Brahmapur Black Stone Quarry No-1 7.70 Acre Or 3.116 7.70 Acre Or
Total Page:16
File Type:pdf, Size:1020Kb
1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S. No. Item Details 1. Name of the Project/s Brahmapur Black Stone Quarry No-1 In Dhenkanal district of Odisha 2. S. No in the schedule 3. Proposed capacity / area /length/tonnage to be 7.70 acre or 3.116 handled /command area /lease area/number of wells to be drilled 4. New /Expansion /Modernization New 5. Existing Capacity / Area etc. * 7.70 acre or 3.116 6. Category of project i.e. ‘A’ or ‘B’ “B2” 7. Does it attract the general condition? If yes, please Yes, Semi-Mechanized specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Refer to Toposheet No:73 H/6 Latitude : N 200 43’ 26.0” to 200 43’36.6” Longitude : E 850 23’ 20.3” to 850 23’ 25.4” Plot/Survey/Khasra No. Plot no.- 1,2,26 Khata No-187 Village Brahmapur Tehsil Hindol District Dhenkanal State Odisha 10 Nearest railway station/airport along with distance The nearest railway station is at Hindol which in kms. is about 20 km from the mine lease area. The nearest airport is Bhubaneswar Airport at 80 km south from the mining site. 11 Nearest Town, city, District, Headquarters along The nearest town is Dhenkanal which is at a with distance in kms. distance of 33 km from the lease area. The District Head Quarter is Dhenkanal at a distance covering 35 km. 12 Village Panchayats, Zilla Parisad, Municipal Village- Brahmapur, Panchayat- Giridhari Corporation, Local body (complete postal Prasad, Zilla Parisad- Dhenkanal addresses with telephone nos. to be given) 13 Name of the applicant Sri Ratikanta Rout 14 Registered address Sri Ratikanta Rout AT-Patala G.P- Balaram Prasad P.S.- Motanga District- Dhenkanal, Odisha 2 15 Address for correspondence : Sri Ratikanta Rout AT-Patala G.P- Balaram Prasad P.S.- Motanga District- Dhenkanal, Odisha Name Sri Ratikanta Rout Designation (Owner/Partner/CEO) Owner Address Sri Ratikanta Rout AT-Patala G.P- Balaram Prasad P.S.- Motanga District- Dhenkanal, Odisha Pin code Pin – 759020 16. Details of Alternative sites examined, if any, Village-District-State Location of these sites should be shown on a 1. toposheet. 2. NA 3. 17. Interlinked Projects NA 18. Whether separate application of interlinked NA project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves approval / clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980 ? NA (b) The Wildlife (Protection) Act, 1972 ? (c) The C.R.Z Notification, 1991 ? 22 Whether there is any Government order/Policy NA relevant/relating to the site? 23 Forest land involved (hectares) NIL 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court NA (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. 3 (II) Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data. 1.1 Permanent or temporary change in land use, Yes Details of Land use is given below. land cover or topography including increase Type of At the At the in intensity of land use (with respect to local land use beginni end of land use plan) ng of the the Plan Plan Period Period 1 Mining 0.33 0.484 2 Top soil Nil Nil 3 Overburde Nil Nil n dump 4 Mineral Nil Nil storage 5 Sub-Grade Nil Nil Storage 6 Infrastructu Nil Nil re 7 Roads 0.07 0.07 8 Green belt Nil 0.11 area 9 Screening Nil Nil plant/Wash ing Plant 10 Tailing Nil Nil pond Total land 0.4 0.664 degradatio n 11 Area which 2.716 2.452 will remain untouched (River) Total 3.116 3.116 1.2 Clearance of existing land. Vegetation and No NA buildings? 1.3 Creation of new land uses? No NA 1.4 Pre-construction investigations e.g. bore No NA houses, soil testing? 1.5 Construction works? No Nil 1.6 Demolition works? No Nil 4 1.7 Temporary sites used for construction works No ------ or housing of construction workers? 1.8 Above ground buildings, structures or Mining will be carried out as per approved earthworks including linear structures, cut Yes Mining Plan. and fill or excavations 1.9 Underground works including mining or No No underground mining work as the lease tunneling? hold area is a flat valley area. 1.10 Reclamation works? Yes Nil 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and manufacturing processes? Yes Semi-Mechanized method of mining of black stone/road metal quarry with production capacity of 1598 Cum. 1.14 Facilities for storage of goods and materials? No NA 1.15 Facilities for treatment or disposal of solid No NA waste or liquid effluents? 1.16 Facilities for long term housing of No As the local labours are available, no operational workers? housing facility will be required. 1.17 New road, rail or sea traffic during No ------ construction or operation? 1.18 New road, rail, air water borne or other No ------ transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport No NIL routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No NIL pipelines? 1.21 Impoundment, damming. culverting, No ------ realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No ------ 1.23 Abstraction or transfers of water from No ------ ground or surface water? 1.24 Changes in water bodies or the land surface No ------ affecting drainage or run-off? 1.25 Transport of personnel or materials for No ------ construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning No NIL or restoration works? 1.27 Ongoing activity during decommissioning Yes No decommissioning activity proposed. 5 which could have an impact on the environment? 1.28 Influx of people to an area in either No ------ temporarily or permanently? 1.29 Introduction of alien species? No ------ 1.30 Loss of native species or genetic diversity? No ------ 1.31 Any other actions? No ------ 2. Use of Natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non renewable or in short supply): S. No Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data. 2.1 Land specially undeveloped or agricultural land Yes Non Forest Govt. land will be (ha) converted to Mining purposes. 2.2 Water (expected source & competing users) Yes Water requirement will be 3KLD. unit: KLD Water would be purchased from wells and tube wells from nearby areas.. 2.3 Minerals (CuM) Yes Black Stone/Road Metal Quarry 1598 Cum of annual production. 2.4 Construction material- stone, aggregates, and No Nil /soil (expected source –MT) 2.5 Forests and timber (source –MT) No Nil 2.6 Energy including electricity and fuels (source, No ---- competing users) Unit : fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate No Not Applicable standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data. 3.1 Use of substances or materials, which are No Not Applicable 6 hazardous (as per MSIHC rules ) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease of affect No Nil disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing Yes Socio-economic condition will living conditions? improve and will have positive impact due to increasing earning sources of nearby peoples.. 3.4 Vulnerable groups of people who could be No Nil affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes. No Nil 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data. 4.1 Soil, overburden or mine wastes No Nil 4.2 Municipal waste (domestic and or commercial No Nil wastes) 4.3 Hazardous wastes (as per Hazardous Waste No Nil Management Rules) 4.4 Other industrial process wastes No Nil 4.5 Surplus product No Nil 4.6 Sewage sludge or other sludge from effluent No Nil treatment. 4.7 Construction or demolition wastes No Nil 4.8 Redundant machinery or equipment No Nil 4.9 Contaminated soils or other materials No Nil 4.10 Agricultural wastes No Nil 4.11 Other solid wastes No Nil 7 5. Release or pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data. 5.1 Emissions from combustion of fossil fuels No Negligible emission is seen due to from stationary or mobile sources vehicular movement on the unmetalled road.