GOVERNMENT OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA

UNSTARRED QUESTION NO:7343 ANSWERED ON:15.05.2002 WORK PACKAGES ON NATIONAL HIGHWAY P.D. ELANGOVAN

Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state:

(a) the details of the work packages tendered so far and the successful bidders of those work packages National Highways-wise, the East West Corridor project and the Golden Quadrilateral project;

(b) whether the Government have decided to debar some of the road contractors entrusted with fourlaning works, previously; and (

(c) if so, the details thereof and the reasons therefor? Answer

THE MINISTER OF STATE OF THE MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (MAJOR GENERAL (RETD.) B.C. KHANDURI)

(a) Details are at Annex.

(b) & (c) M/s PT Sumber Mitra Jaya has been debarred in October, 2001, from participating in any bidding process due to non- adherence of contract conditions.

ANNEX REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 7343 FOR ANSWER ON 15.05.2002 ASKED BY SHRI P.D. ELANGOVAN REGARDING WORK PACKAGES ON NATIONAL HIGHWAY.

Details of work packages tendered so far and the successful bidders for East-West Corridor Project and Golden Quadrilateral Project.

Golden Quadrilateral Project (Completed Stretches)

Sl.No. Stretch NH Length State Name of the Contractor

1 Barwa Adda-BarakarKm 398.75 - km 442 2 43.00 Jharkhand BSC-RBM-PATI (JV) 2 Raniganj-PanagarhKm 475 - km 517 2 42.00 West Bengal BSC-RBM-PATI (JV) 3 Sira BypassKm 122 - km 116 4 5.80 Karnataka Maytas Infrastructure Ltd 4 Vijayawada-Rajamundry Section (near Eluru)Km 75 - km 80 5 5.00 Andhra Prad. Madhucon Projects Ltd 5 Gurgaon-KotputliKm 36 - km 162 8 126.00 Haryana (55)/Rajasthan (71) BSC-RBM-PATI (JV) 6 Jaipur Bypass Phase-IKm 283 - km 297 8 14.00 Rajasthan IRCON International Ltd 7 ROB at Kishangarh 8 1.00 Rajasthan M/s MSK (Project) Pvt. Ltd. Vadodara

Golden Quadrilateral Project (on-going works)

Sl.No. Contract, Stretch and State NH No. Length(in Km) Name of the Contractor

1 Agra-ShikohabadKm 199.66 - km 250.50Contract-IA of Agra-Sikandara 2 51 M/s Oriental Structural Engineers Ltd-Gammon 2 Shikohabad-EtawahKm 250.5 - km 307.5Contract IB of Agra-Sikandara Uttar Pradesh 2 59 China Coal Ltd 3 BypassKm 307.5 - km 321.1 Uttar Pradesh 2 14 Bhageeratha Engg. India & Ashwini Construction Co. (JV) 4 Etawah-RajpurKm 321.1 - km 393Contract IC of Agra-Sikandara Uttar Pradesh 2 73 M/s PATI-BEL 5 Sikandara-BhauntiKm 393 - km 470 through MDR route 16 km shorter.Contract-IIA of Sikandara-Khaga StretchUttar Pradesh 2 62 IT Thai & Som Dutt Builders India (JV) 6 -FatehpurKm 470- km 483(0) km 0-km38Contract IIB of Sikandara-Khaga Uttar Pradesh 2 51 M/s Somdutt-NCC-NEC (JV) 7 Fatehpur-KhagaKm 38 - km 115Contract IIC of Sikandara-Khaga Stretch Uttar Pradesh 2 76 Centrodorstroy Russia 8 Khaga-KokhrajKm 115 - km 158Contract III A of Khaga- Stretch Uttar Pradesh 2 43 IRCON International Ltd 9 Handia-VaranasiKm 245 - km 317Contract III C of Khaga-Varanasi Stretch Uttar Pradesh 2 72 Centrodorstroy Russia 10 Varanasi - MohaniaKm 317 - 329(0) km 0-km 65Contract IV A of Varanasi-Aurangabad Uttar Pradesh (55)/Bihar(21) 2 76 M/s PCL-Suncon (JV) 11 Mohania-SasaramKm 65 - km 110Contract IV B of Varanasi-Aurangabad Stretch Bihar 2 45 LG Engg. & Construction Ltd 12 Sasaram-Dehri on-soneKm 110 - km 140Contract IV C of Varanasi-Aurangabad Bihar 2 30 M/s Somdutt-NCC (JV) 13 Dehri on-sone - AurangabadKm 140-km180Contract IV D of Varanasi-Aurangabad Stretch Bihar 2 40 Ssangyong Korea-Oriental SE India 14 Aurangabad-BarachattiKm 180 - km 240Contract V A of Aurangabad-Barwa-Adda Bihar 2 60 Oriental Structural Engg. Ltd. & Gammon India Ltd (JV) 15 Rajgang - BarakataKm 240 - km 320Contract V B of Aurangabad - Barwa-Adda Bihar (10)/Jharkhand (70) 2 80 M/s L&T - HCC (JV) 16 Gorhar-Barwa AddaKm 320 - km 398.75Contract V C of Aurangabad - Barwa Adda Jharkhand 2 78.75 Progressive Const. Ltd. & Sunway Const. Ltd (JV) 17 Panagarh-PalsitKm 517 - km 581 West Bengal 2 65 Gamuda Malaysia-WLT Malaysia 18 Palsit-DankuniKm 581 - km 666(Durgapur Expressway) West Bengal 2 65 Consortium of Gomuda (Malaysia) & WCT Engineering (Malaysia) 19 Vivekananda Bridge and Approach West Bengal 2 6 SVBT Consortium of AIDC group (USA), STRADC (Philippines), L&T (India) 20 Westerly DiversionKm 868 - km 834Pune bypassMaharashtra 4 34.25 Ashoka Constructions & Birla GTM 21 Katraj-SaroleKm 825.5 - km 797Contract III of Pune-Satara Maharashtra 4 28.5 Satav Constt. Pvt Ltd and Dena Rehsaz 22 Katraj Realignment Km 825 - km 30 of BypassContract III of Pune Satara Maharashtra 4 9 M/s Shakti Kumar M. Sancheti Ltd 23 Sarole-WatharKm 797 - km 760 excluding km 773-km 781Contract II of Pune-Satara Maharashtra 4 28 Birla GTM Entrepose Ltd & B G Shrike Constt. Tech. Ltd 24 Wathar-SataraKm 760 - km 725Contract I of Pune-Satara Maharashtra 4 35 Skanska Cementation India Ltd 25 Satara-KagalKm 725 - km 592Satara-Maharashtra/Karnataka border Maharashtra 4 133 MSRDC 26 Maharashtra Border-BelgaumKm 592 - km 515Contract-III of Maharashtra/Karnataka Border-Haveri Karnataka 4 77 Consortium of IL & FS - Punj Lloyd - CTNL 27 Belgaum ByapssKm 515 - km 495Haveri - Maharashtra Border Section Karnataka 4 18 Sunway Constt. Berhad & R N Shettey & Co. 28 Belgaum - DharwadKm 495 - km 433Contract-II of Maharashtra/Karnataka Border-Haveri Karnataka 4 62 Sunway Constt. Berhad & R N Shettey & Co. 29 Hubli-HaveriKm 404 - km 340Contract-I of Maharashtra/Karnataka Border-Haveri Karnataka 4 64 Afcons-Apil (JV) 30 Haveri-HariharKm 340 - km 284Contract-V of Haveri-Tumkur Karnataka 4 56 UEM-ESSAR(JV) 31 Harihar-ChitradurgaKm 284 - km 207Contract-IV of Haveri-Tumkur Karnataka 4 77 UEM-ESSAR(JV) 32 Chitradurga bypassKm 207 - km 189Contract-III of Haveri - Tumkur Karnataka 4 18 Polomite-Al Sudershan (JV) 33 Chitradurga-SiraKm 189 - km 122.3Contract-II of Haveri-Tumkur Karnataka 4 66.7 UEM-ESSAR(JV) 34 Sira-TumkurKm 116.4 o km 75Contract-I of Haveri-Tumkur Karnataka 4 41.4 Larsen & Toubro 35 Tumkur BypassKm 75- km 62 Karnataka 4 13 A.L. Sudershan & Co. 36 Tumkur-NeelmangalaKm 62 - km 30 Karnataka 4 32 Jayaswals-Neco 37 Valejapat-KanchipuramKm 106.4 - km 70.2Contract-II of Krishnagiri-Ranipet- Tamil Nadu 4 36.2 Larsen & Toubro 38 Kanchipuram-PoonamaleeKm 70.2 - km 13.8Contract-I of Krishnagiri-Ranipet-Chennai Tamil Nadu 4 56.4 Afcon Infrastructure Ltd 39 Krishnagiri-VaniyambadiKm 0.0 - km 49.0Contract-V of Krishnagiri-Ranipet-Chennai Tamil Nadu 46 49 Patel KNR 40 Vaniyambadi-PallikondaKm 49.0 - km 100.0Contract-IV of Krishnagiri-Ranipet-Chennai Tamil Nadu 46 51 Skanska Cementation India Ltd 41 Pallikonda-Ranipet and Valejapet bypassKm 100.0 - km 145.0Contract-III of Krishnagiri-Ranipet-Chennai Tamil Nadu 46 45 Skanska Cementation India Ltd 42 Balasore-Bhadrak (OR-III)Km 136.5 - km 199.14Contract-I of Balasore-Chandikhole Orissa 5 62.64 ELSMEX-TWS-SNC (JV) 43 Bhadrak-Chandikhole (OR-II)Km 61 - km 136Contract-II of Balasore-Chandikhole Orissa 5 75 Larsen & Toubro 44 Bridges section (OR-V)Km 199 - km 61Contract-III of Balasore-Chandikhole Orissa 5 Gammon India Ltd 45 Chandikhole-JagatpurKm 28 - km 61 Orissa 5 33 KMC Constructions Ltd 46 Bhuneshwer-Khurda (OR-I)Km 387.7 - km 418 Orissa 5 30 Gammon-Atlanta 47 Khurda-Sunahala (OR-VI)Km 387.7 - km 335.642Contract-I of Khurda -Icchapuram Orrisa 5 52.058 SMJ-RKD-SD (JV) 48 Sunakhala-Ganjam (OR-VII)Km 338 - km 283Contract-II of Khurda Town-Icchapuram Orrisa 5 55 Progressive-Sitcco 49 Ganjam-Icchapuram (OR-VIII)Km 284 - km 233.2Contract-III of Khurda Town-Icchapuram Orrisa 5 50.8 Bumi-Hiway DDBL 50 Icchapuram-Korlam (AP 4B)Km 233 - km 200Contract-I B of Icchapuram-Vishakhapatanam 5 33 Skanska Cementation India Ltd 51 Korlam-Palasa (AP 4A)Km 200 - km 171Contract-I A of Icchapuram-Vishakhapatanam Andhra Pradesh 5 29 Skanska Cementation India Ltd 52 Palasa-Srikakulam (AP-2)Km 171 - km 97Contract-II of Icchapuram-Vishakhapatanam Andhra Pradesh 5 74 SPCL-IVRCL 53 Srikakulam-Champawati (AP-1)Km 97 - km 49Contract-III of Icchapuram-Vishakhapatanam Andhra Pradesh 5 48 You one-Maharia 54 Champawati-Vishakhapatnam (AP-3)Km 49 - km 2.8Contract-IV of Icchapuram-Vishakhapatanam Andhra Pradesh 5 46.2 Unitech-NCC (JV) 55 Bridges section (AP-6)Km 233 - km 98Srikakulam - Icchapuram Andhra Pradesh 5 Prasad & SEW (JV) 56 Bridges section (AP-5)Km 98 - km 2.8Contract-VI of Icchapuram-Vishakhapatnam Andhra Pradesh 5 Navyuga Engg. Ltd 57 Ankapalli-TuniKm 359 - km 300Andhra Pradesh 5 59 GMR Consortium 58 Tuni-DharmavaramKm 300 - 253Contract-I of Tuni- Andhra Pradesh 5 47 Consortium of Gammon-Punj Lloyd 59 Dharmavaram-RajahmundryKm 253 - km 200Contract-II of Tuni-Rajahmundry Andhra Pradesh 5 53 Consortium of Gammon-Punj Lloyd 60 Vivancheru (near Rajahmundry)- Gowthami (AP-17)Km 200 - km 164.5Contract-I of Rajahmundry-Eluru Andhra Pradesh 5 35.5 Punj Lloyd Ltd 61 Bridges Section (AP 19)Km. 162-Km. 200V-V Section Andhra Pradesh 5 0 Larsen and Toubro Ltd. 62 Gowthami-Gundugolanu (AP-18)Km. 164.5-Km. 80Contract-II of Rajahmundry-Eluru Andhra Pradesh 5 84.5 Limak-Soma (JV) 63 Bridges Section (AP 20)Km. 80-Km. 162V-V Section Andhra Pradesh 5 0 Larsen and Toubro Ltd. 64 Eluru-VijayawadaKm. 75-Km. 3.4Andhra Pradesh 5 72 Madhucon-Binapuri 65 Vijayawada-Chilkaluripet Package IKm. 355-Km. 380 Andhra Pradesh 5 25 IJM-Gayatri 66 Vijayawada-Chilkaluripet Package IIKm. 380-Km. 396.8Including Guntur Bypass (Km.0-Km.15.2) Andhra Pradesh 5 32 IJM-Gayatri 67 Vijayawada-Chilkaluripet Package IIIKm. 408-Km. 420.5Including Krishna bridge Approach (Km. 0-Km. 10.8)Andhra Pradesh 5 23.78 IJM-Gayatri 68 Vijayawada-Chilkaluripet Package IVKm. 10.8-Km. 13.68(1792 m Krishna Bridge + 1095 m Approach road) Andhra Pradesh 5 2.88 UPSBC 69 Chikaluripet-Ongole (AP-13)Km. 357.9-Km. 291Contract-I of Chilkaluripet-Nellore Andhra Pradesh 5 66.9 IJM-Gayatri 70 Ongole-Kavali (AP-12)Km. 291-Km. 222Contract-II of Chilkaluripet-Nellore Andhra Pradesh 5 69 HO_HUP-Simplex (JV) 71 Kavali-Nellore (AP-11)Km. 222-Km. 178Contract-III of Chilkaluripet-Nellore Andhra Pradesh 5 44 KNR-Patel (JV) 72 Nellore BypassKm. 178.2-Km. 161 Andhra Pradesh 5 17.2 Consortium of SomaEnterprises & Navayuga Engg Co, Ltd. 73 Nellore-TadaKm. 163.6-Km. 52.8Nellore-Chennai Section Andhra Pradesh 5 111 CIDBI Malaysia 74 Tada-Chennai (TN-1)Km. 52.80Km.11Contract-II of Nellore-Chennai Tamil Nadu 5 41.8 Larsen & Toubro Ltd. 75 Dhankuni-Kolaghar (WB-I)Km. 17.6 to Km. 72Contracat I of Dhankuni-Kharagpur West Bengal 6 54.4 RBM-PATI (JV) 76 Kolaghat-Kharagpur (WB-II)Km. 72 to Km. 136Contract II of Dhankuni-Kharagpur West Bengal 6 64 Hindustan Construction Company 77 Bridges section (WB-III)Total Stretch Km. 17.6-Km. 136Contract III of Dankuni-Kharagpur StretchWest Bengal 6 1.732 Bhageeratha Engg. Ltd. 78 Kharagpur-Laxmanath (WB-4)Km. 53.41-Km. 119.275Contract I of Kharagpur-Balasore West Bengal 60 65.86 B. Seenaiah Company Ltd. 79 Laxmannath-Baleshwar (OR-4)Km. 0-Km. 53.41Contract II of Kharagpur-Balasore Stretch Orissa 60 53.41 Larsen & Toubro Ltd. 80 Bridges Section (OR/WB-I)Km. 0-Km. 119.275Contract III of Kharagpur-Balasore Stretch Orissa 60 Gammon India Ltd. 81 Hosur-KrishnagiriKm. 48.6-Km. 94.0Common with North South Coridor Tamil Nadu 7 46.6 Shakti Kumar Sancheti Ltd. & Bhola Singh Jaya Prakash (JV) 82 Chittorgarh-MangalwarKm. 220-Km. 172Contract-V of Kishangarh-Udaipur Common with East West Corridor Rajasthan 76 48 Madhucon Binapuri (JV) 83 Mangalwar-UdaipurKm. 172-Km. 113.825Contract-VI of Kishangarh-Udaipur Common with East West Corridor Rajasthan 76 58.175 Sadhav-Prakash (JV) 84 Nasirabad-GulabpuraKm. 15-Km. 70Contract-II of Kishangarh-Udaipur Rajasthan 79 55.87 Punj Lloyd Ltd.-Progressive Constt. Ltd. 85 Gulabpura-Bhilwara BypassKm. 70-Km. 120Contract-III of Kishangarh-Udaipur Rajasthan 79 50 ECSB-JSRC (JV) 86 Bhilwara Bypass-ChittorgarhKm. 120-Km. 183Contract-IV of Kishangarh-Udaipur Rajasthan 79 66 B. Seenaiah & Co. (Projects) Ltd. 87 Kishangarh-Nasirabad Km. 363.9 (NH-8) to Km. 15 (NH-79) Contract-I of Kishangarh-Udaipur Rajasthan 79A 36.23 Sadbhav Engg. Ltd. 88 Jaipur Bypass Phase II Km. 221 of NH-8 - Km. 246 of NH-11 Chandwaji (Delhi-Jaipur Rd.)-Harmara (Jaipur-Sikar Rd.) Rajasthan 8 34.7 Punj Lloyd & Progressive Constt. Ltd. (JV) 89 Mahapura (near Jaipur)-Kishangarh Km. 273.5-Km. 363.885 Rajasthan 8 90.38 Consortium of GVK-BSCPL 90 Udaipur-Kesariaji Km. 278-Km. 340 Contract-I of Udaipur-Ratanpur-Chiloda (Near Ahmedabad) Rajasthan 8 62 KMC Constt. Ltd. 91 Kesariaji-Ratanpur Km. 340-Km. 388.4 Contract-II of Udaipur-Ratanpur-Chiloda (Near Ahmedabad) Rajasthan 8 48.4 Gayatri-Ranjit (JV) 92 Ratanpur-Himatnagar Km. 388-Km. 443 Contract-III of Udaipur-Ratanpur-Chiloda (Near Ahmedabad) Gujarat 8 54.6 Mudajaya-IRB 93 Himatnagar-Chiloda (Near Ahmedabad) Km. 443-Km. 495 Contract-IV of Udaipur-Ratanpur-Chiloda (Near Ahmedabad) Gujarat 8 52 Mudajaya-IRB 94 Ahmedabad-Vadodara Exp. Way Phase-I Km. 0.0-Km. 43.4 Gujarat 8 43.4 PT Sumber Mitra Jaya 95 Ahmedabad-Vadodara Exp. Way Phase-II Km. 43.3 (Nadiad-Dakor SH)-Km. 93.302 Gujarat 8 50 LG Engineering and Const. Co. & Nagarjun Const. Ltd. 96 Surat (Chalthan)-Atul Km. 263.4-Km. 343 Contract I of Surat-Manor Gujarat 8 79.6 SKEC-Dodsal 97 Atul-KaijaliKm. 343-Km. 381.6Contracat II of Surat-ManorGujarat 8 38.6 LG Constructions-Patel Engineering 98 Kaijali-ManorKm. 381.6-Km. 439Contract III of Surat-ManorMaharashtra 8 57.4 Larsen & Toubro

East-West Corridor (Phase-I)

99 Abu Road Deesa Section near Palanpur (EW/1)Km. 340 - km.350 (Completed) Gujarat 14 10.00 Dinesh Chandra R. Agarwal 100 Lucknow Kanpur Section (EW/2)Km. 11.38-Km.21.8 Uttar Pradesh 25 10.42 Villayati Ram Mittal 101 Lucknow-Kanpur (EW/3)Km. 59.5-Km. 75.5 Uttar Pradesh 25 16 Rana projects Int. Ltd. 102 Purnea-Gayakota (EW/4)Km. 410-Km. 419 & Km 470-Km 476.15 Bihar 31 15.15 Progressive Construction Ltd. 103 Dalkhola-Islampore (EW/5)Km. 447-Km.470 West Bengal 31 23 Progressive Construction Ltd. 104 Dalkhola-Islampore Sub section (EW/6)Km. 476.15-Km. 500 West Bengal 31 23.85 Lanco Construction Ltd. 105 Guwahati bypass (EW/7)Km. 156-Km. 163.895 Assam 37 7.9 Valecha Engineering Ltd. 106 Palanpur-Dessa (EW-11/GJ)Km. 350.00 to Km. 370.70 Gujarat 14 22.7 Dinesh Chandra R. Agrawal 107 Lucknow-Kanpur section (EW-8/UP)Km. 21.80 to Km. 44.00 Uttar Pradesh 25 22.2 Villayati Ram Mittal 108 Lucknow-Kanpur section (EW-9/UP)Km. 44-Km. 59.5 Uttar Pradesh 25 15.5 BRA-TRG-Bharat (JV) 109 Purnea-Goyakota section (EW-12/BR)Km. 419-Km. 447 Bihar 31 28 Lanco-Rani (JV) 110 Guwahati Bypass (EW-14/AS)Km. 146.00 to Km. 156.50 Assam 37 10.5 BLA-CISC-C&C (JV) 111 Lucknow Bypass (EW-15/UP)Connecting NH-25 and NH-28 via NH-56Passing through Lucknow . Uttar Pradesh 6A&56 23 Prakash-Atlanta (JV) 112 Gondal to Ribda section (EW-10/GJ)Km. 143-Km. 160 Gujarat 8B 17 Tarmat-Back Bone (JV)