HOT SPRINGS, AR Wayfinding & Signage Program

SCHEMATIC DESIGN: OPTION 4

June 26, 2019

MERJE | ENVIRONMENTS & EXPERIENCES 120 North Church Street Suite 208 West Chester, PA 19380 T 484.266.0648 www.merjedesign.com MUTCD Requirements - 4” High Copy: Less than 25mph roadway - 6” High Copy: Greater than 25mph roadway - High Intensity Re ective Vinyl - Breakaway Post - Clearview Hwy Typeface - 3 Messages (max) Per Panel Translucent Panel Examples

Cut Metal

15'-0" Alternate

3'-8"

13'-6" 7'-1" Bathhouse 12'-0" Row Natl Park 2'-1" Visitor Center Entergy Park 10'-6" 6'-1"

5'-1" P 1/4" Aluminum Panel P w/ High Intensity Convention Painted or Vinyl Garvan Woodland Free Free Re ective

9'-0" 3'-2" Center Back Graphic Gardens 3'-6" Parking Parking Copy & Background 4" High Copy Translucent Clearview Hwy Acrylic Panel 7'-6" Typeface 1/4" Aluminum Panel w/ High Intensity Re ective 1/4" Aluminum Panel 1/4" Aluminum Panel Copy & Background w/ High Intensity w/ High Intensity 6'-0" Re ective Re ective 4" High Copy Copy & Background Copy & Background Clearview Hwy Typeface 6" High Copy 4" High Copy Clearview Hwy Clearview Hwy Existing Pole 7'-6" 5” round Typeface Typeface

Aluminum Post 7'-6" 7'-7 1/2" 7'-6"

Cast Metal Historic Base (Match Existing Streetscape) Transpo Pole Safe Break-away

Vehicular Directional Back View Vehicular Directional Parking Directional Parking Directional SCALE: 3/4" = 1'-0" (25 mph or less) (25 mph or higher) (New Pole) (Existing Pole) ARDOT REVIEW

HOT SPRINGS,AR June 26, 2019 | Schematic Design OPTION 4 HOT SPRINGS ARKANSAS

Where are the Hot Springs?

PLEASANT STREET YOU ARE HERE HISTORIC DISTRICT

The Pleasant Street Historic the Woodmen of Union Building, District is a historic district a four story brick building on the encompassing the historic 500 block of Malvern Avenue. African American community area of Hot Springs, Arkansas. It Hot Springs National Park, is is located southeast of the city’s a collection of ninety-three famous Bathhouse Row area, building representing the most centered on a four block stretch contiguous axtant area of the of Pleasant Street between city’s historic black community. Jefferson and Church Street. The Malvern Avenue commercial 30-acre (12 ha) district includes 93 corridor and its adjacent buildings, most of them residential. neighborhood, was a thriving The area was developed between “ˆÝÌÕÀiœv«ÀœviÃȜ˜>œvwViÃ] about 1900 & 1950, with the stores, musical venues, churches, development taking place after schools, hotels, rooming 1920. Non-residential builings houses and single family include the Visitor’s Chapel A.M.E. residences. Church at 317 Church Street, and

1923-24 1870s 1913

Built for the Supreme Lodge of An African Methodist Episcopal Located just southeast of the the Woodmen of Union congregation city’s famous Bathhouse Row area

15'-0"

13'-6"

3'-7" Natural 12'-0" Stone Base

National Park Service 6'-10 1/2" HIKE 10'-6" Hot Springs Canopy Roof National Park 1'-6" Option for Solar Panel 1/4" Aluminum Panel

3'-10 " West BIKE 9'-0" w/ High Intensity Mountain Re ective HOT SPRINGS HOT SPRINGS

Copy & Background 7 1/2" 11" ARKANSAS ARKANSAS

7'-6" Lighting 9'-1"

HOT SPRINGS Translucent 6'-0" ARKANSAS Panel Where are the Hot Springs? Aluminum Map Panel Aluminum Panel

PLEASANT STREET YOU ARE HERE HISTORIC DISTRICT

3'-1/2" Paint and Vinyl The Pleasant Street Historic the Woodmen of Union Building, District is a historic district a four story brick building on the encompassing the historic 500 block of Malvern Avenue. African American community area of Hot Springs, Arkansas. It Hot Springs National Park, is w/ Dye Sub Print Graphics is located southeast of the city’s a collection of ninety-three famous Bathhouse Row area, building representing the most centered on a four block stretch contiguous axtant area of the Graphic Panel of Pleasant Street between city’s historic black community. Jefferson and Church Street. The Malvern Avenue commercial 30-acre (12 ha) district includes 93 corridor and its adjacent buildings, most of them residential. neighborhood, was a thriving The area was developed between “ˆÝÌÕÀiœv«ÀœviÃȜ˜>œvwViÃ] about 1900 & 1950, with the stores, musical venues, churches, development taking place after schools, hotels, rooming 1920. Non-residential builings houses and single family include the Visitor’s Chapel A.M.E. residences. Church at 317 Church Street, and

1923-24 1870s 1913

Built for the Supreme Lodge of An African Methodist Episcopal Located just southeast of the

5'- 1/2" the Woodmen of Union congregation city’s famous Bathhouse Row area 7'-10" 7'-6"

5” Round Aluminum Pole 2' Natural Stone Base

National Park Pedestrian Directional Pedestrian Totem Pedestrian Kiosk Banners SCALE: 3/4" = 1'-0" Trailblazer

HOT SPRINGS,AR June 26, 2019 | Schematic Design OPTION 4 1”-8 UNC (25 mm) Nut per ASTM A563 Grade DH Top of Concrete 3x28x51 mm (1/8”x1-1/8”x2”) Foundation Flat Washer per ASTM F436 41 mm (1-5/8”) Stainless Steel Washer Pole Base Plate 64 mm (2-1/2”) O.D. 27 mm (1-1/16”) I.D. 70 mm 3x28x51 mm (1/8”x1-1/8”x2”) 3.2 mm (1/8”) Thick (2-3/4”) Flat Washer per ASTM F436 Stainless Steel Threaded Ferrule 1”-8 UNC (25 mm) Thread Depth = 29 mm (1-1/8”), minimum Upper Wrench Flats

Steel Wire, 11.1 mm Double-NeckTM Pole-Safe® 381 mm (7/16”) Diameter Coupling, Model No. 5100 (15”) (4 per Anchor) 129 mm 4 per Pole, Typical (5-1/16”) 56 mm (2-3/16”)

Lower Wrench Flats 29 mm (1-1/8”) Galvanized Steel Shim 14g and/or 18g Thickness (if required for leveling) Closed Wire Coil 37 mm (1-7/16”) O.D. Transpo® Type B Female 51 mm (2”) Long Anchor, 1”-8 UNC (25 mm) 6 Revolutions Internal Threads

POLE-SAFE SERIES 5100 BREAKAWAY ASSEMBLY TRANSPO TYPE B FEMALE ANCHOR 1 SCALE: NTS 2 SCALE: NTS

Cast Decorative Base Coordinate inside dimensions with Anchor Plate dimensions

Round Alum. Post Size Varies Ref. Design Details Bolt circle for exact size. Transpo Pole-Safe Anchor Plate, size per Pole-Safe specs

5" Pole

Ø 1" nuts Measurements as required by structrual engineer Anchor Plate Detail Assembled Section View 3 SCALE: 1 1/2" = 1'-0" 4 SCALE: 3/4" = 1'-0"

HOT SPRINGS,AR June 26, 2019 | Transpo Pole-Safe Breakaway Details Base cover. Coordinate inside Base cover. Coordinate inside dimensions with breakaway dimensions with breakaway assembly dimensions assembly dimensions Note: Design Wind load 300 PSF 120 MPH, Note: Design Wind load 300 PSF 120 MPH, 3 Sec Gust Wind, Exp C Round Fluted Alum. Post 3 Sec Gust Wind, Exp C Round Fluted Alum. Post Size Varies Ref. Design Details Size Varies Ref. Design Details for exact size. for exact size. Aluminum Skirt Aluminum Skirt Break Away Sign Support Break Away Sign Support

5" sidewalks 7" driveways Existing Pavers Existing Concrete Slab 4" 3'-0" min. 3'-0" min.

Class B Class B Concrete Footing Concrete Footing Reference ARDOT Reference ARDOT 3'-0" 3'-0"

Section View: Foundation @ Concrete Section View: Foundation @ Pavers 1 SCALE: 3/4" = 1'-0" 2 SCALE: 3/4" = 1'-0"

Note: Design Wind load 300 PSF 120 MPH, Base cover. Coordinate inside Note: Design Wind load 300 PSF 120 MPH, Base cover. Coordinate inside 3 Sec Gust Wind, Exp C dimensions with breakaway 3 Sec Gust Wind, Exp C dimensions with breakaway assembly dimensions assembly dimensions Round Fluted Alum. Post Round Fluted Alum. Post Size Varies Ref. Design Details Size Varies Ref. Design Details for exact size. for exact size.

Aluminum Skirt Existing Break Away Sign Support Concrete Slab Break Away Sign Support 5" sidewalks 7" driveways Existing 5" sidewalks 7" driveways Concrete Slab 1'-1" 2'-0"

4'-0" square Class B Concrete Footing Class B Reference ARDOT Concrete Footing Reference ARDOT 3'-0" square

Section View: Foundation: Shallow Depth Section View: Foundation: Extremely Shallow Depth 3 SCALE: 3/4" = 1'-0" 4 SCALE: 3/4" = 1'-0"

HOT SPRINGS,AR June 26, 2019 | Transpo Pole-Safe Breakaway Details