Contract Award Notice
Total Page:16
File Type:pdf, Size:1020Kb
Contract Award Notice Project Name: Mumbai Urban Transport Project - III Country: India Project Number: 000228 Contract Reference No: MRVC/W/107(R1) Name of the Contract: Construction of formation in Embankment and Cutting, Blanketing, Rock cutting, Construction of Major & Minor Bridges, RUBs, ROBs, Construction of Drain/ Retaining wall, Ballast Supply and Removal of Infringements in Panvel-Karjat section in connection with Panvel – Karjat double line Suburban Corridor under MUTP-III in 2 LOTs. LOT-I: From Ch: 00+000 (Km) to Ch: 15+000 (Km). LOT-II: From Ch: 15+000 (Km) to Ch: 29+600 (Km). Scope of Contract: The scope of works is summarised as below: LOT-I 1. Earthwork in Embankment and Cutting, Construction of 13 Minor Bridges, 5 Major Bridges, 7 RUBs, 1 FOB in midsection, Toe Wall, Drop Wall, Curtain Wall, Guide Wall, Retaining Wall, slope protection by wire mesh & Rock Bolt, ballast supply, utility shifting etc in Panvel-Karjat section (From Ch: 00+000 (Km) to Ch: 15+000 (Km)) for BG double line suburban corridor. Center line of Panvel Station is taken as Ch: 00+000 (Km). 2. Relocation/shifting of all the utilities related to signalling and telecommunication, electrical general and OHE in Panvel –Karjat section (From Ch: 00+000 (Km) to Ch: 15+000 (Km)) LOT-II 1. Earthwork in Embankment and Cutting, Construction of 18 Minor Bridges, 4 Major Bridges, 8 RUBs, 3 ROBs, 1 FOB in midsection, Toe Wall, Drop Wall, Curtain Wall, Guide Wall, Retaining Wall, slope protection by wire mesh & Rock Bolt, ballast supply, utility shifting etc in Panvel-Karjat section (From Ch: 15+000 (Km) to Ch: 29+600 (Km)) for BG double line suburban corridor. Ch: 15+000 (Km) is 15 Km from center line of Panvel Station. 2. Relocation/shifting of all the utilities related to signalling and telecommunication, electrical general and OHE in Panvel –Karjat section (From Ch: 15+000 (Km) to Ch: 29+600 (Km)) Duration of Contract: 36 Months Contract Price & Currency LOT Contract Price Currency LOT-I ₹ 172,24,22,181.28 + GST INR LOT-II ₹ 1,65,17,92,105.18 + GST INR Awarded Bidder Tender Price at Evaluated Tender Price Name of the Firm Address Discount Ranking Opening (INR) (INR) LOT-I M/s. Thakur Infraprojects Pvt. Panvel, India ₹ 175,75,73,654.37+ GST 2.00% ₹ 172,24,22,181.28 + GST L1 Ltd. LOT-II Andheri RELCON-SREPL (JV) ₹ 1,65,17,92,105.18 + GST Nil ₹ 1,65,17,92,105.18 + GST L1 (West), India Evaluated Bidder(s) Tender Price at Discount Evaluated Tender Name of the Firm Address Ranking Opening (₹) (%) Price (₹) LOT-I M/s. M. Venkata Rao Infra Visakahapatnam, ₹ 214,37,33,418.30 0% ₹ 214,37,33,418.30 L4 Projects Pvt. Ltd. India M/s. DMIA – BALAJEE – Malaysia ₹ 237,02,45,161.74 0% ₹ 237,02,45,161.74 L5 DCS Joint Venture M/s. J M Mhatre Infra Pvt. Panvel, India ₹ 185,14,68,549.00 0% ₹ 185,14,68,549.00 L2 Ltd. M/s. Thakur Infraprojects Pvt. Panvel, India ₹ 175,75,73,654.37 2.00% ₹ 172,24,22,181.28 L1 Ltd. M/s. Dineshchandra R. Gujarat, India ₹ 211,22,02,429.40 3.24% ₹ 204,37,67,070.69 L3 Agarwal Infracon Pvt. Ltd. LOT-II M/s. ISC Projects Pvt. Ltd. Pune, India ₹ 180,92,18,161.33 0% ₹ 1,80,92,18,161.33 L2 M/s. M. Venkata Rao Infra Visakahapatnam, ₹ 251,40,10,010.28 0% ₹ 2,51,40,10,010.28 L6 Projects Pvt. Ltd. India M/s. DMIA – BALAJEE – Malaysia ₹ 252,80,84,825.90 0% ₹ 2,52,80,84,825.90 L7 DCS Joint Venture Andheri (West), M/s. RELCON – SREPL (JV) ₹ 165,17,92,105.18 0% ₹ 1,65,17,92,105.18 L1 India M/s. J M Mhatre Infra Pvt. Panvel, India ₹ 200,17,85,850.24 4.00% ₹ 1,92,17,14,416.23 L3 Ltd. M/s. Thakur Infraprojects Pvt. Panvel, India ₹ 222,82,98,295.80 2.00% ₹ 2,18,37,32,329.88 L5 Ltd. M/s. Dineshchandra R. Gujarat, India ₹ 219,84,00,385.50 3.24% ₹ 2,12,71,72,213.01 L4 Agarwal Infracon Pvt. Ltd. Combined (LOT-I + LOT-II) Discount for Discount Evaluated price Rank LOT-I for LOT-II after discounts M/s. ISC Projects Pvt. Ltd. Pune, India Not quoted for LOT-I M/s. M. Venkata Rao Infra Visakahapatnam, 0% 0% ₹ 465,77,43,428.58 L5 Projects Pvt. Ltd. India M/s. DMIA – BALAJEE – Malaysia 2.00% 2.00% ₹ 480,03,63,387.89 L6 DCS Joint Venture M/s. RELCON – SREPL Andheri (West), Not quoted for LOT-I (JV) India M/s. J M Mhatre Infra Pvt. Panvel, India 0% 4.00% ₹ 377,31,82,965.23 L2 Ltd. M/s. Thakur Infraprojects Pvt. Panvel, India 2.00% 2.00% ₹ 390,61,54,511.17 L3 Ltd. M/s. Dineshchandra R. Gujarat, India 3.24% 3.24% ₹ 417,09,39,283.70 L4 Agarwal Infracon Pvt. Ltd. L1 of LOT-I + L1 of LOT-II N/A N/A ₹ 337,42,14,286.46 L1 Rejected/Non-responsive Bidder Name of the Firm Address Reasons for Rejection Nil Nil Nil .