Feedback from field visits in -NCR by CPCB teams for Air Quality Management Period- 01.10.18 to 07.10.18

The air pollution locations have been identified with GPS coordinates and/or area name.

Team No. Location Date & time Observations Action Taken of observation

North West District 02 Bawana, Kanjhawala, Auchandi 04.10.18 (i) Unpaved Road - near Rajiv Ratan Awas, uploaded on SAMEER app. Border and Narela (9:00 Hrs - Sector - 3, Bawana (28.781830N 19:00 Hrs) 77.067818E) (ii) Open dumping of C&D waste - L-160, Sector- 3, Bawana Industrial Area, Bawana; In front of L-63, Sector- 3, Bawana Industrial Area, Bawana (iii) Open waste dumping - In front of L-63, Sector- 3, Bawana Industrial Area, Bawana; At Shahpur Garhi Mode, Narela (28.816095N 77.103571); Near B 4 Colony, Narela (28.824394N 77.114753E) (iv) Open burning - In front of L-41, Sector- 3, Bawana Industrial Area, Bawana (28.782796N 77.055827E); At Shahpur Garhi Mode, Narela (28.816095N 77.103571); agriculture - Village Sanoot, Narela (28.814261N 77.065016E) 03 Model Town, Kingsway Camp, 04.10.18 (i) Open dumping of C&D waste - Uploaded on SAMEER app. Mukherjee Nagar, Wazirpur, (9:30 Hrs - Kingsway Camp; Wazirpur Industrial Area Ashok Vihar, Sangam Park, 17:00 Hrs) (ii) Construction activity - M.G. Road, Keshav Puram Mukherjee Nagar Crossing (iii) Open storage of construction matereial - M.G. Road, Mukherjee Nagar Crossing; Banda Bahadur Marg, Mukherjee Nagar (iv) Open waste dumping - Mukherjee Nagar;

1

Wazirpur Industrial Area Central District 04 Jama Masjid, Dariya Ganj, 04.10.18 (i) Open dumping of C&D waste - uploaded on SAMEER app. Turkman Gate, Chandini Mahal, (11:30 Hrs - Opposite Hanuman Vatika, Asaf Ali road; LNJP Hospital & Surrounding 18:00 Hrs) Adjacent to old Dy.Comm. office, City Zone, area Asaf Ali road (ii) Open storage of construction material - Ranjeet Marg 06 Pahargang, DBG Road, Dev 05.10.18 (i) Traffic congestion - In front of new (i) Traffic congestion - uploaded on Nagar, Karol Bagh, Sidipura (10:00 Hrs - Delhi station Paharganj (28.643133N SAMEER app., contacted, no response (ii) 17:30 Hrs) 77.218203E) (ii) Open storage of Material got removed from the road (iii) and construction material - In front of Shop No. (iv) Uploaded on SAMEER app. 3262, DBG Road , Pahargang (28.643079N 77.215587E) (iii) Open dumping of C&D waste - Rani Jhansi Road (28.652651N 77.204617E) (iv) Unpaved roads - Near ICICI Bank, Karol Bagh Branch (28.6447365N 77.183571E) 07 Prasad Nagar, Rajender Nagar, 02.10.18 (i) Unpaved roads - Sangtrashan (28.3827N Uploaded on SAMEER app and reported to Pusa Road, Sita Ram Bazar, (14:00 Hrs - 77.1245E); Nabi Karim (28.395N 77.131E) DPCC Sangtrashan, Nabi Karim, IP 18:00 Hrs) (ii) Open dumping of C&D waste - IP estate Estate (28.3731N 77.1439E)

East district

2

13 Naveen Shahdara, Karkardooma, 03.10.18 (i) Road dust re-suspension - Directorate of Uploaded on SAMEER app. Preet Vihar, Shakarpur, (14:00 Hrs - Training, Karkardooma; Back side of Anandvihar, anaj Mandi, Gandhi 21:00 Hrs) Karkardooma metro Station (ii) Unpaved Nagar, Krishna nagar and Old roads - Directorate of Training, Seelampur. Karkardooma; Back side of Karkardooma Metro Station; Under Shahdara Flyover, Near HP Petrol Pump (iii) Open dumping of C&D waste - Near GD Goenka School, back side of Karkardooma Metro Station (iv) Construction activity - Kaushambi Bus Terminal (Opp. Anand Vihar ISBT) (v) Traffic congestion - Under Shahdara Flyover, Loni Road West District 15 Punjabi Bagh, Anand Parbat, 03.10.18 (i) Open waste dumping - Gali No-11, Uploaded on SAMEER app and whtsapp to Meera Bagh, Madipur (09:00 Hrs - Anand Parbat (28.661757N 77.17160E); DPCC 18:00 Hrs) Main Road Anand Parbat (28.663830N 77.167995E) (ii) Open dumping of C&D waste - Nilothi Road, MeeraBagh (28.661475N 77.085046E); No-1, Rameh Nagar Road, Punjabi bagh (iii) Unpaved roads - Near Gali No-11, Anand Parbat (28.663557N 77.171646E) (iv) Construction activity - Punjabi bagh crossing, Delhi, Land mark: CH Balbir Singh Marg (28.664865N 77.132517E); Meerabagh crossing (28.658998N 77.091003E); 621, Street No-11 Anand Parbat (v) Road dust re-suspension - Gali No- 10 Anand Parbat and Main Road Anand Parbat

3

17 Patel Nagar, Shadipur, Kirti 05.10.18 (i) Construction activity - Kirti Nagar Uploaded on SAMEER app. Nagar, Moti Nagar, Raja (8:00 Hrs - Industrial Area, Near SD Public School Garden, Rajouri Garden, 15:00 Hrs) (28.648435N 77.141263E); Near Kirti Nagar Mansarovar Garden, Hari Nagar Industrial Area (28.651756N 77.138400E); Bali Nagar, Moti Nagar, Near Metro Pillar No-324 (28.654801N 77.136925E); Naraina Village, Naraina (28.628198N 77.133023E); Sunil Bakshi Marg, Bali Nagar, Moti Nagar (28.656003N 77.128186) (ii) Unpaved roads - Naraina Vihar, Naraina Ring Road (28.626511N 77.134490E); Patel Road, Near Shadipur Metro Station (28.653071N 77.154918E) (iii) Road dust re-suspension - Patel Road, Near Shadipur Metro Station (28.653071N 77.154918E)

06.10.18 (i) Construction activity - Kirti Nagar Uploaded on SAMEER app. (8:00 Hrs - Industrial Area (28.663784N 77.159958E); 15:00 Hrs) Rama Road, Near Kirti Nagar Industrial Area (28.651756N 77.138400E); Rama Road, Block-B, Kirti Nagar Industrial Area (28.660780N 77.161653E); Kirti Nagar flyover, Near Kirti Nagar metro station (28.655901N 77.151180E); Near Rajouri Garden Metro Station (28.656003N 77.128186E); Near Ghantaghar Chowk, Hari Nagar (28.621006N 77.110816E) (ii) Unpaved roads - Near District Magistrate Office, Rajouri Garden (28.652661N 77.123303E)

North District 20 Red Fort, Lahori Gate, Church 04.10.18 (i) Open storage of construction material - Uploaded on SAMEER app. Mission, Majnu ka Tila, Yamuna (9:20 Hrs - Opposite Redrort, Jama Masjid (ii) Traffic

4

Bazar, Kotwali, Sant Nagar, 17:50 Hrs) congestion - Swami Shradhanand Marg near Burari. Lahori Gate Pollice Station (iii) Open waste dumping - Milan vihar pusta road SantNagar; Opp.-Canara Bank,Main road Burari- Sant Nagar; Laxmi Vihar Main Road Burari Santi Swarup Tyagi Marg (iv) Unpaved roads - Main road Ibrahimpur Nathupura South District 24 Pragati Vihar, Lodhi Colony, East 02.10.18 (i) Open storage of construction material - Uploaded on SAMEER app. Kidwai Nagar, AIIMS, Gulmohar (7:30 Hrs - (28.5553214N 77.2113787E); (28.5544799N Park, Garhi, Amar Colony 14:15 Hrs) 77.2126025E); (28.5550983N 77.2135018E) (ii) Unpaved roads - (28.5834707N 77.2299813E); (28.5846904N 77.2254146E); (28.5899207N 77.2396342E) (iii) Open waste dumping - (28.5846904N 77.2254146E); (28.5129084N 77.2292809E) (iv) Open burning - tandoor - (28.5844293N 77.2245895E) (v) Construction activity - (28.5719979N 77.2093904E) (v) Traffic congestion - (28.5588769N 77.2369454E) 04.10.18 (i) Open dumping of C&D waste - Uploaded on SAMEER app. (08:15 Hrs - (28.5834082N 77.2246056E); (28.5689151N 15:30 Hrs) 77.2085984E) (ii) Construction activity - (28.5687205N 77.2222421E) (iii) Road dust re-suspension - (28.5687205N 77.2222421E) (iv) Traffic congestion - (28.5690618N 77.2096766E); (28.532716N 77.2321219E); (28.5329092N 77.2310949E); (28.5129084N 77.2292809E) (v) Open storage of construction material - (28.5690767N 77.2097448E); (28.5613543N 77.2074549E); (28.5601471N 77.2136447E); (28.5163473N 77.2236986E) (vi) Open

5

burning - (28.5844796N 77.2244384E) (vii) Open waste dumping - (28.5317473N 77.2957409E)

New Delhi District 27 India Gate, North Avenue, South 04.10.18 (i) Open storage of construction material - Uploaded on SAMEER app and whtsapp Avenue, R. M. L. Hospital and (8:00 Hrs - Side Park, India Gate (28.36426N DPCC Rabindra Nagar 18:30 Hrs) 77.13428E); Rabindra Nagar (28.599787N 77.225248E); Inside RML Hospital Campus, In between Gate No. 4 & 5 (28.37326N 77.12067E) (ii) Construction activity - C- Hexagon, India Gate (28.36526N 77.13481E); Jilebi Park, Near Gate No. 8 of Ministry of Home (28.618041N 77.204761E); Jilebi Park, Near Gate No. 8 of Ministry of Home (28.618041N 77.204761E). Noida 33 Botanical garden, Sector-18, 03.10.18 (i) Road dust re-suspension - Network -18, Uploaded on SAMEER app. Expressway between Amity (8:30 Hrs - Exit gate-Filmcity, Sect-16 (ii) Construction University to Noida gate 17:30 Hrs) activity - Gate of Oil India ltd. Filmcity, Sect-16; Besides Redision Hotel, Sect-18; Besides Hira Sweets, Main Market, Sect-18; Main Gate Amity University, Sect-126; Near Express way, Sect-94; Near Karachi Bakery, Sect-18 (iii) Open storage of construction material - Near DND Flyover, Sect-15A; Besides Redision Hotel, Sect-18; Besides Hira Sweets, Main Market, Sect-18; Infront of Muslim Kabristan, Near Amity University Sect-126; Main Gate Amity University, Sect- 126; Near Express way, Sect-94 (iv) DG set - Sect-15A

6

Ghaziabad 34 Pratap Vihar, Vasundhara, 05.10.18 (i) Construction activity - DMRC near uploaded on SAMEER app., reported to DM, Sahibabad, Raj Nagar Extension, (13:00 Hrs - Annapurna Apartments, Sahibabad Ghaziabad and UPPCB. ALT center, NH 24, Hapur 19:00 Hrs) (28.67711N 77.34693E); by Ghaziabad Chungi Development Authority near Shyam Park Extension, Rajendra Nagar, Ghaziabad (28.67737N 77.35382E); by under construction building named Apex The Kremlin, Siddharth Vihar (28.65126N 77.40376E); by Migsun Roofs, Rajnagar Extension (28.705302N 77.434190E); by Agarwal Heights, Rajnagar Extension (28.71012N 77.41725E); flyover at Madan Mohan Malviya Marg (28.66501N 77.36457E) (ii) Traffic congestion - due to unauthorized parking - Chikemberpur Border, Sahibabad (near Dilshad Garden Metro Station) (28.67649N 77.32492E) (iii) Road dust re-suspension - From UP Border (near Dilshad Garden Metro Station) till Shyam Park the GT road (28.67686N 77.33993E) (iv) Open storage of construction material - by under construction building named Apex The Kremlin, Siddharth Vihar (28.65126N 77.40376E); by Migsun Roofs, Rajnagar Extension (28.705302N 77.434190E); by Agarwal Heights, Rajnagar Extension (28.71012N 77.41725E) (v) Open dumping of C&D waste - during construction of Delhi Meerut Expressway, between Rahul Vihar and Indirapuram (28.63829N 77.40228E) (vi) Open burning - Parivahan Nigam Bus Station, Sahibabad (opposite Vasundhara) (28.66833N

7

77.36829E) (vii) Vehicular emission - Truck no. UP 14 ET 3328 near Pratap Vihar (28.63938N 77.40535E) Faridabad 35 Sector 24 and 25 03.10.18 (i) Unpaved roads - Near Plot No. 20 Uploaded on SAMEER app. (10:00 Hrs - Sector 25 (28.02017N 77.01820E); Near JCB 18:00 Hrs) Office Sector 25, (28.02034N 77.01817E); Near Reva Industries Ltd Sector 24 (28.02103N 77.01809E) (ii) Road dust re- suspension - Near Plot No. 12 Sector 25 (28.02027N 77.01819E) (iii) Industrial emission - Near Plot No. 107 Sector 24 (28.02135N 77.01805E) (iv) Open waste dumping - Near JBM Industries Sector 24 28.02113N 77.01822E) 37 Sector 58-59, 68-74 04.10.18 (i) Unpaved roads - Sarai Kale Khan near Uploaded on SAMEER app. (6:15 Hrs - Flyover (28.70480N 77.256251E); 18:15 Hrs) BallabhGarh Fly Over –NH-2; Sect- 59 Crossing at NH-2 to inside industrial area sect-59 Faridabad (BallabhGarh) (28.30890N 77.30490E); Truck Parking Sect-58 Industrial Area (28.30849N 77.29607E); Sect- 59 Faridabad (BallabhGarh) (28.3103632N 77.3106258E); Sector-59, Faridabad, (BallabhGarh) (ii) Open burning - Opp- plot no.-226 Sect-58, Faridabad (BallabhGarh) (28.31855N 77.305579E) (iii) Open storage of construction material - 143 Sect- 69 Faridabad, (BallabhGarh) (28.323502N 77.35987E); 02-RCC-Mixing- Plants at Sect-74 Making Locking Bricks (28.3584256N 77.3479455E) (iv) Construction activity - 02-RCC-Mixing- Plants at Sect-74 Making Locking Bricks (28.3584256N 77.3479455E); 143 Sect- 69

8

Faridabad, (BallabhGarh) (28.323502N 77.35987E) Gurgaon (South)

41 IMT Manesar, Gurgaon Sector-9, 05.10.18 (i) Open waste dumping - Sector-8, IMT uploaded on SAMEER app. And lodged 10 &12 (9:00 Hrs - Manesar (28.3800N 76.8800E); Sector-9, compalint with DPCC 16:30 Hrs) Gurgaon (28.4560N 77.0280E) (ii) Construction activity - Sector-7, IMT Manesar (28.381N 76.893E) (iii) Open storage of construction material - Sector-7, IMT Manesar (28.381N 76.893E); Sector-9, Gurgaon (28.4560N 77.0280E) (iv) Industrial emission - Sector-12, Gurgaon (28.4040N 76.8890E)

9