Mechanically Stabilized Embankment (Caltrans Pre-Designed)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
GEOTEXTILE TUBE and GABION ARMOURED SEAWALL for COASTAL PROTECTION an ALTERNATIVE by S Sherlin Prem Nishold1, Ranganathan Sundaravadivelu 2*, Nilanjan Saha3
PIANC-World Congress Panama City, Panama 2018 GEOTEXTILE TUBE AND GABION ARMOURED SEAWALL FOR COASTAL PROTECTION AN ALTERNATIVE by S Sherlin Prem Nishold1, Ranganathan Sundaravadivelu 2*, Nilanjan Saha3 ABSTRACT The present study deals with a site-specific innovative solution executed in the northeast coastline of Odisha in India. The retarded embankment which had been maintained yearly by traditional means of ‘bullah piling’ and sandbags, proved ineffective and got washed away for a stretch of 350 meters in 2011. About the site condition, it is required to design an efficient coastal protection system prevailing to a low soil bearing capacity and continuously exposed to tides and waves. The erosion of existing embankment at Pentha ( Odisha ) has necessitated the construction of a retarded embankment. Conventional hard engineered materials for coastal protection are more expensive since they are not readily available near to the site. Moreover, they have not been found suitable for prevailing in in-situ marine environment and soil condition. Geosynthetics are innovative solutions for coastal erosion and protection are cheap, quickly installable when compared to other materials and methods. Therefore, a geotextile tube seawall was designed and built for a length of 505 m as soft coastal protection structure. A scaled model (1:10) study of geotextile tube configurations with and without gabion box structure is examined for the better understanding of hydrodynamic characteristics for such configurations. The scaled model in the mentioned configuration was constructed using woven geotextile fabric as geo tubes. The gabion box was made up of eco-friendly polypropylene tar-coated rope and consists of small rubble stones which increase the porosity when compared to the conventional monolithic rubble mound. -
Mechanically Stabilized Embankments
Part 8 MECHANICALLY STABILIZED EMBANKMENTS First Reinforced Earth wall in USA -1969 Mechanically Stabilized Embankments (MSEs) utilize tensile reinforcement in many different forms: from galvanized metal strips or ribbons, to HDPE geotextile mats, like that shown above. This reinforcement increases the shear strength and bearing capacity of the backfill. Reinforced Earth wall on US 50 Geotextiles can be layered in compacted fill embankments to engender additional shear strength. Face wrapping allows slopes steeper than 1:1 to be constructed with relative ease A variety of facing elements may be used with MSEs. The above photo illustrates the use of hay bales while that at left uses galvanized welded wire mesh HDPE geotextiles can be used as wrapping elements, as shown at left above, or attached to conventional gravity retention elements, such as rock-filled gabion baskets, sketched at right. Welded wire mesh walls are constructed using the same design methodology for MSE structures, but use galvanized wire mesh as the geotextile 45 degree embankment slope along San Pedro Boulevard in San Rafael, CA Geotextile soil reinforcement allows almost unlimited latitude in designing earth support systems with minimal corridor disturbance and right-of-way impact MSEs also allow roads to be constructed in steep terrain with a minimal corridor of disturbance as compared to using conventional 2:1 cut and fill slopes • Geotextile grids can be combined with low strength soils to engender additional shear strength; greatly enhancing repair options when space is tight Geotextile tensile soil reinforcement can also be applied to landslide repairs, allowing selective reinforcement of limited zones, as sketch below left • Short strips, or “false layers” of geotextiles can be incorporated between reinforcement layers of mechanically stabilized embankments (MSE) to restrict slope raveling and erosion • Section through a MSE embankment with a 1:1 (45 degree) finish face inclination. -
Linktm Gabions and Mattresses Design Booklet
LinkTM Gabions and Mattresses Design Booklet www.globalsynthetics.com.au Australian Company - Global Expertise Contents 1. Introduction to Link Gabions and Mattresses ................................................... 1 1.1 Brief history ...............................................................................................................................1 1.2 Applications ..............................................................................................................................1 1.3 Features of woven mesh Link Gabion and Mattress structures ...............................................2 1.4 Product characteristics of Link Gabions and Mattresses .........................................................2 2. Link Gabions and Mattresses .............................................................................. 4 2.1 Types of Link Gabions and Mattresses .....................................................................................4 2.2 General specification for Link Gabions, Link Mattresses and Link netting...............................4 2.3 Standard sizes of Link Gabions, Mattresses and Netting ........................................................6 2.4 Durability of Link Gabions, Link Mattresses and Link Netting ..................................................7 2.5 Geotextile filter specification ....................................................................................................7 2.6 Rock infill specification .............................................................................................................8 -
5.4.5 Geological Hazards
Section 5.4.5: Risk Assessment – Geological Hazards 5.4.5 Geological Hazards The following section provides the hazard profile (hazard description, location, extent, previous occurrences and losses, probability of future occurrences, and impact of climate change) and vulnerability assessment for the geological hazards in Sussex County. 2016 Plan Update Changes The hazard profile has been significantly enhanced to include a detailed hazard description, location, extent, previous occurrences, probability of future occurrence, and potential change in climate and its impacts on the geological hazards is discussed. The geological hazards is now located in Section 5 of the plan update. It includes landslide, land subsidence and sinkholes, all of which were profiled separately in the 2011 HMP. New and updated figures from federal and state agencies are incorporated. U.S. 2010 Census data was incorporated, where appropriate. Previous occurrences were updated with events that occurred between 2008 and 2015. A vulnerability assessment was conducted for the geological hazards and it now directly follows the hazard profile. 5.4.5.1 Profile Hazard Description Geological hazards are any geological or hydrological processes that pose a threat to humans and natural properties. Every year, severe natural events destroy infrastructure and cause injuries and deaths. Geologic hazards may include volcanic eruptions and other geothermal related features, earthquakes, landslides and other slope failures, mudflows, sinkhole collapses, snow avalanches, flooding, glacial surges and outburst floods, tsunamis, and shoreline movements. For the purpose of this HMP update, only landslides and land subsidence/sinkholes will be discussed in the Geological Hazard profile. Landslides According to the U.S. -
Mechanically Stabilized Earth Wall Abutments for Bridge Support
JOINT TRANSPORTATION RESEARCH PROGRAM FHWA/IN/JTRP-2006/38 Final Report MECHANICALLY STABILIZED EARTH WALL ABUTMENTS FOR BRIDGE SUPPORT Ioannis Zevgolis Philippe Bourdeau April 2007 TECHNICAL Summary Technology Transfer and Project Implementation Information INDOT Research TRB Subject Code: 62-6 Soil Compaction and Stabilization April 2007 Publication No.FHWA/IN/JTRP-2006/38, SPR-2855 Final Report Mechanically Stabilized Earth Wall Abutments for Bridge Support Introduction Using MSE structures as direct bridge abutments objective of this study was to investigate on the would be a significant simplification in the design possible use of MSE bridge abutments as direct and construction of current bridge abutment support of bridges on Indiana highways and to systems and would lead to faster construction of lead to drafting guidelines for INDOT engineers highway bridge infrastructures. Additionally, it to decide in which cases such a solution would be would result in construction cost savings due to applicable. The study was composed of two major elimination of deep foundations. This solution parts. First, analysis was performed based on would also contribute to better compatibility of conventional methods of design in order to assess deformation between the components of bridge the performance of MSE bridge abutments with abutment systems, thus minimize the effects of respect to external and internal stability. differential settlements and the undesirable “bump” Consequently, based on the obtained results, finite at bridge / embankment transitions. Cost savings in element analysis was performed in order to maintenance and retrofitting would also result. The investigate deformation issues. Findings MSE walls have been successfully used walls compared to conventional reinforced as direct bridge abutments for more than thirty concrete walls is their ability to withstand years. -
5 Embankment Construction
5 Embankment Construction Rock Embankment Lift Requirements Compaction Methods Shale and Soft Rock Embankments Lift and Compaction Requirements Embankments on Hillsides and Slopes Embankments over Existing Roads Treatment of Existing Roadbeds Density Control Settlement Control Method of Measurement CHAPTER FIVE: EMBANKMENT CONSTRUCTION The purpose of this chapter is to teach the Technician how to properly inspect embankment construction. The knowledge acquired will enable the Technician to implement the skills necessary to insure a good, solid, and lasting embankment which is absolutely necessary for a durable and safe highway. Different classifications of materials encountered, lift requirements, compaction methods, benching, density tests, moisture content, earthwork calculations, and Specifications relating to each particular area of embankment of construction will be discussed. ROCK EMBANKMENT Rock excavation consists of removing rock which cannot be excavated without blasting. This material includes all boulders or other detached stones each having a volume of 1/2 yd3 or more. In a rock fill, the lifts are thick and the voids between the rock chunks are large. Although these voids are filled with fines at the top and sides of the embankment, inside the embankment many large voids remain. If these rock pieces remain intact, deformations are small within the embankment because of the friction and interlocking between pieces. LIFT REQUIREMENTS The requirements for a rock embankment are: 1) No large stones are allowed to nest and are distributed over the area to avoid pockets. Voids are filled with small stones. 2) The final 2 ft of the embankment just below the subgrade elevation is required to be composed of suitable material placed in layers not exceeding 8 in. -
BRIDGE DESIGN MEMORANDUM – DM0211 TO: RPG Structural
BRIDGE DESIGN MEMORANDUM – DM0211 TO: RPG Structural Engineers Design Consultants DATE: July 7, 2011 RE: SCDOT Geotechnical Design Manual, Version 1.1 Revisions to Chapters 4, 8, 9, 10, and 17 The first paragraph of Section 4.3 of the SCDOT Geotechnical Design Manual shall be amended by inserting the following sentence between the fifth and sixth sentences: Any requests to deviate from these minimum requirements shall be made in writing and shall be forwarded to the PCS/GDS for consideration. All testing shall be to a sufficient depth to effectively evaluate the appropriate limit state conditions and shall fully penetrate any formation that will affect performance (e.g., settlement or slope instability of a roadway embankment or roadway structure). The paragraph in Section 4.3.3 of the Manual shall be deleted and replaced with the following paragraph: All roadway embankments shall have one testing location at least every 500 feet along the roadway embankment. In addition, roadway embankments within 150 feet of a bridge end shall have a minimum of two testing locations; one at the bridge end (which is also used for bridge foundation design) and one at a point 150 feet from the bridge end. The testing location 150 feet from the bridge end must be to a depth that is sufficient to effectively evaluate Extreme Event I limit state for the roadway embankment design. SCDOT Geotechnical Design Manual, Version 1.1 DM0211 Page 2 July 7, 2011 Table 8-11 of the Manual shall be deleted and replaced with the following table: Table 8-11, Roadway Structure Operational Classification (ROC) Roadway Structure Operational Classification Description (ROC) Roadway embankments located within 150 feet of a bridge with OC = I. -
Coastal and Other Hazards (Se)
Goleta General Plan /Coastal Land Use Plan 5.0 Safety Element CHAPTER 5.0 SAFETY ELEMENT: COASTAL AND OTHER HAZARDS (SE) 5.1 INTRODUCTION General Plan Law Requirements [GP] The Safety Element is one of seven general Safety Element Policies plan elements mandated by state law. The SE 1: Safety in General scope of the Safety Element is specified in SE 2: Bluff Erosion and Retreat Section 65302 (g) of the California SE 3: Beach Erosion and Shoreline Hazards SE 4: Seismic and Seismically Induced Hazards Government Code as follows: SE 5: Soil and Slope Stability Hazards SE 6: Flood Hazards The general plan shall include a safety SE 7: Urban and Wildland Fire Hazards element for the protection of the SE 8: Oil and Gas Industry Hazards community from any unreasonable SE 9: Airport-Related Hazards. SE 10: Hazardous Materials and Facilities risks associated with the effects of SE 11: Emergency Preparedness seismically induced surface rupture, ground shaking, ground failure, tsunami, seiche, and dam failure; slope instability leading to mudslides and landslides; subsidence and other geologic hazards known to the legislative body; flooding; and wild land and urban fires. The safety element shall include mapping of known seismic and other geologic hazards. It shall also address evacuation routes, peak-load water supply requirements, and minimum road widths and clearances around structures, as those items relate to identified fire and geologic hazards. Coastal hazards such as bluff retreat and shoreline erosion are also addressed in this element, as are hazards associated with oil and gas production, processing, and transport. California Coastal Act Requirements [CP] The California Coastal Act (Coastal Act) requires new development to be sited and designed to minimize risks, ensure stability and structural integrity, and neither create nor contribute significantly to erosion or require the construction of new shoreline protective devices that would substantially alter natural landforms along coastal bluffs and cliffs. -
Coming Full Circle 32 30 Years of Launched Soil Nails 48 Ground Stabilization for Underground Construc
20 Ground Improvement 32 30 years of 48 Ground stabilization for 72 The Rise of UAVs – Coming Full Circle Launched Soil Nails Underground Construction in Geotechnics SEPTEMBER // OCTOBER 2016 Ground Improvement Proudly published by the Geo-Institute of ASCE SEPT/OCT GROUND 2016 IMPROVEMENT THE EVOLUTION OF LAUNCHED SOIL NAILS A 30-Year Retrospective By Colby Barrett, JD, PE, M.ASCE, and Graeme Quickfall Fiberglass launched soil nails used for bluff stabilization in Northern California. 32 GEOSTRATA SEPTEMBER/OCTOBER 2016 aunched soil nails are a unique remedial technology in the geotechnical construction Ltoolbox. These 20-ft-long, 1.5-in.-diameter nails are installed in a single shot using a compressed air “cannon” at velocities of up to 250 miles/hour, and at rates approaching 250 nails/day. The nails reinforce an unstable or potentially unstable soil mass by transferring the nail’s tensile and shear capacity into the sliding soil. However, at least as interesting as the tool itself, is the story behind the development of launched soil nail technology over the past 30 years. This story is not just one of technological innovation, advance- ment, and refinement of a specific piece of construction equipment. It stands as a testament of the innovative, bold, and resourceful char- acter of engineers and practitioners in the geotechnical construction industry. It’s also an insight into how engineers from three continents — often working independently — responded to challenges as diverse as national tragedy, shrinking infrastructure budgets, and the challenges posed by geohazards across the globe, to create a powerful new tool that continues to be refined, updated, and improved to the present day. -
BAER) Assessment Specialist Report, Phase 2 – GEOLOGIC HAZARDS
Burned Area Emergency Response (BAER) Assessment Specialist Report, Phase 2 – GEOLOGIC HAZARDS Thomas Fire, Los Padres National Forest January 2018 Allen King – Geologist, Los Padres NF (retired) Dennis Veich – Forest Geologist, Shasta-Trinity NF Fire-damaged Tree near Chismahoo Mountain “When rain starts to fall, people in higher risk basins should be prepared to evacuate. Do not remain in, near or below burned areas at the base of canyons, even during light rain. Stay away from small streams that could become raging rivers in the blink of an eye. If the forecast calls for heavy rains through the night, homes may not be safe places if they are located in or near drainage areas and within a mile of the mountain front. Roads can suddenly become blocked with mud and debris, and can wash out at stream crossings. It is important to pay strong attention to warnings from local emergency responders and weather advisories.” -Sue Cannon, USGS Landslide Hazards Program, 2003 INTRODUCTION The Thomas Fire started on December 4, 2017, near the Thomas Aquinas College (east end of Sulphur Mountain), Ventura County, California. The fire is still considered to be active and as of January 12th, 2018, it is estimated to have burned 281,900 acres and is 92% contained. Approximately 181,300 acres within the burn area are National Forest lands (~64%); 98,200 acres are private (~35%); and 2,400 acres (~1%) are a combination of state and county properties. Although tremendous down-slope/down-drainage resources and values and lives are recognized and kept in mind during our analysis, this report addresses the effects of the Thomas Fire and the associated Values At Risk (VARs) ONLY on Forest Service lands, since the other lands are being evaluated by teams of Cal Fire scientists and other agencies. -
Applications of Geosynthetics in Embankments- a Review
ISSN (Online) 2393-8021 ISSN (Print) 2394-1588 IARJSET International Advanced Research Journal in Science, Engineering and Technology nCORETech LBS College of Engineering, Kasaragod Vol. 5, Special Issue 1, Feburary 2016 Applications of Geosynthetics in Embankments- A Review Ankita I K1, Devika G2, Lakshmi Priya K3, Remya R4, Jayamohan J5 Third Year Students, Civil Engineering Dept, LBS Institute of Technology for Women, Thiruvananthapuram, India1,2,3,4 Associate Professor, Civil Engineering Dept, LBS Institute of Technology for Women, Thiruvananthapuram, India5 Abstract: Construction and maintenance of embankments form an integral part of every highway or railway projects which are keystones of the economy of our nation. In many locations good soil will not be available for the foundation and also for the construction of embankment. In such cases reinforcing soil with geosynthetic is a very effective and economic option. This paper thoroughly reviews the improvements in load settlement behaviour of embankments attained by inclusion of various forms of natural and polymeric geosynthetics. It is seen from literature that natural geosynthetics made with coir or jute can also be effectively used for improving the durability and stability of embankments. Keywords: Embankments, Natural geosynthetics, Polymeric geosynthetics, Stability of embankments. I. INTRODUCTION Geosynthetics have become well established construction materials for geotechnical and environmental applications in most parts of the world. Geosynthetic-reinforced structures have been used worldwide due to their successful performance and economic efficiency. Over the years, these products have helped designers and contractors to solve several types of engineering problems where the use of conventional construction materials would be restricted or considerably more expensive. -
Design of Riprap Revetment HEC 11 Metric Version
Design of Riprap Revetment HEC 11 Metric Version Welcome to HEC 11-Design of Riprap Revetment. Table of Contents Preface Tech Doc U.S. - SI Conversions DISCLAIMER: During the editing of this manual for conversion to an electronic format, the intent has been to convert the publication to the metric system while keeping the document as close to the original as possible. The document has undergone editorial update during the conversion process. Archived Table of Contents for HEC 11-Design of Riprap Revetment (Metric) List of Figures List of Tables List of Charts & Forms List of Equations Cover Page : HEC 11-Design of Riprap Revetment (Metric) Chapter 1 : HEC 11 Introduction 1.1 Scope 1.2 Recognition of Erosion Potential 1.3 Erosion Mechanisms and Riprap Failure Modes Chapter 2 : HEC 11 Revetment Types 2.1 Riprap 2.1.1 Rock Riprap 2.1.2 Rubble Riprap 2.2 Wire-Enclosed Rock 2.3 Pre-Cast Concrete Block 2.4 Grouted Rock 2.5 Paved Lining Chapter 3 : HEC 11 Design Concepts 3.1 Design Discharge 3.2 Flow Types 3.3 Section Geometry 3.4 Flow in Channel Bends 3.5 Flow Resistance 3.6 Extent of Protection 3.6.1 Longitudinal Extent 3.6.2 Vertical Extent 3.6.2.1 Design Height 3.6.2.2 Toe Depth Chapter 4 : HEC 11 Design Guidelines for Rock Riprap 4.1 Rock Size Archived 4.1.1 Particle Erosion 4.1.1.1 Design Relationship 4.1.1.2 Application 4.1.2 Wave Erosion 4.1.3 Ice Damage 4.2 Rock Gradation 4.3 Layer Thickness 4.4 Filter Design 4.4.1 Granular Filters 4.4.2 Fabric Filters 4.5 Material Quality 4.6 Edge Treatment 4.7 Construction Chapter 5 : HEC 11 Rock