±17600 SF Available March 1, 2021 – April 30, 2025

Total Page:16

File Type:pdf, Size:1020Kb

±17600 SF Available March 1, 2021 – April 30, 2025 Plug & Play Lab / R&D Building for Sublease ±17,600 SF available March 1, 2021 – April 30, 2025 TOTAL BUILDING SF ±17,600 MEDICAL DEVICE INFRASTRUCTURE > 90% Drop ceiling throughout > Open manufacturing space > 100% HVAC throughout including warehouse > (2) Walk-in cold rooms (±442 SF) > New renovated LED lighting throughout > (16) Laboratories (11 with sinks) > (2) New York AC units for office area > Deionized water system closet > 100 KW 3-Phase Caterpillar EGenerator > Utility room with compressed air and autoclave > Dedicated trash and recycling enclosure > Storage rooms 1240 Elko Drive > 1200 Amps, 120/208 volt, 3 phase > Glass washroom with new Lancer dishwasher WAREHOUSE - TOTAL SF ±1,650 OFFICE AREA SUPPORT + AMENITIES > (2) Grade level roll-up doors > (17) Private offices > (2) Sets of restrooms > Newly installed under deck insulation > (4) Conference rooms > (1) Lunchroom with ending > ±875 SF Enclosed fencing for secure storage > Open office area > (1) Breakroom, (1) Mother’s room > 15’ Clear height > (1) Storage room Plug & Play Lab / R&D Building for Sublease ±17,600 SF available March 1, 2021 – April 30, 2025 Trash / Recycling Roll-Up Roll-Up Door Door Utilities Air Compressor Warehouse R&D Lab R&D Lab Utility Corridor Utility Glass Lab Wash Warehouse Cold Storage Storage Wet Lab 22’ x 12.4’ R&D Lab R&D Lab 2-8 C Cold Storage R&D Lab 10’ x 17’ OC Lab 2-8 C Manufacturing R&D Lab MFG Lab R&D Lab MFG Wet Lab R&D Lab Storage Room Gowning Oce Breakroom Room Mail Telephone Oce Lunch Storage Room Oce Oce Room Room Room Oce Janitors Manufacturing Oce Oce Womens Room Oce Restroom Open Oce Area Womens Mens Restroom Restroom Oce Oce Mens Oce Restroom Oce Reception Oce Conference Conference Oce Oce Oce Oce Oce Conference Conference Oce = Laboratory = Cold Storage = Warehouse = Oce Space = Utility Rooms = Common Plug & Play Lab / R&D Building for Sublease ±17,600 SF available March 1, 2021 – April 30, 2025 1. Mercado Shopping Opa? Santa Clara 4. AMC Mercado 20 Center Specialty’s Cafe and Bakery Starbucks Fleming’s Prime 5. Santa Clara Golf & Tennis Club 4 Walmart Neighborhood Steakhouse & Wine Bar Market E CARIBBEAN DR Panda Express 6. Fair Oaks Ave at 6. Santa Clara PAL BMX 3 Subway Caliente Dr Track 6 Pho Hoa Noodle Soup 7-aa LAFAYETTE ST Krispy Kreme Daily Doughnuts & 7. Columbia Neighbor In-N-Out Burger Sandwiches Center GREAT AMERICA PKWY GREAT Jamba Juice Domino’s pizza a 2 World Wrapps LoAn’s Hair & Nails BUSINESS CENTERS 1240 Elko Drive BurgerIM Burger Bar Rene Rose Island Cuisine 1 SmokeEaters Hot Wings 1. Santa Clara Convention b REAMWOOD AVE HOTELS Center 2. Fair Oaks Ave & USPS 3 Tasman Dr 1. Country Inn & Suites by 2. 237 zPizza Radisson 1300 Chesapeake 2 FedEx Shipping Center Specialty’s Cafe & Bakery Terrace, Sunnyvale, CA 3. ELKO DR 5 1 Grocery Outlet Bargain 94089 4. UPS Customer Center 5 3 Market 1 4 4 Boba Drive 2. Quality Inn Santa Clara f g Amazing Cuts Convention Center 2 d e FINANCIAL 7 TASMAN DR 2 1280 Persian Dr, Sunnyvale, Borregas Ave Borregas c INSTITUTIONS 3. Lakewood Shopping CA 94089 Morse Ave Morse 4 FAIR OAKS AVE OAKS FAIR Center 1. Bank of the West BOWERS AVE BOWERS Lawrence Expy & 3. Hyatt Regency Santa Lakehaven Dr Clara Union Bank LAWRENCE EXPY LAWRENCE 2. Ming Tasty 5101 Great America Pkwy, Homi Japanese Ramen Santa Clara, CA 95054 3. Simplicity Bank 1 Saigon Seafood Harbor 3 Hotpot First 4. Hilton Santa Clara 4. World Finance Group Lakewood Dental Care 4949 Great America Pkwy, Santa Clara, CA 95054 5. SVB Financial Group 4. Tasman Dr & Lawrence Expy 5. Ramada by Wyndham 101 Taco Bell Sunnyvale/Silicon Valley VTA LIGHT RAIL Xiang Xiang Noodle Big T’s Seafood Market Bar 6. Santa Clara Marriott a. Borregas Station 6 5 6 Gobi Mongolian BBQ 2700 Mission College Blvd, Hometown Health Spa Santa Clara, CA 95054 b. Crossman Station 1 Subway 4 ENTERTAINMENT/ c. Fair Oaks Station 5. Santa Clara Square SPORTING Marketplace d. Vienna Station Il Fornaio 1. California’s Great Puesto Santa Clara America e. Reamwood Station Whole Foods Allegro Coffee Company 2. Levi’s Stadium f. Old Ironsides Station Bluemercury 5 Sur La Table 3. Twin Creeks g. Great America Station 2 3 Lula’s Choclates.
Recommended publications
  • City of Sunnyvale 2006 Bicycle Plan Update
    City of Sunnyvale 2006 Bicycle Plan Update Draft Final June 16, 2006 Acknowledgements Sunnyvale City Council Ron Swegles, Mayor Otto O. Lee, Vice Mayor John N. Howe Dean J. Chu Melinda Hamilton Anthony Spitaleri Christopher Moylan Sunnyvale Bicycle Pedestrian Advisory Committee Thomas Mayer, Chair Ralph Durham, Vice Chair Cindy Cotton Gerald Gras Kevin Jackson Thomas Reuner Andrea Stawitcke City of Sunnyvale Staff Marvin A. Rose, Public Works Director Jack Witthaus, Transportation and Traffic Manager Dieckmann Cogill, Senior Transportation Planner Professional Services John Ciccarelli, Korve Engineering City of Sunnyvale 2006 Bicycle Plan Update Page i Draft Final – June 16, 2006 Contents Caltrans Bicycle Transportation Account (BTA) Cross-Reference........................v 1. Introduction ................................................................................................1 1.1 Overview ........................................................................................................... 1 1.2 Relationship to other Plans and Studies ........................................................... 2 1.3 Summary of Citizen Involvement in Bicycle Planning ..................................... 10 2 Community Conditions .................................................................................11 2.1 Bikeway Network............................................................................................. 11 2.2 Land Use Plans and Guidelines ...................................................................... 14 2.3 Bicycle
    [Show full text]
  • 4.1 Transportation and Traffic
    4.1 Transportation and Traffic 4.1 TRANSPORTATION AND TRAFFIC This section of the EIR summarizes applicable technical transportation-related components of the Google Caribbean Campus project (project or proposed project) to be located at the proposed future addresses of 100 and 200 West Caribbean Drive within the Moffett Park Specific Plan (MPSP). This section is based on the Final Transportation Impact Analysis Study (TIA) completed by Wood Rodgers in August 2019 and included as Appendix C of this EIR. The TIA refers to a project study area to capture roadways, intersections, and infrastructure potentially affected by the proposed project and covers a much larger area than the proposed project site. The TIA did not include intersections that were previously analyzed in the 2016 Mathilda Avenue Improvements at State Route (SR) 237 and US Highway 101 (US HWY 101) Project ("Caltrans EIR"). The Caltrans EIR is also a project EIR that analyzes the reconfiguration of the State Route 237 and US HWY 101 interchanges with Mathilda Avenue, including: modification to on and off ramps; removal, addition, and signalization of intersections; and provision of new left turn lanes. The analysis covers certain potentially significant transportation impacts the proposed project may produce related to the Mathilda Avenue interchanges with State Route 237 and Highway 101. Additionally, the TIA did not include intersections that were included in the LUTE EIR. The LUTE EIR potential traffic impacts based on the City's planned land uses, development density, transportation, and projected buildout by 2035. The LUTE EIR analyzed permitted uses, development density, and projected transportation impacts at the project site and evaluated potential traffic impacts on the surrounding roadway network.
    [Show full text]
  • VTA Daily News Coverage for Monday, October 1, 2018 1
    From: VTA Board Secretary Sent: Monday, October 1, 2018 1:18 PM To: VTA Board of Directors Subject: From VTA: October 1, 2018 Media Clips VTA Daily News Coverage for Monday, October 1, 2018 1. BART to South Bay Attracting High Tech Companies (KCBS radio) 2. BART Housing Bill Signed (NBC Bay Area) 3. Skanska BART-Transbay Center Connection (ABC7 News) 4. Company involved with cracked transbay beams also caught up in BART problem (San Francisco Chronicle) 5. California could be rolling all electric buses by 2040 (Mercury News) 6. Which way is California leaning on gas tax repeal: Roadshow (Mercury News) 7. Mountain View leads the way on housing growth (Mountain View Voice) BART to South Bay Attracting High Tech Companies (KCBS radio) (Link to audio) BART Housing Bill Signed (NBC Bay Area) (Link to video) Skanska BART-Transbay Center Connection (ABC7 News) (Link to video) Back to Top Company involved with cracked transbay beams also caught up in BART problem (San Francisco Chronicle) Skanska, the engineering firm responsible for the structural steel work at the Transbay Transit Center, where two cracked beams were discovered last week, is also at the center of a storm involving the $2.3 billion BART extension to the South Bay. Just this month it was reported that the opening of BART’s 10-mile extension from Fremont to new stations in Milpitas and San Jose could be delayed well into next year after it was discovered that workers had installed used or noncompliant communications equipment. The electronic components, which control everything from public address systems to passenger information signs and fire alarms, need to be replaced.
    [Show full text]
  • Grading California's Rail Transit Sta on Areas Appendix LEGEND
    ! Grading California's Rail Transit Sta3on Areas Appendix LEGEND: CONTENTS: Group 1 - Residen<al • BART Final Scores • LA Metro Final Scores Group 2 - Mixed • Sacramento RT Final Scores • San Diego MTS Final Scores • San Francisco MUNI Final Scores Group 3 - Employment • Santa Clara VTA Final Scores A+ 95% A 80% A- 75% B+ 70% B 55% B- 50% C+ 45% C 30% C- 25% D+ 20% D 5% D- 2% F below 2% Appendix | www.next10.org/transit-scorecard Next 10 ! BART FINAL SCORES AVERAGE: C Final City Line Sta3on Raw Score Grade San SFO-MILLBRAE Civic Center/UN Plaza BART 90.60 A Francisco San SFO-MILLBRAE Montgomery St. BART 88.20 A Francisco San SFO-MILLBRAE 24th St. Mission BART 87.30 A Francisco San SFO-MILLBRAE 16th St. Mission BART 84.30 A Francisco San SFO-MILLBRAE Powell St. BART 84.10 A Francisco San SFO-MILLBRAE Embarcadero BART 83.80 A Francisco Oakland FREMONT Lake Merri] BART 77.60 A DUBLIN/PLEASANTON Berkeley Downtown Berkeley BART 74.50 A TO DALY CITY Berkeley RICHMOND Ashby BART 75.30 A- Berkeley RICHMOND North Berkeley BART 74.30 A- San SFO-MILLBRAE Glen Park BART 74.10 A- Francisco Oakland FREMONT Fruitvale BART 73.50 A- Oakland SFO-MILLBRAE 19th St. Oakland BART 72.90 B+ San SFO-MILLBRAE Balboa Park BART 69.80 B+ Francisco 12th St. Oakland City Center Oakland SFO-MILLBRAE 71.70 B BART Contra Pleasant Hill/Contra Costa Costa SFO-MILLBRAE 66.20 B Centre BART Centre Appendix | www.next10.org/transit-scorecard Next 10 ! Oakland PITTSBURG/BAY POINT MacArthur BART 65.70 B Fremont FREMONT Fremont BART 64.20 B El Cerrito RICHMOND El Cerrito Plaza
    [Show full text]
  • Working BB.Indd
    Builders Bulletin Bidding This Week... OCTOBER 21, 2019 Bid Date Bid Time Location Project Name 2:00 PM 10/21/19 Gilroy Rfp Fuel Station Secondary Containment Components Repairs Corp Yard - City Of Gilroy 10/21/19 3:00 PM Santa Clara Serra Tanks Rehabilitation Project - City Of Santa Clara 11:00 AM Santa Clara Baseball Field Turf Replacement Mission College - Wvmcd NEW 10/22/19 4:00 PM Los Altos Rfp Complete Streets Master Plan - City Of Los Altos 10/22/19 3:00 PM Paso Robles Heritage Ranch Community Services District - Photovoltaic (Pv) System 10/22/19 5:00 PM 10/22/19 Gilroy Rfp 2020 Park Patrol Security Program Multi-Year Contract- City Of Gilroy 2:00 PM Monterey General Municipal Building Improvements Joc 2019 For Pmsa Projects 10/22/19 2:00 PM Monterey Citywide Curb Ramp Project - Phase 1 10/22/19 10:00 AM 10/22/19 San Luis Obispo Fermentation Sciences Institute - Bid Package #3 - Landscaping And Irrigation (Ntb Only) 2:00 PM 10/22/19 San Jose Rfq Directional Drilling, Repair & Replacement Of Electrical Conduit - City Of San Jose 2:00 PM 10/23/19 Mountain View Charleston Road Crossing At Permanente Creek Trail - City Of Mountain View 10/23/19 12:00 PM Grover Beach Rfq - Cbdg Capital Project Engineering Services * 10/23/19 2:00 PM Milpitas Repaving Of City Hall Complex - City Of Milpitas * 10/23/19 2:00 PM Milpitas Repaving Of Public Works & Police Department Complex - City Of Milpitas * 10/23/19 2:00 PM Milpitas Repaving Fire Station No.
    [Show full text]
  • 73,938 SF Sublease Opportunity
    FOR SUBLEASE 1310 Chesapeake Terrace SUNNYVALE 73,938 SF Sublease Opportunity HIGHLIGHTS » 73,938 SF Office / R&D Space » LED 12.31.2023 » Mix of open office, conference rooms, offices » Approximately 14,000+ SF R&D/Lab space » Outdoor seating and picnic areas » Furniture available » Excellent corporate identity » Short term flexible sublease » 1,600 Amps power » Call for pricing and to tour JOHN COLYAR DUFFY D’ANGELO, SIOR COLLIERS INTERNATIONAL Vice President Executive Vice President 225 W. Santa Clara Street +1 408 813 9259 +1 408 282 3950 10th Floor, Suite 1000 [email protected] [email protected] San Jose, CA 95113 Lic. No. 01987484 Lic. No. 00796685 www.colliers.com/sanjose FOR SUBLEASE | 1310 CHESAPEAKE TERRACE 1st Floor COLLABORATION AREA SHIPPING / RECEIVING LAB LAB LAB LAB LAB LAB SMALL WAREHOUSE MAIN LOBBY LAB LAB LAB LAB LAB LAB EMPLOYEE STORAGE LOBBY SERVER ROOM EMPLOYEE ENTRY #2 FOR SUBLEASE | 1310 CHESAPEAKE TERRACE 2nd Floor CONFERENCE BOARD ROOM CAFE CONF. BREAK ROOM STORAGE MOTHER’S PHONE ROOM CONF. LAB INTERNAL TRAINING LAB COLLABORATION AREA LAB FOR SUBLEASE | 1310 CHESAPEAKE TERRACE PHOTO GALLERY FOR SUBLEASE | 1310 CHESAPEAKE TERRACE FOR SUBLEASE | 1310 CHESAPEAKE TERRACE AreaAREA Map MAP 1. Mercado Shopping 6. Fair Oaks Ave at BUSINESS CENTERS Center Caliente Dr 1 Starbucks 7-aa 1. Santa Clara Convention Walmart Neighborhood Daily Doughnuts & Center 2 Sandwiches Market 2. USPS 4 Panda Express Domino’s pizza Subway LoAn’s Hair & Nails 3. FedEx Shipping Center E CARIBBEAN DR Pho Hoa Noodle Soup Rene Rose Island Cuisine 3 1310 Chesapeake Terrace 6 Krispy Kreme 4.
    [Show full text]
  • 520 Almanor Ave.Indd
    520 ALMANOR Sunnyvale, California 520±231,000ALMANOR sf 4 Story building Kenneth J Candelaria David Hiebert 1950 University Avenue, Suite 220 Senior Vice President Managing Principal Palo Alto, CA 94303 +1 408 921 9999 +1 650 320 0250 T: +1 650 852 1200 [email protected] [email protected] F: +1 650 856 1098 LIC #00946634 LIC #1189320 cushmanwakefi eld.com 520 ALMANOR Sunnyvale, California • New construction cold shell delivery as • Full height exterior glass early as Q1, 2018 • Secure open air amenity space • We can deliver a warm shell by Q2 2018 • Covered parking ratio of 3.00/1000 • 4 Story building totaling approximately 231,000 sf including 7,000 sf outdoor • On site café terrace and 2,500 sf of retail • Designed by Korth Sonseri Hagey • LEED Gold • 14” Clear height ceiling • Large fl oor plans with ample glass line • Shuttle to Caltrain approximately 53,000 sf Kenneth J Candelaria David Hiebert 1950 University Avenue, Suite 220 Senior Vice President Managing Principal Palo Alto, CA 94303 +1 408 921 9999 +1 650 320 0250 T: +1 650 852 1200 [email protected] [email protected] F: +1 650 856 1098 LIC #00946634 LIC #1189320 cushmanwakefi eld.com 520 ALMANOR Sunnyvale, California 520 ALMANOR Sunnyvale, California Legend VTA Light Rail Caltrain Avenue Borregas Station Moffett Federal N. Mathilda Airfield East Java Driv 237 Lockheed Martin Station e Crossman Martin Station 10 Minute Walk to Moffett@237 rive Moffett Park D Bayshore NASA Station Borregas Avenue Vienna Station Reamwood Station Moffett Park Station
    [Show full text]
  • Sunnyvale Tech Creative Sublease
    FOR SUBLEASE colliers.com/san jose 328 Gibraltar Drive SUNNYVALE | CA Sunnyvale Tech Creative Sublease • 16,232 square feet • Rare standalone building • Open office floor plan with mix of private offices and conference rooms • Glass roll-up door • Excellent glass line • Walking distance to light rail • Term through 12/31/22 • Available now Colliers International Kyle Portal Jake Smart Paul McManus 225 W. Santa Clara Street 408 282 3954 408 282 3909 650 492 5207 10th Floor, Suite 1000 [email protected] [email protected] [email protected] San Jose, CA 95113 Lic. No. 01928964 Lic. No. 02031308 CA Lic. No. 01834432 FOR SUBLEASE 328 Gibraltar Drive // Sunnyvale colliers.com/sanjose Full Building 16,232 square feet Colliers International Kyle Portal Jake Smart Paul McManus 225 W. Santa Clara Street 408 282 3954 408 282 3909 650 492 5207 10th Floor, Suite 1000 [email protected] [email protected] [email protected] San Jose, CA 95113 Lic. No. 01928964 Lic. No. 02031308 CA Lic. No. 01834432 FOR SUBLEASE 328 Gibraltar Drive // Sunnyvale colliers.com/sanjose Colliers International Kyle Portal Jake Smart Paul McManus 225 W. Santa Clara Street 408 282 3954 408 282 3909 650 492 5207 10th Floor, Suite 1000 [email protected] [email protected] [email protected] San Jose, CA 95113 Lic. No. 01928964 Lic. No. 02031308 CA Lic. No. 01834432 FOR SUBLEASE 328 Gibraltar Drive // Sunnyvale colliers.com/sanjose 1. Mercado Shopping 6. Fair Oaks Ave at BUSINESS CENTERS Center Caliente Dr 1 Starbucks 7-aa 1.
    [Show full text]
  • ACE-Shuttle-Map-Sched-2018.Pdf
    REVISED: A.M. Shuttles will XShuttles for the fourth (ACE 7) incoming train will typically arrive after the train All times are approximate due to varying trafc FREE July 2, 2018 wait for the rst and passengers should expect to wait for the shuttles. Fourth train shuttles may conditions. P.M. shuttle schedules will be adjusted ACE SHUTTLE TIMEGUIDE — GREAT AMERICA STATION three incoming trains. depart Great America prior to the scheduled time due to varying trafc conditions. earlier during weeknight events at Levi’s Stadium. Light Rail Mountain View / Palo Alto West Milpitas North Santa Clara West Milpitas North Sunnyvale A.M. A.M. A.M. A.M. A.M. A.M. SHUTTLES ACE ACE ACE ACE ACE ACE Train Train Train Great America Station Carribean / Moffett Park Java / Crossman / Mathilda 1st Ave Lockheed Martin Center Transit Train Train Train Great America Station Holger / Zanker / McCarthy Technology McCarthy / Barber Zone Lundy / Trade Lundy / Commerce Great America Station N 1st St / Tasman River Oaks / N 1st St Seely / River Oaks N 1st St / Montague Great America Station N. Shoreline/Space Pk Charleston / Huff Marine / Garcia San Antonio / Casey E. Meadow Great America Station / Champion Tasman / Baypointe Tasman / Cisco Tasman Alder / Tasman Ranch / McCarthy Great America Station Old Ironsides / Tasman Patrick Henry / Democracy Old Mt. View-Alviso / Great America America Center SERVING: Great America, Santa Clara & 1 6:16 6:23 6:26 6:30 6:34 1 6:16 6:32 6:34 6:38 6:40 6:46 1 6:16 6:22 6:26 6:30 6:34 6:39 1 6:16 6:21 6:26 6:30 6:32 1 6:16 6:24
    [Show full text]
  • ORANGE LINE Light Rail Time Schedule & Line Route
    ORANGE LINE light rail time schedule & line map Mountain View - Alum Rock View In Website Mode The ORANGE LINE light rail line (Mountain View - Alum Rock) has 9 routes. For regular weekdays, their operation hours are: (1) Alum Rock: 12:24 AM - 11:08 PM (2) Baypointe: 10:49 PM - 11:55 PM (3) Baypointe: 6:07 PM - 6:37 PM (4) Gish: 4:21 PM - 7:33 PM (5) Great Amereica Levi's Stadium: 5:43 PM - 6:41 PM (6) Great America Levi's Stadium: 3:15 PM - 6:51 PM (7) Levi's Stadium / Gish: 4:07 PM - 5:07 PM (8) Levi's Stadium/Alum Rock: 3:08 PM - 7:07 PM (9) Mountain View: 5:29 AM - 10:19 PM Use the Moovit App to ƒnd the closest ORANGE LINE light rail station near you and ƒnd out when is the next ORANGE LINE light rail arriving. Direction: Alum Rock ORANGE LINE light rail Time Schedule 26 stops Alum Rock Route Timetable: VIEW LINE SCHEDULE Sunday 12:25 AM - 10:55 PM Monday 5:50 AM - 11:08 PM Mountain View Transit Center 650 W Evelyn Ave, Mountain View Tuesday 12:24 AM - 11:08 PM Whisman Station Wednesday 12:24 AM - 11:08 PM 400 Paciƒc Dr, Mountain View Thursday 12:24 AM - 11:08 PM Middleƒeld Station Friday 12:24 AM - 11:08 PM 580 E Middleƒeld Rd, Mountain View Saturday 12:24 AM - 11:10 PM Bayshore NASA Station Moffett Park Station 700 W Moffett Park Drive, Sunnyvale ORANGE LINE light rail Info Lockheed Martin Transit Center Direction: Alum Rock 1199 N Mathilda Av, Sunnyvale Stops: 26 Trip Duration: 57 min Borregas Station Line Summary: Mountain View Transit Center, East Java Drive, Sunnyvale Whisman Station, Middleƒeld Station, Bayshore NASA Station,
    [Show full text]
  • 68988 Sf Office / R&D for Lease Moffett Park, Sunnyvale, Ca
    MOFFETT PARK, SUNNYVALE, CA ±68,988 SF OFFICE / R&D . FOR LEASE CRAIG FORDYCE, sior, ccim MICHAEL ROSENDIN, sior, ccim SHANE MINNIS, leed ap FOR LEASE 68,988 SF OFFICE / R&D 1265 Borregas is a freestanding 2-story office / R&D building located on the corner of Borregas Avenue and Gibraltar Court in the heart of the prestigious Moffett Park business district of Sunnyvale. Currently undergoing interior and exterior renovations 1265 Borregas offers great corner visibility coupled with building and monument signage in the vibrant business district of Sunnyvale! • Available Now • Freestanding 2-story office / R&D building • Corner identity with building & monument signage • New interior and exterior remodel complete! • Great window lines and 9’10” ceiling heights offer ample natural light • Dramatic in-door / out-door space • Modern / creative office with open / flexible floor plates • 2,200 amps, 277 / 480 volt power • Grade level loading • Parking ratio +/- 4/1,000 • Passenger and freight elevators • Close to light rail, bus / ACE shuttle stops and 5 minute drive to Sunnyvale CalTrain station • ASVB sentrilock on-site – call for ALARM CODE HORIZONTAL WOOD SLAT FENCE ON LOW RETAINING CURB WITH BUILT-IN BENCH SEAT New Outdoor Collaborative Courtyard DINING TABLES AND CHAIRS New Bench Seating PLANTING AREA IN COURTYARD LOUNGEHORIZONTAL SEATING WOOD AREA SLAT FENCE ON HORIZONTAL WOOD SLAT FENCE ONLOW RETAINING CURB WITH BUILT-IN LOW RETAINING CURB WITH BUILT-INBENCH SEAT BENCH SEAT COLOREDHORIZONTAL CONCRETE WOOD SLAT PAVING FENCE ON LOW RETAINING
    [Show full text]
  • Tasman Corridor Complete Streets Study Round 2 Project Outreach Summary
    TASMAN CORRIDOR COMPLETE STREETS STUDY ROUND 2 PROJECT OUTREACH SUMMARY Summary of May 2018 Community Outreach Meeting May 23rd, 2018 The Santa Clara Valley Transportation Authority (VTA) hosted a corridor-wide community outreach meeting on May 23rd, 2018 from 6:00-7:30 p.m. to discuss and present options to improve mobility along the Tasman Corridor. The meeting was held at the Lakewood Elementary School (750 Lakechime Drive) in Sunnyvale. The Study limits are from the Great Mall area of Milpitas to the Fair Oaks Avenue area of Sunnyvale. The Tasman Corridor Complete Streets Study has three objectives: · to identify a list of projects which enhance the safety, comfort, and reliability of sustainable transportation modes, while still accommodating drivers; · to be community supported; and · to be implementable. A dozen community members attended the meeting: five community members from Sunnyvale, four from San Jose, one from the City of Santa Clara, and one from the City of Palo Alto. An additional attendee arrived after the poll was conducted. Three attendees indicated they had attended the first round of community meetings held in April of 2017. When asked how the attendees heard about the meeting, the top responses were as follows: · Mailed Notices · NextDoor · E-blast lists from VTA’s GovDelivery system · HOA e-blasts · Word of Mouth Sunnyvale Vice Mayor Larry Klein attended the meeting, supported by city staff, Lillian Tsang, Transportation Engineer/Planner. Additional City staff in attendance included Ramses Madou, 1 Transportation Planning Manager from City of San Jose Department of Transportation, and Pratyush Bhatia represented the City of Santa Clara Department of Public Works.
    [Show full text]