ECC/ District Local Highways Panel Scheme List 2012/13 Version 6 Minor Schemes

Estimated Timescale Parish / Assuming Town Requested smooth ID Division Council Location Scheme Problem Justification / Comments By Estimated Cost (£) progress

Request for VAS due to current high speeds. Proximity to school and support from local representatives. No adverse £3,500 mains comments associated with this proposal, however agreement Historic powered VAS; 7 C&LB Manor Road, Chigwell VAS Speeding 3 months would need to be sought from the Parish Council for support scheme list £4,500 solar in funding any future maintenance costs associated with the powered VAS VAS

Pedestrian guardrail at Thomas Pupils entering carriageway from new Member of 8 IT836 C&LB The Broadway, Loughton 2k 3 months Willingale School school exit. Public

£6,000 feasibility There are stats in the area. It may be possible to install a design. Works ~ Manor Road j/w Vicarage Turning movements are difficult due to mini-roundabout or alter the priority of the junction. Initial Historic 9 C&LB Chigwell Junction improvement £40,000 £30K 9 months (total) Lane, Chigwell junction arrangement designs / liaison with stats companies to be undertaken scheme list maximum agreed before the scheme can be confirmed. for scheme

It was noted that there were reasonable gaps in traffic to allow pedestrians to cross safely at most times. Vehicle speeds are relatively low, there is a crossing at the south of A113 High Road; Dolphin the site. The existence of the right turn lane means that Historic £7,500 per 10 C&LB Chigwell Pedestrian refuge Difficult to cross 6 months Court, Chigwell positioning a refuge in that area will be difficult. A refuge scheme list pedestrian refuge could be installed prior to the commencement of the filter lane in the area of Dolphin Court. On the Strategic Network - will require specific sign off.

Unclear where zebra crossings are. Chigwell Rise is Traffic Calming on app to zebra Member of 11 IT366 C&LB Chigwell Chigwell Rise, Chigwell Speeding. strategic route - two collisions within residential stretch of N/A N/A crossings Public route. Against Policy.

60mph strategic route. Traffic calming against policy. Site Member of 12 IT370 C&LB Chigwell Gravel Lane, Chigwell Speeding Issues traffic calming Speeding N/A N/A being progressed as Yr. 1 Safety Scheme. Public

The road is too narrow for a refuge. Limited pedestrian flows, A123 Hainault Road, formal crossing not appropriate (potentially dangerous). Historic 13 C&LB Chigwell Traffic calming/speed reduction Difficult to cross. N/A N/A Chigwell Traffic calming may help but the A123 is a priority 1 route, so scheme list traffic calming would be against policy.

(Pedestrian phasing has been installed at the junction of Manor Road and Fencepiece). Road too narrow for refuges. Could accommodate formal crossing. limited pedestrians £170,000 for puffin B173 Manor Road j/w Junction improvement/pedestrian Junction perceived as dangerous. crossing (park and nursery create demand). Altering the flow Historic crossing; 10,000 for 14 C&LB Chigwell 9 months Stanwyck Road, Chigwell refuge Difficult to cross road. at the junction could improve the situation - this would have a scheme list investigating flow knock-on effect so would require investigation. Any junctions patterns. changes could incorporate traffic calming elements. Strategic route any measures will require sign off.

Chigwell and Loughton Broadway Division Page 1 of 9 ECC/ Local Highways Panel Scheme List 2012/13 Version 6 Minor Schemes

Estimated Timescale Parish / Assuming Town Requested smooth ID Division Council Location Scheme Problem Justification / Comments By Estimated Cost (£) progress £170,00 if a suitable There is limited available locations due to the presence of location is found for crossovers. Not high pedestrian flows, no recorded collisions, a puffin crossing; B173 Manor Road j/w perceived as dangerous due to traffic speed and behaviour. £7,500 per refuge is Historic 15 C&LB Chigwell Tomswood Road, Signal controlled crossing Difficult to cross road Consider signalizing the junction with pedestrian phase. an alternative, 9 months scheme list Chigwell Traffic calming features could reduce the speed and improve should a suitable safety for drivers. Strategic route, measures will require location not be specific sign off. found; £40,000 zebra crossing Request for crossing, however no suitable location. Alternative maybe to signalise Turpin's Road / Manor Road Historic 200,000 for signal- 16 C&LB Chigwell Turpins Lane, Chigwell Signal controlled junction Difficult to cross road 9 months junction. High collision history at junction. Manor Road is on scheme list controlled junction. strategic network, so would require sign off.

Gravel Lane j/w Maypole Already has existing junction protection. Extra signage could Historic 17 C&LB Chigwell Junction improvements Unclear problem N/A N/A Drive, Chigwell confuse drivers and add unnecessary street clutter scheme list

Introduction of one or two speed humps. Application made in Oak Lodge/Grange Hill, Historic 18 C&LB Chigwell Traffic calming Speeding response to complaints received from the residents. Unclear Approx. £15,000 Chigwell scheme list location. More information required.

Chigwell and Loughton Broadway Division Page 2 of 9 ECC/Epping Forest District Local Highways Panel Scheme List 2012/13 Version 6 Small Works

Parish / Requested Estimated ID Division Town Location Scheme Other issues / comments Timescale RAG By Cost Council

BH&LS No Schemes identified C&LB No Schemes identified LC No Schemes identified NW&N No Schemes identified O&R No Schemes identified WA No Schemes identified RAG KEY Division key Green A high priority scheme against strategic criteria BH&LS Buckhurst Amber A low priority scheme against strategic criteria C&LB Chigwell & Red A scheme which is against Policy or there is no appropriate engineering solution. E&TB Epping & Pending validation LC Loughton Scheme prioritised for funding 2012/13 NW&N North Weald O&R Ongar & Rural WA

Chigwell and Loughton Broadway Division Page 3 of 9 ECC/Epping Forest District Local Highways Panel Scheme List 2012/13 Version 6 Bus Stop/ Route Improvements

Division Priority Parish / Town Type of Issues / Comments / Reason Approx Estimated Location Details of Scheme Scheme Origination (RAG) Council Scheme for Scheme Timescale Cost

BH&LS No scheme identified C&LB No scheme identified LC No scheme identified NW&N No scheme identified O&R No scheme identified WA No scheme identified RAG KEY Division Key Green A high priority scheme against strategic criteria BH&LS & Loughton Amber A low priority scheme against strategic criteria C&LB Chigwell & Loughton Red A scheme which is against Essex Policy or there is no appropriate engineering solution. E&TB Epping & Pending validation LC Loughton Central Scheme prioritised for funding 2012/13 NW&N North Weald & Nazeing O&R Ongar & Rural WA Waltham

Chigwell and Loughton Broadway Division Page 4 of 9 ECC/ Epping Forest District Local Highways Panel Scheme List 2012/13 Version 6 School Crossing Patrol Sites

Division Parish Site No School Location of patrol Work required Problem Origin of Total Timescale RAG /Town request Estimated Council Costs

Thomas Willingale Rd, Site safety 2 C&LB Loughton 10407 Willingale Extend school keep clear markings to bus stop Issues raised with site safety assessment 1.18k 3 months Green Loughton assessment Primary School Hereward Colebrook Lane, Parking restrictions opposite school to prevent Site safety 3 C&LB Loughton 10404 Issues raised with site safety assessment 1.77k 6 months Green Primary School Loughton parking on patrol site assessment

Chigwell and Loughton Broadway Division Page 5 of 9 ECC/Epping Forest District Scheme List 2012/13 Version 6 Essex Intelligent Traffic Systems Local Highways Panel Parish / Budgetary Mandatory Ref Division Town Location Measure Benefit Cost work Council RAG BH&LS No schemes identified C&LB No schemes identified E&TB No schemes identified LC No schemes identified NW&N No schemes identified O&R No schemes identified WA No schemes identified RAG Key Green A high priority scheme against strategic criteria Amber A low priority scheme against strategic criteria Red A scheme which is against Essex Policy or there is no appropriate engineering solution. Pending validation General Key SCOOT Split Cycle and Offset Optimisation Technique. This calculates the flow of vehicles along each spur of a junction and can then calculate the timings of the signals required to deal with heavier or lighter amounts of traffic during each cycle of the signals. Particularly good for peak and off-peak periods.

OTU Outstation Transmission Unit. These are in signals and are controlled via the SCOOT system.

RMS Remote Monitoring System. This allows the signals to report back to the main system in Threadneedle House to say that something is wrong with them.

MOVA Microprocessor Optimised Vehicle Actuation. Similar to SCOOT but works better for isolated signals rather than larger junctions.

Chigwell and Loughton Broadway Division Page 6 of 9 ECC/Epping Forest District Local Highways Panel Schemes List 2012/13 Version 6 Cycling Schemes

Parish / Town Estimated ID Division Council Location Scheme Problem Scheme sponsor Cost (£) Timescale RAG BH&LS No schemes identified C&LB No schemes identified E&TB No schemes identified LC No schemes identified NW&N No schemes identified O&R No schemes identified WA No schemes identified

RAG Key Division Key Green A high priority scheme against strategic criteria BH&LS Buckhurst Hill Amber A low priority scheme against strategic criteria C&LB Chigwell & Red More information required. E&TB Epping & Pending validation LC Loughton NW&N North Weald & O&R Ongar & Rural WA Waltham

Chigwell and Loughton Broadway Division Page 7 of 9 ECC/Epping Forest District Local Highways Panel Scheme List 2012/13 Version 6 Public Rights of Way

Parish / Town PROW Division Parish Status Scheme Problem By From Timescale Cost (£) Notes RAG Council Number

BH&LS No schemes identified C&LB No schemes identified E&TB No schemes identified LC No schemes identified WA No schemes identified Division Key RAG Key BH&LS Buckhurst Hill & Loughton South Green A high priority scheme against strategic criteria C&LB Chigwell & Loughton Broadway Amber A low priority scheme against strategic criteria E&TB Epping & Theydon Bois Red A scheme which is against Essex Policy or there is no appropriate engineering solution. LC Loughton Central Pending validation NW&N North Weald & Nazeing Scheme prioritised for funding 2012/13 O&R Ongar & Rural WA Waltham Abbey

Chigwell and Loughton Broadway Division Page 8 of 9 ECC/Epping Forest District Scheme List 2012/13 Version 6 Casualty Reduction Schemes Local Highways Panel Division

Parish / Town Ref No. Council Location Proposed Solution Timescale Cost (£) RAG

Manor Road j/w Tomswood 1 23 C&LB Chigwell Signalise junction (by SA2000) £179K, alternative scheme £30K TBC 179k £30K Green Road, Chigwell

Chevrons, verge markers and lines. Speed limit reduction 2 24 C&LB Chigwell Gravel Lane, Chigwell (£3,000.00, FYRR 1762). Possible resurfacing (£30,000.00, TBC 3k Green FYRR 176). Outside Patsalls, Pudding Improve drainage, Include Pudding Lane in winter gritting 3 26 C&LB Chigwell TBC 30k Green Lane, Chigwell programme. Possible resurface. Division Key RAG Key BH&LS Buckhurst Hill & Loughton South Green A high priority based on Collision history C&LB Chigwell & Loughton Broadway Amber A medium priority based on Collision History E&TB Epping & Theydon Bois A scheme which is against Essex Policy or there is no LC Loughton Central Red appropriate engineering solution. Scheme pending Validation NW&N North Weald & Nazeing Scheme prioritised for O&R Ongar & Rural WA Waltham Abbey

Chigwell and Loughton Broadway Division Page 9 of 9