. Ramky Energy and Salem, Namakkal, Erode, Dharmapuri, Environment Ltd, Krishnagiri & Karur Districts Thangayur, . 8. M/s.Teknotherm Industries, Coimbatore, Nilgris & Tiruppur Districts Orattukuppai, Coimbatore District. 9. M/s. Aseptic System Bio Medical Tirunelveli, & Waste Management Co., Kanyakumari Districts Pappankulam,Tirunelveli District. 10. M/s. Ramky Energy and Madurai, Virudhunagar, Dindigul, Theni Environment Ltd., & Ramanathapuram Districts Undurmikidakulam, Virudhunagar District. 11. M/s. Kovai Bio Waste Coimbatore, Tiruppur & Nilgiris Management Pvt Ltd., Districts Orattukuppai, Coimbatore District. 12. M/s. Pondicherry Solid Waste Ready for operation Management Company Private Limited, S.F.NO.275/2, T. Pudaiyur village, Virudhachalam Taluk,

No. Sl. 2 1 Standard limitStandard for 5.0 mg/l DO limit MPN/100ml Standard coliformfor <500 Fecal limitStandard mg/L for <3 BOD (Borewell) Edappadi Edappadi Edappadi Name of Name of (River) station Station Station Code Code 3024 3024 No.

No Sampling Sampling No D.O mg/L No Flow No Jan-20

BOD at 270 C mg/L River Sarabanga River- riverPolluted Sarabanga from Thathayampatti stretches --KM 15 Priority-I to T.Konagapadi Fecal coliform MPN/100 ml 6.5

No Flow No D.O mg/L Feb-20 <2 BOD at 270 C mg/L 11 Fecal coliform MPN/100 ml 6.2

No Flow No D.O mg/L Mar-20 <2 BOD at 270 C mg/L Water Quality of River Polluted Status Stretches TAMIL NADU BOARD CONTROL POLLUTION 76, Mount Salai, Guindy,Mount 76, 032. - 600 Chennai 14 Fecal coliform MPN/100 ml 6.3

No Flow No D.O mg/L Apr-20 <2 BOD at 270 C mg/L

4 Fecal coliform MPN/100 ml 6.1

No Flow No D.O mg/L May-20 <2 BOD at 270 C mg/L 11 Fecal coliform MPN/100 ml 6.4

No Flow No D.O mg/L Jun-20 <2 BOD at 270 C mg/L

4 Fecal coliform MPN/100 ml 6.0 D.O mg/L No Flow No Jul-20 <2 BOD at 270 C mg/L 1.8 Fecal coliform MPN/100 ml 6.0 D.O mg/L No Flow No Aug-20 <2 BOD at 270 C mg/L 1.8 Fecal coliform MPN/100 ml 6.6

No Flow No D.O mg/L Sep-20 <2 BOD at 270 C mg/L 1.8 Fecal coliform MPN/100 ml 6.3 D.O mg/L No Flow No Oct-20 <2 BOD at 270 C mg/L 1.8 Fecal coliform MPN/100 ml No. Sl. Sl. 2 1 Standard limit for DO 5.0 mg/l DO5.0 for Standardlimit MPN/100ml <500 coliform Fecal for Standardlimit BODmg/L for <3 Standardlimit Uthamasolapuram Uthamasolapuram Uthamasolapuram Name of station of Name (Borewell) (River) Station Station Code 3022 3022 No. 6.6

NoFlow D.O mg/L Jan-20 <2 BOD at 270 C mg/L

11 Fecal coliform MPN/100 ml 6.2 2.1 D.O mg/L River Thirumanimutharu - Polluted river stretches from Salem to Papparapatti - 15 KM - Priority-I - KM 15 toPapparapatti- Salem from stretches Thirumanimutharu River Pollutedriver - 8.5 Feb-20 <2 BOD at 270 C mg/L 11000

11 Fecal coliform MPN/100 ml 5.1 Nil D.O mg/L Mar-20 <2 15 BOD at 270 C mg/L Water Quality Status of Polluted River Stretches QualityStatus of PollutedRiver Water 6100 17 Fecal coliform MPN/100 TAMILNADU POLLUTION CONTROL BOARD 76, Mount Salai, Guindy, MountChennai Salai, 032. 76, 600 - ml 6.7 3.9 D.O mg/L Apr-20 6.1 <2 BOD at 270 C mg/L 1300

8 Fecal coliform MPN/100 ml 4.8 Nil D.O mg/L May-20 2.7 14 BOD at 270 C mg/L 3500

8 Fecal coliform MPN/100 ml 6.0 5.8 D.O mg/L Jun-20 2.1 3.6 BOD at 270 C mg/L

8 9 Fecal coliform MPN/100 ml 6.9 5.1 D.O mg/L Jul-20 3.2 <2 BOD at 270 C mg/L 1400 3.7 Fecal coliform MPN/100 ml 6.0 5.9 D.O mg/L Aug-20 <2 2 BOD at 270 C mg/L 310 1.8 Fecal coliform MPN/100 ml 5.2 0.8 D.O mg/L Sep-20 12 5 BOD at 270 C mg/L <1.8 310 Fecal coliform MPN/100 ml 6.3 1.1 D.O mg/L Oct-20 9.6 <2 BOD at 270 C mg/L <1.8 320 Fecal coliform MPN/100 ml No. Sl. 1 2 * Sago effluent disposed in the river Standard limit DO for 5.0 mg/l Standard limit Fecalfor coliform <500 MPN/100ml Standard limit BOD for <3 mg/L (Subsurface) Thulukkanur Thulukkanur Name of (River) station Station Station Code Code 3023 3023 No. 6.8 D.O mg/L No Flow Jan-20 <2 BOD at 270 C mg/L

2 Fecal coliform MPN/100 ml 6.4 Nil D.O mg/L Feb-20 24 <2 BOD at 270 C mg/L 14000 River Vasista Polluted- river stretches from Manivilundhan Thiyaganur to Priority-I10- - KM 6 Fecal coliform MPN/100 ml 4.8 Nil D.O mg/L Mar-20 15 <2 BOD at 270 C mg/L 17000 11 Fecal coliform MPN/100 ml Water Quality Status Pollutedof River Stretches TAMIL NADU POLLUTION BOARDCONTROL 76, Mount Salai,76, Mount Guindy, Chennai 600- 032. 6.6 Nil D.O mg/L Apr-20 16 <2 BOD at 270 C mg/L 2100

2 Fecal coliform MPN/100 ml 6.5 D.O mg/L No Flow May-20 <2 BOD at 270 C mg/L

4 Fecal coliform MPN/100 ml 6.0 Nil D.O mg/L Jun-20 2.1 20 BOD at 270 C mg/L 33000

8 Fecal coliform MPN/100 ml 4.4 Nil D.O mg/L 500* Jul-20 2.6 BOD at 270 C mg/L 17000

4 Fecal coliform MPN/100 ml 5.6 0.4 D.O mg/L Aug-20 <2 15 BOD at 270 C mg/L 14000

4 Fecal coliform MPN/100 ml 5.8 Nil D.O mg/L Sep-20 <2 30 BOD at 270 C mg/L 11000 3.6 Fecal coliform MPN/100 ml 6.5 2.1 D.O mg/L Oct-20 7.5 <2 BOD at 270 C mg/L 2200 1.8 Fecal coliform MPN/100 ml Sl.No. 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Standard limit for DO 5.0 mg/l 5.0 DO for Standardlimit MPN/100ml<500 coliform Fecal for Standardlimit mg/L BOD<3 for Standardlimit Anaicut Grand Downstream Trichy Upstream Trichy Thirumukkudalur Mohanur Velur P. Vairapalayam PudurR.N. Mayiladuthurai Kumbakonam Pugalur Seerampalayam Urachikottai Komarapalayam Ferry Gate Musiri Borewell Musiri Pallipalayam Mettur Name of station Nameof Station Station Code 1203 1325 1202 1451 1324 1323 1320 1322 3018 3017 3016 3045 3014 3013 3012 No. 31 32 51 50 6.0 6.3 6.6 6.2 6.6 6.1 6.1 6.5 6.5 6.7 6.7 6.6 5.4 5.5 6.0 6.0 6.1 6.0 D.O mg/L NoFlow Jan-20 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 2 BOD at 27 C mg/L 110 460 310 150 170 220 140 110 140 84 31 38 31 45 94 32 58 21 Fecal coliform MPN/100 ml 6.5 5.7 6.1 6.5 0.4 5.1 6.6 5.4 6.0 6.0 1.6 5.1 D.O mg/L NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow Feb-20 23.3 12.0 3.0 2.0 2.0 2.4 0 <2 <2 <2 <2 <2

3 BOD at 27 C mg/L 210 210 220 170 430 170 210 170 170 63 70 43 Fecal coliform I - Priority - 200KM Mayiladuthurai- to Mettur from stretches Cauvery River river Polluted - MPN/100 ml 6.0 5.8 5.6 6.2 5.7 6.0 6.1 6.1 5.8 5.8 6.1 5.8 D.O mg/L NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow Mar-20 2.5 2.2 2.5

<2 0 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 110 170 580 260 220 310 210 490 210 170 Water Quality Status of Polluted River Stretches River Polluted of Status Quality Water 84 46 Fecal coliform TAMIL NADUTAMIL BOARDCONTROL POLLUTION MPN/100 ml Guindy,600Chennai032. - Salai, Mount 76, 6.3 6.0 6.1 6.8 6.7 5.3 6.6 6.9 6.7 6.9 6.6 6.7 D.O mg/L NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow Apr-20

2.0 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 200 170 110 NA 46 38 58 31 32 49 26 21 Fecal coliform MPN/100 ml 6.1 6.2 6.0 5.6 6.1 6.2 5.7 6.0 5.6 5.0 6.0 D.O mg/L NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow NoFlow May-20

2.2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 170 260 250 210 140 140 220 210 58 84 21 Fecal coliform MPN/100 ml 5.8 6.1 6.2 6.0 6.1 6.0 6.0 5.2 6.0 5.9 6.1 4.6 6.1 5.9 6.0 6 6 D.O mg/L NoFlow NoFlow Jun-20 3.3 3.6 6.9 3.8

<2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2

2 BOD at 27 C mg/L 110 430 310 140 130 260 230 110 220 250 310 NA 63 23 94 58 43 Fecal coliform MPN/100 ml 7.5 7.6 7.4 7.0 5.8 6.3 6.1 7.0 5.2 7.0 7.2 6.9 7.3 6.9 6.5 7.2 5.9 4.8 D.O mg/L NoFlow Jul-20

2.2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2

3 3 4 2 3 2 2 BOD at 27 C mg/L 170 140 120 170 260 NA NA NA NA NA NA NA 84 79 26 84 63 32 Fecal coliform MPN/100 ml 5.5 5.6 6.4 6.0 6.0 6.0 6.5 6.5 5.2 6.5 6.1 5.8 6.4 5.4 6.4 5.9 6.0 D.O mg/L NoFlow NoFlow Aug-20

<2 <2 <2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 210 130 110 120 110 140 170 38 23 33 63 70 22 32 43 46 31 Fecal coliform MPN/100 ml 6.5 6.5 6.5 6.9 6.7 6.3 6.4 6.4 6.0 6.5 6.4 7.0 6.0 6.4 5.4 6.3 6.8

6.5 D.O mg/L NoFlow Sep-20 <2 2.0 2.2

<2 <2 <2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 120 230 150 110 140 210 26 14 32 26 38 33 17 32 70 84 26 Fecal coliform 31 MPN/100 ml 6.3 6.7 6.5 6.3 6.8 6.7 6.4 6.3 6.7 6.8 6.4 6.6 6.7 6.2 6.5 6.9 6.0

6.3 D.O mg/L NoFlow Oct-20 2.3 2.9 3.5

<2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C 2.4 mg/L 210 170 170 170 31 63 27 23 63 32 33 27 12 43 31 31 79 31 Fecal coliform MPN/100 ml No. Sl. Sl. 7 6 5 4 3 2 1 Kalingarayan (B10) Canal Kalingarayan (B5) Canal Standard limit for DO 5.0 mg/l DO for 5.0 limit Standard MPN/100ml <500 coliform Fecal for limit Standard BOD for <3 mg/L limit Standard Sathyamangalam Bhavani Bhavanisagar Sirumugai koil Badrakaliamman Name of station of Name Station Station Code Code 3021 3020 3019 1205 1321 1204 1201 No. 6.8 6.8 6.7 6.5 6.5 6.6 6.5 D.O mg/L Jan-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 49 33 13 63 26 22 26 Fecal coliform MPN/100 ml 6.6 6.7 6.0 7.0 6.6 6.2 6.6 D.O mg/L Feb-20 <2 <2 <2 <2 <2 <2 2 BOD at 270 C mg/L River Bhavani Polluted river stretches from Sirumugai to Kalingarayan - 60 KM - Priority-IV - KM Kalingarayanto 60 - Sirumugai from riverRiver stretches Polluted Bhavani 110 130 61 61 63 32 26 Fecal coliform MPN/100 ml 6.1 6.0 5.7 6.3 6.2 6.0 6.3 D.O mg/L Mar-20 2.4 2.1 <2 <2 <2 <2 <2 BOD at 270 C mg/L 140 70 79 38 94 31 31

Fecal coliform MPN/100 ml RiverWater Stretches QualityPolluted of Status TAMIL NADU POLLUTION CONTROL BOARD 76, Mount Salai, Guindy, Chennai - 600 032. Guindy,600 - Salai, Chennai Mount 76, 6.3 6.4 7.1 6.2 6.8 7.1 7.2 D.O mg/L Apr-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 47 31 26 49 26 14 9 Fecal coliform MPN/100 ml 7.4 7.1 6.3 6.1 6.3 6.3 6.2 D.O mg/L May-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L NA NA 49 43 43 34 31 Fecal coliform MPN/100 ml 6.3 5.9 5.7 5.6 6.2 6.0 6.3 D.O mg/L Jun-20 2.5 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 110 21 26 70 63 26 22 Fecal coliform MPN/100 ml 6.5 6.0 6.9 6.8 6.7 6.7 7 D.O mg/L Jul-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 170 14 21 63 46 22 17 Fecal coliform MPN/100 ml 6.5 6.0 6.3 6.4 6.2 6.2 6.4 D.O mg/L Aug-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 11 13 22 21 21 70 21 Fecal coliform MPN/100 ml 6.3 6.8 6.4 6.6 6.6 6.8 6.2 D.O mg/L Sep-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 170 17 46 22 38 17 26 Fecal coliform MPN/100 ml 6.2 6.8 6.3 6.2 6.1 6.5 6.1 D.O mg/L Oct-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 21 17 46 33 14 93 21 Fecal coliform MPN/100 ml No. Sl. 12 11 10 9 8 7 6 5 4 3 2 1 Standard Standard limit for 5.0DO mg/l Standard limit for Fecal coliform <500 MPN/100ml Standard limit <3for BOD mg/L Seevalaperi Vellakovil Srivaikuntam Kallidaikurichi Eral Authoor Ambasamudram Thiruvidaimarudur Murapanadu Kokirakulam Cheranmadevi Papanasam Name of stationof Name Station Code Code 3029 3028 3027 3026 3025 1330 1329 1328 1162 1161 1160 1159 No. 6.4 6.4 7.1 7.2 6.5 6.6 7.0 6.2 6.0 6.6 6.5 7.0 D.O mg/L Jan-20 2.8 2.3 2.2 2.5 2.5 2.4 2.2 2.5 2.6 2.8 2.1 2.9 BOD at 270 C mg/L 110 33 17 43 41 63 25 14 4 9 2 7 Fecal coliform MPN/100 ml 6.8 6.0 7.9 7.1 6.0 7.6 7.0 7.2 7.5 6.5 7.0 7.2 D.O mg/L River Thamirabarani Polluted river from stretches Pappankulam to Arumuganeri - 80 KM - Priority-V Feb-20 2.6 2.2 2.4 2.4 2.8 2.4 2.0 2.7 2.5 2.2 2.2 2.8 BOD at 270 C mg/L 110 120 79 70 63 22 94 17 17 70 22

8 Fecal coliform MPN/100 ml 5.8 6.2 7.0 7.3 5.3 7.2 7.3 7.1 7.6 6.8 7.0 7.2 D.O mg/L Mar-20 2.7 2.9 2.3 2.4 2.3 2.5 2.5 2.2 2.3 2.3 2.8 <2 BOD at 270 C mg/L Water Quality Water of Status Polluted River Stretches 31 22 47 70 58 70 26 TAMIL NADU POLLUTION CONTROL BOARD

6 4 7 8 2 Fecal coliform 76, Mount Salai, Guindy, Chennai - 600 032. MPN/100 ml 6.4 6.5 7.2 7.1 6.5 6.8 7.0 6.8 7.5 6.6 6.6 6.8 D.O mg/L Apr-20 2.6 2.7 2.7 2.1 2.3 <2 <2 <2 <2 3 3 3 BOD at 270 C mg/L 110 110 23 17 43 33 13 10

6 2 8 2 Fecal coliform MPN/100 ml 6.2 6.0 7.3 6.9 6.7 7.1 7.3 7.0 7.3 6.4 6.8 6.1 D.O mg/L May-20 2.6 2.2 2.8 3.2 2.8 <2 <2 <2 <2 <2 3 2 BOD at 270 C mg/L 110 140 220 26 26 70 22

6 4 8 9 2 Fecal coliform MPN/100 ml 6.4 6.3 5.9 7.0 6.2 7.5 7.2 7.2 6.4 7.1 7.0 7.3 D.O mg/L Jun-20 2.9 2.8 2.6 3.3 2.9 2.2 <2 <2 <2 3 3 2 BOD at 270 C mg/L 120 120 94 70 58 53 12 70 21

8 7 4 Fecal coliform MPN/100 ml 6.1 5.9 5.3 7.1 5.8 7.1 7.0 7.2 7.4 6.2 6.5 6.8 D.O mg/L Jul-20 2.5 2.5 3.9 2.6 4.5 5.1 2.5 2.5 2.5 2.4 2.5 2.3 BOD at 270 C mg/L <1.8 31 23 31 34 84 17 26 42 21

6 2 Fecal coliform MPN/100 ml 6.5 6.5 6.0 7.4 6.7 7.3 7.4 7.2 7.4 6.8 7.0 7.6 D.O mg/L Aug-20 2.6 2.4 3.2 3.4 2.4 2.5 2.2 <2 <2 3 2 2 BOD at 270 C mg/L <1.8 <1.8 13 17 21

9 7 2 2 9 9 4 Fecal coliform MPN/100 ml 6.5 6.5 6.6 6.9 7.2 7.0 6.6 6.3 7.1 6.6 6.1 7.5 D.O mg/L Sep-20 2.5 2.9 2.2 2.9 3.2 3.3 2.2 2.7 2.3 2.5 <2 3 BOD at 270 C mg/L 120 40 58 47 21 48 33 13

7 4 8 4 Fecal coliform MPN/100 ml 6.0 5.6 7.6 7.5 6.0 6.8 7.3 6.0 7.1 6.5 7.1 7.4 D.O mg/L Oct-20 2.5 2.4 2.8 2.4 3.1 2.2 2.8 2.4 2.4 <2 <2 2 BOD at 270 C mg/L <1.8 <1.8 <1.8 25 17 47 60 94 39 22

2 4 Fecal coliform MPN/100 ml