Doubling on Going Survey Digital India Railway
Total Page:16
File Type:pdf, Size:1020Kb
Ongoing Project: Doubling • New Bongaigaon - Rangia- Kamakhya(142 kms) • Doubling of Bongaigaon – Goalpara Town- Guwahat (176On Going kms) section Survey • New Mainaguri to Jogoghopa (288.88 kms) • Bongaigaon- Agthori(130 kms) • Pathsala – Nanglam(51.15Digital India kms) • Point of Sale (POS) provided at Bongaigan, New Bongaigaon, Pathsala, Sobhog, Tihu and Barpeta Road • Free High speed Wi–Fi provided at Barpeta Road Railway station, New Bongaigaon, Pathshala, Tihu, Chaprakata, Patiladha, Sorbhogh, Mazgaon, Bongaigaon and Sarupeta. • Digital Museum provided at Barpeta Road and New Bongaigaon during FY 2018-19 • ISS provided at New Bongaigaon in FY 2020-21 • IPIS provided at New Bongaigaon, Barpeta and Bongaigaon stations • CCTV surveillance provided at New Bongaigaon, BarpetaRailway and Bongaigaon Electrification in FY 2020-21 • Railway electrification has been sanctioned from New Jalpaiguri to Guwahati and work is going on in full swing. Electric traction is targeted to be introducedGreen from Initiatives Guwahati by June, 2021 • Solar power generation of 10Kwp capacity at Barpeta Road on 30.12.2020 • Bottle crusher machines provided at New BongaigaonFreight and Barpeta Initiatives Road in FY 2019-20 • Round the clock working of goods shed commissioned at Barpeta Road on 25.11.2020 and New Bongaigaon on 24.12.2020 Barpeta Improvements in Passenger Amenities Parliamentary Constituency Assembly Segments • Second class waiting hall provided at Jogighopa, Pathsala & Barpeta Road station • Façade and circulating area of Bongaigaon Bongaigaon Jania station improved • Executive lounge constructed at New Abhayapuri North Baghbar Bongaigaon Station Abhayapuri South Sarukhetri • Development of Bongaigaon station as Adarsha Patacharkuchi Chenga Station BarpetaWorks completed inDharmapur Last Seven Years • Provision of Passenger Platform (PP) shed at Barpeta Road station • Provision of new Platform at Bijni & Niz Sariha • Second class waiting hall provided at Jogighopa, • Extension/raising of Platform at Barpeta Road Pathsala & Barpeta Road station Station • Façade and circulating area of Bongaigaon • Improvement to station building & circulating station improved area at Bongaigaon station • Executive lounge constructed at New • Improvement of drinking water at New Bongaigaon Station Bogaigaon station • Development of Bongaigaon station as Adarsha • Provision of passenger amenities of class A Station station at Bongaigaon • Doubling works completed in section • Lift installed at New Bongaigaon station in FY New Bongaigaon-Majgaon (8.53 Km.) and 2020-21 commissioned on 21.01.2020 • Coach indication board provided at Sorbhog, • Doubling works completed in section Majgaon- New Bongaigaon, Barpeta Road Abhayapuri (8.96 Km.) and commissioned on • New PP shed, platforms provided at Tihu, 28.11.2020 Sorupeta, Sorbhog, Bijni and Jogighopa in FY • All Unmanned Level Crossing eliminated for 2019-20 better safety. • Divyang toilets provided at Barpeta Road, • Mechanised cleaning at New Bongaigaon and Sorupeta, Patiladaha, Sorbhog, Bijni, Barpeta Road stations provided Chaprakata, New Bongaigaon, Bongaigaon, • Total 09 nos. of manned LC gates eliminated Majgaon, Abhayapuri, Jogighopa in FY 2019-20 upto FY 2019-20 in which 06 Nos. of manned • Ramps for Divyangs at New Bongaigaon, LC gates eliminated during 2014-19 Bongaigaon, Chaprakata, Bijni, Patiladaha, • 1 no. of Road Under Bridge (RUB) constructed Sorbhog, Barpeta Road, Sorupeta, Pathsala, • 8 Nos. of RUB constructed Tihu, Kaithalkuchi, Majgaon, Abhayapuri, Jogighopa provided • 2 no. of Road Over Bridge (ROB) constructed • New PRS/UTS provided at Barpeta Town Head • Redevelopment of stations at Bijni, Tihu, post office (Postal PRS) on 26.09.2017 Barpeta Road, New Bongaigaon and Bongaigaon completed Wi-Fi at Barpeta Road Railway Station.