MULTI-COLOURED GRANITE QUARRY LEASE APPLIED AREA (1.19.0Ha) The proponent Tmt. Farhadeeba Limited has applied for Environmental clearance for the proposed quarry Multi-Coloured Granite for over an extent of 1.19.0Ha in S.F.No: 454/3 (Part) of Pudukkottai Village in , District. Salient features of the proposal are as follows: S. Details of the proposal Data furnished : No 1. Name of the Owner + : Tmt. Farhadeeba, Firm No.14, Hayes Road, Rich Mount Town, Bangalore – 560 025, Karnataka State. Mobile No: 99449 05301, 94439 10375 2. Location of the quarry- : S.F.No: 454/3 (Part) of Pudukkottai Village in S.F.No. Manapparai Taluk, 3. Purpose of Application : It is a Multi - Coloured Granite quarry Project in Pudukkottai Village. 4. Extent of quarry in Ha- : 1.19.0Ha

5. Land use planning : Area to be Area to be a) Mining Present Required at required at b) Storage of Topsoil Description Area the present the End of over burden (Ha.) scheme the lease period(Ha) period(Ha) c) Infrastructure Road d) Utilized Area Area under quarry 0.78.3 0.10.2 0.88.5 Total Waste dump Nil Nil Infrastructure 0.01.0 0.01.0 (Backfillin0.01.0 Roads 0.01.0 0.01.0 0.02g) .0 Green Belt Nil 0.07.8 0.15.0 Stocking Blocks 0.38.7 0.18.7 0.12.5 Grand Total 1.19.0 0.38.7 1.19.0

6. Production (quantity in m3): The proposed quantity of reserves (50%) is about 9062m3 of Multi-Coloured Granite for a during this scheme period of Five years. The quarry operation is proposed up to depth for 34m (1m top soil + 3m Weathered rock + 30m Multi Coloured Granites) at present scenario considering for the entire lease period. The applicant proposed up to a depth of 24m (1m top soil + 3m Weathered rock + 20m Multi Coloured Granites) during this scheme period.

Reserves Granite Weathered Side Total Top Description ROM 50% waste Rock in Burden waste soil in (m3) (m3) 50% (m3) (m3) (M3) (M3) (m3) Geological reserves 99165 49582 49583 5040 845 140715 195338 Mineable Reserves 36475 18238 18237 1581 264 15450 35268 Five years Scheme 18125 9062 9062 1581 264 10825 21468 of mining plan 7. Top soil & overburden : There is a thickness of top soil is about 1m reddish soil, (quantity in m3) the generation of top soil is about 264m3 for a during this scheme period of Five years 8. Method of Mining : The quarrying operation will be carried out by Open cast semi mechanized mining method with 5.0m vertical bench with a bench width of 5.0m is being proposed. 9. Life of Mine as per : The Second Scheme of quarrying is prepared to approved mining plan submission for a period of Five years (2016 – 17 to 2020 - 21). 10. Height / width of the : Height 5.0m & Width 5.0m bench 11. Source of water / quantity Quantity Source required : required (in litres) a. Drinking & Domestic 0.3 KLD Packaged drinking water is available from the approved Purpose water vender b. Dust Suppression 0.3KLD From Existing bore hole on nearby quarry C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry 12. Waste water There is no waste water. Sewage water : The septic tank is constructed on permanent structure with in the quarry lease area. Mode of disposal : To local Panchyat Authority 13. APC Measures : 1.Mist Spray using water tankers, 2. Enclosed covered system. (Tarpaulin) for transportation. 14. Ariel distance of nearest : Approximate S. Distance & Approximate habitation Name of the Village No Direction from population lease area 1. Ponnambalapatti 4.0km –NE 1500 2. Nadupatti 3.0km-NW 1000 3. Kallupatti 5.0km-W 800 4. Pudukkottai 1.0km –W 400

15. Ariel distance from : Pakkirikaradu RF & Semmalai RF is situated 1.2km & Reserve forest, Sensitive 2km away from the West & North side of the area. areas, Forest, Bird Bird Sanctuaries – Nil sanctuaries, Wild life Wild life sanctuaries - Nil sanctuaries, National National Park – Nil parks, Monuments etc., Monuments – Nil within 15km 16. Land owner ship It is a lessee’s own Patta land vide Patta No.1100 document : Own patta land : Lease : Govt. Poromboke 17. Land use classification : It is New proposal Multi – Coloured Granite Quarry Project (the area has been quarrying operation is earlier) in Pudukkottai Village.

18. Mining plan prepared by M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A., : RQP/MAS/183/2004/A 19. Approved by : The Mining Plan was Approved by the Commissioner of Geology sand Mining, vide Letter. No: 288/MM2/2005 Dated: 25.10.2006. 20 Precise area statement : The Mining lease was granted in G.O. (3D) No. 80, Approved by Industries (MMB-1) Department Dated: 07.11.2006. 21. Nearby quarries : There are no quarry within the radius of 500m 22. Nearby lake / river/ odai / : There is no Rivers/Stream, and Reservoir within the 500m channel etc. distance to the lease applied area. Odai is situated 1km away from the North western side of the lease area. Ponnaniyaru Dam is situated 7km away from the Northern side of the area. 23. Latitude / Longitude : 1031’03.29’’N to 1031’07.11’’N 7815’35.18’’ E to 7815’39.70’’ E 24. GI Sheet No. : 58 -J/06 25. Project Cost(Project cost : The Project cost: +EMP cost) A Fixed Asset cost = Rs. 5, 00,000/- B. Operational cost = Rs. 38,00,000/- C. EMP cost = Rs. 2, 55,000/- Total cost = Rs. 45, 55,000/- The total project cost including EMP cost (A+B+C) is about Rs. 45, 55,000/- (Rupees forty five lakhs fifty five thousand only) 26. EMP Cost (Capital and : The total EMP cost is about Rs. 2, 55,000/- (Rupees two recurring) lakhs fifty five thousand only) 27. Water table : The Ground water is about 52mt depth from ground level. 28. Interstate boundary : There is no interstate boundary within the radius of 15km. 29. Western Ghats : There is no Western Ghats within the radius of 15km.