Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Table 8: MA TMDL Re
Total Page:16
File Type:pdf, Size:1020Kb
Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Table 8: MA TMDL Reports with DCR Related Implementation Recommendations Watershed/TMDL Specific Waterbodies Pollutant of Does Does the TMDL If yes, what are the Is Agency meeting How is Agency currently meeting these Concern TMDL include BMP recommendations? these recommendations or how does Agency include a recommendations or recommendations plan to meet them in the future? WLA? performance through existing or requirement regarding proposed DCR (or former DEM/ programs? MDC)? Upper/Middle Charles Alder Brook Phosphorus Yes 1. Identify comprehensive River/Total Maximum Beaver Brook stormwater managmenet strategy Daily Load for Nutrients Charles River including cost estimates and in the Upper/Middle Cheese Cake Brook potential funding sources. Charles River, Factory Pond, Bogastow Brook 2. Develop and implement Massachusetts Franklin Reservoir NE, Miller Brook stormwater management programs Franklin Reservoir SE< Miller Brook including BMP implementation. 3. Illicit discharge detection and Fuller Brook elimination. Hardys Pond, Beaver Brook 4. Provide periodic status reports Houghton Pond, Bogastow Brook on implementation of remedial Lake Pearl, Eagle Brook activities. Lake Winthrop, Winthrop Canal 5. If necessary, identify future Linden Pond, Bogastow Brook programs to reduce phosphorus Lymans Pond, Unnamed Tributary loads in targeted seasons/locations. Milford Pond 6. Collect source monitoring data Mirror Lake, Stony Brook and additional drainage area Populatic Pond information to better target source Rock Meadow Brook areas for controls and evaluate the Rosemary Brook effectiveness of on-going control Sawmill Brook practices. South Meadow Brook 7. Enhance existing stormwater Trout Brook management programs to ptimize Stop River reductions in nutrient loadings with initial emphasis on source controls Uncas Pond, Uncas Brook and pollution prevention practices. 10/6/2014 1 Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Table 8: MA TMDL Reports with DCR Related Implementation Recommendations Watershed/TMDL Specific Waterbodies Pollutant of Does Does the TMDL If yes, what are the Is Agency meeting How is Agency currently meeting these Concern TMDL include BMP recommendations? these recommendations or how does Agency include a recommendations or recommendations plan to meet them in the future? WLA? performance through existing or requirement regarding proposed DCR (or former DEM/ programs? MDC)? TauntonUpper/Middle River/Final Charles Assonet River Bacteria Yes No --1. Identify comprehensive -- -- PathogenRiver/Total TMDL Maximum for the stormwater managmenet strategy TauntonDaily Load River for WatershedNutrients including cost estimates and in the Upper/Middle potential funding sources. Charles River, Beaver Brook 2. Develop and implement Massachusetts Broad Cove stormwater management programs Matfield River including BMP implementation. Meadow Brook 3. Illicit discharge detection and Muddy Cove Brook elimination. 4. Provide periodic status reports Rumford River on implementation of remedial Salisbury Brook activities. Salisbury Plain River 5. If necessary, identify future Segreganset River programs to reduce phosphorus Shumatuscacant River loads in targeted seasons/locations. Taunton River 6. Collect source monitoring data Threemile River and additional drainage area Trout Brook information to better target source Wading River areas for controls and evaluate the Nashua River/ Final Bare Hill Pond Phosphorus Yes Yes 1.effectiveness The MA DEP of on-going will endorse control in- Yes Refer to BMP 2-8. TMDL for Bare Hill Pond lakepractices. remediation efforts that meet (Nuisance all7. environmentalEnhance existing concerns, stormwater Aquatics) however,management instituting programs such to measuresptimize willreductions rest with in nutrientcommunities loadings and withthe Cleaninitial Lakesemphasis Program on source now controls administeredand pollution byprevention EPA and, practices. in Massachusetts, the DEM. 2. DEM forester should check that Yes Refer to BMP 7-4 an approved forest cutting plan is in place and BMP's for erosion are being followed. 10/6/2014 2 Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Table 8: MA TMDL Reports with DCR Related Implementation Recommendations Watershed/TMDL Specific Waterbodies Pollutant of Does Does the TMDL If yes, what are the Is Agency meeting How is Agency currently meeting these Concern TMDL include BMP recommendations? these recommendations or how does Agency include a recommendations or recommendations plan to meet them in the future? WLA? performance through existing or requirement regarding proposed DCR (or former DEM/ programs? MDC)? ChicopeeUpper/Middle River/ Charles Final Browning Pond, Oakham Phosphorus Yes Yes 1. IdentifyThe MA comprehensive DEP will endorse in- Yes Refer to BMP 2-8. PhosphorusRiver/Total MaximumTMDL for Long Pond, Springfield lakestormwater remediation managmenet efforts that strategy meet Yes Refer to BMP 7-4 Daily Load for Nutrients including cost estimates and Selected Chicopee Basin Sugden Reservoir, Spencer all environmental concerns, in the Upper/Middle potential funding sources. Lakes Mona Lake, Springfield however, instituting such measures Charles River, will2. Develop rest with and communitites implement and the Minechoag Pond, Ludlow Massachusetts Cleanstormwater Lakes management Program now programs Spectacle Pond, Wilbraham administeredincluding BMP by implementation.EPA and, in Wickaboag Pond, Brookfield Massachusetts,3. Illicit discharge the detectionDEM. and elimination. 2.4. DEMProvide forester periodic should status check reports that anon approvedimplementation forest cuttingof remedial plan is in placeactivities. and BMP's for erosion are being5. If necessary, followed. identify future Cape Cod/Final TMDL Frost Fish Creek Bacteria Yes No --programs to reduce phosphorus -- Report of Bacteria for loads in targeted seasons/locations. Frost Fish Creek, 6. Collect source monitoring data Chatham and additional drainage area -- information to better target source areas for controls and evaluate the effectiveness of on-going control practices. 7. Enhance existing stormwater management programs to ptimize reductions in nutrient loadings with initial emphasis on source controls and pollution prevention practices. 10/6/2014 3 Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Table 8: MA TMDL Reports with DCR Related Implementation Recommendations Watershed/TMDL Specific Waterbodies Pollutant of Does Does the TMDL If yes, what are the Is Agency meeting How is Agency currently meeting these Concern TMDL include BMP recommendations? these recommendations or how does Agency include a recommendations or recommendations plan to meet them in the future? WLA? performance through existing or requirement regarding proposed DCR (or former DEM/ programs? MDC)? CapeUpper/Middle Cod/Final Charles TMDL Muddy Creek Bacteria Yes No --1. Identify comprehensive -- ReportRiver/Total of Bacteria Maximum for stormwater managmenet strategy MuddyDaily Load Creek, for ChathamNutrients including cost estimates and in the Upper/Middle potential funding sources. -- CapeCharles Cod/Final River, Nitrogen Oyster Pond Total Nitrogen Yes No --2. Develop and implement -- TMDLMassachusetts for Oyster Pond stormwater management programs including BMP implementation. -- Cape Cod/Final Nitrogen Little Pond Embayment System Total Nitrogen Yes No --3. Illicit discharge detection and -- TMDL for Little Pond elimination. 4. Provide periodic status reports -- Connecticut Basin/ Final Aldrich Lake East, Granby Phosphorus Yes Yes 1.on implementationThe MA DEP will of endorseremedial in- Yes Refer to BMP 2-8. TMDLs of Phosphorus Aldrich Lake West, Granby lakeactivities. remediation efforts that meet for Selected Connecticut Leverett Pond, Leverett all5. environmentalIf necessary, identify concerns, future Basin Lakes Lake Wyola, Shutesbury however,programs institutingto reduce phosphorussuch measures loads in targeted seasons/locations. Loon Pond, Springfield will rest with communities and the 6. Collect source monitoring data Lake Warner, Hadley Clean Lakes Program now administeredand additional by drainage EPA and, area in Massachusetts,information to better the DEM. target source areas for controls and evaluate the 2.effectiveness DEM forester of on-going should check control that Yes Refer to BMP 7-4 anpractices. approved forest cutting plan is in place7. Enhance and BMPs existing for erosionstormwater are beingmanagement followed. programs Also, DEM to ptimize should providereductions training in nutrient to local loadings with ConCommsinitial emphasis on harvesting on source controlsBMPs. and pollution prevention practices. French River/ Final Buffumville Lake, Charlton Phosphorus Yes Yes 1. The MA DEP will endorse in- Yes Refer to BMP 2-8. TMDLs of Phosphorus Cedar Meadow Pd, Leicester lake remediation efforts that meet for Selected French Basin Dresser Hill Pond, Charlton all environmental concerns, Lakes Dutton Pond, Leicester however, instituting such measures Gore Pond, Charlton/Dudley will rest with communities and the Granite Reservoir, Charlton Clean lakes Program now Greenville Pond, Leicester administered by EPA and, in Massachusetts, the DEM. Hudson Pond, Oxford Jones Pond, Charlton/Spencer