PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT (PCGIP) THE WORLD BANK FUNDED Entity Name: EDO (W&S) City

Cost as per Sr.No. Name of Scheme Procurement Award Amount Plan

Repair/Improvemnet of Road from Bakkar Mandi Shaikh Colony to Bilawal 1 Town Via Green Belt Gulshan-a-Hayat 38.854 33.36 to Shahbaz Town C Block, Faisalabad. Lenghth: 4.90KM

Repair / Improvement of Maqbool Road From Samundari Road, Ghosia Chowk, Allama Iqbal Colony With Links 2 32.196 28.19 Manzoor Sizing , Madina Street, Dograwan Road CNG, Faisalabad. Length : 3.30 KM Repair/Improvement of Road from Dawood Textile Mill (Sargodha Road) 3 to Samana Pull via Chak No 7 JB Zeenat 30 26.28 Town, Ghafoor Town, Faisalabad: Length: 3.3 KM Repair/Improvement of road from Saleemi Chowk Habib Jalib Road to 4 15.589 11.91 Naaz Khialvi Road, Faisalabad. Length 0.80km Rehablitation of road from Maqbool road to Pahari wali Ground opposite 5 21.334 17.71 Shahr-e-Itehad Faisalabad. Length 1.0Km Repair/Improvement of road from Imam 6 Bargah Fauji Chowk to link Tali Shah 20.008 17.27 Chowk Faisalabad. Repair/Improvement of Road from Jattan Wala Chowk to Peeranawala 7 Chowk alongwith Gangda Nala to 18.893 18.19 Liaqat Chowk, . Faisalabad

8 Repair/Improvement of roads in Sarfaraz 13.975 11.14 Colony and Almasoom Town Faisalabad

9 Repair/Improvement of Bridges at 20.7 17.77 Nishat abad, Abdullah Pur and Novelty. Repair or Road From Tariq Abad Phatak 10 to Shadman Cinema (Green Dot School 13 10.01 ), Faisalabad Repair / Improvement of Road From Chowk Raza Abad to Narwala Road Via 11 13.286 12.27 Milad Road, Gulshan Colony, Faisalabad. Length : 4010 Rft

Repair/Improvement of Road from Chak 12 No 204 Rb Road to Grammaer 12.553 10.60 School to Eden Garden in Khayaban Colony No. 3 Faisalabad. Length:1Km Repair / Improvement of Road at Main 13 Road People Town Gally No. 6 12.295 11.52 Faisalabad. Lehgth : 1300 Rft

Repair/Improvement of Jail Road from 14 12.288 10.64 Liaqat road chowk to Jinnah Colony Gate Faisalabad (Only left Side)

Repair/Improvement of road from 15 11.976 10.69 Muhammadi Chowk to Gulshan-e-Rafiq Samanabad, Faisalabad. Length 1.20Km Repair/Improvement of road from Eid 16 Gah chowk to Chiristian Graveyard, 11.812 10.04 Manan Town Faisalabad Repair/Improvement of Roads in People 17 10.994 9.74 colony No. 2 Faisalabad Rehablitation of Road fro Pahari Wali 18 Ground to Haseeb Shaheed Park 10.86 8.91 Faisalabad. Repair/Improvement of Road from 19 Sargodha Road to Madina Teaching 10.5 10.00 Hospital, Faisalabad. Repair/Improvement of Road from Canal Road Chak No. 203/RB to 20 9.791 7.89 Sheikhupura Road Near Cricket Stadium Faisalabad. Length: 1.0KM

Repair/Improvement of Rao Zaheer road 21 9.631 8.60 from Rasheed Nagar to Khadim Chowk.

Repair/Improvement of road from Raja 22 Chowk Siddiqia Masjid to Dagranwaan 9.07 6.50 Road, Faisalabad Repair / Improvement of Road From Korian Road to Asim Town, Iron 23 8.32 7.22 Market, Faisalabad. Length 0.46 KM(1520 Rft) Repair/Improvement of road from Chatri 24 Chowk to Mujahid abad Colony 7.888 7.06 Faisalabad, length, 0.90 Km Repair / Improvement of Road from 25 Sabri Darbar road to 7.883 6.52 road, Faisalabad Repair/Improvement of road Hajveri 26 road to Gulshan-e-Rafique, Faisalabad 7.556 6.89 0.90Km Rehabilitation of Road from Sant Singh 27 Wala Phatak to Sheikhupura Road, 6.94 5.43 Faisalabad. Lenghth: 1.20KM Repair / Improvement of Road From Jhumra Road Bismillah Hotel to west 28 6.757 5.64 Canal Service Road, Faisalabad. Length : 1.30 KM Repair/Improvement of roads in D Type 29 colony and Allama Iqbal Colony, 6.641 5.89 Faisalabad

30 Repair/Improvement of road from main 6.636 5.91 bazar Raja Park Faisalabad, 0.80 Km Repair /Improvement of road from bridge Samanabad to Rashid Nagar 31 Gulshan-e-Rafique via Dakan school 6.006 5.30 street no 2 Nisar Colony, Faisalabad, Length 0.90 Km

32 Repair/Improvement of Malkhanwala 5.532 4.86 road from Church to Drain (Ganda nala) Repair/Imprvement of Road from Shiekhupura Road From to 33 5 5.43 Chota Manawala Faisalabad with Bituminous sand sealer (5.00 M) Rehabilitation of Slip Road at Halal-a- 34 5.591 3.60 Ahmar Chowk, Faisalabad.

35 Repair of Road From Khadeja Memorial 4.78 4.17 Hospital to Tower Road, Faisalabad Repair / Improvement of Road in Malik 36 Pur, Faisalabad. Length : 1.04 KM 4.719 4.07 (3400 Rft) (4.719 M) 1. Repair / Improvement of Ch. Faqeer Muhammad Road From Ghau-Shala to Grayard, Nazim Abad, Faisalabad. 37 Length : 1.20 Km 4.654 3.781 2. Rehabilitation of road from Korian road to Sindoo Town Graveyard road, Faisalabad Repair/Improvement of Sports Facilities at Sports Complexes Crescent, G.M 39 24 24.00 Abad, Al-Fatah and Road, Faisalabad

Repair/Improvement of the offices of 40 6.054 6.054 District Officer Environment & District Officer Civil Defense, Faisalabad. Repair/Improvement of road from Samandabad Railway crossing factory 41 14.542 Tendring In Process Haji Ashraf to Raja Park via Disposal Work Length. 1.30Km Repair/Improvement of road Back Side 42 Iqbal Stadium, Faisalabad Length 12.952 Tendring In Process 1.29Km Repair/Improvement of Rad from Eid Gah Road Sheikhan wala Phatak (Along 43 10.03 Tendring In Process Railway Line) Faisalabad Length:1.20Km Repair/Improvement of Noor Ansari Road along Link Guddo Bakkarian 44 6 Tendring In Process Wali, Bholi Nashty Wla and road along tanki wala park Length0.82Km Repair/Improvement of Road from Samandabad road to Masjid Qari Ali 45 5.957 Tendring In Process Sher and Rana Chowk Faisalabad Length 0.83 Km Repair/Improvement of Road from Hadibia CNG to Jawala Nagar phatak 46 6.263 Tendring In Process and main road Jawala Nagar Faisalabad. Length 0.80Km

Repair/Improvement of Road from 47 2.58 Tendring In Process Tayyab Masjid Aminabad No. 2 Samandabad Faisalabad Length 0.30Km Repair/Improvement of road from Mirza 48 Younas Wali street Muzzafar Colony, 2.971 Tendring In Process Faisalabad Length, 0.30Km Repair/Improvement of Road from Nisar 49 Colony road to Qari chowk, Faisalabad 2.757 Tendring In Process 0.30Km Repair/Improvement of Road from Rahmania Town road to Dilkhoush 50 3.555 Tendring In Process garden to Jhang road Faisalabad Length 0.85Km Repair/Improvement of road from 51 Jameelabad Chowk to Chibban Road, 3.769 Tendring In Process Faisalabad, Length; 1700RFT Repair/Improvement of Slip Road at Tendring In Process 52 Gummti chowk Length: 450RFT 5.871 Total 561.809 421.039 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT (PCGIP) THE WORLD BANK FUNDED City Faisalabad Year 2013-14

Total Payment Made Savings Current Status as per FMS statement

30.003 5.496 In Progress

0 4.009 In Progress

26.28 3.722 In Progress

1.818 3.68 In Progress

5.399 3.626 In Progress

2.2 2.742 In Progress 14.655 0.706 In Progress

8.241 2.838 In Progress

17.518 2.931 In Progress

6.997 2.992 In Progress

0 1.016 In Progress

10.032 1.956 In Progress

4.655 0.771 In Progress

10.572 1.65 In Progress

5.134 1.283 In Progress

9.918 1.768 In Progress 4.802 1.256 In Progress

4 1.95 In Progress

4 0.501 In Progress

3 1.904 In Progress

0 1.033 In Progress

0 2.567 In Progress

6.656 1.103 In Progress

2.635 0.83 In Progress

3.5 1.365 In Progress

3.034 0.666 In Progress

0 1.507 In Progress 1 1.122 In Progress

5.448 0.752 In Progress

3.24 0.722 In Progress

4.098 0.704 In Progress

2.4 0.673 In Progress

3.645 -0.434 In Progress

1.27 1.992 In Progress

2 0.606 In Progress

0 0.645 In Progress

1.392 0.873 In Progress 0 0 In Progress

0.000 0 In Progress

Tendring In Process

Tendring In Process

Tendring In Process

Tendring In Process

Tendring In Process

Tendring In Process

Tendring In Process Tendring In Process

Tendring In Process

Tendring In Process

Tendring In Process

Tendring In Process

209.542 63.523