George Brown College Waterfront Campus
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
CEO Report - Public
Board Meeting – October 20, 2010 CEO Report - Public John Campbell West Don Lands Waterfront Toronto (“WT”) continues to pursue planning approvals for Phase 2 of West Don Lands (“WDL”). Staff meets weekly with Infrastructure Ontario (“IO”), Ministry of Infrastructure (“MOI”), Ontario Realty Corporation (“ORC”) and the City of Toronto to work through the WDL Phase 2 Plan of Subdivision (“POS”) conditions. It is anticipated that the POS and associated conditions will receive Draft Approval from the Chief Planner in late October, 2010. Toronto Community Housing Corporation (“TCHC”) has advised that it is hoping to have a full building permit by late fall and building occupancy in early 2012. ORC advises that the Risk Assessment Risk Management (“RA/RM”) work for WDL is on schedule to meet with Pan Am Games Athletes’ Village and Urban Capital timelines. The following projects within the WDL are progressing on schedule: Don River Park commenced construction on August 15, 2010; Mill Street Public Realm construction is underway; Underpass Park tenders have been received - WT and ORC are completing an Access Agreement to allow remediation to commence; and Stormwater Management Facility design has commenced. WT and IO are working closely to deliver the Pan Am Games Athletes’ Village. Treasury Board has approved the budget for the Village, allowing the project to proceed. The budget total is subject to Cabinet confidentiality. A Planning, Design and Compliance team (“PDC”) lead by the firm HOK, has been successfully retained to develop the design specifications and work with WT’s Design Review Panel (“DRP”) in creating requirements for the Request for Qualifications (“RFQ”). -
Peer Review EA Study Design Billy Bishop Toronto City Airport BBTCA
Imagine the result Peer Review – EA Study Design Billy Bishop Toronto City Airport (BBTCA) Runway Expansion and Introduction of Jet Aircraft Final Report August 2015 BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS ii 1.0 INTRODUCTION 1-1 1.1 Background 1-1 1.2 Current Assignment 1-3 2.0 PEER REVIEW APPROACH 2-1 2.1 Methodology 2-1 3.0 FINDINGS OF PEER REVIEW OF AECOM’S DRAFT STUDY DESIGN REPORT 3-1 3.1 EA Process and Legislation 3-1 3.2 Public Consultation & Stakeholder Engagement 3-1 3.3 Air Quality 3-2 3.4 Public Health 3-5 3.5 Noise 3-6 3.6 Natural Environment 3-10 3.7 Socio-Economic Conditions 3-11 3.8 Land Use & Built Form 3-14 3.9 Marine Physical Conditions and Water Quality 3-15 3.10 Transportation 3-15 3.11 Archaeology & Cultural Heritage 3-18 4.0 SUMMARY RECOMMENDATIONS 4-1 APPENDIX A Presentation Given to the Working Group (22 June 2015) B Presentation of Draft Phase I Peer Review Report Results (13 July 2015) i BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS AERMOD Atmospheric Dispersion Modelling System ARCADIS ARCADIS Canada Inc. BBTCA Billy Bishop Toronto City Airport CALPUFF Meteorological and Air Quality Monitoring System CCG Canadian Coast Guard CEAA Canadian Environmental Assessment Act CO Carbon Monoxide COPA Canadian Owners and Pilots Association dBA Decibel Values of Sounds EA Environmental Assessment EC Environment Canada GBE Government Business Enterprise GWC Greater Waterfront Coalition HEAT Habitat and Environmental Assessment Tool INM Integrated Noise Model Ldn Day-Night -
Play Me, I'm Yours
PLAY ME, 40 I’M YOURS 6,7,8,17,23, 25,30,33,37 College St. Carlton St. 12 Bay St. Bay Jarvis St. University Ave. University 36 St. Church Yonge St. Yonge Parliament St. Parliament 16 20 Dundas St. W. Dundas St. W. 28 27 Dundas St. E. Bathurst St. 24 Church St. Church Bay St. Bay Spadina Ave. 11 5 26 Queen St. W. Queen St. E. Queen St. E. 39 University Ave. University 38 34 Jarvis St. York St. York 22 15 St. Parliament King St. W. King St. E. King St. E. Peter St. Peter 19 9 1 31 Yonge St. Yonge 3 2 Bathurst St. Front St. W. Front St. W. 4 21 2929,35, 41 Bay St. Bay Lake Shore Blvd. W Bremner Blvd. 13 Spadina Ave. Lake Shore Blvd. W Gardiner Expressway 32 Queens Quay W. Lake Shore Blvd. W Queens Quay W. 18 14 10 FUNDING PARTIES - Bailleurs DE fonds Location Legend ANTIGUA AND BARBUDA ARGENTINA ARUba BAHAMAS CBC The Distillery District Brookfield Place 1 2 3 4 Union Station 205 Wellington St. W. 9 Trinity St. 161 Bay St. 65 Front St. W. BARbaDOS BELIZE BERMUDA BOLIVIA Royal Ontario Museum University of Toronto 5 CIBC Queen & Spadina 6 Royal Conservatory 7 8 378 Queen St. W. 273 Bloor St. W. 100 Bloor St. W. 91 Charles St. W. BRAZIL BRITISH VIRGIN ISLANDS CANADA CaYMAN ISLANDS 9 CIBC Commerce Court 10 Harbourfront Centre 11 Nathan Phillips Square 12 Allan Gardens 25 King St. W. 235 Queens Quay W. 100 Queen St. -
L U X U R Y B Y T H E L A
THIS PAGE GETS SPOT GLOSS www.benchmarksignaturerealty.com LUXURY BY THE LAKE 06 TORONTO’S HARBOUR, FRONT & CENTRE 52 HAVE A LAKE NIGHT 92 THE FUTURE OF HARBOURFRONT Discover year-round events Check out these popular spots This neighbourhood’s momentum is and activities on the waterfront. for divine drinks and dining. showing no signs of slowing down. THIS PAGE GETS FLOOD GLOSS VARNISH Sugar Beach AQUABELLA MAG_V17_Sep 20 revisions.indd 1-2 2016-09-20 5:05 PM LUXURY BY THE LAKE Exclusive waterfront homes from $1.0 million. AQUABELLA is a place where open concept goes far beyond the concept. Where a dynamic expression of large windows blur the boundary between the building and its setting. Providing an immersion in city and sky, AQUABELLA is uniquely designed to follow the contours of the lake with grand terraces, bordered by vast panoramas. Amid opportunities for living, working, shopping, dining and entertaining, AQUABELLA is luxury by the lake. tridel.com Tridel®, Tridel Built for Life® and Tridel Built Green. Built for Life® are registered trademarks of Tridel and used under license. ©Tridel 2016. All rights reserved. Buildings and views are not to scale. Features and finishes may vary by suite designs. Specifications and prices subject to change without notice. Illustrations are artist's concepts. E.&O.E. September 2016. AQUABELLA MAG_V17_Sep 20 revisions.indd 3-4 2016-09-20 5:05 PM HTO Park CONTENTS 06 TORONTO’S HARBOUR, 42 A PET’S PARADISE 66 A COMMUNITY CONNECTED FRONT & CENTRE Places you will love as much as Living in the new age of connectivity Discover year-round events and your furry friends. -
Now Until Jun 16. NXNE Music Festival. Yonge and Dundas. Nxne
hello ANNUAL SUMMER GUIDE Jun 14-16. Taste of Little Italy. College St. Jun 21-30. Toronto Jazz Festival. from Bathurst to Shaw. tolittleitaly.com Featuring Diana Ross and Norah Jones. hello torontojazz.com Now until Jun 16. NXNE Music Festival. Jun 14-16. Great Canadian Greek Fest. Yonge and Dundas. nxne.com Food, entertainment and market. Free. Jun 22. Arkells. Budweiser Stage. $45+. Exhibition Place. gcgfest.com budweiserstage.org Now until Jun 23. Luminato Festival. Celebrating art, music, theatre and dance. Jun 15-16. Dragon Boat Race Festival. Jun 22. Cycle for Sight. 125K, 100K, 50K luminatofestival.com Toronto Centre Island. dragonboats.com and 25K bike ride supporting the Foundation Fighting Blindness. ffb.ca Jun 15-Aug 22. Outdoor Picture Show. Now until Jun 23. Pride Month. Parade Jun Thursday nights in parks around the city. Jun 22. Pride and Remembrance Run. 23 at 2pm on Church St. pridetoronto.com topictureshow.com 5K run and 3K walk. priderun.org Now until Jun 23. The Book of Mormon. Jun 16. Father’s Day Heritage Train Ride Jun 22. Argonauts Home Opener vs. The musical. $35+. mirvish.com (Uxbridge). ydhr.ca Hamilton Tiger-Cats. argonauts.ca Now until Jun 27. Toronto Japanese Film Jun 16. Father’s Day Brunch Buffet. Craft Jun 23. Brunch in the Vineyard. Wine Festival (TJFF). $12+. jccc.on.ca Beer Market. craftbeermarket.ca/Toronto and food pairing. Jackson-Triggs Winery. $75. niagarawinefestival.com Now until Aug 21. Fresh Air Fitness Jun 17. The ABBA Show. $79+. sonycentre.ca Jun 25. Hugh Jackman. $105+. (Mississauga). Wednesdays at 7pm. -
Sugar Wharf Is a Community of Extraordinary Proportions
A WHOLE NEW COMMUNITY From Humber Bay to the Eastern Beaches, Toronto’s magnificent waterfront spans 46 kms. Under the direction of Waterfront Toronto, this highly desirable section of the city is undergoing a sea change. Created by the federal and provincial government and the City of Toronto, Waterfront Toronto has the mandate to transform the area into a vibrant public and cultural space for all Torontonians. Unequalled in size, it’s one of the largest urban revitalization projects in the world. The total area for development is 800 hectars in size, and is one of the largest revitalization projects in the world! Collaborating with developers like Menkes, Waterfront Toronto aims to create 40,000 new residences and approximately 40,000 new jobs. With the introduction of mixed-used neighbourhoods, offices, expanding public transit, parks, and public spaces, the waterfront will be a coveted place to live, work, learn and play. By adopting an economically and environmentally sustainable design approach, this reimagination will change the face of Toronto and deliver a positive, meaningful relationship between the lake and the city. THE LAKE. THE LIFE. THE CITY. LAKE SHORE BLVD E NEW ST COOPER ST Rising on the shores of Toronto’s waterfront, Sugar Wharf is a community of extraordinary proportions. FREELAND ST Striking the perfect work-life balance, this exceptional development will be the future-forward ideal today’s urban population seeks. Home to 7,500 residents, and 4,000 HARBOUR ST office workers once completed, this 11.5-acre community RETAIL PROMENADE offers homes, offices, shops, restaurants, school, daycare, park and more. -
Governance and Funding Options for Project: Under Gardiner and Class Environmental Assessment for Crossing of Fort York Boulevard
EX16.12 STAFF REPORT ACTION REQUIRED Governance and Funding Options for Project: Under Gardiner and Class Environmental Assessment for Crossing of Fort York Boulevard Date: June 20, 2016 To: Executive Committee Deputy City Manager, Cluster A From: Deputy City Manager, Cluster B Wards: Ward 19 – Trinity-Spadina Ward 20 – Trinity-Spadina Reference P:\2015\ClusterB\WF\EX16003 Number: SUMMARY This report recommends a governance and funding model for the programming, operations and maintenance of capital associated with Project: Under Gardiner (or "the Project"). Announced last year, the Project has been made possible by a $25 million donation from the Judy and Wilmot Matthews Foundation (the "Donor"). To date, the City has received $3 million, with the balance of funding to be provided once Council approves a governance and funding model satisfactory to the City, Donor and Waterfront Toronto, the parties to the Memorandum of Understanding ("MOU") for the Project. The full vision for the Project involves the transformation of a 10-acre, 1.75-kilometre linear area beneath the elevated Gardiner Expressway into a new east-west multi-use trail and network of public amenities extending from west of Strachan Avenue to Spadina Avenue. The first phase involves the 5.8-acre area between Strachan Avenue and Bathurst Street with a trail connection extending to Spadina Avenue. Planned elements for the first phase include the "Strachan Gate Timber Pier" structure which provides performance and spectator space, a pedestrian and cycling bridge across Fort York Boulevard, a 450-metre ice skating plaza and programming components to activate the public space on a year-round basis. -
130 Queens Quay E 1,915 SF for Sale: Office
Click Here for Virtual Tour! 130 Queens Quay E 1,915 SF For Sale: Office Here is where your business will grow. lennard.com 130 Queens Quay E 1,915 SF Office space located in the Waterfront Communities-The Island neighborhood in Toronto Suite Availability 819 Immediate Available Space Listing Agents 1,915 SF (approximately) Dillon Stanway Sales Representative Sale Price 416.649.5904 $2,290,000 [email protected] Condo Fees William J. Dempsey** $1,042.29 / month Partner Taxes 416.649.5940 $21,915.10 (2020) [email protected] **Broker Benefits • One of the best located and finished units in the East Tower • Top floor in east tower below the amenities. • Bright corner unit with great Views – 2 sides with full windows. • South and east facing – end of hall privacy. • Access to common amenity space with 2 high tech board rooms, lounge, large outdoor terrace & BBQ area over looking lake. • 24 hrs concierge • Bike locker room and shower room. • Secure heated storage locker available. Move In condition • Finished drop ceiling and premium carpet for sound attenuation • LED lighting throughout • 3 heat/cool zones with separate thermostats. • 5 private offices with glass side lights • 2 larger rooms with view • Separate kitchen with full fridge and dishwasher • Dividing half wall in open space • Extensively pre-wired for data and voip runs from server cupboard lennard.com 130 Queens Quay E lennard.com 130 Queens Quay E Building amenities Main Lobby Bike Storage Private Shower Facilities 130 Queens Quay E Common areas Private Meeting Rooms Rooftop -
West Don Lands Affordable Housing
Mill & Cherry Streets TE19.5.10 West Don Lands – Blocks 3, 4 and 7 West DonDon Lands Lands Affordable Affordable Housing Housing Lands Program Dream Kilmer Tricon selected to enter into a year land lease ith Infrastructure Ontario. Financing by Canada Mortgage and Housing Corporation through the Rental Construction Financing (RCFI) program. Affordable Units exempt from municipal fees through the City of Toronto's Open Doors Program. 0% of the units as affordable rental housing in a range of units sies (R to R) -50% Units 00% AMR -0% Units 0% AMR -0% Units 0% AMR View of WDL Block 8 from the Distillery District (currently under construction) 2 West Don Lands Blocks 3, 4 and 7 CORKTOWN COMMON BLOCK 8 BLOCK 20 3 West Don Lands History Municipal Planning Context West Don Lands Block Revised Block King-Parliament Central Waterfront Plan & Urban Design Plan & Plan of Secondary Plan Secondary Plan Guidelines Subdivision Downtown Plan 1996 2002 2003 2005 2006 2011 2019 West Don Lands Precinct City of Toronto Official West Don Lands Public Draft Secondary Plan Plan Plan Realm Master Plan Update Growth Plan for the Greater Golden Horseshoe 4 The Precinct Plan West Don Lands History Queen Street The West Don Lands is designed to nourish families in all phases of life. A variety of housing options and community services will suit a River Street broad market segment and enable residents to be comfortably St. Lawrence Street accommodated from youth to senior years. Class EA Master Plan (2005) Block Plan and Urban Design Guidelines (2006) sign associates 1 Family-Oriented Housing King Street An affordable mix of housing for families will include 20% of the total units for affordable rental housing. -
CONSTRUCTION NOTICE #9: Martin Goodman Trail Connection & Jarvis Dockwall Reinforcement Week of December 3 to December 7, 2012
November 30, 2012 CONSTRUCTION NOTICE #9: Martin Goodman Trail Connection & Jarvis Dockwall Reinforcement Week of December 3 to December 7, 2012 Jarvis Dockwall Reinforcement Caisson drilling will continue and is expected to be completed by mid-week. Crews may also begin site prep for the next stage of work which includes soil excavation and rock anchor drilling. What to Expect: There will be various truck movements in and out of the site, but no major traffic impacts are expected. Pedestrian access will be maintained at all times. Interim Martin Goodman Trail Connection With the installation of new concrete curbs from just east of Yonge Street to Dockside Drive and Corus Quay now complete, crews will begin pouring concrete for the new sidewalks in this area. Pier27 will remove their marketing hoarding in front of their property to facilitate this work. Redpath Construction Redpath’s western entrance (adjacent to Asphalt grinding and repaving on Queens Quay is also Pier27) is scheduled to be constructed this scheduled to begin this week. The grinding equipment is weekend, (Dec.1st-2nd), following approval expected to arrive this week and work will begin from just by the Redpath management. This east of Yonge Street and extend to the westside of Jarvis. entrance will reopen on Monday, rd December 3 at 6:00am. Last weekend, crews completed Redpath’s centre To accommodate this work, the TTC is planning to relocate entrance and driveway. the rails currently stored in the northside curblane on Queens Quay. We will provide notice of the exact date and time that this work is scheduled. -
Waterfront Toronto Launches
WATERFRONT TORONTO UNVEILS DESIGN SUBMISSIONS FOR JARVIS SLIP Foot of Jarvis Street to become key component in network of world renowned waterfront public spaces Toronto, January 18, 2008 – Waterfront Toronto has selected three distinguished teams to participate in a design competition to enhance the public space at the Jarvis Slip. The teams selected to participate in the design competition are: • Janet Rosenberg & Associates • Claude Cormier architectes paysagistes inc. • West 8 + DTAH Waterfront Toronto will hold a public exhibition of completed design proposals from January 21-25, 2008 at Metro Hall (55 John Street), and a review by a four member jury of prominent arts and design professionals leading to a February 01, 2008 announcement of the winner. “This is yet another opportunity for Waterfront Toronto to distinguish the public realm on the waterfront and in so doing, continue to build a great waterfront for Toronto” said John Campbell, Waterfront Toronto’s President and CEO. The intersection of Lower Jarvis Street and Queens Quay is a key gateway to the future East Bayfront community. Waterfront Toronto is sponsoring this Invited Design Competition to produce an innovative design and bring a fresh, new perspective to the one-acre site at the foot of Lower Jarvis Street. Designs are expected to readily accommodate large scale gatherings and performances without compromising its day- to-day informal usage. This space is seen as a complementary component of the public realm in the East Bayfront precinct, which will also include a revitalized Queens Quay, Sherbourne Park, Aitken Place Park, as well as the water’s edge promenade and public streets. -
The Downtown East Canary District Inside Canary House the Team
The Next Phase of Canary District – Volume 5 The Canary Inside The Downtown East District Canary House Team Introducing Canary House 2 The Downtown East 4 Canary District 18 A District of Visionaries 30 Inside Canary House 42 The Suites 66 The Team 74 Introducing Canary House The Next Phase of Canary District Canary House If you could reimagine city living, what would it look like, what would be different? With Canary House, we’re rewriting the script. Here, the boundaries of nature and home are redefined, where natural elements are complemented by contemporary design and unparalleled sophisticated finishes. Life at Canary House extends far beyond your suite and the array of hotel-inspired lifestyle amenities will be a part of everyday life. Discover an oasis in the heart of the Downtown East, introducing Canary House. 1 22 The Downtown East Union Station Billy Bishop Airport Financial District The Heart of Harbourfront King Station + Sugar Beach Downtown East St. Lawrence Market George Brown Canary District Waterfront Campus George Brown St. James Campus Distillery District Martin Goodman Trail Toronto’s next great neighbourhood is already here. Only minutes Future Corktown Station from the Financial District, St. Lawrence Market, the Distillery District and upcoming East Harbour, Canary District is the perfect place Design District to call home. It is also home to a world class incubator for up-and- 504A King St. Streetcar coming talent at George Brown College, hidden gems and local independent business. Here you’ll be surrounded by a thriving scene Cooper Koo Family YMCA of quaint pizzerias, boutique hotels and refreshing craft breweries, Gardiner Expressway not to mention some of the city’s most captivating greenspaces.