Maps and Diagrams

Total Page:16

File Type:pdf, Size:1020Kb

Maps and Diagrams OLD SALT PERTH Maps, Plans and Diagrams The following diagrammatic aids (maps, plans, renderings and schematics) are to be used in conjunction with the descriptions and contexts provided before each diagram. Swan Canning Riverpark Concept Footprint As illustrated on this diagram, the venue Old Salt Perth will be positioned roughly 150m South from the apex of the ferry paths, 400m out from the Elizabeth Quay development. The depth at this location is an average of roughly 1.3m at lowest astronomical tide, allowing sufficient space for the submerged portion of the venue. Entry to the venue is proposed to occur by private water transport (approx. 38 patrons each trip) from a privately subleased jetty (Jetty 2) from Perth Water Transport/Rottnest Express. Transfers to and from the venue will take approximately 10 minutes, calculated from appropriate speed restrictions on each travel route as well as safe loading/unloading time and safety briefing. The venue is proposed to be secured in place through a four point mooring arrangement. The arrangement is both the safest and most environmentally sound. The mooring arrangement will be permanently placed year-round (aside from maintenance checks, movement for special events or at the Dept. Parks and Wildlife’s / Swan River Trust’s discretion). Total Development Footprint = 437.9m2 Total Development Footprint50m scale = 445.3m2 Coordinates: -31.961798, 115.854822 Coordinates: -31.962564, 115.853400 50m scale 4 -Point Mooring System As designed by Naval Architects MMD, this mooring system is the safest (when 1/20, 1/50 and 1/100 year storms are taken into account) and most environmentally sound solution to permanently positioning the venue. This is discussed in more detail in the Mooring Analysis and Mooring Contingencies included in wider Submission Documentation. Swan Canning Riverpark Concept Footprint As above, zoomed in, with actual venue superimposed and ferry routes positioned on either side. The venue is positioned at a safe distance from neighbouring ferry routes in order to be highly visible and additionally be undisturbed by commercial vehicle wake. Depth Analysis Taken from Swan Canning River Nautical Chart WA898, this chart has assisted in the proposed safe placement of the venue to maximise visibility from Elizabeth Quay, whilst also maximising floor clearance in the event of a low tide. The lowest astronomical tide heights indicate the venue should not be placed too close to the Point Belches Water Ski Area, or on the Eastern side of the ferry channel in the dredged zone. Given accessibility through the channel markers from Elizabeth Quay, the star marker represents the best possible location for the venue. Proposed water charter from Barrack Street Jetty Ensuring that the channel markers are followed accurately, all private transport to and from the venue will be roughly 500m from Barrack Street Jetty. Water charter can occur every 10 minutes during venue open times, allowing for minimised congestion and a high degree of control over patrons entering and exiting the venue. Ferry Route (Barrack St Jetty to Old Salt) Floor Plan The Floor Plan illustrates the distribution of available space between necessary service facilities and space for patrons. Space allocations have been made to ensure safety and compliance from all aspects of design and operation. Capacity Overlays (different function options) Given that the primary focus of this venue will be unique event activations, the design focus has been around versatility of setup (ability to convert from a full formal sit-down layout, to a custom event space layout). The three layouts represent our key event concepts for launch: 1) Blank canvas space for cooperate hire, live music events, open-air cinema screenings 2) Casual seating for corporate hire and relaxed day and night events with live music 3) Formal seating for corporate hire, weddings, brunch and sit down events 1. 2. 3. Raw Body Design (actual structure) These structural drawings are for the actual barge proposed, which will be custom built contingent on approvals. The overall size is 36.5m by 12.2m with a moulded depth of 2.6 and deck capacity of 10T per m2 W.B.T W.B.T W.B.T W.B.T W.B.T W.B.T W.B.T W.B.T Emergency Locations Diagram The objective of the Emergency and Security Management Plan is to clearly outline the process to be followed in the event of an emergency situation occurring at Old Salt Perth. This map is to be used in conjunction with the locations detailed in the plan. This map will be included in highly visible spaces on the venue and the transfer vessel. Staffing Areas The staffing for each event will range from 8-13 crew. For an event at maximum capacity (250) the staffing number required is 13 crew consisting of the ‘core complement’, security, lifeguard, bar and kitchen staff. Please refer to the Safety Management System for all details regarding crewing, roles and responsibilities. The core compliment consist of: 1. Master (Operations Manager) - who looks after the transfer vessels, briefings and safe loading and unloading (venue always in line of sight) 2. Engineer - who looks after mechanics on both vessels 3. Licensee (Chief Warden) - who looks after venue itself and staff/crew on board Staffing notes: * The Master will transfer between Barrack St Jetty, the transfer boat and the venue * The Engineer and Licensee will remain positioned on the venue for events * The Security guard located at Barrack St Jetty will transfer to the venue once all patrons are on board MULTIPLE POSSIBLE POSITIONS OF STAFF Concept Renderings As follows are additional concept renderings which illustrate the venue’s aesthetic potential. The renderings are preliminary and are intended to demonstrate the capabilities of a minimal, yet character filled event space on the Swan River. .
Recommended publications
  • Swan and Helena Rivers Management Framework Heritage Audit and Statement of Significance • FINAL REPORT • 26 February 2009
    Swan and Helena Rivers Management Framework Heritage Audit and Statement of Significance • FINAL REPORT • 26 FEbRuARy 2009 REPORT CONTRIBUTORS: Alan Briggs Robin Chinnery Laura Colman Dr David Dolan Dr Sue Graham-Taylor A COLLABORATIVE PROJECT BY: Jenni Howlett Cheryl-Anne McCann LATITUDE CREATIVE SERVICES Brooke Mandy HERITAGE AND CONSERVATION PROFESSIONALS Gina Pickering (Project Manager) NATIONAL TRUST (WA) Rosemary Rosario Alison Storey Prepared FOR ThE EAsTERN Metropolitan REgIONAL COuNCIL ON bEhALF OF Dr Richard Walley OAM Cover image: View upstream, near Barker’s Bridge. Acknowledgements The consultants acknowledge the assistance received from the Councillors, staff and residents of the Town of Bassendean, Cities of Bayswater, Belmont and Swan and the Eastern Metropolitan Regional Council (EMRC), including Ruth Andrew, Dean Cracknell, Sally De La Cruz, Daniel Hanley, Brian Reed and Rachel Thorp; Bassendean, Bayswater, Belmont and Maylands Historical Societies, Ascot Kayak Club, Claughton Reserve Friends Group, Ellis House, Foreshore Environment Action Group, Friends of Ascot Waters and Ascot Island, Friends of Gobba Lake, Maylands Ratepayers and Residents Association, Maylands Yacht Club, Success Hill Action Group, Urban Bushland Council, Viveash Community Group, Swan Chamber of Commerce, Midland Brick and the other community members who participated in the heritage audit community consultation. Special thanks also to Anne Brake, Albert Corunna, Frances Humphries, Leoni Humphries, Oswald Humphries, Christine Lewis, Barry McGuire, May McGuire, Stephen Newby, Fred Pickett, Beverley Rebbeck, Irene Stainton, Luke Toomey, Richard Offen, Tom Perrigo and Shelley Withers for their support in this project. The views expressed in this document are the views of the authors and do not necessarily represent the views of the EMRC.
    [Show full text]
  • Broadcasting Station Particulars (Contd.)
    YEAR BOOK OF COMMERCIAL BROADCASTING 73 72 YEAR BOOK OF COMMERCIAL BROADCASTING 1940 1940 Station Particulars {contd.) neer: H. Simmons. Other technical staff: M. Uquhart, 7BU BURNIE J. Tapper. Official operating power: 200 watts. Wavelength: 455 Representatives: Melbourne: B. Rieusset. Western Broadcasting Australian offices: A.P.A. Building, 379 Collins Street. m., 660 kC/s. 61X PERTH Operating company: Burnie Broadcasting Service Pty. Ltd., Wilson Street, Burnie, Tas. Phone 125. Box No. Official operating power: 500 watts . Wavelength: 242 Station 6PM FREMANTLE 101. Telegraphic: SEVENBU. m., 1,240 kC/s. Network affiliation: Tasmanian Broadcasting Network, Operating company: W.A. Broadcasters Ltd. Lyric Official operating power: 500 watts. Wavelength: 216 House, Murray Street, Perth, W.A. Phone, B9322. Box Particulars (contd.) Macquarie. m., 1,390 kC/s. Location of studios: Wilson Street, Burnie. Trans- No. N1079. Telegraphic: SIXIX. Operating company: 6PM Broadcasting Ltd., St. Network affiliation: Major Broadcasting Network. mitter: Wilson Street, Burnie. George's House, St. George's Terrace, Perth. Phone, TASMANIAN STATIONS Directors: A. P. Findlay (managing director), P. A. Location of studios: Murray Street, Perth. Transmit­ B 3000-B 4921-B 8484. Box No. D 187. Telegraphic, ter: St. George's Terrace, Perth. Findlay, A. D. Towner. General manager: Arthur D. WHITNET. Towner. · Studio manager: Reg. McMaster. Sales mana­ Directors: F. C. Kingston, H. Greig, H. B. Jackson, Seal< ~ Network affiliation: Whitford Broadcasting Network. 0 • •0 ger: Arthur D. Towner. Secretary: P. A. Frith. An­ C. P. Smith, M.D'O. Musgrove. General manager: B. liwlii;;I 'W--:W Location of studios: St. George's Terrace, Perth. nouncers: Reg.
    [Show full text]
  • Vision and Transition Strategy for A
    Vision and Transition Strategy for a Water Sensitive Greater Perth CRCWSC Integrated Research Project 1: Water Sensitive City Visions and Transition Strategies 2 | Vision and Transition Strategy for a Water Sensitive Greater Perth Vision and Transition Strategy for a Water Sensitive Greater Perth IRP1 WSC Visions and Transition Strategies IRP1-4-2018 Authors Katie Hammer1,2, Briony Rogers1,2, Chris Chesterfield2 1 School of Social Sciences, Monash University 2 CRC for Water Sensitive Cities © 2018 Cooperative Research Centre for Water Sensitive Cities Ltd. This work is copyright. Apart from any use permitted under the Copyright Act 1968, no part of it may be reproduced by any process without written permission from the publisher. Requests and inquiries concerning reproduction rights should be directed to the publisher. Publisher Cooperative Research Centre for Water Sensitive Cities Level 1, 8 Scenic Blvd, Clayton Campus Monash University Clayton, VIC 3800 p. +61 3 9902 4985 e. [email protected] w. www.watersensitivecities.org.au Date of publication: August 2018 An appropriate citation for this document is: Hammer, K., Rogers, B.C., Chesterfield, C. (2018) Vision and Transition Strategy for a Water Sensitive Greater Perth. Melbourne, Australia: Cooperative Research Centre for Water Sensitive Cities. This report builds directly on “Shaping Perth as a Water Sensitive City: Outcomes and perspectives from a participatory process to develop a vision and strategic transition framework”, which was the output of a precursor CRCWSC project, A4.2 Mapping water sensitive city scenarios. Acknowledgements The authors would like to thank the Water Sensitive Transition Network for their ongoing enthusiasm and commitment to the water sensitive city agenda in Perth.
    [Show full text]
  • Student City
    Central Perth Over the past five years, central Perth has been 4 transformed through significant government 13 investment in city shaping projects and 3 15 7 leveraging of existing cultural facilities. 11 Perth 6 Busport 16 Student City 14 8 10 Wellington Street Perth Train This has been strengthened through private investment in international Station 5 Murray Street tourism, tertiary education and purpose built student accommodation (PBSA). An investment in PBSA in central Perth allows students to live at the heart Hay Street of Perth’s cultural and entertainment infrastructure, offering unrivaled 2 17 12 St Georges Terrace Adelaide Terrace lifestyle, employment opportunities and the ability to influence the ongoing Barrack Street Barrack Elizabeth Street William transformation of the central city. Quay Busport Riverside Drive EDUCATION INVESTMENT Elizabeth Quay Train Station 9 1 University of WA 9 Elizabeth Quay | $2.6B 2 CQ University 10 Perth City Link | $1.4B 3 TAFE (Northbridge campus) 11 WA Museum | $0.4B 4 TAFE (East Perth campus) 12 Riverside | $2.2B 5 Curtin University (CBD campus) 13 Perth Stadium | $1.3B City of Perth boundary APPROVED PBSA VITALITY 6 89–95 Stirling Street 14 Perth Arena 15 Northbridge PROPOSED PBSA 16 Perth Cultural Centre 1 7 80 Stirling Street 17 8 Lot 4 – Perth City Link New City of Perth Library Opportunities Quick stats International Education has been identified as a key growth industry for Perth and Western Australia, benefiting from our proximity to the Asia Pacific and strong tertiary education sector. An opportunity exists for developers to address a shortfall of Purpose Built Student Accommodation in the central city area.
    [Show full text]
  • Stepping Stones
    The Perth Mint is one of Perth's most impressive This ore obelisk (popularly Colonial-era buildings and is registered with the referred to as the 'rock kebab') is a National Trust. Built of Quaternary Tamala memorial to State progress. Limestone, the Mint opened in 1899, minting gold Erected in July 1971 , it celebrated sovereigns. After the introduction of decmal jointly the millionth citizen and the currency in 1966 the Perth Mint had produced a decade-long exploration and staggering 855 million one-cent and two-cent mining boom between 1960 __ .,......._ ,.... ,.,_!_.,. coins by 1973. It now mints and markets gold, 1970. It has elicited a range of silver, and platinum Australian legal tender reactions' Designed by architect coinage to investors and collectors worldwide. A Paul Ritter, this 15 m oil-well drill heritage building, gold bullion and nuggets, pipe has 15 different ores precious-metal souvenirs, and a real gold pour threaded onto it, all from Western (liquid gold poured into an ingot) combine to Australia. showcasing the wea lth make the Perth Mint a popular tourist attraction and diversity of our mineral www.perthmint.com.au treasure www.publicartaroundtheworld.com 4. Kangaroos drinking, stirling Gardens The boundary walls and floor of the reflection pool adjacent to Ritter 's Pole (where the kangaroos drink) are made of Toodyay Stone, a light-green rock with sparkling surfaces. The rock is an Archean metamorphosed quartz sandstone, now a quartzite, quarried atToodyay, about 70 km east of Perth. Pale-green fuchsite (a chrome-rich mica) on its surfaces make it sparkle in the sunlight.
    [Show full text]
  • BUILDING and DEVELOPMENT APPLICATIONS RECEIVED for the PERIOD 12/06/2019 to 18/06/2019
    BUILDING AND DEVELOPMENT APPLICATIONS RECEIVED FOR THE PERIOD 12/06/2019 to 18/06/2019 Attached for your information is a list of building, planning and technical applications received for last week. LODGEMENT PROCESSED / APPLICATION APPLICATION RENEWED ADDRESS DESCRIPTION TYPE VALUE NUMBER 13/06/2019 1 Barrack Square Hoarding - 25 months HG $0.00 2017/22 PERTH WA 6000 13/06/2019 1 Barrack Square Hoarding & Gantry - 12 months HG $0.00 2017/23 PERTH WA 6000 13/06/2019 "BUTTERWORTH BUILDING" Hoarding - 3 Months HG $0.00 2019/25 886-890 Hay Street PERTH WA 6000 13/06/2019 1 Barrack Street F&B Works - Fitout of food and beverage areas for the Ritz BPC $18,000,000.00 2019/361 PERTH WA 6000 Carlton Hotel within basement (B1 and B3), podium (G to L5) and club lounge (L6) 14/06/2019 570 Wellington Street Building works on level 8, sprinkler system, fire detection OCCP $43,518.00 2019/373 PERTH WA 6000 and alarm system 13/06/2019 "PARMELIA HOUSE" Partial demolition and internal fitout of existing office - BPC $450,000.00 2019/403 191 St Georges Terrace Level 15, 1813493 Hawaiian PERTH WA 6000 17/06/2019 "THE QUADRANT" Office Fitout - GF,1 (Part Floors), 2,3,16 and 17 (Full BPC $6,173,942.00 2019/437 1 William Street Floors). Tachnip FMC PERTH WA 6000 12/06/2019 Unit 22/326 Hay Street Final stage work of internal fitout work for remedial BPC $4,000.00 2019/438 PERTH WA 6000 massage shop: Internal accessible shower plumbing fitting works, and modification to shopfront.
    [Show full text]
  • City of South Perth Water Management Plan 2017-2022 Page I
    City of South Pe rth Water Management Plan 2017 -2022 Prepared by the City of South Perth and Eastern Metropolitan Regional Council March 2017 Acknowledgements The City of South Perth recognises the effects of the drying climate induced by climate change and has committed to improving the City’s and the community’s water management through participating in the Waterwise Council program. The City in partnership with Eastern Metropolitan Regional Council (EMRC) has developed the Water Management Plan (2017-2022) to continue to improve water management practices within both corporate and community sectors. The preparation of this report required considerable effort, resources and coordination between the City’s relevant officers and the EMRC. The City of South Perth would like to thank its staff members for their contribution and support in the development of the Water Management Plan (2017-2022). The City would especially like to thank the members of the Water Team who gave up their valuable time to review and guide the development of the Water Management Plan (2017-2022). Water Team Yulia Volobueva, City Environment Coordinator Adele Scarfone, Natural Resource Management Officer Shirley King Ching, Building and Asset Coordinator Richard Bryant, Reticulation Supervisor John Murray, Streetscapes Supervisor Chris Simondson, Parks Maintenance Officer Geoff Colgan, Parks Operations Coordinator Peter Beach, Collier Park Golf Course Superintendent Len Dalton, Works and Services Coordinator Lewis Wise, Infrastructure Projects Coordinator, Engineering
    [Show full text]
  • April, 1940 Page 5 •
    OFFICIAL ORGAN OF THE RE<;!ST ERED :\T TH E (;.P.O., PERTH, APRIL, 194 0 r n R TR :\~SMJSS J O:-J BY POST .'\S :\ R.S.S. I.LA. (\V A. BR,\NCH) ' :J:','.';;P:\PER. VOLU ME 19 NO. 4 ANZAC COVE. GALLIPOLI F>·om a pai11ti11g by C. R. Crozier ·'The Australian and New Zealand trtx>ps have indeed proved themsdves worthy sons of the Empire." April, 191 5. GEORGE R.I. ... ' . THE L JSTENI:'\1. I'.'J.H . ~trfl. A j' r d. f <).I(J The Western Machinery Gompany are carrying Large Stocks of BRITISH ENGINES (NATIONAL DIESEL) from 3! to 90 horse-power in Perth and Kalgoorlie Stocks. They have the latest American Rock Drill-Thor ( Cochise) . Large Stocks available and no delivery problems. Canadian-Longyear Diamond Drills. Outboard Motors for your Fishing Holidays. Cotton Waste. Drill and T ool Steel from Great Britain. Call, Write or 'Phone 494 Murray Street, Perth Telephones: Office 87764 ' T. C. Faicley: F2945 86648 I • '· ' i CITY HOTELS, CITY CAFES, CITY CAFETERIAS, SUBURBAN STORES, i COUNTRY STORES ! and now again Australian Military Camps and Royal Australian Naval U~its have: sc:lc:cud I ·i JOHNSTON'S Quality Meat i ' . aud .. dc:ltnousl v di(f c:reut' · l SAUSAGES AND SMALLGOODS FOLLOW TiiB TROOPS-BUY JOHNSTON'S PROM YOUR LOCAL STOREKEEPeR I •. W. 0. Johnston & Sons 382 BBAUFORT STREBT, PBRTH. STORES QUOTBD WITH PLBASUR.E. 'PHONES 84547, 87021. "THE FACTORY IN T HE GARDEN" - - 'The Listening_ The official o•gan of the W.A. B.anch R.S.S.l.L.A.
    [Show full text]
  • Venue Info Elizabeth Quay
    VENUE INFO The Big Top at Elizabeth Quay is located in Perth CBD’s newest exciting event space directly opposite the Esplanade Train Station and within minutes walk of both Bus and Ferry links. See the location map below. ELIZABETH QUAY MAP FAQs Parking? Perth Convention & Exhibition Centre is the closest (across the road to the West), directly behind Esplanade Train Station. There is another smaller parking centre across the road on The Esplanade. There are approximately 5,000 car parking bays within a 10 minute walk. What are the public transport options? By Train: Esplanade Train Station is across the road from the Brick Man Experience tent. By Bus: Buses depart from the bus station behind the Esplanade Train Station. Many bus services depart and arrive at the Elizabeth Quay Busport including the free CBD ‘Blue and Green CAT’ service. By Ferry: Elizabeth Quay Jetty is 25 metres from the Brick Man Experience tent. A ferry service operates across the Swan River between Elizabeth Quay Jetty (Perth) and Mends Street Jetty (South Perth). Services operate daily from 7:50am to 7:20pm For all bus, train or ferry information, or to plan your journey, please contact Transperth on 13 62 13 or visit their website. For hearing impaired please contact (08) 9428 1999. What is the price for concessions and seniors? We will post this information when the event goes on sale from 9AM Wednesday March 16th. Session times – how long can we stay in session? You can stay for up to 90 minutes inside the exhibition. Group Bookings Group Bookings can be arranged by calling 1300 889 278 or [email protected] Can you buy tickets at the door? Yes , tickets will be available however we strongly encourage you to buy tickets before you arrive so ensure you can secure tickets for your preferred session time.
    [Show full text]
  • • Boom • Bust Visitperthcity.Com
    • WALKING TRAIL • TRAIL • WALKING • BOOM • • BOOM BUST VISITPERTHCITY.COM OR www.visitperthcity.com Convicts & Colonials Icons of Influence Parks & Gardens Public Art iCity Visitor Service Street Mall (near Forrest Place), Perth Murray City of Perth Council House, 27 St George Tce, Perth can be accessed Audio versions of these trails by going to The trail intersects with the city’s free CAT buses with the city’s free CAT intersects The trail servicing East Perth, Northbridge, West Perth, Perth and the foreshore. central Day) Christmas and Day ANZAC (except Good Friday, TRAILS: CITY WALKING OTHER This self-guided trail will take up to two will take This self-guided trail hours. You can join in or depart from the along the way. trail anywhere This historical walk through Perth city will highlight the ‘boom’ created by gold and the surge of growth, wealth and prosperity in Western Australia that followed. The city’s population swelled from 8,500 to over 27,000 in a decade and it seemed Perth would ‘bust’ as this remote town turned into a buzzing cosmopolitan city. MCNESS ROYAL ARCADE LONDON COURT WILLIAM STREET 3 CORNER HAY AND BARRACK STREETS 5 BETWEEN HAY STREET MALL 7 AND ST GEORGES TERRACE McNess Royal Arcade (1897) is a great demonstration of First known as King William Street after King William IV, Next door to the Theatre Royal, this mock Elizabethan the wealth that poured into Perth from the Goldfields. the uncle of Queen Victoria, this street served as a major reproduction of an old London street was built in 1937 as Designed by American architect William Wolf, it was thoroughfare for the camel trains that supplied the Goldfields.
    [Show full text]
  • Barrack St and Wellington St Road Works
    Barrack St and Wellington St road works Sinking the Fremantle Line from William Street to Lake/King Streets is the first stage of the Perth City Link – a Federal, State and Local Government project to reconnect the CBD and Northbridge. To allow upgrades in Perth Station to occur as part of this project, works will take place on the FEBRUARY 2012 Barrack Street Bridge (April 2012 - late 2012) and Wellington Street (May 2012 - mid 2013). Description of works Changes to traffic conditions are shown on the map to the right. All access for the Citiplace complex, and from Perth Station into Forrest Alternative bus stops Pedestrian access Place, will remain open throughout the work. Road lanes Construction area This work includes closing and removing the staircase on the Wellington Street side of the Horseshoe Bridge. Impact during construction Barrack Street Bridge Wellington Street Motorists No impact to the two northbound lanes. From William Street to Forrest Place, Wellington Street will Southbound lanes will close. Motorists connecting be one lane in both directions. from Roe Street to Wellington Street should find From late 2012 the two westbound lanes will be alternate routes, such as the Horseshoe Bridge or reinstated. Eastbound will remain as one lane until mid Lord Street. 2013. Cyclists As per the current arrangement, cyclists are As per the current arrangement, cyclists are required to required to travel with road traffic during this work. travel with road traffic during this work. Southbound cyclists wishing to continue using this route must dismount and use the footpath. Pedestrians Access, including ramps, into Citiplace and Perth Access from Perth Station to Forrest Place will remain.
    [Show full text]
  • BUILDING and DEVELOPMENT APPLICATIONS RECEIVED for the PERIOD 11/12/2019 to 17/12/2019
    BUILDING AND DEVELOPMENT APPLICATIONS RECEIVED FOR THE PERIOD 11/12/2019 to 17/12/2019 Attached for your information is a list of building, planning and technical applications received for last week. LODGEMENT PROCESSED / APPLICATION APPLICATION RENEWED ADDRESS DESCRIPTION TYPE VALUE NUMBER 11/12/2019 14 Kakulas Crescent Front fence BPC $5,000.00 2019/1011 NORTHBRIDGE WA 6003 12/12/2019 "GLOBE BACKPACKERS & OASIS Forward works Piling and piling mat - Wellington PBSA BPC $1,430,000.00 2019/1012 RESORT" 553-561 Wellington Street PERTH WA 6000 17/12/2019 "AMP BUILDING" Internal fitout and hoarding - Level 27 - Halliburton BPC $35,140.00 2019/1013 140 St Georges Terrace PERTH WA 6000 12/12/2019 225 St Georges Terrace Internal office fitout BPC $250,000.00 2019/1014 PERTH WA 6000 12/12/2019 42 Bennett Street 4 x ACM Panel signs fixed to building BPC $3,000.00 2019/1017 EAST PERTH WA 6004 16/12/2019 469 Murray Street Full demolition of 469-471 Murray and 39-47 Milligan St DEMO $460,000.00 2019/1019 PERTH WA 6000 13/12/2019 "PERTH SKY GARDEN" installation of solar PV system on roof of existing building BPC $61,520.00 2019/1020 Unit 1-81/239 Adelaide Terrace PERTH WA 6000 17/12/2019 Unit 601/112 Mounts Bay Road Permanent change of the use classification from serviced OCCP $0.00 2019/1021 PERTH WA 6000 apartment to permanent residential. 16/12/2019 125 Barrack Street Commercial Fit Out - Summer Star (Bon Bon Char) OCCP $70,000.00 2019/1027 PERTH WA 6000 13/12/2019 "BIRD CAMERON BLDG" Hoarding - 3 Months HG $0.00 2019/49 8 St Georges Terrace PERTH WA 6000 17/12/2019 "PARMELIA HILTON" Gantry - 6 Months HG $0.00 2019/50 14-20 Mill Street PERTH WA 6000 16/12/2019 18-20 Howard Street Conservation and maintenance works to the external DA $250,000.00 2019/5454 PERTH WA 6000 facades of No 18 and No 20 Howard Street.
    [Show full text]