SHEET TOTAL STATE STATE PROJECT REFERENCE NO. NO. SHEETS
S n o L u A k t a r h m 50138.3.63 b e N.C. k u STATE OF NORTH CAROLINA r 1 a l r h n C C S t STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION u g 2771 a r
D r 85 50138.1.63 HSIP-0485(039) P.E. G R/W a llo w G w $ 50138.2.63 HSIP-0485(039) a o a y R a y R d ll d 485 DIVISION OF HIGHWAYS $ 50138.3.63 HSIP-0485(039) CONST.
J MECKLENBURG B PROJECT %29 1 0 LOCATION: I-485 NORTH BOUND RAMP AT US 29, 0.26 MILES WEST OF PAVILION BLVD. 6 S ir C L n A a o n W n r D e a t th n o iv H n a y B l
e D u S
M r
5 t r n t r ia n
g y D e
a L D fr
d a r ie
n k n
l e e d P B e l D n d R r a r e d d B id o - r h 2679 S t d rt D S t a n RESURFACING, RECONFIGURING SIGNALS, AND o e h m N s n c TYPE OF WORK: t ire F re C h S S rt e Elysian o d t THERMOPLASTIC PAVEMENT MARKINGS. r N a
e n
la F i
3047 p e
e H s l
E d 85 P e s
k o r
i it S n a t 485 t g C D r e
W $ h $ u
: r c h S R 29 to n e d 2472 Q % u a P r ry R d I VICINITY MAP NOT TO SCALE
T S T .) ON T R Y T H N OR 2 9 ( U S 16+63.87 -L- END RESURFACING
N 3 O R T H
6 B
. O U N D
3 R A M . P I-
8 4 8 5 3 1 0
5 10+04.95 -L- BEGIN RESURFACING : T
Prepared in the Office of: DIVISION OF HIGHWAYS C GRAPHIC SCALES DESIGN DATA PROJECT LENGTH DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA DIVISION TEN O F N H 0 50 100 O E DIVISION DESIGN / CONSTRUCT UNIT I S I O N I ADT = V I G S N O R T H F C H 2012 STANDARD SPECIFICATIONS I O A 1 I R D E O 0 W J ADT = T L PLANS V A I A T N I S A DHV % Y = D D
0 50 100 RIGHT OF WAY DATE: E S D RANDY BOWERS N : 50138.3.63 0.12 P LENGTH OF ROADWAY PROJECT = MILES I O A % PROJECT ENGINEER V
O D = I T I R I 7/6/2016 N/A S T T N I M A TOTAL LENGTH OF STATE PROJECT = MILES : 50138.3.63 0.12 O E T U PROFILE (HORIZONTAL) T = % N N R APPROVED BY T O T D S P C DDC ENGINEER DATE E O F T R A N U S T R V = MPH LETTING DATE: DONALD HARWARD I G N N S R 0 5 10 C O July 27, 2016 PROJECT DESIGN ENGINEER PROFILE (VERTICAL) P 05-JUL-2016 11:52 S:\DDC\RDY\Mecklenburg\I-485 NB Ramp at US29\tsh\I485_NBramp_US29_me7_tsh.dgn dlsimpson AT D10DIVCAD279827
2 2
: :
1 1 EXISTING GROUND EXISTING
T T
MATERIAL
SHOULDER
30 -35 SLOPE 30 -35 4' (TYP) 4' STA. 10+04.95 TO 10+49.13 -L- STA. 10+49.13 TO 16+63.87 -L- TYPICAL SECTION NO. 2
TYPICAL SECTION NO. 1
SAFETY EDGE SAFETY EXISTING PAVEMENT EXISTING
E E
X X
I I
S S
T T VARIES
I I
N N
G G 23.5' TO 110' 0' TO 23.5'
VARIES VARIES
SAFETY EDGE DETAIL EDGE SAFETY
SURFACE COURSE SURFACE ASPHALT CONCRETE ASPHALT
P P
A A
V V
C1 C1
E E
M M
E E
N N
T T PROFILE MILLING 10' X1
E
X
I
S
B
T
A
I
R
N
R
G
I
E
B
R
R
I
W
D
A
G
L
E
L X1 C1 T PROFILE MILLING (0'' TO 1.5'') RATE OF 168 LBS. PER SQ. YD. PROP. APPROX. 1 " ASPHALT CONC. SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE EARTH MATERIAL PAVEMENT SCHEDULE DWG. BY DATE SCALE DESIGN BY APPROVED 5/16 N/A RWB JDH DLS I-485 NB RAMP AT US 29 F.A. PROJECT NO. STATE N.C.
D
I V
D
I
V
I I S
I
D E S O P
A
R
N D
T S I T
M A I D
E T O
N E E V
T
S N
O
I
I F
G O
S F
N N
O
O
I
PROJECT NO. R T
C
50138.3.63 T
R O F
O
A H
N
N
N
S C
S
A
T P H
R
R O O
R L
U I
1
T I
C N
A
A G T T 0
IO N H U
N
IT W
A
Y S HSIP-0485(039) SHEET NO. 2 REVISIONS SHEETS TOTAL P
O
T
S
t a .
1 1 5 6 +
7 0
. 0
5
P - I L
S -
t a .
1 4 + P 6 I 1 . 5 S 4 t a . -
1 3 L - P +
T 5
0 . S 5 t 6 P a
. C - 1 2 L S + - t a 4 . 8
.
1 1 9
0 1
+ 8 N
O
6 R
8 - T H 1 '
-
P . L 2 6
- B "
O 0 O C
T U U N
R
- D B
S L R A
- A N
t M U
D
a P
. S
G
I
1 - U
0 4 T 8 T + 5 2 E R 0
0 9
. 0 0 ( N
- 2 O L ' - RESURFACING BEGIN - 10+04.95 -L- 6 R "
C T U
R
B H
A N DI RESURFACING END
16+63.87 -L- D
T
G U R T
T
E Y R O N
2 2
' ' S
- -
6 6
" "
C C
U U
R
R T B B
A A
N N
D D
. G G
U
U )
T T
T T
E E
R R R = 1,599.53' T = 40.40' L = 80.78' D
PI Sta 12+08.60 -L-
TO THE EXISTING ASPHALT PAVEMENT. ASPHALT EXISTING THE TO
TIE IN TO PROVIDE A SMOOTH TRANSITION SMOOTH A PROVIDE TO IN TIE NOTE: INCIDENTAL MILL APPROX. 25' AT EACH AT 25' APPROX. MILL INCIDENTAL NOTE: DWG. BY DATE SCALE DESIGN BY APPROVED 4/16 1"=50' RWB JDH DLS I-485 NB RAMP AT US 29 F.A. PROJECT NO. HSIP-0485(039) STATE N.C.
D
I V
D
I
V
I I S
I
D E S O P
A
R
N D
T S I T
M A I D
E T O
N E E V
T
S N
O
I
I F
G O
S F
N N
O
O
I
PROJECT NO. R T
C T
R O F
O 50138.3.63
A H
N
N
N
S C
S
A
T P H
R
R O O
R L
U I
1
T I
C N
A
A G T T 0
IO N H U
N
IT W
A
Y S SHEET NO. 3 REVISIONS SHEETS TOTAL SHEET TOTAL STATE STATE PROJECT REFERENCE NO. NO. SHEETS J N.C. 50138.3.63EC-1 STATE OF NORTH CAROLINA STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION B 1 DIVISION OF HIGHWAYS 0
6 EROSION AND SEDIMENT CONTROL MEASURES Std. # Description Symbol
5 PLAN FOR PROPOSED 1630.03 Temporary Silt Ditch TSD 1630.05 Temporary Diversion
- TD HIGHWAY EROSION CONTROL 1605.01 Temporary Silt Fence 1606.01 Special Sediment Control Fence 1622.01 Temporary Berms and Slope Drains
W 1630.02 Silt Basin Type B
S 1633.01 Temporary Rock Silt Check Type-A o n L u A k t a r h m k b e u a l r r Temporary Rock Silt Check Type-A with n h C C S t Matting and Polyacrylamide (PAM) u g 2771 a : r
D 1633.02 Temporary Rock Silt Check Type-B r 85 Wattle/Coir Fiber Wattle G a llo w G P w $ a y R a llo a y R d 485 Wattle/Coir Fiber Wattle d with Polyacrylamide (PAM)
I $ 1634.01 Temporary Rock Sediment Dam Type-A 1634.02 Temporary Rock Sediment Dam Type-B 1635.01 Rock Pipe Inlet Sediment Trap Type-A T 1635.02 Rock Pipe Inlet Sediment Trap Type-B 1630.04 Stilling Basin 1630.06 Special Stilling Basin Rock Inlet Sediment Trap: PROJECT 29 1632.01 Type A A 3 % 1632.02 Type B B
6 1632.03 Type C C . Skimmer Basin
3 Tiered Skimmer Basin . S ir C Infiltration Basin L n A a o n W n r a t th n D e o 8 iv H n a y B l
e D u S
M rt r n t r ia n
g y D e
a L D fr d i
3 a r e
n k n
l e e d P B e l D n d R r a r e d d B id o 1 r h 2679 S t d rt D S t a n o e h m N s n c t ire F re C th S S r e t Elysian 0 o d r N a
e n
la F
i
3047 p e
e H s l
E d 85 P e s
k o r 5
i it S n a t 485 t g C D r e $ h $ u r c
: h S R 29 to n e d 2472 Q % u a T r ry R d C VICINITY MAP NOT TO SCALE n E g d . p c e J _ 7 e
m ROADSIDE ENVIRONMENTAL UNIT _ 9
2 GRAPHIC SCALE DIVISION OF HIGHWAYS Roadway Standard Drawings S U
_ STATE OF NORTH CAROLINA O p The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design m 0 a
r Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest B
N Prepared in the Office of: revison thereto are applicable to this project and by reference hereby are considered a part of _
5 these plans. 8 R 4
I PLANS THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY \ 1604.01 Railroad Erosion Control Detail 1632.01 Rock Inlet Sediment Trap Type A n WITH THE REGULATIONS SET FORTH BY THE DDC UNIT DIVISION 10 o
i 1605.01 Temporary Silt Fence 1632.02 Rock Inlet Sediment Trap Type B s 0 NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 DEPARTMENT OF TRANSPORTATION o 1606.01 Special Sediment Control Fence 1632.03 Rock Inlet Sediment Trap Type C r e P ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND DIVISION OF HIGHWAYS 7 \ 1607.01 Gravel Construction Entrance 1633.01 Temporary Rock Silt Check Type A 2 9
8 NATURAL RESOURCES DIVISION OF WATER QUALITY. 2 1622.01 Temporary Berms and Slope Drains 1633.02 Temporary Rock Silt Check Type B 9 S 7 U PROFILE (HORIZONTAL) 2012 STANDARD SPECIFICATIONS 1630.01 Riser Basin 2 1634.01 Temporary Rock Sediment Dam Type A t D 3 Silt Basin Type B
a 1630.02 A
5 1634.02 Temporary Rock Sediment Dam Type B :
C
4 0 p V 1 1630.03 Temporary Silt Ditch 1635.01 Rock Pipe Inlet Sediment Trap Type A I
m D 6 a Stilling Basin 1 1630.04
0 1635.02 Rock Pipe Inlet Sediment Trap Type B R 1 0 DONALD HARWARD
3028 2 D 1630.05 Temporary Diversion 1640.01 Coir Fiber Baffle B -
N Y EROSION CONTROL DESIGNER LEVEL III-A CERTIFICATION # T 1630.06 Special Stilling Basin 1645.01 Temporary Stream Crossing
A A PROFILE (VERTICAL) 5 M 1631.01 Matting Installation - 8
9 4
- 0 n I o \ s g p r
m u
i
b
s n l
e
d
l
k c e M \ Y D R \ C D D \ : S TOTAL STATE PROJECT NO. SHEET NO. SHEETS N.C. 50138.3.63 EC-2 F.A. PROJECT NO. HSIP-0485(039)
T .) N S R YO T T E R G U D T A N B H R U R T T T E 6 " C OR G U 1' - N A N D ( U R B 9 6 " C S 2 2 ' - U 16+63.87 -L- END RESURFACING
L- 0 5 - N + 7 0 . O a . 16 R S T OT t P H
B O U N D R A M P I- 4 8 5 - L- 15 6 1.5 4 a . 14 + P I S t PI Sta 12+08.60 -L- D L = 80.78'
2 T = 40.40' ' - L- 6 - " R = 1,599.53' 6 C 5 U 5 0 . R + B 13 A S a . N t D P I G U T T E R
L- 8 9 8 - 12 + 4 . S a . P T t
2 0 - L- 1+ 6 8 . DI S t a . 1 P C USE WATTLES AROUND DROP INLET BOX EROSION CONTROL MEASURES MAY BE CHANGED, IN FIELD AS DIRECTED BY THE ENGINEER.
10+04.95 -L- BEGIN RESURFACING
0 0 - L- 0 + 0 0 . S t a . 1 P OT 10 I-485 NB RAMP AT US 29
O F N H SCALE 1"=50' O S I O N I REVISIONS G I V I O R T N H C S I O F A 1 H R I D E O 0 W DATE T L 4/16 A V I A T N I S A Y
D
D S
E DWG. BY DLS N D P O I A I T V I R T I N S T A DESIGN BY I M T U JDH O E R N N O T T S P C D O F T R A N U R E S T APPROVED RWB I G N C O N S TOTAL STATE PROJECT NO. SHEET NO. SHEETS N.C. 50138.3.63 PMP-1 F.A. PROJECT NO. HSIP-0485(039)
TA
TIE TO EXISTING PAVEMENT MARKINGS R T T E G U D A N B R U R T T E " C G U 1' - 6 N D B A C U R 2 ' - 6 "
TB T2 TIE TO EXISTING ) D PAVEMENT MARKINGS S T . ON T R Y UB T H UA OR 9 (N 2 UD
U S 15
0
' D S D T O R TE A G
E D
2 ' 12 ' D D 1
12 ' D 4' P.S. D D TC 4' P.S. UB UA
UD PAVEMENT MARKING SCHEDULE D PAVEMENT MARKING LINES TC TA - WHITE EDGELINE (4" , 90 MIL) TU - WHITE DIAGONAL (12" , 90 MIL) TB - YELLOW EDGELINE (4" , 90 MIL) TV - YELLOW DIAGONAL (12" , 90 MIL) TC - 10FT. WHITE SKIP (4" , 120 MIL) T1 - WHITE LINE, RR X (16" , 120 MIL) TD - 3FT.-9FT./SP WHITE MINISKIP (4" , 120 MIL) T2 - WHITE STOPBAR (24" , 120 MIL) D TE - WHITE SOLID LANE LINE (4" , 120 MIL) T3 - WHITE CROSSWALK LINE (24" , 120 MIL) TF - 10FT. YELLOW SKIP (4" , 120 MIL) T4 - WHITE RUMBLE STRIP (4" , 240 MIL) TD TH - YELLOW SINGLE CENTER (4" , 120 MIL) T5 - YELLOW RUMBLE STRIP (4" , 240 MIL) TI - YELLOW DOUBLE CENTER (4" , 120 MIL) T6 - WHITE EDGELINE (6" , 90 MIL) TJ - 10FT. WHITE SKIP (6" , 120 MIL) T7 - YELLOW EDGELINE (6" , 90 MIL) 2 TK - 3FT.-9FT./SP WHITE MINISKIP (6" , 120 MIL) T8 - 2FT.-6FT./SP WHITE MINISKIP (4" , 120 MIL) ' - 6 TL - WHITE SOLID LANE LINE (6" , 120 MIL) T9 - 2FT.-6FT./SP YELLOW MINISKIP (4" , 120 MIL) " C TM - 10FT. YELLOW SKIP (6" , 120 MIL) T10 - 3FT.-3FT./SP WHITE MINISKIP (12" , 120 MIL) U R TN - WHITE GORELINE (8" , 90 MIL) T11 - 2FT.-6FT./SP WHITE MINISKIP (6" , 120 MIL) B A TO - WHITE DIAGONAL (8" , 90 MIL) T12 - 2FT.-6FT./SP YELLOW MINISKIP (6" , 120 MIL) N TP - YELLOW DIAGONAL (8" , 90 MIL) T13 - 3FT.-9FT./SP WHITE MINISKIP (8" , 120 MIL) D G U TQ - WHITE CROSSWALK LINE (8" , 120 MIL) T14 - 3FT.-9FT./SP WHITE MINISKIP (12" , 120 MIL) T T TR - WHITE SOLID LANE LINE (8" , 120 MIL) T15 - YELLOW SINGLE CENTER (6" , 120 MIL) E TS - WHITE GORELINE (12" , 90 MIL) T16 - YELLOW DOUBLE CENTER (6" , 120 MIL) R TT - WHITE SOLID LANE LINE (12" , 120 MIL) T17 - 3FT.-3FT./SP WHITE MINISKIP ENTRANCE LINE (8" , 120 MIL) PAVEMENT MARKING SYMBOLS UA -LEFT TURN ARROW (90 MIL) UU - FISH-HOOK STRAIGHT ARROW (90 MIL) UB - RIGHT TURN ARROW (90 MIL) UV - FISH-HOOK LEFT/STRAIGHT ARROW (90 MIL) UC - STRAIGHT ARROW (90 MIL) UW - FISH-HOOK RIGHT/STRAIGHT ARROW (90 MIL) UD - COMBO. LEFT/STRAIGHT ARROW (90 MIL) UX - FISH-HOOK LEFT/RIGHT ARROW (90 MIL) UE - COMBO. RIGHT/STRAIGHT ARROW (90 MIL) UY - FISH-HOOK LEFT/RIGHT/STRAIGHT ARROW (90 MIL) D UF - COMBO. LEFT/RIGHT ARROW (90 MIL) UZ - FISH-HOOK W/CIRCLE STRAIGHT ARROW (90 MIL) N O UG - COMBO. LEFT/RIGHT/STRAIGHT ARROW (90 MIL) TD R T UH - HANDICAP PARKING (90 MIL) WA - FISH-HOOK W/CIRCLE LEFT ARROW (90 MIL) H UI - ALPHANUMERIC CHAR. (120 MIL) DI WB - FISH-HOOK W/CIRCLE LEFT/STRAIGHT ARROW (90 MIL) B UJ - BICYCLE SYMBOL (90 MIL) WC - FISH-HOOK W/CIRCLE LEFT/RIGHT/STRAIGHT ARROW (90 MIL) O U UK - BICYCLE STRAIGHT ARROW (90 MIL) N D UL - BICYCLE CHAR. (120 MIL) MA - PERMANENT RAISED MARKER (YELLOW & YELLOW) R UM - 12" YIELD LINE TRIANGLE (90 MIL) MB - PERMANENT RAISED MARKER (CRYSTAL & RED) A M UN - 24" YIELD LINE TRIANGLE (90 MIL) MC - PERMANENT RAISED MARKER (YELLOW & RED) P
UO - BICYCLE LEFT ARROW (90 MIL) MD - PERMANENT RAISED MARKER (YELLOW) I- UP - MERGE ARROW (90 MIL) ME - SNOWPLOWABLE MARKER (YELLOW & YELLOW) 4 8 TA UQ - RAMP ARROW SYMBOL (90 MIL) MF - SNOWPLOWABLE MARKER (CRYSTAL & RED) 5 UR - SHARROW (90 MIL) MG - SNOWPLOWABLE MARKER (YELLOW & RED) TIE TO EXISTING US - BICYCLE LOOP DETECTOR (90 MIL) ML - PERMANENT RAISED MARKER (CRYSTAL & CRYSTAL) UT - U-TURN ARROW (90 MIL) MO - SNOWPLOWABLE MARKER (CRYSTAL & CRYSTAL) PAVEMENT MARKINGS
TB I-485 NB RAMP AT US 29 TIE TO EXISTING PAVEMENT MARKINGS O F N H SCALE 1"=50' O S I O N I REVISIONS G I V I O R T N H C S I O F A 1 H R I D E O 0 W DATE T L 4/16 A V I A T N I S A Y
D
D S
E DWG. BY DLS N D P O I A I T V I R T I N S T A DESIGN BY I M T U JDH O E R N N O T T S P C D O F T R A N U R E S T APPROVED RWB I G N C O N S