Extension of Barapullah Elevated Road Across River Yamuna (Phase Iii) from Sarai Kale Khan to Mayur Vihar
Total Page:16
File Type:pdf, Size:1020Kb
PRESENTATION TO: CORE WORKING GROUP (UTTIPEC) FOR EXTENSION OF BARAPULLAH ELEVATED ROAD ACROSS RIVER YAMUNA (PHASE III) FROM SARAI KALE KHAN TO MAYUR VIHAR VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Understandings of the Project Our Understandings of the project • Extension of Barapullah Elevated Road across River Yamuna (Phase-III) from Sarai Kale Khan to Mayur Vihar: New Corridor between Nizamuddin Bridge and DND Flyway. • Govt. of Delhi is committed to decongest roads of Delhi – Flyovers, Elevated Corridors, improvements of Intersections etc. • These additional roads are expected to decongest the Ring road and other arterial road network. VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Marked alignment on street hierarchy network on Master Plan 2021 VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Zonal Development Plan VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s ZONE - D VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Zone E VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Stage I (Earlier CWG Presentation) . Marked Alignment – MPD 2021 .Zonal Development Plan (Zone D, Zone O & Zone E) .Google Map showing location and Study area . Influence Area Network showing approved/planned Prop. Agencies . Survey Map showing Footprints . Photos . Traffic Surveys . Projections VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Core Working Group Suggestions: . Vehicles should be converted to Passenger Trips .Need of the bridge .More Photographs VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Trip Network Trip VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s 7 : NEED: Bridge across river Yamuna at Mayur Vihar PH I is as per Master Plan 2021. Current Situation: •ITO bridge congestion Ring Road side (queue in peak hour 700 mts to 1.5 kms) •Nizamuddin Bridge congestion Noida Side (700 m to 1.3 km) •DND Flyway Congestion Ring road side (Bridges are opearting at capacity) •Corridor between Sarai kalen Khan to Safdarjung average speed in peak Hour 10-15 kmph. (Capacity constrained) VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s 7(a) :Macro Level & Micro Level: Macro Level: •Rapid increase in development to the East of the Yamuna River in the National Capital Territory of Delhi – CWG games (Holding capacity 28 lakhs/2001 Popl 27 lakhs) • East Delhi in two parts North-East Delhi and East Delhi with population ratio of 15.77% to 10.55% respectively. (2001 population) •The interactions and developments of immediate adjoining Counter magnets (Noida, Ghaziabad, and Greater Noida.) will demand more trips across Yamuna •It is estimated that the traffic will witness an increase on the NH 24 and UP Link Road due to fast development of residential townships in GZB, Noida & GN. VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s 7(a) :Macro Level & Micro Level: Macro Level: •Thus it is imperative to develop planning criteria which takes into consideration balancing effect of Demand supply of passenger trips. •As per Rites Estimates 40 lakhs trips projected for Metro in 2011 but present level is 20 lakhs (50% of projections) in 2012. •The maximum trips in one day ever observed is 23 lakhs where 8.88 lakhs trips across river Yamuna followed by Gurgaon Metro link 8.1 lakhs trips. •So its not only East Delhi (Three sides by UP) but also the counteragents make adding to demand supply gap across river Yamuna. VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Micro Level: •Need to connect East Delhi to South Delhi, the most direct link. •The Barapullah Nallah elevated corridor will remain under-utilised due to 2 lanes off and on ramps at Ring Road. • The traffic at DND Flyway and Nizamuddin bridge consists mainly of daily commuters nearly 74% of the total traffic. VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s NECESSITY OF THE PROJECT MISSING LINK EXTENSION OF BARAPULLAH NALA PHASE-I & PHASE-II MACRO LEVEL & MICRO LEVEL GOALS, NEEDS & VISION BASED ON MPD-2021 VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s ALTERNATIVE - 1 ALONG TRILOKPURI ROAD (ROW 30 M) VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s ALTERNATIVE - 1 VKS INFRATECH PVT. MANAGEMENT LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s e r a g n M a & s r e n n l a P s r e e i n n g g E i n l t u ns o C Uni-directional Flyover at Mayur Vihar-1 T-junction (view from MV-I road) VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s View of the flyover & elevated metro from Yamuna to Mayur Vihar-I road VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s INNOVATIONS Alignment Option 1 Connects the existing Barapullah Nallah corridor at Sarai Kale Khan with Mayur Vihar phase-1 junction. After joining it leads to Trilokpuri, Mayur Vihar Phase-1 & 2 and Kalyanpuri. It runs parallel to proposed track of DMRC Phase-3. At the joining point of Mayur Vihar Phase I: Uni-directional flyover and elevated Metro corridor present. Lesser trip length for majority of the users of the proposed road. Intersection/ Interchange design will have several configuration. Aligned along Old Pontoon Bridge. Shahadra drain (along UP Link Road) & elevated metro. Constraint for full access control interchange. VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s ALTERNATIVE - 2 ALONG SAHKARITA MARG (ROW 30 M) VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s ALTERNATIVE - 2 VKS INFRATECH PVT. MANAGEMENT LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s e r a g n M a & s r e n n l a P s r e e i n n g g E i n l t u ns o C The overhead metro line as seen from Yamuna VKS INFRATECH MANAGEMENT PVT. LTD. C o n s u l t i n g E n g i n e e r s P l a n n e r s & M a n a g e r s Metro over Sahakarita Marg as seen from Yamuna side VKS INFRATECH MANAGEMENT PVT.