1.0 Project Background 1.1 Project Title Proposed Expansion And

Total Page:16

File Type:pdf, Size:1020Kb

1.0 Project Background 1.1 Project Title Proposed Expansion And Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist 1.0 Project Background 1.1 Project Title Proposed Expansion and Capacity Upgrade of An Existing Scheduled Wastes Recovery Facility for SW 204, SW 325, SW 409, SW 410, SW 411, and SW 422 at Plot 88A, Jalan Perindustrian Bukit Minyak, Kawasan Perindustrian Bukit Minyak, 14000 Bukit Mertajam, Pulau Pinang. 1.2 Project Locations a. Area Coordinates Boundary Longitude Latitude B1 100°27'5.72"E 5°17'59.19"N B2 100°27'10.90"E 5°17'58.30"N B3 100°27'10.24"E 5°17'55.21"N B4 100°27'5.04"E 5°17'56.41"N b. Total Acreage (ha) : 2.16 c. Lot No./ P.T : 835 d. HSD/ HSM : HSD 54014 e. Name of Industrial Area : Taman Perindustrian Bukit Minyak f. Mukim : Bukit Mertajam g. District : Seberang Perai Tengah h. State : Pulau Pinang 1.3 Project Approving Authority a. Agency: Pulau Pinang State and Local Authority 1.4 Project Proponent a. Company Name : Reclaimtek (M) Sdn Bhd b. Address : Plot 88A, Jalan Perindustrian Bukit Minyak, Kawasan Perindustrian Bukit Minyak, 14000 Bukit Mertajam, Pulau Pinang c. Company registration No: 237666-P d. Person In Charge : En Amiruddin Shukri Bin Omar e. Designation: Production Engineer f. Telephone : 04 – 508 8570 g. Email: [email protected] h. Fax: 04 – 508 8577 GSR Environmental Consultancy Sdn Bhd I-1 Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist 1.5 EIA Consultant a. Company Name : GSR Environmental Consultancy Sdn. Bhd. (548601-H) b. Address : 18B, 2nd Floor, Jalan SS15/4B, 47500 Subang Jaya, Selangor Darul Ehsan. c. EIA Team Leader: Dr Dennis J Victor d. Registration No: C0145 e. Telephone: 03-56216707 f. Fax : 03-56216706 g. Email : [email protected] No Item Tick and For DOE Page use only Number 1.6 Preliminary Site Assessment (Penilaian Awal Tapak) a. Letter of PAT comments from the Department √ D-1 of Environment (State Office) : Pulau Pinang b. Date of PAT Letter : 30 April 2014 c. Reference number: AS (B)P50/013/902/025 2.0 GUIDELINES, GUIDANCE DOCUMENTS AND OTHER REFERENCES 2.1 List of guidelines, guidance documents and other √ A -1 references referred to during the preparation of the EIA report. 3.0 EIA CONSULTANT 3.1 List of EIA Study Team Members (EIA Consultants √ 1 -6 and Subject Consultants). 3.2 A soft copy of the EIA report (including Executive √ CD Summary) - attached. 3.3 A soft copy of raw data used in the EIA study – √ CD attached. 4.0 EIA REPORT 4.1 Documents – to be included at the beginning of the EIA report. a. List of EIA Study Team Members (EIA √ 1-6 Consultants and Subject Consultants). GSR Environmental Consultancy Sdn Bhd I-2 Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist No Item Tick and For DOE Page use only Number b. List of Assistant Consultants. √ 1 -7 c. Declaration from Project Initiator. (In the report) √ - d. Declaration from EIA Study Team Leader. (In the report) √ - e. Declaration from EIA Team Members. √ - (In the report) 4.2 Executive Summary (as a ‘stand alone’ document) in addition to summarizing the main findings and issues, also containing the following information: a. Name / title of Project. √ ES -1 b. Name & Contact Details of the Project √ ES-1 Proponent (contact person, address, tel, fax, e- mail). c. Name of the EIA Consultant (firm) & Contact √ ES-1 Person (Address, Tel, Fax, E mail). d. Location of the project (including where √ ES-2 applicable, coordinates, lot numbers, sub-district and district name). e. Relevant maps showing project location and √ ES-2 sensitive receptors. f. Summary of the main findings and issues √ ES-9 mitigating measures. Note: Executive Summary in two languages (English and Bahasa Melayu shall be submitted to √ CD DOE in both hard copy and soft copy. 4.3 Introduction a. Statement of Need √ 2-1 b. Justification for the proposed project. c. Objective of the proposed project. d. Benefits from the proposed project. e. Project viability : volume of the waste, value of recovered waste, the current recovery facilities. GSR Environmental Consultancy Sdn Bhd I-3 Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist No Item Tick and For DOE Page use only Number 4.4 Project and Site Options √ 4-1 a. Project options. b. Site options (refer to PAT). √ 4-1 c. Technology options. √ 4-1 d. Pollution control options. √ 4-2 e. No project option. √ 4-3 4.5 Project Description a. Site Description (i) Location Plan and Current Landuse Map The proposed project location is shown clearly √ 1-1 on the coordinates, lot number, PT or etc; showing the general location, specific location and the proposed project boundaries. Current satellite image land use map, covering √ 5-20 an area of 5 km radius from the proposed project boundary (250m intervals). The land use map clearly indicate the area of √ 5-20 environmentally sensitive areas such as human settlements, schools, hospitals, food and beverage industries, pharmaceutical industries, potable water intake point etc. Cadastral map showing the lots adjacent to the proposed project site, at least within 1km √ 5-18 radius from the proposed project boundary. (ii) Other Maps/ Plans Map showing infrastructure facilities. √ 5-20 Master Plan. NA - Structure Plan. NA - Local Plan. √ 5-20 GSR Environmental Consultancy Sdn Bhd I-4 Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist No Item Tick and For DOE Page use only Number b. Process Description i. Project components. √ 3 -18 ii. Types of scheduled wastes (scheduled wastes √ 3-21 codes and category) – physical and chemical properties and quantity. iii. Waste Acceptance Criteria. √ 3 -25 iv. Mass balance - mass balance calculation in every process. √ 3-56 v. Proposed recovery technology – plant capacity, process flow description, diagram, material √ 3-29 balance. vi. Sources of pollutions from the recovery √ 3-44 processes and proposed pollution controls. vii. Percentage of recovery (precious metals, etc). √ 3-23 viii. Products from recovery process – quantity and √ 3-23 quality.(for recovered waste oil, please refer to the Guidelines On Standard And Specification Of Recovered Waste Oil In Malaysia by the Department of Environment ix. Layout Plan showing, among others:- √ J-1 Scheduled waste acceptance area such as weigh bridge facility. Laboratory unit for the purpose of sampling and analysis of scheduled wastes. Scheduled wastes reception area. Main building for the recovery processes. Washing area (for transportation). Pollution control equipment/areas such as effluent treatment plant and air pollution control system. Bund and drainage system separating the storage, handling and washing areas. Lined storm water retention pond as mitigation measures in the event of overflow from the contaminated area. Storage area to be covered and designed with separate drainage systems. Residues from recovery processes storage area. Recovered products storage area. Fire-fighting system, water sprinkler system. Security fence Note:Layout plan must be endorsed by Certified Planner and the Project Proponent. GSR Environmental Consultancy Sdn Bhd I-5 Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist No Item Tick and For DOE Page use only Number 4.6 Soil Erosion and Sediment Control Aspects a. The chapter on Soil Erosion and Sediment NA - Control Aspects was prepared by (name of the consultant) __________, who is Certified Professional In Erosion And Sediment Control (CPESC) with the CPESC registration number _______, in accordance to the Guidance Document For Addressing Soil Erosion And Sediment Control Aspect in the (EIA) Report by the DOE. b. The conceptual erosion and sediment control drawings indicating effective mitigating measures or Best Management Practices (BMPs) to be implemented on the site are described in Chapter ____ on page ____ of the EIA report, and illustrated in Figure ___ on page ____ of the EIA report. Note: Best Management Practices (BMPs) means activities, facilities, measures, planning or procedures used to minimize accelerated erosion and sedimentation and manage storm water to protect and maintain the quality of soil or inland or Malaysian waters and the existing and designated uses of waters before, during, and after earth disturbance activities’ Not Applicable (NA) as Project is located within existing factory lot on a development industrial area. Project would not involve earthworks or building construction. 4.7 Description of Existing Environment a. Description on the sampling methodologies, location (with justification), monitoring stations √ 5 -40 and sampling parameters. b. Identification of the baseline data for the following environmental components :- (i) Air Quality Number of air quality monitoring stations: 1 √ 5-46 Parameters: Total Suspended Particulates (TSP), PM10, Nitrogen Dioxide (NO2), Sulfur Dioxide (SO2), and Hydrogen Cyanide Map showing locations of air quality monitoring stations. GSR Environmental Consultancy Sdn Bhd I-6 Reclaimtek (M) Sdn Bhd Appendix I : EIA Checklist No Item Tick and For DOE Page use only Number (ii) Water Quality √ 5-40 Number of water quality monitoring stations: 5 Parameters: WQI & NWQS Map showing locations of water quality monitoring stations. (iii) Soil Quality Number of water quality monitoring stations: - NA - Parameters: - Map showing locations of soil quality monitoring stations. Refer to Contaminated Land Management and Control Guidelines by the Department of Environment (iv) Groundwater Quality NA - Number of water quality monitoring stations: - Parameters: - Map showing locations of ground water quality monitoring stations. Refer to Contaminated Land Management and Control Guidelines by the Department of Environment (v) Noise Quality √ 5-52 Number of noise quality monitoring stations: 4 Parameters: LAeq, LAmax, LAmin, LA10, LA50, and LA90 Map showing locations of noise quality monitoring stations. c. Socio economic Baseline Data √ 5-55 i. Human settlement area ii. Commercial area iii. Sensitive receptors (schools, institutions, hospitals, religious centres) iv. Transportation & traffic 4.8 All raw data used as input for EIA study are provided in the EIA main report or in Appendices √ E-1 (hardcopy) and accompanied with softcopy (CD).
Recommended publications
  • Lampiran a Senarai Kilang-Kilang Yang Beroperasi Memproses Sisa Plastik
    LAMPIRAN A SENARAI KILANG-KILANG YANG BEROPERASI MEMPROSES SISA PLASTIK IMPORT DI NEGERI PULAU PINANG KAPASITI DILULUSKAN/ BIL NAMA SYARIKAT ALAMAT PREMIS DAERAH BULAN (METRIK TAN) 875, Lorong Perusahaan Ringan BTL RESOURCES SDN Juru 3, Kawasan Perusahaan SEBERANG PERAI 1 1100 BHD Ringan Juru, 14100 Simpang TENGAH Ampat, Pulau Pinang Plot 157-A, Mukim 13. Jalan Perindustrian Bukit Minyak 7, CENTURY SURF SDN. SEBERANG PERAI 2 Kawasan Perindustrian Bukit 5 BHD TENGAH Minyak, 14000 Bukit Mertajam, Pulau Pinang. No. 1001, Jalan Perindustrian Bukit Minyak, Kawasan CYCLE TREND SEBERANG PERAI 3 Perindustrian Bukit Minyak, 300 INDUSTRIES SDN BHD TENGAH 14000 Bukit Mertajam, Pulau Pinang. No. 2, Lorong Industri 15, DRAGON ALLIANCE Kawasan Industri Bukit Panchor, SEBERANG PERAI 4 3000 SDN BHD 14300 Nibong Tebal, Pulau SELATAN Pinang. 775, Jalan Perindustrian Bukit ECOLOGY TRADE SDN Minyak 7, Taman Perindustrian SEBERANG PERAI 5 6000 BHD Bukit Minyak, 14100 Simpang TENGAH Ampat, Penang. No 1 Lintang Beringin 8, Diamond Vallley Industrial Park, 6 EMBATECH SDN BHD off Jalan Permatang Damar DAERAH BARAT DAYA 20 Laut, 11960 Bayan Lepas, Pulau Pinang. 4988, Lot 527, Mukim 13, ESH RESOURCE Disebelah Jalan Kmpung Juru, SEBERANG PERAI 7 MANAGEMENT SDN 4 14000 Bukit Mertajam, Pulau TENGAH BHD Pinang 1ID10/18 LAMPIRAN A KAPASITI DILULUSKAN/ BIL NAMA SYARIKAT ALAMAT PREMIS DAERAH BULAN (METRIK TAN) No 4 Jalan Pala 6, Imperial GLOBECYCLE Industrial Park, Permatang SEBERANG PERAI 8 MANUFACTURING SDN 5 Tinggi, 14000 Bukit Mertajam, TENGAH BHD Pulau Pinang Plot 88A, Jalan Perindustrian Bkt Minyak, Kawasan IRM INDUSTRIES SEBERANG PERAI 9 Perindustrian Bukit Minyak, 1440 (PENANG) SDN BHD TENGAH 14000 Bukit Mertajam, Pulau Pinang NO.49, Lorong Mak Mandin 5/3, KHK RECYCLE SDN Kawasan Perindustrian Mak SEBERANG PERAI 10 2 BHD Mandin, 13400 Bukit Mertajam, TENGAH Pulau Pinang.
    [Show full text]
  • Chapter 2: Penang's Macroeconomic Performance
    Penang Economic and Development Report 2017/2018 22 Penang’s Macroeconomic 22 Performance 2.1 Output performance down from 8.7% in 2016 to 6.2% in 2017, it still exceeded the national average (1%) (Figure 2.2). The Penang’s economy has been growing at an average manufacturing and services sectors have been the rate of 5.6% over the past seven years (Figure main contributors to Penang’s GDP over the past 2.1). The state’s GDP growth slowed down by 0.3 seven years. In fact, Penang’s economic structure percentage point to 5.3% in 2017, mainly due to is mainly manufacturing- and services-oriented. In the negative 10.1% growth rate in the construction 2017, the services sector accounted for 49.3% of sector. Agricultural and manufacturing sectors GDP, while 44.8% was from the manufacturing sector registered the higher growth rates at 2.2% and 5.7%, (Table 2.1). However, the agricultural (2%), mining respectively, in 2017 compared to 2016, while the and quarrying (0.1%), and construction (2.6%) services sector remained at 5.6%. Although growth sectors were less significant, altogether accounting in Penang’s mining and quarrying sector had slowed for only 4.7% of Penang’s GDP. Figure 2.1 GDP growth in Malaysia and Penang, 2011–17 (at constant 2010 prices) 9.0 8.0 8.0 7.0 6.0 5.9 6.0 5.4 5.6 5.5 5.4 5.3 5.3 5.1 5.0 5.0 4.5 4.7 4.2 4.0 Percentage 3.0 2.0 1.0 0.0 2011 2012 2013 2014 2015 2016 2017 Malaysia Penang Source: Department of Statistics, Malaysia.
    [Show full text]
  • Seberang Perai(PDF)
    31 October 2014 (Friday) Pacifico, Yokohama, Japan DATO’ MAIMUNAH MOHD SHARIF MUNICIPAL PRESIDENT MUNICIPAL COUNCIL OF SEBERANG PERAI (MPSP) PENANG, MALAYSIA To cut emissions 3 categories; energy efficiency, low carbon technologies and halt deforestation Malaysia is adopting an indicator of a voluntary reduction up to 40 percent in terms of emissions intensity of GDP by the year 2020 compared to 2005 levels National Green Technology Council chaired by Malaysia Prime Minister, Penang Green Council, MPSP Level- Green Office Vision is for energy, economy, environment & society 2 To assists local authorities, townships developers, designers and individuals in accessing whether developments carried out within the city contribute towards the reduction or decrease in Green House Gases (GHG) 3 Incentives Carbon trading & regulation Increase technology support Ecological footprint Engagement with the public or residents 4 Less pollution Better Health GOOD Cleaner transport QUALITY OF LIFE Protects water supply Controls Flooding Provide bio-diversity 5 THINK GLOBAL ACT LOCAL 6 SEGREGATION AT SOURCE WASTE GENERATORS PAY: To reduce cost at landfill To reduce wastage and as a source for other beneficial output/ activities To involve industries in recycling to reduce waste To encourage innovation and productions of new item base on industrial and commercial waste To increase the life- span of existing sanitary landfill To encourage zero waste, waste minimization and low carbon initiative. 7 MOU with Kawasaki, Japan- Waste to
    [Show full text]
  • Seberang Perai Low Carbon City Definition
    Global Covenant of Mayors for Climate and Energy : Urban adaptation to climate change 21st March 2019 Climate Change Actions : Seberang Perai’s Experience on Climate Change Adaptation and Mitigation Speaker: Ahmad Zabri Mohamed Sarajudin Director of Crisis Management Department, Seberang Perai SEBERANG PERAI EXPERIENCE ON CLIMATE CHANGE SEBERANG PERAI EXPERIENCE ON CLIMATE CHANGE 3,256 171,428 houses 162 cars people affected trapped affected 9,636 358 1 Person 15 cars people Died houses affected relocated affected 362mm 15,942 tonnes rainfall within 12 days Solid Waste 6 consecutive for collected hours recovery RM11.3M 11,323 1,194 trees Economic Warriors uprooted Loss SEBERANG PERAI Aspiring City Of Tomorrow Citizen Cashless Public Participation Payment Reporting System System System Smart Industry Data 4.0 Exchange Smart Street Platform Light Flood Management Digital System Signage Smart & Smart Sustainable Parking Building Smart & Smart Smart Solid Smart Integrated Sustainable Traffic Waste Learning Command Hawkers Complex Light Management Center Center Vision Seberang Perai Resilient, Inclusive, Green, Competitive and Technology Driven Smart City Mision To provide urban service, development planning and infrastructure efficiently, effectively and responsive to the needs of the community in Seberang Perai Corporate Value We work collaboratively across organization and communities to improve outcome, value for money and services 7Ps INCLUSIVE PARTNERSHIP Guiding Principles MODEL “City for all” •Improve governance and inclusiveness •Accessibility
    [Show full text]
  • Penang Eco Town Workshop 2012 Flextronics Commitment Towards Environmental Sustainability
    Penang Eco Town Workshop 2012 Flextronics Commitment Towards Environmental Sustainability 13th Dec 2012 ABOUT FLEXTRONICS (SIGNIFICANT SCALE IN OPERATIONS) GLOBAL FOOTPRINT Austria, Hungary, Norway, UK, Czech Republic, Poland, Denmark, Ireland, Sweden, Finland, Israel, Switzerland, France, Ukraine, Italy, Germany, Netherlands, Romania USA, Brazil, Canada, Mexico China, Hong Kong, India, South Africa Indonesia, Japan, Korea, Taiwan, Singapore, Malaysia PENANG SITE OVERVIEW Footprint 1,033,000 sq ft (~96,000 sq m) Headcount ~7,800 employees P1 - PRAI P2 – BUKIT MINYAK P3 – BUKIT MINYAK P5 – NAGASARI, PRAI A1 – PRAI FLEXTRONICS PLEDGE OUR MISSION : Protect the Environment/ Planet Treat employees with respect & dignity Be part of the community Uphold the highest standards At Flextronics, we believe that a sustainable approach to business is essential and therefore, it forms a core part of the way in which we do business. FLEXTRONICS Pledge identities our Corporate Social and Environmental Responsibility (CSER) program. COMPLIANCE TOWARDS INTERNATIONAL STANDARDS The legislation provides for the creation of Flextronics Commitment to Flextronics collection schemes where consumers return is a founding member of the Electronics their used e-waste free of charge. The Industry Citizenship Coalition (EICC), a objective of these schemes is to increase worldwide association of electronics the recycling and/or re-use of such companies committed to promoting an products. It also requires heavy metals such industry code of conduct to improver as lead, mercury, cadmium, and hexavalent working and environmental conditions chromium and flame retardants such as across the global electronics supply polybrominated biphenyls (PBB) or chain. polybrominated diphenyl ethers (PBDE) to be substituted by safer alternatives The restriction of the Use of Certain Hazardous Substances in Electronic Equipment Regulations ISO 14001 specifies the requirements of an environmental management system (EMS) for small to large organizations.
    [Show full text]
  • ASPEN (GROUP) HOLDINGS LIMITED Company Registration No.: 201634750K (Incorporated in the Republic of Singapore)
    ASPEN (GROUP) HOLDINGS LIMITED Company Registration No.: 201634750K (Incorporated in the Republic of Singapore) RESPONSE TO QUESTIONS FROM SECURITIES INVESTORS ASSOCIATION (SINGAPORE) ON ANNUAL REPORT 2019 The Board of Directors (the “Board”) of Aspen (Group) Holdings Limited (the “Company” and together with its subsidiaries, the “Group”) refers to the questions raised by the Securities Investors Association (Singapore) (“SIAS”) relating to the Company’s Annual Report for the financial year ended 31 December 2019 (“Annual Report 2019”) and appends the replies as follows: SIAS Question 1: As noted in the Corporate milestones, in 2019, the group completed the Vervea commercial precinct which is the first phase of Aspen Vision City’s masterplan. This was followed by the opening of Ikea and IKEA Meeting Place in March 2019 and December 2019 respectively. The group is targeting to complete Vertu Resort and Beacon Executive Suites in 2021, although the completion dates may be delayed due to the COVID-19 outbreak. Other projects include: - Vivo Executive Apartment (expected TOP: 2023) - Viluxe (Phase1) (expected TOP: 2023) - Vogue Lifestyle Residence As at 31 December 2019, TRI PINNACLE and Beacon Executive Suites have achieved sales of 91% and 64% respectively. Vervea and Vertu Resort are 89% and 71% sold respectively. (i) With sales of 91% achieved, there are approximately 110-120 units left at TRI PINNACLE. What are management’s plans for the remaining units of TRI PINNACLE? The TOP for the project was obtained in December 2018. (ii) Can management confirm that it is the group’s strategy to sell the units in commercial developments (for example, Vervea) and thus it would not be building up an investment portfolio for recurring income at this stage of the group’s growth? It was stated the group envisioned the investments in Aloft Hotel, the Regional Integrated Shopping Centre and the Shah Alam Integrated Logistics Hub would contribute to its recurring income in years to come.
    [Show full text]
  • 27 SHORT COMMUNICATION Diversity Of
    Malaysian Journal of Microbiology, Vol 3(1) 2007, pp. 27-30 http://dx.doi.org/10.21161/mjm.00407 SHORT COMMUNICATION Diversity of Fusarium species in cultivated soils in Penang Latiffah, Z., * Mohd Zariman M and Baharuddin, S. School of Biological Sciences, Universiti Sains Malaysia, 11800 Minden, Penang E-mail: [email protected] ABSTRACT Fusarium species were isolated from 12 cultivated soil planted with different crops in Penang. A total of 42 Fusarium isolates were recovered in which four Fusarium species were identified namely, F. solani, F. semitectum, F. equiseti and F. oxysporum. The most prevalent Fusarium species recovered was F. solani (84%), followed by F. semitectum (7%), F. equiseti (7%) and F. oxysporum (2%). The present study showed that Fusarium populations are diverse within cultivated soils and could be potential inoculum to infect certain agriculture crops. Keywords: diversity, Fusarium, cultivated soil INTRODUCTION Fusarium species are ubiquitous in soil and have been the soil samples were passed through 200 µm sieve. For isolated from various soil types in tropical and temperate each soil samples, approximately 1- 2 g were spread over regions from desert soil to artic and alpine soils. However, peptone chloro-nitro benzene (PCNB) media, with four the majority of Fusarium species were recovered in replicates. The plates were incubated at room temperature cultivated soils especially near the soil surface. Fusarium for 5 – 7 days or until visible sign of colony growth. The species occurred widely in cultivated soils and often plates were observed under a binocular microscope and associated with plant roots either as parasites or the colonies formed were then transferred onto potato saprophytes (Booth, 1971).
    [Show full text]
  • High-Level Roundtable Discussion on Smart Sustainable Cities World Smart Sustainable Cities Organization
    High-level Roundtable Discussion on Smart Sustainable Cities World Smart Sustainable Cities Organization Mr. Kyong-yul Lee Secretary General WeGO | World Smart Sustainable Cities Organization WHAT IS WeGO? INTERNATIONAL ORGANIZATION OF 131 CITIES + 5 NATIONAL ICT INSTITUTIONS + 7 CORPORATE MEMBERS • President City: Seoul • Executive Vice President City: Makati • Vice President Cities: Addis Ababa, Beyoğlu, Ha Noi, Jakarta, Mexico City, Moscow, Ulyanovsk Region • Executive Committee Member Cities: Bucharest, Chengdu, Goyang, Hebron, Khartoum State, Kigali, Nairobi, Pittsburgh, Seberang Perai, Ulaanbaatar • Regional Offices: Asia, Europe, Latin America, Mediterranean • Secretariat: Seoul Global Center 7F, South Korea WeGO | World Smart Sustainable Cities Organization WeGO MEMBERS 20 5 44 65 143 MEMBERS WORLDWIDE VISION: Smart Sustainable Cities for All • Innovative cities that leverage digital technology and connectivity to improve quality of life, efficiency of urban operation and services, and economic prosperity for all citizens, while ensuring long-term economic, social and environmental sustainability MISSION • To promote and facilitate the transformation of cities to Smart Sustainable Cities worldwide; • To be a global platform for cities to enhance their digital capabilities and leverage their innovation potentials in order to develop transformative solutions; and • To foster international exchange, cooperation, and learning among cities. WeGO | World Smart Sustainable Cities Organization WeGO ACTIVITIES 1. Capacity Building 3. Knowledge
    [Show full text]
  • (Emeer 2008) State: Pulau Pinang
    LIST OF INSTALLATIONS AFFECTED UNDER EFFICIENT MANAGEMENT OF ELECTRICAL ENERGY REGULATIONS 2008 (EMEER 2008) STATE: PULAU PINANG No. Installation Name Address BADAN PENGURUSAN BERSAMA PRANGIN MALL, PEJABAT 1 PRANGIN MALL PENGURUSAN, TINGKAT 5, PRANGIN MALL, NO.33, JALAN DR. LIM CHWEE LEONG, 10100 PULAU PINANG 161,KAWASAN INDUSTRI,11900 BAYAN LEPAS FTZ,BAYAN LEPAS, PULAU 2 RAPID PRECISION PINANG 3 TECO INDUSTRY (MALAYSIA) 535/539,LRG PERUSAHAAN BARU,13600 PERAI,PULAU PINANG 4 MEGAMALL PENANG 2828, JALAN BARU, BANDAR PERAI JAYA, 13600 PERAI, PULAU PINANG PLOT 17A,JLN PERUSAHAAN,13600 KAWASAN PERINDUSTRIAN PRAI 5 METECH ALUMINIUM SDN BHD IV,PRAI, PULAU PINANG ALLIANCE RUBBER PRODUCTS SDN 2714, LRG INDUSTRI 15, KAWASAN PERINDUSTRIAN BKT PANCHOR, 6 BHD NIBONG TEBAL, 14300, PULAU PINANG BENCHMARK ELECTRONICS (M) SDN PLOT 17A & B, TECHNOPLEX, MEDAN BAYAN LEPAS, BAYAN LEPAS 7 BHD - PRECISION TECHNOLOGIES INDUSTRIAL PARK, PHASE 4, 11900 BAYAN LEPAS, PULAU PINANG NO. 2515, TINGKAT PERUSAHAAN 4A, PERAI FREE TRADE ZONE, 13600 8 TONG HEER FASTENERS CO. SDN BHD PERAI, PULAU PINANG 9 NI MALAYSIA SDN BHD NO. 8, LEBUH BATU MAUNG 1, 11960 BAYAN LEPAS, PULAU PINANG 10 EPPOR-PACK SDN BHD 2263, PERMATANG KLING, 14300 NIBONG TEBAL, PULAU PINANG FLEXTRONICS SYSTEMS (PENANG) PMT 719, LINGKARAN CASSIA SELATAN, 14100 SIMPANG AMPAT, PULAU 11 SDN BHD PINANG 12 GURNEY PARAGON MALL 163-D, PERSIARAN GURNEY, 10250, PULAU PINANG BENCHMARK ELECTRONICS (M) SDN BAYAN LEPAS FREE INDUSTRIAL ZONE PHASE 1, 11900 BAYAN LEPAS, 13 BHD - ELECTRONIC MANUFACTURING PULAU PINANG SERVICES
    [Show full text]
  • Malaysia Real Estate Highlights
    RESEARCH REAL ESTATE HIGHLIGHTS 1ST HALF 2019 KUALA LUMPUR PENANG JOHOR BAHRU KOTA KINABALU HIGHLIGHTS KUALA LUMPUR More market activity in the high-end condominium / HIGH END CONDOMINIUM serviced apartment segment (> RM1 million) in 2018 and MARKET this momentum is expected to continue into 2019. MARKET SUPPLY AND 1H2019 saw the launches of a INDICATIONS DEMAND few high-end condominium / The Malaysian economy continues with As of 1H2019, the completion of 602 units serviced apartment projects in its growth momentum albeit at a slower of high-end condominiums / serviced Kuala Lumpur City. The projects pace of 4.7% in 2018 (2017: 5.9%). It apartments from two projects brought are generally smaller in scale, on continued to expand 4.5% in 1Q2019 the cumulative supply in Kuala Lumpur pockets of land. (4Q2018: 4.7%), supported by private to 56,786(R) units. The completed projects sector expenditure. For the whole year were Opus KL (357 units) and Residensi The prices of new launches of 2019, economic growth is expected Sefina (245 units). remain flattish as the high-end to range between 4.3% and 4.8%. In (Note: (R) The cumulative supply has residential segment continues to May 2019, the Department of Statistics been revised) be challenging. Malaysia (DOSM) rebased of the country’s gross domestic product (GDP), The scheduled completion of Sky Suites In the secondary market, the from year 2010 to 2015. @ KLCC (986 units), 8 Kia Peng (442 units), Tower 1 and Tower 2 @ Star overall transacted price of The current period of low headline Residences (1,039 units), Aria KLCC selected schemes analysed was inflation, recorded at 1.0% in 2018 (2017: (598 units), Stonor 3 (400 units), Novum lower by 1.6% when compared 3.7%), is largely due to key policies such Bangsar (729 units), TWY Mont’ Kiara to 2018 as purchasers continue as the fixing of domestic retail fuel prices (484 units), Arte Mont’ Kiara (1,706 to be spoilt for choice.
    [Show full text]
  • PARS Workshop Listing - Pulau Pinang
    PARS Workshop Listing - Pulau Pinang No PARS No. Company Name Expiry Date Address 1 Address 2 Address 3 Post Code City State Phone No. Fax No. Email Lot 263-J Lorong Permatang 1 PNG/0001/16 Wirana Motor Sdn Bhd 31/12/2021 11960 Batu Maung Pulau Pinang (Island) 604-6262497 04-6261710 [email protected] Damar Laut Lot 845, Plot 2, Jalan 2 PNG/0002/15 Yeaw Seng Motor Services Sdn Bhd 30/9/2021 Mukim 12 11960 Bayan Lepas Pulau Pinang (Island) 04626 5639 04626 3641 [email protected] Permatang Damar Laut, NO.1620, JALAN DATUK HJ 3 PNG/0002/18 Bengkel Kereta Weng Iyau Sdn Bhd 31/12/2021 SEBERANG PERAI UTARA 13200 Kepala Batas Pulau Pinang (Mainland) 04-5750530 04-5750530 [email protected] AHMAD BADAWI 4 PNG/A14/11 Autobinee Sdn Bhd 31/12/2021 111,Tye Sin Street 10300 Pulau Pinang Pulau Pinang (Island) 04-2631314 04-2634861 [email protected] No. 322, Jalan Tanjung 5 PNG/A5/85 A-Automobile Body Works Sdn Bhd 31/12/2021 10470 Pulau Pinang Pulau Pinang (Island) 04-8913333 04-8999977 [email protected] Tokong, 6 PNG/C8/85 Syarikat Chin Huat & Sons Motor Sdn Bhd 31/12/2021 151-A , Presgrave Street 10300 Pulau Pinang Pulau Pinang (Island) 04-2629282 04-2627302 [email protected] 7 PNG/G3/11 Goh Brothers Motor Sdn Bhd 30/9/2021 1874, Lorong IKS Bukit Tengah Taman IKS Bukit Tengah 14000 Bukit Mertajam Pulau Pinang (Mainland) 04-5022999 04-5020477 [email protected] Lot 576 MK 11, Jalan 8 PNG/K10/04 KTN Auto Repair Sdn Bhd 31/12/2021 11900 Bayan Lepas Pulau Pinang (Island) 04-6466219 [email protected] Permatang
    [Show full text]
  • Sungai Dua Water Treatment Plant Seberang Perai, Malaysia
    Sungai Dua Water Treatment Plant Seberang Perai, Malaysia 1. Background Information Sungai Dua Water Treatment Plant (SDWTP) is located at Seberang Perai and occupies about 13 hectares of land. SDWTP is the most important WTP in the Penang as it supplies 80% of the total volume of treated water to Penang. SDWTP was first commissioned in the year 1973 and after series of upgrading in 1994, 1999, 2004, 2011 and 2013, it now has the design capacity of 1,113,792 m3/day . SDWTP usually draws water from Muda River as a primary source and Mengkuang Dam as the secondary source which is the largest dam in the Penang. Currently, the Mengkuang Dam is temporarily decommissioned since February 2014 to facilitate its expansion project. SDWTP is owned and operated by Perbadanan Bekalan Air Pulau Pinang (PBAPP). SDWTP also serves as the control center for PBAPP’s “on-line” supervisory control and data acquisition (SCADA) system to facilitate remote operation. SCADA gathers real-time data from remote location and empowers the operator to remotely control equipment and conditions. The plant operates at 3 shifts per day. The general information of SDWTP is shown in Table 1. Table 1: Overall Information of Sungai Dua Water Treatment Plant Location Seberang Perai, Penang Constructed Year 1973 (1994, 1999, 2004, 2011 & 2013 upgrading) Raw Water Source Muda River (primary) & Mengkuang Dam Maximum Design Capacity (m3/d) 1,113,792 Operating Capacity (m3/d) 1,002,412 Number of employees 120 Topography Tropical Automation Yes Water Quality Exceeds Standards for Drinking Water set by Ministry of Health, Malaysia Supply Areas Seberang Perai, Penang Island Reference Perbadanan Bekalan Air Pulau Pinang (PBAPP) Source: Making Sure Penang’s Taps Keep Flowing.
    [Show full text]