DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AB [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AB District Administration

16 Major Works ( DPC4059 01 051 AB 16 00 )

Electrical Division, Madurai 1 . Provision of 3Nos. 13 persons capacity passenger KONE Lifts and 2Nos 200KVA Diesel Generator sets to the Madurai Bench of at Madurai. G.O.Ms.No. 285 Home (Courts-III) Department Dated: 04.03.2016 AS / TS / RAS: 11400 Electrical Division, Madurai 1,14,00

TOTAL - 4059 01 051 AB 1,14,00 AF Jails

16 Major Works ( DPC4059 01 051 AF 16 02 )

Building C & M Division, Thiruvallur 1 . Construction of Video conference room in Judicial Magistrate Court at 2,67 2,66 2,67 G.O.Ms.No.797 Home (Pro-IV) Dept., dt.07.10.2013 AS / TS / RAS: 267 Electrical Division-2,

TOTAL - 4059 01 051 AF 2,67 2,66 2,67

1 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AL [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AL Registration

16 Major Works ( DPC4059 01 051 AL 16 00 )

Building C & M Division, Thiruvallur 1 . Construction of own building for Sub Registrar Office at 47,00 44 46,56 G.O.Ms.No.57 CT & R (U2) Dept Dt.12.04.2012 AS / TS / RAS: 5000 Electrical Division-2, Chennai 3,00

Building C & M Division, Kancheepuram 2 . Construction of Sub Registrar Office building - IV over the Existing Sub 46,70 44 46,25 1 Registrar Office Building - II in Taluk Office Campus at Kancheepuram G.O.Ms.No.128 CT & R (U2) DeptDt. 22.12.2015 & G.O.Ms.No.57 CT & R (U2) Dept Dt. 12.04.2012 AS / TS / RAS: 5000 Electrical Division-2, Chennai 3,30 3,00 3,30

Building C & M Division, Cuddalore 3 . Construction of Sub Registrar Office Building at Bhuvanagiri in 72,10 30,12 52,10 20,00 Cuddalore District. GO (D) No. 81 CT & R (U2) Dept./Dt. 24.05.2016. AS / TS / RAS: 7530 Electrical Division-2, Chennai 3,20 2,00 1,20

Building C & M Division, Pudukottai 4 . Construction of own building sub registrar office at Gandarvakkottai in 47,00 46,83 17 Pudukkottai District G.O.(MS) No.57/CT & R (U2) / dept: 12.04.2012 AS / TS / RAS: 5000 Electrical Division, Salem 3,00 1,49 1,51

5 . Construction of own building sub registrar office at Alangudi in 47,00 44,43 2,57 Pudukkottai District G.O.(MS) No.57/CT & R (U2) / dept: 12.04.2012 AS / TS / RAS: 5000 Electrical Division, Salem 3,00 2,96

Building C & M Division, Aryallur 6 . Construction of Building for Sub Registrar Office at Chettikulam in 47,75 47,75 Perambalur District G.O.Ms.No.57/CT&R (U2)Dept.Dt.12.04.2012 AS / TS / RAS: 5000 Electrical Division, Salem 2,25 1,12 1,13

Building C & M Division, Ramanathapuram 7 . Construction of Sub Registrar Office at Paramakudi 70,44 30,00 25,00 45,44 G.O.Ms.No.81 CR & R (U2) Dept Dt. 24.05.2016 AS / TS / RAS: 7500 Electrical Division, Madurai 4,56 1,00 3,56

TOTAL - 4059 01 051 AL 4,00,30 1,45,46 1,09,68 1,35,03 70,21

2 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AM [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AM Treasuries and Accounts

16 Major Works ( DPC4059 01 051 AM 16 08 )

Building Construction Division-I, Chennai 1 . Construction of Sub Treasury office building at - . 60,05 60,05 5,00 55,05 GO Ms. No. 410 Finance (Treasury A/C III Dept./Dt. 17.10.2013 G.O.Ms.No.83 Fin (Try) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-I, Chennai

2 . Construction of Integrated Office Complex for Finance Department at 23,15,34 18,27,83 1,05,06 4,87,51 . Chennai G.O.Ms.No.151 Fin (T&A) Dept Dt. 22.05.2015., RAS GO.No. 36 dated. 08.02.2016 AS / TS / RAS: 251134 Electrical Division-I, Chennai 1,96,00 86,90 2,26,85 1,09,10

3 . Infrastructural facilities to integrated Office complex for 10 Officers 11,22,00 4,48,80 11,22,00 under the control of Finance Department, Chennai. G.O. Ms. No. 163 Finance (T&A-III) Department dated, 01.06.2016. AS / TS / RAS: 112200 Electrical Division-I, Chennai

Building C & M Division, Thiruvallur 4 . Construction of own building for Sub Treasury office at Thiruvallur 56,55 14,74 56,02 41,81 G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai 3,50 3,50 3,50

5 . Construction of own building for Sub Treasury office at Thiruthani in 52,50 25,88 51,50 26,62 Thiruvallur District G.O.Ms.No.403 Fin (T&A) Dept Dt. 15.11.2012 AS / TS / RAS: 5500 Electrical Division-2, Chennai 2,50 3,00 2,50

6 . Construction of Sub Treasury Office at . 73,20 25,00 48,20 G.O.Ms.No.40 Fin (T&A-3) Dept dt.08.02.2016. AS / TS / RAS: 7320 Electrical Division-2, Chennai

7 . Construction of own building for Sub Treasury office at Pallipet in 56,55 56,55 1,00 55,55 Thiruvallur District G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai 3,50 3,50 10 3,40

8 . Construction of own building for Sub Treasury office at in 56,55 56,55 56,55 Thiruvallur District G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai 3,50 3,50 3,50

3 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AM [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AM Treasuries and Accounts

16 Major Works ( DPC4059 01 051 AM 16 08 )

Building C & M Division, Kancheepuram 9 . Construction of sub Treasury office Building at Cheyyar in 56,55 50,75 5 5,80 Kancheepuram G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai 3,50 3,50

10 . Construction of sub Treasury office Building at in 56,55 56,53 Kancheepuram G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai 3,50 2,48 1,00 1,00

11 . Construction of sub Treasury office Building at in 60,05 60,05 1,00 59,05 Kancheepuram G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai

12 . Construction of Sub Treasury Office at 66,55 66,55 1,00 65,55 G.O.Ms.No. 302, Finance (T&A-III) Dept, Dated.29.12.2014 AS / TS / RAS: 6655 Electrical Division-2, Chennai

Building C & M Division, Vellore 13 . Construction of new building for Sub treasury Office building at Arcot in 63,00 43,00 Vellore G.O.Ms.No.302 Fin (T&A) Dept Dt. 30.11.2016 AS / TS / RAS: 6300 Electrical Division-2, Chennai

Building C & M Division, Cuddalore 14 . Construction of sub Treasury office Building at Kattumannarkoil in 57,05 35 56,70 1 56,69 Cuddalore District. GO Ms. No. 410 Finance (T&A-III) Dept, dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division-2, Chennai 3,00 3,00 3,00

Building C & M Division, Trichy 15 . Construction of Sub Treasury office building at Thiruverambur in Trichy 57,05 20,90 28,30 36,15 G.O.Ms.No.410/ Finance (T&A-3) Dept./Dt.17.10.13 AS / TS / RAS: 6005 Electrical Division, Salem 3,00 1,00 3,00

16 . Construction of Sub Treasury office building at Srirangam. 57,05 19,74 28,30 37,31 G.O.Ms.No.410/ Finance (T&A-3) Dept./Dt.17.10.13 AS / TS / RAS: 6005 Electrical Division, Salem 3,00 1,00 3,00

4 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AM [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AM Treasuries and Accounts

16 Major Works ( DPC4059 01 051 AM 16 08 )

Building C & M Division, Pudukottai 17 . Construction of Sub Treasury office building at Ponamaravathy 63,55 62,55 48,55 15,00 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Salem 3,00 3,00 1,50 1,50

18 . Construction of Sub Treasury office building at Illuppur. 63,55 62,55 48,55 15,00 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Salem 3,00 3,00 1,50 1,50

19 . Construction of Sub Treasury office building at Karambakudy 63,55 62,55 48,55 15,00 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Salem 3,00 3,00 1,50 1,50

Building C & M Division, Thanjavur 20 . Construction of Own Building for Sub Treasury Office at 57,55 55,65 2,75 1,90 Thiruvidaimarudur G.O.Ms.No.410/ Finance (T&A-3) Dept./Dt.17.10.13 AS / TS / RAS: 6005 Electrical Division, Salem 2,50 2,50

21 . Construction of Own Building for Sub Treasury Office at Thiruvaiyaru 57,75 27,09 2,75 30,66 G.O.Ms.No.410/ Finance (T&A-3) Dept./Dt.17.10.13 AS / TS / RAS: 6005 Electrical Division, Salem 2,30 2,30

Building C & M Division, Nagapattinam 22 . Construction of Sub Treasury building at Mayiladuthurai in 58,05 62 57,43 50 56,93 Nagapattinam District. G.O.Ms.No.410, Finance (T&A-3) Dept, Dt.17.10.13 AS / TS / RAS: 6005 Electrical Division, Salem 2,00 2,00 2,00

23 . Construction of Sub Treasury building at Kilvelur in Nagapattinam 64,55 64,55 63,55 1,00 District. G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Salem 2,00 2,00 2,00

24 . Construction of Sub Treasury building at Kuthalam in Nagapattinam 64,55 64,55 63,55 1,00 District. G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Salem 2,00 2,00 2,00

5 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AM [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AM Treasuries and Accounts

16 Major Works ( DPC4059 01 051 AM 16 08 )

Building C & M Division, Salem 25 . Construction of Sub-Treasury Office at Gangavalli in Salem Dist. 63,55 31,03 64,55 32,52 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Salem 3,00 2,00 3,00

26 . Construction of Sub-Treasury Office at Valappady in Salem Dist. 64,44 64,44 50 63,94 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6644 Electrical Division, Salem 2,00 2,00 2,00

27 . Construction of building for Sub- Treasury office at Salem 57,05 57,05 50 56,55 G.O.Ms.No.410/ Finance (T&A-3) Dept./Dt.17.10.13 AS / TS / RAS: 6005 Electrical Division, Salem 3,00 3,00 3,00

28 . Construction of new building for Sub treasury Office building at 66,55 36,55 Suramangalam in Salem District G.O.Ms.No.300 Fin (T&A) Dept Dt. 28.11.2016 AS / TS / RAS: 6655 Electrical Division, Salem

Building C & M Division, Aryallur 29 . Construction of Sub Treasury Building at Sendurai in Ariyalur District. 58,00 41,81 16,19 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6050 Electrical Division, Salem 2,50 2,50

30 . Construction of Sub Treasury Building at Veppanthattai in 57,50 30,15 27,35 Perambalur District. G.O.Ms.No.302, Fin (T&A-III) Dt, 29.12.2014 G.O.Ms.No.64/Fin (T&A- III) Dept, dt.10.03.2015 AS / TS / RAS: 6000 Electrical Division, Salem 2,50 2,50

31 . Construction of new building for Alathur Sub Treasury at Perambalur 72,05 28,82 District G.O.Ms.No.56 Fin (T&A-3) Dept Dt. 06.03.2017 AS / TS / RAS: 7205 Electrical Division, Salem

Building C & M Division, Coimbatore 32 . Construction of sub Treasury office Building at Kinathakadavu in 56,55 56,55 25,00 31,55 Coimbatore G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division, Coimbatore 3,50 3,50 50 3,00

6 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AM [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AM Treasuries and Accounts

16 Major Works ( DPC4059 01 051 AM 16 08 )

Building C & M Division, Karur 33 . Construction of Sub Treasury Office Building at Krishnarayapuram in 59,50 58,74 76 . G.O.Ms.No.64/Fin(T&A), Dept., Dated.10.03.2015. AS / TS / RAS: 6250 Electrical Division, Coimbatore 3,00 2,13 50 87

34 . Construction of sub Treasury office building at Tharagampatty in 59,50 58,50 50 1,00 in Karur District. G.O. Ms No.64/Fin(T&A) Dept dated : 10.03.2015. AS / TS / RAS: 6250 Electrical Division, Coimbatore 3,00 50 3,00

35 . Construction of Sub Treasury Office Building at Aravakuruchi in Karur 56,55 54,24 2,31 District. G.O.Ms.No.410/Fin(T&A-3), Dept., Dated.17.10.2013 AS / TS / RAS: 6005 Electrical Division, Coimbatore 3,50 3,50

Building C & M Division, Dindigul 36 . Constn. of own building for Sub Treasury office at Authoor in Dindigul 63,05 63,05 District. G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Madurai 3,50 3,46 50

Building C & M Division, Theni 37 . Construction of Sub Treasury Office building at Andipatti in Theni 56,05 55,67 38 District. G.O Ms.No.410, Treasuries and Account Department, Dated:17.10.2013 and G.O.Ms.No.233, Fin (T&A-III) Dept, dated 24.9.2014 AS / TS / RAS: 6005 Electrical Division, Madurai 4,00 4,00

Building C & M Division, Ramanathapuram 38 . Construction of Sub Treasury office at Thiruppathur in Sivagangai 37,00 35,00 2,00 District G.O.Ms.No.39/ FIN (T&AIII) Dept Dt 08.02.2016 AS / TS / RAS: 3900 Electrical Division, Madurai 2,00 2,00

39 . Construction of Sub Treasury office at Rameswaram in Ramnad 57,05 55,90 1,15 District G.O.Ms.No.410, Fin (T&A-III) Dept, dated 17.10.2013 and G.O. Ms.No. 235, Fin (T&A-III) Dept. Dt. 26.09.2014 AS / TS / RAS: 6005 Electrical Division, Madurai 3,00

7 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AM [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AM Treasuries and Accounts

16 Major Works ( DPC4059 01 051 AM 16 08 )

Building C & M Division, Virudhunagar 40 . Construction of Sub Treasury at Kariyapatti 63,55 57,49 6,06 G.O Ms. No 302, Fin (T&A-III) Dept, dated 29-12-2014 AS / TS / RAS: 6655 Electrical Division, Madurai 3,00 3,00

Building C & M Division, Thoothukudi 41 . Construction of Own building for Sub- Treasury office at Ottapidaram 52,00 51,90 1 1 in Thoothukudi District G.O.Ms.No.403/Finance(Treasury&Account-)Dept/ Date;15.11.2012 AS / TS / RAS: 5500 Electrical Division, Madurai 3,00 2,65

Building C & M Division, Thirunelveli 42 . Construction of sub Treasury office Building at V.K. Pudur in Tirunelveli 57,05 21,93 37,00 35,12 G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 AS / TS / RAS: 6005 Electrical Division, Madurai 3,00 2,00 3,00

43 . Construction of sub Treasury office Building at Tirunelveli Town 62,56 62,54 1 G.O.Ms.No.410 Fin (T&A-3) Dept Dt. 17.10.2013 RAS G.O.Ms.No.175 Fin (T&A-3) Dept Dt. 22.06.2015 AS / TS / RAS: 6606 Electrical Division, Madurai 3,50 3,50

44 . Construction of sub Treasury office Building at Alankulam in Tirunelveli 62,75 62,48 27 G.O.Ms.No.44, Fin (T&A-3)Dept. Dt:16.02.15 AS / TS / RAS: 6600 Electrical Division, Madurai 3,25 3,25

Name of Division Yet to be Identified 45 . Construction of own building for 7 Sub Treasury Offices 4,28,90 2,77,88 2,77,88 New Scheme - AS awaited AS / TS / RAS: 42890 Name of Division Yet to be Identified

TOTAL - 4059 01 051 AM 66,69,94 29,22,88 22,87,49 24,34,01 10,65,27

8 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AR [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AR Transport Department

16 Major Works ( DPC4059 01 051 AR 16 08 )

Building Construction Division-I, Chennai 1 . Construction of Office Buildings for Joint Transport Commissioners in 3,63,87 3,61,88 8,00 North and G.O.Ms.No.432 Rev Dept Dt. 31.10.2013 . RAS GO No. 347/home (Tr. VII) Dated. 20.04.2015 AS / TS / RAS: 38387 Electrical Division-I, Chennai 20,00 19,18

2 . Construction of Office building for RTO - Chennai (North East) at R.K. 2,00,00 90,75 Nagar G.O.Ms.No.845 Home Transport VII Dept Dt. 29.11.2016 AS / TS / RAS: 20000 Electrical Division-I, Chennai

Building C & M Division, Thiruvallur 3 . Construction of Regional Transport Office at Ponnamalle 2,48,43 99,37 G.O.(Ms) No.130, Home Dept, Dt.14.02.2017 AS / TS / RAS: 24843 Electrical Division-2, Chennai

Building C & M Division, Kancheepuram 4 . Providing Protection Wall in Testing Track Soolinganallur in 1,86,46 2,97 60,00 1,23,49 Kancheepuram G.O.Ms.No.177 Home Dept Dated 15.02.2016 AS / TS / RAS: 18646 Electrical Division-2, Chennai

Building C & M Division, Vellore 5 . Construction of unit office at Ambur in Vellore District 1,26,70 50,68 G.O.(Ms) No.131, Home Dept , Dt.14.02.2017 AS / TS / RAS: 12670 Electrical Division-2, Chennai

Building C & M Division, Villupuram 6 . Construction of office building and formation testing track for Regional 3,41,12 3,15,47 9,00 25,65 Transport Offices at Tindivanam G.O.Ms.No.1013 Home (Tr.VII) Dept Dt.26.11.2013 RAS G.O.(Ms).No.819 Home (Tr.VII) Dept./Dated.16.11.2015 AS / TS / RAS: 38558 Electrical Division-2, Chennai 44,46 21,72 13,05

Building C & M Division, Trichy 7 . Construction of unit office at Musiri in Trichy 1,23,59 49,44 G.O.(Ms) No.131, Home Dept, Dt.14.02.2017 AS / TS / RAS: 12359 Electrical Division, Coimbatore

9 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AR [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AR Transport Department

16 Major Works ( DPC4059 01 051 AR 16 08 )

Building C & M Division, Trichy 8 . Construction of Regional Transport Office, Srirangam 1,66,97 23,83 1,47,22 1,43,14 G.O.Ms.No.174 / Home (Tr VII) Dept Dt.19.3.2013 AS / TS / RAS: 17697 Electrical Division, Salem 10,00 3,63 10,00

Building C & M Division, Pudukottai 9 . Construction of unit office at Illuppur in Pudukottai District 1,26,48 50,59 G.O.(Ms) No.131, Home Dept, Dt.14.02.2017 AS / TS / RAS: 12648 Electrical Division, Salem

Building C & M Division, Dharmapuri 10 . Construction of office building and formation testing track for Regional 2,18,50 1,44 2,17,06 2,17,06 Transport Offices at Hosur G.O.Ms.No.1013 Home (Tr.VII) Dept Dt.26.11.2013 AS / TS / RAS: 23200 Electrical Division, Coimbatore 13,50 13,50 13,50

Building C & M Division, Coimbatore 11 . Construction of Regional Transport Office, Udumalaipet. 74,92 74,80 1 1 G.O.Ms.No: 430 Revenue RA2 (1) dated: 30.10.2013 AS / TS / RAS: 7842 Electrical Division, Coimbatore 3,50 3,50

Building C & M Division, Erode 12 . Construction of unit office and testing track at Bhavani in Erode Dist. 1,21,32 74,61 8,00 46,71 G.O.Ms.No.1022, Home (Tpt) Dept, Dt. 27.11.13 AS / TS / RAS: 12632 Electrical Division, Coimbatore 5,00 3,52 1,48

13 . Construction of Regional Transport Office at Tiruppur 2,40,50 96,20 G.O.(Ms) No.130, Home, Dt.14.02.2017 AS / TS / RAS: 24050 Electrical Division, Coimbatore

Building C & M Division, Virudhunagar 14 . Construction of Regional Transport office building at Srivilliputhur 46,17 56 46,17 G.O.Ms.No.824 Home (Tr 7) Dept Dt.24.09.2009 AS / TS / RAS: 5217 Electrical Division, Madurai 6,00 6,00

10 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 AR [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction AR Transport Department

64 Lands ( DPC4059 01 051 AR 64 07 )

Building Construction Division-I, Chennai 1 . Purchase of land measuring an extent of 4000 Sq.ft owned by the 1,20,00 Metropolitan Transport Corporation at G.O.Ms.No.845 Home (Tpt VII) Dept Dt. 29.11.2016 AS / TS / RAS: 12000 Electrical Division-I, Chennai

TOTAL - 4059 01 051 AR 28,07,49 9,03,48 4,58,58 3,00,04 7,91,09

11 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

North Presidency Division, Chennai 1 . Provision of fencing and protective arrangements for land resumed 20,00 16,70 20,00 from private Institutions G.O.Ms.No.189, Rev Dept, dated 7.6.2012 AS / TS / RAS: 2000 Electrical Division-I, Chennai

South Presidency Division, Chennai 2 . Construction of Green roof on the 2nd floor of west wing building of 11,02 1,02 10,00 Ezhilagam above the office of the Commissionerate of Land Reforms (Part II Scheme 2014-15) G.O. Ms. No. 378, Revenue (L.R.1(2) Dept., dt 27.08.14 AS / TS / RAS: 3000 Electrical Division-I, Chennai 18,98 18,98

Building Construction Division-I, Chennai 3 . Construction of Taluk office building , Chennai 1,87,00 1,43,23 45,05 43,77 GO.Ms.No.91 (RA II (1) Dept dt.25.2.2014 AS / TS / RAS: 20200 Electrical Division-I, Chennai 15,00 9,12 4,00 4,88

4 . Construction of Taluk office building at Guindy, Chennai 1,89,00 1,88,10 1 90 GO.Ms.No.91 (RA II (1) Dept dt.25.2.2014 AS / TS / RAS: 20200 Electrical Division-I, Chennai 13,00 9,83 3,17

5 . Construction of Amijikarai Taluk office building , Chennai 1,88,00 1,86,52 1 1,48 GO.Ms.No.91 (RA II (1) Dept dt.25.2.2014 AS / TS / RAS: 20200 Electrical Division-I, Chennai 14,00 13,72

6 . Construction of Puraisavakkam / Tondairpet Taluk office building at 1,88,00 1,83,40 1 Chennai GO.Ms.No.91 (RA II (1) Dept dt.25.2.2014 AS / TS / RAS: 20200 Electrical Division-I, Chennai 14,00 13,19

7 . Construction of Taluk office building , Chennai 1,88,00 1,78,00 50,00 76,62 GO.Ms.No.91 (RA II (1) Dept dt.25.2.2014 AS / TS / RAS: 20200 Electrical Division-I, Chennai 14,00 14,00 10,00

12 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Thiruvallur 8 . Construction of Tahsildars Quarters at Maduravayal 18,60 17,60 17,60 G.O.(Ms) No.91 Revenue (RA II (1) Department Dated25.02.2014 AS / TS / RAS: 2000 Electrical Division-2, Chennai 1,40 1,40 1,40

9 . Construction of RI Office cum residential Quarters at Thiruvootiyur 13,14 1,00 12,14 G.O.Ms.No.418 Rev (RA II-1) Dept dt. 07.12.2015. AS / TS / RAS: 1314 Electrical Division-2, Chennai

10 . Construction of Tahsildars Quarters at Thiruvottriyur 18,60 17,60 17,60 G.O.(Ms) No.91 Revenue (RA II (1) Department Dated25.02.2014 AS / TS / RAS: 2000 Electrical Division-2, Chennai 1,40 1,40 1,40

11 . Construction of New Taluk Office Building at Thiruvottiyur. 1,82,00 1,81,00 1,50,00 G.O.No.91 Rev (RA II-1) Dept. 25.02.2014. AS / TS / RAS: 20200 Electrical Division-2, Chennai 20,00 20,00 10,00

12 . Construction of New Taluk Office Building at 1,82,00 1,81,00 1,50,00 G.O.No.91 Rev (RA II-1) Dept. 25.02.2014. AS / TS / RAS: 20200 Electrical Division-2, Chennai 20,00 20,00 10,00

13 . Construction of Taluk office building at in Thiruvallur 1,82,00 58 1,71,42 1,29,22 District G.O.Ms.No.430 Revenue (RA 2(1)) Dept Dated: 30.10.2013 AS / TS / RAS: 20200 Electrical Division-2, Chennai 20,00 20,00 10,00

14 . Construction of Village Administrative Office-cum-residential Quarters 6,95 6,95 6,95 at Padi in Thiruvallur District G.O.Ms.No.476 Revenue (RA 2(2)) Dept Dated: 27.11.2013 AS / TS / RAS: 695 Electrical Division-2, Chennai

15 . Construction of RI Office cum residential Quarters at Manali 13,14 1,00 12,14 G.O.Ms.No.418 Rev (RA II-1) Dept dt. 07.12.2015. AS / TS / RAS: 1314 Electrical Division-2, Chennai

13 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Kancheepuram 16 . Construction of Building for District Assistant Director of Survey Office 1,59,00 1,12 1,07,88 50,00 at Kancheepuram G.O.Ms.No. 87, Revenue Department, Dated.18.02.2016 AS / TS / RAS: 17000 Electrical Division-2, Chennai 11,00 6,00 5,00

17 . Construction of Revenue Inspector Office cum Residential Quarters at 13,14 13,14 Paiyanoor G.O.Ms.No. 418, Revenue Department, Dated 07.12.2015 AS / TS / RAS: 1314 Electrical Division-2, Chennai

18 . Construction of Revenue Inspector Office cum Residential Quarters at 13,14 3,64 9,50 Mambakkam G.O.Ms.No. 418, Revenue Department, Dated.07.12.2015 AS / TS / RAS: 1314 Electrical Division-2, Chennai

19 . Construction of Revenue Inspector Office cum Residential Quarters at 13,14 3,00 10,14 Nellikuppam G.O.Ms.No. 418, Revenue Department, Dated.07.12.2015 AS / TS / RAS: 1314 Electrical Division-2, Chennai

20 . Construction of New Taluk office at at Kancheepuram District 1,88,00 59,00 1,62,00 1,28,90 10 G.O.170 / Revenue RA 2(1) Dept. Dt:28.05.2014 AS / TS / RAS: 20200 Electrical Division-2, Chennai 14,00 14,00

21 . Setting up of State level Training Centre for Revenue Officials at 35,00 34,99 1 34,99 Chengalpattu in Kancheepuram District G.O.Ms.No.206 Rev (RA2 (1) Dept Dt. 08.06.2012 AS / TS / RAS: 4000 Electrical Division-2, Chennai 5,00 5,00 5,00

22 . Construction of Taluk office buildings Sholinganallur in Kancheepuram 2,02,00 2,01,00 1,60,00 G.O.Ms.No.430 Revenue (RA 2(1)) Dept Dated 30.10.2013 AS / TS / RAS: 20200 Electrical Division-2, Chennai

Building C & M Division, Vellore 23 . Construction of New Taluk office building at Anaicut in Vellore District. 1,88,50 1,57,85 22,50 30,65 G. O. Ms. No.91 Revenue (RA II (1))Dept. Dated 25.02.2014 AS / TS / RAS: 20200 Electrical Division-2, Chennai 13,50 5,62 5,00 7,88

14 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Cuddalore 24 . Construction of Taluk office building at Chidambaram. 1,90,00 1,85,07 58,44 4,93 GO Ms. No.91/Rev. RA-II(1) Dept.Dt25.02.2014 AS / TS / RAS: 20200 Electrical Division-2, Chennai 12,00 7,48 2,00 4,52

25 . Construction of collectorate building at Cuddalore District 27,17,62 25,01,19 2,54,12 2,16,42 G.O.Ms.No.126 Rev Dept Dt 30.03.2012 & RAS G.O.Ms.No.128 Rev (RA1 (2) Dept Dt. 03.03.2016 AS / TS / RAS: 275412 Electrical Division-2, Chennai 36,50 36,50

26 . Construction of Sub Collector office building at Chidambaram. 1,29,97 98,46 18,93 31,51 GO Ms.No. 91/Rev.(RA.II(1)) Dept. Dt 25.02.2014 AS / TS / RAS: 13897 Electrical Division-2, Chennai 9,00 6,18 2,82

Building C & M Division, Villupuram 27 . Construction of New Taluk office Building at Vikkaravandi in 1,90,00 1,75,51 1,00 14,49 Villupuram District. G.O.170 / Revenue (RA 2(1)) Dept. Dt:28.05.2014 AS / TS / RAS: 20200 Electrical Division-2, Chennai 12,00 12,00

28 . Construction of Revenue Inspector Office-cum-residential Quarters at 12,39 12,39 Vellimalai. G.O.(Ms).No.418 Revenue (RA2(1)) Dept. Dt.07.12.2015. AS / TS / RAS: 1314 Electrical Division-2, Chennai 75 75

Building C & M Division, Trichy 29 . Construction of Taluk office buildings for Trichy East. 1,86,00 1,85,00 50 1,50,00 G.O.Ms.No.161 RA.1(1) Dept Dated 03.06.2013 AS / TS / RAS: 20000 Electrical Division, Salem 14,00 14,00 10,00

30 . Construction of Taluk office at Marungapuri. 1,89,00 1,81,00 3,58 89,00 G.O.Ms.No.163 Rev (RA1 (1) Dept Dt. 03.06.2013 AS / TS / RAS: 20000 Electrical Division, Salem 11,00 14,00 9,00

31 . Construction of Revenue Inspector Office cum-Residential Quarters at 12,44 12,44 Tiruverambur. G.O.Ms.No.418 Rev (RA2(1)) Dept/ Dt.7.12.2015. AS / TS / RAS: 1314 Electrical Division, Salem 70 70

15 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Trichy 32 . Construction of Revenue Inspector Office cum-Residential Quarters at 12,44 12,44 Trichirappalli North in Trichy Dist. G.O.Ms.No.418 Rev (RA2(1)) Dept/ Dt.7.12.2015. AS / TS / RAS: 1314 Electrical Division, Salem 70 70

Building C & M Division, Pudukottai 33 . Construction of Taluk Office building at Karambakudi in Pudukkottai 1,86,00 1,81,00 50 1,85,50 District G.O.170 / Revenue RA 2(1) Dept. Dt:28.05.2014 AS / TS / RAS: 20200 Electrical Division, Salem 16,00 16,00 16,00

34 . Construction of Taluk Office building at Ponnamaravathy in 1,92,00 1,86,67 5,02 5,00 Pudukkottai District. G.O.170 / Revenue RA 2(1) Dept. Dt:28.05.2014 AS / TS / RAS: 20200 Electrical Division, Salem 10,00 10,00

Building C & M Division, Thanjavur 35 . Construction of Taluk Office Building at Budalore in Thanjavur District 1,91,00 1,85,07 83 5,93 Go Ms No. 91/ Revenue (RA1 (2)) Dept. Dt.25.02.2014 AS / TS / RAS: 20200 Electrical Division, Salem 11,00 9,21 1,00 1,79

36 . Creation of New Muthupettai Taluk at Tiruvarur Dt. 1,91,86 1,83,85 1 G.O. (RT) No.53 Rev (RA (1) Dept Dt. 20.02.2013 AS / TS / RAS: 20286 Electrical Division, Salem 11,00 11,00

37 . Construction of Tasildar Quarters at Budalore in Thanjavur District 19,20 18,75 G.O.Ms.No.91/Rev (RA-1 (2))Dept.Dt.25.02.2014 AS / TS / RAS: 2000 Electrical Division, Salem 80 66 14

38 . Construction of Office cum Residential Quarters for Firka Surveyor's at 12,31 10,96 1,35 Pattukottai in Thanjavur District Go Ms No. 257 Rev (SS-II (2)) Dept.Dt.16.07.2013 AS / TS / RAS: 1271 Electrical Division, Salem 40 40

Building C & M Division, Nagapattinam 39 . Construction of Taluk office building at Needamangalam in Thiruvarur 2,11,20 2,08,63 4,20 2,57 District G.O.Ms.No.33 Rev Dept Dt. 14.01.2015 AS / TS / RAS: 22220 Electrical Division, Salem 11,00 8,82 2,18

16 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Nagapattinam 40 . Construction of Taluk office building at Valangaiman in Thiruvarur 2,11,20 1,91,23 4,20 19,97 District G.O.Ms.No.33 Rev Dept Dt. 14.01.2015 AS / TS / RAS: 22220 Electrical Division, Salem 11,00 8,69 2,31

41 . Construction of Revenue Inspector Office cum Residential Quarters at 12,39 12,39 Sannanallur in Thiruvarur District. G.O.Ms.No.418/Revnue/RA2(1)/Dept.dt. 17-12-2015 AS / TS / RAS: 1314 Electrical Division, Salem 75 75

Building C & M Division, Salem 42 . Construction of Revenue Inspector Office cum Residential Quarters at 13,14 50 12,64 Suramangalam in Salem Dt. G.O.Ms. 418/Revenue RA2(1) Department dt.7.12.2015 AS / TS / RAS: 1314 Electrical Division, Salem

43 . Construction of Taluk office building at Attur in Salem District 1,90,00 1,19,38 1,14,32 70,62 G.O.Ms.No.557 Revenue RA II (1) dt., 17.12.2014 AS / TS / RAS: 20200 Electrical Division, Salem 12,00 3,58 8,00 8,42

44 . Construction of Taluk Office - Salem (West) in Salem Dt. 1,90,00 1,82,72 49,53 7,28 G.O.Ms.No.91 Revenue RA II (1) dt., 25.2.2014 AS / TS / RAS: 20200 Electrical Division, Salem 12,00 11,62 6,97 38

45 . Construction of Taluk Office Building at Vazhapadi in Salem District 2,32,20 1,09 1,20,91 1,00 1,25,00 G.O.Ms.No.288 Rev II (1) Dpet Dt. 25.05.2007 AS / TS / RAS: 24420 Electrical Division, Salem 12,00 8,00 10,00

46 . Construction of Taluk Office at Mettur in Salem Dist. 1,90,00 1,28,34 78,72 61,66 G.O.Ms.No.91 Revenue RA II (1) dt., 25.2.2014 AS / TS / RAS: 20200 Electrical Division, Salem 12,00 9,70 2,00 2,30

47 . Construction of Revenue Inspector Office cum Residential Quarters at 13,14 50 12,34 Kondalampatty in Salem Dt. G.O.Ms.No. 418/Revenue RA2(1) Department dt.7.12.2015 AS / TS / RAS: 1314 Electrical Division, Salem

17 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Salem 48 . Construction of Taluk office at Salem in Salem Dist. 1,90,00 47 1,80,00 1,00 1,25,00 G.O.Ms.No.91 Revenue RA II (1) dt., 25.2.2014 AS / TS / RAS: 20200 Electrical Division, Salem 12,00 11 11,97 10,00

Building C & M Division, Namakkal 49 . Construction of Revenue Divisional Officer Quarters at Namakkal. 26,11 26,00 11 109/Rev/RA2(1)Dept/06.03.2015. AS / TS / RAS: 2811 Electrical Division, Coimbatore 2,00 2,00

50 . Construction Taluk Office building and Thasildar Quarters at Kollihills 2,62,90 2,52,85 10,05 in Namakkal District. G.O.Ms.No.229/Rev.dept./dt.20.06.12, RAS G.O.Ms.No.34/Rev/RA2(1)/dt.18.01.16 AS / TS / RAS: 27540 Electrical Division, Coimbatore 12,50 12,02

Building C & M Division, Dharmapuri 51 . Construction of Taluk office building at Krishnagiri in Krishnagiri 1,90,00 1,89,05 Distirct G.O.Ms.No: 91 Revenue (RA) II (1) Department dated: 25.02.2014. AS / TS / RAS: 20200 Electrical Division, Coimbatore 12,00 6,35 3,65

Building C & M Division, Aryallur 52 . Construction of Revenue Inspector Office-cum residential Quarters 13,14 5,00 8,13 building @ Koovathur (or) Koothur in Perambalur District G.O.Ms.No.418 /Rev2(1) / Dept / dt.17.12.2015 AS / TS / RAS: 1314 Electrical Division, Salem

Building C & M Division, Coimbatore 53 . Construction of Tahsildars Quarters at Madukkarai in Coimbatore 19,00 10,00 9,00 9,00 G.O.(Ms) No.91 Revenue (RA II (1) Department Dated25.02.2014 AS / TS / RAS: 2000 Electrical Division, Coimbatore 1,00 1,00 1,00

54 . Construction of Tahsildars Quarters at Perur in Coimbatore 19,00 14,87 4,00 4,13 G.O.(Ms) No.91 Revenue (RA II (1) Department Dated25.02.2014 AS / TS / RAS: 2000 Electrical Division, Coimbatore 1,00 50 1,00

55 . Construction of Revenue Inspector Office - Cum Residential Quarters 13,14 13,14 at Thungavi in Tiruppur District G.O No:418 Revenue (RA2(1)) Dept Dt:07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

18 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Coimbatore 56 . Construction of Revenue Inspector Office - Cum Residential Quarters 13,14 13,14 at Vadavalli in Coimbatore District G.O No:418 Revenue (RA2(1)) Dept Dt:07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

57 . Construction of Revenue Inspector Office - Cum Residential Quarters 13,14 13,14 at Mathampatti in Coimbatore District G.O No:418 Revenue (RA2(1)) Dept Dt:07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

58 . Construction of Taluk Office Building at Perur. 1,92,00 1,70,45 24,55 21,50 5 G.O.Ms.No: 91 Revenue (RA) II (1) Department dated: 25.02.2014. AS / TS / RAS: 20200 Electrical Division, Coimbatore 10,00 9,90 10 10

59 . Construction of Revenue Inspector Office - Cum Residential Quarters 13,14 13,14 at Kurichi in Coimbatore District G.O No:418 Revenue (RA2(1)) Dept Dt:07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

60 . Construction of Revenue Inspector Office - Cum Residential Quarters 13,14 13,14 at Thirumalayampalayam in Coimbatore District G.O No:418 Revenue (RA2(1)) Dept Dt:07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

61 . Construction of New building for Coimbatore Collectorate in MPC 18,06,96 15,66,46 80,00 2,40,50 Coimbatore. G.O.Ms.No.432 Revenue (RA 2(1)) Dept Dated: 31.10.2013 , G.O.Ms.No. 103 Revenue (RA1(2) Dept, dated: 26.02.2015 AS / TS / RAS: 203496 Electrical Division, Coimbatore 2,28,00 1,17,83 1,10,17

62 . Construction of Taluk office building at Madukkarai. 1,92,00 1,72,46 24,55 19,50 4 G.O.Ms.No: 91 Revenue (RA) II (1) Department dated: 25.02.2014. AS / TS / RAS: 20200 Electrical Division, Coimbatore 10,00 9,89 10 10

63 . Creation of New Taluk - Annur taluk in Coimbatore District 1,92,86 54,09 1,40,57 50 1,38,27 G.O.Ms.No.407 Rev (RA1 (1) Dept Dt. 21.11.2012 AS / TS / RAS: 20286 Electrical Division, Coimbatore 10,00 9,50 10,00

19 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Coimbatore 64 . Construction of Revenue Inspector Office - Cum Residential Quarters 13,14 2,00 11,14 at Kuniyamuthur in Coimbatore District G.O No:418 Revenue (RA2(1)) Dept Dt:07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

65 . Construction of RDO Building at Udumalaipet at Coimbatore. 1,13,50 1,13,16 1 1 G.O.Ms.No.288 RA 2 (1) Dept Dt. 14.8.2012 AS / TS / RAS: 12000 Electrical Division, Coimbatore 6,50 6,06

66 . Creation of New Taluk - Kinathukadavu taluk in Coimbatore District 1,92,86 1,58,72 32,87 50 33,64 G.O.Ms.No.406 Rev (RA1 (1) Dept Dt. 21.11.2012 AS / TS / RAS: 20286 Electrical Division, Coimbatore 10,00 9,50 10,00

Building C & M Division, Erode 67 . Construction of New Taluk office building at Uthukuli in Tiruppur Dist 1,92,00 1,60,13 41,60 31,87 G.O.Ms.No. 91/Revenue (RAII(1))Department dated 25.02.2014 AS / TS / RAS: 20200 Electrical Division, Coimbatore 10,00 6,52 2,50 3,48

68 . Construction of Revenue Inspector office cum-Residential Quarters at 13,14 13,14 Velampalayam in Tiruppur District G.O.(Ms) No.418 Revenue (RA2(1) Department Dated 07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

69 . Construction of New Taluk office building (south) at Tiruppur in 1,92,00 1,20,12 41,60 71,88 Tiruppur Dist. G.O.Ms.No. 91/Revenue (RAII(1))Department dated 25.02.2014 AS / TS / RAS: 20200 Electrical Division, Coimbatore 10,00 7,18 2,00 2,82

70 . Construction of Tahsildars Quarters at Uthukuli in Tiruppur 17,50 7,50 17,50 G.O.(Ms) No.91 Revenue (RA II (1) Department Dated25.02.2014 AS / TS / RAS: 2000 Electrical Division, Coimbatore 2,50 84 1,50 1,66

71 . Construction of Revenue Inspector office cum-Residential Quarters at 13,14 13,14 Nallur in Tiruppur District G.O.(Ms) No.418 Revenue (RA2(1) Department Dated 07.12.2015 AS / TS / RAS: 1314 Electrical Division, Coimbatore

20 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Erode 72 . Construction of District Revenue officers Quarters at Erode in Erode 52,09 40,00 12,09 District G.o.Ms.No.111 Dt Revenue RA2(1) Dated 29.2.2016. AS / TS / RAS: 5459 Electrical Division, Coimbatore 2,50 1,50 1,00

73 . Construction of New Taluk office building at Perundurai in Erode Dist. 2,10,20 80,00 1,30,20 G.O.Ms.No:417 Revenue (RA2(1) Dept. / Dt.07.12.15 AS / TS / RAS: 22220 Electrical Division, Coimbatore 12,00 6,00 6,00

Building C & M Division, Ooty 74 . Construction of Additional Collectorate at Udhagamandalam for 25,60,00 25,34,78 5,00 20,22 5,00 accommodation of 28 Offices G.O.Ms.No.429 Revenue (RA 1(2)) Dept Dated: 30.10.2013 AS / TS / RAS: 270000 Electrical Division, Coimbatore 1,40,00 1,25,99 14,01

75 . Construction of Village Administrative Office-cum-residential Quarters 6,95 1 at Oveli-II-The Nilgiris G.O.Ms.No.476 Revenue (RA 2(2)) Dept Dated: 27.11.2013 AS / TS / RAS: 695 Electrical Division, Coimbatore

Building C & M Division, Karur 76 . Construction of Village Administrative Office Cum Residential Quarters 6,95 6,74 21 at Thirukkampuliyur in Karur District. G.O.Ms.No.169/Rev(RA2(1)), Dept., Dated.15.04.2015. AS / TS / RAS: 695 Electrical Division, Coimbatore

77 . Construction of Revenue Inspector Office Cum Residential Quarters at 13,14 13,14 Manmangalam in Karur District. G.O.Ms.No.418/Rev(RA2(1)), Dept., Date.07.12.2015. AS / TS / RAS: 1314 Electrical Division, Coimbatore

Building C & M Division, Madurai 78 . Construction of Village Administrative Office-cum-residential Quarters 6,95 4,95 at Sathamangalam -Madurai G.O.Ms.No.476 Revenue (RA 2(2)) Dept Dated: 27.11.2013 AS / TS / RAS: 695 Electrical Division, Madurai

79 . Construction of Taluk Office building for Madurai Taluk Office West in 1,87,50 1,24,51 86,91 62,99 Madurai District. G.O.Ms.No.91/Rev (RA.II (2) / Dept/dated 25.02.2014. AS / TS / RAS: 20200 Electrical Division, Madurai 14,50 4,61 10,00 9,89

21 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Madurai 80 . Construction of Taluk Office building for East Taluk Office at 1,92,00 1,91,43 52 Narasingam in Madurai District. G.O.Ms.No.91/Rev (RA.II (2) / Dept/dated 25.02.2014. AS / TS / RAS: 20200 Electrical Division, Madurai 10,00 10,00 1,00

81 . Construction of Taluk Office at Thirupparankundram in Madurai 20,00 20,00 G.O.Ms.No.91/Rev (RA.II (2) / Dept/dated 25.02.2014. AS / TS / RAS: 2000 Electrical Division, Madurai

82 . Construction of Tauk Office building and Tahsildar Quarters at 1,87,37 33,06 1,35,87 1,54,31 Thirupparankundram in Madurai District. G.O.Ms.No.91/Rev (RA.II (2) / Dept/dated 25.02.2014. AS / TS / RAS: 20200 Electrical Division, Madurai 14,63 13,13 14,63

83 . Construction of New Taluk Office Building at Usilampatti 1,87,50 1,87,40 83 10 G.O.Ms.No.174 Rev (RA2(1) Dept Dt. 29.05.2014 AS / TS / RAS: 20200 Electrical Division, Madurai 14,50

Building C & M Division, Dindigul 84 . Construction of RI office cum Quarters at Ayyampalayam in Dindigul 13,14 13,14 District G.O.(Ms).No.418 Revenue (RA2(1)) Dept. Dt.07.12.2015. AS / TS / RAS: 1314 Electrical Division, Madurai

Building C & M Division, Ramanathapuram 85 . Construction of combined offices building in Master Plan Complex at 10,25,00 9,88,99 30,00 36,01 Ramnad G.O.Ms.No.379 Rev [RA1(2)] Dept Dt.28.09.2013 AS / TS / RAS: 110000 Electrical Division, Madurai 75,00 59,22 75 15,78

86 . Construction of Circuit House at Rameswaram 2,07,47 1,97,70 48,02 9,77 G.O.Ms.No.422 Rev (RA2 (1) Dept Dt. 05.09.2014 AS / TS / RAS: 22300 Electrical Division, Madurai 15,53 9,78 5,00 5,75

Building C & M Division, Virudhunagar 87 . Constn of Taluk Office building at Sattur in Virudhunagar 1,98,25 1,31,52 58,25 66,73 Go.No.53/ Rev (RA1 (2) Dept Dt. 29.01.2015 AS / TS / RAS: 21300 Electrical Division, Madurai 14,75 4,73 9,75 10,02

22 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Building C & M Division, Virudhunagar 88 . Construction of Revenue Inspector office cum residential Quarters at 13,14 3,26 9,88 Kilarajakularaman in Rajapalayam Taluk G.O.Ms.No.418/ Revenue (RA2(1)) Department/ dt.07.12.2015 AS / TS / RAS: 1314 Electrical Division, Madurai

89 . Construction of VAO office cum residential Quarters at Moolipatti in 6,95 3,17 3,78 Virudhunagar Taluk G.O.Ms.No.476 Rev Dept Dt. 27.11.2013 G.O.Ms.No.401/ Revenue[RA-2(1)] Dept./ dt.16.11.2015 AS / TS / RAS: 695 Electrical Division, Madurai

Building C & M Division, Thoothukudi 90 . Construction of RI office cum Quarters at Nalattinpudur 12,39 5,00 7,39 G.O. (Ms.) No. 418, Revenue (RA2(1) Department dated: 07.12.2015 AS / TS / RAS: 1314 Electrical Division, Madurai 75 50 25

91 . Construction of RI office cum Quarters at Kamanayakanpatti. 12,39 5,00 7,39 G.O. (Ms.) No. 418, Revenue (RA2(1) Department dated: 07.12.2015 AS / TS / RAS: 1314 Electrical Division, Madurai 75 50 25

Building C & M Division, Nagercoil 92 . Construction of Annexure Building in Kanniyakumari Collectorate 8,94,00 7,92,23 1,03,45 1,01,77 G.O.Ms. No.10 Rev (RA1 (2) Dept Dt. 13.01.2014 AS / TS / RAS: 101350 Electrical Division, Madurai 1,19,50 51,28 74,43 68,22

93 . Construction work to VAO at Padmanabhapuram in Kalkulam Taluk 26,28 24,88 1,40 and Sub Collector office building at Nagercoil in Agasteeswaram Taluk in Kanniyakumari District. G.O.Ms.No. 65/Rev.(RA (2) dept. dt. 04.02.2015 AS / TS / RAS: 2700 Electrical Division, Madurai 72 72

94 . Construction of New Village Office Building 107 Nos in various places 5,35,00 5,04,35 20,00 10,00 13,75 in Kanyakumari District G.O.Ms.No.227 Rev. (RA 1 (1) Dept Dated 18. 06.2012 AS / TS / RAS: 53500 Electrical Division, Madurai

95 . Improvement to the Main Guest house and Bharathi Circuit house at 83,20 75,51 7,12 Kanniyakumari G.O.Ms.No. 552 Rev (RA2(1) dept. dt. 15.12.2014 AS / TS / RAS: 9020 Electrical Division, Madurai 7,00 7,00

23 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JC Land Revenue

16 Major Works ( DPC4059 01 051 JC 16 09 )

Name of Division Yet to be Identified 96 . New Works likely to be sanctioned during 2017-18 60,00,00 53,00,00 1 GO Awaited AS / TS / RAS: 600000 Electrical Division-I, Chennai

JC Land Revenue

64 Lands ( DPC4059 01 051 JC 64 08 )

Building C & M Division, Thanjavur 1 . Towards 150% of the land value for the lands measuring an extent of 2,45 2,45 0.16.5 hectares of wet lands in S.No.367/6, 372/6A, 373/2 belonging to Kanchi Sankara Mutt comprised in Kooranattukaruppur-2 Village, Kumbakonnam Taluk, Thanjavur District towards Compensation to the Sankara Mutt for Provision of pathway to house sites already allotted to the families of deceased children in devastating inferno G.O.(3D) No.122 Rev (LA-I (1) Dept Dt. 23.08.2016 AS / TS / RAS: 245 Electrical Division, Salem

TOTAL - 4059 01 051 JC 258,63,64 145,38,10 93,83,46 24,26,87 20,81,37

24 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building Construction Division-I, Chennai 1 . Construction of Sub Registrar Office at Velacherry 52,55 52,55 52,05 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-I, Chennai 2,45 2,45 2,45

2 . Constsruction of Integrated Registration Complex at 4,47,67 4,47,66 5,00 2,29,11 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 45897 Electrical Division-I, Chennai 11,30 11,30 11,30

3 . Construction of combined registration Department complex at T. 50,00 49,98 Nagar, G.O.Ms.No.144 CR & R (U2) Dept Dt. 20.11.2012 AS / TS / RAS: 5500 Electrical Division-I, Chennai 5,00 3,67 1,33

4 . Construction of combined registration Department complex at South 1,13,00 71,30 50,00 Chennai (Velachery) G.O.Ms.No.144 CR & R (U2) Dept Dt. 20.11.2012 AS / TS / RAS: 11900 Electrical Division-I, Chennai 6,00 6,00 6,00

Building C & M Division, Thiruvallur 5 . Construction of own building for Sub Registrar office at Pallipet 52,00 9,81 42,19 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,00 3,00

6 . Construction of own building for Sub Registrar office at Uthukkottai 52,00 48,43 3,57 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,00 3,00

7 . Construction of own building for Sub Registrar office at Thiruvottiyur. 51,50 51,50 50 51,00 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,50 3,50 3,50

8 . Construction of own building for Sub Registrar office at Manavalanagar. 51,50 51,50 28,62 1,50 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,50 3,50 1,00

25 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building C & M Division, Thiruvallur 9 . Construction of own building for Sub Registrar office at . 51,50 14,74 50,50 36,76 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,50 3,50 3,00

Building C & M Division, Kancheepuram 10 . Construction of Sub Registrar Office Building at in 55,25 37,53 17,72 Kancheepuram District G.O.Ms.No. 42 , Commercial Tax and Registration(U2) Department, Dated.12.03.2015 AS / TS / RAS: 5775 Electrical Division-2, Chennai 2,50 2,50

11 . Construction of Integrated District Registration Office at Kancheepuram 1,30,05 1,11,51 47,78 55,05 Go Ms No. 42/ CT & R/ U2 Dept.Dt.12.03.2015 Govt. CT & R (U2) Dept Lr.No.13609/U2/2015-2 Dt. 18.02.2016 AS / TS / RAS: 14800 Electrical Division-2, Chennai 17,95 16,95 12,95

Building C & M Division, Thiruvannamalai 12 . Construction of Integrated office building Complex for Registration 1,27,93 1,17,92 4,75 Department at Cheyyar in Tiruvannamalai District G.O.Ms.No.4 Commercial Taxes & Registration (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 16904 Electrical Division-2, Chennai 41,11 41,11 1,11

Building C & M Division, Villupuram 13 . Construction of Sub Registerar Office Building at Chinnasalem in 52,00 50,93 Villupuram District. G.O.MS. 4/ CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,00 3,00

14 . Construction of Sub Registerar Office Building at Vadaponparappi in 52,00 51,63 Villupuram District. G.O.MS. 4/ CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division-2, Chennai 3,00 1,00 2,00

Building C & M Division, Pudukottai 15 . Construction of Sub Registrar office at Annavasal in Pudukkottai 55,25 9,82 45,25 45,43 District G.O MS NO 42/CT&R Department dated 12-03-2015 AS / TS / RAS: 5775 Electrical Division, Salem 2,50 2,50 2,50

26 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building C & M Division, Thanjavur 16 . Construction of Registrar Office at Thanjavur 1,88,90 1,56,51 1,00,00 88,90 Go Ms No. 42/ CT & R/ U2 Dept.Dt.12.03.2015 Govt. CT & R (U2) Dept Lr.No.13609/U2/2015-2 Dt. 18.02.2016 AS / TS / RAS: 20685 Electrical Division, Salem 17,95 17,95 10,00 7,95

17 . Construction of Sub Registrar office at Papanadu 54,75 10,77 4,75 43,98 Go Ms No. 42/ CT & R/ U2 Dept.Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Salem 3,00 1,00 3,00

18 . Construction of Sub registrar Office at Thiruppanandal 54,75 9,68 4,75 45,07 Go Ms No. 42/ CT & R/ U2 Dept.Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Salem 3,00 1,00 3,00

Building C & M Division, Salem 19 . Construction of Combined Registrar Department building for 1,63,55 1,56,52 50 1,63,05 Dist.Registrar, Sub Registrar No.1, Sub-Registrar, Ayyothiya-pattanam and Sub-Registrar/ Dhathagapatty in Salem. Go Ms No. 42/ CT & R/ U2 Dept.Dt.12.03.2015 Govt. CT & R (U2) Dept Lr.No.13609/U2/2015-2 Dt. 18.02.2016 AS / TS / RAS: 18150 Electrical Division, Salem 17,95 16,95 17,95

20 . Constn. of Sub-Registrar office at Pethanaickenpalayam at Salem 54,45 53,91 4,45 54 Dist. G.O.Ms.No.42 CR&R(u2) Dept.dt.12.3.2015 AS / TS / RAS: 5775 Electrical Division, Salem 3,30 3,18 1,30 12

21 . Construction of building for Sub Registration office building at 54,75 30,41 24,34 Suramangalam in Bodinaickenpatty Village in Salem Dt. G.O.Ms.No.80/Commercial tax & Registration (U2) Dept. dt.29.9.2015 AS / TS / RAS: 5775 Electrical Division, Salem 3,00 3,00

Building C & M Division, Dharmapuri 22 . Construction of Sub Registarar Office at Marandahalli in Dharmapuri 51,70 36,29 15,41 District G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division, Coimbatore 3,30 3,30

27 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building C & M Division, Dharmapuri 23 . Construction of Sub-Registarar Office at Raiyakottai in Krishnagiri Dist. 51,70 7,89 51,62 43,81 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division, Coimbatore 3,30 3,30 3,30

Building C & M Division, Aryallur 24 . Construction of building for Sub Registrar Office at Sendurai in 54,75 29,34 24,75 25,41 Ariyalur District. G.O.NO 42/ Commercial & Registration (U2) Dept / dated 12.3.15 AS / TS / RAS: 5775 Electrical Division, Salem 3,00 3,00 3,00

25 . Construction of building for Sub Registrar Office at Vikkiramangalam 54,75 19,88 24,75 34,87 in Ariyalur District. G.O.NO 42/ Commercial & Registration (U2) Dept / dated 12.3.15 AS / TS / RAS: 5775 Electrical Division, Salem 3,00 3,00 3,00

Building C & M Division, Erode 26 . Construction of building for integrated office complex for combined 1,63,55 1,21,15 50 50,00 Registration office at Tiruppur District. Go Ms No. 42/ CT & R/ U2 Dept.Dt.12.03.2015 Govt. CT & R (U2) Dept Lr.No.13609/U2/2015-2 Dt. 18.02.2016 AS / TS / RAS: 18150 Electrical Division, Coimbatore 17,95 17,95 17,95

Building C & M Division, Ooty 27 . Constsruction of Integrated Registration Complex at Udhagamandalam 1,81,85 1,73,26 8,30 2,00 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 19185 Electrical Division, Coimbatore 10,00 7,99 2,00 2,01

Building C & M Division, Karur 28 . Construction of Sub Registrar Office building at Krishnarayapuram in 54,50 53,80 70 Karur District. G.O.Ms.No.42/CR & R (U2), Dept., Dated.12.03.2015. AS / TS / RAS: 5775 Electrical Division, Coimbatore 3,25 2,47 75 78

29 . Construction of Sub Registrar Office building at Velayuthampalayam in 54,50 54,11 39 Karur District. G.O.Ms.No.42/CR & R (U2), Dept., Dated.12.03.2015. AS / TS / RAS: 5775 Electrical Division, Coimbatore 3,25 2,48 75 77

28 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building C & M Division, Madurai 30 . Construction of Sub-registrar Office at Karungalakudi in Madurai 54,25 54,15 25 10 District G.O.Ms.No.42/Commercial Tax & registration department/dated 12.03.2015. AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50

31 . Construction of Sub-registrar Office at Checkkanurani in Madurai 54,25 41,52 25 12,73 District. G.O.Ms.No.42/Commercial Tax & registration department/dated 12.03.2015. AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50

Building C & M Division, Dindigul 32 . Constn. of Sub Registrar office at Ayyampalayam in Dindigul District. 51,50 28,47 9,81 23,03 G.O.Ms.No.4 CR & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 5500 Electrical Division, Madurai 3,50 2,99 1,00 51

33 . Constn. of Sub Registrar office at Sendurai in Dindigul District. 54,25 29,99 24,25 24,26 G.O.Ms.No. 42 / Commercial Tax and Registration (U2) Dept. / dt.12.3.15 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,45 2,00 5

34 . Construction of Integrated Registration office building at Dindigul. 1,90,14 1,87,42 G.O.Ms.No.4 CT & R (U2) Dept Dt. 17.01.2014 AS / TS / RAS: 25514 Electrical Division, Madurai 65,00 44,92 2,99 2,95

Building C & M Division, Theni 35 . Construction of Sub Registrar Office building at Andipatti in Theni 54,25 53,89 36 District. G.O Ms.No.42, Registration (U2) Dept.,Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50

Building C & M Division, Ramanathapuram 36 . Construction of Sub Register office building at sayalkudi. 54,75 33,02 34,75 21,73 Go.Ms.No.42 CR & R (U2) Dept Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,00 3,00 3,00

29 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building C & M Division, Ramanathapuram 37 . Construction of Sub Register office building at R.S.Mangalam. 54,75 35,02 34,75 19,73 Go.Ms.No.42 CR & R (U2) Dept Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,00 3,00 3,00

38 . Construction of Sub Register office building at Thiruvadanai. 54,75 34,86 34,75 19,89 Go.Ms.No.42 CR & R (U2) Dept Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,00 3,00 3,00

39 . Construction of Sub Register office building at Singampunari. 52,00 51,83 16,95 17 G.O.Ms.No.144 CR Dept Dt. 20.11.2012 Amendment G.O.Ms.No.38 CR Dept Dt. 06.03.2012 AS / TS / RAS: 5500 Electrical Division, Madurai 3,00 2,95 1,00 5

40 . Construction of Sub Register office building at Kalaiyarkovil. 53,75 19,36 34,75 34,39 Go.Ms.No.42 CR & R (U2) Dept Dt.12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 4,00 3,00 4,00

Building C & M Division, Nagercoil 41 . Construction of Sub Registrar office at Karungal in Kanniyakumari 52,70 42,13 10,57 District. G.O.Ms.No. 4 CR SR (U2) dept. dated 17.01.2014 AS / TS / RAS: 5500 Electrical Division, Madurai 2,30 2,30

42 . Construction of Sub Registrar office at Colachal in Kanniyakumari 54,45 24,09 30,33 District. G.O.Ms.No. 42 CR SR (U2) dept. dated 12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,30 3,30

43 . Construction of Sub Registrar office at Manavalakurichi 52,00 51,41 59 G.O.Ms. No.144CR SR(U2) Dept. dated 20.11.2012 AS / TS / RAS: 5500 Electrical Division, Madurai 3,00 2,86

Building C & M Division, Thirunelveli 44 . Construction of Sub Registrar Office at Pettai. 54,25 46,96 34,25 7,29 G.O.Ms.No.42/ CR & R (U2) Dept Dt. 12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50 3,50

30 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JD [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JD Registration

16 Major Works ( DPC4059 01 051 JD 16 07 )

Building C & M Division, Thirunelveli 45 . Construction of Sub Registrar Office at Kadayam. 54,25 54,23 1 G.O.Ms.No.42/ CR & R (U2) Dept Dt. 12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 1,73 1,77

46 . Construction of Sub Registrar Office at Kallidaikurichi. 54,25 45,70 24,25 8,55 G.O.Ms.No.42/ CR & R (U2) Dept Dt. 12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50 3,50

47 . Construction of Sub Registrar Office at Kalakadu. 54,25 49,08 29,25 5,17 G.O.Ms.No.42/ CR & R (U2) Dept Dt. 12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50 3,50

48 . Construction of Sub Registrar Office at Melapalayam. 54,25 54,25 G.O.Ms.No.42/ CR & R (U2) Dept Dt. 12.03.2015 AS / TS / RAS: 5775 Electrical Division, Madurai 3,50 3,50

TOTAL - 4059 01 051 JD 41,22,85 18,87,86 19,24,59 8,75,47 8,21,71

31 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

North Presidency Division, Chennai 1 . Construction of Five Permanent security screening points in the High 98,00 1,03,00 98,00 Court Campus at Chennai - 104 G.O.Ms.No.294 Home (Pol.12) Department, Dated : 4.3.2016 AS / TS / RAS: 10300 Electrical Division-I, Chennai 5,00 5,00

2 . Construction of police lock up room buildings adjacent to the police 4,70 3,98 72 control room inside the High Court Campus at Chennai - 104 G.O.Ms.No.389 Home (Court.III) Department, Dated : 7.5.2015 AS / TS / RAS: 470 Electrical Division-I, Chennai

3 . Conversion of existing record rooms, section office and Law Offices in 5,37,00 4,80,71 High Court Main Building into Additional Court Halls and Hon'ble Judges Chamber in the High Court Main Building Chennai (12 Courts + 9 Chambers) G.O. Ms. No. 627 Home ( Cts. III ) Dept. Dt 02.09.2016 AS / TS / RAS: 53700 Electrical Division-I, Chennai

Building Construction Division-I, Chennai 4 . Construction of Additional three floor over the second floor of the 8,69,00 1,00,00 7,69,00 Additional Block of buildings at Court Compex G.O. Ms. No. 609 Home ( Cts. III ) Dept. Dt 24.08.2016 AS / TS / RAS: 86900 Electrical Division-I, Chennai

5 . Renovation and improvement works to the old Malligai buildings the 1,55,33 62,13 Judicial academy buildings, chennai G.O.(MS) No.27/Home Dept/Dt.06.01.2017 AS / TS / RAS: 15533 Electrical Division-I, Chennai

6 . Construction of Servant quarters and other Additional Amenities for 2,84,00 1,13,60 Chief Justice's Bungalow and five Bungalows for Judges in Madras High Court, Madras AS Awaited AS / TS / RAS: 28400 Electrical Division-I, Chennai

7 . Construction of additional office building at the rear side of the Annexe 4,03,68 3,89,54 1 building in the premises of Madras High Court, Chennai. G.O.Ms.No.467 Home (Courts) III Dept.dt.09.07.2013 G.O.Ms.No.5 Home Courts III Dept Dt. 09.01.2015 AS / TS / RAS: 43568 Electrical Division-I, Chennai 32,00 30,82

32 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building Construction Division-I, Chennai 8 . Construction of Additional Block of Building for the accommodation of 13,90,00 7,50,13 6,24,00 6,39,80 7 Metropolitan Magistrates Court and Additional buildings at Egmore, Chennai. G.O.Ms.No.134 Home (Cts.III) Dept.Dt.13.2.2012. RAS G.O.Ms.No.479 Home (Court-III) Dept dt 10.07.2013 RAS G.O.Ms.No.387 Home Courts III Dept Dt. 18.11.2015 AS / TS / RAS: 155000 Electrical Division-I, Chennai 1,60,00 97 1,40,00 40,00 19,03

9 . Construction of New Building for Metropolitan Magistrate Court at 6,35,80 6,00,00 Saidapet in Chennai G.O. Ms. No. 610 Home ( Cts. III ) Dept. Dt 24.08.2016 AS / TS / RAS: 63580 Electrical Division-I, Chennai

10 . Provision of lift and construction of two more additional floors in the 2,84,30 2,50,00 buildings of High Court Guest House, State Judicial Academy Premises, Adyar, Chennai G.O. Ms. No. 608 Home ( Cts. III ) Dept. Dt 24.08.2016 AS / TS / RAS: 28430 Electrical Division-I, Chennai

11 . Cnstruction of Toilet in Third Floor at rear annexe building High Court 1,00,00 90,00 Madras G.O.(2D) No.477 Home Courts-IV Dept Dt. 21.10.2016 AS / TS / RAS: 10000 Electrical Division-I, Chennai

12 . Construction of rear side (East) of the Annexe Building of Madras High 75,50 30,20 Court of Madras, Chennai G.O.Ms.No.288 Home Courts III Dept Dt. 04.03.2016 AS / TS / RAS: 7550 Electrical Division-I, Chennai

Building C & M Division, Thiruvallur 13 . Construction of 7 more courts with two wheeler shed and garege in 18,18,30 16,00,00 Thiruvallur G.O.Ms.No.645 Home Courts III Dept Dt. 08.09.2016 AS / TS / RAS: 181830 Electrical Division-2, Chennai

Building C & M Division, Kancheepuram 14 . Constn of combined court building at Madhuranthagam in 7,57,09 7,39,30 1,15,13 17,79 Kancheepuram G.O.Ms.No.873 Home Courts III Dept Dt. 28.11.2014 RAS G.O.Ms.No.312 Home Courts III Dept Dt. 06.06.2016 AS / TS / RAS: 83639 Electrical Division-2, Chennai 79,30 25,00 54,30 54,30

33 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Kancheepuram 15 . Construction of court building for District Munsif cum Judicial 2,58,20 49,97 2,07,23 1,00 Magistrate Court Building at Thirukazhukundram in Kancheepuram G.O.Ms.No.830 Home Courts - III Dept Dt. 18.11.2015 AS / TS / RAS: 30140 Electrical Division-2, Chennai 43,20 41,20 2,00

16 . Renovation of existing ground and first floor of the District Munsif cum 33,00 33,00 Judicial Magistrate court building and providing wooden dias, witness box and furniture to the court hall for separate accomodation of Judicial Magistrate Court, Sriperambudur G.O.(MS) No.37/Home Dept/Dt.06.01.2017 AS / TS / RAS: 3300 Electrical Division-2, Chennai

Building C & M Division, Vellore 17 . Constn of combined court building at Sathuvachari in Vellore 13,51,50 5,61,58 8,31,73 7,89,92 G.O.Ms.No.872 Home Courts III Dept Dt. 28.11.2014 RAS G.O.Ms.No.393 Home Courts III Dept Dt. 11.08.2016 AS / TS / RAS: 145750 Electrical Division-2, Chennai 1,06,00 79,00 96,00 27,00

Building C & M Division, Thiruvannamalai 18 . Construction of Combined Court Building at Thiruvannamalai in 14,16,63 14,14,05 Thiruvannamalai District. G.O.Ms.No.1004/ Home Courts III Dept Dt. 25.11.2013 AS / TS / RAS: 153045 Electrical Division-2, Chennai 1,13,82 89,73 6,00

19 . Construction of Combined Court building at Cheyyar in Tiruvannamalai 35,11 25,11 10,00 District G.O.(2D) No. 399 / Home (Courts-III) Dept. / Dt. 25.11.2015 AS / TS / RAS: 7219 Electrical Division-2, Chennai 37,08 37,08

Building C & M Division, Cuddalore 20 . Construction of building for the District Munsif cum Judicial Magistrate 9,76 8,76 1,00 Court at Protonovo in Cuddalore District. RAS G.O.(2D).NO.55 /Home(Courts-III) Department Dated12.02.2016. AS / TS / RAS: 1876 Electrical Division-2, Chennai 9,00 9,00

Building C & M Division, Villupuram 21 . Construction of the Combined Court Building at Ulundurpet. 9,95 9,95 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014. & RAS G.o.(2D).No.317 HOME (COURTS-III) DEPARTMENT Dated:15.09.2015 AS / TS / RAS: 995 Electrical Division-2, Chennai

34 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Villupuram 22 . Construction of Combined Court Building at Gingee in Villupuram 7,62,23 4,55,48 83,08 3,06,75 District. G.O. Ms.No. 163 /Home Court III Dt:25.2.14 RAS G.O. (2D)No. 395 /Home Court III Dt:16.08.2016 AS / TS / RAS: 83963 Electrical Division-2, Chennai 77,40 41,04 41,40 23,84 5,00

23 . Construction of Combined court building at Kallakurichi in Villupuram 7,22,73 6,10,18 1,31,21 1,12,55 District G.O.Ms.No.718 Home (Court-III) Dept dt. 26.08.2009 & RAS G.O.Ms.No.910/Home (Courts-III) Dept. dt.8.12.2014. AS / TS / RAS: 79966 Electrical Division-2, Chennai 76,93 69,04 6,14 7,89

24 . Construction of Combined Court building at Tindivanam in Villupuram 14,70,52 10,17,03 5,80,28 4,48,49 5,00 District GO.Ms.No.482/Home Court Department/Dated.25.06.2012 & RAS G.O.(2D).No.270/Home (Courts-III) Department/Dated.11.05.2016 AS / TS / RAS: 166325 Electrical Division-2, Chennai 1,92,73 28,66 1,12,00 1,22,50

Building C & M Division, Trichy 25 . Construction of Combined Court building for District Munsif and 5,36 5,36 5,36 Judicial Magistrate Court at Musiri in Trichy District. RAS.GO.(2D)No.257 (Home Courts-III) Dept/ Dt.4.5.16. AS / TS / RAS: 536 Electrical Division, Salem

26 . Construction of Combined court buildings at Manapparai in 6,07,95 2,00,00 4,07,95 Tiruchirappalli District. G.O.Ms.No. 171 /Home (court -III) Dept./dt. 12.2.2016 AS / TS / RAS: 68070 Electrical Division, Salem 72,75 12,75 60,00

27 . Construction of Combined Court Building with Subsidiary Building at 42,25 31,00 Thuraiyur in Trichy RAS G.O. (2D) No.394 Home Courts III DeptDt. 11.08.2016 AS / TS / RAS: 4225 Electrical Division, Salem

Building C & M Division, Pudukottai 28 . Construction of building for District Munsif cum Judicial Magistrate 2,14,67 1,41,40 42,90 73,27 Court at Keeranur G.O. Ms. No:.1010 Home ( Cts. III ) Dept. Dt 30-12-2014 AS / TS / RAS: 22900 Electrical Division, Salem 14,33 2,79 3,00 11,54

35 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Pudukottai 29 . Construction of Police lockup room with toilet facility and police waiting 7,59 7,59 room in District Court at Pudukottai G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 759 Electrical Division, Salem

30 . Construction of Court Building for District Munisif Cum Judicial 2,48,00 30,47 2,39,36 1,86,00 31,53 Magistrate Court at Thirumayam. G.O.Ms. NO: 459 Home ( C&S III) Dept. Dt: 10.06.2009. RAS G.O.(2D) No.257 Home Courts III Dept Dt. 04.08.2015 AS / TS / RAS: 28000 Electrical Division, Salem 32,00 10,00 10,00 22,00

Building C & M Division, Thanjavur 31 . Construction of combined court building and compound wall at 35,39,00 14,15,60 Thanjavur G.O.(Ms) No.35/Home Dept/Dt.6.1.2017 AS / TS / RAS: 353900 Electrical Division, Salem

32 . Construction of Court Buildings for District Munsif cum Judicial 2,25,60 50,00 1,25,60 magistrate Court at Orathanadu in Thanjavur District Go Ms No. 195 / Home Court III / Dept.Dt.17.02.2016 AS / TS / RAS: 24860 Electrical Division, Salem 23,00 1,00 20,00

Building C & M Division, Nagapattinam 33 . Construction of combined court building at Nannilam at Tiruvarur 3,34,38 19,69 3,54,38 3,13,69 1,00 District G.O.Ms.No.573 Home (Cts.III) Dept Dt. 04.08.2015 AS / TS / RAS: 37438 Electrical Division, Salem 40,00 20,00 20,00

34 . Constn of combined court building at Nagapattinam 15,34,58 15,24,58 1 G.O.Ms.No.874 Home Courts III Dept Dt. 28.11.2014 AS / TS / RAS: 153458 Electrical Division, Salem

Building C & M Division, Salem 35 . Construction of 98 Law Chambers within the Coimbined Court Building 8,16,00 95,92 premises in Salem District (1st Phase 16-17 Rs.24980, 2nd Phase 17- 18 Rs.24980 & 3rd Phase Rs.31640=81600) G.O.Ms.No.773 Home Courts III Dept Dt. 15.11.2016 AS / TS / RAS: 81600 Electrical Division, Salem

36 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Salem 36 . Provision of Ramp and Renovation of ramp at the entrance of all court 8,03 buildings in the Court and Combined Court building campus at Salem in Salem Dt. G.O.Ms.No.30 Home (Cts-III) Dept., Dt.06.1.2017. AS / TS / RAS: 803 Electrical Division, Salem

37 . Construction of Compound wall, Two Wheeler shed and provision for 53,52 28,52 approach road in the Combined Court building Campus at Mettur in Salem Dt. G.O.Ms.No.11 Home (Cts-III) Dept., dt.07.1.2017. AS / TS / RAS: 5352 Electrical Division, Salem

38 . Construction of dining hall and meeting hall for the Advocates in 1,63,59 64,64 Combined Court building Campus at Salem in Salem Dt. G.O.Ms.No.45 Home (Cts-III) Dept., dt.07.1.2017. AS / TS / RAS: 16359 Electrical Division, Salem

39 . Construction of Police lockup room with toilet facility and police waiting 12,10 12,10 room in District Court at Salem G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 1210 Electrical Division, Salem

Building C & M Division, Dharmapuri 40 . Construction of combined court building and other buildings in 26,36,37 2,61 18,00,00 4,59,77 Thadangam Village of Dharmapuri G.O.Ms.No.959 Home Courts Dept Dt. 28.12.2015 RAS G.O.(2D) No.33/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 278892 Electrical Division, Coimbatore 1,52,55 50,44 1,02,11

41 . Construction of court building for Distirct Munsiff cum Judicial 1,58,60 1,57,96 Magistriate at Denkanikottai in Krishnagiri 415/Home (CTS III) dept dt 08.06.2012 & RAS GO.Ms No (2D 198 Home CTS III ) dt 01.06.2015 AS / TS / RAS: 16850 Electrical Division, Coimbatore 9,90 7,95 1,54

Building C & M Division, Aryallur 42 . Construction record room for Sub Court and Principal District Munsif 16,20 16,20 Court at Ariyalur G.O.(Ms) No.36/ Home Dept, Dt.06.01.2017 AS / TS / RAS: 1620 Electrical Division, Salem

37 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Aryallur 43 . Construction of Police lockup room with toilet facility and police waiting 7,48 7,48 room in District Court at Ariyalur G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 748 Electrical Division, Salem

Building C & M Division, Coimbatore 44 . Construction of Police lockup room with toilet facility and police waiting 8,20 8,20 room in District Court at Coimbatore G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 820 Electrical Division, Coimbatore

Building C & M Division, Erode 45 . Construction of combined Court building at Tiruppur 33,74,50 33,00,00 G.O.Ms.No.646 Home Courts III Dept Dt. 08.09.2016 AS / TS / RAS: 337450 Electrical Division, Coimbatore

46 . Construction of Third floor over the existing civil court building at Erode 1,80,00 72,00 G.O.(MS) No.42/Home Dept/Dt.07.01.2017 AS / TS / RAS: 18000 Electrical Division, Coimbatore

47 . Construction of Combined Court Buildign at Perundurai in Erode 5,05,35 25,00 3,05,35 District. G.O.MS.No.948 Home (courts.III) Department Dated 23.12.2015 AS / TS / RAS: 57750 Electrical Division, Coimbatore 72,15 67,15

Building C & M Division, Madurai 48 . Construction of CISF security screening points arrangements in 74,35 35,34 74,35 Madurai Bench of Madras High Court at Madurai. G.O.Ms.No.366, Home (Pol.12) Department, Dated: 22.04.2016 AS / TS / RAS: 8835 Electrical Division, Madurai 14,00 14,00

49 . Conversion of Sections / halls into 8 Nos court Halls with chambers 4,69,34 1,87,74 and offices in Administrative Block and construction of 8 Nos of Judges Bungalows in Madurai Bench of Madras High Court AS Awaited AS / TS / RAS: 46934 Electrical Division, Madurai

50 . Construction of Police lockup room with toilet facility and police waiting 7,87 7,87 room in District Court at Madurai G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 787 Electrical Division, Madurai

38 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Madurai 51 . Construction of Chief Justice Bungalow and 5 Judges Bungalow in 6,20,34 2,90,47 1,48,33 3,29,87 High Court Campus at Madurai. G.O.Ms.No.465/Home (Court.III)Dept/dated 09.07.2013. (RAS (1) Rs.51618 vide G.O.Ms.No.429/Home (Court.III)Dept/dated 28.12.2015) (RAS (2) Rs.70662 vide G.O.(2D) No.388/Home (Courts.III) Dept/dated 04.08.2016. AS / TS / RAS: 67894 Electrical Division, Madurai 58,60 25,14 30,50 33,46

52 . Construction of building for housing - the office cum chambers of the 22,99 22,99 Aser of at Madurai Bench of Madras High Court Madurai G.O.Ms.No.628 Home Courts III Dept Dt. 02.09.2016 AS / TS / RAS: 2299 Electrical Division, Madurai

53 . Provision of Ramp and Lift facilities in the combined court buildings, 76,91 18,01 1,11,91 58,90 District Court campus at Madurai G.O.Ms.No.668 Home Courts - III Dept Dt. 16.09.2015 AS / TS / RAS: 13191 Electrical Division, Madurai 55,00 55,00

54 . Providing Security arrangements and laying and approach Road to the 39,30 17,29 39,30 Law chamber in the premises of Madurai Bench of Madras High Court. G.O.(2D).No.231 Home (Courts-III) Dept dated 22.04.2016 AS / TS / RAS: 4322 Electrical Division, Madurai 3,92 3,92

55 . Towards Carrying out renovation work in the additional space 76,00 76,00 measuring an extent of 471 sq.ft in the second floor of the main building in the High Court of Madras, Chennai G.O.Ms.No.19 Home Courts-III Dept Dt. 05.01.2017 AS / TS / RAS: 7600 Electrical Division, Madurai

Building C & M Division, Dindigul 56 . Provision of Storm water drainage arrangements to the District-cum- 70,79 35,40 Judicial Magistrate at Kodaikanal G.O.(2D) No.44/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 7079 Electrical Division, Madurai

57 . Construction of Court Building for District munisiff cum- Judicial 2,70,20 70,20 Majistrate at Natham. G.O.Ms.No.196 / Home (Court - III) Dept / Date.17.02.2016. AS / TS / RAS: 29400 Electrical Division, Madurai 23,80 18,80

39 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Dindigul 58 . Construction of combined court building at Dindigul 36,26 36,25 RAS G.O. (2D) No.391Home ( Cts. III ) Dept. Dt 08.08.2016 AS / TS / RAS: 3626 Electrical Division, Madurai

Building C & M Division, Theni 59 . Construction of Court Building at Periyakulam in Theni District. 5,66,00 5,65,78 21 G.O(4D).No.31/Home (Cts.IV) Dept., Dt:28.04.2013 and RAS G.O No.84/Home (Cts.III) Dept., Dt:02.03.2015. AS / TS / RAS: 64200 Electrical Division, Madurai 76,00 58,11 17,89

60 . Construction of Combined Court Buildings (2 Court Halls) along with 5,04,13 42,41 2,73,53 1,88,19 12 Law Chambers at Bodinayakanur in Theni District. G.O.Ms.No.731 Home Courts - III Dept Dt. 19.10.2015 AS / TS / RAS: 55563 Electrical Division, Madurai 51,50 5,00 46,50

Building C & M Division, Ramanathapuram 61 . Construction of Police lockup room with toilet facility and police waiting 12,63 12,63 room in District Court at Ramnad G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 1263 Electrical Division, Madurai

62 . Construction of ramp in the first and second floor of the Combined 34,10 29,10 court building at Paramakudi G.O.Ms.NO.20Home(Cts-III)Dept dt.05.01.2017 AS / TS / RAS: 3410 Electrical Division, Madurai

63 . Formation and laying Paver block rood in the CombinedCourt Building 33,88 at Ramanathapuram G.O.Ms.NO.43Home(Cts-III)Dept dt.07.01.2017 AS / TS / RAS: 3388 Electrical Division, Madurai

Building C & M Division, Virudhunagar 64 . Construction of combined Court at Sivakasi, Virudhunagar 15,76,63 6,30,65 G.O.Ms.No.40 Home Courts-III Dept Dt. 06.01.2017 AS / TS / RAS: 157663 Electrical Division, Madurai

Building C & M Division, Thoothukudi 65 . Construction of combined Court building at Sathankulam, Thoothukudi 4,73,00 4,50,00 G.O. Ms. No. 611 Home ( Cts. III ) Dept. Dt 24.08.2016 AS / TS / RAS: 47300 Electrical Division, Madurai

40 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Nagercoil 66 . Construction of combined court buildings Nagercoil 15,34,14 10,94,85 3,85,81 4,39,29 G.O.Ms.No.809 Courts - III Dept Dt. 08.10.2013 RAS G.O.(2D).No. 390 Courts - III Dept Dt. 08.08.2016 AS / TS / RAS: 165114 Electrical Division, Madurai 1,17,00 51,50 65,50

67 . Provision of additional amenities and infrastructure favilities to the 5,00,32 2,00,13 Combined Court Building at Nagercoil AS Awaited AS / TS / RAS: 50032 Electrical Division, Madurai

68 . Lift Facilities in the Combined court building at Padmanabhapuram in 11,16 10,24 Kanniyakumari District. G.O.Ms.No. (2D) 52Home (court) III dept.dt. 25.2.2014 AS / TS / RAS: 4141 Electrical Division, Madurai 30,25 9,85 20,00 20,40

Building C & M Division, Thirunelveli 69 . Construction of Court building and quarters at Cheranmahadevi in 2,75,76 9,74 2,72,20 2,65,02 1,00 Tirunelveli G.O.Ms.No.591 Home (Cts.III) Dept Dt. 11.08.2015 AS / TS / RAS: 31020 Electrical Division, Madurai 34,44 26,00 28,00 6,44

70 . Construction of Coimbined Court Building at Nanguneri in Tirunelveli 3,86,00 3,11,00 District. 172 Home (Courts.III)Dept. dated 12.02.2016 AS / TS / RAS: 41800 Electrical Division, Madurai 32,00 30,00

71 . Construction of combined court building at Tenkasi in Tirunelveli District 3,94,84 3,74,84 1 G.O.Ms.No.876 Home (Cts.III) Dept Dt. 12.10.2009 AS / TS / RAS: 42484 Electrical Division, Madurai 30,00 30,00 1

72 . Construction of Coimbined Court Building at Ambasamudram in 6,40,41 6,20,41 Tirunelveli Distric G.O.Ms.No.170 Home (Courts.III) Dept dated 12.02.2016 AS / TS / RAS: 72341 Electrical Division, Madurai 83,00 73,54

73 . Construction of combined Court building at Tenkasi in Tirunelveli 12,14,96 4,85,98 District G.O.Ms.No.951 Home Courts III Dept Dt. 27.12.2016 AS / TS / RAS: 121496 Electrical Division, Madurai

41 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

16 Major Works ( DPC4059 01 051 JG 16 01 )

Building C & M Division, Thirunelveli 74 . Construction of Police lockup room with toilet facility and police waiting 7,87 7,87 room in District Court at Tirunelveli G.O.(Ms) No.122/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 787 Electrical Division, Madurai

Electrical Division-2, Chennai 75 . Provision of (2 Nos.) lift facilities in the Combined Court Building at Chengalpattu in Kancheepuram G.O.Ms.No.31 Home Courts-III Dept Dt. 06.01.2017 AS / TS / RAS: 7205 Electrical Division-2, Chennai 72,05 72,05

Electrical Division, Salem 76 . Provision of lift and AC facilities to the building housing the District Munsif cum Judicial Magistrate Court, Keeranur in Pudukottai G.O. Ms. No. 606 Home ( Cts. III ) Dept. Dt 18.08.2015 AS / TS / RAS: 2076 Electrical Division, Salem 20,76 20,76

Electrical Division, Madurai 77 . Provision of 3Nos. 13 persons capacity passenger KONE Lifts and 2Nos 200KVA Diesel Generator sets to the Madurai Bench of Madras High Court at Madurai. G.O.Ms.No. 285 Home (Courts-III) Department Dated: 04.03.2016 AS / TS / RAS: 11400 Electrical Division, Madurai 1,14,00 1,14,00 65,00 1

Name of Division Yet to be Identified 78 . Works Likely to be sanctioned in 2017-18 6,77,40 6,77,40 1 AS / TS / RAS: 67740 Name of Division Yet to be Identified

79 . Construction of Toilets for Judicial Officers, Staff, General Public and 9,09,71 3,63,88 differently abled persons in the court buildings in various Districts AS Awaited AS / TS / RAS: 90971 Name of Division Yet to be Identified

80 . Provision of Toilet facilities in the Court Buildings at various places 1,88,64 75,46 G.O.(Ms) No.121/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 18864 Name of Division Yet to be Identified

42 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JG [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JG Administration of Justice

64 Lands ( DPC4059 01 051 JG 64 00 )

Building C & M Division, Nagapattinam 1 . Transferring land measuring an extent of 0.14.0 hectares in T.S.27/4 1,62,74 1,62,74 yamunambal chatram, in favour of judicial Dept for construction of building at Needamangalam in Tiruvarur District G.O.(Ms) No.33/ Home Dept, Dt.06.01.2017 AS / TS / RAS: 16274 Electrical Division, Salem

Building C & M Division, Coimbatore 2 . The land cost for transfer of land in Sangampalayam (Vi) in Pollachi 3,26,67 3,26,67 Municipality in favour of Judicial Department for Construction of court building at Pollachi G.O.Ms.No.633 Home Courts III Dept Dt. 02.09.2016 AS / TS / RAS: 32667 Electrical Division, Coimbatore

Building C & M Division, Erode 3 . Land cost for Constrction of Quarters for judicial officers at Triuppur 10,72,70 10,72,70 G.O.(Ms) No.21/ Home Dept, Dt.05.01.2017 AS / TS / RAS: 107270 Electrical Division, Coimbatore

Building C & M Division, Madurai 4 . Land Acquition - Acquition of lands for construction of buildings for 76,07 Madurai Bench of Madras High Court - Enhanced compensation Awarded G.O.Ms.No.775 Home Courts III Dept Dt. 15.11.2016 AS / TS / RAS: 7607 Electrical Division, Madurai

Building C & M Division, Ramanathapuram 5 . Towards land cost, building cost and the cost of trees for transferring 1,51,03 the land measuring an extent of 2.70 acres in S.No.105/2A, Kottaimedu, Kamuthi belonging to the Tamil Nadu Khadi and Village Industries Board in favour of Judicial Department G.O.Ms.No.34 Home (Courts-III) Dept Dt. 06.01.2017 AS / TS / RAS: 15103 Electrical Division, Madurai

TOTAL - 4059 01 051 JG 438,42,25 89,19,58 73,71,68 80,20,44 160,08,81

43 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JJ [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JJ Public Works

16 Major Works ( DPC4059 01 051 JJ 16 05 )

South Presidency Division, Chennai 1 . Construction of Women Trainees Stay Rooms and Dining Hall over the 24,00 24,00 existing PWD Staff Training Institute at Thodhunter Nager Saidapet Chennai G.O.No:.16 Public Works (Y2) Dpt. Dt 06.02.2017 AS / TS / RAS: 2400 Electrical Division-I, Chennai

Building Construction Division-I, Chennai 2 . Construction of four numbers of Govt. Bungalows in Podhigai campus 4,31,00 4,74,00 4,31,00 at , Adyar, Chennai for accomodation of Hon'ble Ministers G.O.Ms.No.102 PW (Y2) Dept Dt. 05.05.2015 AS / TS / RAS: 48400 Electrical Division-I, Chennai 53,00 52,00

3 . Reconstruction part of the fire affected distressed Khalsa Mahal 17,73,07 3,67,68 8,05,09 10,12,31 3,93,07 Building at , Chennai. G.O.(Ms.)No.144 PW(G1) Dept.dt.09.07.2013 AS / TS / RAS: 184307 Electrical Division-I, Chennai 70,00 70,00 70,00

4 . Construction of new Guest House in the Omandurar Government 19,00,00 16,84,48 4 2,15,52 Estate G.O.Ms.No.444 Public (Pro.II) Dept Dt. 10.06.2014 AS / TS / RAS: 190000 Electrical Division-I, Chennai

Building C & M Division, Vellore 5 . Construction of Inspection Bungalow with 2 rooms at Elagiri Hills in 57,48 37,21 20,27 Vellore District. G.O.Ms.No.162 PW (Y2) Dept Dt. 7.8.2009 RAS G.O.Ms.No.94 PW (Y2) dept Dt. 30.04.2015 AS / TS / RAS: 6148 Electrical Division-2, Chennai 4,00 4,00

Building C & M Division, Trichy 6 . Construction of new building for the office of the Chief Engineer, PWD, 3,71,80 3,47,80 Trichy Region G.O.(Ms) No.185/ Home Dept, Dt.29.12.2016 AS / TS / RAS: 37180 Electrical Division, Salem

Building C & M Division, Pudukottai 7 . Construction of Inspection Bungalow at Illuppur in Pudukkottai District 67,70 28,64 38,70 39,06 G.O.Ms.No.103 / PW (Y2) Dept. Dt: 05.05.2015. AS / TS / RAS: 7270 Electrical Division, Salem 5,00 2,00 5,00

44 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JJ [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JJ Public Works

16 Major Works ( DPC4059 01 051 JJ 16 05 )

Building C & M Division, Thoothukudi 8 . Construction of Guest house at Tiruchendur 1,93,35 82 26,00 1,66,53 G.O.Ms.No.221/Public works (Y2)Dept.dated 19.11.2015. AS / TS / RAS: 23835 Electrical Division, Madurai 45,00 45,00

Building C & M Division, Thirunelveli 9 . Construction of new Office Building for Sub Division at 21,58 21,58 Ambasamudram in Tirunelveli Dist., G.O.No:.68 Public Works (Y2) Dpt. Dt 22.02.2016 AS / TS / RAS: 2258 Electrical Division, Madurai 1,00 1,00

TOTAL - 4059 01 051 JJ 50,17,98 21,18,83 13,89,83 18,97,74 9,76,40

45 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

North Presidency Division, Chennai 1 . Modernization of Check Posts of Commercial Taxes Concor (Chennai- 20,00 20,00 I) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2012 AS / TS / RAS: 2000 Electrical Division-I, Chennai

2 . Modernization of Check Posts of Commercial Taxes Central parcel 3,00 3,00 office (Chennai-I) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2012 AS / TS / RAS: 300 Electrical Division-I, Chennai

South Presidency Division, Chennai 3 . Modernizing the office of the Principal Secretary / Commissioner of 89,90 19,76 69,90 70,14 Commercial Taxes, Chennai G.O. Ms. No. 41, Commercial Taxes and Registration (D1) Dept., Dt.12.03.2015. AS / TS / RAS: 13829 Electrical Division-I, Chennai 48,39 18,40 48,39 29,99

Building Construction Division-I, Chennai 4 . Construction of Integrated Complex for both Registration and 51,98,00 10,79,20 1,00,00 30,00,00 Commercial Tax Department at Venkatapuram Village, Guindy, South Chennai G.O. Ms. No. 57 Commercial tax & Regristration (D2) Department. Dated 04.03.2016. AS / TS / RAS: 519800 Electrical Division-I, Chennai

5 . Construction of Commercial Tax complex for . 22,56,07 9,00,00 7,56,07 G.O. Ms. No. 2 Commercial tax & Regristration (D2) Department. Dated 11.01.2016. AS / TS / RAS: 252540 Electrical Division-I, Chennai 2,69,33 10,00 1,59,34

Building C & M Division, Thiruvallur 6 . Modernization of Check Posts of Commercial Taxes Tiruttani (Chennai- 29,20 29,20 10,88 2) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division-2, Chennai

7 . Modernization of Check Posts of Commercial Taxes Uthukottai 29,20 29,20 17,85 (Chennai-2) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division-2, Chennai

46 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

Building C & M Division, Thiruvallur 8 . Construction of integrated Commercial Tax Office Complex at 10,00,00 4,00,00 50,00 9,50,00 Nazarathpettai, Poonamalle. G.O.Ms.No.83 CT & R (D-2) Dept dt.24.05.2016 AS / TS / RAS: 100000 Electrical Division-2, Chennai

Building C & M Division, Vellore 9 . Construction of Training Centre for commericial Tax office at Vellore in 2,30,00 1,28,30 1,03,83 1,01,70 Vellore District. G.O.Ms.No. 24/CT& Reg.(T2) Dept. dt. 26.02.2014 AS / TS / RAS: 27500 Electrical Division-2, Chennai 45,00 25,00 30,60 20,00

Building C & M Division, Cuddalore 10 . Construction of commercial Tax Offie building at Chidambaram in 1,45,60 1,39,74 46,40 5,86 Cuddalore. G.O.Ms.No. 24/CT& Reg.(T2) Dept. dt. 26.02.2014 AS / TS / RAS: 16100 Electrical Division-2, Chennai 15,40 5,40 10,00 10,00

11 . Construction of Commercial Tax Office Building at Vridhachalam. 1,13,66 1,10,21 3,45 G.o.Ms.No. 4 CT & R (D2) Dept/ dt 22.01.2013. RAS G.O.(Ms) No. 001/CT (D2) Dated 05.01.2015 AS / TS / RAS: 11916 Electrical Division-2, Chennai 5,50 5,50

12 . Modernization of Check Posts of Commercial Taxes Pennayar Bridge 29,20 6,02 12,99 23,18 (Cuddalore) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division-2, Chennai

Building C & M Division, Villupuram 13 . Construction of Integrated Office building for Commercial Tax 33,47 33,47 departement in Master plan complex at Villupuram. G.O.Ms.No.160 CT & R (D2) Dept. Dated.28.12.2011 and RAS G.O.Ms.No.54, CTO (D2) Dept. Daed.04.03.2016 AS / TS / RAS: 3347 Electrical Division-2, Chennai

14 . Modernization of Check Posts of Commercial Taxes Pattanur, 27,95 27,94 27,95 Villupuram G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division-2, Chennai 1,25 1,25 1,25

47 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

Building C & M Division, Trichy 15 . Providing Cup board shutters arrangements to the Newly Construted 3,00 1,20 3,00 Commercial Taxes Staff Training Institute at Trichy G.O.(Ms).No.56, CT&R Dept, Dt.4.3.16 AS / TS / RAS: 300 Electrical Division, Salem

16 . Providing False ceiling arrangemnts in Computer room to the Newly 50 20 50 Construted Commercial Taxes Staff Training Institute at Trichy G.O.(Ms).No.56, CT&R Dept, Dt.4.3.16 AS / TS / RAS: 50 Electrical Division, Salem

17 . Providing Gravel filling in Low Laying Area of the Newly Construted 4,00 1,60 4,00 Commercial Taxes Staff Training Institute at Trichy G.O.(Ms).No.56, CT&R Dept, Dt.4.3.16 AS / TS / RAS: 400 Electrical Division, Salem

18 . Providing approach road from main road to the Newly Construted 8,00 3,20 8,00 Commercial Taxes Staff Training Institute at Trichy G.O.(Ms).No.56, CT&R Dept, Dt.4.3.16 AS / TS / RAS: 800 Electrical Division, Salem

19 . Providing Two wheeler and Four Wheeler shed to the Newly 10,00 4,00 10,00 Construted Commercial Taxes Staff Training Institute at Trichy G.O.(Ms).No.56, CT&R Dept, Dt.4.3.16 AS / TS / RAS: 1000 Electrical Division, Salem

Building C & M Division, Nagapattinam 20 . Modernization of Check Posts of Commercial Taxes Tharangambadi 29,20 29,20 G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Salem

Building C & M Division, Dharmapuri 21 . Construction of Commerical Taxes Office at Krishnagiri, Krishnagiri 1,41,30 56,52 District G.O.(MS) No.8/CT Dpt, Dt.07.02.2017 AS / TS / RAS: 14130 Electrical Division, Salem

22 . Modernization of check points of Commercial Taxes Dept. at Thoppur 68,70 68,70 68,70 (in) in Dharmapuri Dt. G.O.Ms.No. 94 CT&R (A1) Dept., Dated. 9.7.2012 AS / TS / RAS: 6870 Electrical Division, Coimbatore

48 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

Building C & M Division, Dharmapuri 23 . Modernization of check points of Commercial Taxes Dept. at Thoppur 68,70 68,70 68,70 (out) in Dharmapuri Dt. G.O.Ms.No. 94 CT&R (A1) Dept., Dated. 9.7.2012 AS / TS / RAS: 6870 Electrical Division, Coimbatore

24 . Modernization of check points of Commercial Taxes Dept. at Hosur 68,70 68,70 68,70 (out) in Krishnagiri Dt. G.O.Ms.No. 94 CT&R (A1) Dept., Dated. 9.7.2012 AS / TS / RAS: 6870 Electrical Division, Coimbatore

25 . Modernization of check points of Commercial Taxes Dept. at Hosur (in) 68,70 68,70 68,70 in Krishnagiri Dt. G.O.Ms.No. 94 CT&R (A1) Dept., Dated. 9.7.2012 AS / TS / RAS: 6870 Electrical Division, Coimbatore

Building C & M Division, Coimbatore 26 . Modernization of Check Posts of Commercial Taxes Gopalapuram 28,00 28,00 28,00 (Coimbatore) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Coimbatore 1,20 1,20 1,20

27 . Construction of Staff Training Institution Commercial Tax at 2,61,00 2,55,86 53,07 5,14 Coimbatore. G.O.Ms.No. 24/CT& R(T2) Dept. dt. 26.02.2014 AS / TS / RAS: 27500 Electrical Division, Coimbatore 14,00 8,92 4,00

28 . Modernization of Check Points of Commercial Taxes Department at 31,60 31,60 31,60 KG Chavady (In) Coimbatore G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 3360 Electrical Division, Coimbatore 2,00 2,00 2,00

29 . Modernization of Check Posts of Commercial Taxes Pichanur 28,00 28,00 28,00 (Coimbatore) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Coimbatore 1,20 1,20 1,20

Building C & M Division, Ooty 30 . Modernization of Check Posts of Commercial Taxes Gudalur 28,20 28,20 28,20 (Coimbatore) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Coimbatore 1,00 1,00 1,00

49 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

Building C & M Division, Dindigul 31 . Construction of Commerical Taxes Office at Palani, Dindigul District 1,53,15 61,26 G.O.(MS) No.6/CT &R Dept, Dt.01.02.2017 AS / TS / RAS: 15315 Electrical Division, Madurai

Building C & M Division, Theni 32 . Modernization of Check Posts of Commercial Taxes Bodimettu in 27,20 27,19 27,20 Theni District. G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Madurai 2,00 2,00 2,00

33 . Modernization of Check Posts of Commercial Taxes Lower Camp in 27,20 27,19 27,20 Theni District. G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Madurai 2,00 2,00 2,00

Building C & M Division, Thoothukudi 34 . Modernization of Check Posts of Commercial Taxes Tuticorin Port 29,20 29,20 (Tirunelveli) G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2013 AS / TS / RAS: 2920 Electrical Division, Madurai

Building C & M Division, Nagercoil 35 . Construction of commercial Tax office building for Vazhvachakostum 85,50 79,60 5,90 at Kattathurai . G.O.Ms.No. 24/C1 SC Rg(T2) dept. dated 26.02.2014 AS / TS / RAS: 9500 Electrical Division, Madurai 9,50 9,50

36 . Modernization of Check Posts of Commercial Taxes Kaliakkavilai 29,20 29,20 G.O.Ms.No.94 CT & R (A1) Dept Dt. 09.07.2012 AS / TS / RAS: 2920 Electrical Division, Madurai

Building C & M Division, Thirunelveli 37 . Construction of Commercial Tax office at Nanguneri in Tirunelveli 83,08 75,66 7,43 District. G.O.Ms.No.4 CT&R Dept, Dt:22.01.2013 & G.O.Ms.No.53 CT&R Dept, dated 04.03.2016. AS / TS / RAS: 8808 Electrical Division, Madurai 5,00

50 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

Building C & M Division, Thirunelveli 38 . Construction of commercial Tax employees training centre at 1,41,20 1,38,68 21,20 2,52 Tirunelveli G.O.Ms.No. 24/CT& Reg.(T2) Dept. dt. 26.02.2014 AS / TS / RAS: 16500 Electrical Division, Madurai 23,80 18,77 5,03

39 . Construction of Commercial Tax office at Ambasamudiram in 79,67 73,83 5,84 Tirunelveli District. G.O.Ms.No.4 CT&R Dept, Dt:22.01.2013 & G.O.Ms.No.53 CT&R Dept, dated 04.03.2016. AS / TS / RAS: 8667 Electrical Division, Madurai 7,00 7,00

Electrical Division-I, Chennai 40 . Infrastructure facilities to the Near Line Disaster Recovery Centre in CTO Annexe Building, Greams Road, Chennai-6 G.O.Ms.No. 33/CT&R (D1) Dept. dt. 26.02.2015 AS / TS / RAS: 8700 Electrical Division-I, Chennai 87,00 67,39 87,00 19,61

41 . Renovation of two lifts in perarignar Anna Platinum Jubilee Memorial Chennai-6 G.O.(MS) No.12, CT&R Dept, Dt.10.02.2017 AS / TS / RAS: 5500 Electrical Division-I, Chennai 55,00 55,00

42 . Provision of HT Supply arrangements with 500 KVA and 250 KVA Transformer and allied works at Commercial Tax Office Main Building and Annex Building, Greams Road, Chennai-6 G.O. Ms. No.60 CT&R dept, dt 04.03.2016 AS / TS / RAS: 9901 Electrical Division-I, Chennai 99,01 99,02 50,00 49,01

Electrical Division-2, Chennai 43 . Provision of HT Supply to the combined Commercial Tax in Vellore G.O. Ms. No.60 CT&R Dept dt 04.03.2016 AS / TS / RAS: 4401 Electrical Division-2, Chennai 44,01 44,01 44,01

Electrical Division, Coimbatore 44 . Provision of power mains arrangements to the Commercial Tax office Complex at Coimbatore G.O. Ms. No.60 CT&R Dept dt 04.03.2016 AS / TS / RAS: 1652 Electrical Division, Coimbatore 16,52 16,51 16,52

51 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 JN [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction JN Commercial Taxes

16 Major Works ( DPC4059 01 051 JN 16 07 )

Electrical Division, Madurai 45 . Providing HT supply arrangements with 250KVA, 11KV/ 433V Transformer, MV Panel board and segregation of cable feeder to supply to various places in Commercial Tax Office at Madurai. G.O. Ms. No.60 CT&R Dept dt 04.03.2016 AS / TS / RAS: 3851 Electrical Division, Madurai 38,51 38,51 30,00 8,51

46 . Providing power supply to various Computer plug arrangements in the Commercial Tax Office complex at Tirunelveli. G.O. Ms. No.60 CT&R Dept dt 04.03.2016 AS / TS / RAS: 195 Electrical Division, Madurai 1,95 1,95 1,95

JN Commercial Taxes

64 Lands ( DPC4059 01 051 JN 64 00 )

Building C & M Division, Vellore 1 . Modernisation of Commercial Tax Checkposts -purchase of lands for 3,44 3,44 3,44 the Construction of checkpost at Katpadi Checkpost G.O.(MS)No.79/CT&R Dept/ Dt:28.4.2016 AS / TS / RAS: 344 Electrical Division-2, Chennai

Building C & M Division, Theni 2 . Modernisation of Commercial Tax Checkposts -purchase of lands for 12,37 12,38 12,37 the Construction of checkpost at Bodimettu Checkpost G.O.(MS)No.79/CT&R Dept/ Dt:28.4.2016 AS / TS / RAS: 1237 Electrical Division, Madurai

3 . Modernisation of Commercial Tax Checkposts -purchase of lands for 8,28 8,28 8,28 the Construction of checkpost Lower Camp Checkpost G.O.(MS)No.79/CT&R Dept/ Dt:28.4.2016 AS / TS / RAS: 828 Electrical Division, Madurai

TOTAL - 4059 01 051 JN 115,27,91 11,84,04 28,62,95 15,34,14 56,75,23

52 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 KB [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction KB Construction of Office Buildings for MLA's in their constituencies

16 Major Works ( DPC4059 01 051 KB 16 00 )

South Presidency Division, Chennai 1 . Construction of office building for Member of Legislative Assembly 6,95 6,93 3,26 Constituency at Triplicane. GO.Ms.No.638, LA-Sectt, dated 25.10.99 AS / TS / RAS: 695 Electrical Division-I, Chennai

2 . Construction of office building for Member of Legislative Assembly 15,35 15,33 3,26 Constituency at . GO.Ms.No.439,LA-Sectt, dated 06.06.2012. AS / TS / RAS: 1535 Electrical Division-I, Chennai

3 . Construction of office building for Member of Legislative Assembly 6,95 6,93 3,26 Constituency at Mylapore. GO.Ms.No.638, LA-Sectt, dated 25.10.99 AS / TS / RAS: 695 Electrical Division-I, Chennai

Building C & M Division, Thiruvallur 4 . Construction of MLA office at Tiruvottiyur. 13,75 13,75 13,75 G.O.Ms.No.439/Assm.Sec./ dt.06.06.12 AS / TS / RAS: 1375 Electrical Division-2, Chennai

5 . Construction of MLA office at Avadi. 23,50 16 13,59 13,59 9,75 G.O.Ms.No.439/Assm.Sec./ dt.06.06.12 RAS G.O.Ms.No.696 Assm.Sec./ Dt. 28.11.2016 AS / TS / RAS: 2350 Electrical Division-2, Chennai

Building C & M Division, Vellore 6 . construction of MLA office building at Ambur 13,50 13,49 13,49 G.O Ms. No. 439, LAS/ Dt. 06.06.2012 AS / TS / RAS: 1350 Electrical Division-2, Chennai

TOTAL - 4059 01 051 KB 80,00 16 70,02 13,59 46,77 KC District Administration

16 Major Works ( DPC4059 01 051 KC 16 08 )

Building C & M Division, Aryallur 1 . Construction of new collectorate building in MPC at Ariyalur in Ariyalur 11,93,00 11,86,00 7,00 District G.O.Ms.No.592 Revenue (RA2) (1) Dept / dt.15.10.2008 AS / TS / RAS: 128800 Electrical Division, Salem 95,00 94,76

53 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 KC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction TOTAL - 4059 01 051 KC 12,88,00 12,80,76 7,00 KM Buildings - Tamil Nadu Public Service Commission

16 Major Works ( DPC4059 01 051 KM 16 08 )

Building Construction Division-I, Chennai 1 . Construction of New Building for Tamil Nadu Public Service 17,48,64 17,12,51 1 36,12 1 Commission G.O. Ms.No.173 P & AR (M) DeptDt. 09.12.2010 RAS G.O.Ms.No.89 P &AR (M) Dept Dt. 18.6.2012 AS / TS / RAS: 198564 Electrical Division-I, Chennai 2,37,00 2,35,58

TOTAL - 4059 01 051 KM 19,85,64 19,48,09 1 36,12 1 KU Construction of Regional Centres of the State Judicial Academy under 13th Finance Commission Grants

16 Major Works ( DPC4059 01 051 KU 16 02 ) Building C & M Division, Coimbatore 1 . Construction of Regional centre for the state Judicial Academy at 7,65,77 7,58,18 3,80 Coimbatore G.O.Ms.No1017 Home (Courts-I) Dept. Dt. 9.12.2010 RAS G.O.Ms.No.56 home Court I Dept Dt. 20.01.2015 AS / TS / RAS: 87577 Electrical Division, Coimbatore 1,10,00 1,09,93

TOTAL - 4059 01 051 KU 8,75,77 8,68,11 3,80 KV Construction of Alternative Disputes Resolution Centres under the 13th Finance Commission Grants

16 Major Works ( DPC4059 01 051 KV 16 00 ) Building C & M Division, Dharmapuri 1 . Construction of Alternate Disputes Resolution Centre at Dharmapuri 4,09 4,10 4,09 G.O. (Ms) No.137 Home (Courts-IV) Dept. Dt. 14.02.2012 AS / TS / RAS: 409 Electrical Division, Coimbatore

Building C & M Division, Karur 2 . Construction of Alternative Dispute Resolution Centre at Karur in Karur 20,95 20,95 District. RAS. GO. Ms. No.719 / Home (Courts - IV) Dept., Dated.19.08.2016 AS / TS / RAS: 2095 Electrical Division, Coimbatore

TOTAL - 4059 01 051 KV 25,04 4,10 25,04

54 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 KX [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction KX Construction of Alternate Disputes Resolution Centre under 13th Finance Commission Grant

16 Major Works ( DPC4059 01 051 KX 16 06 ) Building C & M Division, Pudukottai 1 . Construction of Alternate Disputes Resolution Centre at Pudukottai 94,00 33,71 95,00 60,29 1 G.O. (Ms) No.137 Home (Courts-IV) Dept. Dt. 14.02.2012 AS / TS / RAS: 10000 Electrical Division, Salem 6,00 5,00 6,00

Building C & M Division, Dharmapuri 2 . Construction of Alternate Disputes Resolution Centre at Dharmapuri 93,00 66,76 42,41 26,24 G.O. (Ms) No.137 Home (Courts-IV) Dept. Dt. 14.02.2012 AS / TS / RAS: 10000 Electrical Division, Coimbatore 7,00 6,97

Building C & M Division, Ooty 3 . Construction of Alternate Disputes Resolution Centre at The Nilgiris 94,00 94,00 G.O. (Ms) No.137 Home (Courts-IV) Dept. Dt. 14.02.2012 AS / TS / RAS: 10000 Electrical Division, Coimbatore 6,00 3,15 1,00 2,85

Building C & M Division, Karur 4 . Construction of Alternate Disputes Resolution Centre at Karur 95,00 53,86 40,14 41,14 G.O. Ms.No.137 Home (Courts-IV) Dept. Dt. 14.02.2012 AS / TS / RAS: 10000 Electrical Division, Coimbatore 5,00 5,00

TOTAL - 4059 01 051 KX 4,00,00 2,63,45 1,83,55 1,36,52 1 LA Construction of Regional Centres of the State Judicial Academy

16 Major Works ( DPC4059 01 051 LA 16 01 )

Building Construction Division-I, Chennai 1 . Construction of twelve guest rooms in the third floor of the Judicial 3,88,60 1,55,44 Academy Building, Chennai G.O.Ms.No.760 Home (Courts I) Dept Dt. 11.11.2016 AS / TS / RAS: 38860 Electrical Division-I, Chennai

Building C & M Division, Coimbatore 2 . Providing additional amenidies for newly constructed Regional 73,00 72,87 centre for Judicial Academy at Coimbatore G.O.Ms.No. 419 Home (Court-I) Dept dt 22.05.2015 AS / TS / RAS: 17056 Electrical Division, Coimbatore 97,56 95,75 1,81

TOTAL - 4059 01 051 LA 5,59,16 1,68,62 1,81 1,55,44

55 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 01 051 SC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 01 Office Buildings 051 Construction SC Strengthening of Weights and Measures Machinery

16 Major Works ( DPC4059 01 051 SC 16 00 )

Building C & M Division, Vellore 1 . Construction of working standard Laboratories and a Secondary 65,00 20,00 Standard Laboratory at Vellore G.O.Ms.No.211 L&E (K2) Dept Dt. 17.12.2015 AS / TS / RAS: 6500 Electrical Division-2, Chennai

Building C & M Division, Trichy 2 . Construction of working standard Laboratories and a Secondary 65,00 20,00 Standard Laboratory at Trichy G.O.Ms.No.211 L&E (K2) Dept Dt. 17.12.2015 AS / TS / RAS: 6500 Electrical Division, Salem

Building C & M Division, Erode 3 . Construction of working standard Laboratories and a Secondary 65,00 20,00 Standard Laboratory at Erode G.O.Ms.No.211 L&E (K2) Dept Dt. 17.12.2015 AS / TS / RAS: 6500 Electrical Division, Coimbatore

Building C & M Division, Dindigul 4 . Construction of working standard Laboratories and a Secondary 65,00 20,00 Standard Laboratory at Dindigul G.O.Ms.No.211 L&E (K2) Dept Dt. 17.12.2015 AS / TS / RAS: 6500 Electrical Division, Madurai

Building C & M Division, Thoothukudi 5 . Construction of working standard Laboratories and a Secondary 65,00 20,00 Standard Laboratory at Thoothukudi G.O.Ms.No.211 L&E (K2) Dept Dt. 17.12.2015 AS / TS / RAS: 6500 Electrical Division, Madurai

TOTAL - 4059 01 051 SC 3,25,00 1,00,00 BA Secretariat

16 Major Works ( DPC4059 60 051 BA 16 00 )

North Presidency Division, Chennai 1 . Construction of Watch and Ward Room, Compound wall along the 23,00 23,00 23,00 Southern and Western sides of the newly installed Petrol Bunk situated opposite to Fort. St. George Secretariat, Chennai G.O.Ms.No.444 Public Dept Dated 03.05.2016 AS / TS / RAS: 2300 Electrical Division-I, Chennai

TOTAL - 4059 60 051 BA 23,00 23,00 23,00

56 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 60 051 JI [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 60 Other Buildings 051 Construction JI Conservation and Restoration of Heritage Court Building recommended by 13th Finance Commission Grants

16 Major Works ( DPC4059 60 051 JI 16 06 ) North Presidency Division, Chennai 1 . Conservation and restoration of Chief Metropolitan Magistrate Court 4,98,93 50,00 4,48,93 and Additional Chief Metropolitan Magistrate Court, Egmore, Chennai - 8 G.O.Ms.No.971 Home Courts III Department Dated:14.11.2013 AS / TS / RAS: 49893 Electrical Division-I, Chennai

2 . Conservation & Restoration of Small Causes Court, High Court, 16,65,40 6,35,01 4,16,63 8,41,39 1,89,00 Campus Chennai G.O.Ms.No.971 Home (Courts-III) Dept Dated 14.11.2013. G.O.Ms.No.860 Home Courts III Department Dated: 25.11.14 AS / TS / RAS: 172000 Electrical Division-I, Chennai 54,60 54,60

TOTAL - 4059 60 051 JI 22,18,93 6,89,61 4,16,63 8,91,39 6,37,93

57 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 60 051 UB [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 60 Other Buildings 051 Construction UB Buildings

16 Major Works ( DPC4059 60 051 UB 16 09 )

Building Construction Division-I, Chennai 1 . Construction of buiding for accommodation the Advocate society 3,93,69 3,85,57 2,00 cnteen and law chambers for Advocates in the High Cort Campus. Chennai. RAS GO.N O. 1047/ Home (court-iii) Dept Dated. 28.11.2013 AS / TS / RAS: 44789 Electrical Division-I, Chennai 54,20 47,27 6,63

Building C & M Division, Kancheepuram 2 . Construction of Combined Court Buildings and Cycle stand and 100 7,14,05 2,85,62 K.V.A. Generator room at Sriperambudur, Kancheepuram District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 71405 Electrical Division-2, Chennai

Building C & M Division, Thiruvannamalai 3 . Construction of combined court buildings at Cheyyar at Tiruvannamalai 6,29,90 4,23,86 3,21,90 2,06,04 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 69590 Electrical Division-2, Chennai 66,00 33,00 33,00

4 . Construction of Combined Court Buildings at Chengam, 9,52,38 3,80,95 Tiruvannamalai District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 95238 Electrical Division-2, Chennai

Building C & M Division, Cuddalore 5 . Construction of Combined Court Buildings at Chidambaram, Cuddalore 16,15,35 6,46,14 District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 161535 Electrical Division-2, Chennai

6 . Construction of building for the District Munsif cum Judicial Magistrate 2,36,75 14,55 2,21,75 2,22,20 Court at Protonovo, Cuddalore G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 26800 Electrical Division-2, Chennai 31,25 31,25 31,25

Building C & M Division, Villupuram 7 . Construction of the Combined Court Building at Ulundurpet. 8,30,46 7,20,09 1,05,00 1,10,37 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014. AS / TS / RAS: 98266 Electrical Division-2, Chennai 1,52,20 37,97 40,18 1,14,23

58 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 60 051 UB [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 60 Other Buildings 051 Construction UB Buildings

16 Major Works ( DPC4059 60 051 UB 16 09 )

Building C & M Division, Trichy 8 . Construction of Combined Court building for District Munsif and 4,01,46 3,97,95 35,11 3,51 Judicial Magistrate Court at Musiri in Trichy District. RAS.GO.(2D)No.257 (Home Courts-III) Dept/ Dt.4.5.16. AS / TS / RAS: 42646 Electrical Division, Salem 25,00 18,38 5,00 6,62

9 . Construction of Combined Court and Subsidery building at Thuraiyur. 3,92,58 3,31,69 12,70 60,89 G.O.Ms.No.796 Home Courts III Dept Dt. 05.11.2014 G.O.Ms.No.394 Home (Courts III) Dept Dt.11.8.2016. AS / TS / RAS: 41728 Electrical Division, Salem 24,70 12,41 1,00 12,29

Building C & M Division, Thanjavur 10 . Construction of Combined Court Building at Thiruthuraipoondi 3,43,59 1,00,20 2,68,50 2,43,39 Go Ms No. 796/ Home (Courts - III) dept Dt.05.11.2014 RAS G.o. No. (2D) No. 36 Home Courts III Dept Dt. 05.11.2014 AS / TS / RAS: 37209 Electrical Division, Salem 28,50 23,00 28,50

Building C & M Division, Nagapattinam 11 . Construction of combined court building at Sirkali in Nagapattinam 4,24,20 55,00 3,62,23 3,61,70 7,50 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 45320 Electrical Division, Salem 29,00 31,50 29,00

Building C & M Division, Dharmapuri 12 . Construction of Combined Court Buildings in the vacant space 16,73,10 6,69,24 available in the existing District Court Campus at Krishnagiri, Krishnagiri District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 167310 Electrical Division, Salem

Building C & M Division, Erode 13 . Construction of the Combined Court Building at Kodumudi in Erode 2,93,84 1,26,57 1,85,00 1,66,77 50 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 30869 Electrical Division, Coimbatore 14,85 8,92 5,85 5,93

Building C & M Division, Madurai 14 . Construction of Combined Court Buildings at Vadipatti, Madurai District 5,83,00 2,33,20 G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 58300 Electrical Division, Madurai

59 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4059 60 051 UB [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4059 CAPITAL OUTLAY ON PUBLIC WORKS 60 Other Buildings 051 Construction UB Buildings

16 Major Works ( DPC4059 60 051 UB 16 09 )

Building C & M Division, Dindigul 15 . Construction of combined court building at Dindigul 27,74,51 14,68,36 14,67,51 12,56,15 50,00 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 318436 Electrical Division, Madurai 4,09,85 47,35 1,66,85 3,52,50 10,00

Building C & M Division, Ramanathapuram 16 . Construction of combined court buildings at Mudhukalathur in Ramnad 4,23,63 4,14,19 8,00 6,48 Dist. G.O.Ms.No.967 Home (Court-III) Dept Dt. 13.12.2012 & G.O.Ms.No.44 Home (Court-III) Dept Dt. 09.02.2015 AS / TS / RAS: 46168 Electrical Division, Madurai 38,05 30,63

Building C & M Division, Virudhunagar 17 . Construction of Combined Court Buildings at RajaPalayam in 8,14,00 3,25,60 Virudhunagar District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 81400 Electrical Division, Madurai

18 . Construction of the Combined Court Building at Sathur in Virudhunagar 3,24,80 1,49,98 2,24,80 1,74,82 District G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 38280 Electrical Division, Madurai 58,00 21 58,00 57,79

Building C & M Division, Thoothukudi 19 . Construction of remaining portion of the Combined Court Buildings in 4,88,84 1,95,54 the vacant space available in front of the existing Civil Court building at Thoothukudi, Thoothukudi District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 48884 Electrical Division, Madurai

Building C & M Division, Thirunelveli 20 . Construction of Court Buildings for the Court at Sivagiri, Tirunelveli 2,61,67 1,48,90 1,11,67 1,11,67 1,10 District. G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 26917 Electrical Division, Madurai 7,50 4,27 3,00 3,23

TOTAL - 4059 60 051 UB 155,10,90 49,77,32 36,89,80 36,06,96 28,05,39

60 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4202 01 202 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4202 CAPITAL OUTLAY ON EDUCATION, SPORTS, ART AND CULTURE 01 General Education 202 Secondary Education JA Buildings

16 Major Works ( DPC4202 01 202 JA 16 07 )

Building C & M Division, Villupuram 1 . Construction of office building for DEO office at Kallakurichi (Part II 78,00 77,44 Scheme 2014-2015) G.O (D) No.196 SE 4 (1) Dept Dt. 25.08.2014 AS / TS / RAS: 8000 Electrical Division-2, Chennai 2,00 2,00

Building C & M Division, Salem 2 . Construction of Class Rooms 10 Nos., science lab 2 Nos. and 1,56,20 1,46,80 9,40 9,40 1 compound wall in GHS at Vadugapatty at Salem District G.O.Ms.No.157 /SE 4(2) dt.8.10.2014 AS / TS / RAS: 15620 Electrical Division, Salem

3 . Construction of Class Rooms 5 Nos., science lab, toilet 2 Nos., 1,40,30 1,37,67 2,63 Drinking water supply and compound wall in GHS at Karipatti at Salem District G.O.Ms.No.157 /SE 4(2) dt.8.10.2014 AS / TS / RAS: 14030 Electrical Division, Salem

4 . Construction of Class Rooms 5 Nos., science lab, toilet 2 Nos., 97,46 97,38 61,53 Drinking water supply and compound wall in GHS at Veppampoondi at Salem District G.O.Ms.No.157 /SE 4(2) dt.8.10.2014 AS / TS / RAS: 9746 Electrical Division, Salem

5 . Construction of Class Rooms 15 Nos., science lab, toilet 4 Nos., 2,47,28 1,79,60 67,68 67,68 Drinking water supply and compound wall in GHSS at Vellar at Salem District G.O.Ms.No.157 /SE 4(2) dt.8.10.2014 AS / TS / RAS: 24728 Electrical Division, Salem

Building C & M Division, Karur 6 . Construction of Science Lab in GHSS at Thennilai in Karur District 30,62 24,15 6,47 6,47 G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 3062 Electrical Division, Coimbatore

7 . Construction of 9 Class room and Toilet Block 2 Nos. in GHSS at 1,38,50 1,19,29 19,21 19,21 Jegadabi in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 13850 Electrical Division, Coimbatore

8 . Construction of 2 Class room and Science Lab in GHS at Mayanur in 40,94 23,61 17,33 17,33 Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 4094 Electrical Division, Coimbatore

61 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4202 01 202 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4202 CAPITAL OUTLAY ON EDUCATION, SPORTS, ART AND CULTURE 01 General Education 202 Secondary Education JA Buildings

16 Major Works ( DPC4202 01 202 JA 16 07 )

Building C & M Division, Karur 9 . Construction of 5 Class room, Science Lab, Toilet 2 Nos. and 1,05,74 59,92 45,82 45,82 Compound wall in GHS at Chinna Sengal in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 10574 Electrical Division, Coimbatore

10 . Construction of 2 Class room, Science Lab, Toilet 4 Nos. and 77,86 28,98 48,88 48,88 Compound wall in GHS at Kadavur in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 7786 Electrical Division, Coimbatore

11 . Construction of 5 Class room, Science Lab and Compound wall in 1,04,92 53,17 51,75 51,75 GHSS at Velliyanai in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 10492 Electrical Division, Coimbatore

12 . Construction of 5 Class room, Science Lab, Toilet 3 Nos. and 98,25 95,73 2,52 2,52 Compound wall in GHS at Porani in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 9825 Electrical Division, Coimbatore

13 . Construction of 15 Class room, Lab, Toilet Block 2 Nos. and 2,20,62 1,14,74 1,05,88 1,05,88 Compound wall in GHSS at Kurunikulathupatty in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 22062 Electrical Division, Coimbatore

14 . Construction of 5 Class room, Science Lab, Toilet 2 Nos. and 92,30 69,22 23,08 23,08 Compound wall in GHS at Karvizhi in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 9230 Electrical Division, Coimbatore

15 . Construction of 5 Class room and Toilet Block 2 Nos. in GHSS at G. 63,80 62,08 1,72 1,72 Udayapatty in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 6380 Electrical Division, Coimbatore

16 . Construction of 5 Class room and Toilet Block 4 Nos. in GHSS at G. 72,50 65,53 6,97 6,97 Elavannur in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 7250 Electrical Division, Coimbatore

62 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4202 01 202 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4202 CAPITAL OUTLAY ON EDUCATION, SPORTS, ART AND CULTURE 01 General Education 202 Secondary Education JA Buildings

16 Major Works ( DPC4202 01 202 JA 16 07 )

Building C & M Division, Karur 17 . Construction of 4 Class room, Toilet 1 Nos. and WSA in GHS at 50,39 50,17 13,11 22 Andankoil (East) in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 5039 Electrical Division, Coimbatore

18 . Construction of 2 Class room, Science Lab, Toilet 2 Nos. and 55,08 43,60 11,48 11,48 Compound wall in GHS at Pallapalayam in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 5508 Electrical Division, Coimbatore

19 . Construction of Toilet 1 No. and Compound wall in GHS at 12,35 12,33 2 2 Sounthirapuram in Karur District G.O.Ms.No.157, SE 4(2) Dept., dated 08.10.2014 AS / TS / RAS: 1235 Electrical Division, Coimbatore

TOTAL - 4202 01 202 JA 18,85,11 14,63,41 4,95,48 4,18,43 1

63 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4202 01 203 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4202 CAPITAL OUTLAY ON EDUCATION, SPORTS, ART AND CULTURE 01 General Education 203 University and Higher Education JA Buildings

16 Major Works ( DPC4202 01 203 JA 16 05 )

North Presidency Division, Chennai 1 . Raising the Compound Wall for Dr. Ambedkar Government Law 20,00 19,00 20,00 College, Chennai (Part-II 2014-15) G.O.Ms.No.130 Law (LS) Dept Dt. 24.09.2014 AS / TS / RAS: 2000 Electrical Division-I, Chennai

Building Construction Division-I, Chennai 2 . Construction of Administration office, Library Building UG & PG class 61,74,59 59,17,72 2,47,60 2,56,87 room, Hostel for Students hostel at Tamil Nadu Dr. Ambedkar Law University at , G.O.Ms.No.482 Law (LS) Dept Dated 24.09.2013 RAS G.O.Ms.No.223 Law (LS) Dept Dt. 24.05.2016 AS / TS / RAS: 617459 Electrical Division-I, Chennai

3 . Construction Ambedkar College for UG and PG students at Perungudi, 1,70,00 1,69,97 1 2 1 Kancheepuram Distict G.O.Ms.No.241 Law (LS) Dept Dt. 2.8.2010 AS / TS / RAS: 17156 Electrical Division-I, Chennai 1,56 1,47

Building C & M Division, Thiruvallur 4 . Construction Law College at Thiruvallur 60,13,15 1 55,13,15 G.O.Ms.No.430 Law (LS) Dept Dt. 08.09.2016 AS / TS / RAS: 601315 Electrical Division-2, Chennai

Building C & M Division, Kancheepuram 5 . Construction Law College at Kancheepuram 57,17,80 1 52,17,80 G.O.Ms.No.429 Law (LS) Dept Dt. 08.09.2016 AS / TS / RAS: 571780 Electrical Division-2, Chennai

Building C & M Division, Vellore 6 . Construction of Permanent building for Government law college, 7,07,90 6,67,73 40,15 Katpadi in Vellore District G.O.Ms.No.405 Law (Edu) Dept Dt. 18.07.2013 RAS G.O.Ms.No.73 Law (Edu) Dept Dt. 17.02.2016 AS / TS / RAS: 70790 Electrical Division-2, Chennai

Building C & M Division, Trichy 7 . Construction of an Indoor Badminton Court, Compound wall and 5,64,41 5,64,41 Providing Furniture and other Amenities to various buildings in the Tamil Nadu National Law School at Navalurkuttapattu Srirankam Taluk, Trichy G.O.Ms.No.58/ Law (LS) / Department/ Dt.12.2.2016. AS / TS / RAS: 71662 Electrical Division, Salem 1,52,21 1,52,21

64 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4202 01 203 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4202 CAPITAL OUTLAY ON EDUCATION, SPORTS, ART AND CULTURE 01 General Education 203 University and Higher Education JA Buildings

16 Major Works ( DPC4202 01 203 JA 16 05 )

Building C & M Division, Madurai 8 . Construction Additional Building for Women’s Hostel of Government 58,32 58,32 Law College, Madurai G.O.Ms.No.28 Law (LS) Dept Dt. 29.01.2015 AS / TS / RAS: 5832 Electrical Division, Madurai

TOTAL - 4202 01 203 JA 195,79,94 67,56,89 2,66,61 10,72,00 107,50,96 KD Renovation work in Connection with 8th WTC

64 Lands ( DPC4202 04 800 KD 64 08 )

Building C & M Division, Thanjavur 1 . Additional Compensation towards Construction of Manimandapam and 35,19 35,19 35,19 Memorial Tower for 8th World Tamil Conference at Thanjavur G.O.(4D)No.4/PWD/ Dt:4-3-16. AS / TS / RAS: 3519 Electrical Division, Salem

TOTAL - 4202 04 800 KD 35,19 35,19 35,19 SA Institute of Ageing

16 Major Works ( DPC4210 01 051 SA 16 00 )

Building Construction Division-I, Medical Works, Chennai 1 . Construction of National Centre of Ageing at King Institute and 30,00,00 10,00,00 30,00,00 1 Preventive Medicine, Guindy, Chennai GO. (Ms). No. 46 H&FW(E2 ) Dept/ dt.11.05.20167G.O. (2D) No.75 H & FW (E2) Dept Dt. 24.06.2016 AS / TS / RAS: 300000 Electrical Division, Medical Works , Chennai

TOTAL - 4210 01 051 SA 30,00,00 10,00,00 30,00,00 1

65 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building Construction Division-I, Medical Works, Chennai 1 . Construction of A C and D type residential quarters for faculty and 4,32,60 1,14,49 4,32,60 3,18,11 other administrative staff at Chengalpattu Medical College Chengalpattu G.O.Ms.No.266 H & FW (J1) Dept Dt. 02.09.2015 AS / TS / RAS: 46310 Electrical Division, Medical Works , Chennai 30,50 30,50 30,50

2 . Construction of new building for Nephrology and Urology departments 28,48,00 5,45,08 26,48,00 23,02,91 1 in Rajiv Gandhi Govt. General Hospital, Chennai G.O.Ms.No.267 H & FW (J1) Dept Dt. 03.09.2015 AS / TS / RAS: 294800 Electrical Division, Medical Works , Chennai 1,00,00 1,00,00 1,00,00

3 . Construction of additional floor for PG students (Men) over the existing 1,05,60 99,46 1 1 PG Hostel near Geriatric Building at MMC, Chennai G.O.Ms.No.63 H&FW(E1) Dept dated.5.03.2015. RAS G.O.(Ms) No.37/ H&FW Dept, Dated 17.02.2017. AS / TS / RAS: 11060 Electrical Division, Medical Works , Chennai 5,00 5,00

4 . Construction of Lecture Hall ( 250 Students ) in Government 1,92,50 1 1,92,49 1 Chengalpattu Medical College Hospital , Chengalpattu. G.O.(Ms) No.122 / H&FW(J1)Dept / dt.04.03.2016. AS / TS / RAS: 19250 Electrical Division, Medical Works , Chennai

5 . Upgradation of PHC at Walajabad in Kancheepuram 45,00 27,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works , Chennai

6 . Construction of building for Rheumatology Department in new cancer 17,86,27 4,99,31 13,86,27 12,49,73 1 Govt General Hospital, Chennai G.O.Ms.No.110 H&FW (E1) Dept dated.10.04.2015. AS / TS / RAS: 196500 Electrical Division, Medical Works , Chennai 1,78,73 1,78,73 1,77,92

7 . Construction of building for out patients and other Departments at 58,65,00 11,66 56,33,45 24,59,00 33,53,34 Rajiv Gandhi Govt General Hospital, Chennai G.O.Ms.No.75 H&FW (E1)Dept dt.12.03.2015. AS / TS / RAS: 586500 Electrical Division, Medical Works , Chennai

66 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building Construction Division-I, Medical Works, Chennai 8 . Upgradation of PHC at Thiruporur in Kancheepuram 1,12,00 67,20 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 11200 Electrical Division, Medical Works , Chennai

9 . Construction of Additional floors for PG Students (Women) over the 4,94,00 4,94,00 50,00 existing UG Hostel (Women) near MMC at Old Jail Campus. G.O.Ms.No.63/H&FW(E1) Dept.dt.05.03.2015. AS / TS / RAS: 49400 Electrical Division, Medical Works , Chennai

10 . Construction of Radiation Oncology block in Govt. 1,91,00 1,73,93 9,00 Hospital Chennai G.O.Ms.No329 H & FW Dept Dt. 20.10.2014 AS / TS / RAS: 22100 Electrical Division, Medical Works , Chennai 30,00 14,38 20,00 15,62

11 . Construction of Men's Hostel for Under Graduate (UG) Students at 28,85,00 5,87,28 12,97,72 1 MMC, old Jail compound Chennai G.O.Ms.No.50 H & FW (E1) Dept Dt. 13.02.2016 AS / TS / RAS: 288500 Electrical Division, Medical Works , Chennai

12 . Constn of Radiation Oncology block (15MV Linear Accelerator room 1,68,95 1,68,73 No.2 & Part of Front portion and side portion) for Rajiv Gandhi Government Hospital, Chennai. G.O.(D) No. 279. H&FW(G)Dept. Dt.22.03.2013. RAS G.O. (D) No.111 H & FW Dept Dt. 29.01.2015 AS / TS / RAS: 19030 Electrical Division, Medical Works , Chennai 21,35 19,53 10,00

13 . Improvement of Post Mortem Facilities in Government Royapettah 1,09,00 1,08,82 Hospital Chennai-14 G.O.Ms.No.22/H&FW/(J1)dt.29.01.2014. AS / TS / RAS: 18000 Electrical Division, Medical Works , Chennai 71,00 68,24 20,00

14 . Construction of Post Mortem Block with Cold Storage in Chengalpattu 82,05 81,89 Medical College Houpital at Chengalpattu. G.O.Ms.No.22/H&FW/(J1)dt.29.01.2014. AS / TS / RAS: 15000 Electrical Division, Medical Works , Chennai 67,95 63,83 20,00

15 . Construction of CRRI Quarters for Boys and Girls Students and 6,30,38 6,23,27 6,70 Residential Quarters for male and Female residents at Chengalpattu Medical College Houpital at Chengalpattu. Go.ms.no.64/H&FW/(J1)dt. 27.02.2014. AS / TS / RAS: 67070 Electrical Division, Medical Works , Chennai 40,32 40,32 20,00

67 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building Construction Division-I, Medical Works, Chennai 16 . Construction of building at the King institute of Preventive Medicine for 7,70,55 7,67,04 1 the revival of vaccine production. G.O.(Ms) No. 347 H&F (M1) Dept. Dt.18.12.2012. G.O.Ms.No.111 H & FW (E2) Dept Dt. 15.04.2015 AS / TS / RAS: 79955 Electrical Division, Medical Works , Chennai 29,00

17 . Construction of Protection Wall and Other Construction Works for PG 2,35,00 1 2,34,00 1,00 Students Ladies Hostels at MMC in Old Jail Campus, Chennai G.O.No.163/ H&FW (E1) Dept / Dt.30.05.2016. AS / TS / RAS: 23500 Electrical Division, Medical Works , Chennai

18 . Construction of building for Hepatology department in Rajiv Gandhi 16,69,48 6,94,78 9,74,70 Government General Hospital, Chennai-3 GO.Ms.No.49, H&FW (E1) Dept. Dt.12.02.16 AS / TS / RAS: 166948 Electrical Division, Medical Works , Chennai

19 . Provision of Additional Infrastructure facilities for new building at the 7,06,02 6,73,62 1,00,00 32,39 1 KIPM at Guindy G.O.Ms.No.431 H & FW Dept Dt. 26.12.2014 AS / TS / RAS: 70602 Electrical Division, Medical Works , Chennai

Building Construction Division-2, Medical Works, Chennai 20 . Construction of HT Room & Provision of 11 KV HT Supply 30,00 12,76 17,24 arrangements with 2 Nos 500 KVA Transformers and allied works in Govt. , Chennai -1. G.O.Ms.No.1607 H & FW (H1) DeptDt. 14.12.2015 AS / TS / RAS: 13000 Electrical Division, Medical Works , Chennai 1,00,00 1,00,00

21 . Construction of Additional two floors (fourth & fifth floor) over the 25,07 13,59 11,47 Accident and Emergency Trauma Block for creation of Centre of Excellence for Pediatric Cardio Thoracic Surgery in the Institute of Child Health and Hospital for Children Egmore Chennai G.O.Ms.No.144 H & FW Dept Dt. 27.05.2014 AS / TS / RAS: 2507 Electrical Division, Medical Works , Chennai

22 . Construction of Hostel for UG Students (Men) in Govt. Stanley Medical 10,50,00 4,20,00 College Chennai AS Awaited AS / TS / RAS: 105000 Electrical Division, Medical Works , Chennai

68 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building Construction Division-2, Medical Works, Chennai 23 . Upgradation of PHC at Madhavaram (NTK HL) in Thiruvallur 33,00 33,00 33,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 3300 Electrical Division, Medical Works , Chennai

24 . Construction of Additional reading hall for existing library Govt. Stanley 43,45 23,72 19,73 Medical College, Chennai G.O.Ms.No.355 H & FW (E2) Dept Dt. 01.12.2015 AS / TS / RAS: 4345 Electrical Division, Medical Works , Chennai

25 . Construction of Speciality Tower Block to Stanley Hospital 75,00,00 54,59,74 44,90,04 20,40,26 G.O.Ms.No.378 H&FW(E2)DT.03.12.2014 AS / TS / RAS: 750000 Electrical Division, Medical Works , Chennai

26 . Construction of (Ramp Arrangements) Emergency Exit for the five 1,50,50 43,12 1,07,38 floors of the Accident and Emergency Trauma Block at ICH and Govt. Hospital, Egmore, Chennai - 8 G.O.Ms.No.367 H & FW (E1) Dept Dt. 09.12.2015 AS / TS / RAS: 15750 Electrical Division, Medical Works , Chennai 7,00 7,00

27 . Construction of 300 bedded additional buildings for the Institute of 16,39,97 15,52,78 72,43 72,43 Child Health and Hospital for Women and Children in Egmore-8. G.O.Ms.No.415/ H & FW (J1) Dept, Dt.29.10.2007. RAS G.O.Ms.No.137 H & FW (J1) Dept Dt. 18.04.2012 AS / TS / RAS: 184697 Electrical Division, Medical Works , Chennai 2,07,00 2,06,20

28 . Construction of building for CRRI quarters at Government Stanley 4,39,50 4,38,98 50,00 52 Medical College, Chennai G.O.Ms.No.10 H&FW(E-2)Dept. Dated 21.01.2014 AS / TS / RAS: 46200 Electrical Division, Medical Works , Chennai 22,50 21,88 10,00 62

29 . Establishment of Laboratory for Diagnosing inherited disorder 42,57 42,57 Molecular diagnoses at Institute of Child Health and Hospital for Children Chennai G.O.Ms.No.118 H & FW (E1) Dept Dt. 04.03.2016 AS / TS / RAS: 4257 Electrical Division, Medical Works , Chennai

69 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building Construction Division-2, Medical Works, Chennai 30 . Upgradation of Govt. District Head Quarters Hospital at to 1,19,00 1,18,99 the level of Medical college Hospital 1. Construction of Additional wards AS:Rs. 10000

2. Construction of Yoga and Naturopathy Life Style Clinic AS Rs.3300 G.O.Ms.No.127H&FW(F1)Dept. Dt19.05.2014 AS / TS / RAS: 13300 Electrical Division, Medical Works , Chennai 14,00 13,58 10,00

31 . Construction of Lecture Hall and construction of Animal House in 4,21,60 4,11,91 30,00 Government Stanley Medical College, Chennai G.O.Ms.No.11 H &FW (E2) Dept Dt. 21.01.2014 AS / TS / RAS: 45460 Electrical Division, Medical Works , Chennai 33,00 20,46 20,00 9,69

32 . Construction of Multistoried Building in Govt (Tower Block) Stantely 41,14,52 39,58,03 1,56,50 1,56,49 Medical College Hospital Chennai G.O.M.s. No.173 H & FW (J1) Dept. dt.16.06.09. AS / TS / RAS: 454454 Electrical Division, Medical Works , Chennai 4,30,02 4,30,02

Building Construction Division-3, Medical Works, Chennai 33 . Construction of buildings for Rheumatology in the IIIrd floor of existing 2,42,00 2,13,88 casuality Block at KMCH Campus, , Chennai-10. G.O.Ms.No.137 H&FW(E1) Dept., Dated 19.06.2013. AS / TS / RAS: 24200 Electrical Division-2, Chennai

34 . Improvement of Post Mortem facilities in KMC & Hospital, Chennai-10. 1,51,20 1,50,50 46 G.O.Ms.No.315 H&FW(J1) Dept, Dated 08.11.2012. AS / TS / RAS: 15120 Electrical Division-2, Chennai

35 . Construction of Additional two floor, Head room and lift machine rooms 4,15,00 3,93,24 in the third floor above Burns Centre Buildings of Govt. KMC, Chennai- 10. G.O.Ms.No.439 H&FW (E2) Dept., Dated 29.12.2014. AS / TS / RAS: 41500 Electrical Division-2, Chennai

36 . Conversion of rooms for the Nuclear Medicine Department in the 1,47,40 1,32,67 1,00,00 1,33 Ground Floor and Third Floor of Tamil Nadu Government Multi Super Speciality Hospital, Omandurar Estate, Chennai G.O.Ms.No. 64 Health and Family Welfare (E1) Department / Dated 05.03.2015 AS / TS / RAS: 14740 Electrical Division-2, Chennai

70 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building Construction Division-3, Medical Works, Chennai 37 . Construction of Radiation oncology block at Multisuper Speciality 5,33,64 4,53,59 1 46,40 33,65 Hospital, Omandhurar Estate G.O.Ms.No.228 H & FW (E1) Dept Dated 15.10.2013 AS / TS / RAS: 53364 Electrical Division-2, Chennai

38 . Construction of Structural Steel Dome and sky light glazing around and 6,27,60 5,57,97 68,63 above the main conference hall in MSSH at OGE, Chennai-02 G.O.Ms.No.15 H&FW (E1)Dept., Dated 22.01.2014. AS / TS / RAS: 62760 Electrical Division-2, Chennai

39 . Constn of third and fourth floor building over the second floor of the 5,00,00 4,53,68 1,00,00 46,32 DME Kilpauk, Chennai G.O.Ms.No.323 H & FW (E2) Dept Dt. 17.10.2014 AS / TS / RAS: 50000 Electrical Division-2, Chennai

40 . Construction of Compulsory Rotatory Residential Intership (CRRI) Qtrs 12,93,50 1 2,60,00 8,93,50 for 150 students (B&G) and Resident Qtrs. For 140 to Junior & Senior Residents (B&G) in Govt. KMCH, Chennai-10. G.O.Ms.No.109 H&FW (E2) Dept., Dated 03.03.2016. AS / TS / RAS: 140000 Electrical Division-2, Chennai 1,06,50 3,00 1,03,50

41 . Construction of Medical College and Hospital in Block-B building at 196,95,98 119,42,77 2,00,01 3,42,23 15,13,22 Omandurar Government Estate, Chennai G.O.Ms.No.167 H &FW (E1) Dept.,dated:17.07.2013 RAS G.O.Ms.No.275 H & FW (E1) Dept Dt. 28.11.2016 AS / TS / RAS: 1969598 Electrical Division-2, Chennai

Building Maintenance Division, Medical Works, Chennai 42 . Construction of Lift Well in Administrative Block in MMC attached to 8,03 8,03 Rajiv Gandhi Government General Hospital, Chennai-3. and Supply and Erection of Lift and Electrical Works. G.O. (MS) NO. 55 HEALTH AND FAMILY WELFARE (E1) DEPARTMENT DATED 16.02.2016 AS / TS / RAS: 3013 Electrical Division, Medical Works , Chennai 22,10 22,10

43 . Uggradatation of the infrastructure to the Bio-Chemistry, Microbiology, 28,56 16,01 Pathology and Molecular biology lab in first floor of main building in Institute of Child Health and Hospital for Children at Egmore, Chennai- 8.- G.O.(M.S) NO.118 H & FW (E1) Dept Dt. 04.03.2016. AS / TS / RAS: 4256 Electrical Division, Medical Works , Chennai 14,00

71 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Vellore 44 . Upgradation of PHC at Chinnasalem in Villupuram 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works , Chennai

45 . Upgradation of PHC at Vikkaravandi in Villupuram 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works , Chennai

46 . Construction of 40 Bedded IMU Ward, Burn Ward, High Dependency 3,12,00 3,11,98 Unit, Eye Ward and Naturopathy Building in Govt.Head Quarters Hospital at Cuddalore in Cuddalore dist. GO.MS.No:127/H&FW(F-1) /DEPT/ Date:19.05.2014. AS / TS / RAS: 34200 Electrical Division, Medical Works , Chennai 30,00 26,20 20,00

47 . Upgradation of PHC at Vembakkam in Tiruvannamalai 1,21,00 1,21,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 12100 Electrical Division, Medical Works , Chennai

48 . Upgradation of PHC at Anaikattu in Vellore 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works , Chennai

49 . Construction of Protection Wall and Entrance Arch to the Govt. 77,00 45,94 67,00 31,06 Villupuram Medical College and Hospital at Villupuram G.O.Ms.No.126 H & FW (J-1)Dept.Date:24.04.2015 AS / TS / RAS: 7700 Electrical Division, Medical Works , Chennai

50 . Construction of Additional 30 Bedded Ward Building for Upgradation of 85,50 14,49 75,50 71,01 PHC as Government Taluk Hospital at Kalasapakkam in Thiruvannamalai Dist. G.O.Ms.No.71 H & FW (F-1) Dept.Date: 11.02.2015 AS / TS / RAS: 9000 Electrical Division, Medical Works , Chennai 4,50 4,50 4,50

51 . Upgradation of PHC at Bhuvanagiri in Cuddalore 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works , Chennai

72 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Vellore 52 . Upgradation of PHC at Thandarampet in Tiruvannamalai 1,21,00 1,21,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 12100 Electrical Division, Medical Works , Chennai

53 . Construction of 200 Bedded Ward under Phase II in Govt.Medical 26,05,00 1 11,00,00 13,05,00 College and Hospital at thiruvannamalai in Thiruvannamalai District. G.O.Ms.No 105/H&FW (J2) Dept dated: 03.03.2016 AS / TS / RAS: 281000 Electrical Division, Medical Works , Chennai 2,05,00 1,95,00

54 . Upgradation of Primary Health Centre as Taluk Head Quarters 85,50 59,84 75,50 25,66 Hospital at Natrampalli in Vellore Distirct. G.O. (Ms) No.71 H & FW (J1) Dept Dated 11.02.2015 AS / TS / RAS: 9000 Electrical Division, Medical Works , Chennai 4,50 4,50

55 . Upgradation of PHC at Veppur in Cuddalore 1,23,00 1,23,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 12300 Electrical Division, Medical Works , Chennai

56 . Construction of Additional Library Building in Govt.Vellore Medical 82,50 1 82,50 College and Hospital at Adukkamparai in Vellore District G.O. Ms No.123 H & FW (J2) Dept Dated: 04.03.2016 AS / TS / RAS: 8900 Electrical Division, Medical Works , Chennai 6,50 6,50

57 . Construction of Mortuary Block with Cold Storage in Government 35,00 24,66 25,00 10,34 Hospital at Vaniyambadi in Vellore Dist. G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works , Chennai

58 . Upgradation of PHC at Chetput in Tiruvannamalai 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works , Chennai

59 . Upgradation of PHC at Marakkanam (NTK HL) Villupuram 1,12,00 1,12,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 11200 Electrical Division, Medical Works , Chennai

73 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Trichy 60 . Construction of Institution Building for New Govt Medical College and 56,53,00 40,94,47 Hospital Buildings @ Karur in Karur Dist. G.O.Ms.No.352/H&FW (E-2)/Dept, dt. 30.11.2015 AS / TS / RAS: 602300 Electrical Division, Medical Works, Trichy 3,70,00 2,22,00

61 . Construction of Mortuary Block with Cold Storage in Government 26,00 6,89 24,00 19,10 Hospital Annavasal in Pudukottai G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00 9,00

62 . Construction of 30 Bedded Ward in Govt Taluk Hospital @ 85,00 24 75,00 64,76 20,00 Karambakudi in Pudukkottai Dist. G.O.Ms.No.71, H&FW(F1) Dept, dt.11.03.2015 AS / TS / RAS: 9000 Electrical Division, Medical Works, Trichy 5,00 2,50 5,00

63 . Construction of Hospital Building for New Govt Medical College and 97,37,00 58,42,20 Hospital Building @ Karur in Karur Dist. G.O.Ms.No.352/H&FW (E-2)/Dept, dt.30.11.2015 AS / TS / RAS: 1074000 Electrical Division, Medical Works, Trichy 10,03,00 6,01,80

64 . Construction of Residential Building for New Govt Medical College and 58,23,00 34,93,80 Hospital Buildings @ Karur in Karur Dist. G.O.Ms.No.352/H&FW (E-2)/Dept, dt.30.11.2015. AS / TS / RAS: 618300 Electrical Division, Medical Works, Trichy 3,60,00 2,16,00

65 . Construction of Institution Buildings for Pudukottai Medical College at 55,45,77 33,00,00 22,45,77 Pudukottai G.O.Ms.No.401 H& FW (J2) Dept Dt. 31.12.2015 AS / TS / RAS: 591577 Electrical Division, Medical Works, Trichy 3,70,00 7,50 3,62,50

66 . Upgradation of PHC at Karai (Alathur) in Perambalur 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

74 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Trichy 67 . Construction of Residential Quarters for 85 Doctors at 3,22,44 3,16,81 K.A.P.Viswanatham Medical College attached to Mahatma Gandhi Memorial Govt Hospital @ Trichy in Trichy Dist. G.O.Ms.No.292/H&FW (J2) Dept, dt.06.12.2013 RAS G.O.Ms.No.61 /H&FW(J1)/Dept, dt.04.03.2015 AS / TS / RAS: 32244 Electrical Division, Medical Works, Trichy

68 . Construction of Mortuary Block in Mahatma Gandhi Memorial Govt 1,10,50 56,79 50,50 53,71 Hospital attached to KAP.Viswanatham Govt Medical College @ Trichy in Trichy Dist. G.O.Ms.No.127 H&FW(J1) Dept, dt. 24.04.2015 AS / TS / RAS: 13200 Electrical Division, Medical Works, Trichy 21,50 12,31 16,50 9,19

69 . Upgradation of PHC at Manamelkudi (NTK HL) in Pudukottai 21,00 2,10 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 2100 Electrical Division, Medical Works, Trichy

70 . Construction of 54 Bedded Ward in Govt Taluk Hospital @ Illuppur in 1,38,00 53,95 78,00 84,05 Pudukkottai Dist. G.O.Ms.No.71 H&FW(F1) Dept, dt.11.03.2015 AS / TS / RAS: 15000 Electrical Division, Medical Works, Trichy 12,00 2,87 2,00 7,13

71 . Upgadation of PHC Thuvakudi as Govt. Hospital at Thiruverumbur 95,50 68,95 45,50 26,55 Taluk in Trichy G.O. Ms.No. 142/ H & FW (F1) Dept Dt. 27.05.2014 AS / TS / RAS: 10000 Electrical Division, Medical Works, Trichy 4,50 4,41 2,50

72 . Construction of 24 Bedded Ward (First Floor Over the Existing 30 72,00 47,80 22,00 24,20 Bedded Ward) in Govt Taluk Head Quarters Hospital @ Manmangalam In Karur Dist. G.O.Ms.No.71, H&FW(F1) Dept, dt.11.03.2015 AS / TS / RAS: 7500 Electrical Division, Medical Works, Trichy 3,00 2,96

73 . Upgradation of PHC at Kadavur (Tharangampatti TK HQ, PHC 45,00 27,00 Mailampatti) in Karur G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

75 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Trichy 74 . Construction of Residential Buildings for Pudukottai Medical College at 57,70,95 9,99,91 40,00,00 17,70,95 Pudukottai G.O.Ms.No.401 H& FW (J2) Dept Dt. 31.12.2015 AS / TS / RAS: 613095 Electrical Division, Medical Works, Trichy 3,60,00 1,50,00 2,10,00

75 . Construction of Mortuary Block with Cold Storage in Government 26,00 6,56 24,25 19,44 Hospital Illupur in Pudukottai G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00 9,00

76 . Construction of Hospital Buildings for Pudukottai Medical College at 98,96,28 72,50,00 26,46,28 Pudukottai G.O.Ms.No.401 H& FW (J2) Dept Dt. 31.12.2015 AS / TS / RAS: 1089928 Electrical Division, Medical Works, Trichy 10,03,00 30,00 7,11,50

77 . Upgradation of PHC at Viralimalai in Pudukottai 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

78 . Upgradation of PHC at Ponamaravathy in Pudukottai 1,18,00 1,18,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 11800 Electrical Division, Medical Works, Trichy

79 . Construction of Mortuary Block with Cold Storage in Government 26,00 26,00 26,00 Hospital Manamelkudi in Pudukottai G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00 9,00

80 . Construction of Mortuary Block with Cold Storage in Government 26,00 3,93 24,00 22,07 Hospital Thuvakudi in Trichy G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00 9,00

81 . Upgradation of PHC at Thuvarankuruchi (NTK HL) in Trichy 36,00 36,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 3600 Electrical Division, Medical Works, Trichy

76 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thiruvarur 82 . Construction of Resident Quarters for (30 Students) Hostel building for 8,88,86 8,85,49 125 students (Girls) (II & IIIrd floor) Hostel building for 125 Students (Boys) (II & IIIrd floor) and Library building (IInd floor) in the Government Medical College and Hospital at Thiruvarur. G.O.Ms. No.230 / H&FW (J1) Dept. / Dated:15.10.2013 AS / TS / RAS: 88886 Electrical Division, Medical Works, Trichy

83 . Upgradation of PHC at Udayarpalayam in Ariyalur 42,00 42,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4200 Electrical Division, Medical Works, Trichy

84 . Construction of Yoga & Naturopathy Life Style Clinic Building in 31,00 30,99 G.H.Q.H. at ARIYALUR. G.O.Ms.No.78/H&FW(F1) Dept. Dated : 27.02.2014. AS / TS / RAS: 3300 Electrical Division, Medical Works, Trichy 2,00 1,69 31

85 . Upgradation of PHC at Boothalur in Thanjavur 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

86 . Upgradation of PHC at Kuttalam (NTK HL) in Nagapattinam 94,00 94,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 9400 Electrical Division, Medical Works, Trichy

87 . Upgradation of Thanjavur Medical College Hospital under PMSSY 10,00,00 1 1 1 (AS awaited) AS / TS / RAS: 100000 Electrical Division, Medical Works, Trichy

88 . Improvements of Post Mortem facilities in Thanjavur Medical College 97,50 87,50 10,00 Hospital at Thanjavur. G.O.Ms.No.22/H&FW (J1) Dept. Date.29.01.2014 AS / TS / RAS: 13000 Electrical Division, Medical Works, Trichy 32,50 30,50 10,00 2,00

77 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thiruvarur 89 . Construction of Mortuary Block with Cold Storage in Government 26,00 21,92 4,08 Hospital, Orathanadu in Thanjavur District. G.O.(Ms) No.219 H&FW (F1) Dept. Dated:31.07.2015. AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00

90 . Construction of 100 bedded ward, Yoga and Naturopathy Life Style 2,65,00 2,43,79 Clinic for the upgradation of Government Head Quarters Hospital at Nagapattinam in Nagapattinam District G.O.Ms. No.127/H&FW (F1) Dept. / Dated:19.05.2014 AS / TS / RAS: 28300 Electrical Division, Medical Works, Trichy 18,00 16,98 2

91 . Construction of Residential Quarters (30 Residents) and Lecture Hall 2,97,60 2,74,60 2,89,60 8,00 (400 Students) at Government Thiruvarur Medical College, Tiruvarur G.O.Ms.No.265 H & FW (J1) Dept Dt. 02.09.2015 AS / TS / RAS: 31460 Electrical Division, Medical Works, Trichy 17,00 15,00 17,00

92 . Establishment of Regional Cancer Centre at Thanjavur Medical College 2,81,00 1,12,28 1,50,00 1,68,72 G.O.Ms.No.255 H EAP Dept Dt. 01.11.2013 AS / TS / RAS: 30000 Electrical Division, Medical Works, Trichy 19,00 7,79 2,00 11,21

Building C & M Division, Medical Works, Salem 93 . Upgradation of PHC at Senthamangalam (NTK HL) in Namakkal G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 0 Electrical Division, Medical Works, Trichy

94 . Construction of Additional 30 bedded ward building for UGPHC at 85,50 75,41 50,00 10,09 Govt.Taluk Hospital at Valapadi in Salem District. G.O.Ms.No.71, H & FW (F-1) Dept / Date:11.03.2015. AS / TS / RAS: 9000 Electrical Division, Medical Works, Trichy 4,50 3,99

95 . Construction of New Mortuary Block in Government Mohan 86,20 86,20 50,00 Kumaramangalam Medical College Hospital, Salem G.O.Ms.No.239 H & FW (J1) Dept Dt. 13.08.2015 AS / TS / RAS: 12320 Electrical Division, Medical Works, Trichy 37,00 43 30,00 36,50

96 . Construction of Staff Nurse Quarters in Government Mohan 7,62,00 3,00,00 1,62,00 Kumaramangalam in Medical College at Salem. G.O.Ms.No.67/H&FW (J1) Dept / Dt: 19.02.2016. AS / TS / RAS: 81200 Electrical Division, Medical Works, Trichy 50,00 20,00 30,00

78 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Salem 97 . Construction of Residential quarters (for teaching and non teaching 8,42,00 5,31,80 8,07,00 3,10,20 staff) at Government Mohan Kumaramangalam Medical College, Salem G.O.Ms.No.238 H & FW (J1) Dept Dt. 13.08.2015 AS / TS / RAS: 90200 Electrical Division, Medical Works, Trichy 60,00 55,00 60,00

98 . Construction of Mortuary Block with Cold Storage in Government 26,00 26,00 26,00 Hospital Sendamangalam, Namakkal G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00 9,00

99 . Upgradation of PHC at Kolli Hills in Namakkal 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

100 . Construction of Mortuary Block with Cold Storage in Government 26,00 25,83 26,00 17 Hospital Edappady in Salem G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Trichy 9,00 9,00 8,77

101 . Upgradation of PHC at Bethanaickenpalayam in Salem 1,21,00 1,21,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 12100 Electrical Division, Medical Works, Trichy

102 . Upgradation of PHC at Burgur in Krishnagiri 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

103 . Upgradation of PHC at Nainampettai in Salem 75,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 7500 Electrical Division, Medical Works, Trichy

104 . Construction of Residential quarters for Junior and Senior and 8,09,93 8,06,40 1,00,00 3,53 Construction of CRRI Quarters for Boys and Girls at Salem. G.O.Ms.No:414, H& FW (J1) Dept. Date:17.12.2014. AS / TS / RAS: 85593 Electrical Division, Medical Works, Trichy 46,00 22,45 26,00 22,60

79 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thiruppur 105 . Upgradation of PHC at Kinathakadavu (PHC) in Coimbatore 1,30,00 10,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 13000 Electrical Division, Medical Works, Trichy

106 . Upgradation of PHC as Taluk Hospital at Madathukulam inTiruppur 1,56,30 76,53 1,15,00 79,77 District. G.O. (Ms) No.71 H & FW (J1) Dept Dated 11.03.2015 AS / TS / RAS: 16500 Electrical Division, Medical Works, Trichy 8,70 6,99 3,00 1,71

107 . Upgradation of PHC as Taluk Hospital at Uthukuli in Tiruppur District. 1,42,00 71,64 90,50 70,36 G.O. (Ms) No.71 H & FW (J1) Dept Dated 11.03.2015 AS / TS / RAS: 15000 Electrical Division, Medical Works, Trichy 8,00 6,50 3,00 1,50

108 . Construction of Centenary Block (Multi Storied Building) at Coimbatore. 55,04,69 51,88,34 38,17 G.O.Ms.No.350 H &FW (J1) Dept Dt. 11.12.2010. RAS G.O.Ms.No.140 H &FW Dept Dt. 26.05.2014 AS / TS / RAS: 615869 Electrical Division, Medical Works, Trichy 6,54,00 4,46,51 2,00,00 2,00,00

109 . Upgradation of PHC at Annur (NTK HL) in Coimbatore 27,00 10,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 2700 Electrical Division, Medical Works, Trichy

110 . Construction of 100 Bedded ward & Naturopathy lifestyle clinic building 3,13,00 1,89,54 1,15,04 1,23,46 in Govt. Head Quarters Hospital at Tiruppur in Tiruppur Dt. G.O. (Ms) No.127 H & FW (F1) Dept Dated 19.05.2014 AS / TS / RAS: 33300 Electrical Division, Medical Works, Trichy 20,00 14,83 5,00 4,47

111 . Upgradation of PHC at Sulur (NTK HL) in Coimbatore 36,00 10,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 3600 Electrical Division, Medical Works, Trichy

112 . Upgradation of PHC as Taluk Hospital at Sundakamuthur in 84,50 49,98 34,50 34,52 Coimbatore District. G.O. (Ms) No.71 H & FW (J1) Dept Dated 11.03.2015 AS / TS / RAS: 9000 Electrical Division, Medical Works, Trichy 5,50 50 5,50

80 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thiruppur 113 . Upgradation of PHC at Anthiyur (NTK HL) in Erode G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 0 Electrical Division, Medical Works, Trichy

114 . Improvement of post mortem facilities in Govt. Coimbatore Medical 1,79,50 1,57,13 1 College Hospital Coimbatore G.O. (Ms) No.315 H & FW (J1) Dept Dated 08.11.2012 and G.O. (Ms) No.107 & FW (J1) Dept Dated03.03.2016 AS / TS / RAS: 23675 Electrical Division, Medical Works, Trichy 57,25 9,86

115 . Upgradation of PHC at Madukkarai (UPHC) in Coimbatore 45,00 16,87 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy

116 . Construction of new building at Govt. Hospital, Gobichettipalayam in 2,10,00 2,20,00 2,10,00 Erode District G.O.Ms.No.280 H & FW (F1) Dept Dt. 14.09.2015 AS / TS / RAS: 22000 Electrical Division, Medical Works, Trichy 10,00 10,00

117 . Establishment of Regional Cancer Centre at Coimbatore 3,77,00 2,85,00 1 92,00 G.O. (D) No.1206 H & FW Dept Dt. 19.11.2012 RAS G.O.Ms.No.119 H & FW Dept Dt. 04.03.2016 AS / TS / RAS: 39200 Electrical Division, Medical Works, Trichy 15,00 9,79 15,00 5,13

118 . Construction of 10 bedded A.E. ward, 10 bedded male and female 1,43,00 83,88 61,10 59,12 surgical ward, 10 bedded maternity ward and 10 bedded Eye ward and yoga & Naturopathy Life Style Clinic arrangement in Govt. Head Quarters Hospital at Pollachi in Coimbatore Dt. G.O. (Ms) No.127 H & FW (F1) Dept Dated 19.05.2014 AS / TS / RAS: 15000 Electrical Division, Medical Works, Trichy 7,00 3,03 1,00 3,97

119 . Construction of Library Block in Coimbatore Medical College Hospital 41,13 40,94 (RAS) G.O.Ms.No.434 H & FW (J1) Dept Dt. 26.12.2014 AS / TS / RAS: 4313 Electrical Division, Medical Works, Trichy 2,00

120 . Upgradation of PHC as Taluk Hospital at Kollarpatti in Coimbatore 70,50 40,61 30,50 29,89 District. G.O. (Ms) No.71 H & FW (J1) Dept Dated 11.03.2015 AS / TS / RAS: 7500 Electrical Division, Medical Works, Trichy 4,50 2,94 1,56

81 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thiruppur 121 . Construction of Nursing Student Hostel in Coimbatore Medical College 3,05,07 1,94,13 1,05,07 1,10,94 Hospital at Coimbatore G.O.Ms.No.33 H & FW Dept Dt.05.02.2015 AS / TS / RAS: 32307 Electrical Division, Medical Works, Trichy 18,00 5,30 13,00 12,70

Building C & M Division, Medical Works, Madurai 122 . Construction of additional Library building in Govt. Theni Medical 1,97,00 1,84,76 College Hospital, Theni Go.Ms.No.141 H& FW(J2) dept. dt.26.5.14 AS / TS / RAS: 20900 Electrical Division, Medical Works, Madurai 12,00 9,12

123 . Construction of Hostel Building for 200 students for School of Nursing 5,70,00 49,93 5,95,00 3,60,07 1,60,00 in Govt. Theni Medical College Theni G.O.Ms.No.264 H & FW (J2) Dept Dt. 02.09.2015 AS / TS / RAS: 60500 Electrical Division, Medical Works, Madurai 35,00 10,00 25,00

124 . Construction of Psyciotric Wing at Govt. Theni Medical College 44,10 12,55 41,10 31,55 G.O.Ms.No.406 H &FW(F1) Dept.dt.16.12.2014 AS / TS / RAS: 4610 Electrical Division, Medical Works, Madurai 2,00 2,00

125 . Construction of new 200 bedded ward building in Govt. Head Quarters 5,60,50 5,48,86 2,49,72 1,00 Hospital at Dindigul G.O.Ms.No.127 H &FW(F1) Dept.dt.19.5.14 AS / TS / RAS: 63300 Electrical Division, Medical Works, Madurai 72,50 30,33 38,00 40,00 2,17

126 . Construction of Additional Hostel building for post Graduate Students 6,38,00 2,55,20 in Madurai Medical College, Madurai G.O.Ms.No.48, H&FW Dept, dated 22.2.2017 AS / TS / RAS: 63800 Electrical Division, Medical Works, Madurai

127 . Creation of New Nursing at Periyakulam Govt Theni Medical College 7,35,00 7,01,22 2,35,00 21,94 G.O.Ms.No.205 H&FW (PME) Dept Dated 17.09.2013 AS / TS / RAS: 77500 Electrical Division, Medical Works, Madurai 40,00 29,01 18,92 10,99

128 . Upgradation of PHC at Thiruparankundaram in Madurai 51,00 51,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 5100 Electrical Division, Medical Works, Madurai

82 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Madurai 129 . Construction of Additional Examination Hall Buildings for 250 students 70,00 74,00 70,00 in First Floor over the existing examination hall in Govt. Theni Medical College G.O.Ms.No.235 H & FW (J2) Dept Dt. 13.08.2015 AS / TS / RAS: 7400 Electrical Division, Medical Works, Madurai 4,00 4,00

130 . Upgradation of PHC at Attur in Dindigul 1,30,00 1,30,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 13000 Electrical Division, Medical Works, Madurai

131 . Upgradation of PHC at Keelakarai (NTK HL) in Ramnad 15,00 15,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 1500 Electrical Division, Medical Works, Madurai

132 . "Construction of Academic Block and Nursing Hostel (Addl.Block for 9,32,65 8,79,52 300 Nurses) Collge of Nursing at Govt. Rajaji Hospital at Madurai G.O.Ms.No.104 H & FW Dept Dt. 01.03.2011 RAS GoMs.No.357/H&FW Dept Dt.01.12.2015 AS / TS / RAS: 98265 Electrical Division, Medical Works, Madurai 50,00 48,06

133 . Construction of Regional Cancer Centre at Madurai 3,23,75 77,15 3,00,00 2,45,60 1,00 G.O.Ms.No.1206 H & FW (J1) Dept Dt. 19.11.2012 AS / TS / RAS: 38000 Electrical Division, Medical Works, Madurai 56,25 30,00 50,00 6,25

134 . Improvement of Post Mortem facilities in Govt. Rajaji Hospital Madurai 1,05,00 1,01,98 3,02 GO.Ms.No.1206 H&FW(Ji) Dept.Dt.19.11.2012 AS / TS / RAS: 13950 Electrical Division, Medical Works, Madurai 34,50 33,74 23,94

Building C & M Division, Medical Works, Sivagangai 135 . Upgradation of PHC at Kallamanayackanpatti in Virudhunagar 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Madurai

83 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Sivagangai 136 . Upgradation of PHC Thiruppuvanam as Govt. Taluk Hospital in 2,82,50 2,63,31 79,66 19,19 Sivagangai District. G.O.Ms.No.148 H&FW Dept. dt:27.05.2014 AS / TS / RAS: 30000 Electrical Division, Medical Works, Madurai 17,50 7,49 10,00 10,01

137 . Construction of Additional building over the existing boys and girls 5,95,29 5,76,97 hostel building at Sivagangai Medical College G.O.Ms.No.234 H & FW (J2) Dept Dated 21.10.2013 AS / TS / RAS: 65529 Electrical Division, Medical Works, Madurai 60,00 29,77 29,57 30,23

138 . Construction of Accident and Emergency Block at Sivagangai Medical 4,50,00 1,80,00 College and Hospital G.O.Ms.No.52 H & FW Dept Dt. 27.02.2017 AS / TS / RAS: 45000 Electrical Division, Medical Works, Madurai

139 . Construction of compound wall with approach road at 50 bedded 52,70 21,08 Rehabilitation Institution cum Hospital at Erwadi in Ramnad AS Awaited AS / TS / RAS: 5270 Electrical Division, Medical Works, Madurai

140 . Construction of additional building for Residential's Quarters (Male and 1,08,30 1,07,99 48,30 Female) in Govt. Medical College at Sivagangai G.O.Ms.No.325 H & FW Dept Dt. 17.10.2014 AS / TS / RAS: 11330 Electrical Division, Medical Works, Madurai 5,00

141 . Upgradation of PHC at Kalaiyarkovil in Sivagangai 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Madurai

142 . Constn.of New buildings for Nurshing and Hostel in Ramanathapuram 7,80,40 7,32,87 2,76,10 47,40 in Ramanathapuram District. G.O.Ms.No.62 H&FW (J2) Dept. Dt:27.02.2014 RAS G.O.(MS)No.106/H&FW/ Dept Dt: 03.03.2016 AS / TS / RAS: 81740 Electrical Division, Medical Works, Madurai 37,00 18,45 20,00 18,55

143 . Upgradation of Govt. Head Qtrs. Hospital at Virudhunagar in 1,80,00 1,34,53 80,20 45,47 Virudhunagar District. G.O.Ms.No.127 H&FW (F1) Dept. dt:19.05.2014 AS / TS / RAS: 19300 Electrical Division, Medical Works, Madurai 13,00 7,80 5,20

84 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Sivagangai 144 . Constn.of Hostel for Nursing School Students in Govt. Head Quarters 5,02,40 47,98 4,97,40 3,54,42 1,00,00 Hospital at Virudhunagar in Virudhunagar District. G.O.Ms.No:114/H&FW(J2)/Dept./dt:16.04.2015 AS / TS / RAS: 53240 Electrical Division, Medical Works, Madurai 30,00 35,00 20,00 10,00

145 . Upgradation of Govt. Head Qtrs. Hospital at Ramanathapuram in 4,90,00 3,26,46 1,90,45 1,63,54 Ramanathapuram District G.O.Ms.No.127 H&FW (F1) Dept. Dt:19.05.2014. AS / TS / RAS: 55700 Electrical Division, Medical Works, Madurai 67,00 20,44 30,00 46,56

146 . Upgradation of PHC Thiruthangal as Govt. Hospital in Virudhunagar 2,81,50 2,57,45 1,02,53 9,77 District. G.O.Ms.No.147 H&FW (F1) Dept. Dt:27.05.2014. AS / TS / RAS: 30000 Electrical Division, Medical Works, Madurai 18,50 18,45 10,00

Building C & M Division, Medical Works, Thirunelveli 147 . Upgradation of PHC at Alangulam in Tirunelveli 45,00 45,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 4500 Electrical Division, Medical Works, Madurai

148 . Modernization of Operation Theatres in District and Medical College 17,74 17,74 33,49 Hospital at Tirunelveli. G.O.Ms.No.303 H & FW (J1) Dept Dt. 31.10.2012 AS / TS / RAS: 3350 Electrical Division, Medical Works, Madurai 15,76 15,76

149 . Establishment of Regional Cancer Centre at Tirunelveli Medical 3,64,00 2,75,01 2,00,00 1,64,00 College in Tirunelveli. G.O.Ms.No.255 H & FW dept. dated 01.11.2013. RAS G.O.Ms.No.108 H & FW Dept Dt. 03.03.2016 AS / TS / RAS: 43500 Electrical Division, Medical Works, Madurai 71,00 5,00 66,00

150 . Upgradation of Thirunelveli Medical College Hospital under RMSSY 10,00,00 1 AS Awaited AS / TS / RAS: 100000 Electrical Division, Medical Works, Madurai

151 . Upgradation of PHC at Kadayanallur (NTK HL) in Tirunelveli G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 0 Electrical Division, Medical Works, Madurai

85 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thirunelveli 152 . Upgradation of PHC at Veerakeralampudur in Tirunelveli 1,21,00 1,21,00 G.O.Ms.No.233 H & FW (J1) Dated 23.09.2016 AS / TS / RAS: 12100 Electrical Division, Medical Works, Madurai

153 . Construction of 100 Men's (25 x 4) Students Hostel buildings (G+3) 2,71,20 2,58,22 2,00,00 10,00 2,43 with furniture and kitchen facilities at Thoothukudi Medical College G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 28820 Electrical Division, Medical Works, Madurai 17,00 11 9,45 16,89

154 . Construction of Examination Hall in first floor over the existing 79,00 68,92 10,06 10,08 Examination hall with furniture and air-condition facilities at Thoothukudi Medical College in Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 9900 Electrical Division, Medical Works, Madurai 20,00 5,00 15,00

155 . Construction of additional faculty facilities building at Thoothukudi 1,11,40 69,40 1,00,00 42,00 Medical College in Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 11880 Electrical Division, Medical Works, Madurai 7,40 7,40

156 . Construction of Paediatric block over the existing sterlite paediatric 1,49,60 1,49,60 1,00 1,48,60 block at Thoothukudi Medical College in Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 14960 Electrical Division, Medical Works, Madurai

157 . Construction of 100 Junior Residents Quarters building with furniture 2,69,00 21,88 2,48,12 2,47,12 facilities in Thoothukudi Medical College at Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 28600 Electrical Division, Medical Works, Madurai 17,00 17,00

158 . Construction of Ortho ward over the existing AE ward in Government 29,90 17,46 12,44 12,44 Medical College in Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 3190 Electrical Division, Medical Works, Madurai 2,00 2,00

159 . Construction of CRRI Girls hostel over the existing blood bank building 27,65 27,03 62 with furniture facilities at Thoothukudi Medical College G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 2915 Electrical Division, Medical Works, Madurai 1,50 1,50

86 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thirunelveli 160 . Construction of 100 Women's (25 x 4) Students Hostel buildings (G+3) 2,71,20 2,59,59 2,00,00 11,61 with furniture and kitchen facilities at Thoothukudi Medical College in Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 28820 Electrical Division, Medical Works, Madurai 17,00 11 16,89

161 . Construction of CRRI boys hostel over the existing blood bank building 45,85 45,76 1,59 with furniture facilities at Thoothukudi Medical College G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 4785 Electrical Division, Medical Works, Madurai 2,00 2,00

162 . Improvement of Post Mortem facilites in Tirunelveli Medical College 95,00 89,77 5,53 Hospital at Tirunelveli. G.O. (Ms) No.22 H & FW (J1) dept. dt. 29.01.2014. AS / TS / RAS: 12000 Electrical Division, Medical Works, Madurai 25,00 15,69 15,00 3,78

163 . Construction of Oncology wing (Teletheraphy) in Thoothukudi Medical 2,54,00 3,38 2,50,62 2,00,00 50,62 College at Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 28600 Electrical Division, Medical Works, Madurai 32,00 15,00 17,00

164 . Construction of Mortuary Block with Cold Storage in Government 27,00 8,33 34,00 18,67 Hospital Nanguneri in Tirunelveli District. G.O.Ms.No.219 H & FW (F-1) Dept.Date: 31.07.2015 AS / TS / RAS: 3500 Electrical Division, Medical Works, Madurai 8,00 8,00

165 . Construction of School of Nursing and Hostel building for 200 students 11,09,00 97,67 10,34,00 8,69,58 1,41,75 in Govt. Medical College at Thoothukudi. G.O.Ms.No.326 H & FW (E2) Dept Dt. 17.10.2014 AS / TS / RAS: 117000 Electrical Division, Medical Works, Madurai 61,00 61,00 40,00 21,00

166 . Construction of Library building in First floor over the existing library 1,34,45 1,00,85 1,87,00 33,60 building with air-condition facilities in Reading Hall at Thoothukudi Medical College G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 14850 Electrical Division, Medical Works, Madurai 14,05 14,05 14,05

87 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Building C & M Division, Medical Works, Thirunelveli 167 . Construction of Modern Laundry with dump lift over the old OP Block 24,50 29 35,75 50 23,71 at Thoothukudi Medical College in Thoothukudi. G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 3575 Electrical Division, Medical Works, Madurai 11,25 11,25

168 . Construction of Eye ward with ramp over the existing eye ward at 1,29,60 40,04 89,56 89,56 Thoothukudi Medical College G.O.Ms.No.341 H & FW (J2) Dept Dt. 24.10.2014 AS / TS / RAS: 14410 Electrical Division, Medical Works, Madurai 14,50 14,50

Electrical Division-2, Chennai 169 . Provision of 2 nos of Additional lift with 20 persons capacity to New 69,70 48,54 Medical College and Hospital at Omandurar Government Estate, Chennai-02. G.O(D).No.539 H&FW (H1) Dept., Dated 16.04.2015. AS / TS / RAS: 6970 Electrical Division-2, Chennai

Electrical Division, Medical Works , Chennai 170 . Provision of additional 2 Nos, 20 persons passenger lift at New Medical College Hospital at Omandurar Govt. Estate G.O.Ms.No.539 H & FW (J1) Dept Dt. 16.04.2015 AS / TS / RAS: 6970 Electrical Division, Medical Works , Chennai 69,70 69,70 69,70

171 . Provision of one passenger lift with 6 persons capacity for the existing Cornea Block at Govt. Ophthalmic Hospital Chennai G.O. (D) No.1046 H & FW (H1) Dept Dt. 18.08.2015 AS / TS / RAS: 1529 Electrical Division, Medical Works , Chennai 15,29 15,29 5,29 10,00

172 . Supply, Erection, Testing and Commissioning of 11 KV High Tension supply with 2 Nos. of 250 KVA at DME Office campus G.O.Ms.No.335 H & FW (H1) Dept Dt. 21.10.2014 AS / TS / RAS: 10500 Electrical Division, Medical Works , Chennai 1,05,00 84,10 1,00,00 20,90

173 . Provision of 220 KVA HT Transformer for installation of MRI Scan at Institute of Child Health and Hospital Egmore Chennai G.O.Ms.No.68 H & FW (H1) Dept Dt. 27.02.2014 AS / TS / RAS: 6500 Electrical Division, Medical Works , Chennai 65,00 56,78 65,00 8,22

88 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 01 110 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 01 Urban Health Services 110 Hospital and Dispensaries (including Pharmacy) JA Buildings

16 Major Works ( DPC4210 01 110 JA 16 02 )

Electrical Division, Medical Works , Chennai 174 . Provision of 2 nos of 10 persons capacity passenger lifts in the newly constructed faculty block at Govt. Kilapuk medical college Chennai G.O.Ms.No.296 H&FW(H1) Dept. Dt.18.02.2016 AS / TS / RAS: 3700 Electrical Division, Medical Works , Chennai 37,00 37,00

175 . Providing lift arrangements to the maternity block (CEMONC Centre in Govt Villupuram Medical College and Hospital Villupuram G.O.Ms.No.112 H & FW (J1) Dept Dt. 16.04.2015 AS / TS / RAS: 2150 Electrical Division, Medical Works , Chennai 21,50 21,50 21,50

Electrical Division, Medical Works, Madurai 176 . Constn.of Govt. Hospital Burns and Renovation of existing burns ward 1,97,00 1,97,00 in GH Sivakasi G.O.Ms.No.268 H & FW (F-1) Dept Dt. 07.09.2012. AS / TS / RAS: 22500 Electrical Division, Medical Works, Madurai 28,00 2,50

TOTAL - 4210 01 110 JA 1,406,96,21 499,24,28 265,26,93 350,00,00 350,05,12

89 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building Construction Division-2, Medical Works, Chennai 1 . Construction of PHC at Papparambakkam at Thiruvallur Dist 50,00 47,64 82 16 G.O. Ms.No.80 H&FW Dept. Dt.15.04.13 RAS G.O.Ms.No.23 H & FW (EAP-II-1) Dept Dt. 22.01.2016 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai

2 . Construction of New building PHC at Sunnambukulam. 46,00 45,48 52 46/H&FW/dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 4,00 4,00

3 . Establishment of New Primary Health Centre at Medhur in block 46,00 15,00 15,00 31,00 of G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 4,00 4,00 4,00

4 . Establishment of New Primary Health Centre at Aarambakkam in 46,00 45,16 12,00 84 Gummudipoondi block of Tiruvallur District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 4,00 4,00

5 . Establishment of New Primary Health Centre at Kavarapettai in 46,00 45,49 46,00 51 Gummudipoondi block of Tiruvallur Dist. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 4,00 4,00 4,00

6 . Establishment of New Primary Health Centre at Velliyagaram in 46,00 40,60 12,00 5,40 block of Tiruvallur District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 4,00 4,00

7 . Establishment of New Primary Health Centre at Alamathi in 46,00 45,45 14,00 55 of Tiruvallur District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 4,00 4,00 4,00

90 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Vellore 8 . Construction of New Primary Health Centre Building at Arasampattu in 38,00 37,36 64 Villupuram District G.O. (Ms) No.80 Health and family welfare(EAP II-2) Dept Dated: 15.04.2013 AS / TS / RAS: 3800 Electrical Division, Medical Works , Chennai

9 . Construction of New Primary Health Centre Building at Perumuchi in 46,65 6,67 39,98 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

10 . Construction of New Primary Health Centre Building at Bojanapuram in 46,65 46,05 59 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 2,97

11 . Construction of New Primary Health Centre Building at Arumpakkam 46,65 33,39 13,26 in Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 7 3,28

12 . Construction of New Primary Health Centre Building at Nagavedu in 46,65 26,96 19,69 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 7 3,28

13 . Construction of New Primary Health Centre Building at Sembedu in 47,00 36,25 10,75 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,00 3,00

14 . Construction of New Primary Health Centre Building at 46,65 30,20 16,45 Thamalerimuthur in Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 1,58 1,77

91 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Vellore 15 . Construction of New Primary Health Centre Building at Chinnamottur 46,65 30,60 16,05 in Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 1,58 1,77

16 . Construction of New Primary Health Centre Building at Vallipattu in 46,65 30,06 16,59 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

17 . Construction of New Primary Health Centre Building at Eraiyur in 35,00 21,01 34,86 13,99 Villupuram District G.O.Ms.No.80 H & FW (L1)Dept.Date:15.04.2013 AS / TS / RAS: 3800 Electrical Division, Medical Works , Chennai 3,00 3,00

18 . Construction of New Primary Health Centre Building at Vellimedupettai 22,80 22,80 22,80 in Villupuram District G.O.Ms.No.181 H & FW (L1)Dept.Date:13.06.2012 AS / TS / RAS: 2280 Electrical Division, Medical Works , Chennai

19 . Construction of New Primary Health Centre Building at Sorakolathur in 35,00 6,50 30,00 28,50 Thiruvannamalai District G.O.Ms.No.80 H & FW (L1)Dept.Date:15.04.2013 AS / TS / RAS: 3800 Electrical Division, Medical Works , Chennai 3,00 3,00 3,00

20 . Construction of New Primary Health Centre Building at Udhayenthiram 46,65 50 25,00 30,60 in Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 7 3,00 3,28

21 . Construction of New Primary Health Centre Building at Kakkangarai in 46,65 46,03 62 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

92 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Vellore 22 . Construction of New Primary Health Centre Building at 46,50 70 35,80 10,00 Peenjamandhai in Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,50 7 2,00 1,00

23 . Construction of New Primary Health Centre Building at Seerpananthal 47,00 46,34 66 in Villupuram District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,00 3,00

24 . Construction of New Primary Health Centre Building at Aravatla in 46,60 42,25 4,35 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,40 7 3,33

25 . Construction of New Primary Health Centre Building at 46,65 35,52 11,13 Venkatasamuthiram in Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

26 . Construction of New Primary Health Centre Building at Minnur in 46,65 33,54 13,10 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35

27 . Construction of New Primary Health Centre Building at Jammapudur in 46,65 45,98 67 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

28 . Construction of New Primary Health Centre Building at Sholavaram in 46,65 33,60 13,05 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

93 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Vellore 29 . Construction of New Primary Health Centre at Senkurichi in 47,00 41,94 5,06 Villupuram District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,00 3,00

30 . Construction of New Primary Health Centre Building at Serkadu in 46,65 33,41 13,24 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,35 3,35

31 . Construction of New Primary Health Centre Building at Agrakaram in 46,60 29,21 17,39 Vellore District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,40 7 3,33

32 . Construction of New Primary Health Centre at Kattuyedaiyur in 47,00 46,38 62 Villupuram District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,00 3,00

33 . Construction of New Primary Health Centre at Asanur in Villupuram 47,00 46,02 98 District G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW (EAP II -2) Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works , Chennai 3,00 3,00

Building C & M Division, Medical Works, Trichy 34 . Construction of Health Sub Centre Building @ Rajendram in Kulithalai 16,90 1 6,89 Block at Karur Dist. G.O.Ms.No.136/H&FW(N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10 1,10 1,10

35 . Construction of Health Sub Centre Building @ Sukkampatty in 16,90 16,08 12 Kadavur Block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

94 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Trichy 36 . Construction of Health Sub Centre Building @ K.Seethapatty in 16,90 16,57 12 Aravakurichi Block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

37 . Construction of Health Sub Centre Building @ P.Udayapatty in Karur 16,90 16,55 12 Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

38 . Construction of Health Sub Centre Building @ G.Udayapatty in 16,90 16,44 12 Thogamalai block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

39 . Construction of Health Sub Centre Building @ Vadivel Nagar in 16,90 16,43 12 Uppidamangalam block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

40 . Construction of PHC Building @ Sevalpatty in Trichy Dist. 35,80 35,50 30 G.O.Ms.No.80/H&FW[EAP-II-2] Dept, dt.15.04.2013 AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,20

41 . Construction of Health Sub Centre Building @ Krishnarayapuram in 16,90 15,49 12 K.R.Puram Block of Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

42 . Construction of PHC Building @ Pulvayal in Pudukkottai Dist. 46,50 42,97 3,53 G.O. (Ms) No.46 / H&FW (EAP II-2) /Dept, Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,49 1,01

43 . Construction of Health Sub Centre Building @ Thogamalai in 16,90 15,71 12 Thogamalai block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

95 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Trichy 44 . Construction of HSC Building @ Nangavaram in Karur Dist. 16,90 8,39 7,61 G.O.Ms.No.136/H&FW(N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

45 . Construction of Health Sub Centre Building @ Chinnapanaiyur in Karur 16,90 15,79 12 Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

46 . Construction of PHC Building @ Virachilai in Pudukkottai Dist 46,50 44,35 2,15 G.O. (Ms) No.46 /H&FW (EAP II-2) /Dept, Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,60 90

47 . Construction of PHC Building @ Sathiyamangalam in Pudukkottai Dist. 46,50 43,24 3,26 G.O. (Ms) No.46 /H&FW (EAP II-2) /Dept, Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,58 92

48 . Construction of Health Sub Centre at Manmangalam in Karur Block @ 16,90 1 6,89 Karur Dist. G.O.Ms.No.136/H&FW(N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10 1,10 1,10

49 . Construction of Health Sub Centre at Gandhigrammam West in 16,90 1 6,89 16,89 Thanthoni Block at Karur Dist. G.O.Ms.No.136/H&FW(N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10 1,10 1,10

50 . Construction of New PHC Building @ Mathiyanallur in Pudukkottai Dist. 46,50 9,21 35,28 37,29 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,50 3,50

51 . Construction of Health Sub Centre Building @ P.Vellalapatty in 16,90 16,45 12 Uppidamangalam block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

96 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Trichy 52 . Establishment of new Primary Health Centres @ Samayapuram in 22,80 15 22,65 Trichy Dist G.O.Ms.No.304 H & FW (L-1) Dept Dt. 28.11.2011 AS / TS / RAS: 2280 Electrical Division, Medical Works, Trichy

53 . Construction of Health Sub Centre Building @ Thenkadaikurichi in 16,90 15,81 12 Kulithalai Block of Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

54 . Construction of Health Sub Centre Building @ Nachalur in Karur Dist. 16,90 15,72 12 G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

55 . Construction of Health Sub Centre Building @ Kammanallur in Karur 16,90 16,72 12 Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

56 . Construction of Health Sub Centre Building @ Naganur in Thogamalai 16,90 16,49 12 block in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

57 . Construction of Health Sub Centre Building @ Thimmachipuram in 16,90 15,37 12 Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

58 . Construction of PHC Building @ Esanai in Perambalur Dist. 46,50 46,07 10 G.O. (Ms) No.46 /H&FW (EAP II-2)/ Dept, Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,61 89

59 . Construction of PHC Building @ Kallamedu in Trichy Dist. 46,50 43,15 3,35 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,49 1,00

97 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Trichy 60 . Construction of Health Sub Centre at Kodangipatty at Karur Dist. 16,90 16,68 G.O.Ms.No.136/H&FW(N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10 1,08

61 . Construction of PHC Building @ B.Mettur in Trichy Dist. 46,50 45,81 69 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,50 1,00

62 . Construction of Health Sub Centre Building @ Mayanur in Karur Dist. 16,90 16,60 12 G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

63 . Construction of PHC Building @ Rasanaickanpatti in Pudukkottai Dist 46,50 42,75 3,75 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,52 98

64 . Construction of PHC Building @ Karumalai in Trichy Dist. 46,50 45,85 65 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,49 1,00

65 . Construction of PHC Building @ Anampatty in Trichy Dist. 46,50 46,01 49 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,49 1,00

66 . Construction of Health Sub Centre at Thondamanginam at Karur Dist. 16,90 1 6,89 G.O.Ms.No.136/H&FW(N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10 1,10

67 . Construction of Health Sub Centre Building @ Mathipatty in Karur Dist. 16,90 16,59 12 G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

98 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Trichy 68 . Construction of PHC Building @ Valady in Trichy Dist. 46,50 45,84 66 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 2,50 1,00

69 . Construction of Health Centre Building @ Vittukatti in K.R.Puram block 16,90 15,63 6,89 12 in Karur Dist. G.O.Ms.No.136/H&FW (N1)/Dept, dt.26.05.2014 AS / TS / RAS: 1800 Electrical Division, Medical Works, Trichy 1,10

Building C & M Division, Medical Works, Thiruvarur 70 . Construction of New PHC in Adanur in Thanjavur Dist. 46,50 43,95 2,55 G.O.Ms.No.46 / H & FW (EAP II - 2 ) Dept./ dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50

71 . Establishment of new Primary Health Centres at Okkanadu Kelaiyur at 46,50 40,49 Thanjavur G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 1,69 1,81

72 . Construction of New PHC in Pinnavasal in Thanjavur Dist. 46,50 44,00 2,50 G.O.Ms.No.46 / H & FW (EAP II - 2 ) Dept./ dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 3,47

73 . Construction of PHC at Kathiruppu in Nagapattinam District. 36,00 35,00 36,00 G.O. Ms.No.80 H&FW Dept. Dt.15.04.13 RAS: 6000 AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,00 2,00 2,00

74 . Construction of OP Block and Ambulance Shed in PHC at Muthupettai 42,00 35,99 6,01 in Thiruvarur Dist. G.O.Ms.No.138, H&FW (EAP-II) Dept. Dt. 18.04.2012 AS / TS / RAS: 4500 Electrical Division, Medical Works, Trichy 3,00 3,00

75 . Construction of New PHC in Thiruneelakudi in Thanjavur Dist. 46,50 42,73 3,77 G.O.Ms.No.46 / H & FW (EAP II - 2 ) Dept./ dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 3,50

99 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Thiruvarur 76 . Construction of New PHC in Narasingampattai in Thanjavur Dist. 46,50 42,71 3,79 G.O.Ms.No.46 / H & FW (EAP II - 2 ) Dept./ dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 3,49

77 . Construction of New PHC in Sakkarapalli in Thanjavur Dist. 46,50 44,00 2,50 G.O.Ms.No.46 / H & FW (EAP II - 2 ) Dept./ dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,50 3,47

78 . Construction of Primary Health Centre at Themangalam in 47,00 45,00 2,00 Nagapattinam District. G.O.Ms.No.46 / H & FW (EAP II - 2 ) Dept./ dt.17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00

Building C & M Division, Medical Works, Salem 79 . Construction of New PHC at Sowriyur in Salem District. 35,50 15,00 5,00 30,50 G.O.Ms. No.135 / H & FW (N-2) Dept/Date: 26.05.2014. AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,50 2,50 50 2,00

80 . Construction of new PHC at Haumantheertham in Krishnagiri 35,50 15,00 1,00 1 G.O.Ms.No:80/H&FW/Dept./Dt:15.04.2013. AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,50 2,50

81 . Construction of New PHC at Koottaathupatty in Salem District 47,00 46,34 66 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 2,98 1,00

82 . Construction of New PHC at Ullukurukki in Krishnagiri District. 47,00 37,31 30,00 9,69 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

83 . Construction of New PHC at Muthali in Krishnagiri District. 47,00 35,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

100 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Salem 84 . Construction of New PHC at Kumlapuram in Krishnagiri District. 47,00 15,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

85 . Construction of New PHC at Rajathopu in Dharmapuri District. 47,00 47,00 G.O.Ms.No.46/H&FW(EAP-II-2)/Dept. dated 17.02.2014. AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00

86 . Construction of new PHC at Sitling in Dharmapuri 35,50 15,00 1,00 1 G.O.Ms.No:80/H&FW/Dept./Dt:15.04.2013. AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,50 2,50

87 . Construction of New PHC at Kodamandapatti in Krishnagiri District. 47,00 37,83 30,00 9,17 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 2,02 3,00 98

88 . Construction of New PHC at Bellampalli in Krishnagiri District. 47,00 38,37 36,80 8,63 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

89 . Construction of New PHC at Thorapalli in Krishnagiri District. 47,00 15,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

90 . Construction of New PHC at K.N.Halli in Dharmapuri District. 47,00 9,08 15,00 37,92 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

91 . Construction of New PHC at Begarahalli in Dharmapuri District. 47,00 15,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

101 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Salem 92 . Construction of New PHC at Mattiayampatti in Salem District. 35,50 15,00 35,50 G.O.Ms. No.135 / H & FW (N-2) Dept/Date: 26.05.2014. AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,50 2,50 2,50

93 . Construction of New PHC at Keeraipatti in Dharmapuri District. 47,00 15,00 1,00 30,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 1,00

94 . Construction of New PHC at Soolankurichi in Salem District. 35,50 15,00 35,50 G.O.Ms. No.135 / H & FW (N-2) Dept/Date: 26.05.2014. AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,50 2,50 2,50

95 . Construction of New PHC at Athimugam in Krishnagir District. 47,00 10,39 30,00 36,61 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

96 . Construction of New PHC at Maganurapatti in Krishnagiri District. 47,00 16,84 30,00 30,16 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

97 . Construction of New PHC at Kothakondapalli in Krishnagiri District. 47,00 14,90 35,00 32,10 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

98 . Construction of New PHC at Orappam in Krishnagiri District. 47,00 10,63 35,00 36,37 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

99 . Construction of New PHC at Periyamuthur in Krishnagiri District. 47,00 35,00 1,00 30,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 1,00

102 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Salem 100 . Construction of New PHC at Chellamudi in Dharmapuri District. 47,00 29,81 15,00 17,19 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

101 . Construction of New PHC at Urigam in Krishnagiri District. 47,00 45,67 1,33 G.O.Ms. No.46 , H&FW (EAP II-2) Dept / Date: 17.02.2014.RAS G.O. Ms.No. 330 H & FW Dept / Date: 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00

102 . Construction of New PHC at Madhakandapalli in Krishnagiri District. 47,00 35,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 2,00 3,00

103 . Construction of New PHC at Thadikkal in Krishnagiri District. 47,00 15,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

104 . Construction of New PHC at Thanampatti in Krishnagiri District. 47,00 87 15,00 46,13 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

105 . Construction of new PHC at Hogenakkal in Dharmapuri 35,50 15,00 1,00 1 G.O.Ms.No:80/H&FW/Dept./Dt:15.04.2013. AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy 2,50 2,50

106 . Construction of New PHC at Sekodi in Dharmapuri District. 47,00 38 35,00 46,62 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00 3,00

Building C & M Division, Medical Works, Thiruppur 107 . Establishment of new Primary Health Centres at Kanchikoil at Erode 22,80 22,00 22,80 G.O.Ms.No.304 H & FW (L-1) Dept Dt. 28.11.2011 AS / TS / RAS: 2280 Electrical Division, Medical Works, Trichy 80

103 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Thiruppur 108 . Construction of Primary Health Centre at Osur in Erode Dt. 38,00 38,00 38,00 G.O.Ms.No.135 H &FW (N-2) Dept. Dt. 26.05.2014 AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy

109 . Construction of Primary Health Centre at Hongalvady in Erode Dt. 38,00 17,00 24,00 G.O.Ms.No.135 H &FW (N-2) Dept. Dt. 26.05.2014 AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy

110 . Construction of PHC at Appakudal in Bhavani block in Erode dist 38,00 38,00 38,00 GO Ms No 80 H&FW Dept dt 15.04.2013 AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy

111 . Construction of Primary Health Centre at Kadambur in Erode Dt. 38,00 38,00 38,00 G.O.Ms.No.135 H &FW (N-2) Dept. Dt. 26.05.2014 AS / TS / RAS: 3800 Electrical Division, Medical Works, Trichy

112 . Construction of New PHC Building at Mookanur in Annur Block of 50,00 49,38 62 Coimbatore Dt. G.O.Ms.No.46 H &FW (EAP-II-2) Dept. Dt. 17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy

113 . Construction of New PHC Building at Samathur in Pollachi Block 50,00 48,77 1,23 of Coimbatore Dt. G.O.Ms.No.46 H &FW (EAP-II-2) Dept. Dt. 17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy

114 . Construction of New PHC Building at 4 Veerapandi in P.N.Palayam 47,00 37,57 9,43 Block of Coimbatore Dt. G.O.Ms.No.46 H &FW (EAP-II-2) Dept. Dt. 17.02.2014 AS / TS / RAS: 5000 Electrical Division, Medical Works, Trichy 3,00 3,00

104 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Madurai 115 . Establishment of Primary Health Centre (PHCs) at Kurangani in Theni 47,00 35,00 27,00 20,00 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00 50 1,00

116 . Establishment of New Primry Health Centre at P. Tharmathupatti in 47,00 35,00 30,00 Aundipatti Taluk Theni District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 1,00

117 . Establishment of New Primry Health Centre at Santhaiyur in Madurai 47,00 13,52 35,00 33,48 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00 3,00

118 . Construction of Primary Health Centre at R. Kombai in Palani 35,00 89 17,00 34,02 G.O.Ms.No.135 H &FW (N-2) Dept. Dt. 26.05.2014 AS / TS / RAS: 3800 Electrical Division, Medical Works, Madurai 3,00 3,00

119 . Construction of new Primary Health Centre at Mannadimangalam in 47,00 38,64 8,36 Madurai District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

120 . Construction of New PHC Building for Sitlangudi in Madurai Dist. 47,00 46,23 77 GO.Ms.No.46 H & FW(EAP-II-2) dept.dt.17.2.14 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

Building C & M Division, Medical Works, Sivagangai 121 . Constn.of New PHC building at Vishwanatham in Virudhunagar District. 47,50 14,92 46,00 32,58 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 2,50 3,00 2,50

105 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Sivagangai 122 . Construction of Primary Health Centre at Sithurajapuram in 47,50 47,38 Virudhunagar G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 2,50 1,44 1,06

123 . Construction of Primary Health Centre at Alagapuri in Virudhunagar 47,50 47,18 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 2,50 1,35 1,15

124 . Construction of New PHC building in Erichanatham ( Kumilangulam) 47,50 66 35,71 1 in Sivakasi Taluk at Virudhunagar District. G.O.Ms.No:80/H&FW/Dept./Dt:15.04.2013. AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 2,50 2,00

Building C & M Division, Medical Works, Thirunelveli 125 . Contruction of new Primary Health centre at Poigai in Tirunelveli 47,00 46,99 1 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

126 . Contruction of new Primary Health centre at Sunderasapuram in 47,00 46,97 1 Tirunelveli District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

127 . Contruction of new Primary Health centre at Kulayaneri in Tirunelveli 47,00 46,98 1 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 2,99

128 . Contruction of new Primary Health centre at Meladevanallur in 47,00 25,00 30,00 Tirunelveli G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00 1,00

106 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Thirunelveli 129 . Contruction of new Primary Health centre at Kadalaiyur in Thoothukudi 47,00 46,70 1 Dist. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 2,96

130 . Contruction of new Primary Health centre at Agasthiarpatti in 47,00 39,60 7,40 Tirunelveli District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

131 . Contruction of new Primary Health centre at Keezhanatham in 47,00 35 5,00 36,65 10,00 Tirunelveli District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00 1,00 2,00

132 . Contruction of new Primary Health centre at Idaikal in Tirunelveli 47,00 41,53 5,47 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

133 . Upgradation of Karisalpatti Public Health Centre in Tirunelveli District. 98,50 86,70 11,80 G.O.Ms.No.52 H & FW (EAP - II - 2) Dept Dt. 21.02.2014 & RAS G.O.Ms.No.157 H & FW (N1) Dept Dt. 25.05.2016 AS / TS / RAS: 10500 Electrical Division, Medical Works, Madurai 6,50 6,00 50

134 . Contruction of new Primary Health centre at Ilanji in Tirunelveli District. 47,00 35 30,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 1,00

135 . Contruction of new Primary Health centre at Periyapillaivalasai in 47,00 35 25,00 46,65 Tirunelveli District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

107 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Thirunelveli 136 . Contruction of new Primary Health centre at Mannarkoil in Tirunelveli 47,00 46,99 1 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 2,97

137 . Contruction of new Primary Health centre at Palavoor in Tirunelveli 47,00 25,00 30,00 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00 1,00

138 . Contruction of new Primary Health centre at Rettiapatti in Tirunelveli 47,00 47,00 G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

139 . Contruction of new Primary Health centre at Vadakkupudur in 47,00 24,73 22,27 Tirunelveli District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

140 . Contruction of new Primary Health centre at Devipattinam in Tirunelveli 47,00 27,04 19,96 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

141 . Contruction of new Primary Health centre at Karumbanur in Tirunelveli 47,00 20,65 26,00 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

142 . Contruction of new Primary Health centre at Vadamalapuram in 47,00 46,99 1 Tirunelveli District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00

108 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 02 103 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 02 Rural Health Services 103 Primary Health Centres JA Buildings

16 Major Works ( DPC4210 02 103 JA 16 06 )

Building C & M Division, Medical Works, Thirunelveli 143 . Contruction of new Primary Health centre at Melagaram in Tirunelveli 47,00 22,59 22,00 24,41 District. G.O. (Ms) No.46 Health and family welfare(EAP II-2) Dept Dated: 17.02.2014 RAS G.O.Ms.No.330 H & FW Dept Dt. 05.11.2015 AS / TS / RAS: 5000 Electrical Division, Medical Works, Madurai 3,00 3,00 3,00

TOTAL - 4210 02 103 JA 61,90,40 35,97,01 14,97,03 16,88,18 4,74,25 JA Buildings

16 Major Works ( DPC4210 03 104 JA 16 03 )

Building Construction Division-2, Medical Works, Chennai 1 . Improve all infrastructural facilities to:- Construction of ward for Siddha 6,13,97 5,21,02 1,03,74 92,95 Ayurvedha and Unani, strengthening the existing B.T. Road, realignment of sewage systems, land scaping, entrance arch with the name of board & face lift of buildings in Aringar Anna Govt. Hospital of Indian Medicine, Chennai G.O.Ms.No.238 H & FW (IM1) Dept Dt. 23.10.2013 AS / TS / RAS: 70000 Electrical Division, Medical Works , Chennai 86,03 69,07 75,03 16,96

2 . Construction of Buildings for Govt. Siddha Medical College Chennai 2,97,47 2,22,28 93,00 75,19 (1. Construction of Buildings for Animal House and Gunapadam P.G.Lab with L.P.G. Connection 2) Formation of Herbal Garden ) G.O.Ms.No.304 H&FW(IMI-2)Dept. Dated 23.12.2013 AS / TS / RAS: 32750 Electrical Division, Medical Works , Chennai 30,03 22,00 2,00 8,03

Building C & M Division, Medical Works, Thirunelveli 3 . Construction of new Multistoried Building at Government Siddha 4,78,00 7,89 4,70,09 1 Medical College, Palayamkottai in Tirunelveli District. G.O.Ms.No.15 H & FW (J1) Dept Dt. 30.10.2012 AS / TS / RAS: 50000 Electrical Division, Medical Works, Madurai 22,00 22,00 1

4 . Construction of new block at Govt. Ayurveda Medical College at Kottar 4,36,50 4,36,50 in Kanniyakumari District. G.o.(4D)No.22H&FW(1-2)Dept Dated.07.12.2012 AS / TS / RAS: 50000 Electrical Division, Medical Works, Madurai 63,50 45,44 18,06

TOTAL - 4210 03 104 JA 20,27,50 13,24,20 7,65,86 1,27,97 83,24

109 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4210 03 200 JW [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4210 CAPITAL OUTLAY ON MEDICAL AND PUBLIC HEALTH 03 Medical Education Training and Research 200 Other Systems JW Buildings

16 Major Works ( DPC4210 03 200 JW 16 01 )

Building Construction Division-2, Medical Works, Chennai 1 . Establishment of Research and Development wing Exlusively for 5,64,00 4,74,87 1,18,30 89,13 Indian system of Medicine G.O.Ms.No.303 H&FW(IM1-2)Dept. Dated 20.12.2013 AS:60000 AS / TS / RAS: 60000 Electrical Division, Medical Works , Chennai 36,00 15,70 20,00 20,00

TOTAL - 4210 03 200 JW 6,00,00 4,90,57 1,38,30 1,09,13 JB Construction of Office Rooms for Tamil Nadu State Health Transport Department

16 Major Works ( DPC4211 00 800 JB 16 07 ) Building C & M Division, Medical Works, Vellore 1 . Construction of WorkShop Building for Mobile Work Shop(H) at 33,00 14,70 18,00 18,30 1 Thiruvannamalai G.O.Ms.No.270 H & FW (AD1) Dept Dt. 09.09.2014 AS / TS / RAS: 3300 Electrical Division, Medical Works , Chennai

TOTAL - 4211 00 800 JB 33,00 14,70 18,00 18,30 1

110 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 AE [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation AE Revenue Department-Housing scheme

16 Major Works ( DPC4216 01 106 AE 16 06 )

Building C & M Division, Thiruvallur 1 . Construction of RDO Quarters at . 22,24 22,17 7 G.O.Ms.No.86 Rev dept dt.09.03.2012. AS / TS / RAS: 2324 Electrical Division-2, Chennai 1,00 1,00

Building C & M Division, Trichy 2 . Construction of Tahsildar quarters at Marungapuri 18,50 17,50 18,50 G.O.Ms.No.163 Rev. (RA 1 (1) Dept Dated 03.06.2013 AS / TS / RAS: 2000 Electrical Division, Salem 1,50 1,50 1,50

3 . Construction of Tahsildar quarters for Trichy East. 18,50 13,13 1,00 5,37 G.O.Ms.No.161 Rev RA 1 (1) Dept Dated 03.06.2013 AS / TS / RAS: 2000 Electrical Division, Salem 1,50 50 1,50

Building C & M Division, Thanjavur 4 . Creation of New Muthupettai Tk at Tiruvarur Dt. – Quarters 18,52 13,52 15,58 G.O. (RT) No.53 Rev (RA (1) Dept Dt. 20.02.2013 AS / TS / RAS: 1932 Electrical Division, Salem 80 80

Building C & M Division, Coimbatore 5 . Creation of New Taluk - Kinathukadavu taluk in Coimbatore District - 17,32 12,32 4,01 5,00 Construction of Tahsildar Quarters G.O.Ms.No.406 Rev (RA1 (1) Dept Dt. 21.11.2012 AS / TS / RAS: 1932 Electrical Division, Coimbatore 2,00 2,00 2,00

6 . Creation of New Taluk - Annur taluk in Coimbatore District 17,32 3,00 16,32 14,32 Construction of Tahsildar Quarters G.O.Ms.No.407 Rev (RA1 (1) Dept Dt. 21.11.2012 AS / TS / RAS: 1932 Electrical Division, Coimbatore 2,00 2,00 2,00

Building C & M Division, Ooty 7 . Formation of New Taluks to Udhagamandalam by fabricating Kunoor 28,12 27,12 16,30 Kottam G.O.Ms.No.439 Rev (RA1 (1) Dept Dt. 07.10.2014 AS / TS / RAS: 2812 Electrical Division, Coimbatore

TOTAL - 4216 01 106 AE 1,49,32 51,62 85,47 26,94 56,00

111 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JA Public Works Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JA 16 05 )

Building Construction Division-I, Chennai 1 . Construction of Community Hall at Government employees 1,29,00 4 1 residential quarters at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 12900 Electrical Division-I, Chennai

2 . Construction of Post Office at Government employees residential 25,00 1 quarters at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 2500 Electrical Division-I, Chennai

3 . Providing part of the Washermen of MLA'S Quarters at Omandurar 43,35 43,34 1 Government Estate. GO.No513 Y2 Dept Dated.09.07.12 AS / TS / RAS: 4600 Electrical Division-I, Chennai 2,65 2,64

4 . Provision of Park at Govt employees residential quarters at Todhunter 50,00 2 Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 5000 Electrical Division-I, Chennai

5 . Construction of "C" type quarters for Govt. employees Residential 94,21,91 94,20,11 1 complex at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 RAS G.O.Ms.No. 207 PW (Y2) Dept Dt. 12.11.2015 AS / TS / RAS: 1005438 Electrical Division-I, Chennai 6,32,47 6,11,08 21,39

6 . Construction of "D" type quarters for Govt . Employees Residential 58,15,99 1 complex at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 581599 Electrical Division-I, Chennai

7 . Construction of GYM at Govt employees residential quarters at 30,00 1 Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 3000 Electrical Division-I, Chennai

8 . Construction of "A" type quarters for Govt. employees Residential 19,52,82 19,52,82 1,00 19,51,82 complex at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 195282 Electrical Division-I, Chennai

112 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JA Public Works Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JA 16 05 )

Building Construction Division-I, Chennai 9 . Construction of Public Works Department Employees Guest House 50,00 1 at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 5000 Electrical Division-I, Chennai

10 . Construction of "B" type quarters for Govt. Employees Residential 17,19,25 17,19,25 1,00 17,18,25 complex at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 171925 Electrical Division-I, Chennai

11 . Construction of "C" type quarters (Part - Stilt + 4 Floors) for Govt . 4,49,95 1 Employees Residential complex at Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 44995 Electrical Division-I, Chennai

12 . Provision of Internal Roads at Govt employees residential quarters at 1,52,00 1 Todhunter Nagar, Chennai G.O.Ms.No.39 PW (Y2) Dept.dt.7.2.2011 AS / TS / RAS: 15200 Electrical Division-I, Chennai

Building Construction Division-I, Medical Works, Chennai 13 . Provision of and additional VVIP Lift and Additional Amenities to the 48,80 45,82 2,98 Additional Guest House of Tamil Nadu House New Delhi G.O.Ms.No.216 Public Works (Y2) Dept. Dated 09.02.2015 RAS G.O.Ms.No.300 PW (Y2) Dept Dt. 22.03.2016 AS / TS / RAS: 4880 Electrical Division-2, Chennai

14 . Improvement and face lift works to the VVIP - Entry VVIP lift lobby in 7,67 7,67 Tamil Nadu House, New Delhi G.O.Ms.No.924 Public (G-II) Dept Dt. 05.12.2016 AS / TS / RAS: 767 Electrical Division, Medical Works , Chennai

Building C & M Division, Ooty 15 . Construction of 25 Staff Quarters for Group 'A' and 'B' Officers at 6,46,30 4,45,84 1,95,66 1,99,96 50 Udhagamandalam in the Nilgiris District. G.O.Ms.No. 89 Public Works (Y2) Dept. Dated 21.5.2014 & 98 Public Works (Y2) Dept. Dated 26.5.2016 AS / TS / RAS: 66330 Electrical Division, Coimbatore 17,00 45 2,00 16,55

TOTAL - 4216 01 106 JA 211,94,16 105,69,32 38,69,83 2,50,55 36,70,58

113 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JO [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JO Law Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JO 16 07 )

Building Construction Division-I, Chennai 1 . Construction of V.I..P. Guest Housein the Additional Chief Metropolitan 3,63,00 3,63,00 Magistrate's Court Campus at Egmore. GO.No. 197 HOME( COURT-III) Department Dated. 17.02.2016 AS / TS / RAS: 36300 Electrical Division-I, Chennai

Building C & M Division, Thiruvallur 2 . Construction of 8 more quarters for Judicial Officers in Thiruvallur 5,32,46 32,46 4,59,04 G.O.Ms.No.645 Home Courts III Dept Dt. 08.09.2016 AS / TS / RAS: 53246 Electrical Division-2, Chennai

Building C & M Division, Kancheepuram 3 . Constn of quarters for Judicial Officers at Madhuranthagam in 92,93 92,79 5 14 Kancheepuram G.O.Ms.No.873 Home Courts III Dept Dt. 28.11.2014 AS / TS / RAS: 10043 Electrical Division-2, Chennai 7,50 7,50 7,50

4 . Construction of District Munsif cum Judicial Magistrate Quarters 43,20 10,00 33,20 Building at Thirukazhukundram in Kancheepuram G.O.Ms.No.830 Home Courts - III Dept Dt. 18.11.2015 AS / TS / RAS: 4730 Electrical Division-2, Chennai 4,10 4,10

Building C & M Division, Vellore 5 . Construction of VIP Guest House for Judicial Department in the 1,85,46 74,18 campus of combined court building at Sathuvachari in Vellore G.O.Ms.NO.41 Home(Cts-III)Dept dt.07.01.2017 AS / TS / RAS: 18546 Electrical Division-2, Chennai

6 . Constn of quarters for Judicial Officers at Sathuvachari in Vellore 3,22,61 2,86,82 76,88 35,79 G.O.Ms.No.872 Home Courts III Dept Dt. 28.11.2014 RAS G.O.(2D) No.54 Home Courts III Dept Dt. 12.02.2016 AS / TS / RAS: 32261 Electrical Division-2, Chennai

Building C & M Division, Cuddalore 7 . Construction Of Post Attached Quarters for Judicial Magistarate No.II 45,50 35,50 at Panruti in Cuddalore District. G.o.198/Home (Court III/Dept.Dt.17.02.2016. AS / TS / RAS: 4800 Electrical Division-2, Chennai 2,50 2,50

114 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JO [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JO Law Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JO 16 07 )

Building C & M Division, Villupuram 8 . Construction of the Quarters for the Principal District Munsif II 2,83 2,83 Additional District Munsif II Court complex at Ulundurpet. G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014. & RAS G.o.(2D).No.317 HOME (COURTS-III) DEPARTMENT Dated:15.09.2015 AS / TS / RAS: 283 Electrical Division-2, Chennai

9 . Construction of New Judge Quarters (FTC I & III) at Gingee in 1,25,57 1,16,65 8,91 Villupuram District. G.O. Ms.No. 163 /Home Court III Dt:25.2.14 RAS G.O. Ms.No. 395 /Home Court III Dt:16.08.2016 AS / TS / RAS: 13857 Electrical Division-2, Chennai 13,00 10,00 3,00

10 . Construction of Quarters Building for Judicial Officers at Tindivanam. 1,45,85 1,10,53 7,94 35,32 GO.Ms.No.482/Home Court Department/Dated.25.06.2012 & RAS G.O.(2D).No.270/Home (Courts-III) Department/Dated.11.05.2016 AS / TS / RAS: 15502 Electrical Division-2, Chennai 9,17 9,17

Building C & M Division, Trichy 11 . Construction of quarters for Judicial officers at Manapparai in 94,30 75,00 19,30 Tiruchirappalli District. G.O.Ms.No. 171 /Home (court -III) Dept./dt. 12.2.2016 AS / TS / RAS: 9930 Electrical Division, Salem 5,00 1,00 4,00

Building C & M Division, Nagapattinam 12 . Constn of quarters for Judicial Officers at Nagapattinam in 1,68,21 1,66,08 82,00 2,13 Nagapattinam District. G.O.Ms.No.874 Home Courts III Dept Dt. 28.11.2014 AS / TS / RAS: 17621 Electrical Division, Salem 8,00 7,73 8,00 27

13 . Construction of quarters for Sessions Judge (Magalir Neethimandram) 2,30,24 92,10 and for Sub Judget and Chief Judicial Magistrate at Thiruvarur G.O.Ms.No.39 / Home (Court - III) Dept / Date.06.01.2017. AS / TS / RAS: 23024 Electrical Division, Salem

Building C & M Division, Namakkal 14 . Construction of Quarters for Additional District and Sessions Judge, 1,43,40 19,39 1,23,40 1,24,01 Principal District Munsif and Judicial Magistrate No.II at Namakkal. Go.Ms.No.431/Home Courts III/dept/dt.28.05.2015. AS / TS / RAS: 15370 Electrical Division, Coimbatore 10,30 10,30 10,30

115 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JO [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JO Law Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JO 16 07 )

Building C & M Division, Namakkal 15 . Construction of Post attached quarters for Judicial Magistrate at 47,97 47,97 Tiruchengode in Namakkal G.O.(Ms) No.950/ Home Dept, Dt.27.12.2016 AS / TS / RAS: 4797 Electrical Division, Salem

Building C & M Division, Dharmapuri 16 . Construction of building for Judicial Officers in Combined Court 6,27,80 6,07,80 20,00 Campus at Thadangam Village at Dharmapuri G.O.Ms.No.959 Home Courts Dept Dt. 28.12.2015 AS / TS / RAS: 65780 Electrical Division, Coimbatore 30,00 20,00 10,00

17 . Construction of compound wall around the Judges quarters at 27,17 22,17 Bethathalapalli Village in Krishnagiri G.O. (2D) No.10 Home (Courts-III) Dept. Dt. 06.01.2017 AS / TS / RAS: 2717 Electrical Division, Salem

Building C & M Division, Erode 18 . Construction of Building for Quarters for the Judicial Officers at 1,24,50 20,00 84,50 Perundurai in Erode District G.O.MS.No.948 Home (Courts-III) Dept. Dt.23.12.2015. AS / TS / RAS: 13200 Electrical Division, Coimbatore 7,50 5,50

Building C & M Division, Madurai 19 . Conversion of Sections / halls into 8 Nos. Court Halls with Chambers 13,56,80 5,42,72 and offices in Administrative Block and Construction of 8 Nos of Judges Bungalow in Madurai Bench of Madras High Court AS Awaited AS / TS / RAS: 135680 Electrical Division, Madurai

20 . Construction Of 272 Quarters For Officers And Staff Members Of 22,91,00 22,72,19 18,00 Madurai Bench Of Madras High Court At Madurai. GO.Ms.No.994/Home (Courts-III) Dept dt. 26.12.2014. AS / TS / RAS: 274600 Electrical Division, Madurai 4,55,00 4,51,42

21 . Construction of quarters for Registrars, Deputy Registrars, Assistant 7,09,50 2,83,80 Registrars and Transit House for the Hon'ble Judges in the Madras High Court G.O.Ms.No.18 / Home (Court - III) Dept / Date.05.01.2017. AS / TS / RAS: 70950 Electrical Division, Madurai

116 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JO [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JO Law Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JO 16 07 )

Building C & M Division, Dindigul 22 . Construction of quarters for Judicial Officers at Dindigu 8,09 8,09 RAS G.O. (2D) No.391Home ( Cts. III ) Dept. Dt 08.08.2016 AS / TS / RAS: 809 Electrical Division, Madurai

23 . Provision of Storm water drainage arrangements to the District-cum- 26,62 26,62 Judicial Magistrate at Kodaikanal G.O.(2D) No.44/ Home Dept, Dt.09.02.2017 AS / TS / RAS: 2662 Electrical Division, Madurai

24 . Construction of District munisiff cum Judicial Majistrate Quarters at 42,25 42,25 Natham. G.O.Ms.No.196 / Home (Court - III) Dept / Date.17.02.2016. AS / TS / RAS: 4500 Electrical Division, Madurai 2,75 2,00 75

Building C & M Division, Theni 25 . Construction of Additional District Judge and Sessions Judge (Fast 62,44 62,11 33 Track Court) quarters at Periyakulam in Theni District. G.O(4D).No.31/Home (Cts.IV) Dept., Dt:28.04.2013 and RAS G.O No.84/Home (Cts.III) Dept, Dt:02.03.2015. AS / TS / RAS: 6644 Electrical Division, Madurai 4,00 3,99

26 . Construction of 2 Quarters for Judicial Officers at Bodinayakanur in 96,04 19,54 95,04 1,00 Theni District. G.O.Ms.No.731 Home Courts - III Dept Dt. 19.10.2015 AS / TS / RAS: 10104 Electrical Division, Madurai 5,00 3,00 2,00

27 . Construction of Post attached quarters for Sessions Judge (Magalir 1,86,45 74,58 Neethimanram), Judicial Magistrate (FTC) and Judicial Magistrate (Special Court for Land Grabbing Cases) in the combined court building complex at Theni G.O.Ms.No.17 / Home (Court - III) Dept / Date.05.01.2017. AS / TS / RAS: 18645 Electrical Division, Madurai

Building C & M Division, Ramanathapuram 28 . Construction of Compount wall around the residential qtrs of Judicial 15,75 officers at Devakottai. G.O.Ms.NO.38Home(Cts-III)Dept dt.06.01.2017 AS / TS / RAS: 1575 Electrical Division, Madurai

117 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JO [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JO Law Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JO 16 07 )

Building C & M Division, Virudhunagar 29 . Construction of four Judicial Officers quarters and a VIP Guest House 2,78,96 1,11,58 at Virudhunagar G.O.Ms.No.44 / Home (Court - III) Dept / Date.07.01.2017. AS / TS / RAS: 27896 Electrical Division, Madurai

30 . Construction of combined Court building and quarters for Judicial 39,93 39,93 Officer at Sivakasi, Virudhunagar G.O.Ms.No.40 / Home (Court - III) Dept / Date.06.01.2017. AS / TS / RAS: 3993 Electrical Division, Madurai

Building C & M Division, Thoothukudi 31 . Construction of two quarters at Tiruhendur after dismantling the 88,94 86,94 existing old post attached quarters of the Judcial Magistrate, Tiruchendur G.O.Ms.No.493 Home Courts III Dept Dt. 15.11.2016 AS / TS / RAS: 8894 Electrical Division, Madurai

32 . Construction of quarters for District Munsif and Judicial Magistrate at 82,28 10,00 72,28 Sathankulam, Thoothukudi G.O.Ms.No.611 / Home (Court - III) Dept / Date.24.08.2016. AS / TS / RAS: 8228 Electrical Division, Madurai

Building C & M Division, Nagercoil 33 . Construction of Quarters for judicil officer at Eraniel in Kanniyakumari 35,80 1,81 15,54 33,99 District. G.O.Ms.No.132 Home (C,III) dept. dt. 23.02.2011 RAS G.O.Ms.No. 184 dt.28.5.2015 AS / TS / RAS: 3780 Electrical Division, Madurai 2,00 1,00 2,00

34 . Construction of Quarters for judicial officer at Nagercoil in 1,47,60 1,46,17 43 Kanniyakumari District. G.O.Ms.No.809 Home (C,III) dept. dt. 23.02.2011 RAS G.O.Ms.No. 184 dt.8.10.2013 AS / TS / RAS: 15660 Electrical Division, Madurai 9,00 9,00

Building C & M Division, Thirunelveli 35 . Construction of Judicial Officer Quarters at Tenkasi in Tirunelveli 3,01,63 1,20,66 District G.O.Ms.No.951 Home Courts III Dept Dt. 27.12.2016 AS / TS / RAS: 30163 Electrical Division, Madurai

118 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 JO [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation JO Law Department - Housing Scheme

16 Major Works ( DPC4216 01 106 JO 16 07 )

Building C & M Division, Thirunelveli 36 . Construction of quarters for judicial officers at Tenkasi in Tirunelveli 93,64 92,64 50 93,14 District G.O.Ms.No.876 Home (Cts.III) Dept Dt. 12.10.2009 AS / TS / RAS: 10364 Electrical Division, Madurai 10,00 10,00 10,00

37 . Construction of Quarters for Judicial Officers of District Munsif and 50,70 40,70 50,70 Judicial Magistrate Court at Cheranmahadevi in Tirunelveli G.O.Ms.No.591 Home (Cts.III) Dept Dt. 11.08.2015 AS / TS / RAS: 5390 Electrical Division, Madurai 3,20 2,20 3,20

38 . Construction of Quarters for Judicial Officers at Nanguneri in 50,70 25,00 25,70 Tirunelvel District 172 Home (Courts.III)Dept. dated 12.02.2016 AS / TS / RAS: 5390 Electrical Division, Madurai 3,20 50 2,70

39 . Construction of Post attached Quarters for Seven Judicial Officers 3,36,70 1,38,68 49,04 2,76,70 inside the District Court Campus at Tirunelveli in Tirunelveli District. 278 Home (Courts.III) dated 04.03.2016 & 463 Home (Courts.III)dated 13.06.2016 AS / TS / RAS: 34670 Electrical Division, Madurai 10,00 1,00 9,00

TOTAL - 4216 01 106 JO 102,26,04 37,66,68 6,36,37 17,79,00 26,18,86

119 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 UA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation UA Administration of Justice

16 Major Works ( DPC4216 01 106 UA 16 04 )

Building Construction Division-I, Chennai 1 . Construction of quarters for the Judicial Officers at Saidapet Chennai 3,25,37 3,22,38 1 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 36800 Electrical Division-I, Chennai 42,63 35,95 6,68

Building C & M Division, Kancheepuram 2 . Construction of quarters for Judicial Officers at Sriperambudur, 95,83 38,33 Kancheepuram District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 9583 Electrical Division-2, Chennai

Building C & M Division, Thiruvannamalai 3 . Construction of quarters for judicial Officers, Guest house, staff 1,45,64 58,26 canteen, garage and two wheeler shed at Chengam, Tiruvannamalai District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 14564 Electrical Division-2, Chennai

Building C & M Division, Cuddalore 4 . Construction of quarters for Additional Mahiia Judge (Magisterial level), 2,32,67 93,07 Special Judges for MCOP Cases- Special Judge for LAOP cases- Special Judge for Land Grabbing Cases at Cuddalore, Cuddalore District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 23267 Electrical Division-2, Chennai

5 . Construction of quarters for six Judicial Officers quarters at 3,95,67 1,58,27 Chidambaram, Cuddalore District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 39567 Electrical Division-2, Chennai

Building C & M Division, Trichy 6 . Construction of JM Quarters Building at musiri in Trichy District. 42,84 52 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 4434 Electrical Division, Salem 1,50

Building C & M Division, Nagapattinam 7 . Construction of quarters for the Judicial Magistrate and District Munsif 74,00 33,31 38,45 40,69 at Sirkali in Nagapattinam G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 7700 Electrical Division, Salem 3,00 3,00 3,00

120 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 UA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation UA Administration of Justice

16 Major Works ( DPC4216 01 106 UA 16 04 )

Building C & M Division, Nagapattinam 8 . Construction of Judicial Officers Quarters at Mayliaduthurai in 1,97,50 1,97,07 Nagapattinam District G.O.Ms.No.967/Home (Court III) /Dept.Dt.13.12.2012 AS / TS / RAS: 21000 Electrical Division, Salem 12,50 10,78 47

Building C & M Division, Salem 9 . Construction of quarters for Judicial Magistrate No.2 and Fast Track 85,47 34,19 Court (Magisterial Level) at Attur, Salem District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 8547 Electrical Division, Salem

Building C & M Division, Dharmapuri 10 . Construction of 4 post attached quarters for Special DJ (MACT), 2,97,00 1,18,80 Sessions Judge (FTMC), Special Sub Judge (MACT) and Special Judge for Land Grabbing Cases at Krishnagiri, Krishnaqiri District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 29700 Electrical Division, Salem

Building C & M Division, Erode 11 . Construction of Building for Quarters for the District Munsif-Cum- 41,31 40,10 69 Judicial Magistrate Court at Kodumudi in Erode District G.O.MS.No.796 Home (Courts-III) Dept. Dt.05.11.2014. AS / TS / RAS: 4331 Electrical Division, Coimbatore 2,00 1,92

Building C & M Division, Karur 12 . Construction of five numbers of Judicial Officers quarters at MPC at 1,58,50 1,58,50 1,00,00 Karur G.O.Ms.No.796 Home (Courts-III) Dept dated 05.11.2014 AS / TS / RAS: 17350 Electrical Division, Coimbatore 15,00 15,00 4,10

Building C & M Division, Madurai 13 . Construction of quarters for Judicial Officers at Vadipatti, Madurai 94,60 37,84 District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 9460 Electrical Division, Madurai

Building C & M Division, Dindigul 14 . Construction of post attached quarters for Judicial Officers at Dindigul 4,86,60 4,71,47 60 15,13 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 52549 Electrical Division, Madurai 38,89 35,36 3,89 3,53

121 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4216 01 106 UA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4216 CAPITAL OUTLAY ON HOUSING 01 Government Residential Buildings 106 General Pool Accommodation UA Administration of Justice

16 Major Works ( DPC4216 01 106 UA 16 04 )

Building C & M Division, Theni 15 . Construction of quarters for Judicial Magistrate (Fast Track Court) at 42,35 16,94 Uthamapalayam, Theni District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 4235 Electrical Division, Madurai

Building C & M Division, Virudhunagar 16 . Construction of quarters for Judicial Officers at RajaPalayam in 1,50,70 60,27 Virudhunagar District G.O.Ms.No.87 Home (Courts-III) Dept Dt. 25.01.2017 AS / TS / RAS: 15070 Electrical Division, Madurai

Building C & M Division, Thirunelveli 17 . Construction of Judicial Quarters at Tirunelveli 5,79,42 5,79,39 5,00 G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 61380 Electrical Division, Madurai 34,38 28,29 4,38 6,09

18 . Construction of quarters for t he District Munsif cum Judicial Magistrate 36,28 36,22 1 Court at Sivagiri in Tirunelveli G.O.Ms.No.796 Home Courts III Dept Dt. 5.11.2014 AS / TS / RAS: 3828 Electrical Division, Madurai 2,00

TOTAL - 4216 01 106 UA 36,33,65 17,92,24 2,28,84 76,80 7,20,07 AC Buildings

16 Major Works ( DPC4220 60 101 AC 16 03 )

Building Construction Division-I, Chennai 1 . Construction of Memorial for Hon'ble Chief Minister of Tamil Nadu 15,00,00 15,00,00 Purachithalaivi Selvi J. Jayalalitha inside the Dr.MGR Memorial G.O.Ms.No.197 Tamil Dev Dept Dt. 07.12.216 AS / TS / RAS: 150000 Electrical Division-I, Chennai

Building C & M Division, Salem 2 . Renovation of the damaged compound wall for Freedom Fighter 2,50 2,50 Theeran Memorial at Salem District G.O.Ms.No.206 TD & I (M) Dept Dt. 21.12.2016 AS / TS / RAS: 250 Electrical Division, Salem

TOTAL - 4220 60 101 AC 15,02,50 2,50 15,00,00

122 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4220 60 101 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4220 CAPITAL OUTLAY ON INFORMATION AND PUBLICITY 60 Others 101 Buildings JA Buildings

16 Major Works ( DPC4220 60 101 JA 16 08 )

South Presidency Division, Chennai 1 . Renovation of Mahakavi Bharathiyar Illam at Triplicane, Chennai-5 25,00 20,64 25,00 4,36 G.O. Ms. No.3, TDR & News Dt.02-01-2015 AS / TS / RAS: 2500 Electrical Division-I, Chennai

2 . Providing Entrance arch at Dr.MGR Statue (Bust size) in the MGR 15,00 14,77 15,00 Govt. Film & TV Institute at , Chennai G.O. Ms. No.213, TDR & News Dt.26.12.2014 AS / TS / RAS: 1500 Electrical Division-I, Chennai

Building Construction Division-I, Chennai 3 . New Waterline and sewer connection for thamilaga arasu printing 28,75 28,75 28,75 press at Tharamani. GO. No. 95 / Tamil Valarachi & News/ 4/ Dept Dated. 06.06.2016 AS / TS / RAS: 2875 Electrical Division-I, Chennai

4 . Construction of Memorial for Nadigar Thilagam Sivaji Ganesan at 2,80,00 10,00 2,70,00 Chennai. G.O. Ms. No. 42 Tamil valarchi & News (Memorial) department dated. 23.02.2016. AS / TS / RAS: 28000 Electrical Division-I, Chennai

5 . Construction of Memorial & Library for Thiru Singaravelar & 2,30,35 2,17,84 1 12,51 Jeevarathinam at , Chennai. G.O.Ms.No.176 Tamil Valarchi & News Dept.dt.12.07.2013 AS / TS / RAS: 24935 Electrical Division-I, Chennai 19,00 11,76 7,24 1,24

6 . Provision of Infrastructure facilities to Govt. Press at Taramani 30,00 29,31 12,31 G.O.Ms.No.216 TD & EX Dept (M) Dept Dt. 29.12.2014 AS / TS / RAS: 3000 Electrical Division-I, Chennai

7 . Construction of New Kalai Arangam at Omandhurar Govt. Estate 62,72,90 62,37,68 30,83 Chennai G.o.Ms.No.236/TD(M) Dept. dt.24.9.2013 RAS G.O.Ms.No.86 TD (M) Dept Dt. 21.04.2015 AS / TS / RAS: 627290 Electrical Division-I, Chennai

8 . Construction of Tamil Nadu News Station at Omandhurar Government 2,00,00 1,96,52 20,00 Estate Chennai G.o.Ms.No.237/TD(M) Dept. dt.24.9.2013 AS / TS / RAS: 20000 Electrical Division-I, Chennai

123 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4220 60 101 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4220 CAPITAL OUTLAY ON INFORMATION AND PUBLICITY 60 Others 101 Buildings JA Buildings

16 Major Works ( DPC4220 60 101 JA 16 08 )

Building Construction Division-I, Chennai 9 . Construction of 2nd floor for Film section over the existing Tamil Nadu 57,62 56,51 57,62 1,10 1 News Station at Omandhurar Government Estate Chennai G.O.Ms.No.151 TD Dept Dt. 03.09.2015 AS / TS / RAS: 5762 Electrical Division-I, Chennai

10 . Construction of Building for Tamil Arasu Office cum Printing Press at 5,36,77 5,28,88 17,07 Tharamani, Chennai G.O.Ms.No.247 Tamil valarchi/Dept.dt.13.7.2012. RAS Go No. 44/ TV & NEWS (Ad 4) Dt.04.03.15 AS / TS / RAS: 62227 Electrical Division-I, Chennai 85,50 73,94 24,56

Building C & M Division, Cuddalore 11 . Construction of Memorial for Swamy Sagajanantha at Chidambaram 1,08,25 14,19 1,13,59 90,06 4,00 G.O.Ms.No.75 TD & EX Dept (M) Dept Dt. 29.05.2014 AS / TS / RAS: 11500 Electrical Division-2, Chennai 6,75 5,00 1,75

Building C & M Division, Trichy 12 . Providing Bronze statue for Keezhapaluvur Mozhippor Thiyagi Thiru 8,79 8,27 4,88 52 Chinnasamy at Woraiyur salai road Thillai Nagar Sasthiri road Junction at Trichy G.O.Ms.No.258/Tamil Development-endowment and Information ( Memorial )Dept/ Dt.24.7.12 AS / TS / RAS: 879 Electrical Division, Salem

Building C & M Division, Thanjavur 13 . Construction of Memorial for Pattukottai Alagirisamy in 82,00 38,35 27,00 43,65 Avudaiyankulam in Thanjavur District RAS G.O.Ms.No.47 TD Dept Dt. 09.03.2015 AS / TS / RAS: 8500 Electrical Division, Salem 3,00 3,00

Building C & M Division, Nagapattinam 14 . Construction of Memorial Buildings for Manuneedhi Cholan 1,01,45 75,23 25,00 26,22 Manimandapam at Thiruvarur in Thiruvarur District. G.O.Ms.No.71/Tamil Dev.& News(Memorials)Dept.dt. 26.05.2014. AS / TS / RAS: 11000 Electrical Division, Salem 8,55 2,94 5,55 5,61

Building C & M Division, Dindigul 15 . Construction of Manimandapam for Haithar Ali and Tippusulthan in 1,25,00 51,65 1,19,99 73,35 Dindigul Distrirct G.O.Ms.No.320 TD (M) Dept. Dt:30.12.2013 AS / TS / RAS: 13000 Electrical Division, Madurai 5,00 5,00

124 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4220 60 101 JA [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4220 CAPITAL OUTLAY ON INFORMATION AND PUBLICITY 60 Others 101 Buildings JA Buildings

16 Major Works ( DPC4220 60 101 JA 16 08 )

Building C & M Division, Thoothukudi 16 . Provision of Statute of Va.Vu.Chidambaranar, Ottapidaram in 8,50 8,41 8,50 Thoothukudi G.O.Ms.No.34 TD and I (M) Dept, Dated.13.02.2015 AS / TS / RAS: 850 Electrical Division, Madurai

TOTAL - 4220 60 101 JA 82,38,18 75,86,89 5,42,90 3,10,37 2,75,76

125 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4235 02 101 JU [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4235 CAPITAL OUTLAY ON SOCIAL SECURITY AND WELFARE 02 Social Welfare 101 Welfare of handicapped JU Buildings

16 Major Works ( DPC4235 02 101 JU 16 01 )

Building Construction Division-I, Chennai 1 . Establishment of Disability Museum at Chennai (Part II 36,00 36,00 Scheme 2013-2014 G.O.Ms.No.52 Welfare of the DAPD(DAP1(2) Dept. dt:25.10.2011 AS / TS / RAS: 4000 Electrical Division-I, Chennai 4,00 1,14 2,86

2 . Construction of building for the office of the Commissionerate for the 1,42,90 1,42,87 Welfare of the Differently Abled persons in the campus of the State Resource cum Training Centre at Lady Willington School Part II Scheme 2011-2012 G.O.Ms.No.52 DAW Dept Dt. 25.10.11 G.O.Ms.No.42 DAW/Dept dt.29.3.2012 & RAS G.O.Ms.No.34/ WDAP/Dept Dt 15.06.2015 AS / TS / RAS: 16390 Electrical Division-I, Chennai 21,00 12,30 8,70

3 . Construction of First Floor (Partly) and Second floor for the office of 1,24,50 1,24,50 the State Commissioner for the Differently Abled in the Lady Willington College Campus Triplicane Chennai G.O.Ms.No.54 DAP (DAP1) Dept Dt. 24.11.2015 AS / TS / RAS: 13000 Electrical Division-I, Chennai 5,50 5,50

4 . Construction of State Commissioner for the Differently Abled Building 1,30,00 1,11,30 at Chennai Govt. Letter No.12053/DAP-1 / 2016-3 Dated 25.11.2016 AS / TS / RAS: 13000 Electrical Division-I, Chennai

Building C & M Division, Pudukottai 5 . Construction of Government middle school for deaf in Pudukottai 1,10,00 1,16,00 97,00 13,00 G.O.Ms.No.2 Diff Abled Dept Dt. 25.01.2016 AS / TS / RAS: 11600 Electrical Division, Salem 6,00 6,00

Building C & M Division, Salem 6 . Provision of Modular Kitchen in Govt. Rehabilitation Home at 27,53 10,00 17,53 Deviyakurichi in Salem District G.O.Ms.No.40 Welfare of Diff Abled Dept Dt. 08.12.2016 AS / TS / RAS: 2753 Electrical Division, Salem

TOTAL - 4235 02 101 JU 6,07,43 1,92,31 1,16,00 3,59,86 36,53

126 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4235 02 103 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4235 CAPITAL OUTLAY ON SOCIAL SECURITY AND WELFARE 02 Social Welfare 103 Women's Welfare JC Construction of own buildings for Working Women Hostel

16 Major Works ( DPC4235 02 103 JC 16 03 )

Building Construction Division-I, Chennai 1 . Construction of working women Hostel at 6 places in 6,06,00 4,05,00 1,98 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 60600 Electrical Division-I, Chennai

Building C & M Division, Thiruvallur 2 . Construction of working women Hostel at Thiruvallur 1,01,00 1,01,00 1,01,00 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division-2, Chennai

Building C & M Division, Kancheepuram 3 . Construction of working women Hostel at Solinganallur in 1,01,00 1,00,00 1,01,00 Kancheepuram G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division-2, Chennai

4 . Construction of working women Hostel at Chengalpattu in 1,01,00 1,00,00 1,01,00 Kancheepuram G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division-2, Chennai

5 . Construction of working women Hostel at Sriperambathur in 1,01,00 1,00,00 1,01,00 Kancheepuram G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division-2, Chennai

Building C & M Division, Vellore 6 . Construction of Working Womens Hostel at Katpadi in Vellore District. 97,00 97,00 1,00 G.O.Ms.No. 93/ SW & NS (SW3) Dept. Dt:22.10.13 AS / TS / RAS: 10100 Electrical Division-2, Chennai 4,00 3,37 63

Building C & M Division, Villupuram 7 . Construction of Working Women Hostel at Villupuram 96,00 89,74 1,00 6,26 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division-2, Chennai 5,00 5,00

Building C & M Division, Trichy 8 . Construction of Working Women Hostel building at Trichy 1,01,00 1,00,00 1,01,00 G.O.Ms.No. 93/ Social Welfare and Nutritous meal programme (SW 3) dept. dated:22.10.2013 AS / TS / RAS: 10100 Electrical Division, Salem

127 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4235 02 103 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4235 CAPITAL OUTLAY ON SOCIAL SECURITY AND WELFARE 02 Social Welfare 103 Women's Welfare JC Construction of own buildings for Working Women Hostel

16 Major Works ( DPC4235 02 103 JC 16 03 )

Building C & M Division, Thanjavur 9 . Construction of working women Hostel atThanjavur 1,01,00 96,00 1,00,00 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division, Salem

Building C & M Division, Salem 10 . Construction of working Womens hostel building at Salem 1,01,00 1,00,00 G.O.Ms.No.108/SW3 dept., dt.24.12.2013. AS / TS / RAS: 10100 Electrical Division, Salem

Building C & M Division, Dharmapuri 11 . Construction of own building for Govt. Working Women Hostel at 71,25 12 71,13 1 Hosur. G.O.Ms.No.93 SW & NM (SW3) Dept., dt.31.3.2010 AS / TS / RAS: 7500 Electrical Division, Coimbatore 3,75 3,75 1

Building C & M Division, Aryallur 12 . Construction of working women Hostel Building at Perambalur 97,00 96,38 22,00 62 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division, Salem 4,00 1,88 2,00 2,12

Building C & M Division, Coimbatore 13 . Construction of working women Hostel at Coimbatore 97,50 96,50 97,50 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division, Coimbatore 3,50 3,50 3,50

Building C & M Division, Erode 14 . Construction of working women Hostel at Tiruppur 97,50 49,50 47,50 47,50 50 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division, Coimbatore 3,50 2,50 3,50

Building C & M Division, Ramanathapuram 15 . Construction of working women Hostel at Sivagangai 1,01,00 81,00 1,01,00 G.O.Ms.No.93 SW & NM (SW3) Dept., dt.22.10.2013 AS / TS / RAS: 10100 Electrical Division, Madurai

Building C & M Division, Thirunelveli 16 . Construction of Own building for Government working womens hostel 97,26 86,13 11,13 at Tirunelveli G.O.No:.93 SW & NM ( SW3) Dept., dt: 22.10.2013 AS / TS / RAS: 10100 Electrical Division, Madurai 3,74 3,50 3,74

128 DEMAND NO.39 - PUBLIC WORKS DEPARTMENT - BUILDINGS 39 02 BUILDINGS (Public Works Department)

4235 02 103 JC [ ` in Thousands]

Expenditure Budget Estimate Budget Revised upto Estimate Details of Works Amount Estimate Estimate 31-3-2016 2016-17 2016-17 2017-18

4235 CAPITAL OUTLAY ON SOCIAL SECURITY AND WELFARE 02 Social Welfare 103 Women's Welfare TOTAL - 4235 02 103 JC 20,95,00 4,29,12 13,37,38 75,50 9,09,50 JU Buildings

16 Major Works ( DPC4235 02 106 JU 16 01 )

Building Construction Division-I, Chennai 1 . Construction of 17 residential quarters at Government Children Home, 1,61,04 1,61,04 Chennai G.O.Ms.No.7 SW & NMP Dept Dt. 08.01.2013 RAS G.O.Ms.No.55 SW & NMP Dt. 5.8.2015 AS / TS / RAS: 17266 Electrical Division-I, Chennai 11,62 11,62 2,02

2 . Construction of 22 residential quarters at Government Children / 1,98,06 1,92,53 1 observation Home, Chennai G.O.Ms.No.7 SW & NMP Dept Dt. 08.01.2013. RAS GO No. 63 SW & NMP dated. 24.12.2014 AS / TS / RAS: 21256 Electrical Division-I, Chennai 14,50 14,47 3,04

Building C & M Division, Kancheepuram 3 . Construction of 20 residential quarters at Government Special Home, 1,81,21 1,81,21 32,70 Chengalpattu G.O.Ms.No.7 SW & NMP Dept Dt. 08.01.2013 AS / TS / RAS: 19050 Electrical Division-2, Chennai 9,29 9,29 10,00

Building C & M Division, Villupuram 4 . Construction of New Building for Govt. Children Home at Villupuram 3,42,34 3,20,86 G.O.Ms.No.12 SW NMP (SW8) Dept Dated 10.01.2013 RAS G.O.Ms.No.60 SW NMP (SW8) Dept Dated 19.12.2014. AS / TS / RAS: 36134 Electrical Division-2, Chennai 19,00 13,43 5,57 5,57

Building C & M Division, Thanjavur 5 . Construction of 21 residential quarters at Government Children Home, 2,09,04 1,91,12 17,92 Thanjavur G.O.Ms.No.7 SW & NMP Dept Dt. 08.01.2013 RAS G.O.Ms.No.81 SW&NMP (SW8) Dept Dt. 16.11.2016 AS / TS / RAS: 21714 Electrical Division, Salem 8,10 4,60 3,50 3,50

Building C & M Division, Thoothukudi 6 . Construction of 21 residential quarters at Government Children Home, 2,04,47 2,00,61 3,16 Thattaparai G.O.3D.No.10 SW & NMP Dept Dt. 25.11.2015 AS / TS / RAS: 21847 Electrical Division, Madurai 14,00 12,41

TOTAL - 4235 02 106 JU 13,72,67 13,13,19 60,00 26,99