HMS Cambria, Cardiff Bay Design and Access Statement January 2017 This document has been prepared by: on behalf of: Prepared by: Liam Hopkins The Urbanists, The Creative Quarter, 8A Morgan Arcade, Cardiff, CF10 1AF, United Kingdom
[email protected] UG1606, January 2017, Document Revision 3 All maps within this document are: Reproduced from Ordnance Survey with permission of the controller of Her Majesty’s Stationary Office (C) Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution/civil proceedings. Licence No 100054593 www.theurbanists.net Contents 1. Introduction p. 4 2. Context p. 6 3. Design Proposals p.14 4. Design Statement p. 16 5. Planning Statement p. 34 6. Conclusion p. 36 1. Introduction Statement Purpose • Recruiting design of the development takes that context into account; This Design and Access Statement has been produced • Retention to accompany an application for planning permission 3. Explain the policy or approach adopted as to • Training for a naval reserve training facility in Cardiff Bay. The access, and how policies relating to access in development will be named HMS Cambria and will • Deploying welfare, and the development plan have been taken into be a training centre for the South Wales Maritime account; and Reserves and Royal Navy. • Post operation recovery. 4. Explain how any specific issues which might The Development The proposed building would provide a modern, affect access to the development have been operationally effective training facility that will be addressed. The development proposed in the application robust, adaptable and extendable, whilst maintaining includes: a modern naval appearance which will enhance it’s This statement has been prepared to satisfy the context.