S.No. Item Details 1 Name of the Project “SONIGARA AANGAN ” 2 S
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX I (See paragraph – 6) FORM – 1 (I) Basic Information S.No. Item Details 1 Name of the Project “SONIGARA AANGAN ” 2 S. No. in the Schedule 8(a) Proposed Total Plot Area = 25840 m2 capacity/area/length/tonnage to Total Built up Area (FSI) = 23015.27 m2 3 be handled/ command area/ lease Total Built up Area(NON FSI) = 20353.76 m2 area/ number of wells to be drilled Total Construction Area = 43369.03 m2 4 New/Expansion/Modernization New Total Plot Area = 25840m2 Total Built up Area (FSI) 23015.27 m2 5 Existing Capacity/Area etc. Total Built up Area(NON FSI) = 20353.76 m2 Total Construction Area = 43369.03 m2 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ Does it attract the general 7 No condition? If yes, please specify. Does it attract the specific 8 No condition? If yes, please specify. S.No.179/2,CTS No – 95(p) to 98(p) Location 99,100,101(p),103 (p) 104,105 Ravet, Pune S.No.179/2,CTS No – 95(p) to 98(p) Plot/Survey/Khasra No. 99,100,101(p),103 (p) 104,105 Ravet, Pune 9 Village Ravet Tehsil Haveli District Pune State MAHARASHTRA Nearest railway station/airport 10 Akurdi Railway Station -1Km along with distance in Kms. Nearest Town, city, District 11 Headquarters along with distance Pune – 20.00 Kms. in Kms Village Panchayats, Zilla Parishad, Pimpri-Chinchwad Municipal Corporation Municipal Corporation, Local body 12 (Complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/s M. K. CONSTRUCTION C/o Sonigara Homes, Dange Chowk, 14 Registered Address Thergaon, Pune Shop No.11, Laxmitara Market, Sonigara Address for correspondence: Homes, Dange Chowk, Thergaon, Pune- 411033 Name MR.MADAN K. SONIGARA Designation Director (Owner/Partner/CEO) 15 97, East Mumbai-Road, Dehu Road, Pune- Address 412101 Pin code 412101 E- mail [email protected] Telephone No. 020-27273351 Fax No. ----- Details of Alternative Sites examined, if any. Location of these No 16 sites should be shown on a toposheet. 17 Interlinked Projects No Whether separate application of 18 interlinked project has been Not Applicable submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. 21 (a) The Forest (Conservation) Act, No 1980? (b) The Wild life (Protection) Act 1972? (c) The C.R.Z. Notification, 1991? Whether there is any Government 22 Order / Policy relevant/ relating to No the site? 23 Forest Land involves (hectares) No Whether there is any litigation pending against the project and/ or land in which the project is proposal to be set up 24 No Name of the Court (a) Case No. (b) Orders / directions of the Court, if any and its relevance with the proposed project. II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Permanent or temporary Basically land is Barren land. The proposed change in land use, land project site is designated for the intended cover or topography purpose and the necessary change in the land 1.1 including increase in No use of the plot area measuring 8416.82 m2 intensity of land use (with has already been affected by converting it for respect to local land use residential use. plan) Annexure II : Site Location Plan Clearance of existing land, 1.2 No Not Applicable vegetation and buildings? 1.3 Creation of new land uses? No Not Applicable Pre-construction 1.4 investigations e.g. bore Yes Not Applicable houses, soil testing? 43369.03 m2 (FSI + NON FSI) will be total 1.5 Construction works? Yes built up area.. Annexure IV: Master Layout 1.6 Demolition works? No Not Applicable Temporary sites used for construction works or During construction total 40 Nos. of workers 1.7 Yes housing of construction will be on site. workers? Above ground buildings, Total 43369.03 m2 (FSI + NON FSI ) will be structures or Earth works built up area for residential & commercial 1.8 Yes including linear structures, purpose. Excavated material during cut and fill or excavations construction will be used for leveling of land. Underground works 1.9 including mining or No Not Applicable tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Production and 1.13 No Not Applicable manufacturing processes? Facilities for storage of goods Temporary shed will be constructed for the 1.14 Yes or materials? storage of the construction material Solid Waste Management During Construction Phase – Excavated material will be used for backfilling and landscape. During Operation Phase – a) During Construction phase – Excavated material will be used for backfilling and landscape. For Residential – Population – 1600 nos., Commercial Population –790 nos. Total Solid waste Generated 1) Total Solid Waste = 997.5kg /day 2) Total Wet Waste = : 559 kg/day 3) Total Dry Waste = 438.5 kg/day Biodegradable and non biodegradable waste will be segregated. Dry waste will be sold Facilities for treatment or out. Wet waste will be treated by ‘ Organic Waste 1.15 disposal of solid waste or Yes Convertor’ for composting liquid effluents? WATER MANAGEMENT - During Construction Phase : Source of water – Tanker/Bore Well Total Water requirement – 30 m3/day During Operation Phase : Water Source: Pimpri Chinchwad Municipal Corporation. Water Demand :Dry Season DRY SEASON • Total Water demand is 274.88m3/day. • Domestic Water for Residential: 144 m3/day • Flushing Water for Residential: 72 m3/day. • Domestic Water for Commercial : 15.08 m3/day • Flushing Water for Commercial : 19.75m3/day • Club house 10 m3/day Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Landscaping is 13.33 m3/day) Facilities for long term 1.16 housing of operational No Not Applicable workers? New road, rail or sea traffic 1.17 during construction or No Not Applicable operation? New road, rail, air waterborne or other transport infrastructure 1.18 No Not Applicable including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or 1.19 infrastructure leading to No Not Applicable changes in traffic movements? New or diverted 1.20 transmission lines or No Not Applicable pipelines? Impoundment, damming, culverting, realignment or 1.21 other changes to the No Not Applicable hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable Abstraction or transfers of 1.23 water from ground or surface No Not Applicable waters? Changes in water bodies or 1.24 the land surface affecting No Not Applicable drainage or run-off? Transport of personnel or 1.25 materials for construction, No Not Applicable operation or Details thereof (with approximate quantities Sr. Information/Checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data decommissioning? Long-term dismantling or 1.26 decommissioning or No Not Applicable restoration works? Ongoing activity during decommissioning which 1.27 No Not Applicable could have an impact on the environment? INFLUX DURING CONSTRUCTION : During construction approximately 50 nos. Influx of people to an area in workers & 10 Nos. Staff. 1.28 either temporarily or Yes INFLUX DURING OPERATION : permanently? During operation influx of approximately 2390 Nos. of persons are going to reside in the Residential & Commercial complex. 1.29 Introduction of alien species? No Not Applicable Loss of native species or 1.30 No Not Applicable genetic diversity? 1.31 Any other actions? No Not Applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities Sr. Information/checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Undeveloped land of about 25840 m2. Land especially undeveloped The proposed development has been planned 2.1 Yes or agricultural land (ha) in such a way that it does not damage the existing contours as well as flora & fauna at site. WATER MANAGEMENT - During Construction Phase : Source of water – Tanker/Bore Well Water (expected source & 2.2 Yes Total Water requirement – 30 m3/day competing users) unit: KLD During Operation Phase : Water Source: Pimpri Chinchwad Municipal Corporation. Details thereof (with approximate quantities Sr. Information/checklist Yes/ /rates, wherever possible) with source of No. confirmation No information data Water Demand :Dry Season DRY SEASON • Total Water demand is 274.88 m3/day. • Domestic Water for Residential: 144m3/day • Flushing Water for Residential 72 m3/day. • Domestic Water for Commercial : 15. 8 m3/day • Flushing Water for Commercial : 19.75m3/day • Club house :10.00 m3/day Landscaping is 13.3 m3/day) (Annexure VIII – Water Balance Statement) 2.3 Minerals (MT) No Not Applicable Construction material – stone, 2.4 aggregates, sand / soil Yes Companies authorized/ approved local vendors (expected source – MT) Forests and timber (source – 2.5 No Not Applicable MT) SOURCE – Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: Energy including electricity a) Total Load –30 KW and fuels (source, competing b) D.G. Set – 40 KVA x 1 No. 2.6 Yes users) Unit: fuel (MT), energy c) Fuel Requirement : 6.5 Litres / Hour (MW) During Operation Phase: • a)Total Demand- 2375 KW • b) Total Maximum Demand – 2111.11 KVA • c) Transformer – 22 KV / 630 KVA – 4 No’s.