APPENDIX I

(See paragraph – 6)

FORM – 1

(I) Basic Information

S.No. Item Details 1 Name of the Project “SONIGARA AANGAN ” 2 S. No. in the Schedule 8(a) Proposed Total Plot Area = 25840 m2 capacity/area/length/tonnage to Total Built up Area (FSI) = 23015.27 m2 3 be handled/ command area/ lease Total Built up Area(NON FSI) = 20353.76 m2 area/ number of wells to be drilled Total Construction Area = 43369.03 m2 4 New/Expansion/Modernization New Total Plot Area = 25840m2 Total Built up Area (FSI) 23015.27 m2 5 Existing Capacity/Area etc. Total Built up Area(NON FSI) = 20353.76 m2 Total Construction Area = 43369.03 m2 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ Does it attract the general 7 No condition? If yes, please specify. Does it attract the specific 8 No condition? If yes, please specify. S.No.179/2,CTS No – 95(p) to 98(p) Location 99,100,101(p),103 (p) 104,105 Ravet, S.No.179/2,CTS No – 95(p) to 98(p) Plot/Survey/Khasra No. 99,100,101(p),103 (p) 104,105 Ravet, Pune 9 Village Ravet Tehsil Haveli District Pune State Nearest railway station/airport 10 Akurdi Railway Station -1Km along with distance in Kms. Nearest Town, city, District 11 Headquarters along with distance Pune – 20.00 Kms. in Kms Village Panchayats, Zilla Parishad, - Municipal Corporation Municipal Corporation, Local body 12 (Complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/s M. K. CONSTRUCTION C/o Sonigara Homes, Dange Chowk, 14 Registered Address Thergaon, Pune Shop No.11, Laxmitara Market, Sonigara Address for correspondence: Homes, Dange Chowk, Thergaon, Pune- 411033 Name MR.MADAN K. SONIGARA Designation Director (Owner/Partner/CEO) 15 97, East Mumbai-Road, Road, Pune- Address 412101 Pin code 412101 E- mail [email protected] Telephone No. 020-27273351 Fax No. ----- Details of Alternative Sites examined, if any. Location of these No 16 sites should be shown on a toposheet. 17 Interlinked Projects No Whether separate application of 18 interlinked project has been Not Applicable submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. 21 (a) The Forest (Conservation) Act, No 1980? (b) The Wild life (Protection) Act 1972? (c) The C.R.Z. Notification, 1991? Whether there is any Government 22 Order / Policy relevant/ relating to No the site? 23 Forest Land involves (hectares) No Whether there is any litigation pending against the project and/ or land in which the project is proposal to be set up 24 No Name of the Court (a) Case No. (b) Orders / directions of the Court, if any and its relevance with the proposed project.

II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, etc.)

Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Permanent or temporary Basically land is Barren land. The proposed change in land use, land project site is designated for the intended cover or topography purpose and the necessary change in the land 1.1 including increase in No use of the plot area measuring 8416.82 m2 intensity of land use (with has already been affected by converting it for respect to local land use residential use. plan) Annexure II : Site Location Plan Clearance of existing land, 1.2 No Not Applicable vegetation and buildings? 1.3 Creation of new land uses? No Not Applicable Pre-construction 1.4 investigations e.g. bore Yes Not Applicable houses, soil testing? 43369.03 m2 (FSI + NON FSI) will be total 1.5 Construction works? Yes built up area.. Annexure IV: Master Layout 1.6 Demolition works? No Not Applicable Temporary sites used for construction works or During construction total 40 Nos. of workers 1.7 Yes housing of construction will be on site. workers? Above ground buildings, Total 43369.03 m2 (FSI + NON FSI ) will be structures or Earth works built up area for residential & commercial 1.8 Yes including linear structures, purpose. Excavated material during cut and fill or excavations construction will be used for leveling of land. Underground works 1.9 including mining or No Not Applicable tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Production and 1.13 No Not Applicable manufacturing processes? Facilities for storage of goods Temporary shed will be constructed for the 1.14 Yes or materials? storage of the construction material Solid Waste Management During Construction Phase – Excavated material will be used for backfilling and landscape. During Operation Phase – a) During Construction phase – Excavated material will be used for backfilling and landscape. For Residential – Population – 1600 nos., Commercial Population –790 nos. Total Solid waste Generated 1) Total Solid Waste = 997.5kg /day 2) Total Wet Waste = : 559 kg/day 3) Total Dry Waste = 438.5 kg/day Biodegradable and non biodegradable waste will be segregated. Dry waste will be sold Facilities for treatment or out. Wet waste will be treated by ‘ Organic Waste 1.15 disposal of solid waste or Yes Convertor’ for composting liquid effluents? WATER MANAGEMENT - During Construction Phase : Source of water – Tanker/Bore Well Total Water requirement – 30 m3/day During Operation Phase : Water Source: Pimpri Chinchwad Municipal Corporation. Water Demand :Dry Season DRY SEASON • Total Water demand is 274.88m3/day. • Domestic Water for Residential: 144 m3/day • Flushing Water for Residential: 72 m3/day. • Domestic Water for Commercial : 15.08 m3/day • Flushing Water for Commercial : 19.75m3/day • Club house 10 m3/day Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Landscaping is 13.33 m3/day) Facilities for long term 1.16 housing of operational No Not Applicable workers? New road, rail or sea traffic 1.17 during construction or No Not Applicable operation? New road, rail, air waterborne or other transport infrastructure 1.18 No Not Applicable including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or 1.19 infrastructure leading to No Not Applicable changes in traffic movements? New or diverted 1.20 transmission lines or No Not Applicable pipelines? Impoundment, damming, culverting, realignment or 1.21 other changes to the No Not Applicable hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable Abstraction or transfers of 1.23 water from ground or surface No Not Applicable waters? Changes in water bodies or 1.24 the land surface affecting No Not Applicable drainage or run-off? Transport of personnel or 1.25 materials for construction, No Not Applicable operation or Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data decommissioning? Long-term dismantling or 1.26 decommissioning or No Not Applicable restoration works? Ongoing activity during decommissioning which 1.27 No Not Applicable could have an impact on the environment? INFLUX DURING CONSTRUCTION : During construction approximately 50 nos. Influx of people to an area in workers & 10 Nos. Staff. 1.28 either temporarily or Yes INFLUX DURING OPERATION : permanently? During operation influx of approximately 2390 Nos. of persons are going to reside in the Residential & Commercial complex. 1.29 Introduction of alien species? No Not Applicable Loss of native species or 1.30 No Not Applicable genetic diversity? 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities Sr. Information/checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Undeveloped land of about 25840 m2. Land especially undeveloped The proposed development has been planned 2.1 Yes or agricultural land (ha) in such a way that it does not damage the existing contours as well as flora & fauna at site. WATER MANAGEMENT - During Construction Phase : Source of water – Tanker/Bore Well Water (expected source & 2.2 Yes Total Water requirement – 30 m3/day competing users) unit: KLD During Operation Phase : Water Source: Pimpri Chinchwad Municipal Corporation. Details thereof (with approximate quantities Sr. Information/checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Water Demand :Dry Season DRY SEASON • Total Water demand is 274.88 m3/day. • Domestic Water for Residential: 144m3/day • Flushing Water for Residential 72 m3/day. • Domestic Water for Commercial : 15. 8 m3/day • Flushing Water for Commercial : 19.75m3/day • Club house :10.00 m3/day Landscaping is 13.3 m3/day) (Annexure VIII – Water Balance Statement) 2.3 Minerals (MT) No Not Applicable Construction material – stone, 2.4 aggregates, sand / soil Yes Companies authorized/ approved local vendors (expected source – MT) Forests and timber (source – 2.5 No Not Applicable MT) SOURCE – Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: Energy including electricity a) Total Load –30 KW and fuels (source, competing b) D.G. Set – 40 KVA x 1 No. 2.6 Yes users) Unit: fuel (MT), energy c) Fuel Requirement : 6.5 Litres / Hour (MW) During Operation Phase: • a)Total Demand- 2375 KW • b) Total Maximum Demand – 2111.11 KVA • c) Transformer – 22 KV / 630 KVA – 4 No’s. Any other natural resources 2.7 (use appropriate standard No Not Applicable units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approx. quantities/ Sr. Information/Checklist Yes/ rates, wherever possible) with source of No. confirmation No information data Use of substances or materials, 3.1 No Not Applicable which are hazardous (as per Details thereof (with approx. quantities/ Sr. Information/Checklist Yes/ rates, wherever possible) with source of No. confirmation No information data MSIHC rules) to human health or the environment (flora, fauna, andwater supplies) Changes in occurrence of disease 3.2 or affect disease vectors (e.g. insect No Not Applicable or water borne diseases) Affect the welfare of people e.g. by It can help in improving the living 3.3 No changing living conditions? standards of that area. Vulnerable groups of people who could be affected by the project e.g. 3.4 No Not Applicable hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data Excavated material will be used for back 4.1 Soil, overburden or mine wastes No filling site. Solid Waste Management During Construction Phase – Excavated material will be used for land leveling During Operation Phase – For Residential – Population – 1600 Municipal waste (domestic and or nos., Population –790 nos. 4.2 Yes commercial wastes) Total Solid waste Generated 1) Total Solid Waste = 997.5 kg/day 2) Total Wet Waste = 559 kg/day 3) Total Dry Waste = 438.5 kg/day (Annexure X – Solid Waste Management- Organic Waste Convertor) Hazardous wastes (as per 4.3 Hazardous Waste Management No Not Applicable Rules) Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable Sewage Treatment Plant will be provided for treatment of domestic Sewage sludge or other sludge 4.6 Yes waste. from effluent treatment (Annexure IX: Sewage Treatment Plant- Schematic Layout & Details) Construction or demolition 4.7 No Not Applicable wastes Redundant machinery or 4.8 No Not Applicable equipment Contaminated soils or other 4.9 No Not Applicable materials 4.10 Agricultural waste No Not Applicable 4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data Emissions from combustion of fossil 5.1 fuels from stationary or mobile No Not Applicable sources Emissions from production 5.2 No Not Applicable processes Emissions from materials handling 5.3 No Not Applicable including storage or transport Emissions from construction There will be temporary emission 5.4 activities including plant and Yes from construction equipments (mobile equipment Source) Dust or odors from handling of As per Environment Management 5.5 materials including construction Yes Plan materials, sewage and waste Annexure XIX Emissions from incineration of 5.6 No Not Applicable waste Emissions from burning of waste in 5.7 open air (e.g. slash materials, No Not Applicable construction debris) Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data with source of information data Sources of noise Pollution during construction phase are machinery like compressor, Compactors, Concrete From operation of equipment e.g. Plant, Cranes and transportation 6.1 engines, ventilation plant, Yes materials. crushers During operation phase DG sets will be provided with Canopy to reduce noise and vibration. From industr ial or similar 6.2 No Not Applicable processes 6.3 From construction or demolition Yes As per Environment Management Plan. 6.4 From blasting or piling No Not Applicable From construction or operational 6.5 Yes As per Environment Management Plan. traffic 6.6 From lighting or cooling systems No Not Applicable 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data From handling, storage, use or 7.1 No Not Applicable spillage of hazardous materials Sewage will be treated and reused for From discharge of sewage or flushing, gardening and green belt other effluents to water or the 7.2 No areas. land (expected mode and place of Hence there is no risk of contamination discharge) due to release of sewage or effluent. By deposition of pollutants 7.3 emitted to air into the land or into No Not Applicable water 7.4 From any other sources No Not Applicable Is there a risk of long term build 7.5 up of pollutants in the No Not Applicable environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data From explosions, spillages, fires etc from storage, handling, use or 8.1 No Not Applicable production of hazardous substances There is a risk of accident during 8.2 From any other causes Yes construction however proper safety measures will be taken Could the project be affected by Adequate earthquake proof RCC design natural disasters causing will be adopted. 8.3 environmental damage (e.g. Yes Annexure VII: Seismic Zoning Map Of floods, earthquakes, landslides, India cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data Lead to development of supporting . 1) Power supply is available. Facilities, ancillary development 2) Sewage Treatment Plant will be or development stimulated by provided hence there will not additional the project which could have load on Municipal Sewage treatment. impact on the environment e.g.: 3) Solid Waste Management facility will 9.1 • Supporting infrastructure Yes be provided. (roads, power supply, waste or 4) Adequate parking facility available waste water treatment, etc.) within campus. • Housing development • Extractive industries Housing Development • Supply industries • Other Lead to after-use of the site, 9.2 which could have an impact on No Not Applicable the environment Details thereof (with approx. Sr. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data Set a precedent for later 9.3 No Not Applicable developments Have cumulative effects due to proximity to other existing or 9.4 No Not Applicable planned projects with similar effects

III) Environmental Sensitivity

Sr. Name/ Aerial distance (within 15 km.) Areas No Identity Proposed project location boundary Areas protected under international conventions, 1 national or local legislation for No Not Applicable their ecological, landscape, cultural or other related value Areas which are important or sensitive for ecological reasons - 2 Wetlands, watercourses or other No Not Applicable water bodies, coastal zone, biospheres, mountains, forests Areas used by protected, important or sensitive species 3 of flo ra or fauna for breeding, No Not Applicable nesting, foraging, resting, over wintering, migration Inland, coastal, marine or 4 No Not Applicable underground waters 5 State, National boundaries No Not Applicable Routes or facilities used by the 6 public for access to recreation or No Not Applicable other tourist, pilgrim areas 7 Defence installations No Not Applicable Densely populated or built-up 8 No Not Applicable area Areas occupied by sensitive man-made land uses (hospitals, 9 No Not Applicable schools, places of worship, community facilities) Areas containing important, high quality or scarce resources 10 No Not Applicable (Ground water resources, surface resources, forestry, agriculture, Sr. Name/ Aerial distance (within 15 km.) Areas No Identity Proposed project location boundary fisheries, tourism, minerals) Areas already subj ected to

pollution or environmental 11 damage. (Those where existing No Not Applicable

legal environmental standards are

exceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems 12 No Not Applicable (Earthquakes, subsi dence, landslides, erosion, flooding or extreme or adverse climatic conditions )

(IV) Proposed Terms of Reference for EIA studies. EIA not required as project is under B-2 Category.