Hornsby Quarry
Total Page:16
File Type:pdf, Size:1020Kb
LEGEND Site Sealed project access road Sealed and widened access road Conveyor Fence around project zone Existing quarry void fence Pedestrian trail Silvia Street Conveyor feeder Truck bridge Gate Existing gate Mountain bike trail grading (Hornsby Shire Council) Easiest Intermediate More difficult Advanced Hornsby TAFE Hornsby TAFE Quarry Road PACIFIC HIGHWAY (Peats Ferry Road) Blue Gum Walk Hornsby Aquatic and Leisure Centre A1 Dural StreetS treet PACIFIC HIGHWAY Dural LaneL ane N Lisgar Road 0 100 200m F rederickFrederickF Street Street Figure 4-4 Mountain bike trails and pedestrian trails in the project area (blank page) Hornsby Quarry Road Construction Spoil Management Project 56 Roads and Maritime Services Environmental Impact Statement LEGEND Site Sealed project access road Sealed and widened access road Conveyor Fence around project zone Existing quarry void fence Pedestrian trail Silvia Street Conveyor feeder Truck bridge Gate Existing gate Area being investigated to maintain access to bike trails Mountain bike trail grading (Hornsby Shire Council) Trail proposed to remain open Trail proposed to be closed Hornsby TAFE Hornsby TAFE Quarry Road PACIFIC HIGHWAY (Peats Ferry Road) Blue Gum Walk Hornsby Aquatic and Leisure Centre A1 Dural StreetS treet PACIFIC HIGHWAY Dural LaneL ane N Lisgar Road 0 100 200m F rederickFrederickF Street Street Figure 4-5 Proposed changes to recreational access during the project (blank page) Hornsby Quarry Road Construction Spoil Management Project 58 Roads and Maritime Services Environmental Impact Statement 4.5 Working hours All works and haulage associated with spoil management at the Hornsby Quarry site would be conducted within standard work hours comprising: 7 am to 6 pm Monday to Friday. 8 am to 1 pm Saturdays. No work on Sundays or public holidays. 4.5.1 Out of hours works While no works are anticipated to occur outside of standard hours there may be circumstances where out-of-hours activities associated with the project are necessary. Activities which may be undertaken outside of standard daytime hours (in accordance with Section 2.3 of the Interim Construction Noise guidelines (ICNG) would include the following circumstances: The delivery of materials or oversized plant as required by the Police or other authorities for safety reasons. Where it is required to avoid the loss of lives, property and / or to prevent environmental harm in an emergency. Activities which are determined to comply with the relevant Noise Management Level (NML) at the most affected sensitive receiver, excluding activities associated with the transport and handling of spoil. Such activities may include refuelling of plant and equipment maintenance. Where agreement is reached with affected receivers. Out of hours work may also be undertaken where explicitly approved through an EPL. 4.6 Plant and equipment The equipment and plant listed in Table 4-5 are likely to be used during the project. Table 4-5 Indicative project plant and equipment Project phase Plant and Equipment Preparatory works 2 mulchers 2 water pumps 1 excavator 2 tipper trucks, roller, grader, generator, fuel delivery /service truck, lights. Site establishment works 2 excavators and breaker 1 lifting crane 2 tipper trucks, water cart, wheel loader 2 graders 2 rollers, fuel delivery / service truck 2 generators, concrete truck, concrete pump, 2 vibrators submersible pump, backhoe, lights. Establishment of conveyor 2 excavators and breakers 2 lifting cranes 2 tipper trucks, water cart, fuel delivery / service trucks, concrete truck, concrete pump 2 vibrators, backhoe, submersible pump, generator, delivery trucks, lights. Hornsby Quarry Road Construction Spoil Management Project 59 Roads and Maritime Services Environmental Impact Statement Project phase Plant and Equipment Spoil haulage and 2 belt conveyors emplacement activities 4 dozers, 4 front end loaders 2 rollers 2 articulated dump trucks 1 water cart, delivery trucks 3 generators 2 submersible pumps, lights. Site clean-up, demobilisation 1 dozer and rehabilitation 2 lifting cranes, 2 tipper trucks, fuel delivery / service trucks 2 excavators, generator, water carts, grader, roller. 4.7 Construction materials The construction materials listed in Table 4-6 are likely to be used during the project. Table 4-6 Indicative construction materials Phase Construction materials Preparatory works Fencing. Steel for reinforcement. Cement and concrete. Pavement materials including road base, asphalt, bitumen and aggregate. Materials for lining drainage channels. Wood for use in formwork and other temporary structures. Mechanical and electrical equipment. Site establishment works Fill for Bridge Road upgrade and widening, sourced from the road cutting. Steel for reinforcement. Cement and concrete. Pavement materials including road base, asphalt, bitumen and aggregate. Materials for lining drainage channels. Wood for use in formwork and other temporary structures. Mechanical and electrical equipment. Establishment of conveyor Steel for reinforcement. Cement and concrete. Wood for use in formwork and other temporary structures. Mechanical and electrical equipment. Spoil haulage and Mechanical and electrical equipment. emplacement activities Cement and concrete. Steel for reinforcement. Wood for use in formwork and other temporary structures. Site clean-up, demobilisation Hydro-seeding (or similar) mixture for stabilisation. and stabilisation Mechanical and electrical equipment. Hornsby Quarry Road Construction Spoil Management Project 60 Roads and Maritime Services Environmental Impact Statement 4.8 Rehabilitation and final landform As identified in Table 4-1, following the completion of the project, site facilities would be demobilised and all disturbance areas would rehabilitated and stabilised to a standard as agreed to with Hornsby Shire Council. With respect to the conveyor, all equipment would be removed from site with the exception of the footings. Sealed internal access roads including Bridge Road would be retained unless otherwise agreed to with Hornsby Shire Council. Temporary project facilities would be removed from site and erosion and sediment controls would be kept in place until the site is stabilised. The quarry void would be filled to a level that would facilitate its future use for rehabilitation, this being an approximate height of RL 64, with spoil volumes of up to 1.5 million cubic metres. The filled-in void would be compacted to a level suitable for future use for recreation rather than structural/building capacity. The filled-in void would be stabilised through hydro-seeding or similar as part of site completion works. These rehabilitation measures would allow the handover of the site back to Hornsby Shire Council in an appropriately stabilised state to enable the site to be managed by Hornsby Shire Council in the interim period before its eventual rehabilitation into recreation land use. Following handover of the site, any ongoing works including works associated with the maintenance of the site would be the responsibility of Hornsby Shire Council unless otherwise agreed between Roads and Maritime and Hornsby Shire Council prior to the commencement of the works. Following site completion works, the site would revert back to the responsibility of Hornsby Shire Council. It is anticipated that existing monitoring bores on site would continue to be monitored by Hornsby Shire Council post-completion as part of the ongoing maintenance of the site (unless otherwise agreed to between parties) to monitor the stabilisation of groundwater levels post-filling. Dewatering of the quarry void would be undertaken on an as-required basis post-completion (informed by groundwater monitoring results) in accordance with the conditions of Hornsby Shire Council's existing groundwater licence, until groundwater drawdown levels into the quarry stabilise. The eventual rehabilitation of the site to recreational land use is not part of the current project. After completion of the Hornsby Quarry Road Construction Spoil Management Project, the final land form and land use for the site would be determined by Hornsby Shire Council and implemented as part of long-term plans for the site by Hornsby Shire Council, which would be the subject of a separate planning approval. Hornsby Quarry Road Construction Spoil Management Project 61 Roads and Maritime Services Environmental Impact Statement (blank page) Hornsby Quarry Road Construction Spoil Management Project 62 Roads and Maritime Services Environmental Impact Statement Chapter 5 Consultation 5 Consultation This chapter describes the communication and engagement activities carried out to date during the project’s development and the preparation of the EIS. Table 5-1 outlines the community consultation requirements from the SEARs and where these have been addressed in the EIS. This chapter also outlines the consultation process for the public exhibition of the EIS and the consultation activities planned during the project, should it be approved. Table 5-1 SEARs - consultation SEARs Where addressed in this EIS During the preparation of the EIS, you must consult with Information regarding consultation is the relevant local and State Government authorities, provided in this chapter. service providers, community groups and affected landowners. In particular you must consult with: Local, State and Australian government authorities, Consultation with government including the: authorities and emergency services