SOUTHERN RAILWAY BY RPAD No. T/W.148/North/02/2015 Divisional Office, Works Branch, Tiruchchirappalli, Date: 13.04.2015.

LETTER OF ACCEPTANCE

M/s. Highpowerv Infrastructure Limited, Plot No.61, Highpowerv Towers, 5th Cross Street, Logaiah Colony, Saligramam, , PIN – 600 093.

Sirs,

Sub: Villupuram - Tiruchchirappalli (chord line), Villupuram - and Villupuram – Puducherry sections - Deployment of Gate Counselors/Gate Mitras at various 80 unmanned level crossings in Assistant Divisional Engineer/Villupuram Sub division for a period of 110 days.

Ref: Sanction No. and date: ADRM's No.T/W.287/LC/Gate - Mitras dt.15.01.2015.

Your tender opened on 02.03.2015 for item No. 02 of Tender Notice No. TPJ 01 of 2015 dated 22.01.2015.

**********

1. Your tender for the above work has been accepted at the rates quoted as given below. Sl Total Rate Amount Description Unit No. Qty ` ` Schedule 1 Deploying Gate Counselors/Gate Mitras at the rate of one man for

each unmanned level crossing for

twelve hours during day time from Per LC 450/- 39,60,000/- sun rise to sun set for a period of 8800 Per day one hundred and ten days from date specified by the Engineer-in- charge in writing, etc.,

Grand total of schedule ` 39,60,000/- 39,60,000/- (Rupees thirty nine lakhs and sixty thousand only)

[

Page No: 2:

2. Based on the accepted rates, the total value of contract works out to 39, 60,000/- (Rupees thirty nine lakhs and sixty thousand only). Your attention in this connection is invited to the various conditions stipulated by the Railway in the tender and signed by you.

3. The security deposit to be remitted by you is ` 1, 98,000/- (Five percent of the contract value). The sum of ` 82,720/- remitted through DD No. 851465176 dated. 28.02.2015 issued by Indian Overseas Bank, Ayanavaram, chennai towards earnest money will be adjusted towards security deposit till the equivalent amount recovered from the 10 % of the running bills.

4. The balance security deposit amount of ` 1, 15,280/- will be recovered at the rate of 10% of the running bills only. No other mode of payment shall be accepted. No interests will accrue on the Security Deposit Amount.

5. In addition to that, you have to submit irrevocable Bank guarantee for 5% of the contract value i.e. ` 1, 98,000/- from the Nationalized/Scheduled Banks/ only towards performance guarantee before signing of agreement or in cash to be remitted through Sr.Divisional cashier/S.Rly/Tiruchchirappalli. FDR towards performance guarantee may be drawn in favour of Sr.Divisional finance manager, Southern Railway, Tiruchchirappalli. The performance guarantee bond should be valid up to stipulated date of completion plus 60 days beyond that.

6. The successful bidder shall have to submit a Performance Guarantee (PG) within 30 (thirty) days from the date of issue of Letter Of Acceptance (LOA). Extension of time for. submission of PG beyond 30 (thirty) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty) days, i.e. from 31st day after the date of issue of LOA. In case the contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract shall be terminated duly forfeiting EMD and other dues, if any payable against that contract. The failed contractor shall be debarred from participating in re- tender for that work. 6 (i) This LOA is the due notice for submission of PG and no further communication will be sent to you reminding for submission of PG. In case of failure to submit PG with in the stipulated date action will be taken under clause 16(4) of GCC is final and binding. 7. The work will have to be completed within Five months from the date of issue of this letter. You should submit a programme of work in suitable proforma within 10 days of receipt of this letter in consultation with the Assistant Divisional Engineer/ Villupuram.

8. The letter of acceptance issued is binding contract between Railways and the contractor and the date of completion will be reckoned from the date of issue of this letter only and therefore you may please make arrangements to commence the work immediately.

9. Please attend this office on any working day to execute the agreement duly Producing Performance Bank Guarantee as stated in para.5.

10. Please commence the work within fifteen days form the date of receipt of this letter in consultation with Senior Section Engineer’s/ P.way/ Villupuram, A-Vriddhachalam, and sections.

Page No: 3:

11. In addition to the above, the other terms and conditions given in the tender document submitted along with your offer will also be applicable and the contract agreement to be signed by you will be replica of the same.

12. The person to be deployed as Gate Mitra by the agency will be trained/Certified by Railway’s Safety Branch of the Division. Railway (Safety branch) will give one day training for them free of cost. An identity card will be issued under the joint signature of the Safety Counselors and the SSE/P.way in charge of the section.

Encl: - One Tender Schedule.

Yours faithfully,

Sd……..

(V.Thiagarajan) Sr.Divisional Engineer/North, Tiruchchirappalli For and on behalf of the President of ,

Copy to:-

Sr. DFM/TPJ, DSO/TPJ, ADEN/VM, SSE’s/P.way/VM, A-VRI, TNM & VLR, Ch.OS/Budget, Ch.OS/WA II, SSEs/Estimate, Tender, CVO/MAS, DRM/CON/TENDER/543 & The Labour Enforcement Officer, (Central) Labour enforcement officer, No.178-180 Mohan Nagar, Puducherry- 606 005 & The Labour Enforcement Officer, (Central), The Labour Enforcement office, Railway East colony, Salem – 636 005.

SOUTHERN RAILWAY TIRUCHCHIRAPPALLI DIVISION Name of work: Villupuram - Tiruchchirappalli (chord line), Villupuram -Katpadi and Villupuram - Puducherry sections - Deployment of Gate Counselors/Gate Mitras at various 80 unmanned level crossings in Assistant Divisional Engineer/Villupuram Sub division for a period of 110 days. Sanction No. and date : ADRM's No. T/W.287/LC/Gate - Mitras dt. 15.01.2015 Name of Contractor: M/s. High powerv infrastructure Limited.

NOTE 1.0 SITE OF WORK : The site of work is at existing various unmanned level crossings in Assistant Divisional Engineer/Villupuram sub division of total 80 LCs in Villupuram - Tiruchchirappalli (chord line), Villupuram -Katpadi and Villupuram - Puducherry sections (list of LCs vide annexure)

The Tenderer should satisfy himself with the site conditions and facilities available before submitting the

tender at his own cost. 2.0 SCOPE OF WORK : The work involves Deploying Gate Counselors/Gate Mitras at the rate of one man for each unmanned level crossing for twelve hours during day time from sun rise to sun set for a period of one hundred and ten days from date specified by the Engineer-in-charge in writing etc., complete with all contractor's men, materials, tools etc., complete as per schedule, special conditions,

Railway's drawings and specifications. SCHEDULE:- This schedule contains only one schedule for items not covered by Southern Railway 3.1 Unified Standard Schedule of rates 2011. The quantity furnished in the schedule is only approximate and may vary during execution. Payment will be

made for the actual work done as per agreement conditions. If the rate/percentage rate quoted by the tenderer/contractor is stated differently in figures and in words, then

the rate/percentage rate quoted in words shall prevail. The tenderer/Contractor shall quote unit rate in words in bold “CAPITAL LETTERS” besides figures for each item of schedule separately only in the space provided as tabulation with squares in the schedule for

filling up of rates. Please do not leave any of the squares left blank but may be filled up with letters and Indian numerals as the case may be or mark `X’ suitably in each square if not applicable. 3.2 Special conditions of contract: Conditions on deployment of Gate Counselors/gate Mitras, safety, contract policy and site clearance are 3.2.1 attached vide annexure. ***

SOUTHERN RAILWAY TIRUCHCHIRAPPALLI DIVISION Name of work: Villupuram - Tiruchchirappalli (chord line), Villupuram -Katpadi and Villupuram - Puducherry sections - Deployment of Gate Counselors/Gate Mitras at various 80 unmanned level crossings in Assistant Divisional Engineer/Villupuram Sub division for a period of 110 days. Sanction No. and date : ADRM's No. T/W.287/LC/Gate - Mitras dt. 15.01.2015 Name of Contractor : M/s. High powerv infrastructure Limited. SCHEDULE (Item which is not covered by Southern Railway Unified Standard Schedule of rates 2011 for Tiruchchirappalli Division) Sl. Description No 1 Deploying Gate Counselors/Gate Mitras at the rate of one man for each unmanned level crossing for twelve hours during day time from sun rise to sun set for a period of one hundred and ten days from date specified by the Engineer-in-charge in writing. The Gate counselor shall be in possession of luminous jacket, Hand flag (Red and Green), Thunder Whistle, Shoe one pair, temporary shed accommodation (bunk size 6 sqm). The rate shall be inclusive of cost of all the above materials, provision of temporary shed, salary and other incidental charges, etc., complete by the contractor as per special conditions of contract attached and as directed by the Engineer’s representative. Unit Quantity Rate RATES IN FIGURES RUPEES x x x x x 450.00P A I S E ONLY RATES IN WORDS (in CAPITAL LETTERS) per R U P EES x x x x x x x x x x x CRORES LC 8800 per x x x x x x x x x x x x x x x x x LAKHS day x x x x x x x x x x x x x x x x x THOUSAND x x x x x x x x x x x x x F O U R HUNDRED x x x x x x x x x x x x FI F T Y AND x x x x x x x x x x x x x x x x x PAISE ( item one only) Note: 1 Payment will be made once in month 2 The successful tenderer (agency), shall submit the record of availability of Gate Mitra for the specified period to the SSE/P.way who in turn will verify the details and take further necessary action. 3 Age of Gate Mitra should not be less than 18 years and not more then 40 years. They shall be physically fit for carrying out of the work and should have good hearing capacity and eye sight. The Gate Mitras shall be fully alert during their working hours 4 The person to be deployed as Gate Mitra by the agency will be trained/Certified by Railway’s safety Branch of the Division. Railway (Safety branch) will give one day training for them free of cost. An identity card will be issued under the joint signature of the Safety Counsellors and the SSE/P.way in charge of the section. 5 Penalties: For absenteeism, penalty will be as per following procedure. If gate Mitra is found absent once in a month on a particular gate, then penalty will be 5% of the due monthly payment for that particular gate, If he is found absent two times in a month, then penalty will be totally 10% of due monthly payment. For further absenteeism, penalty will be imposed at the rate of 10% of due monthly payment for that particular gate, for each absenteeism (in addition to penalty as mentioned for two days). IF penalty goes more than 25% of the contract value, for all gates put together, the contract will be terminated. ***

*******

SOUTHERN RAILWAY TIRUCHCHIRAPPALLI DIVISION Name of work: Villupuram - Tiruchchirappalli (chord line), Villupuram -Katpadi and Villupuram - Puducherry sections - Deployment of Gate Counselors/Gate Mitras at various 80 unmanned level crossings in Assistant Divisional Engineer/Villupuram Sub division for a period of 110 days. Sanction No. and date : ADRM's No. T/W.287/LC/Gate - Mitras dt. 15.01.2015. Name of Contractor : M/s. High powerv infrastructure Limited. LIST OF UM LEVEL CROSSINGS WHERE GATE MITHRAS ARE PROPOSED Senior Section Sl. Level Crossing Major Block Engineer P.way Location No. No. section Section section 1 2 1/500‐600 2 4 3/800‐900 3 6 5/200‐300 4 9 7/300‐400 5 10 8/100‐200 Villupuram ‐ 6 11 8/400‐500 Chinnababu 7 13 9/200‐300 samudram 8 17 12/300‐400 9 21 17/100‐200 Puducherry

10 22 ‐ Villupuram 17/400‐500 11 25 19/500‐600 12 26 20/0‐100 13 29 23/200‐300 Villupuram 14 29 A 24/200‐300 15 30 24/900‐25/0 Chinnababu 16 33 27/900‐28/0 samudram ‐ 17 37 30/300‐400 Puducherry 18 41 32/800‐900 19 42 33/800‐900 Villupuram ‐ 20 128 167/300‐400 Kandambakkam 21 141 180/400‐500 22 142 181/300‐400 Tiruvennainallur Road 23 143 182/200‐300 ‐ Parikkal 24 146 183/900‐184/0 25 147 A‐Vriddhachalam 184/400‐500 26 150 188/500‐600 Parikkal ‐ Ulundurpet 27 154 195/500‐600 28 158 202/100‐200 29 159 203/000‐100 Ulundurpet ‐ Puvanur 30 160 203/500‐600 Villupuram - Tiruchchirappalli chord line line chord Tiruchchirappalli Villupuram - 31 161 205/000‐100 32 3 2/600‐700 Villupuram ‐

33 5 m- Tiruvannamalai 3/900‐4/0 Venkatesapuram Katpadi Katpadi

34 7 Villupura 6/0‐100 35 11 11/500‐600 Venkatesapuram ‐

36 12 12/100‐200 Mambalappattu 37 15 16/900‐17/0 Mambalappattu ‐

38 17 18/700‐800

39 18 19/500‐600 40 21 23/600‐700 Ayandur ‐ 41 24 25/900‐26/0 42 25 26/900‐27/0 Mugaiyur ‐ 43 26 27/500‐600 Tirukkovilur 44 27 29/200‐300 45 29 31/700‐800 46 32 36/200‐300 Tirukkovilur ‐ 47 34 39/400‐500 Adichchanur 48 38 44/300‐400 Adichchanur ‐ 49 42 48/800‐900 50 43 49/700‐800 51 45 53/500‐600 52 46 54/100‐200 Tandarai ‐ 53 47 55/900‐56/0 Tiruvannamalai 54 49 61/300‐400 55 57 69/300‐400 56 58 70/600‐700 Tiruvannamalai ‐ 57 59 72/300‐400 Turinjapuram 58 61 74/700‐800 59 62 76/100‐200 60 65 77/600‐700 61 66 78/400‐500 Turinjapuram ‐ 62 68 82/100‐200 Agaram sibbandi 63 69 83/500‐600 64 72 87/400‐500 65 73 88/500‐600 Agaram Sibbandi ‐ 66 75 92/300‐400 67 78 Vellore 96/100‐200 68 81 99/900‐100/0 Polur ‐ Arni Road 69 85 105/700‐800 70 94 117/300‐400 71 96 119/400‐500 Arni Road ‐ 72 99 123/400‐500 Kannamangalam 73 101 125/600‐700 74 104 127/800‐900 75 110 132/400‐500 Kannamangalam ‐ 76 113 137/900‐138/000 Kaniyambadi 77 115 140/400‐500

78 119 143/500‐600 Kaniyambadi ‐ Vellore 79 121 145/500‐600 80 122 146/100‐200 ********