36.Solid Waste Management
Total Page:16
File Type:pdf, Size:1020Kb
Agenda of 92nd Meeting of State Expert Appraisal Committee-2 (SEAC-2) SEAC Meeting number: 92 Meeting Date March 14, 2019 Subject: Environment Clearance for “SUN CITY” Residential and Commercial Project. Is a Violation Case: No 1.Name of Project Environmental Clearance for “SUN CITY” Residential and Commercial Project. 2.Type of institution Private 3.Name of Project Proponent Mr. Rakesh Kumar Wadhawan Address: Deewan Tower, Station road Vasai road , Thane -401202 Name-Mr. H.K. Desai Address: M/s. Enviro Analysts and Engineers Pvt. Ltd. B-1003, Enviro 4.Name of Consultant House, 10thFlr. Western Edge II, Western Express Highway, Borivali (E), Mumbai-400 066. Tel.: 28541647/48/67/68, Fax: 28541290 5.Type of project Residential cum commercial 6.New project/expansion in existing project/modernization/diversification New project in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project At S.NO. 96, H.NO. 11,14,8,15,5, 12, 1A, 7, 10, 2, 4A, 13,3,9,1B,4B&6, S.NO. 97, H.NO.1, 4, 6, 7, S.NO.108, H.NO.3, 4, 5, 6, 7, 8, 9, 15, 18, 19, S.NO.109, H.NO. 2A,2B,2C,3,4,5,6,7,8,9,10,11,12,13, 14, 15, 16, 17A,17B,17C,19,20, S.NO.111,H.NO. 1A, 3, 2, 4, 1B &5, S.NO. 110,H.NO. 1B,9,8, 11,3,7, 1A,2,4,6,10&5, S.NO.112,H.NO. 6, 3,5,2,1,4&7, S.NO. 113, H.NO.2, 3 & 1, S.NO.92, H.NO.4B, 4A,1,3,4C&2, S.NO.90,H.NO. 1,5,4&3, S.NO. 93, H.NO. 5, 2,1,4&3.S.NO. 94, S.NO.91, H-NO-2A, 2B& 2C,S.NO. 70, H.NO. 4&2. S. No. 91, H. No. 3/1, S. No. 95, H. No. 2,3,4,5, S. No. 97, H. No. 4,6,7,8, S. No. 98, H. No. 3,5 ,6,7,9, S. No. 106, H. No. 8.Location of the project 1,2,3,4, S. No. 107, H.No.1,2, 3,4,5,6,7,8,9,10, 11,12,13,14,15, 16, 17, 18,19, S. No. 108, H. No. 1,2,10,12,13,14,16,17,20,21, S. No. 109, H. No. 1,18, 21, Village: Diwanman & S. No. 24, H. No. 1, 2,3,4/2,4/4,8, S. No. 25, H. No. 6/9, 6/10, 8A, 8B, 8C, 9, S. No. 26, H.No. 1, 2, 3, 4A,4B,4C, 5, 6, 7, 8, 9, 10,11,12,13,14, S. No. 27, H. No. 1, 2, 3,4,5,6,7,8,9,10,11,12,13,14, S. No. 28, H. No. 4A,4B, S. No. 33, H. No. 8, 11, 12, 13A, 13B,15,18, S. No. 34, H. No. 1,2,3, 4,5,6,7,8,9, 10,11,12,13,14,15, 16,17,18, 19, 20,21, 22, 23,24,25,26, 4D, 4E,5, S. No. 37, H. No. 12, S. No. 38, H. No. 1A, 1B, 7A,7B, S. No. 205 S.NO. 192 of Village – Chulne & Diwanman, Vasai (W), Thane. 9.Taluka thane 10.Village Chulne & Diwanman Correspondence Name: Rakesh Kumar Wadhawan Room Number: - Floor: - Building Name: Deewan Tower Road/Street Name: Vasai Station road Locality: Vasai City: thane 11.Area of the project Vasai Virar City Municipal Corporation YES 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: CIDCO/VVSR/RDP/BP 3602 & 4503/W/5976. Approval Number Approved Built-up Area: 194565 13.Note on the initiatedSEAC-AGENDA-0000000234 work (If Phase I - 62 nos of buildings (St/G +7 & G+1), prior to EIA Notification 2004 applicable) 14.LOI / NOC / IOD from MHADA/ yes, CIDCO/VVSR/RDP/BP 3602 & 4503/W/5976 – 09/03/2010 Other approvals (If applicable) 15.Total Plot Area (sq. m.) 2,45,870.00 sq m 16.Deductions 86,065 sq m 17.Net Plot area 1,59,805.01 sq m a) FSI area (sq. m.): 85,127.74 18 (a).Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): 26,239.56 Non-FSI) c) Total BUA area (sq. m.): 111368 Mr. Surykant Nikam SEAC Meeting No: 92 Meeting Date: March 14, Page 1 of Shri M.M.Adtani (Chairman (Secretary SEAC-II) 2019 97 SEAC-II) Approved FSI area (sq. m.): 1,94,612.69 18 (b).Approved Built up area as per Approved Non FSI area (sq. m.): 26,239.56 DCR Date of Approval: 09-03-2010 19.Total ground coverage (m2) - 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open 27 % to sky) 21.Estimated cost of the project 2400000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 Residential Buildings - 20 nos. St / Gr + 14 floors 44.12 2 Row Houses 75 nos. G+1 Floors 6.70 23.Number of Residential – 1340 nos. and Row Houses – 75 nos. tenants and shops Shops – 88 nos. 24.Number of expected residents / Residential: 7075 nos. Shops: 176 nos. Total: 7251 nos. users 25.Tenant density 205 per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire 30.0 mt wide DP road (Vasai Gass road) station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all 7.5 m wide around the building excluding the width for the plantation 29.Existing Phase I – 62 nos. of buildings constructed, construction has been completed which was structure (s) if any commenced prior to EIA notification 2004. 30.Details of the demolition with there will be no demolition during Phase II development disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 SEAC-AGENDA-0000000234Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Mr. Surykant Nikam SEAC Meeting No: 92 Meeting Date: March 14, Page 2 of Shri M.M.Adtani (Chairman (Secretary SEAC-II) 2019 97 SEAC-II) Source of water VVCMC & Recycled water Fresh water (CMD): 641 Recycled water - 322 Flushing (CMD): Recycled water - 152 Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) 1115 : Fire fighting - Underground water 300 cum – 2 tanks & 250 cum – 2 tanks tank(CMD): Fire fighting - Overhead water 100 cum tank(CMD): Excess treated water 335 KLD Source of water VVCMC & Recycled water Fresh water (CMD): 641 Recycled water - 322 Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) 936 : Fire fighting - Underground water 300 cum – 2 tanks & 250 cum – 2 tanks tank(CMD): Fire fighting - Overhead water 100 cum tank(CMD): Excess treated water 487 KLD Details of Swimming NA pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require ExistingSEAC-AGENDA-0000000234Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable Mr. Surykant Nikam SEAC Meeting No: 92 Meeting Date: March 14, Page 3 of Shri M.M.Adtani (Chairman (Secretary SEAC-II) 2019 97 SEAC-II) Level of the Ground 3 m - 4 m water table: Size and no of RWH tank(s) and RWH tank 1: 150 cum; RWH: 250 cum Quantity: Location of the RWH Underground tank(s): Quantity of recharge 12 nos. 34.Rain Water pits: Harvesting Size of recharge pits 1.5m x 1m x 2.5m (RWH) : Budgetary allocation Rs. 42 lakhs (Capital cost) : Budgetary allocation 2.5 lakh / yr (O & M cost) : Location of tanks – At ground / Stilt level Details of UGT tanks Domestic Tank= 642 cum if any : Flushing Tank= 322cum Fire Tank = 300 Cum, 2 tanks and 250 cum 2 tanks. Natural water As per the natural slope of the plot. drainage pattern: 35.Storm water Quantity of storm 4.7 cum/sec drainage water: Size of SWD: 0.45 m x 0.30 m Sewage generation 899 in KLD: STP technology: SBR (Sequential Batch Reactor) Capacity of STP 920 KLD (CMD): Sewage and Location & area of Ground level and 736 sq m Waste water the STP: Budgetary allocation Rs. 180 lakhs (Capital cost): Budgetary allocation Rs. 24 lakhs (O & M cost): 36.Solid waste Management Empty cement bags: 13134 nos.; Steel: 40 MT; Scrap: 25 tons; Aerocan Waste generation: lightweight block: 17,865 Sq.m; Tiles/Marble & granite: 2500 sq m; Aluminum windows: 1270 sq m. Waste generationSEAC-AGENDA-0000000234 in Empty cement bags: Shall be sold to recyclers; Steel: Steel cut pieces the Pre Construction shall be used as spacers and chairs in the structure and wastage of steel (balance non-usable steel of odd lengths) is sent for recycling; Scrap: and Construction Disposal of the Sold for recycling; Aerocan lightweight block: Block masonry assumed phase: construction waste for toilet blocks only and other walls will be dry walls; Tiles/Marble & debris: granite: To be used as crazy marble flooring in common areas and balance to be used for land filling. Aluminum windows: To be sent for recyc Dry waste: 1441 Kg/day Wet waste: 2136 kg/day Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry 45 kg/day Mr.