Grand Coulee Dam Columbia River –Central Washington

Total Page:16

File Type:pdf, Size:1020Kb

Grand Coulee Dam Columbia River –Central Washington Grand Coulee Dam Columbia River –Central Washington Becky Brosz Objectives ► Irrigation Original goal More than half a million acres of farmland ► Hydropower 24 generators - up to 6.8 GW ► Flood control Regulates highly variable flows in Columbia River Owners & Financing ► Managgyed by U.S. Bureau of Reclamation Department of the Interior Columbia Irrigation Project ► State of Washington $377,000 (1933 ► Franklin D . Roosevelt $63 million (1933) Public Works Administration Technical Description ► Gravity Dam ► 5223 feet long ► 440 feet thick at the base ► 550 f eet high ► 11,975,521 cubic yards of concrete ► Nine million acreacre--feetfeet of water Technical Challenges ► Getting enough materials The railroad hauled ► over twelve million barrels of cement (46,500 carloads) ► 77 millioopoudsoen pounds of reinfo ocgrcing steel ► and ten million pounds of steel for the penstocks ► Excavating earth 2 mi long conveyor belt ► Cold weather Steam through pipes in wet concrete to keep from freezing ► Hot weather 2000 mi of cooling pipes Technical Successes ► Pumping Plant 6 – 65,000 hp pumps 6 – 67,500 hp pumps 12 - 12 ft diameter pipes 1,600 –2– 2,,p000 cu ft per second When reversed – 50 MW each ► Largest concrete structure in the United States ► Fourth largest hydropower producer in the world ► Largest hydropower producer in the U.S. (6.8 GW) Benefits & Disbenefits ► Benefits Hydropower Flood Protection Tourism Irrigation Jobs ► Disbenefits Salmon Steelhead Colville Native Americans Project Now ► Electricity generated has returned over $4 billion ► Tourist attraction - laser shows, fireworks ► Effor ts for fis h – hthhatcheri es, t ransport tb by truc k Remarkable Traits ► Woody Guthrie – folk singer hired by government to write pro-dam propaganda (26 songs) ► Wippyed out more salmon than any single structure in American history. ► Colville Native Americans – fighting for money (15-25%, $62 - $103 million annually) ► Been called the 8th Wonder of the World Questions.
Recommended publications
  • Gills Coulee Creek, 2006 [PDF]
    Wisconsin Department of Natural Resources Bureau of Watershed Management Sediment TMDL for Gills Coulee Creek INTRODUCTION Gills Coulee Creek is a tributary stream to the La Crosse River, located in La Crosse County in west central Wisconsin. (Figure A-1) The Wisconsin Department of Natural Resources (WDNR) placed the entire length of Gills Coulee Creek on the state’s 303(d) impaired waters list as low priority due to degraded habitat caused by excessive sedimentation. The Clean Water Act and US EPA regulations require that each state develop Total Maximum Daily Loads (TMDLs) for waters on the Section 303(d) list. The purpose of this TMDL is to identify load allocations and management actions that will help restore the biological integrity of the stream. Waterbody TMDL Impaired Existing Codified Pollutant Impairment Priority WBIC Name ID Stream Miles Use Use Gills Coulee 0-1 Cold II Degraded 1652300 168 WWFF Sediment High Creek 1-5 Cold III Habitat Table 1. Gills Coulee use designations, pollutants, and impairments PROBLEM STATEMENT Due to excessive sedimentation, Gills Coulee Creek is currently not meeting applicable narrative water quality criterion as defined in NR 102.04 (1); Wisconsin Administrative Code: “To preserve and enhance the quality of waters, standards are established to govern water management decisions. Practices attributable to municipal, industrial, commercial, domestic, agricultural, land development, or other activities shall be controlled so that all waters including mixing zone and effluent channels meet the following conditions at all times and under all flow conditions: (a) Substances that will cause objectionable deposits on the shore or in the bed of a body of water, shall not be present in such amounts as to interfere with public rights in waters of the state.
    [Show full text]
  • Northrup Canyon
    Northrup Canyon Why? Fine basalt, eagles in season Season: March to November; eagles, December through February Ease: Moderate. It’s about 1 ¾ miles to an old homestead, 3 ½ miles to Northrup Lake. Northrup Canyon is just across the road from Steamboat Rock, and the two together make for a great early or late season weekend. Northrup, however, is much less visited, so offers the solitude that Steamboat cannot. In season, it’s also a good spot for eagle viewing, for the head of the canyon is prime winter habitat for those birds. The trail starts as an old road, staying that way for almost 2 miles as it follows the creek up to an old homestead site. At that point the trail becomes more trail-like as it heads to the left around the old chicken house and continues the last 1 ½ miles to Northrup Lake. At its start, the trail passes what I’d term modern middens – piles of rusted out cans and other metal objects left from the time when Grand Coulee Dam was built. Shortly thereafter is one of my two favorite spots in the hike – a mile or more spent walking alongside basalt cliffs decorated, in places, with orange and yellow lichen. If you’re like me, about the time you quit gawking at them you realize that some of the columns in the basalt don’t look very upright and that, even worse, some have already fallen down and, even more worse, some have not quite finished falling and are just above the part of the trail you’re about to walk.
    [Show full text]
  • Power System
    HISTORY AND CURRENT STATUS OF THE ELECTRICITY INFRASTRUCTURE IN THE PACIFIC NORTHWEST Kevin Schneider Ph.D., P.E. Chair, Seattle Chapter of the IEEE PES IEEE PES SCHOLARSHIP PLUS INITIATIVE 2 Washington State PES Scholars • Patrick Berg, Seattle University • Parichehr Karimi, University of • Zachary Burrows, Eastern Washington Washington UiUnivers ity • TiTravis Kinney, WhitWashington Sta te UiUnivers ity • Erin Clement, University of Washington • Allan Koski, Eastern Washington University • Anastasia Corman, University of • Kyle Lindgren, University of Washington, Washington • John Martinsen, Washington State • Gwendolyn Crabtree, Washington State University University • Melissa Martinsen, University of • David Dearing, Washington State Washington University • JthJonathan NhiNyhuis, SttlSeattle PifiPacific UiUnivers ity • Terra Donley, Gonzaga University Derek Jared Pisinger, Washington State Gowrylow, Seattle University University • Sanel Hirkic, Washington State University • Douglas Rapier, Washington State • Nathan Hirsch, Eastern Washington University University • Chris Rusnak, Washington State University • John Hofman, Washington State • Kaiwen Sun, University of Washington University • Joshua Wu, Seattle University • • Tracy Yuan, University of Washington 3 OVERVIEW Part 1: The Current Status of the Electricity Infrastructure in the Pacific North west Part 2: How the Current System Evolved Over Time Part 3: Current Challenges and the Path Forward Part 4: Concluding Comments PART 1:: THE CURRENT STATUS OF THE ELECTRICITY INFRASTRUCTURE
    [Show full text]
  • Stormwater Ordinance Leaf & Grass Blowing Into Storm Drains Lafayette
    Good & Bad • Stormwater GOOD: Only Rain in the Drain! The water drains to Ordinance the river. Leaf & Grass Blowing into Storm Drains Lafayette BAD: Grass and leaves blown into a storm drain interfere with drainage. Parish Dirt is also being allowed in our waterways. Potential Illicit Discharge Sources: Environmental Quality • Sanitary sewer wastewater. Regulatory Compliance 1515 E. University Ave. • Effluent from septic tanks. Lafayette, LA 70501 Phone: 337-291-8529 • Laundry wastewater. Fax: 337-291-5620 • Improper disposal of auto and household toxics. www.lafayettela.gov/stormwater • Industrial byproduct discharge. Illicit Discharge (including leaf blowing) Stormwater Ordinance Stormwater Runoff Illicit Discharge Please be advised that the Environmental Grass clippings and leaves blown or swept is defined by the EPA as: Quality Division of Lafayette Consolidated into storm drains or into the street harms Any discharge into a municipal separate Government has recently adopted an waterways and our river. Storm drains flow storm sewer that is not composed entirely of into coulees and into the Vermilion River. rainwater and is not authorized by permit. Illicit Discharge (including leaf blowing) Grass clippings in the river rob valuable Stormwater Ordinance oxygen from our Vermilion River. Chapter 34. ENVIRONMENT When leaf and grass clippings enter the Signs of Potential Illicit Discharge Article 5. STORMWATER storm drain, flooding can occur. Only rain must enter the storm drain. When anything • Heavy flow during dry weather. Division 4 Sec. 34-452 but rain goes down the storm drain, it can • Strong odor. It is now in effect and being enforced. You become a drainage problem. may access this ordinance online at Grass clippings left on the ground improve the • Colorful or discolored liquid.
    [Show full text]
  • Effects of Dams on Native Americans in the Columbia River Basin Elliott
    Dammed Societies: Effects of Dams on Native Americans in the Columbia River Basin Elliott McGill Senior Capstone Project Faculty Advisors: Dr. Jamie Dolan, Dr. Jeremy Johnson, and Dr. David McCanna McGill 1 Abstract Since dam construction began in the New Deal Era, it has represented a dominance of humankind over nature. These massive structures have harnessed, collected, and distributed electricity from the rivers they hold back and allow humans to reap the benefits of that cycle. One of the areas where dams are particularly apparent is in the Columbia River Basin in the Pacific Northwest region of the United States. While the dams in this region certainly have allowed the area to develop and build by using the electricity collected by these dams, they have also had several negative effects on the tribal people in the region who once fished the mighty Columbia during its populous salmon runs and relied on the salmon for nutritional, economic, and cultural reasons. This project seeks to examine the costs of human advancement when it comes to dams, and will do so by studying three dams located in the Columbia River Basin: The Bonneville Dam, The Dalles Dam, and The Grand Coulee Dam. These dams will be studied using Black’s Theory of Law as a framework to examine the manner in which law was applied to each case. The research finds that although the dams certainly provide a useful resource to the people of the region, it has had negative effects on the Native American people who depended on the river. McGill 2 Introduction When President Franklin D.
    [Show full text]
  • Tolna Coulee Control Structure Nears Completion
    The Tolna Coulee Control Structure Nears Completion FROM THE NORTH DAKOTA STATE WATER COMMISSION The Tolna Coulee Control Strucutre on June 6. Inset shows water elevation measurement on The Tolna Coulee Control Structure prior to completion. structure at the same elvevation as the lakes. In the last part of May, the U.S. more likely. As a result, the Corps Construction of the structure Army Corps of Engineers (Corps), began the design and construction began in the fall of 2011, and was and their contractor, announced of a control structure on Tolna aided by the mild winter. Less than Key Points of the Tolna Coulee Control Structure they had substantially completed Coulee, with input from the Water a year later, the structure is now construction on the Tolna Coulee Commission. ready for operation. • The intent of the Tolna Control Structure is that • Once water begins to flow over the divide, stop control structure. the existing topography, not the structure, will logs in the middle of the structure will be placed The structure is designed Initially, the Corps will control discharge, with the removal of stop logs at an elevation of 1,457’. as the divide erodes. This will allow the lake Tolna Coulee is the natural outlet to permit erosion of the divide, manage operation of the Tolna to lower as it would have without the structure - from Devils Lake and Stump Lake. allowing the lake to lower, as it Coulee Control Structure, which while limiting releases to no more than 3,000 cfs. • If erosion occurs, the stop logs will be removed to As recently as 2011, the lake was would have without the project, will be guided by the “Standing the new lake elevation, with flows not to exceed less than four feet from overflowing while limiting releases to no Instructions To The Project 3,000 cfs.
    [Show full text]
  • Report on The
    REPORT ON THE U. S. D EPA R E INTERIOR BONNEVILLE IN ISTRATION UNITED STATES DEPARTMENT OF THE INTERIOR ----<COl--- . REPORT ON THE COLUMBIA RIVER POWER SYSTEM Consisting of THE BONNEVILLE POWER ADMINISTRATION and Power Components of THE BONNEVILLE DAM PROJECT AND THE COLUMBIA BASIN PROJECT (GRAND COULEE DAM) 19!6 Prepared by THE BONNEVILLE POWER ADMINISTRATION 811 NORTHEAST OREGON STREET PORTLAND 8, OREGON LETTER OF TRANSMITTAL 1 ~ONTENTS REVENUES 5 REPAYMENT OF FEDERAL INVESTMENT 6 INTEREST 8 ENERGY DELIVERIES 9 ENER<;Y PRODUCTION 12 TRANSMISSION SYSTEM 15 MAP-TRANSMISSION SYSTEM 17 OPERATING RESULTS 20 POWER RESOURCE MANAGEMENT 24 ADVANCE CONSTRUCTION PROGRAM 26 CUSTOMER SERVICE 29 POWER RATES 31 PERSONNEL 34 LETTER OF TRANSMITTAL TO THE SECRETARY OF THE INTERIOR December 31,1946. THE HoNORABLE THE SECRETARY OF THE INTERIOR WASHINGTON, D. C. My dear Mr. Secretary: Transmitted herewith is a report showing the results of operations of the Bonneville Power Administration from July 1, 1945 to June 30, 1946. Where matters of significance have occurred since the close of the fiscal year additional data have been included. This report, to which is attached the second independent annual audit of the accounts of the Administra­ tion, conforms with the requirements of Section 9 (c) of the Bonneville Project Act. Financially, operations were satisfactory during the fiscal year 1946. Total revenues of $19,884,285 covered all costs of operation, maintenance, depreciation and interest and left a surplus of $4,754,895 for the year­ thus increasing surplus net revenues from power operations as of June 30, 1946 to $16,326,947.
    [Show full text]
  • The Columbia Basin Grand Coulee Project
    THE COLUMBIA BASIN GRAN D COULEE PROJECT The mighty Columbia sweeps out of the north on its twelve hundred mile journey to the sea. A Remarkable National Resource that will contribute perpetually to the country's wealth, prosperity, and well-being THE COLUMBIA BASI N GRAND COULEE PROJECT A REMARKABLE NATIONAL RESOURCE THAT WILL CONTRIBUTE PERPETUALLY TO THE COUNTRY'S WEALTH, PROSPERITY, AND WELL-BEING PREPARED AND PUBLISHED BY THE SPOKANE CHAMBER OF COMMERCE SPOKANE, WASHINGTON MARCH, 1937 THE COLUMBIA BASIN GRAND COULEE PROJECT West Needs More Agricultural Lands Area largely taken up by Public Domain, forests, desert, mountains U>"T~VHE WIDE-OPEN SPACES OF THE WEsT'-through the years the phrase X has become a by-word carrying with it perhaps a mistaken idea of many and far-reaching ranches and farms, until one confronts facts and figures with surprise. The eleven western states, those west of the iooth meridian, including Arizona, New Mexico, Utah, Nevada, California, Wyoming, Colorado, Montana, Idaho, Oregon and Washington, are the home of somewhat more than 9% of the population of the United States, but they contain only 4.5% of the farmed and cropped area. These eleven states can never be agriculturally self-sustaining. Their towering mountain ranges, the plateaus and sweeps of sagebrush wastes and deserts, the vast stands of forest timber leave only 54,- 300,000 acres of the states' total land area of 760,400,000 acres that can be cultivated. This is only slightly larger than the State of Nebraska. Of this arable area of 54,300,000 acres, nearly one-half, or about 24,000,000 acres, is non-irrigable.
    [Show full text]
  • NMFS National Marine Fisheries Service
    20120307-5193 FERC PDF (Unofficial) 3/7/2012 4:54:15 PM 20120307-5193 FERC PDF (Unofficial) 3/7/2012 4:54:15 PM 20120307-5193 FERC PDF (Unofficial) 3/7/2012 4:54:15 PM 20120307-5193 FERC PDF (Unofficial) 3/7/2012 4:54:15 PM 20120307-5193 FERC PDF (Unofficial) 3/7/2012 4:54:15 PM Table of Contents LIST OF FIGURES ...................................................................................................................... 4 LIST OF TABLES ........................................................................................................................ 5 TERMS AND ABBREVIATIONS .............................................................................................. 6 1. INTRODUCTION ............................................................................................................... 11 1.1 BACKGROUND ................................................................................................................................................ 11 1.2 CONSULTATION HISTORY .................................................................................................................................. 11 1.3 PROPOSED ACTION .......................................................................................................................................... 11 1.4 ACTION AREA ................................................................................................................................................. 12 2. ENDANGERED SPECIES ACT: BIOLOGICAL OPINION AND INCIDENTAL TAKE STATEMENT ................................................................................................................
    [Show full text]
  • Desautel (Sinixt)
    IN THE SUPREME COURT OF BRITISH COLUMBIA Citation: R. v. Desautel, 2017 BCSC 2389 Date: 20171228 Docket: 23646 Registry: Nelson Between: Regina Appellant And Richard Lee Desautel Respondent And Okanagan Nation Alliance Intervenor On appeal from: Provincial Court of British Columbia, March 27, 2017 R. v. DeSautel, 2017 BCPC 84, Nelson Registry No. 23646 Before: The Honourable Mr. Justice Sewell Reasons for Judgment Counsel for the Appellant: G. Thompson H. Cochran Counsel for the Respondent: M. Underhill K. Phipps Counsel for the Intervenor: R. Kyle Place and Date of Trial/Hearing: Nelson, B.C. September 6-8, 2017 Place and Date of Judgment: Nelson, B.C. December 28, 2017 R. v. Desautel Page 2 Introduction .............................................................................................................. 3 Position of the Parties ............................................................................................. 4 Background .............................................................................................................. 4 Grounds of Appeal ................................................................................................... 6 Are the Sinixt an aboriginal people of Canada ...................................................... 7 What is the Relevant Aboriginal Collective? ....................................................... 10 The Intervenor’s Submissions .............................................................................. 12 Discussion of Crown’s Submissions ..................................................................
    [Show full text]
  • Structural Alternatives for Tdg Abatement at Grand Coulee Dam
    STRUCTURAL ALTERNATIVES FOR TDG ABATEMENT AT GRAND COULEE DAM FEASIBILITY DESIGN REPORT OCTOBER 2000 STRUCTURAL ALTERNATIVES FOR TDG ABATEMENT AT GRAND COULEE DAM FEASIBILITY DESIGN REPORT October, 2000 Prepared for U. S. Bureau of Reclamation Pacific Northwest Region by Kathleen H. Frizell and Elisabeth Cohen Bureau of Reclamation Technical Service Center Denver, Colorado Table of Contents Table of Contents ................................................... i Executive Summary ................................................. ix Acknowledgments ..................................................xiii Background .......................................................1 Introduction .......................................................2 Grand Coulee Dam ..................................................2 TDG Evaluation for Existing Conditions ...................................3 Flow Mixing .................................................4 Existing Outlet Works TDG Generation .............................5 Feasibility Design Discharge and Tailwater ...........................7 Feasibility Designs for Structural Alternatives ................................8 Hydraulic Modeling ............................................9 Outlet Works Model .....................................9 Forebay Pipe with Cascade Model ..........................10 Cover and Extend Mid-level Outlet Works (Alternative 1) ................11 Description ...........................................11 Maintenance Issues ...............................12 Hydraulic and Total
    [Show full text]
  • INTERIOR/GEOLOGICAL SURVEY USGS· INF -72- 2 !R I) - Electric City-Grand Coulee, Washington the CHANNELED SCABLANDS of EASTERN WASHINGTON
    9 INTERIOR/GEOLOGICAL SURVEY USGS· INF -72- 2 !R I) - Electric City-Grand Coulee, Washington THE CHANNELED SCABLANDS OF EASTERN WASHINGTON - The Geologic Story of the Spokane Flood- '(( U.S. GOVERNMENT PRINTING OFFICE , 1976 0 -208-172 F'or sale by the uperint.endent. of Documents, .S. Government Printing Office Washington, D.. 20402- Pric~ 70 cents Lock No. 024 - 001-02507- I nL nlog o. I 19.2: W27/6/974 There is n minimum charge of $1.00 for each mail order A trave ler enterin g th e tal f W as hington fro m th e Eas t crosses a flat-to-rolling country­ sid o f deep, fertil so il commonly sown with w heat. ontinuing wes twa rd , he abruptly nters a d eply scar red land o f bare bl a k ro k ut by labyrin thine ca nyons and chann el , plunge pools and ro k bas in s, ca ca de and ca tara t ledges, and di playi ng ragged buttes and li ffs, alcoves, im­ men e gravel bars, and giant ripple marks. Th e traveler has reached the starkly sceni " Chan­ neled cab lands," and this d ramatic hange in th e landscape may well ca use him to w onder " w hat happ n d here? " Th e answ er- th e grea te t fl ood documented by man. This publica tion, summari zin g th e equence of geologic events that culminated in th e so-call ed ''Spokan Fl ood," w as prepar d in res ponse to a ge neral int re t in geology and a particul ar interes t in th e o ri gin of th e Scab land o ften ex pre sed by th ose ross in g th e State of W as hington.
    [Show full text]