1 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited's

Total Page:16

File Type:pdf, Size:1020Kb

1 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited's

1 EXECUTIVE SUMMARY Hindustan Corporation Limited’s Vision is to be world-class company known for caring and delighting customers with quality products and innovative services. The Corporation will be a model of excellence in meeting environmental, health and safety norms. In order to realize this Vision, Corporation will be focusing on enhancement of productivity, quality and caring for environmental protection. HPCL has two port based refineries at and . Corporation Limited (HPCL) is having a LPG Bottling plant at Opp Hassan National Highway, Yediyur - 572142, Karnataka and is located approximately 1.5 kms from the city of Yediyur. The Bottling Plant caters to the Domestic, Commercial and Industrial LPG Needs of nearby district. The present capacity of the plant is 3 X 700 (2100 MT), with mounded storage facility. The raw material is supplying thru HPCL pipeline ( Hassan Bangalore Pipeline). The additionally 3 X 700 (2100 MT). Then the total capacity of plant 4200 MT. From the point of view of having adequate supplies of LPG in the market and for making storage operations safer and eliminating all the environmental aspects, it is proposed to undertake the project inside the existing premises as cited above. The project is targeted to be mechanically completed within 28 months from the date of handing over the land or statutory MOEF approval. 1.1 Industrial Area (processing area) The plant area is approximate 75 Acres. No extra land will required for the project. 1.2 Residential Area (non-processing area) Construction area being located in notified industrial growth centre. So, no residential area permitted. 1.3 Green belt Approximate 75000 M2 (18.5 Acres), 33 % of the greenbelt will be developed. 1.4 Drinking water management (source & supply of water) Existing drinking water management system is sufficient for proposed project. No additional facility will be required. Water demand full fill by exiting borewell. 1.5 Sewage system Existing 3.5 KL STP already install also sufficient for proposed project. No additional facility will be required. 1.6 Industrial waste management No cylinder bottling will be increase capacity in this project only storage will increase. No hazardous waste generation is envisaged due to operation of proposed mounded storage vessel. The generation of hazardous waste in form of Lube Oil from other existing allied facilities viz. 200 litre/year, Oil Soaked cotton waste 360 Kg/Annum, Discarded container 20mo’s/Annum and paint sludge 2400 Kg/Amnnum. 10 KLD capacities ETP already installed at project site. 1.7 Power requirement & supply/ source Power will be sourced from Karnataka Sate Electricity Distribution Company Ltd. S. No. Resources Existing Capacity Proposed additional Total Capacity Capacity

1 Power requirement 500 KVA 250 KVA 750KVA 2 DG set capacity 750 & 380 KVA NA 1130KVA

Recommended publications
  • List of Abbreviations
    LIST OF ABBREVIATIONS S. No. 1. A&N Andaman & Nicobar 2. ACO Assistant Committee Officer 3. AEES Atomic Energy Education Society 4. AeBAS Aadhaar enabled
    [Show full text]
  • HPCL-LPG Dist Ad
    HINDUSTAN PETROLEUM CORPORATION LIMITED (A Govt. of India Enterprise) LPG SBU, GMO-SZ NOTICE FOR APPOINTMENT OF NON-DOMESTIC LPG DISTRIBUTORS HINDUSTAN
    [Show full text]
  • Annualreport2013-14.Pdf
    2013-14 Hindustan Petroleum Corporation Limited Annual Report 2013-14 TOGETHER TOWARDS TOMORROW TOGETHER TOWARDS TOMORROW
    [Show full text]
  • CHAPTER - I Through International Competitive Biddings in a 1
    CHAPTER - I through international competitive biddings in a 1. INTRODUCTION deregulated scenario. Appraisal of 35% of the total sedimentary basins is targeted
    [Show full text]
  • Hindustan Petroleum Corporation Limited
    HINDUSTAN PETROLEUM CORPORATION LIMITED GAS & RENEWABLES SBU- CGD Projects EXPRESSION OF INTEREST (EOI) FOR SALE OF LAND EOI Opening Date:
    [Show full text]
  • IBEF Presentataion
    OIL and GAS For updated information, please visit November 2017 Table of Content Executive Summary……………….….…….3 Advantage
    [Show full text]
  • Global Notice Inviting Expression of Interest (Eoi)
    HINDUSTAN PETROLEUM BHARAT PETROLEUM CORPORATION LIMITED CORPORATION LIMITED (A Govt of India Undertaking) (A Govt of India Undertaking) Mumbai, India Mumbai,
    [Show full text]
  • Expenditure Budget Vol. I, 2013-2014 53 STATEMENT 15 RESOURCES of PUBLIC ENTERPRISES (In Crores of Rupees) Revised 2012-2013 Budget 2013-2014 S.No
    Expenditure Budget Vol. I, 2013-2014 53 STATEMENT 15 RESOURCES OF PUBLIC ENTERPRISES (In crores of Rupees) Revised 2012-2013 Budget 2013-2014 S.No. Name of
    [Show full text]
  • Monthly Summary of Ministry of Petroleum and Natural Gas for the Month of December, 2020
    Monthly Summary of Ministry of Petroleum and Natural Gas for the month of December, 2020. 1. Hon’ble Minister, PNG delivered the keynote address at the
    [Show full text]
  • PPAC's Snapshot of India's Oil & Gas Data
    PPAC's Snapshot of India’s Oil & Gas data Abridged Ready Reckoner February, 2021 Petroleum Planning & Analysis Cell (Ministry of Petroleum & Natural
    [Show full text]
  • Hindustan Petroleum Corporation Limited Sustainability Report 2019-20 Contents 2019-20
    2019-20 Hindustan Petroleum Corporation Limited Sustainability Report 2019-20 Contents 2019-20 Hindustan Petroleum Corporation Limited
    [Show full text]
  • Delivering Happiness
    2016-17 Delivering Happiness... Our Directors Whole Time Directors Government Directors Independent Directors (Ex-Officio Part-Time) Shri
    [Show full text]