Mechanical Abbreviations Mechanical Piping Symbols Mechanical Piping Mechanical Symbol List Control System and Sequence of Opera

Total Page:16

File Type:pdf, Size:1020Kb

Mechanical Abbreviations Mechanical Piping Symbols Mechanical Piping Mechanical Symbol List Control System and Sequence of Opera MECHANICAL CRITERIA CONTROL SYSTEM AND SEQUENCE OF OPERATIONS MECHANICAL ABBREVIATIONS MECHANICAL SYMBOL LIST 1. BEFORE SUBMITTING A PROPOSAL, THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE OF WORK AND FAMILIARIZE SEQUENCES OF OPERATION HIMSELF WITH ALL SITE CONDITIONS. MECHANICAL CONTRACTOR SHALL CAREFULLY EXAMINE ALL CIVIL, ARCHITECTURAL, AFF ABOVE FINISHED FLOOR SUPPLY AIR DUCT UP STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL CONSTRUCTION DOCUMENTS. SUBMISSION OF A BID WILL 1. FCU-1 (GAS HEAT, DX COOLING CONSTANT VOLUME) AHJ AUTHORITY HAVING JURISDICTION ACKNOWLEDGE THE MECHANICAL CONTRACTOR HAS VISITED THE SITE AND EXAMINED ALL CONSTRUCTION DOCUMENTS AHU AIR HANDLING UNIT SUPPLY AIR DUCT DOWN AND BID INSTRUCTIONS. THE MECHANICAL CONTRACTOR'S BID SHALL INCLUDE ALL MECHANICAL WORK IN THE OCCUPIED MODE: A.I.P. ABANDON IN PLACE CONSTRUCTION DOCUMENTS, INCLUDING MECHANICAL WORK RELATED TO EQUIPMENT PROVIDED BY OTHERS. OUTDOOR AIR DAMPER OPEN TO SETPOINT AS SCHEDULED AL ALUMINUM RETURN AIR DUCT UP SUPPLY FAN OPERATES CONTINUOUSLY ALT ALTERNATE 2. MECHANICAL CONTRACTOR SHALL REQUEST CLARIFICATION ON ANY ITEM(S) OF THE CONTRACT DOCUMENTS THAT ARE THERMOSTAT SET FOR 70°F (FIELD ADJUSTABLE), UNLESS OTHERWISE DIRECTED BY OWNER. AP ACCESS PANEL RETURN AIR DUCT DOWN NOT UNDERSTOOD OR WHERE CONFLICTS MAY EXIST. CLARIFICATIONS MUST BE PRESENTED AS A "REQUEST FOR AS AIR SEPARATOR INFORMATION" (RFI) IN WRITING PRIOR TO SUBMITTING A BID. RFI SHALL BE PRESENTED A MINIMUM OF FIVE (5) WORKING COOLING: ATC AUTOMATIC TEMPERATURE CONTROL VALVE EXHAUST AIR DUCT UP DAYS BEFORE THE BID DATE. OBTAIN THE RFI FORM AT WWW.GANDWENGINEERING.COM/DOCUMENTS. SUBMISSION OF A UPON SIGNAL FROM 7-DAY PROGRAMMABLE THERMOSTAT; ATR ALL THREAD ROD BID WILL ACKNOWLEDGE THE MECHANICAL CONTRACTOR UNDERSTANDS THE SCOPE OF WORK, MEANS AND METHODS OF IF SPACE TEMPERATURE RISES 2°F OR MORE ABOVE SET POINT COOLING IS ENERGIZED ATU AIR TERMINAL UNIT EXHAUST AIR DUCT DOWN INSTALLATION, EQUIPMENT AND MATERIALS TO BE USED. RFI THAT HAVE NOT BEEN CLARIFIED PRIOR TO BID, WILL BE AV MANUAL AIR VENT PROVIDED BY THE MECHANICAL CONTRACTOR, AS DIRECTED BY THE ENGINEER OF RECORD, AND THE MOST STRINGENT HEATING: BB BASEBOARD HEATER CHANGE IN DUCT SIZE MATERIALS, EQUIPMENT, AND SCOPE OF WORK SHALL APPLY. NO ADDITIONAL COMPENSATION WILL BE MADE FOR THE UPON SIGNAL FROM 7-DAY PROGRAMMABLE THERMOSTAT; BDD BACK DRAFT DAMPER FAILURE OF THE CONTRACTOR TO OBTAIN CLARIFICATIONS PRIOR TO BID. IF SPACE TEMPERATURE DROPS 2°F OR MORE BELOW SET POINT HEATING IS ENERGIZED BES BANKING EQUIPMENT SUPPLIER TURNING VANES BFF BELOW FINISHED FLOOR 3. THE MECHANICAL CONTRACTOR'S BID SHALL BE BASED ON THE SCHEDULED EQUIPMENT, MATERIALS, AND UNOCCUPIED MODE: BMS BUILDING MANAGEMENT SYSTEM FLEXIBLE DUCT CONNECTION MANUFACTURERS WHICH FORM THE "BASIS OF DESIGN". ALL OTHER EQUIPMENT, MATERIALS, AND MANUFACTURERS, ARE OUTDOOR AIR DAMPER CLOSED BOD BOTTOM OF DUCT CONSIDERED SUBSTITUTIONS. CONTRACTOR PROPOSED SUBSTITUTIONS MUST BE SUBMITTED TO THE ENGINEER OF SUPPLY FAN OPERATES UPON CALL FOR COOLING OR HEATING BOE BOTTOM OF EQUIPMENT HORIZONTAL LIFE SAFETY DAMPER RECORD FOR REVIEW AND WITH A COMPLETED SUBSTITUTION REQUEST FORM. OBTAIN THIS FORM AT THERMOSTAT SET FOR 80°F COOLING AND 70°F HEATING BOP BOTTOM OF PIPE WWW.GANDWENGINEERING.COM/DOCUMENTS. APPROVALS OF SUBSTITUTIONS ARE CONTINGENT UPON ENGINEER'S BS BRANCH SELECTOR - DAIKIN VERTICAL LIFE SAFETY DAMPER REVIEW. THE MECHANICAL CONTRACTOR SHALL MAKE NO PRIOR ASSUMPTIONS ON SUBSTITUTIONS NOT APPROVED BY COOLING: CH CHILLER THE ENGINEER. IF THE ENGINEER APPROVES A SUBSTITUTION REQUEST, THE MECHANICAL CONTRACTOR WILL BE HELD UPON SIGNAL FROM 7-DAY PROGRAMMABLE THERMOSTAT; CLG CEILING M MOTORIZED AUTOMATIC DAMPER (MAD) RESPONSIBLE FOR ENGINEERING REVISIONS, PHYSICAL SIZE, CAPACITIES, COORDINATION, SUPPLEMENTAL DRAWINGS IF SPACE TEMPERATURE RISES 2°F OR MORE SET POINT COOLING IS ENERGIZED CO CARBON MONOXIDE AND INFORMING OTHER TRADE CONTRACTORS RELATED TO THE INSTALLATION, AS TO ANY SPECIFIED ITEM CHANGES. THE CO2 CARBON DIOXIDE MANUAL DAMPER MECHANICAL CONTRACTOR SHALL BEAR AS PART OF HIS CONTRACT, ANY ADDITIONAL COSTS INCURRED IN HIS WORK OR HEATING: CR CONDENSER WATER RETURN BY THE OTHER CONTRACTORS AS A RESULT OF INSTALLATION FOR OTHER THAN "BASIS OF DESIGN" MATERIALS AND UPON SIGNAL FROM 7-DAY PROGRAMMABLE THERMOSTAT; CRAC COMPUTER ROOM AIR CONDITIONER F CARBON DIOXIDE DETECTOR CO 2 EQUIPMENT. IF SPACE TEMPERATURE DROPS 2°F OR MORE BELOW SET POINT HEATING IS ENERGIZED CRCU COMPUTER ROOM CONDENSING UNIT CS CONDENSER WATER SUPPLY F CARBON MONOXIDE DETECTOR CO 4. SHOP DRAWINGS SHALL BE SUBMITTED ELECTRONICALLY AS PDF FILES. SHOP DRAWINGS SHALL INCLUDE TRANSMITTAL 2. EF-B WITH MOTORIZED DAMPER CSST CORRUGATED STAINLESS STEEL TUBING PAGE(S) INDICATING THE NAME OF THE PROJECT, AND THE NAME, ADDRESS, AND PHONE NUMBER OF THE GENERAL AND CT COOLING TOWER H HUMIDISTAT MECHANICAL CONTRACTORS. GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR SHALL REVIEW SHOP DRAWING EXHAUST FAN OPERATES UPON SIGNAL FROM TIMED OVER-RIDE AND/OR CO DETECTOR (FIELD ADJUSTABLE), CU CONDENSING UNIT SUBMITTALS FOR COMPLIANCE, CONTENT AND COMPLETENESS AND PROVIDE A STAMP WITH THE DATE OF REVIEW AND SEE ELECTRICAL DRAWINGS FOR CO AND TIMER INFORMATION. MOTORIZED DAMPERS TO BE WIRED TO BE CUH CABINET UNIT HEATER M MANOMETER SIGNATURE OF THE REVIEWER. TRANSMITTAL PAGE SHALL HAVE INDEX WITH SPECIFICATION SECTION AND DESCRIPTION NORMALLY OPEN (SPRING OPEN, POWER CLOSED). DAMPERS ARE TO BE INTERLOCKED WITH CO DETECTOR DDC DIRECT DIGITAL CONTROL OF SUBMITTED ITEMS. NO EXCEPTIONS WILL BE TAKEN. SHOP DRAWINGS NOT SUBMITTED IN THIS FORMAT WILL BE PS AND SHALL OPEN UPON SIGNAL FROM CO DETECTOR. TIMER SHALL ALSO ENABLE DAMPER AND FAN, BUT DIFF DIFFUSER PRESSURE SWITCH REJECTED AND WILL NOT CAUSE REASON FOR PROJECT DELAYS. EQUIPMENT SHALL NOT BE ORDERED UNTIL ENGINEER SHALL NOT INTERFERE WITH CO MONITORING SYSTEM. DISC DISCONNECT OF RECORD HAS PROCESSED APPLICABLE SHOP DRAWINGS. A MINIMUM OF SEVEN WORKING DAYS WILL BE ALLOWED FOR DLSS DUCTLESS SPLIT SYSTEM F RETURN AIR SMOKE DETECTOR SUBMITTAL PROCESSING BY THE ENGINEER. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. 3. FAI-1 MOTORIZED DAMPER DN DOWN DPS DIFFERENTIAL PRESSURE SWITCH F REFRIGERANT (Rxxx) DETECTOR 5. MECHANICAL CONTRACTOR SHALL PERFORM WORK IN A SAFE MANNER. COMPLY WITH APPLICABLE OSHA SAFETY REF MOTORIZED DAMPERS TO BE WIRED TO BE NORMALLY OPEN (SPRING OPEN, POWER CLOSED). DAMPERS ARE (E) EXISTING GUIDELINES DURING THE COURSE OF COMPLETING THE WORK DESCRIBED ON THESE CONSTRUCTION DOCUMENTS. EA TO BE INTERLOCKED WITH EF-B AND OPEN WHEN EF-B IS ENABLED. EXHAUST AIR EBB ELECTRIC BASE BOARD T THERMOSTAT 6. PROVIDE ALL REQUIRED INSPECTIONS AND RE-INSPECTIONS. PROVIDE A SIGNED CERTIFICATE OF INSPECTION AT THE EC ELECTRICAL WORK CONTRACTOR PROJECT COMPLETION. EF EXHAUST FAN A PIPE/DUCT IN ATTIC EG EXHAUST GRILLE 7. ALL ITEMS OF WORK AND MATERIALS SHALL BE SPECIFICALLY INSTALLED PER WRITTEN INSTALLATION INSTRUCTIONS AND EMS ENERGY MANAGEMENT SYSTEM B PIPE/DUCT BELOW FLOOR OR GRADE METHODS OF INSTALLATION AS PROVIDED BY THE MANUFACTURER OF THE EQUIPMENT OR MATERIAL PROVIDER. EQPT EQUIPMENT MECHANICAL CONTRACTOR SHALL UNDERSTAND THE PRODUCT AND METHODS OF INSTALLATION. THE CONTRACTOR ER EXHAUST REGISTER C PIPE/DUCT ABOVE CEILING SHALL OBTAIN THE INSTALLATION INSTRUCTIONS AND REQUIREMENTS PRIOR TO BID. ALL REQUESTS FOR ADDITIONAL ERV ENERGY RECOVERY VENTILATOR INFORMATION DURING CONSTRUCTION WHERE THE CONTRACTOR HAS NOT PREVIOUSLY OBTAINED THIS INFORMATION PIPE & TUBING SUPPORT SPACING SCHEDULE ET EXPANSION TANK E EXPOSED DUCT, W/ MILL PHOSPHATIZED FINISH FOR BIDDING PURPOSES WILL NOT BE CAUSE FOR ADDITIONAL COSTS OR CONSTRUCTION DELAY. EUH ELECTRIC UNIT HEATER NOMINAL PIPE SIZE (IN.) < 1/2 1/2 3/4 1 1-1/2 2 3 4 5 6 8 10 12 14 16 18 20 24 EWC ELECTRIC WATER COOLER R PIPE/DUCT ON ROOF 8. SYSTEMS AS SHOWN ARE DIAGRAMMATIC AND GIVE THE GENERAL ARRANGEMENT ONLY. EXACT LOCATIONS SHALL BE MAXIMUM SUPPORT PIPE 7 7 7 9 10 11 12 14 1617 19 2223 25 27 2830 32 EWH ELECTRIC WATER HEATER NEW CONNECTION TO EXISTING (VERIFY SIZE SPACING (FT.) TUBING 56 7 8 8 9 10 12 1314 16 --- - -- - DETERMINED IN THE FIELD ON THE BASIS OF DETAIL DRAWINGS, REVIEWED DRAWINGS, AND SUPPLEMENTARY EXH EXHAUST AND LOCATION IN FIELD PRIOR TO BID) INFORMATION. INSTALLATION SHALL PROVIDE FOR OPERATING EFFICIENCY, NEATNESS OF APPEARANCE AND EASE OF NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE. FA FIRE ALARM MAINTENANCE. IT IS EXPECTED THAT THE CONTRACTOR WILL PREPARE DIMENSIONED FIELD ERECTION DRAWINGS AND FAAP FIRE ALARM ANNUNCIATOR PANEL NEW BRANCH DUCT TAP & CONNECTION N WORK SKETCHES FOR USE BY THEIR MECHANICS, TO ENSURE PROPER INSTALLATION AND COORDINATION. THE FACP FIRE ALARM CONTROL PANEL TO EXISTING MECHANICAL CONTRACTOR SHALL TAKE THEIR OWN MEASUREMENTS AT THE BUILDING, AND BE RESPONSIBLE FOR THE FC FLEX CONNECTION # DUCT INSULATION (SEE SCHEDULE) CORRECT INTERPRETATION AND USE OF ALL SIZES AND DIMENSIONS. INSULATION HANGER FCU ROD FAN COIL UNIT FD FIRE DAMPER XX XX XX PLAN NOTE SYMBOL 9. CAST IRON NO-HUB, COPPER OR BLACK IRON PIPE IS REQUIRED ABOVE CEILINGS OR IN CAVITIES USED AS PROVIDE INSULATION FPC FIRE PROTECTION CONTRACTOR ENVIRONMENTAL AIR PLENUM; NO PVC PIPING WILL BE ALLOWED IN RETURN AIR PLENUM SPACES. REFER TO SHIELD AND INSERT FRT FIRE-RETARDANT-TREATED X REVISION SYMBOL ARCHITECTURAL, MECHANICAL OR PLUMBING DRAWINGS OR VERIFY AT SITE, ALL RETURN AIR PLENUM LOCATIONS. WELD FOR ALL PIPING, 8" FSC ADJUSTABLE, MAXIMUM. FOOD SERVICE CONSULTANT SWIVEL ROLLER XX PIPE FSD FIRE/SMOKE DAMPER EQUIPMENT CALLOUT (SEE SCHEDULE) SADDLE HANGER,. SEE SPECS XX 10. THE CONTRACTOR SHALL KEEP "AS-BUILT" INFORMATION DURING CONSTRUCTION AND FURNISH TO THE OWNER OR INSULATION FSEC FOOD SERVICE EQPT. CONTRACTOR TENANT A RECORD SET OF LEGIBLE BLACK LINE PRINTS AND AN ELECTRONIC COPY OF THESE DOCUMENTS AT THE BAND FTU FAN TERMINAL UNIT XX XX GRILLE/DIFFUSER CALLOUT (SEE SCHEDULE) PROJECT COMPLETION. ADJUSTABLE ROLLER HANGER FV FIELD VERIFY TYPE 43 IN SPECIFICATIONS GC GENERAL WORK CONTRACTOR XX LIFE SAFETY DAMPER CALLOUT (SEE SCHEDULE) 11.
Recommended publications
  • Tubing and Pipe
    SECTION K Pages TUBING and PIPE 3-96 Mechanical & K Structural Tubing The various tubular products have been arranged in this sec- tion according to the primary end uses for which they are manufactured: Pages MECHANICAL TUBING 97-107 Commercial and Aircraft Quality. Pipe PIPE —— Steel and Aluminum STRUCTURAL STEEL TUBING Pages 107-112 Square and Rectangular Structural Tubing AIRCRAFT STEEL TUBING HYDRAULIC LINE TUBING Pages 113-116 Refer to the index tabs following this page to locate infor- Aircraft Airframe mation regarding the various classes of tubular prod- Tubing ucts, including sizes, weights, and technical data. This arrangement is presented to make it easy for you to deter- Pages mine the availability of tubing or pipe for a particular specifica- 117-128 Hydraulic tion. However, it is often possible to substitute an item in one Line class for a similar item in another class when the latter is not Tubing available. For example, pipe and structural tubing may often be inter-changed, or a hydraulic tube may be used for a mechanical application. For critical applications, though, especially when Pages governed by the specifications, care should be taken to insure 129-135 that the tube ordered possesses the necessary properties. Titanium Tubing Sec. K Page 1 Sizes listed herein are those normally available from stock at the time of publication. However, our stocks are continually being adjusted to reflect changing demands. The item you need may have been added to stock after this book went to press. If the particular item you need cannot be supplied from stock immediately, we will endeavor to obtain it for you, either locally or from another part of the country.
    [Show full text]
  • Welding Procedure Specification for Shielded Metal Arc Welding of Steel Pipe and Fittings
    LAST REVIEW DATE: 2/26/18 REVIEW CYCLE: 5 Years EFFECTIVE DATE: 3/29/18 SPECIFICATION: G-1064-22b TITLE: Welding Procedure Specification for Shielded Metal Arc Welding of Steel Pipe and Fittings VOLUME: 2 (Section 13.0), 10, and Yellow Book COURSE ID: NONE CORE GROUP: NONE TARGET AUDIENCE: Gas Welders REV 22a (04/02/18): Section 6.1 & Section 9.0 Table 5, updated time between weld passes for clarity. REV 22b (9/06/18): Cover Page, added “Gas Welders” to Target Audience. Section 12.1, added epoxy coating to list of material to be cleaned. REVISIONS: (See ) 1) Table of Contents - Added section 35.0 “Records”. Renumbered subsequent sections. 2) Section 27.1 - Reworded. Added reference to Records section. 3.) Section 31.0 - Clarified minimum cylinder length to be cut out. Added note to consult with Gas Engineering if minimum cylinder length cannot be met. 4) Section 35.0 - New section, “Records”. 5) Section 36.0 - Added reference to CI-870-1, Records Management. G-1064-22b Gas Operations Standards TITLE: Welding Procedure Specification for Shielded Metal Arc Welding of Steel Pipe and Fittings TABLE OF CONTENTS SECTION TITLE PAGE 1.0 SCOPE 3 2.0 LEGAL REQUIREMENTS 3 3.0 WELDER QUALIFICATION 3 4.0 WELDING PROCESS 3 5.0 GRADE OF PIPE, FITTINGS, AND COMPONENTS 3 6.0 TIME LAPSE BETWEEN PASSES 4 7.0 JOINT DESIGN 4 8.0 FILLER METAL 10 9.0 ELECTRIC CHARACTERISTICS 13 10.0 POSITION AND DIRECTION OF WELDING 14 11.0 NUMBER OF WELDERS 14 12.0 CLEANING 14 13.0 ALIGNMENT 14 14.0 TYPE OF LINEUP CLAMPS 15 15.0 REMOVAL OF LINEUP CLAMPS 15 16.0 PREHEAT 15 EFFECTIVE DATE: 3/29/18 EH&S REVIEW BY: W.
    [Show full text]
  • Plastic Piping Handbook Every Solution Begins with a Good Idea
    Ideas that flow. Thermoplastic Flow Solutions ® ol r t Chem - Plastic Piping Handbook Every solution begins with a good idea. We’ve got ideas that flow NIBCO INC. directly to solutions for World Headquarters Plastic 1516 Middlebury Street your industrial piping Elkhart, IN 46516-4740 Piping applications. Ideas that USA make your installations Phone: 800.343.5455 Handbook easier and more cost- Fax: 800.541.3841 Technical Service: effective. Ideas that work, Phone: 888.446.4226 and ideas that last. Our International Office: ideas are strengthened by Phone: +1.574.295.3327 Fax: +1.574.295.3455 a sound foundation for www.chemtrol.com growth and a solid commitment to service. For ideas that fit your flow-control applications, call on us. We’re Chemtrol, a product line committed to innovation, growth, and superiority in thermoplastics— ideas whose time has come. CH-HB-1116-R071020 Corzan® is a registered trademark of The Lubrizol Corporation. Tru-Bloc® is a registered trademark of NIBCO INC. Chem-Pure® is a registered trademark of NIBCO INC. Chemcock® is a registered trademark of NIBCO INC. Kynar® is a registered trademark of Arkema Inc. Chemtrol® is a brand of www.chemtrol.com Ideas that flow. PLASTIC PIPING HANDBOOK “To the best of our knowledge the information contained in this publication is accurate; however, we do not assume any liability whatsoever for the accuracy or completeness of such information. Moreover, there is a need to reduce human exposure to many materials to the lowest practical limits in view of possible long-term adverse effects. To the extent that any hazards may have been mentioned in this publication, we neither suggest nor guarantee that such hazards are the only ones to exist.
    [Show full text]
  • MS 547—Plastic Pipe
    Chapter 3 National Standard Material Part 642 Specifications National Engineering Handbook Material Specification 547—Plastic Pipe 1. Scope This specification covers the quality of poly vinyl chloride (PVC), polyethylene (PE), high-density polyethylene (HDPE), and acrylonitrile-butadiene-styrene (ABS) plastic pipe, fittings, and joint materials. 2. Material Pipe—The pipe must be as uniform as commercially practicable in color, opaqueness, density, and other specified physical properties. It must be free from visible cracks, holes, foreign inclusions, or other defects. The dimensions of the pipe must be measured as prescribed in ASTM D2122. Unless otherwise specified, the pipe must conform to the requirements listed in this specification and the applicable reference specifications in table 547–2, the requirements specified in Construction Specification 45, Plastic Pipe, and the requirements shown on the drawings. Fittings and joints—Fittings and joints must be of a schedule, SDR or DR, pressure class, external load carrying capacity, or pipe stiffness that equals or exceeds that of the plastic pipe. The dimensions of fittings and joints must be compatible with the pipe and measured in accordance with ASTM D2122. Joint and fitting material must be compatible with the pipe material. The joints and fittings must be as uniform as commercially practicable in color, opaqueness, density, and other specified physical properties. They must be free from visible cracks, holes, foreign inclusions, or other defects. Fittings and joints must conform to the requirements listed in this specification, the requirements of the applicable specification referenced in the ASTM or AWWA specification for the pipe, the requirements specified in Construction Specification 45, and the requirements shown on the drawings.
    [Show full text]
  • Design Guidelines for Stainless Steel in Piping Systems
    DESIGN GUIDELINES FOR STAINLESS STEEL IN PIPING SYSTEMS A DESIGNERS’ HANDBOOK SERIES NO 9024 Produced by Distributed by AMERICAN IRON NICKEL AND STEEL INSTITUTE INSTITUTE DESIGN GUIDELINES FOR STAINLESS STEEL IN PIPING SYSTEMS A DESIGNERS’ HANDBOOK SERIES NO 9024 Originally, this handbook was published in 1980 by the Committee of Stainless Steel Producers, American Iron and Steel Institute. The Nickel Institute republished the handbook in 2020. Despite the age of this publication the information herein is considered to be generally valid. Material presented in the handbook has been prepared for the general information of the reader and should not be used or relied on for specific applications without first securing competent advice. The Nickel Institute, the American Iron and Steel Institute, their members, staff and consultants do not represent or warrant its suitability for any general or specific use and assume no liability or responsibility of any kind in connection with the information herein. Nickel Institute [email protected] www.nickelinstitute.org DESIGN GUIDELINES FOR STAINLESS STEEL IN PIPING SYSTEMS Introduction This publication presents information on the design, fabrication, installation and economy of stainless steel in piping systems. The guidelines presented contain Contents important information for piping specialists and design engineers that will save money, time and effort in the several diverse industries utilizing piping systems. Stainless steels are defined as iron-base alloys con- Introduction ............................................................ 3 taining 10 percent or more chromium. They are en- The Selection of a Piping System ........................... 6 gineering materials selected primarily for their excellent Stainless Steel in Piping Systems ........................... 6 resistance to corrosion, their outstanding mechanical Advantages ........................................................
    [Show full text]
  • Pvc Piping Systems for Commercial and Industrial Applications
    PVC PIPING SYSTEMS FOR COMMERCIAL AND INDUSTRIAL APPLICATIONS Plastic Pipe and Fittings Association © 2012 Plastic Pipe and Fittings Association (PPFA) Acknowledgments We would like to thank the following contributors to the Design Guide: The PVC and Thermoplastic Industrial Piping Systems (TIPS) Product Line Committees and member companies of the Plastic Pipe and Fittings Association (PPFA). In particular the following PPFA companies and individuals ably assisted in reviewing the text and tables and provided valuable comments which added greatly in producing a better and more accurate source document: Chuck Bush – Oatey Company Mike Cudahy – PPFA Staff Patrick Fedor – IPEX Bill Morris – Charlotte Pipe & Foundry Jack Roach – Mueller Industries Bill Weaver – Harvel Plastics Larry Workman – LASCO Fittings All text, tables and photos were prepared and or edited by David A. Chasis of Chasis Consulting, Inc. Using the Design Guide The Design Guide was created to assist engineers, installers, end-users, engineering students and building code officials in learning more of the dos and don’ts of PVC piping systems. The Design Guide is comprised of ten sections including: Introduction Features and Benefits Engineering Design Joining Methods Installation Testing and Repair Applications Building Codes, Standards, and Sample Specifications PVC Piping and the Environment Other Plastic Piping Systems In addition, in the back of the guide is the most complete appendix and glossary of PVC piping systems ever assembled. Other PPFA Educational Materials The PPFA offers a wide range of other educational materials developed to assist the engineering and construction industry to become more proficient in the use of the preferred piping system...plastics! On-site seminars, Webinars, CD-based seminars, workbooks, online tutorials and product and technical literature are available.
    [Show full text]
  • Hydraulics Manual Glossary G - 3
    Glossary G - 1 GLOSSARY OF HIGHWAY-RELATED DRAINAGE TERMS (Reprinted from the 1999 edition of the American Association of State Highway and Transportation Officials Model Drainage Manual) G.1 Introduction This Glossary is divided into three parts: · Introduction, · Glossary, and · References. It is not intended that all the terms in this Glossary be rigorously accurate or complete. Realistically, this is impossible. Depending on the circumstance, a particular term may have several meanings; this can never change. The primary purpose of this Glossary is to define the terms found in the Highway Drainage Guidelines and Model Drainage Manual in a manner that makes them easier to interpret and understand. A lesser purpose is to provide a compendium of terms that will be useful for both the novice as well as the more experienced hydraulics engineer. This Glossary may also help those who are unfamiliar with highway drainage design to become more understanding and appreciative of this complex science as well as facilitate communication between the highway hydraulics engineer and others. Where readily available, the source of a definition has been referenced. For clarity or format purposes, cited definitions may have some additional verbiage contained in double brackets [ ]. Conversely, three “dots” (...) are used to indicate where some parts of a cited definition were eliminated. Also, as might be expected, different sources were found to use different hyphenation and terminology practices for the same words. Insignificant changes in this regard were made to some cited references and elsewhere to gain uniformity for the terms contained in this Glossary: as an example, “groundwater” vice “ground-water” or “ground water,” and “cross section area” vice “cross-sectional area.” Cited definitions were taken primarily from two sources: W.B.
    [Show full text]
  • Plastic Pipe Timeline Copyright © Plastic Pipe Data Collection Committee 2017All Rights Reserved
    Plastic Pipe Timeline Copyright © Plastic Pipe Data Collection Committee 2017All Rights Reserved Administered by American Gas Association 400 North Capitol Street, N.W., 4th Floor Washington, DC 20001 U.S.A. NOTICE AND COPYRIGHT The Plastic Pipe Database Committee (PPDC), composed of representatives of the American Gas Association (AGA), American Public Gas Association (APGA), Plastics Pipe Institute (PPI), National Association of Regulatory Utility Commissioners (NARUC), National Association of Pipeline Safety Representatives (NAPSR), National Transportation Safety Board (NTSB) and U.S. Department of Transportation’s (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA), coordinates the creation and maintenance of a database (“PPDC Database”) to proactively monitor the performance of plastic pipe and metal and/or plastic appurtenances contained within plastic piping systems. While AGA provides administrative services to the PPDC, it does not independently test, evaluate, or verify the accuracy or soundness of any statements contained in the PPDC database or made by the PPDC. This document is based on information from the database that has not been verified or audited. The PPDC and the AGA disclaim liability for any personal injury, property or other damages of any nature whatsoever, whether special, indirect, consequential or compensatory, directly or indirectly resulting from the publication, use of, or reliance on this document. The PPDC and the AGA also make no representation, warranty or guarantee in connection with this document, including, the accuracy or completeness of the information therein. Nothing contained in this document should be viewed as an endorsement or disapproval of any particular manufacturer or product. In issuing and making this document available, the PPDC and the AGA are not undertaking to render professional or other services for or on behalf of any person or entity.
    [Show full text]
  • PLUMBING DICTIONARY Sixth Edition
    as to produce smooth threads. 2. An oil or oily preparation used as a cutting fluid espe cially a water-soluble oil (such as a mineral oil containing- a fatty oil) Cut Grooving (cut groov-ing) the process of machining away material, providing a groove into a pipe to allow for a mechani cal coupling to be installed.This process was invented by Victau - lic Corp. in 1925. Cut Grooving is designed for stanard weight- ceives or heavier wall thickness pipe. tetrafluoroethylene (tet-ra-- theseveral lower variouslyterminal, whichshaped re or decalescensecryolite (de-ca-les-cen- ming and flood consisting(cry-o-lite) of sodium-alumi earthfluo-ro-eth-yl-ene) by alternately dam a colorless, thegrooved vapors tools. from 4. anonpressure tool used by se) a decrease in temperaturea mineral nonflammable gas used in mak- metalworkers to shape material thatnum occurs fluoride. while Usedheating for soldermet- ing a stream. See STANK. or the pressure sterilizers, and - spannering heat resistantwrench and(span-ner acid re - conductsto a desired the form vapors. 5. a tooldirectly used al ingthrough copper a rangeand inalloys which when a mixed with phosphoric acid.- wrench)sistant plastics 1. one ofsuch various as teflon. tools to setthe theouter teeth air. of Sometimesaatmosphere circular or exhaust vent. See change in a structure occurs. Also used for soldering alumi forAbbr. tightening, T.F.E. or loosening,chiefly Brit.: orcalled band vapor, saw. steam,6. a tool used to degree of hazard (de-gree stench trap (stench trap) num bronze when mixed with nutsthermal and bolts.expansion 2. (water) straightenLOCAL VENT.
    [Show full text]
  • Plastic Pipe Terms & Definitions
    PLASTIC PIPE TERMS & DEFINITIONS Every product has certain terms and definitions that are unique to that particular product. Listed below are some of the more common terms and definitions that relate to plastic pipe. A good understanding of these definitions is essential to understanding flexible pipe and future Info Briefs and Information Series. ASTM D 883 and F 412 define additional terms relating to plastic pipe. ACRYLONITRILE-BUTADIENE-STYRENE (ABS): Plastics containing polymers or blends of polymers, or both, in which the minimum butadiene content is 6%, the minimum acrylonitrile content is 15%, the minimum styrene or substituted content, or both, is 15%, and the maximum content of all other monomers is not more than 5%; plus lubricants, stabilizers and colorants. ADDITIVE: A substance added to another substance, usually to improve properties, such as plasticizers, initiators, light stabilizers, and flame retardants. AGING: The effects on materials of exposure to an environment for an interval of time. ASH CONTENT: Proportion of the solid residue remaining after a reinforcing substance has been incinerated (charred or intensely heated). BURST STRENGTH: The internal pressure required to cause a pipe or fitting to fail. CARBON BLACK: A black pigment produced by the incomplete burning of natural gas or oil. Because it possesses useful ultraviolet protective properties, it is also much used in molding compounds intended for outside weathering applications. CELL CLASSIFICATION: A rating of the primary properties of the resin material. To include density, melt index, flexural modulus, tensile strength at yield, environmental stress crack resistance, hydrostatic design basis, color and UV stabilizer. 208 Page 1 of 5 03/96 COEXTRUSION: A process whereby two or more heated or unheated plastic material streams forced through one or more shaping orifice(s) become one continuously formed piece.
    [Show full text]
  • Stainless Steel Piping Products
    Stainless Steel Piping Products Stainless Steel and Other Corrosion Resistant Metal Pipe, Tubing, Flanges and Fittings ALASKAN COPPER WORKS www.alaskancopper.com A laskan stainless steel pipe and fittings are found throughout the world in installations for the chemical, fertil- izer, pulp and paper, marine, food, beverage and other process industries. Buttwelding fittings range from 1/2 inch to 60 inches in diameter. This catalog on stainless steel piping products lists the dimensions and weights of the most commonly Automatic straight-seam welding from both sides specified sizes. Note that in addition using the gas tungstenarc to the austenitic stainless steel grades, process produces pipe Alaskan also manufactures pipe and and tubing in sizes up to 24 inch diameter in fittings in austenitic-ferritic (duplex) continuous lengths up to The drawn outlet tee stainless steel grades, copper-nickel 20 feet. Sizes up to 60 offers a smooth contour inch diameter are available alternative to nozzle weld (see separate catalog), aluminum, using other equally refined construction. titanium, zirconium, and the nickel welding techniques. based and copper based alloys. Contact one of our sales repre- Picking and passivation sentatives for assistance with your enhances the appear- ance, and in certain inquiries for price and availability or the cases, the corrosion placement of your next order. resistance of Alaskan stainless steel pipe and fittings. A “Cotton Test” checks the smoothness of the interior surface of pulp Flanges are offered in a These stub ends illus- mill head box piping. wide variety of alloys and trate some of the many configurations. styles available. Threaded fittings are stocked in most The Alaskan "business card Prefabricated piping systems, common sizes and alloys.
    [Show full text]
  • The Dynisco Extrusion Processors Handbook 2Nd Edition
    The Dynisco Extrusion Processors Handbook 2nd edition Written by: John Goff and Tony Whelan Edited by: Don DeLaney Acknowledgements We would like to thank the following people for their contributions to this latest edition of the DYNISCO Extrusion Processors Handbook. First of all, we would like to thank John Goff and Tony Whelan who have contributed new material that has been included in this new addition of their original book. In addition, we would like to thank John Herrmann, Jim Reilly, and Joan DeCoste of the DYNISCO Companies and Christine Ronaghan and Gabor Nagy of Davis-Standard for their assistance in editing and publication. For the fig- ures included in this edition, we would like to acknowledge the contributions of Davis- Standard, Inc., Krupp Werner and Pfleiderer, Inc., The DYNISCO Companies, Dr. Harold Giles and Eileen Reilly. CONTENTS SECTION 1: INTRODUCTION TO EXTRUSION Single-Screw Extrusion . .1 Twin-Screw Extrusion . .3 Extrusion Processes . .6 Safety . .11 SECTION 2: MATERIALS AND THEIR FLOW PROPERTIES Polymers and Plastics . .15 Thermoplastic Materials . .19 Viscosity and Viscosity Terms . .25 Flow Properties Measurement . .28 Elastic Effects in Polymer Melts . .30 Die Swell . .30 Melt Fracture . .32 Sharkskin . .34 Frozen-In Orientation . .35 Draw Down . .36 SECTION 3: TESTING Testing and Standards . .37 Material Inspection . .40 Density and Dimensions . .42 Tensile Strength . .44 Flexural Properties . .46 Impact Strength . .47 Hardness and Softness . .48 Thermal Properties . .49 Flammability Testing . .57 Melt Flow Rate . .59 Melt Viscosity . .62 Measurement of Elastic Effects . .64 Chemical Resistance . .66 Electrical Properties . .66 Optical Properties . .68 Material Identification . .70 SECTION 4: THE SCREW AND BARREL SYSTEM Materials Handling .
    [Show full text]