APPENDIX VIII FORM 1 M (See paragraph 6)

APPLICATION FOR MINING OF MINERALS UNDER CATEGORY ‘B2’ FOR LESS THAN AND (II) Basic Information EQUAL TO FIVE HECTARE. Sl.No Areas Distance in Kilometer/Details M/s. Stone Crushers "Granite Building Stone Quarry" of (i) Name of the Mining Lease Site

Location/Site (GPS Co-Ordinate) Sy. No. 236/3, 237/1 & 238/2 in Thirumeni Village, PayyanurB. P. No. Taluk, LatitudeKannur District, KeralaLongitude State. 1 N-12°14'57.838" E-75°24'27.897" 2 N-12°14'58.701" E-75°24'30.556" 3 N-12°14'59.443" E-75°24'30.021" 4 N-12°14'59.952" E-75°24'30.086" 5 N-12°14'59.817" E-75°24'30.761" (ii) 6 N-12°15'01.707" E-75°24'31.203" 7 N-12°15'02.874" E-75°24'28.190" 8 N-12°15'01.546" E-75°24'27.953" 9 N-12°15'01.501" E-75°24'28.902" 10 N-12°15'00.434" E-75°24'28.723" 11 N-12°14'59.133" E-75°24'27.843" 12 N-12°14'58.475" E-75°24'26.964"

(iii) Size of the Mining Lease (Hectare) 0.9742 Ha (2.4072 Acres) Capacity of Mining Lease (TPA) It is proposed to produce maximum of 45,228.75 tonnes per (iv) annum of granite building stone. (v) Period of Mining Lease 6Years Sri. Narikkadan Dasan (vi) Expected cost of the project 48.00 Lakhs

M/s. Thirumeni Stone Crushers (vii) Contact Information Prapoyil, Thirumeni P.O District, -670511 PhCyriac No.: Joseph, +91 9633746770 DMG/KERALA/RQP/15/2018Accreditation No.73 upto 22.02.2028

Valid Global Environment & Mining Services, (vii) RQP Address 394, HBR Layout, 5th Block, 5th Main, 1st Cross, 1st Stage -560043, Karnataka Email. Id: [email protected] Environment Sensitivity Ph: +91-9880788836 Landline: +918025432447 Sl.No Areas Distance in Kilometer/Details

Distance of Project site from rail or road River: Kuppam River, 6 Kms Rivulet: Cherupuzha, 0.50Km 1 bridge over the concerned River, Rivulet, Nallah etc. Rail : Cherupuzha -8.00 Kms

2 Distance from infrastructural facilities Railway line Cherupuzha -8.00 Kms National Highway Kasaragod - Kannur Road, 23.47Kms. State Highway Malabar Hill Highway Road (SH-58), 2.23Kms. Major District Road Cherupuzha-Muthuvom Road, 1Km Any Other Road Prapoyil - Korali Road, 0.064Km Electrical Pole : 0.090m Electrical transmission line pole or tower Electrical tower : 1.5Km Canal or check dam or reservoirs or lake Canal: Pulingome Canal, 5Kms or ponds Panchayath Water Tank, Prapoyil, 4Km In-take for drinking water/pump house

Intake for Irrigation canal pumps Canal: Pulingome Canal, 5Kms Areas protected under international conventions, national or local legislation 3 None within 5 Kms of the project site for their ecological, landscape, cultural or other related value. Areas which are important or sensitive for River: Kuppam River, 6 Kms ecological reasons – Wetlands, Rivulet: Cherupuzha, 0.50Km 4 watercourses or other water bodies, Forest: Brahmagiri Wildlife Sanctuary, 30Kms coastal zone, biospheres, mountains, forests Areas used by protected, important or sensitive species of flora or fauna for 5 None within 5 Km of the project site breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or underground 6 Coast: Kannur Payyabalam,42Kms waters State, National boundaries Karnataka State boundary is about 5.00Kms from the 7 project site. Routes or facilities used by the public for National Highway: Kasaragod - Kannur Road, 23.47Kms. 8 access to recreation or other tourist, State Highway: Malabar Hill Highway Road (SH-58), pilgrim areas 2.23Kms. 9 Defense installations None within 5 Km of the project site Densely populated or built-up area, The nearest human settlements is at Thirumeni is located 10 distance from nearest human habitation at 1.20 km away from the mine. Areas occupied by sensitive man-made Hospital: Thirumeni Govt Model Homoeo Dispensary, land uses (Hospitals, schools, places of 0.500Kms worship, community facilities) School: Government HighSchool Vayykkara, 11.1 Kms Church: St. Marys Malankara Church, Thirumeni, 11 0.650Kms Mosque: Prapoyil Juma Masji, 1.60Kms Temple: Sree Vayanattukulavan Temple, Prapoyil, 2.2kms. Anganwadi: Prapoyil, 4 Kms Areas containing important, high quality or scarce resources (ground water 12 None within 5 Km of the project site resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental damage, (those where 13 Not applicable, since this is Fresh proposal existing legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to present No, Permit area is not susceptible to natural hazard, as 14 environmental problems (earthquakes, there is no history of such incidents. subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) 15 Is proposed mining site located over or No