BUILDING and DEVELOPMENT APPLICATIONS RECEIVED for the PERIOD 17/02/2021 to 23/02/2021
Total Page:16
File Type:pdf, Size:1020Kb
BUILDING AND DEVELOPMENT APPLICATIONS RECEIVED FOR THE PERIOD 17/02/2021 to 23/02/2021 Attached for your information is a list of building, planning and technical applications received for last week. LODGEMENT PROCESSED / APPLICATION APPLICATION RENEWED ADDRESS DESCRIPTION TYPE VALUE NUMBER 18/02/2021 "RAINE SQUARE" Hoarding - 3 Months HG $0.00 2020/26 300 Murray Street PERTH WA 6000 17/02/2021 Unit 1-24/1 Bremer Promenade Hoarding and Scaffolding - 2 Months HG $0.00 2021/3 EAST PERTH WA 6004 23/02/2021 "MCNESS ROYAL ARCADE" Decommission of the existing Commonwealth Bank Branch DA $90,000.00 2021/5023 611-619 Hay Street Mall at Hay Street Mall including make good works. PERTH WA 6000 17/02/2021 "OTTIMO" Change of use from Office to 'Cafe' (Dining) & 'Takeaway DA $5,000.00 2021/5024 6-12 Serich Lane Food' (Mixed Commercial) NORTHBRIDGE WA 6003 17/02/2021 "SOLAI" Proposed residential apartment development, incorporating DA $12,000,000.00 2021/5026 Unit 1-6/20 Mounts Bay Road a transfer of plot ratio from 360 Murray Street CRAWLEY WA 6009 19/02/2021 50-56 Murray Street New End of trip facilities and refurbishment of landscaped DA $300,000.00 2021/5027 PERTH WA 6000 plaza area between buildings 19/02/2021 "COMMERCIAL UNION HSE" Major Works and Refurbishment DA $3,000,000.00 2021/5030 179 St Georges Terrace PERTH WA 6000 18/02/2021 "TAXATION DEPT" Sections 40 Application for Tenancy 2, William Square, 45 SEC40 $0.00 2021/5031 45 Francis Street Francis Street, Northbridge, WA 6003 NORTHBRIDGE WA 6003 18/02/2021 Unit 35/228 James Street Change of Use of units 11 and 35 from Short Stay to DA $0.00 2021/5032 NORTHBRIDGE WA 6003 permanent Residential 19/02/2021 Unit 603/112 Mounts Bay Road Change of Use - Short term Accommodation to Residential DA $0.00 2021/5033 PERTH WA 6000 23/02/2021 "COLLEGE HOUSE" Section 40 Application - TERRARIUM - Small Bar Licence SEC40 $0.00 2021/5034 99 St Georges Terrace PERTH WA 6000 23/02/2021 54-56 Francis Street Extension of carpark licence for another 5 years DA $0.00 2021/5035 NORTHBRIDGE WA 6003 17/02/2021 "CITY WEST" Partial Demolition & Internal Fitout of Retail - T11 & T12 OCCP $0.00 2021/54 102 Railway Street WEST PERTH WA 6005 23/02/2021 "ENEX100" Refurbishment and reinstatement of the existing heritage BPC $12,500,000.00 2021/56 683-703 Hay Street Mall facade and replacement of existing ACP cladding on Hay PERTH WA 6000 Street Mall with Solid Aluminium cladding 17/02/2021 "ALLENDALE SQUARE" Lobby and Plaza Canopy Refurbishment BPC $650,980.77 2021/75 77 St Georges Terrace PERTH WA 6000 17/02/2021 556 Wellington Street Minor fitout works to existing office to improve social BPC $154,368.00 2021/76 PERTH WA 6000 distancing 18/02/2021 "MARKALINGA HOUSE" Alterations & additions to Ground Floor to provide a new BPC $2,912,576.00 2021/77 251-253 St Georges Terrace double height entry and foyer PERTH WA 6000 18/02/2021 225 St Georges Terrace Level 2 - Demolition and Makegood BPC $442,604.00 2021/78 PERTH WA 6000 22/02/2021 Unit 1-49/105 St Georges Terrace Office Fitout of Display Suites - Levels 2 & 11 BPC $795,150.00 2021/79 PERTH WA 6000 18/02/2021 "UNIVERSITY OF WA" Re-tiling the external entry and installation of new hand rails BPC $75,000.00 2021/80 35 Stirling Highway to various locations within Winthrop Hall at UWA. CRAWLEY WA 6009 23/02/2021 "CITY WEST" Fit-out construction of toilet facilities and accessible platform OCCP $0.00 2021/82 102 Railway Street WEST PERTH WA 6005 22/02/2021 "BROOKFIELD PLACE" Office - fitout works to create tenant use multi-purpose BPC $334,090.00 2021/85 125-137 St Georges Terrace rooms PERTH WA 6000 22/02/2021 "PARMELIA HILTON" Temporary Occupancy Permit - Parmelia Hilton & AIF (part) OCCP $0.00 2021/87 14-20 Mill Street PERTH WA 6000 22/02/2021 "PARMELIA HOUSE" Unauthorised Works - Fire Engineering extended travel BAC $20,000.00 2021/88 191 St Georges Terrace distance and door opening against the direction of egress PERTH WA 6000 23/02/2021 655 Hay Street Mall Change from roof to roof top deck area and internal BPC $0.00 2021/89 PERTH WA 6000 modifications within the design to align with the revised Development Approval 23/02/2021 238 Adelaide Terrace Forward Works - Piling, ground slab and ground services BPC $1,000,000.00 2021/91 PERTH WA 6000 23/02/2021 "AMP BUILDING" Level 7 - Part Floor Fit out BPC $53,203.00 2021/95 140 St Georges Terrace PERTH WA 6000 TOTAL $34,332,971.77.