ROAD WORKS & EVENTS INFORMATION: HUNTS 16th-30th November 2017 For further information on the below please contact 0345 045 5212 Not all road works are included in the list below as some are issued at very short notice due to emergencies or very small works which don't require a long period of notice. . The Police can also close roads for safety reasons. KEY: :denotes Road Closure Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date CAMBRIDGESHIRE HIGH STREET ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE PYMS GARDENS ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE ST NEOTS ROAD ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE POTTON ROAD ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) (C174) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE DREWELS LANE ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE PITSDEAN ROAD ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE HIGH GREEN ABBOTSLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. Cadent Gas Limited THE MALTINGS ALCONBURY SOME C/W 16-Nov-2017 22-Nov-2017 LAY 6M NEW DOMESTIC SERVICE FROM THE MAIN IN INCURSION THE FARSIDE VERGE CAMBRIDGESHIRE BRIDGE FROM ALCONBURY ROAD 20-Nov-2017 24-Nov-2017 Repointing works to the internal face of the Scheduled HIGH STREET TO CLOSURE Ancient Monument as well minor external brickwork repairs BROOKSIDE (C108)

CAMBRIDGESHIRE MILLER WAY BRAMPTON SOME C/W 22-Nov-2017 23-Nov-2017 Dropped Kerb - Cafferkey Construction LTD - 01223 520 (D245) INCURSION 221 Cadent Gas Limited ORCHARD LANE BRAMPTON GIVE & TAKE 27-Nov-2017 01-Dec-2017 LAY NEW DOMESTIC SERVICE WITH 8.2M IN PUBLIC FROM MAIN IN FARSIDEFOOTWAY Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date BT BRIDGE ROAD BROUGHTON GIVE & TAKE 18-Nov-2017 20-Nov-2017 Build 2 precast jointing chamber (725mm x 225mm) 600mm dep,Install 11m of 1 way poly duct in Carriageway,Install 25m of 1 way poly duct in Verge,Provide 1 core drill(s) into jointbox or building BT WARBOYS ROAD BURY SOME C/W 16-Nov-2017 20-Nov-2017 Install 1m of 1 way poly duct in Verge,Provide 1 core drill(s) INCURSION into jointbox or building CAMBRIDGESHIRE OWLS END BURY ROAD 24-Nov-2017 24-Nov-2017 Bury Christmas Lights Switch On (17:30 - 19:30) CLOSURE ROAD CLOSURE - Owls End BT BLUNTISHAM COLNE GIVE & TAKE 16-Nov-2017 20-Nov-2017 Install 30m of 1 way poly duct in Verge BT BLUNTISHAMROAD COLNE SOME C/W 16-Nov-2017 20-Nov-2017 Excavate 2m to allow for damaged duct to be cut prior to ROAD INCURSION remov BT BLUNTISHAM COLNE GIVE & TAKE 16-Nov-2017 20-Nov-2017 Build 1 concrete chamber 1690mm x 710mm x 1565mm ROAD deep in Footway CAMBRIDGESHIRE ST NEOTS ROAD EATON FORD ROAD 26-Nov-2017 26-Nov-2017 St Neots Christmas Lights Switch On (08:00 - 23:59) CLOSURE ROAD CLOSURE - High St, Market Square North, St Neots Road CAMBRIDGESHIRE PETERBOROUGH ELTON ROAD 18-Nov-2017 19-Nov-2017 Install traffic islands, new lining, red surfacing, replace ROAD CLOSURE crawler lane signs and additional deflection arrows. CAMBRIDGESHIRE PETERBOROUGH ELTON TWO-WAY 18-Nov-2017 19-Nov-2017 Crack sealing ROAD SIGNALS CAMBRIDGESHIRE POTTON ROAD EYNESBURY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) (B1046) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE CROMWELL ROAD EYNESBURY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) (B1046) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. Cambridge Water HEADLANDS FENSTANTON SOME C/W 20-Nov-2017 22-Nov-2017 Repair water leak near SV10152 Company INCURSION CAMBRIDGESHIRE LONDON ROAD FENSTANTON TWO-WAY 22-Nov-2017 22-Nov-2017 Hedge cutting (Palmer Fencing Ltd 01473834960) SIGNALS CAMBRIDGESHIRE WINDSOR ROAD GODMANCHESTER GIVE & TAKE 22-Nov-2017 24-Nov-2017 Drop Kerb (K A Page 07976351079) CAMBRIDGESHIRE THE HIGHWAY GREAT STAUGHTON MULTI-WAY 20-Nov-2017 24-Nov-2017 Junction improvements and lining SIGNALS CAMBRIDGESHIRE GREEN LANE GREAT STAUGHTON MULTI-WAY 20-Nov-2017 24-Nov-2017 Permit for tm only SIGNALS CAMBRIDGESHIRE CAUSEWAY GREAT STAUGHTON MULTI-WAY 20-Nov-2017 24-Nov-2017 Permit for TM only SIGNALS CAMBRIDGESHIRE PETERBOROUGH HADDON TWO-WAY 18-Nov-2017 19-Nov-2017 Crack sealing ROAD SIGNALS ANGLIAN WATER SAPLEY ROAD HARTFORD MULTI-WAY 17-Nov-2017 21-Nov-2017 Chamber/Cover/Frame SIGNALS Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date CAMBRIDGESHIRE HARTFORD LANE 17-Nov-2017 21-Nov-2017 Crack Sealing NORTHERN CLOSURE BYPASS VIRGIN MEDIA MERLIN CLOSE HARTFORD SOME C/W 23-Nov-2017 27-Nov-2017 8m swept tee in footway tarmac outside 18 MERLIN INCURSION CLOSE UK POWER NETWORKS CHURCH LANE HARTFORD ROAD 27-Nov-2017 01-Dec-2017 Connections Small Service:NEW SERVICE: (APPROX EASTERN& LONDON CLOSURE DEPTH 450mm-600mm):UKPN to excavate and re-instate trench from base off Pole 5 for 1m in public unmade verge and 4m tarmac road crossing. TM Required: ROAD CLOSURE WITH ACCESS ANGLIAN WATER PENNINGTON HARTFORD MULTI-WAY 28-Nov-2017 29-Nov-2017 Placement of signal head as part of 3 way light set up for ROAD SIGNALS works on Coneygear Road UK POWER NETWORKS HIGH STREET HEMINGFORD TWO-WAY 27-Nov-2017 01-Dec-2017 Connections Highway Services:SERVICE ALTERATION: EASTERN& LONDON ABBOTS SIGNALS (APPROX DEPTH 450mm):Same day disconnection and reconnection of electricity supply to a lamp column VIRGIN MEDIA WEIR CLOSE SOME C/W 20-Nov-2017 22-Nov-2017 TEE REQUIRED IN THE CARRIAGEWAY O/S INCURSION PROPERTY. 12M X 0.5M IN CARRIAGEWAY TARMAC, 100M X 0.5M IN FOOTWAY TARMAC AND 7M X 0.5M IN GRASS UP TO PIT ON THE CORNER OF WEIR CLOSE J/W WEIR ROAD UK POWER NETWORKS WEIR ROAD HEMINGFORD GREY SOME C/W 27-Nov-2017 01-Dec-2017 Connections Highway Services:NEW INDIVIDUAL EASTERN& LONDON INCURSION SUPPLY::NEW SUPPLY TO LAMP COLUMN 215 BT CHAPEL CLOSE HILTON TWO-WAY 17-Nov-2017 17-Nov-2017 Access is required to a overhead structure to allow BT SIGNALS Openreach to give provision of service CAMBRIDGESHIRE ERMINE STREET HUNTINGDON STOP/GO 19-Nov-2017 19-Nov-2017 Hot rolled Asphalt BOARDS BT BROOKSIDE HUNTINGDON SOME C/W 19-Nov-2017 21-Nov-2017 Laying duct in footway and c/w both ways and replace INCURSION street cabinet CAMBRIDGESHIRE ERMINE STREET HUNTINGDON ROAD 26-Nov-2017 26-Nov-2017 Carriageway patching CLOSURE ANGLIAN WATER CONEYGEAR HUNTINGDON MULTI-WAY 28-Nov-2017 29-Nov-2017 Excavate and reinstate to repair 5x manhole in carriageway ROAD SIGNALS CAMBRIDGESHIRE MARKET HILL HUNTINGDON ROAD 30-Nov-2017 03-Dec-2017 Huntingdon Christmas Market (30/11 18:00 - 22:00 and CLOSURE 1/12 10:00 - 21:00 and 3/12 09:00 - 20:00) ROAD CLOSURE - High St CAMBRIDGESHIRE HIGH STREET HUNTINGDON ROAD 30-Nov-2017 03-Dec-2017 Huntingdon Christmas Market (30/11 18:00 - 22:00 and CLOSURE 1/12 10:00 - 21:00 and 3/12 09:00 - 20:00) ROAD CLOSURE - High St Cambridge Water SLADE CLOSE RAMSEY SOME C/W 20-Nov-2017 22-Nov-2017 Replace stop tap cover and frame in footway Company INCURSION Cadent Gas Limited FAIRFIELDS DRIVE RAMSEY GIVE & TAKE 23-Nov-2017 29-Nov-2017 LAY NEW DOMESTIC SERVICE WITH 2M IN PUBLIC FROM MAIN IN NEARSIDE FOOTWAY Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date CAMBRIDGESHIRE LITTLE WHYTE RAMSEY ROAD 25-Nov-2017 25-Nov-2017 Ramsey Christmas Lights Switch On (00:01 - 22:00) CLOSURE ROAD CLOSURE AND PARKING SUSPENSION - New Rd and Great Whyte CAMBRIDGESHIRE GREAT WHYTE RAMSEY ROAD 25-Nov-2017 25-Nov-2017 Ramsey Christmas Lights Switch On (00:01 - 22:00) (B1040) CLOSURE ROAD CLOSURE AND PARKING SUSPENSION - New Rd and Great Whyte CAMBRIDGESHIRE GREAT WHYTE RAMSEY ROAD 25-Nov-2017 25-Nov-2017 Ramsey Christmas Lights Switch On (00:01 - 22:00) CLOSURE ROAD CLOSURE AND PARKING SUSPENSION - New Rd and Great Whyte CAMBRIDGESHIRE NEW ROAD RAMSEY ROAD 25-Nov-2017 25-Nov-2017 Ramsey Christmas Lights Switch On (00:01 - 22:00) CLOSURE ROAD CLOSURE AND PARKING SUSPENSION - New Rd and Great Whyte UK POWER NETWORKS MIDDLE DROVE RAMSEY HEIGHTS SOME C/W 28-Nov-2017 05-Dec-2017 Network Operations EASTERN& LONDON INCURSION Distribution:INSTALL/REPLACE/REMOVE/DISCONNECT UNDERGROUND SERVICE CABLES:Remake underground LV Service Joints BT UGG MERE COURT RAMSEY ST MARYS TWO-WAY 22-Nov-2017 24-Nov-2017 Install 1m of 1 way poly duct in Verge,Install 7m of 1 way ROAD SIGNALS poly duct in Carriageway ANGLIAN WATER FEN LANE SAWTRY TWO-WAY 20-Nov-2017 24-Nov-2017 New Supply Off-site in verge ,footway, carriageway SIGNALS ANGLIAN WATER ST ANDREWS WAY SAWTRY MULTI-WAY 20-Nov-2017 22-Nov-2017 Fix leak on newly laid main SIGNALS ANGLIAN WATER FEN LANE SAWTRY MULTI-WAY 20-Nov-2017 22-Nov-2017 Fix leak on newly laid main SIGNALS GAS TRANSPORTATION CHAPEL END SAWTRY GIVE & TAKE 20-Nov-2017 22-Nov-2017 Excavate& connect to cadent Gas Main providing gas CO LTD supply to new housing development. Approx dimensions: 35m x 0.5m verge/carriageway. Depth: 0.8m. BT ST ANDREWS WAY SAWTRY MULTI-WAY 27-Nov-2017 29-Nov-2017 Build 1 precast chamber 1310mm x 610mm x 1265mm SIGNALS deep in Footway,Install 119m of 1 way poly duct in Verge BT HIGH STREET SOME C/W 17-Nov-2017 21-Nov-2017 Dangerous sunken cover and frame to be replaced INCURSION BT ST IVES ROAD SOMERSHAM TWO-WAY 21-Nov-2017 22-Nov-2017 Access required to openreach Overhead Network-Highway SIGNALS Surface will be unaffected- transferring BT Plant to new Poles- BT PARKHALL ROAD SOMERSHAM ROAD 27-Nov-2017 29-Nov-2017 Install 41m of 1 way poly duct in Footway,Provide 1 core CLOSURE drill(s) into jointbox or building Cambridge Water EDINBURGH DRIVE ST IVES SOME C/W 16-Nov-2017 20-Nov-2017 Repair water leak on fitting located in footway Company INCURSION CAMBRIDGESHIRE MERRYLAND ST IVES ROAD 25-Nov-2017 26-Nov-2017 St Ives Christmas Lights and Christmas Market (18:00 on CLOSURE 25/11 until 22:00 on 26/11) ROAD CLOSURE - Market Hill, The Pavement, Crown St, Bridge St, Merrylands Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date CAMBRIDGESHIRE BRIDGE STREET ST IVES ROAD 25-Nov-2017 26-Nov-2017 St Ives Christmas Lights and Christmas Market (18:00 on CLOSURE 25/11 until 22:00 on 26/11) ROAD CLOSURE - Market Hill, The Pavement, Crown St, Bridge St, Merrylands CAMBRIDGESHIRE CROWN STREET ST IVES ROAD 25-Nov-2017 26-Nov-2017 St Ives Christmas Lights and Christmas Market (18:00 on CLOSURE 25/11 until 22:00 on 26/11) ROAD CLOSURE - Market Hill, The Pavement, Crown St, Bridge St, Merrylands CAMBRIDGESHIRE THE PAVEMENT ST IVES ROAD 25-Nov-2017 26-Nov-2017 St Ives Christmas Lights and Christmas Market (18:00 on CLOSURE 25/11 until 22:00 on 26/11) ROAD CLOSURE - Market Hill, The Pavement, Crown St, Bridge St, Merrylands CAMBRIDGESHIRE MARKET HILL ST IVES ROAD 25-Nov-2017 26-Nov-2017 St Ives Christmas Lights and Christmas Market (18:00 on CLOSURE 25/11 until 22:00 on 26/11) ROAD CLOSURE - Market Hill, The Pavement, Crown St, Bridge St, Merrylands VIRGIN MEDIA THE BROADWAY ST IVES SOME C/W 27-Nov-2017 29-Nov-2017 Virgin Media - Clear blocked duct in the cw INCURSION VIRGIN MEDIA HOUGHTON ROAD ST IVES MULTI-WAY 27-Nov-2017 28-Nov-2017 Excavate F/W to clear Blockages on existing VM Network. SIGNALS night works BT BEDFORD STREET ST NEOTS SOME C/W 19-Nov-2017 21-Nov-2017 dfe for 3x102 boxes in footway INCURSION CAMBRIDGESHIRE CROMWELL ROAD ST NEOTS ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE MARKET SQUARE ST NEOTS ROAD 26-Nov-2017 26-Nov-2017 St Neots Christmas Lights Switch On (08:00 - 23:59) NORTH CLOSURE ROAD CLOSURE - High St, Market Square North, St Neots Road CAMBRIDGESHIRE HIGH STREET ST NEOTS ROAD 26-Nov-2017 26-Nov-2017 St Neots Christmas Lights Switch On (08:00 - 23:59) CLOSURE ROAD CLOSURE - High St, Market Square North, St Neots Road CAMBRIDGESHIRE HIGH STREET ST NEOTS ROAD 26-Nov-2017 26-Nov-2017 St Neots Christmas Lights Switch On (08:00 - 23:59) CLOSURE ROAD CLOSURE - High St, Market Square North, St Neots Road CAMBRIDGESHIRE BENTLEY CLOSE UPWOOD PRIORITY 16-Nov-2017 17-Nov-2017 Drop Kerb (K A Page 07976351079) WORKING Telefonica (O2 (UK) HUNTINGDON UPWOOD TWO-WAY 21-Nov-2017 21-Nov-2017 2-way signals in place 0900-1800 for collection of trackway Limited) ROAD SIGNALS and temp site entrance. CAMBRIDGESHIRE HEATH ROAD WARBOYS LANE 22-Nov-2017 24-Nov-2017 Crack sealing (A141) CLOSURE Cadent Gas Limited WOODLANDS WARBOYS GIVE & TAKE 23-Nov-2017 29-Nov-2017 LAY 7M NEW DOMESTIC SERVICE FROM THE MAIN IN THE FARSIDE FOOTWAY Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date CAMBRIDGESHIRE HIGH STREET WARBOYS ROAD 25-Nov-2017 25-Nov-2017 CHRISTMAS LIGHTS SWITCHON 15:30-18:00 CLOSURE CAMBRIDGESHIRE HIGH STREET WARBOYS ROAD 25-Nov-2017 25-Nov-2017 CHRISTMAS LIGHTS SWITCHON 15:30-18:00 CLOSURE CAMBRIDGESHIRE DREWELS LANE WARESLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. CAMBRIDGESHIRE MANOR FARM WARESLEY ROAD 19-Nov-2017 19-Nov-2017 St Neots Half Marathon (06:00 - 13:30) ROAD CLOSURE ROAD CLOSURES - Cromwell Rd (B1046), Potton Road (B1046), Manor Farm Road. NETWORK RAIL - BRIDGE STREET WOODWALTON TWO-WAY 21-Nov-2017 22-Nov-2017 Bridge survey works including coring hol;es in side of PROMOTERS NATIONAL SIGNALS structure and trial hole at base of abutment wall. Hours of Works 08.00 - 17.00 Daily BT BROADWAY YAXLEY SOME C/W 16-Nov-2017 20-Nov-2017 Provide 1 new pole INCURSION ANGLIAN WATER BENTLEY AVENUE YAXLEY PRIORITY 16-Nov-2017 16-Nov-2017 Replace 2 No. noisy manhole covers and frames in the WORKING carriageway, which are causing a noise pollution. Complete reinstatement works as required using liquid asphalt materials.