PASB . PASB . PASB . PASB . PASB . PASB . PASB . PASB KLIST OF CONTENTJ INFORMATION KEY PERSONNEL ORGANIZATION STRUCTURE MACHINERIES, VEHICLE & EQUIPMENT CREDIT FACILITIES BANK FACILITIES & STATEMENT BANK WORK EXPERIENCE LETTER AWARDED REGISTRATION APPENDICES KINFORMATIONJ PRESTASI ASIA (M) SDN. BHD.

COMPANY BACKGROUND PRESTASI ASIA (M) SDN. BHD. (PASB) is a fully owned Bumiputra Company registered as CLASS ‘A’ with PKK and GRED ‘7’ UNLIMITED with CIDB. PASB was established in 1992 with a paid-up capital of RM2,200,000.00. PASB commenced operation as a contractor in patching potholes. Being a fast growing, dynamic and ambitious contractor, now PASB has attained its core expertise in pavement. For the last 11 years of establishment PASB has successfully completed pavement works, earthwork, drainage work pipe work, bridge work, building work and other associated work ranging from HIGHWAYS to AIRPORTS. This is not an end. In the area of New Millennium PASB has advanced to acquire the State Of The Art Technilogy. This is to ensure that PASB could comply with the various needs of our esteemed Client. With an array of skills, experience and technology, PASB provide the following expertise in PAVEMENT TECHNOLOGY: ¾ Soil Stabilization ¾ Mill & Pave ¾ Very Thin Overlay ¾ Stone Mastic Asphalt ¾ Earthwork ¾ Drainage ¾ Structure ¾ Soft & Hard Landscaping PRESTASI ASIA (M) SDN. BHD.

GENERAL CORPORATE INFORMATION

Company Name : PRESTASI ASIA (M) SDN. BHD. (Nama Syarikat)

Registered Address : 31-1, Jalan 3/27B, (Alamat Berdaftar) Seksyen 10, Wangsa Maju, 53300 Kuala Lumpur.

Office Address : Lot 3603, Jalan Sungai Pusu, (Alamat Pejabat) 53100 Gombak, Kuala Lumpur. Tel: 03-6187 4416 / 4417 Fax: 03-6188 2411 E-mail : [email protected] Website : www.rubinga.com

Date of Inc with ROC : 08th August 1992 (Tarikh Ditubuhkan)

Company Registration : 246309-W (Nombor Pendaftaran)

Nature of Business : Construction in Civil and Road Works (Perniagaan Yang (PKK registered class A contractor) Dijalankan)

Authorized Capital : RM 5,000,000.00 Only (Modal Dibenarkan)

Paid-up Capital : RM 2,200,000.00 Only (Modal Berbayar)

Shareholder : PRESTASI ASIA (M) SDN. BHD (Pemegang Saham)

Board of Directors : HJ RUSNAN BIN NGADIO (Managing Director) - 98% (Lembaga Pengarah) FIRDAUS BIN RUSNAN (Director) - 2% PRESTASI ASIA (M) SDN. BHD.

GENERAL CORPORATE INFORMATION

Company Secretary : AIM WANGSA CONSULTANCY (Setiausaha Syarikat) 31-1, Jalan 3/27B, Seksyen 10, Wangsa Maju, 53300 Kuala Lumpur.

Company Auditor : AGS Advisory (Juruaudit Syarikat) D-3-12, Plaza Damas, 60, Jalan Sri Hartamas 1, Sri Hartamas, 50480 Kuala Lumpur.

Company Advocates : ZAINAL & BADROL & Solicitors Lot 2.15, 2nd Floor, (Panel Peguam) Angkasaraya Building, Jalan Ampang, 50450 Kuala Lumpur. PRESTASI ASIA (M) SDN. BHD.

GENERAL CORPORATE INFORMATION

Panel of Banks : MALAYAN BANKING BERHAD (MBB) (Panel Bank) Lot 3799, Pasar Moden, Batu 5, Jalan Gombak, 53000 Kuala Lumpur. Acct No.: 514226300095 (1) 514226001650 (2) 564221213880 (3) 564221213135 (4)

BANK MUAMALAT BERHAD HQ, Menara Bumiputra, 21, Jalan Melaka, Peti Surat 10407, 50913 Kuala Lumpur. Acct No.: 14030003211714 14035004132719

BANK ISLAM BHD. Cawangan UIAM Gombak, C1, Central Kompleks, UIAM, Jln Gombak, 53100 Kuala Lumpur. Acct No.: 14162010003863

RHB Berhad Branch Jalan Ipoh Acct No.: 2642090002655 2642090007193

Bumiputra Commerce Berhad (BCB) USJ Subang Jaya, Darul Ehsan. Acct No.: 1209000958058 KKEY PERSONNELJ PRESTASI ASIA (M) SDN. BHD.

KEY PERSONEL

NO. NAME QUALIFICATION POSITION EXPERIENCE 1. HJ RUSNAN BIN NGADIO BEC.SC (USA) MANAGING DIRECTOR 21 years in Project Management & 630426-10-7363 Road / Highway Maintenance 2. FIRDAUS BIN RUSNAN DIP. BUSINESS ADMINISTRATION DIRECTOR 2 Years in Management 870604-02-5743 (IIC) 3. FITRI ELINA BT BAHRI DIPLOMA IN CIVIL ENGINEERING PERSONAL ASSISTANT 1 Years in Administration Works 860326-33-5530 4. MUHAMMAD AZWAN BIN MAT JUSOH CERT.IN CIVIL ENGINEERING PROJECT MANAGER 10 years In Management Road Work 780720-03-5843 (POLITENIK) 5. WAN MOHD ASRI BIN WAN MOHD POUZAN CERT.IN CIVIL ENGINEERING SITE SUPERVISOR 10 years in Project Management & Road Site 720102-03-6801 (POLITEKNIK) Maintenance 6. ADAM RADZWAN BIN ABDUL RAZAK DEGREE IN CIVIL ENGINEERING SITE ENGINEER 870402-01-6101 7. MOHD PERWIRA SETIA IRWAN SPM SITE SUPERVISOR 15 years in Roadwork & Machinery 720625-06-5257 8. MOHD SAHRIN BIN AMARAN SPM ASISTANT SITE 16 years in Roadwork & Machinery 790724-06-5045 SUPERVISOR 9. ROSDY BIN SELAMAT SPM ASISTANT SITE 15 years in Roadwork & Machinery 820923-04-5607 SUPERVISOR PRESTASI ASIA (M) SDN. BHD.

KEY PERSONEL

NO. NAME QUALIFICATION POSITION EXPERIENCE 10. RIDWAN BIN ALI SPM LORRY DRIVER 10 years in Driving 811024-10-5499 11. RASID BIN KASIM - MECHANIC 20 Years in Repairing 630307-71-5569 12. MUHAMMAD NAZRY BIN SULAIMAN CERT.IN WOOD INDUSTRI SITE 5 years in Roadwork & Machinery 840902-03-5459 13. AMARATUL RAHMAN BIN AHMAD - SITE 5 years in Roadwork & Machinery 850517-14-5757 KORGANIZATION STRUCTUREJ PRESTASI ASIA (M) SDN. BHD.

(HQ) ORGANIZATION CHART - MANAGEMENT

MANAGING DIRECTOR (HJ. RUSNAN B. NGADIO)

DIRECTOR (FIRDAUS B. RUSNAN)

PROJECT ADMIN CLERK SITE PERSONAL ASSISTANT SITE ENGINEER ASST.SITE MANAGER (RIDZUAN B. TAJUL ENGINEER ASSISTANT ACCOUNT (AHMAD AFIQ SUPERVISOR (MUHAMMAD ARIF) (ADAM (FITRI ELINA BT (SALINA LUBIS BT. ABDUL AZIS) ( ROSDY BIN AZWAN) RAZWAN) BAHRI) AMINUDDIN) SELAMAT) PRESTASI ASIA (M) SDN. BHD.

(SITE) ORGANIZATION CHART – OPERATIONS SITE MANAGEMENT

MANAGING DIRECTOR (HJ. RUSNAN B. NGADIO)

DIRECTOR (FIRDAUS B. RUSNAN)

PROJECT MANAGER (MOHD AZWAN B. MAT JUSOH)

SITE ENGINEER (AHMAD AFIQ ABDUL AZIS)

SITE ENGINEER (ADAM RADZWAN B. ABDUL RAZAK)

SITE SUPERVISOR SITE SUPERVISOR ASSITANT SITE SUPERVISOR (WAN MOHD ASRI B. WAN (MOHD PERWIRA SETIA IRWAN) (ROSDY BIN SELAMAT) MOHD FOUZAN)

SITE CONSTRUCTION SITE CONSTRUCTION OPERATOR MACHINE (GENERAL WORKER) (GENERAL WORKER) SITE WORKER) KMACHINERIES, VEHICLE & EQUIPMENTJ PRESTASI ASIA (M) SDN. BHD.

MACHINERIES & EQUIPMENT NO. VEHICLE MODEL REG. NO. NO. VEHICLE MODEL REG. NO. 1. MILLING MACHINE WIRTGEN WFU 807 21. LOW TRAILER TA 8162 2. MILLING MACHINE WIRTGEN WFA 3435 22. LORRY CCM 4566 3. MILLING MACHINE WIRTGEN WJX 7426 23. LORRY BGY 6635 4. ROAD ROLLER SAKAI JKN 2488 24. LORRY ISUZU WQA 2519 5. ROAD ROLLER SAKAI JEU 2599 25. LORRY ISUZU WFE 2788 6 ROAD ROLLER DYNAPAC JKG 4497 26. LORRY ISUZU MBR 4900 7. ROAD PAVER DYNAPAC WKS 9162 27. LORRY DAIHATSU WBT 3923 8. ROAD PAVER SUMITOMO JEU 2630 28. LORRY DAIHATSU JEJ 5261 9. ROAD PAVER SUMITOMO BJT 1160 29. LORRY HICOM WJQ 2718 10. ROAD PAVER / TRAKTOR TANAH SUMITOMO AGH 6850 30. LORRY BDD 6965 11. ROAD PAVER BARFORD JAH 7994 31. STIHL CHAIN SAW C/W 25’ 12. ROAD PAVER DYNAPAC WDL 9476 32. ORIMAS CONCRETE CUTTER 13. BACKHOE LOADER / EXCAVATOR HITACHI WKX 106 33. FURUKAWA AIR BREAKER 14. BACKHOE LOADER / EXCAVATOR HITACHI WDS 1482 34. CORING MACHINE 15. BACKHOE LOADER / EXCAVATOR HITACHI WNL 3574 35. DIAMAX DIAMOND CONE BIT 16. BACKHOE 580 SE WSQ 5400 36. ROBIN PETROL ENGINE EY20 17. BACKHOE LOADER / EXCAVATOR 580 E WDM 9760 37. MAKITA DEMILITION HAMMER 18. COMPACTOR ROLLER DYNAPAC WAL 5600 38. CONCRETE CUT& ASPHALT 19. TANDEM ROLLER BETELLI WDG 2694 39. WELDING MACHINE 20. LOW LOADER AFX 4444 PRESTASI ASIA (M) SDN. BHD.

MACHINERIES & EQUIPMENT NO. VEHICLE MODEL REG. NO. NO. VEHICLE MODEL REG. NO. 1. TOYOTA HARRIER TOYOTA NAN 4566 20. PROTON WIRA PROTON WNE 9523 2. TOYOTA HARRIER TOYOTA 21. PROTON WIRA PROTON NAN 1162 3. TOYOTA HILUX TOYOTA WPU 4566 22. PROTON ISWARA PROTON WGC 3675 4. TOYOTA ESTIMA TOYOTA BGU 4466 23. PROTON SAGA PROTON WCS 558 5. TOYOTA LITEACE TOYOTA WEV 9346 24. PROTON SAGA PROTON BDL 2657 6. LAND CRUISER TOYOTA BDD 6965 25. JIP SUZUKI WVN 4566 7. FORD RANGER FORD WHX 8826 26. SYM WVV 4566 8. MERCEDES BENZ WMD 4566 28. KRISS MODENAS WJP 7021 9. NISSAN NAVARA NISSAN WSM 4566 29. KRISS MODENAS WJP 7212 10. SUZUKI JIMMY SUZUKI WER 3483 30. ELEGAN MODENAS WMP 4566 11. SUZUKI (JEEP) SUZUKI WBY 913 31. HONDA C100 HONDA WKS 9102 12. SUZUKI SUZUKI BDJ 4571 32. HONDA C100 HONDA WKS 9094 13. HONDA CRV HONDA WQQ 4566 33. HONDA C 100 HONDA BHN 9683 14. STORM MITSUBISHI WKN 4566 34. HONDA C100 HONDA BFC 6535 15. KEMBARA PERODUA WJN 6685 35. HONDA NF 100 HONDA WGQ 9965 16. KEMBARA PERODUA BHK 5312 17. KEMBARA PERODUA WJD 4017 18. PERODUA MYVI PERODUA WNA 2728 KCREDIT FACILITIESJ PRESTASI ASIA (M) SDN. BHD.

LIST OF SUPPLIERS AND TRADE CREDIT FACILITIES

PRODUCT SUPPLIERS 1. COMPUTER FORMS & MEDIA SDN BHD 2. POLIKLINIK SHAH 3. DS LINK TRONICS ENTERPRISE 4. SUN BLINDS (M) SDN BHD STATIONERY / FURRNITURE / CLINIC 5. CT PHOTO TRADING 6. GROUSIEY PRINTHOUSE 7. ANJAKAN JAYA SDN BHD 8. SINAR QULAAN ENTERPRISE

CRANE 1. HUP YAP CONTRACTOR & CRANE SERVICES

1. BINA JITU ENGINEERING CONCRETE 2. I-MIX CONCRETE INDUSTRIES SDN BHD DIESEL / THERMORPLASTIK / 1. BHP MALAYSIA SDN BHD SIGNBOARD / HYDROLIC OIL 2. SHELL 3. EXXOBRITE SDN. BHD. 4. OMITECH ROAD SYSTEM (M) SDN. BHD. 5. SUTERA UNGGUL ENTERPRISE 6. SIGNCOMS TRADING 7. SYARIKAT BUNGA RAYA 1. FUJI XEROX ASIA PACIFIC PTE LTD 2. KOMBINASI AKTIF SDN BHD COMPUTER & PHOTOSTAT MACHINE 3. RISYS-TECH SDN BHD 4. SANJIN CORPORATION SDN BHD 1. DATA SURVEY SERVICES SDN BHD 2. ELEKTRIK JALIN DUA WIRING / SURVEYOR 3. EXCEL ENGINEERING SURVEY 4. JURUKUR SETIA 5. SYARIKAT ISMAIL BIN MOHAMAD PRESTASI ASIA (M) SDN. BHD.

LIST OF SUPPLIERS AND TRADE CREDIT FACILITIES

PRODUCT SUPPLIERS

1.ACP-DMT SDN BHD 2.GOLDEN PLUS GRANITE SDN BHD 3.HANSON QUARRY PRODUCTS (CENTRAL) SDN BHD 4.HANSON QUARRY PRODUCTS (PREMIX) SDN BHD QUARRY 5.HANSON QUARRY PRODUCTS SDN BHD 6.KENNEISON CONSTRUCTION MATERIALS SDN BHD 7.KENNEISON QUARRIES SDN BHD 8.SUNWAY QUARRY INDUSTRIES SDN BHD 9.SELANGOR INDUSTRIAL CORPORATION SDN BHD

1.BANYAN AUTO SDN BHD 2.THOONG LOON TYRE BATTERY SDN BHD 3.TRIANGLE ENGINEERING & METAL WORKS SDN BHD 4.AKITA AUTO REPAIRS 5.BENGKEL MOTOR KERETA KERLING 6.CACO HEAVY MACHINE SERVICE 7.HING SING TYRE TRADING WORKSHOP 8.LIM AIK GUAN 9.MITHONISTODA PERFORMANCE ENTERPRISE 10.OON SOON WORKSHOP 11.RAJA SHAKAR A/L KAN (WIREMAN) 12.SEN TATT MOTOR WORKSHOP 13.SYARIKAT HONG SENG ENGINEERING 14.SYARIKAT MERDEKA AUTO TRADING PRESTASI ASIA (M) SDN. BHD.

LIST OF SUPPLIERS AND TRADE CREDIT FACILITIES

PRODUCT SUPPLIERS

1.AMMAN TECH (M) SDN BHD 2.GUNACON (M) SDN BHD 3.LONGRAD TRADING & TRANSPORTATION (M) SDN BHD 4.ARLIN TRADING & TRANSPORT 5.C.H LEE CONSTRUSTION WORKS 6.CHOONG PAN KHOON 7.CHOONG WAH SENG 8.GUNASEGARAN ENG & CONST. 9.GURDIAL TRADING & SONS 10.HUP SENG TRACTOR SDN BHD TRANSPORTER 11.KT BALCON ENTERPRISE 12.MAHENDRA SINGH & BROS 13.MALKIT SINGH A/L MUKHTAR SINGH 14.MRSS TRADING 15.N.M ENTERPRISE 16.PERNIAGAAN EKOTA 17.SUKHDEVE TRADING & TRANSPORT AGENCY 18.THO THIA & SONS 19.PUDUJITSU ENTERPRISE 20.MANJEET SINGH THIND TRADING PRESTASI ASIA (M) SDN. BHD.

LIST OF SUPPLIERS AND TRADE CREDIT FACILITIES

PRODUCT SUPPLIER

1.ANN GIAP TRADING SDN BHD 2.CONCRETE CUT MARKETING SDN BHD 3.CONCRETE CUT SERVICES SDN BHD 4.HOWARD ALAT PERTANIAN SDN BHD 5.KS SIM SUI ENGINEERING SDN BHD 6.TONG HUP SDN BHD 7.T.S.B HARDWARE SDN BHD 8.BEAM BATTERY SALES & SERVICES 9.CHIN TAT TRADING & TRANSPORT AGENCY 10.J & W ENTERPRISE 11.PERNIAGAAN SOON LEE HARDWARES & MACHINERIES 12.SYARIKAT PERNIAGAAN WANJU 13.ACP- DMT SDN BHD 14.GOLDEN PLUS GRANITE SDN BHD 15.HANSON QUARRY PRODUCT SDN BHD 16.SUNWAY QUARRY INDUSTRIES SDN BHD 17.KENNEISON CONTRUCTION MATERIALS SDN BHD 18.SELANGOR INDUSTRIAL CORPORATION SDN BHD 19.WIRTGEN (M) SDN BHD 20.LEONG FOO YEW TRACTOR WORKS 21.KEE PHOO TRANSPORT (M) SDN BHD 22.PADUJITSU ENTERPRISE PRESTASI ASIA (M) SDN. BHD.

LIST OF SUPPLIERS AND TRADE CREDIT FACILITIES

PRODUCT SUPPLIERS

1.NOVA PANTAS SDN BHD 2.MUTIARA RESMI (M) SDN BHD 3.DINURAI SDN BHD 4.ANGGERIK BUDI SDN BHD 5.GTE VENTURE (M) SDN BHD 6.SELANGOR INDUSTRIAL CORPORATION SDN BHD 7.SUNWAY QUARRY INDUSTRIAL CORPORATION SDN BHD 8.SYARQIYAH HOLDING SDN BHD 9.MASTERSIGN COMMUNICATION 10.LAMAN REKA SDN BHD 11.SUTERA UNGGUL ENTERPRISE 12.TEKNOLOGI TERAS PADU SUB CONTRACTOR 13.WIRASA TIMUR SDN BHD 14.WANTER PANTAS ENTERPRISE 15.RR CONSTRUCTION 16.HARTA ANGSANA SDN BHD 17.ONLYONE MASTER SDN BHD 18.ZURASCO SDN BHD 19.RUBINGA SDN BHD 20.EASTERN SDN BHD 21.AHMAD ENTERPRISE 22.ENERGY SERVICES 23.SYARIKAT LUQMAN UL–HAKIM 24.B KIUB ENTERPRISE 25.MIN NIAGA KBANK FACILITIES J

KWORK EXPERIENCEJ PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2008

ACCEPT TOTAL PO NO NO PO ITEM/LOCATION CAWANGAN QTY DATE ( RM )

1 20222190 02/01/2008 TMN PERINDUSTRIAN NO.6 249,900.00 TOTAL - 249,900.00 2 20202802 01/02/2008 CAD PEM 2 BLOK RUMAH KL PUSAT 1500 36,750.00 3 20209868 19/02/2008 TETUAN ALLIED FLOURISH BANGI 3750 91,875.00 4 20176607 19/02/2008 TAN SOO BEY BANGI 4080 99,960.00 5 40075596 26/02/2008 BEBAN PEMBEKAL KL PUSAT 6050 403,465.00 TOTAL 6,050.00 632,050.00 6 20201645 21/04/2008 TETUAN SHAYHER RENOVATION BANGI 1050 25,725.00 7 20093984 21/04/2008 BDR TEKNOLOGI KAJANG BANGI 345 8,452.50 8 21/04/2008 47,775.00 9 20211761 24/04/2008 LAMPU AWAM KLIA BANTING 780 19,110.00 10 20198582 24/04/2008 MERENTANG 1 LITAR SAVT DR PPU SG BANTING 1500 36,750.00 11 20222187 24/04/2008 LEE MAN NO 5 KE SRI MANJA NO.1 PJ 4500 110,250.00 TOTAL 8,175.00 248,062.50 12 20141368 08/05/2008 KERJA-KERJA BREAKDOWN SUBANG 630 15,435.00 13 20222189 15/05/2008 PRIMA KE PE BDR UTAMA PJ 10100 247,450.00 14 20206060 20/05/2008 NGV PETRONAS KL PUSAT 321 9,437.40 TOTAL 11,051.00 272,322.40 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2008

ACCEPT TOTAL PO NO NO PO ITEM/ LOCATION CAWANGAN QTY DATE ( RM )

15 20208908 06/06/2008 RUMAH BERKEMBAR KL PUSAT 600 14,700.00 16 20139960 06/06/2008 PKNS SEC 7 BANGI BANGI 150 3,675.00 17 20197648 06/06/2008 TETUAN ARA ASA BANGI 1500 36,750.00 18 20176608 06/06/2008 GREEN CRESCENT NO. 7 BANGI 2700 66,150.00 19 20090133 06/06/2008 HAZAMAGUMI BANGI 2000 49,000.00 20 20203726 06/06/2008 JALAN TERAT KL PUSAT 300 7,350.00 21 20214346 06/06/2008 KL TIMUR KL TIMUR 816 19,992.00 22 20211606 06/06/2008 JLN HJ YUSOFF KL TIMUR 1140 27,930.00 23 20205655 06/06/2008 GOLF KE P/E PORIM BANGI 1100 26,950.00 24 20235701 17/06/2008 BT 13 JLN CHERAS SELANGOR 549.55102 13,464.00 25 20181308 17/06/2008 EXCELLA KL PUSAT 500 12,250.00 26 20211791 03/06/2008 TETAUN JOHANJAYA PJ 1400 34,300.00 TOTAL 12,755.55 312,511.00 27 20204068 02/07/2008 KWS SG TEKALI BANGI 2586 63,357.00 28 20192101 17/07/2008 PERFECT PLASTIC SUBANG 3600 88,200.00 29 20223528 17/07/2008 DIGI S.ALAM 2853 79,521.75 30 20174539 17/07/2008 MONASH UNIVERSITY SUBANG 4025 98,612.50 31 20207222 17/07/2008 JLN INAI KL PUSAT 510 14,994.00 32 20210342 17/07/2008 BUKIT PERMAI KL PUSAT 168 4,116.00 33 20179660 17/07/2008 BUKIT INDAH KL PUSAT 24 705.60 34 20174651 17/07/2008 JLN WANGSA KL PUSAT 18 529.20 35 20186709 17/07/2008 JLN P. INDAH KL PUSAT 21 617.40 TOTAL 13,805.00 350,653.45 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2008

ACCEPT TOTAL PO NO NO PO ITEM/ LOCATION CAWANGAN QTY DATE ( RM ) 36 20157387 21/08/2009 TETUAN UDA HOLDING BANGI 780 19,110.00 TOTAL 780.00 19,110.00 37 20226211 12/09/2009 SANJUNG UTAMA SUBANG 4740 132,957.00 38 20229499 12/09/2009 SEAFIELD 71 SUBANG 4270 97,473.50 TOTAL 9,010.00 230,430.50 39 20199823 06/10/2008 KL TIMUR KL TIMUR 1761 43,144.50 40 20171145 06/10/2008 WANGSA BAIDURI SUBANG 4080 99,960.00 41 20193373 06/10/2008 TETUAN JKR SUBANG 2850 69,825.00 42 20147708 06/10/2008 JLN SS 17/1E, 2B, 2G SUBANG 498 12,201.00 43 20144209 06/10/2008 KWSN SS 19/1 SUBANG 312 7,644.00 44 20200729 06/10/2008 KAWASAN SUBANG SUBANG 2100 51,450.00 45 20194206 06/10/2008 SHAH ALAM FEB 07 S.ALAM 1149.6327 28,166.00 46 20237125 06/10/2008 MAJLIS AMANAH RAKYAT BANGI 7470 209,533.50 47 20179666 21/10/2008 PERUMAHAN MKM BATU KL BARAT 1050 25,725.00 48 20184000 21/10/2008 BANGLO & TERES BKT TUNKU KL BARAT 480 11,760.00 49 20269709 10/10/2008 KERJA2 SERVIS MENGIKUT NC 1500319 BANGI 270 7,573.50 50 20267173 21/10/2008 PARAMOUNT BLOK E PJ 1440 40,392.00 TOTAL 23,460.63 607,374.50 51 20272317 03/12/2008 MSVT PPU UPM KE SRI SERDANG BANGI 5430 133,035.00 52 20265611 03/12/2008 TETUAN ZUHRAH BINA SDN. BHD. PJ 1400 39,270.00 53 20276239 03/12/2008 TETUAN TAKIN ENGINEERING SB PJ 5261.55 42,355.50 54 20277771 03/12/2008 MILL&PAVE JLN UTARA UNTUK MBPJ PJ 872.3 24,467.50 55 20280361 03/12/2008 TETUAN DYNAVANCE CONSTRUCTION PJ 672 18,849.60 56 20281816 03/12/2008 MILL&PAVE SEPTEMBER 2 S.ALAM 1060 29,733.00 57 20283045 17/12/2008 MTOP PE MIEL #2 KE MIEL #3 S.ALAM 1330 37,306.50 TOTAL 42,726.48 325,017.10 TOTAL CONTRACT 3,247,431.45 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2009

ACCEPT TOTAL PO NO NO PO ITEM/ LOCATION CAWANGAN QTY DATE ( RM )

1 20265613 12/01/2009 TETUAN HEDGEFORD SDN. BHD. PJ 4380 122,859.00 2 20269079 12/01/2009 PPU B. HITAM KE PE BDR BKT PCG SUBANG 4500 126,225.00 3 20271339 12/01/2009 P/E PELANGI 2 BLOK B BDR UTAMA PJ 7480 209,814.00 4 20277716 12/01/2009 B/E UTK.KONTRAK KONSULT S/B PJ 7936 222,604.80 5 20287008 12/01/2009 B/E UTK TETUAN MUTIARA RINI SDN BHD PJ 1073 30,097.65 6 20289048 12/01/2009 B/E UNK.TETUAN FOCALAIMSLAND S/B PJ 5220 146,421.00 TOTAL 30,589.00 858,021.45 7 20273613 04/02/2009 MSVT PPU BARANANG BANGI 3000 84,150.00 8 20291467 04/02/2009 MSVT KE PE TROPICANA NO 7, PARCEL 5 ® PJ 6592 184,905.60 9 20293626 04/02/2009 MSVT ANTARA PPU MOX PJ KE PE SINGER PJ 1690 47,404.50 10 20291462 04/02/2009 MSVT UTK.LENG SENG GARDEN N0.3 PJ 4370 122,578.50 11 20296510 04/02/2009 B/E UNK.TETUAN UNIVERSITI MALAYA PJ 650 18,232.50 13 20283901 04/02/2009 B/E UNK.TETUAN DAYA PETALING SDN BHD PJ 1506 42,243.30 TOTAL 17,808.00 499,514.40 12 20286830 04/03/2009 TETUAN LIM CHEE SEONG BANGI 1050 29,452.50 14 20293630 04/03/2009 MSVT UTK. AMWAY SDN. BHD PJ 2868 80,447.40 15 20294886 04/03/2009 B/E UNK. TETUAN SUSUNAN BARU SDN. BHD PJ 1850 51,892.50 16 20294884 04/03/2009 B/E UTK TETUAN DAMANSARA IMPIAN PJ 1400 39,270.00 17 20294882 04/03/2009 B/E UNK. SUMBER AUTO EDARAN SDN. BHD PJ 1000 28,050.00 18 20294895 04/03/2009 B/E KE KOMPLEKS MAHKAMAH BARU – JKR PJ 2450 68,722.50 TOTAL 10,618.00 297,834.90 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2009

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

19 20299925 13/04/2009 PUCHONG PERANGSANG BANGI 375 10,518.75 20 20287046 13/04/2009 NC 1620429 BANGI 465 13,043.25 21 20286826 13/04/2009 TETUAN SOUTHERN NISHA BANGI 360 10,098.00 22 20304289 13/04/2009 PETRONAS DAGANGAN PJ 2220 62,271.00 23 20305452 13/04/2009 TETUAN LUTHERN PJ 480 13,646.00 24 20301249 13/04/2009 PKNS PJ 418 11,724.90 TOTAL 4,318.00 121,301.90 25 20286828 07/05/2009 TETUAN KEM PENGAJIAN TINGGI BANGI 510 14,305.50 26 20286829 07/05/2009 TETUAN TESCO BANGI 600 16,830.00 TOTAL 1,110.00 31,135.50 27 20296509 04/06/2009 TETUAN TROPICANA PJ 1443 40,476.15 28 20308560 04/06/2009 TETUAN SRI AMAN PJ 8540 239,547.00 29 20301248 04/06/2009 PPU JAYA 33 PJ 6780 190,179.00 30 20307797 04/06/2009 TETUAN DAZZLING PJ 900 25,245.00 31 20307801 04/06/2009 TETUAN TETAP TIARA PJ 1200 33,660.00 32 20294881 04/06/2009 TETUAN KUMP. PERANGSANG PJ 300 8,415.00 33 20315723 04/06/2009 TETUAN SAFEGUARD PJ 420 11,781.00 34 20307807 04/06/2009 PPU DUNLOP & NESTLE PJ 2500 70,125.00 35 20307800 04/06/2009 TETUAN TROPICANA PJ 750 21,037.50 36 20304293 04/06/2009 TETUAN QUILL INTERIOR PJ 8850 248,242.50 TOTAL 31,683.00 888,708.15 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2009

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

37 20305455 08/07/2009 JALAN 11/2 PJ 1155 32,397.75 38 20319361 08/07/2009 MERENTANG KABEL DR PE D'SARA UTAMA PJ 5882 164,990.10 39 20303308 08/07/2009 JALAN PJS 6/5 PJ 10 31,416.00 40 20310849 08/07/2009 JALAN 14/20 PJ 125 3,506.25 41 20298794 08/07/2009 JLN SS 7/26 PJ 770 21,598.50 42 20310844 08/07/2009 JALAN 12/6A PJ 256 7,180.80 43 20298792 08/07/2009 JLN SS 7/2, SS 7/13 PJ 1960 54,987.00 44 20308114 08/07/2009 ALIH KABEL BANGI 150 4,207.50 45 20291577 08/07/2009 TETUAN TRANSLOYAL BANGI 642 18,008.10 TOTAL 10,950.00 338,292.00 46 20292414 06/08/2009 TETUAN MRCB BANGI 630 17,671.50 47 20317470 06/08/2009 USAHASAMA KELANA PJ 1405 39,410.25 48 20307793 06/08/2009 TETUAN WESTERN DIGITAL PJ 5826 163,419.30 49 20315726 06/08/2009 TETUAN MIDF PROPERTY PJ 3600 100,980.00 50 20308552 06/08/2009 TETUAN MERDU IMPRESIF PJ 5840 163,812.00 51 20323865 06/08/2009 TETUAN NAYAKA PJ 600 16,830.00 52 20308576 06/08/2009 NEW SEA PARK VINTAGE PJ 8200 230,010.00 TOTAL 26,101.00 732,133.05 53 20308513 10/09/2009 AFFIN BANK PJ 280 7,854.00 54 20308510 10/09/2009 PON PENGAWAL PJ 385 10,799.25 55 20310852 10/09/2009 JLN 5/19 & 5/19B PJ 690 19,354.50 56 20310846 10/09/2009 JLN 5/13 SEK 5 PJ 252 7,068.60 57 20308512 10/09/2009 JLN GASING PJ 280 7,854.00 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2009

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

58 20308507 10/09/2009 JLN YONG SHOK LIN PJ 540 15,147.00 59 20323868 10/09/2009 JABATAN KERJA RAYA PJ 1480 41,514.00 60 20326008 10/09/2009 MAKTAB KERJASAMA MALAYSIA PJ 5355 150,207.75 61 20319373 10/09/2009 PKNS PJ 1100 30,855.00 62 20263568 10/09/2009 TETUAN INTIGREEN BANGI 2100 58,905.00 63 20296546 10/09/2009 TETUAN SU TOO HOUSING BANGI 300 8,415.00 64 20310855 10/09/2009 LOJI NAJIS PJ 512 14,361.60 65 20296543 10/09/2009 KEIN NOODLES BANGI 900 25,245.00 66 20280356 10/09/2009 TRIPLE EQUITY SUBANG 400 8,990.00 67 20283888 10/09/2009 MPSJ & NURANI SUBANG 180 5,336.50 68 20282108 10/09/2009 PERMAHARTA SUBANG 400 8,990.00 69 20265635 10/09/2009 TMN INDUSTRI UTAMA SUBANG 2100 154,350.00 TOTAL 17,254.00 575,247.20 70 20315962 22/10/2009 TETUAN SPRING BOND BANGI 1323 32,902.65 71 20212770 22/10/2009 SRI TANJUNG BANGI 2100 51,450.00 TOTAL 3,423.00 84,352.65 72 20326014 09/11/2009 MSVT DARI PPU ALCN#2 KE KAH MOTOR PJ 8912 249,981.60 73 20287048 09/11/2009 KERJA2 MILL N PAVE NC 1680359 PJ 24 673.20 74 20288970 09/11/2009 KERJA2 MILL N PAVE NC 1671098 PJ 210 5,890.50 75 20324459 09/11/2009 KERJA MILL & PAVE NC 1840503 PJ 555 15,567.75 TOTAL 9,701.00 272,113.05 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2009

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

76 20319357 23/12/2009 TETUAN MUTIARA RINI PJ 7900 221,595.00 77 20331224 23/12/2009 TETUAN DAMANSARA PJ 1750 49,087.50 78 20326011 23/12/2009 B/E UTK.TETUAN MALAYSIA AIRPORT HOLDING PJ 8100 227,205.00 79 20308493 23/12/2009 JALAN SS 2/63 TMN SEA PJ 490 13,744.50 80 20308485 23/12/2009 JALAN SS 2/66 TMN SEA PJ 420 11,781.00 81 20308484 23/12/2009 JALAN SS 2/61 TMN SEA PJ 280 7,854.00 82 20331221 23/12/2009 B/E UNK .TETUAN UNIPAC DAGANGAN SDN BHD PJ 580 16,269.00 83 20141696 23/12/2009 TETUAN HIJRAH MURNI S/B PJ 305.7041 8,575.00 84 20319441 23/12/2009 BBB 5943-TETUAN ARAPROP DEVELOPMENT BANGI 2520 70,686.00 85 20298885 23/12/2009 TETUAN SINARAN SURIA POWER BANGI 500 14,025.00 TOTAL 22,845.70 640,822.00 TOTAL CONTRACT 5,339,476.25 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2010

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM ) 1 20153937 12/01/10 MSVT PPU COM SQUARE & PPU SWAY DOWNTOWN SUBANG 2000 48,510.00 2 20339049 22/01/10 ELIT MERIDIAN KE DAMANSARA BARU PJ 5906 163,868.10 3 20332214 22/01/10 B/E UNK .TETUAN SIME DARBY HOLDINGS S.B PJ 880 23,842.50 4 20344091 29/01/10 SPEKTRA SEGMEN SDN. BHD. PJ 3000 84,150.00 TOTAL 11,786.00 320,370.60 5 20233390 03/02/10 B/E UTK MEDAN DAMAI SDN. BHD. SUBANG 3300 95,440.00 6 20347881 19/02/10 B/E UNK. TETUAN SINO MILLION INVESTMENT PJ 1365 38,007.75 TOTAL 4,665.00 133,447.75 7 20347871 04/03/10 TETUAN SIME DARBY BRUNSFIELD PJ 1752 47,628.90 8 20286832 04/03/10 MSVT TMN PUTRA KAJANG 1 BANGI 3000 84,150.00 9 20313132 04/03/10 LOYAL SIERRA DEV SDN BHD PJ 750 4,628.25 10 20326113 04/03/10 CRS 0214 – TETUAN JOWAT (M) SDN BHD CHERAS 360 10,098.00 11 20322120 04/03/10 CRS 900280MSVT P/E ALEQUIP & WONG SUE KA CHERAS 1500 34,333.20 12 20319442 04/03/10 CRS 90029-MSVT SSU BKT BELIMBING CHERAS 1092 23,141.25 13 20324855 04/03/10 CRS 0134 – TETUAN BAKAT UTARA CHERAS 300 8,415.00 14 20298374 04/03/10 MSVT P/E DESA PELANGI CHERAS 750 18,037.50 15 20305454 19/03/10 NC 131294 NO 68 JALAN TR 9/1 TROPICANA PJ 490 13,744.50 16 20315853 19/03/10 NC 134282 JALAN SS6/5 & SS6/14 PJ 406 11,388.30 17 20357793 19/03/10 TETUAN POLY GAS SDN BHD PJ 210 5,890.50 18 20342793 19/03/10 JLN OJU 3/39 & 3/3 PJ 1050 29,452.50 19 20310839 19/03/10 JALAN PJS 3/1 TMN MEDAN PJ 450 12,622.50 20 20308498 19/03/10 JALAN SS6/16A DT GLOM PJ 700 19,635.00 21 20342784 19/03/10 JLN PJU 3/16 B DAMANSARA PJ 540 15,147.00 TOTAL 13,350.00 338,312.40 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2010

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

22 20305453 16/03/09 NC 130352 NO 41 JALAN BU 1/11 BDR UTAMA PJ 210 5,890.50 23 20341403 07/04/10 DMANASARA HEIGHT 2L5-PPU PJOF PJ 480 17,880.00 24 20342774 07/04/10 JLN BU 4/4 BDR UTAMA PJ 280 7,854.00 25 20342796 07/04/10 JLN SS25/28 TMN MAYANG PJ 560 15,708.00 26 20319447 07/04/10 BBB 5743-TETUAN BCI CHEMICAL CORP BANGI 100 2,805.00 27 20325840 12/04/10 NC 134738 JLN SS23/5 TMN SEA PJ 245 6,872.25 28 20319368 12/04/10 B/E UNK TETUAN HORSEDALE DEVELOPMENT BHD PJ 1500 39,270.00 29 20333684 16/04/10 NC 133790 JLN PJU 1A/9 ARA D;SARA PJ 560 15,708.00 30 20311337 16/04/10 NO 26 JLN 14/14 SEK 14 PJ 910 25,525.50 31 20359358 16/04/10 TETUAN LAMBANG SELOKA SDN BHD PJ 1400 38,176.05 32 20319358 22/04/10 UTK TETUAN TELEKOM MALAYSIA PJ 7000 196,350.00 33 20347888 22/04/10 TETUAN KESM INDUSTRIES BHD PJ 8800 245,437.50 34 20359360 22/04/10 TETUAN ANIM BIN HARUN PJ 160 4,207.50 35 20267106 22/04/10 TETUAN ASTANA ASAS (M) S/B BANGI 4122 115,622.10 36 20324997 22/04/10 BBB 5761 – TETUAN HAMTON REALTY SDN BHD BANGI 230 6,451.50 37 20329205 28/04/10 BBB 5817 – TETUAN DYNAFARE SDN BHD BANGI 350 8,106.45 38 20326034 28/04/10 BBB 90593 – MSVT TUKAR UNDERSIZE BANGI 225 5,553.90 TOTAL 27,132.00 757,418.25 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2010

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

39 20299926 13/05/10 MSVT SSU HAZAGUMI NO 2 BANGI 870 1,286.65 40 20337164 13/05/10 MEMBINA SEBUAH KILANG KGU 357 10,013.85 41 20357813 21/05/10 TETUAN SIME PILMOOR DEVELOPMENT PJ 1150 31,696.50 42 20299927 21/05/10 MSVT UBAHSUAI SISTEM F01 KT BANGI 2340 65,637.00 43 20319444 21/05/10 BBB 5787-TETUAN SRI JANG SDN BHD BANGI 1737 48,722.85 44 20356898 21/05/10 ADUAN MPKJ PJ 900 27,622.05 45 20331233 21/05/10 SENGGARAAN KABEL VOLTAN TINGGI 08/09 S.ALAM 1085 26,598.50 46 20355339 21/05/10 KILANG COCOALAND RAWANG 875 24,543.75 TOTAL 9,314.00 236,121.15 47 20315961 25/06/10 TETUAN HARIAN KLASIK BANGI 5700 102,554.17 48 20369380 25/06/10 MILL & PAVE ANTARA P/E SG CHUA IND BANGI 399 11,191.95 TOTAL 6,099.00 113,746.12 49 20374760 20/07/10 MERENTANG KABEL KE PE NORTH & SOUTH PORT PJ 5542 154,275.00 50 20337076 20/07/10 TETUAN JKR S.ALAM 423.5 11,879.18 51 20290407 23/07/10 TETUAN PASUKAN GERAK AM BANGI 3400 57,502.50 TOTAL 9,365.50 223,656.68 PRESTASI ASIA (M) SDN. BHD.

LIST OF WORKS MILL & PAVE TNB IMPLEMENTED FOR THE YEAR 2010

ACCEPT TOTAL PO NO NO PO ITEM / LOCATION CAWANGAN QTY DATE ( RM )

52 20346959 12/08/10 UTK BULLETIN ENGINEERING SDN. BHD. SUBANG 245 7,274.75 53 20362342 12/08/10 PERUMAHAN KINRARA SUBANG 690 20,504.50 54 20371960 12/08/10 MSVT - INJECT KABEL 240 2X4.5 KM DR PPU MAX BANTING 900 24,992.55 55 20363852 12/08/10 MEMBINA SEBUAH PUSAT SERVIS KERETA SUBANG 150 4,380.00 TOTAL 1,985.00 57,151.80 56 20329197 07/09/10 BBB 5836 – TETUAN I & P MENARA SDN BHD BANGI 1545 7,192.00 57 20362388 08/09/10 CAD M'BINA SEK KEB & SEK MEN SUBANG 60 1,740.50 58 20362416 08/09/10 M'BINA 8 UNIT KDI PJB 3 TKT 64 UNIT SUBANG 600 17,290.00 59 20390559 08/09/10 TETUAN DUTCH LADY MILK IND. PJ 5200 140,250.00 60 20363866 07/09/10 TETUAN JKR CHERAS 495 14,833.50 61 20338358 08/09/10 TETUAN TANJUNG BALAI CHERAS 495 12,471.00 62 20364898 08/09/10 TETUAN TANMING MANAGEMENT SDN BHD CHERAS 956 28,385.55 63 20381785 07/09/10 MENUKAR SAIZ KABEL 185MMP 3C PILC K KLANG 3000 63,449.10 64 20329197 30/09/10 BBB 5836 – TETUAN I & P MENARA SDN BHD BANGI 1545 43,337.25 TOTAL 13,896.00 328,948.90 65 20386446 08/10/10 SS 22/17,P.JAYA PJ 1330 37,306.50 66 20386444 08/10/10 SS 22/13,P.JAYA PJ 1540 43,197.00 67 20365908 08/10/10 ROMBAKAN P/E KELANAN JAYA NO 1 & PE PJ 1020 32,619.60 68 20387521 29/10/2010 PASARAYA TESCO RAWANG RAWANG 2975 95,140.50 69 20375986 29/10/2010 TETUAN TAN MING VENTURE S/B BANGI 1000 13,183.50 70 20394872 29/10/2010 MSVT KJG BARU 1 - KJG BARU 2 BANGI 455 11,662.63 TOTAL 8,320.00 233,109.73 TOTAL CONTRACT 2,392,416.11 PRESTASI ASIA (M) SDN. BHD.

LIST OF COMPLETED PROJECTS 2009-2012

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

1. Projek Menaiktaraf Sungai Kuang Kampung Melayu Kundang (Fasa 3) RUBINGA SDN. BHD. JPS 5,111,673.00 03/09/2007 - Daerah Gombak, Selangor Darul Ehsan. 19/01/2009

2. Membina Dan Menyiapkan Kerja-kerja Infrastruktur Utama Yang PRESTASI ASIA (M) SDN. BHD. PKNS 21,300,000.00 22/10/2007 – Merangkumi Sistem Jalan Saliran, Paip Air, Paip Pembentungan Dan 21/04/2009 Kerja-kerja Berkaitan Laman 1, Bernam Jaya Selangor Darul Ehsan.

3. Cadangan Kerja-kerja Tanah Untuk Tapak Industri Fasa 2 Taman Sains ZULAN ENTERPRISE SDN.BHD PKNS 26,720,000.00 17/12/2007 – Selangor 2, Mukim Dengkil Sepang Selangor Darul Ehsan. 13/06/2009

Cadangan Projek Penutup Selamat Dan Pemulihan 16 Tapak Pelupusan PRESTASI ASIA (M) SDN.BHD CYPARK 1,331,170.00 05/04/2010 – 4. Sisa Pepejal Di Semenanjung Malaysia 28/12/2010

5. Kerja- kerja Kontrak Mill & Pave PJY 4696 PRESTASI ASIA (M) SDN.BHD TNB 240,000.00 04/05/2011

6. Kerja- kerja Kontrak Milling + Paving + Coring PRESTASI ASIA (M) SDN.BHD TNB 120,830.00 05/03/2011

7. Kerja- kerja Kontrak Milling + Paving + Coring PRESTASI ASIA (M) SDN.BHD TNB 191,025.00 29/11/2011

8. Proposed Resurfacing Works For Arf Main Bay And Sub Fire Station At KL PRESTASI ASIA (M) SDN.BHD Malaysia Airport Holding 259,486.00 01/12/11-08/01/2012 International Airport. Berhad

9. Merekabentuk Membina, Menyiapkan dan Mengujiterima Cadangan RUBINGA SDN.BHD JKR (PETALING) 3,400,000.00 24/10/2011- Satu(1) Blok Bangunan Empat (4) Tingkat dan lain-lain berkaitan di SJK(T) 23/09/2012 KG.Lindungan,Daerah Petaling Selangor Darul Ehsan. PRESTASI ASIA (M) SDN. BHD.

LIST OF COMPLETED PROJECTS

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

1. Cadangan Membina & Menyiapkan Bangunan Kolej Islam Antarabangsa JOHAWAKI SDN. BHD. JABATAN KERJA RAYA 1,379,797.00 1998 Selangor, Bangi, Daerah Hulu Langat Selangor Darul Ehsan. (SELANGOR) JHB (QS) – 147/97/(01) SC

2. Cadangan Merekabentuk, Membina & Menyiapkan Kolej Islam Selangor PRESTASI ASIA (M) SDN. BHD. JOHAWAKI 170,560.00 01/08/2002 – (KISDAR) Fasa ll, Bangi Daerah Hulu Langat, Selangor. 17/08/2002

3. Membina Dan Menyiapkan Tiga Blok Bangunan Sekolah Empat Tingkat PRESTASI ASIA (M) SDN. BHD. JKR 5,600,000.00 20/08/2001 – Dan Lain-lain Kerja Yang Berkaitan Di Sekolah Kebangsaan Cheras Jaya, 19/11/2003 Daerah Hulu Langat , Selangor Darul Ehsan.

4. Membina Jambatan Kampung Sawah Dan Menaik Taraf Jalan Telok PRESTASI ASIA (M) SDN. BHD. JKR (SELANGOR) 33,755,679.80 15/10/2001 – Panglima Garang Ke Pekan Banting, Daerah Kuala Langat Selangor. 15/08/2004

5. Cadangan Membina Dan Menyiapakan Persimpangan Keluar Masuk Ke PRESTASI ASIA (M) SDN. BHD. PKNS 4,540,000.00 03/06/2002 – Shapadu Dan Lain-laian Kerja Berkaitan Di Kawasan Pembangunan Fasa 10/02/2003 4, BSS Perlabuhan Klang Selangor.

6. Menyiapkan Kerja-kerja Jalan Di Persiaran Kayangan Fasa 2 Di Seksyen 7 HARTA ANGSANA PKNS 4,688,000.00 21/04/2003 – Shah Alam Selangor. SDN. BHD. 01/12/2003

7. Pemasangan 750 mm Paip Air Keluli Dari Bukit Chandang Ke SYARQIAH HOLDING PKNS 7,610,000.00 19/08/2002 – Persimpangan Antara Gapi, Daerah Hulu Selangor. 18/02/2004

8. Pembinaan Tangki Air Konkrit 2.2 MGD Berserta Rumah Pam dan Tangki ZURASCO SDN. BHD. PKNS 7,818,000.00 19/08/2002 – Sedutan Di Pembangunana Antara Gapi, Daerah Hulu Selangor. 18/02/2004

9. Cadangan Membina Dan Menyiapkan Padang-padang Permainan Di PRESTASI ASIA (M) SDN. BHD. UNIVERSITI PUTRA 5,740,113.00 17/02/2003 – Universiti Putra Malaysia (UPM), Serdang, Selangor Darul Ehsan. MALAYSIA, SERDANG 16/05/2004

10. Membina, Menyiapkan Dan Menyelenggara Sistem Jalan Dan Saliran Di Zulan Enterprise PKNS 2,180,000.00 01/10/2003 – Jalan 66 Kaki (Ring Road) Seksyen 4 Kota Damansara. 30/03/2004

11. Menjalankan Dan Menyiapkan Kerja-kerja Infrastruktur Untuk Lot-lot FLEXICIRCLE SDN. BHD. PKNS 970,000.00 24/04/2003 – Banglo (Bahagian A) di Seksyen 2A Antara Gapi, Daerah Hulu Selangor, 23/01/2004 Selangor.

12. Cadangan Membina Fasa 1 Pusat Inkubator Dan Makmal R & D, Pusat MUTIARA RESMI (M) SDN. BHD. PKNS 4,650,000.00 01/06/2004 – Teras, Taman Sains Selangor 1, Seksyen 2 & 3 Kota Damansara. 31/12/2004

13. Menaiktaraf Jalan Putrajaya Ke Simpang 3 Jenderam Melalui RKT Sg. PRESTASI ASIA (M) SDN. BHD. JKR/SEL//957/2002 27,600,036.03 14/12/2002 – Merab, Sepang Selangor Darul Ehsan. 09/09/2005 PRESTASI ASIA (M) SDN. BHD.

LIST OF COMPLETED PROJECTS

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

14. Cadangan Pelebaran Jalan Reko Dari Persimpangan Ladang West Contry WIRASA TIMUR PKNS 960,000.00 29/07/2004 – Ke Persimpangan Taman Tenaga Bandar Baru Bangi. SDN. BHD. 26/03/2005

15. Cadangan Pembinaan Fasa 1 Pusat Inkubator Dan Makmal R&D Pusat MUTIARA RESMI PKNS 4,578,000.00 07/07/2004 – Teras Taman Sains Selangor 1, Seksyen 2&3, Kota Damansara, Daerah SDN. BHD. 06/12/2004 Petaling Selangor.

16. Kerja-kerja Baikpulih, Menurap Semula Jalan Serta Kerja-kerja Berkaitan EASTERN INTEREST SDN. BHD. PKNS 2,220,000.00 06/12/2004 – Dari CH. 1100 – CH. 1875 Dan Dari CH. 3620 – CH. 5500 Di Persiaran 08/05/2005 Mahogani (M001), Kota Damansara, Petaling Jaya, Selangor Darul Ehsan.

17. Kerja-kerja Membina, Menyiapkan & Menyelenggara Sistem Jalan Saliran, NOVA PANTAS PKNS 1,006,000.00 08/12/2004 – Sistem Pembentungan Dan Paip Retikulasi Air Serta Kerja-kerja Berkaitan SDN. BHD. 07/06/2005 Di Jalan Sepah Puteri 5/26, Kota Damansara B524.

18. Menyiapkan Kerja-kerja Jalan Di Kawasan Perumahan Di Seksyen 7, Fasa PRESTASI ASIA (M) SDN. BHD. PKNS 4,060,000.00 14/06/2005 – 3A Shah Alam. 15/05/2006

19. Menyiapkan Kerja-kerja Jalan Di Kawasan Perumahan Di Seksyen 7, Fasa ONLYONE MASTER SDN. BHD. PKNS 9,200,000.00 09/06/2005 – 2 Shah Alam. 25/10/2006

20. Menjalankan Dan Menyiapkan Sebahagian Jalan Persiaran Batu Arang 2 LAMAN REKA PKNS 4,244,000.00 15/06/2005 – Di Kota Puteri Daerah Gombak, Selangor Darul Ehsan. SDN. BHD. 30/05/2006

21. Pembinaan Jalan Parit Infrastruktur Dan Kerja-kerja Berkaitan Di ZURASCO SDN. BHD. PKNS 4,300,000.00 15/06/2005 – Sebahagian Jalan SGI, Di Seksyen 1 Antara Gapi Daerah Ulu Selangor. 14/06/2006

22. Cadangan Kerja-kerja Tanah, Pembinaan Parit Utama Dan Kerja-kerja SYARQIAH HOLDING SDN. BHD. PKNS 11,050,000.00 COMPLETED Berkaitan Untuk Fasa 1 Precint 12 Di Cadangan Pembangunan Bandar Setia Alam Di Seksyen U13 Shah Alam.

23. Cadangan Paip Air Utama Dari Kompleks Tangki Air Seksyen 16 Ke Tapak ANGGERIK BUDI PKNS 6,420,000.00 COMPLETED Projek Penswastaan Seksyen 16 Shah Alam. SDN. BHD.

24. Membina Dan Menyiapkan Infrastruktur Utama Di Sebahagian Tapak ‘A’ GTE VENTURE PKNS 5,035,000.00 COMPLETED Fasa 4 Bandar Sultan Suleiman Perlabuhan Kelang Selangor Darul Ehsan. SDN. BHD.

25. Menjalankan Dan Menyiapkan Sebahagian Jalan Persiaran Batu Arang 3 LAMAN REKA PKNS 4,244,000.00 COMPLETED Di Kota Puteri Daerah Gombak, Selangor Darul Ehsan. SDN. BHD. PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CLIENT CONTRACT VALUE DATE OF CONTRACTOR (RM) COMPLETION

1. Pavement and Shoulder Works for Projek Kerja-kerja Membaikpulih Dan PROPEL JABATAN KERJA RAYA 1,649,344.93 07/04/1994 Menurap Laluan Persekutuan 1 Dari FT001-420-000 Hingga FT001-468-600 Dengan Menggunakan Kaedah HIPR (Hot In Place Recycling) – Milling and Paving at Negeri Selangor.

2. Kerja-kerja Membaikpulih Landasan Terbang Dan Taxiway Serta Kerja-kerja PROPEL IKRAM BHD / 1,913,512.80 06/11/1994 Berkaitan Di Lapangan Terbang Antarabangsa Kuala Lumpur Subang- JABATAN KERJA RAYA Pavement Work.

3. Projek Pembangunan Semula Lapangan Terbang Johor Bahru, Johor- PROPEL IKRAM BHD / 2,288,948.00 02/06/1995 Resurfacing of Existing Runaway and Taxiway. JABATAN KERJA RAYA

4. Improvement to Kuala Lumpur – Seremban Proposed 3rd Lane Extention PROPEL IKRAM BHD / 91,665.00 02/02/1996 between Bangi and Seremban. JABATAN KERJA RAYA

5. Road Milling and Rectification Work for Bina Sat-Com. BINA SAT-COM NETWORK SDN. 333,912.50 24/09/1996 BHD.

6. Road Resurfacing at Kajang Area. BINA SAT-COM NETWORK SDN. 76,600.00 11/08/1996 BHD.

7. Road Milling and Rectification Work for Bina Sat-Com Network Sdn. Bhd. at Sri BINA SAT-COM NETWORK SDN. 80,000.00 10/06/1996 Kembangan. BHD.

8. Road Milling and Rectification Work for Bina Sat-Com Network Sdn. Bhd. at BINA SAT-COM NETWORK SDN. 297,955.00 21/07/1997 MPPJ Area. BHD.

9. Road Milling and Rectification Work for Bina Sat-Com Network Sdn. Bhd. at BINA SAT-COM NETWORK SDN. 1,048,080.00 09/07/1997 MPPJ Area. BHD.

10. Road Milling and Rectification Work for Bina Sat-Com Network Sdn. Bhd. at BINA SAT-COM NETWORK SDN. 79,065.00 11/04/1997 MPPJ Area. BHD.

11. Road Milling and Rectification Work for Bina Sat-Com Network Sdn. Bhd. at BINA SAT-COM NETWORK SDN. 157,934.80 25/02/1997 Keramat Area, Ampang. BHD.

12. Road Milling and Rectification Work for Bina Sat-Com Network Sdn. Bhd. at BINA SAT-COM NETWORK SDN. 122,810.00 05/02/1997 Majlis Daerah Petaling Area. BHD.

13. Road Milling for MPPJ Projects, Subang Man, PJ Man Network Sdn. Bhd. at TIME TELEKOM 186,752.00 28/02/1997 Sri Kembangan. SDN. BHD. PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

14. Road Milling on the Trenching Work along Jalan Enggang KL Man Package TIME TELEKOM 71,007.20 25/07/1997 15. SDN. BHD.

15. Letter of Undertaking for the Project “Milling and Paving” Celcom SYARIKAT YOM PEMBENAAN 208,890.00 08/11/1997 Transmisson under JKR Gombak. PEMBANGUNAN S/B

16. Implementation of Civil Infrastructure Works Fiber Optic Metro Network : CELCOM TRANSMISSION 398,772.00 13/11/1997 Klang Valley Metro Phase 2 – Ampang Point – Taman Kosas (Road Milling SDN. BHD. and Paving).

17. Road Milling and Rectification Work for Matubatech Engineering Sdn. Bhd. at MATUBATECH TENAGA NASIONAL BERHAD 105,906.00 20/10/1997 MPPJ Area.

18. Road Milling and Rectification Work for Matubatech Engineering Sdn. Bhd. at MATUBATECH TENAGA NASIONAL BERHAD 153,276.00 13/10/1997 MPPJ Area.

19. Road Milling and Rectification Work for Matubatech Engineering Sdn. Bhd. at MATUBATECH TENAGA NASIONAL BERHAD 138,273.00 01/10/1997 MPPJ Area.

20. Road Milling and Rectification Work for Matubatech Engineering Sdn. Bhd. at MATUBATECH TENAGA NASIONAL BERHAD 108,753.60 12/09/1997 MPPJ Area.

21. Milling and Paving Work at Jalan SS5A/8, P.J. for Akli (M) Sdn. Bhd. AKLI (M) SDN. BHD. TENAGA NASIONAL BERHAD 44,100.00 14/05/1998

22. Milling and Paving Work for Akli (M) Sdn. Bhd. at MPPJ Area. AKLI (M) SDN. BHD. TENAGA NASIONAL BERHAD 31,985.80 27/04/1998

23. Milling and Paving Work for Akli (M) Sdn. Bhd. at MPPJ Area. AKLI (M) SDN. BHD TENAGA NASIONAL BERHAD 114,462.90 14/09/1998

25. Milling and Paving Work for Tenaga Nirwana (M) Sdn. Bhd. at MPPJ Area. TENAGA NIRWANA TENAGA NASIONAL BERHAD 58,443.00 20/04/1998

26. Jejaran Sesalur Antara Ibusawat Rawang, Batu Arang. AKLI (M) SDN. BHD. TENAGA NASIONAL BERHAD 90,000.00 02/10/1998

27. Milling and Paving Work for Akli (M) Sdn. Bhd. / TNB at MPPJ Area. AKLI (M) SDN. BHD. TENAGA NASIONAL BERHAD 11,414,095.00 09/11/1998

28. Milling and Paving Works for T.P Indah Sdn. Bhd. / TNB at MPPJ Area. T.P INDAH SDN. BHD. TENAGA NASIONAL BERHAD 70,434.00 12/11/1998

29. Milling and Paving Works for Syarikat Pembangunan Minhaj and Ming at SYKT. PEMBANGUNAN TENAGA NASIONAL BERHAD 275,633.20 22/11/1998 MPPJ Area. MINHAJ & MING

30. Milling and Paving Work for Kasim bin Nordin / TNB at MPPJ area. KASIM BIN NORDIN TENAGA NASIONAL BERHAD 31,095.90 27/11/1998 PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

31. To supply labour, transportation, materials and machineries for Milling and PI-GAS ENGINEERING SDN. JABATAN KERJA RAYA 29,500.00 30/11/1998 Resurfing Works at KM 15 Jalan Ipoh / Rawang (JKR Gombak). BHD. GOMBAK

32. Milling and Paving Work for SR Power Sdn. Bhd. / TNB at MPPJ area. SR POWER SDN. BHD. TENAGA NASIONAL 14,539.50 30/11/1998 BERHAD

33. Milling and Paving Work for Persada Satria (M) Sdn. Bhd. / TNB at MPPJ PERSADA SATRIA (M) SDN. TENAGA NASIONAL 90,760.50 10/12/1998 area. BHD. BERHAD

34. Milling and Paving Works for Syarikat Minhaj Dan Ming at MPPJ area. SYKT. PEMBANGUNAN MINHAJ TENAGA NASIONAL 201,751.10 14/12/1998 & MING BERHAD

35. Milling and Paving Works at Kg. Ampang Campuran for JBA. MPPJ JABATAN BEKALAN AIR 47,650.00 20/12/1999

36. Milling and Paving Works at FIZ, Kelana Jaya fot TNB at MPPJ area. T.P INDAH SDN. BHD. TENAGA NASIONAL 159,122.00 23/11/1999 BERHAD

37. Milling and Paving Works at F12, Kelana Jaya for Gas Malaysia Sdn. Bhd. GAS MALAYSIA SDN. BHD. 159,122.00 23/11/1999 at MPPJ area.

38. Milling and Paving Works for TNB at Majlis Perbandaran Shah Alam SYKT. PEMBANGUNAN MINHAJ TENAGA NASIONAL 130,000.00 - (MPSA) & MING BERHAD

39. Milling and Resurface of Asphaltic Road Meter. PRESTASI ASIA (M) SDN. BHD. MAXIS BROADBAND SDN. 185,592.00 30/12/1999 BHD.

40. Kerja Segera Bagi Menampal Jalan Dengan Menggunakan Kaedah SALEHAN ENTERPRISE MAJLIS PERBANDARAN 18,800.00 01/07/2000 Pengisaran (Milling) di Atas Jalan Asphaltic Concrete bagi Mengatasi PETALING JAYA Masalah Kerosakan Jalan di Sekitar Jalan Protokol Zon A.

41. Kerja-kerja Mengorek (Milling) Permukaan Jalan Sedia Ada Serta Membaru SALEHAN ENTERPRISE JABATAN KERJA RAYA 97,900.00 04/10/2000 Muka Permukaan Jalan di Sepanjang Laluan 2 Lebuhraya Persekutuan di (PETALING) Dalam Daerah Petaling.

42. Kerja-kerja Mengorek (Milling) Permukaan Jalan Sedia Ada Serta Membaru JDN Jaya Enterprise JABATAN KERJA RAYA 99,952.50 13/12/2000 Muka Jalan di Persimpangan Sg. Buloh / Kem Perhebat di dalam Daerah (PETALING) Petaling.

43. Kerja-kerja Segera Membaikpulih Kerosakan Jalan Selepas Penanaman SYARIKAT JAYA DIRI JABATAN KERJA RAYA 99,220.00 06/10/2000 Paip Air di Jalan Sekolah Seri Kembangan di Dalam Daerah Petaling. (PETALING)

44. Kerja-kerja Segera / Kecemasan Bagi Membaikpulih Jalan Selepas AULIA BINA ENTERPRISE JABATAN KERJA RAYA 98,060.00 19/01/2000 Pananaman Kabel Oleh Maxis Di Laluan Batu 3, Sg. Buloh Di Dalam (PETALING) Daerah Petaling. PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

45. Kerja-kerja Segera Membaikpulih Kerosakan Jalan Selepas SHAH BINA ENTERPRISE JABATAN KERJA RAYA 99,023.00 02/10/2000 Penanaman Paip Di Jalan Seri Kembangan Daerah Petaling. (PETALING)

46. Kerja Segera Bagi Menampal Jalan Dengan Menggunakan Kaedah PRESTASI ASIA (M) SDN. BHD. JABATAN KERJA RAYA 80,000.00 2000 Pengisaran (Milling) Di Atas Jalan Asphaltic Concrete Bagi Mengatasi (PETALING) Masalah Kerosakan Jalan.

47. Kerja-kerja Menurap Jalan Termasuk Kerja Mengecat Semula Garis ROSLI TUAH ENTERPRISE MAJLIS PERBANDARAN 79,459.00 2000 Aturan Jalan Di Jalan Barat, PJ. PETALING JAYA

48. Kerja-kerja Segera Bagi Menampal Jalan Dengan Menggunakan SRI NOR IMAN ENTERPRISE MAJLIS PERBANDARAN 18,800.00 29/05/2000 Kaedah Pengisaran (Milling) Di Atas Jalan Asphaltic Concrete Bagi PETALING JAYA Mengatasi Masalah Kerosakan Jalan Di Sekitar Jlan Protokol Zon C.

Road and Earthworks:-

49. Kg. Orang Asli Ulu Kuang, Kuang, Selangor. HJ ARSHAD BIN PEJABAT DAERAH & TANAH 36,863.60 1992 HJ NOOR GOMBAK

50. Jalan Taman Buaya Raya, Semenyih Selangor. 29,850.00 1992

51. Roadworks for 452 Unit Rumah Panjang, Jinjang Utara, Kuala Lumpur. GUNUNG MEWAH DEWAN BANDARAYA 32,597.70 1992 KUALA LUMPUR

52. Jalan at Kg. Melayu Sri Kundang, Kundang Selangor. PEJABAT DAERAH & TANAH 27,487.43 1992 GOMBAK

53. Tempat Letak Kereta Di Hutan Lipur Sungai Tua, Selangor. INDOK ENTERPRISE PEJABAT DAERAH & TANAH 24,964.50 1992 GOMBAK

54. Lapangan Tempat Letak Kereta di Surau Petaling. MAJLIS DAERAH GOMBAK 5,600.00 1992

55. Taman Gombak, Selangor. WANTER PANTAS ENTERPRISE MAJLIS DAERAH GOMBAK 47,851.70 1992

56. Taman Desa Jaya, Kepong Selangor. AHMAD ENTERPRISE MAJLIS DAERAH GOMBAK 44,578.80 1993

57. Jalan SG 4/3, SG 4/4, SG 4/5 & SG 4/6, Fasa 4 Taman Sri Gombak, SYARIKAT USAHA JAYA MAJLIS DAERAH GOMBAK 49,548.87 1993 Selangor.

58. Road Work for Proposed Extension of Mas Flight Simulator Building GUNUNG MEWAH MALAYSIA AIRPORT 24,572.54 1993 (A330) at Mas Complex A, Subang International Airport. BERHAD

59. Kerja-kerja Melebarkan Jalan Di KM 9, Jalan Rawang 1, Selangor. AHMAD ENTERPRISE JABATAN KERJA RAYA 41,075.00 1993 (GOMBAK) PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

60. Jalan Stesen Di Stesen Ibu Pejabat Mardi Serdang, Serdang Selangor. MARDI SERDANG 25,575.00 1993

61. Roadwork and Pavement for Tg. Malim (N) Layby PROPEL PLUS 57623.55 1993

62. Membina Dan Menyiapkan Kerja-kerja Melebarkan Jalan Batang Kali/Ulu PROPEL JABATAN KERJA RAYA 526,980.00 1993 Rening Dari CH400-CH1500 Dalam Daerah Hulu Selangor, Selangor Darul (SELANGOR) Ehsan.

63. Supply od Labour Basics for JKR State Resurfacing 1993/1994 Road SUNGAI LONG INDUSTRIES JABATAN KERJA RAYA 42,000.00 1993 Works at Ulu Selagor District. (SELANGOR)

64. Kerja-kerja Memperbaiki dan Menurap Semula Permukaan Jalan Di Jalan AHMAD ENTERPRISE SHAH ALAM PROPERTIES 84,949.97 1993 Permai 6, Permai, Selayang Baru, Bt. Caves Selangor.

65. Surfacing Roads at Bandar Baru Selayang Phase 1B-1A Daerah Gombak, AHMAD ENTERPRISE SHAH ALAM PROPERTIES 84,949.97 1993 Selangor.

66. Kerja-kerja Miling dan Menurap Semula di Kawasan Timbang Kerling Hulu PELANGI CONSTRUCTION JABATAN KERJA RAYA 35,000.00 1993 Selangor. (SELANGOR)

67. Kerja-kerja Menaiktaraf Jalan 1, Rumah PKNS, Batu 16 Rawang, Selangor. USAHASAMA H & M MAJLIS DAERAH GOMBAK 62,582.88 1993

68. Kerja-kerja Dalam Tempoh Kecacatan Bagi Projek Pavement & Shoulder PROPEL JABATAN KERJA RAYA 145,283.00 1993 Works bagi Projek Kerja-kerja Membaikpulih Dan Menurap Laluan (SELANGOR) Persekutuan 1 Dari FT 001-420-000 hingga FT 001-468-600 Dengan Menggunakan Kaedah ‘Hot In Place’ di Negeri Selangor.

Supplier of Spare Part, Hardwares and Road Sfety Equipment ( Thermoplastic, Signboard & Machine)

69. Membekal Spare Parts & Hardwares MAJLIS DAERAH GOMBAK 64,998.51 1993

70. Supply And Delivery Of Fifteen (15) Units Of Roadline Marking Machines RC MACHINERY JABATAN KERJA RAYA 187,500.00 1993 To JKR Workshop Negeri-negeri Semenanjung Malaysia. SDN. BHD.

71. Bekalan Dan Pengiriman Sepuluh (10) Unit Cold Emulsion Sprayer. RC MACHINERY JABATAN KERJA RAYA 45,000.00 1993 SDN. BHD.

72. Bekalan Dan Pengiriman Empat Puluh Tiga (43) Units Chain Saw. RC MACHINERY JABATAN KERJA RAYA 49,450.00 1993 SDN. BHD. PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

Tipper Lorry and Backhoe Rental 1993/1994

73. Kerja-Kerja Mancuci Dan Membersihkan Serta Termasuk Penyewaan Lori MAJLIS PERBANDARAN 504,000.00 1993 Dan Backhoe. AMPANG JAYA

74. Kerja-Kerja Mencuci Dan Membersihkan Seta Termasuk Penyewaan Lori MAJLIS PERBANDARAN 344,000.00 1994 Dan Backhoe. AMPANG JAYA

75. Membersihkan Longkang-Longkang Konkrit, Longkang ‘V’ Pembentung PEMBINAAN DARUL MUKMIN JABATAN KERJA RAYA 20,305.00 1994 Jalan Di Jalan , Daerah Gombak Selangor. (GOMBAK)

76. Membekal Jentera Pengangkutan, Peralatan Dan Tenaga Buruh Untuk NASS CONSULT JABATAN KERJA RAYA 990.00 1994 Kerja-Kerja Memotong Pokok Yang Bahaya Di Kawasan Sg. Buluh, (GOMBAK) Selangor.

77. Tempat Letak Kereta Di Hutan Lipur Sungai Tua, Selangor. SRIBUDI ENTERPRISE PEJABAT DAERAH & TANAH 39,450.47 1994 GOMBAK

78. Roadworks for 452 Unit Rumah Panjang, Jinjang Utara Kuala Lumpur. GUNUNG MEWAH DEWAN BANDARAYA 66,977.35 1994 KUALA LUMPUR

79. Membina Jalan Asas Di Kg. Permata, Rawang Selangor. SYARIKAT USAHA JAYA PEJABAT DAERAH & TANAH 24,942.53 1994 GOMBAK

80. Membina Jalan Asas Di Kg. Cempedak, Kuang, Selangor. PEMBINAAN DARUL MUKMIN PEJABAT DAERAH & TANAH 16,327.12 1994 GOMBAK

81. Membina Jalan Asas Di Kg. Orang Asli, Ulu Kuang, Selangor. HJ. ARSAD HJ. NOR PEJABAT DAERAH & TANAH 15,103.40 1994 GOMBAK

82. Membina Jalan Premix Di Kg. Sri Kundang, Selangor. ALIAS ISHAK PEJABAT DAERAH & TANAH 26,271.30 1994 GOMBAK

83. Kerja-Kerja Membina Jalan Premix Di Kg. Sg. Kertas, Batu Caves SYARIKAT OTHMAN & PEJABAT DAERAH & TANAH 42,370.40 1994 Selangor. KELUARGA GOMBAK

84. Kerja-kerja Membina Jalan Asas Di Kg. Nakhoda Batu Caves Selangor. NASS CONSULT PEJABAT DAERAH & TANAH 29,764.90 1994 GOMBAK

85. Kerja-kerja Membina Jalan Asas Di Kg. Nakhoda Batu Caves Selangor. NASH SHITA PEJABAT DAERAH & TANAH 19,990.00 1995 GOMBAK PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

86. Proposed Pavement Rehabilitation And Associated Works Along Ipoh- PROPEL PLUS 956,192.71 1998 Changkat Jering Expressway (Package G3B KM252.20-255.00 SB) – Pavement Works.

87. The Xxecutive and Completion of Work Order at South Region Lebuhraya PROPEL PLUS 2,000,000.00 1998 Utara Selatan At Section S1.

88. Execution and Completion of Work Order for Northern, Central and PROPEL PLUS 3,500,000.00 1998 Southern Region for The Period of 1st June 1999 until 31ST May 2000. Contract No : PROPEL/CD/LOU/07/99-135

89. Propose Pavement Rehabilition and Associated Works at Yong Peng ( PROPEL PLUS 2,925,585.00 1998 North) Interchange.

90. Cadangan Membina Jln Di Seksyen 7, Shah Alam / PKNS Shah Alam. KONTRA BINA PKNS SHAH ALAM 1,089,300.00 1998 SDN. BHD.

91. Road Reinstatement di Kawasan Majlis Perbandaran Selayang Untuk MPS PUNCAK NIAGA 159,700.00 1998 Puncak Niaga Sdn. Bhd. SDN. BHD.

92. Cadangan Membina Sambungan Jalan Raya Satu Ke Jalan Basar Seri SYARIKAT BINAAN JAYA MAJLIS PERBANDARAN 329,705.00 1999 Kembangan, Mukim Dan Daerah Petaling Selangor Darul Ehsan. SEPAKAT SUBANG JAYA

93. Cadangan Kerja Lanskap Membina Sebuah Dataran Awan Di SS 13, PRESTASI ASIA (M) SDN. BHD. MAJLIS PERBANDARAN 3,078,598.90 1999 Subang Jaya Fasa 1 dan Fasa 2. SUBANG JAYA

94. Cadangan Membina dan Menyiapkan Taman Lanskap di Relau, Pulau RADZAH ENG. JABATAN LANSKAP 2,952,051.00 2000 Pinang. SDN. BHD. NEGARA

95. Cadangan Pengindahan Kiri Kanan Jalan Untuk Kawasan Perumahan FY RESOURCES WORLD WIDE HOLDING 565,000.00 2000 Taman Subang Bistari, Mukim Sungai Buloh Untuk Tetuan Worldwide SDN. BHD. SDN. BHD. Holdings Sdn. Bhd.

96. Kerja Semula Menurap Jalan Termasuk Kerja Mengecat Semula Garis ROSLI TUAH ENTERPRISE MAJLIS PERBANDARAN 79,459.00 2000 Aturan Jalan Di Jalan Barat, Petaling Jaya. PETALING JAYA

97. Cadangan Menaikkan Taraf Infrastruktur Jalan Di Kg. Sg. Penchala Kuala PRESTASI ASIA (M) SDN. BHD. DEWAN BANDARAYA 2,000,000.00 2000 Lumpur (1999/A176) KUALA LUMPUR PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

98. Kerja Membina Dan Mempertingkatkan Kemudahan Laluan Pejalan Kaki PRESTASI ASIA (M) SDN. BHD. DEWAN BANDARAYA 2,000,000.00 2000 Ke Stesen Sistem Transit Di Wilayah Persekutuan Kuala Lumpur. KUALA LUMPUR (1998/2000) (52/98)

99. Cadangan Merekabentuk dan Menaiktaraf Bulatan Majlis Untuk Tetuan AULIA BINA ENTERPRISE MAJLIS PERBANDARAN 90,000.00 2001 Majlis Perbandaran Petaling Jaya. PETALING JAYA

100. Kerja Perlaksanaan Penandaan Jalan Di Jalan-jalan Di Wilayah PRESTASI ASIA (M) SDN. BHD. DEWAN BANDARAYA 884,750.00 01/08/2009 – Persekutuan Kualal Lumpur. KUALA LUMPUR 31/10/2001

101. Kerja-kerja Menaiktaraf Jalan Usaha, UEP Subang Jaya, Selangor Darul NORDIN BIN JAMUL MAJLIS PERBANDARAN 345,625.00 09/08/2001 – Ehsan. SUBANG JAYA 27/09/2001

102. The Excecution and Complection of Earthworks for the Proposed PORIM KUMPULAN GUTHRIE BHD. PORIM 965,675.00 21/11/2000 Experimental Mill Tender No. AF 10/96.

103. Kerja-kerja Baikpulih Menurap Semula Jalan dan Kerja Berkaitan Dari ZULAN ENTERPRISE SDN. BHD. PKNS 1,121,000.00 04/12/2001 – CH1200 – CH4280 Persiaran Surian (M 002) Kota Damansara. 03/06/2002

104. Kerja-kerja Menaiktaraf / Membaikpulih Jalan-jalan Industri Daerah SINAR BEBAS JABATAN KERJA RAYA 999,003.75 08/12/2001 – Gombak, Selangor. 21/12/2001

105. Kerja-kerja Membaiki Jalan Dengan Kaedah Milling & Paving. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 820,676.50 2000 BERHAD

106. Kerja-kerja Membaiki Jalan Dengan Kaedah Milling & Paving. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 820,676.50 2000 BERHAD

107. Kerja-kerja Milling & Paving di Jalan 51/215, 5/217, Jalan Tandang 204, PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 99,225.00 2001 201. BERHAD

108. Kerja-kerja Milling & Paving di Jalan TR 2/2, TR 4/1, Jalan Damansara PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 78,645.00 2001 Lebuh BU 10/8. BERHAD

109. Kerja-kerja Milling & Paving di Jalan 20/2, 20/9, 20/11. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 73,500.00 2001 BERHAD

110. Kerja-kerja Milling & Paving di Jalan Othman Jalan Railway1/2 Jalan 1/3. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 95,550.00 2001 BERHAD PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

111. Kerja-kerja Milling & Paving di Jalan PJS 6/4, Jalan PJS 10/11 & Jalan PJS PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 88,200.00 2001 8/9. BERHAD

112. Kerja-kerja Milling & Paving di Jalan Pantai 9/7, Jalan Gasing & Lorong PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 99,225.00 2001 Timur. BERHAD

113. Kerja-kerja Milling & Paving di Jalan Templer Jalan 6/29, Jalan 6/30, Jalan PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 99,225.00 2001 6/10, Jalan 6/12. BERHAD

114. Kerja-kerja Milling & Paving di Jalan 25/23, Jalan SS 25/9, Jalan SS25/24, PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 80,200.00 2001 Jalan SS 25/34, Jalan SS 25/23 & Jalan SS 25/37. BERHAD

115. Kerja-kerja Milling & Paving di Persiaran Kenanga, Persiaran Perdana & PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 36,015.00 2001 Persiaran Meranti, Sri Damansara Kuala Lumpur. BERHAD

116. Kerja-kerja Milling & Paving di Jalan Sg. Jernih 8/1 Jalan Kelah 8/6. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 36,750.00 2001 BERHAD

117. Kerja-kerja Mill & Pave di sekitar P/E Puteri Park & P/E Taman Putra No.1. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 58,800.00 2001 BERHAD

118. Kerja-kerja Mill & Pave di Kawasan Perindustrian Jalan Enggang Kuala PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 43,365.00 2001 Lumpur. BERHAD

119. Menjalankan Kerja-kerja Pembaikan Jalan Dengan Kaedah Milling & PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 8,085.00 2001 Paving di Kawasan MPAJ Di Jalan Cempaka 14, Taman Cempaka BERHAD (merujuk kepada surat MPAJ (27) dalam MPAJ 05/03/01-5-TNB).

120. Kerja-kerja Mill & Pave di Jalan Air Mata & Jalan Air Jernih Setapak Kuala PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 37,338.00 2001 Lumpur. BERHAD

121. Kerja-kerja Milling & Paving di Jalan SS 15/5A Subang Jaya Selangor. PRESTASI ASIA (M) SDN. BHD. TENAGA NASIONAL 73,500.00 2001 BERHAD

122. Cadangan Membina Dan Menyiapkan Persimpangan Keluar Masuk Ke PRESTASI ASIA (M) SDN. BHD. PKNS 4,540,000.00 03/06/2002 – Lebuhraya Shapadu Dan Lain-lain Kerja Berkaitan Di Fasa 4, Bandar 10/02/2003 Sultan Suleiman, Pelabuhan Klang. PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works) – Tenaga Nasional Berhad (TNB)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

1. Jalan Aman, Jalan Subang Lama & Jalan Subang 9. PRESTASI ASIA (M) SDN. BHD. TNB 73,500.00 29/11/2000

2. Perindustrian Jalan Enggang. PRESTASI ASIA (M) SDN. BHD. TNB 43,365.00 27/11/2001

3. Sek. Sri Inai ke Lot 279, Kg. Hulu Klang. PRESTASI ASIA (M) SDN. BHD. TNB 13,957.50 02/06/2003

4. Jalan Kartunis UI/46 Temasya Shah Alam. PRESTASI ASIA (M) SDN. BHD. TNB 25,725.00 02/06/2003

5. Jalan Perindustrian 2 Subang Jaya. PRESTASI ASIA (M) SDN. BHD. TNB 2,572.50 02/06/2003

6. Taman Kosas No 2 & Pandan Jaya No 10. PRESTASI ASIA (M) SDN. BHD. TNB 13,671.00 23/07/2002

7. Jalan Kia Peng & KLCC. PRESTASI ASIA (M) SDN. BHD. TNB 38,587.00 30/04/2002

8. PPU Wangsa Maju Pembekal No 12. PRESTASI ASIA (M) SDN. BHD. TNB 26,215.00 01/07/2002

9. Jalan 2/8 Selayang Baru. PRESTASI ASIA (M) SDN. BHD. TNB 24,181.50 01/07/2002

10. Sekitar PPU Ultramine Kekal Subang Jaya. PRESTASI ASIA (M) SDN. BHD. TNB 58,800.00 15/09/2002

11. Pencawang Elektrik Dagang Jaya No. 3. PRESTASI ASIA (M) SDN. BHD. TNB 14,700.00 15/09/2002

12. Pencawang Elektrik Dagang Jaya No. 2. PRESTASI ASIA (M) SDN. BHD. TNB 15,067.50 15/09/2002

13. Jalan Usahawan 6 Jalan 2/27A. PRESTASI ASIA (M) SDN. BHD. TNB 99,898.75 15/09/2002

14. Taman Seraya & Taman Indah Abra. PRESTASI ASIA (M) SDN. BHD. TNB 39,690.00 15/09/2003

15. Jalan Bukit Indah Ampang. PRESTASI ASIA (M) SDN. BHD. TNB 4,483.50 03/01/2003

16. MSVT PPU Wangsa Maju. PRESTASI ASIA (M) SDN. BHD. TNB 66,150.00 03/01/2003

17. Kawasan Lembah Jaya Selatan. PRESTASI ASIA (M) SDN. BHD. TNB 32,707.50 03/01/2003

18. Jalan SS 7/3, Kelana Jaya, Petaling Jaya. PRESTASI ASIA (M) SDN. BHD. TNB 36,750.00 03/01/2003

19. Jalan 4/19 Pandan Indah & Pandan Utama. PRESTASI ASIA (M) SDN. BHD. TNB 26,166.00 03/01/2003

20. Jalan Wangsa 13, Bukit Antarbangsa. PRESTASI ASIA (M) SDN. BHD. TNB 24,255.00 29/10/2003

21. Puchong Perdana. PRESTASI ASIA (M) SDN. BHD. TNB 33,075.00 18/01/2005

22. Jln Rasmi 7, 14, Jln Indah Utama, Jln Bukit Indah 4/4. PRESTASI ASIA (M) SDN. BHD. TNB 37,485.00 29/10/2003

23. Persiaran Titiwangsa 3, Belakang Hospital Tawakal. PRESTASI ASIA (M) SDN. BHD. TNB 41/417.25 29/10/2003 PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works) – Tenaga Nasional Berhad (TNB)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

24. Jalan Daya 7, 11 Dan 12, Taman Daya. PRESTASI ASIA (M) SDN. BHD. TNB 21,829.50 29/10/2003

25. Jln Medan Bukit Indah 5 & Tmn Tun Abdul Razak. PRESTASI ASIA (M) SDN. BHD. TNB 16,905.00 15/12/2003

26. Batu 6 Tkt Rawang. PRESTASI ASIA (M) SDN. BHD. TNB 43,120.00 19/12/2003

27. Jalan Berjaya. PRESTASI ASIA (M) SDN. BHD. TNB 23,520.00 02/03/2004

28. Jalan Pasar. PRESTASI ASIA (M) SDN. BHD. TNB 98,698.25 02/03/2004

29. Jalan Tago & Wangsa Permai. PRESTASI ASIA (M) SDN. BHD. TNB 16,684.50 25/05/2004

30. Kerosakan Jalan. PRESTASI ASIA (M) SDN. BHD. TNB 9,187.50 09/07/2004

31. Subang Mewah / USJ (PJY 90154). PRESTASI ASIA (M) SDN. BHD. TNB 99,960.00 29/10/2004

32. Jalan Kawasan USJ 21/1 Subang Jaya. PRESTASI ASIA (M) SDN. BHD. TNB 7,250.00 02/11/2004

33. MSVT Kesan Lampau. PRESTASI ASIA (M) SDN. BHD. TNB 32,046.00 02/11/2005

34. Hypermarket. PRESTASI ASIA (M) SDN. BHD. TNB 12,544.00 02/11/2006

35. Jalan TP 5 Taman SIME UP. PRESTASI ASIA (M) SDN. BHD. TNB 1,286.25 08/11/2004

36. Lot 38508 Gie & Div Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 4,287.50 08/11/2006

37. Jalan Lompat Galah. PRESTASI ASIA (M) SDN. BHD. TNB 36,015.00 09/11/2004

38. Jalan Perindustrian 2 Subang Jaya. PRESTASI ASIA (M) SDN. BHD. TNB 2,572.50 09/11/2005

39. Kawasan KL BA. PRESTASI ASIA (M) SDN. BHD. TNB 4,802.00 29/11/2004

40. Unit Servis PRESTASI ASIA (M) SDN. BHD. TNB 8,599.50 04/03/2005

41. Kerja Bagi Milling di Kawasan MPAJ. PRESTASI ASIA (M) SDN. BHD. TNB 4,704.00 11/03/2005

42. Jalan C10 Taman Melawati. PRESTASI ASIA (M) SDN. BHD. TNB 18,375.00 20/04/2005

43. Jalan Nakhoda Tengah Kanan & Kanan 1. PRESTASI ASIA (M) SDN. BHD. TNB 24,622.50 20/04/2005

44. Jalan SBC, Taman Sri Batu Caves. PRESTASI ASIA (M) SDN. BHD. TNB 6,100.50 20/04/2005

45. Jalan Bendahara, Sri Selayang & Dewan Beringin. PRESTASI ASIA (M) SDN. BHD. TNB 6,100.50 20/04/2005

46. MSVT P/E UL Tramine Ke P/E Chubb. PRESTASI ASIA (M) SDN. BHD. TNB 98,000.00 03/06/2005 PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works) – Tenaga Nasional Berhad (TNB)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

47. MSVR KL Timur. PRESTASI ASIA (M) SDN. BHD. TNB 28,518.00 06/06/2005

48. MSVT Sekitar Bukit Antarabangsa. PRESTASI ASIA (M) SDN. BHD. TNB 83,202.00 06/06/2006

49. MGURN Bil Pencawang Tmn. Dato Ahmad Razali CB10. PRESTASI ASIA (M) SDN. BHD. TNB 15,435.00 06/06/2007

50. Belanjawan Modal 2002. PRESTASI ASIA (M) SDN. BHD. TNB 33,410.11 14/07/2005

51. MSVT P/E Sri Putra. PRESTASI ASIA (M) SDN. BHD. TNB 45,276.00 14/07/2005

52. B/E Untuk Mujur Mas Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 39,690.00 14/07/2005

53. Dari PPU Kajang Utama ke P/E Taman Sri Bukit Kajang. PRESTASI ASIA (M) SDN. BHD. TNB 88,567.50 14/07/2005

54. Bangunan Klang Tambahan Di Atas Lot 805. PRESTASI ASIA (M) SDN. BHD. TNB 49,245.00 04/08/2005

55. B/E Untuk Korakyat Plantation. PRESTASI ASIA (M) SDN. BHD. TNB 24,990.00 10/08/2005

56. B/E Untuk Masjid Al-Falah JKR 102,977. PRESTASI ASIA (M) SDN. BHD. TNB 9,800.00 10/08/2006

57. MSVT Pasar Jalan Othman. PRESTASI ASIA (M) SDN. BHD. TNB 99,225.00 10/08/2007

58. FEB 05 Fasa 2. PRESTASI ASIA (M) SDN. BHD. TNB 50,592.50 10/08/2008

59. Pandan Indah. PRESTASI ASIA (M) SDN. BHD. TNB 26,827.50 12/08/2005

60. Jalan SBC, Taman Sri Batu Caves. PRESTASI ASIA (M) SDN. BHD. TNB 6,100.50 20/04/2005

61. Jalan Bendahara, Sri Selayang, Dewan Beringin. PRESTASI ASIA (M) SDN. BHD. TNB 6,100.50 20/04/2005

62. MSVR Bandar Baru Selayang. PRESTASI ASIA (M) SDN. BHD. TNB 19,404.00 22/08/2006

63. Unit Servis. PRESTASI ASIA (M) SDN. BHD. TNB 16,268.00 08/09/2005

64. Unit Servis. PRESTASI ASIA (M) SDN. BHD. TNB 9,628.50 16/09/2005

65. No. 8 Jalan Watan 1. PRESTASI ASIA (M) SDN. BHD. TNB 882.00 28/06/2006

66. Wanterpantas – Beban Lampau (Tender). PRESTASI ASIA (M) SDN. BHD. TNB 74,884.45 13/10/2006

67. B/E Stesen Minyak Shell. PRESTASI ASIA (M) SDN. BHD. TNB 8,575.00 22/02/2006

68. B/E Untuk Memory Tech 205, 765. PRESTASI ASIA (M) SDN. BHD. TNB 47,775.00 21/02/2006

69. B/E Untuk Pilihan Megah Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 19,722.50 28/06/2006 PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works) – Tenaga Nasional Berhad (TNB)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

70. B/E Ke Kondo – Jalan Wangsa Baiduri. PRESTASI ASIA (M) SDN. BHD. TNB 5,880.00 28/06/2006

71. KWSN SS 19/1. PRESTASI ASIA (M) SDN. BHD. TNB 7,644.00 22/03/2006

72. Jalan SS 17/1E, 2B, 2G, 2L 3. PRESTASI ASIA (M) SDN. BHD. TNB 25,725.00 25/07/2006

73. Amiezie Kepada TNB (Tender). PRESTASI ASIA (M) SDN. BHD. TNB 105,435.00 01/08/2006

74. MSVT PMU Ke PPU Petronas. PRESTASI ASIA (M) SDN. BHD. TNB 65,400.30 16/02/2006

75. Sekitar Shah Alam – Mac 06. PRESTASI ASIA (M) SDN. BHD. TNB 62,735.00 27/07/2006

76. PPU Wangsa Maju. PRESTASI ASIA (M) SDN. BHD. TNB 66,150.00 25/07/2006

77. Shah Alam 3. PRESTASI ASIA (M) SDN. BHD. TNB 58,310.00 04/08/2006

78. BICC. PRESTASI ASIA (M) SDN. BHD. TNB 99,470.00 04/08/2006

79. Shah Alam 2. PRESTASI ASIA (M) SDN. BHD. TNB 39,788.00 12/09/2006

80. Lorong Memanda 2. PRESTASI ASIA (M) SDN. BHD. TNB 2,499.00 12/09/2006

81. Taman Cuepacs No. 2. PRESTASI ASIA (M) SDN. BHD. TNB 99,225.00 12/09/2006

82. MSVT P/E Seahousing No. 5. PRESTASI ASIA (M) SDN. BHD. TNB 94,325.00 04/10/2006

83. Damansara Perdana. PRESTASI ASIA (M) SDN. BHD. TNB 99,225.00 13/10/2006

84. Kedai Pejabat Seksyen 20 Untuk GMBUILD. PRESTASI ASIA (M) SDN. BHD. TNB 14,520.00 13/10/2006

85. Tkt Bandar Rawang CPC. PRESTASI ASIA (M) SDN. BHD. TNB 21,780.00 13/10/2006

86. PKNS & Mentari. PRESTASI ASIA (M) SDN. BHD. TNB 25,725.00 14/11/2006

87. Com Square & Sway Doowntown. PRESTASI ASIA (M) SDN. BHD. TNB 49,000.00 14/11/2006

88. Merentang Kabel Injection Dr SSU. PRESTASI ASIA (M) SDN. BHD. TNB 33,001.50 22/12/2006

89. Untuk Kenweld Malaysia Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 47,162.50 20/12/2006

90. Untuk Ilham Tulus Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 17,150.00 20/12/2006

91. MSVT P/E Sekolah Ugama Jenderam. PRESTASI ASIA (M) SDN. BHD. TNB 26,019.00 10/01/2007

92. MSVT P/E Bandar Teknologi Kajang. PRESTASI ASIA (M) SDN. BHD. TNB 8,452.50 10/01/2007 PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works) – Tenaga Nasional Berhad (TNB)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

93. Sekolah Rendah Agama Jalan Pandan Mewah. PRESTASI ASIA (M) SDN. BHD. TNB 11,377.80 10/01/2007

94. Di Lorong Awan 2. PRESTASI ASIA (M) SDN. BHD. TNB 18,228.00 10/01/2007

95. RHB Bank Wawasan 2/3. PRESTASI ASIA (M) SDN. BHD. TNB 2,646.00 10/01/2007

96. Maybank Taman Putra. PRESTASI ASIA (M) SDN. BHD. TNB 5,733.00 10/01/2007

97. MSVT PPU Bandar Mahkota VCB 3. PRESTASI ASIA (M) SDN. BHD. TNB 37,632.00 10/01/2007

98. MSVT P/E Jenderam Hilir No. 2. PRESTASI ASIA (M) SDN. BHD. TNB 8,820.00 21/03/2007

99. PJY 4315 CLSD PRESTASI ASIA (M) SDN. BHD. TNB 25,725.00 04/04/2007

100. Kondominium Untuk Ken Property PRESTASI ASIA (M) SDN. BHD. TNB 22,050.00 04/04/2007

101. Kabel Dari P/E Temasya No. 9. PRESTASI ASIA (M) SDN. BHD. TNB 85,750.00 04/04/2007

102. Sunway Damansara Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 3,430.00 04/04/2007

103. Rumah Pangsa Untuk TD Management. PRESTASI ASIA (M) SDN. BHD. TNB 94,325.00 04/04/2007

104. Tetuan Yong Soon Fatt. PRESTASI ASIA (M) SDN. BHD. TNB 3,430.00 04/04/2007

105. Christian Brethern Malaysia. PRESTASI ASIA (M) SDN. BHD. TNB 5,267.50 04/04/2007

106. Wawasan Indera 2. PRESTASI ASIA (M) SDN. BHD. TNB 18,375.00 04/04/2007

107. Wanter Pantas – Puchong. PRESTASI ASIA (M) SDN. BHD. TNB 98,000.00 06/06/2006

108. CAD Pembangunan 1 Blok Pangsapuri 11. PRESTASI ASIA (M) SDN. BHD. TNB 16,905.00 06/06/2007

109. Taman Muda. PRESTASI ASIA (M) SDN. BHD. TNB 3,675.00 06/06/2007

110. PJY 4246 CLSD. PRESTASI ASIA (M) SDN. BHD. TNB 99,470.00 11/07/2007

111. B/E Untuk Tetuan Cahaya Kota Development Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 34,300.00 11/07/2007

112. JLN SS. PRESTASI ASIA (M) SDN. BHD. TNB 7,350.00 11/07/2007

113. JLN 51A/227 (LA) PRESTASI ASIA (M) SDN. BHD. TNB 15,925.00 11/07/2007

114. B/E Untuk Tetuan Mentaril Properties Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 13,720.00 11/07/2007

115. JLN SS 2/67, TMN. PRESTASI ASIA (M) SDN. BHD. TNB 12,201.00 11/07/2007 PRESTASI ASIA (M) SDN. BHD.

COMPLETED PROJECTS (Milling and Paving Works) – Tenaga Nasional Berhad (TNB)

NO. DESCRIPTION MAIN CONTRACTOR CLIENT CONTRACT VALUE DATE OF (RM) COMPLETION

116. MSVR (P/E Taman Ahmad Razali No 7). PRESTASI ASIA (M) SDN. BHD. TNB 17,983.00 11/07/2007

117. No. 2-4, 5 Jalan SS 6/6. PRESTASI ASIA (M) SDN. BHD. TNB 6,125.00 13/07/2007

118. P/E Sg. Long No. 15. PRESTASI ASIA (M) SDN. BHD. TNB 92,316.00 13/07/2007

119. Kawasan UM. PRESTASI ASIA (M) SDN. BHD. TNB 49,549.50 13/07/2007

120. Seapark ke PE Taman Gelora No. 3. PRESTASI ASIA (M) SDN. BHD. TNB 58,800.00 13/07/2007

121. B/E Untuk Monash University (M) Sdn. Bhd. PRESTASI ASIA (M) SDN. BHD. TNB 98,612.50 14/07/2007

122. Wangsa Bajuri, BPB 8, 3, 9, 11. PRESTASI ASIA (M) SDN. BHD. TNB 99,960.00 14/07/2007

123. Jalan MPSJ SJY 547. PRESTASI ASIA (M) SDN. BHD. TNB 88,200.00 14/07/2007

124. Pengalihan Kabel VT Tetuan JKR. PRESTASI ASIA (M) SDN. BHD. TNB 69,825.00 14/07/2007

125. Jalan Langgak Tuanku. PRESTASI ASIA (M) SDN. BHD. TNB 11,760.00 16/07/2007

126. Jalan Inai / Kampung. PRESTASI ASIA (M) SDN. BHD. TNB 14,994.00 16/07/2007

127. PPU Jaya 33 ke PE Granval. PRESTASI ASIA (M) SDN. BHD. TNB 156,800.00 27/07/2007

128. Tetuan Allied Flourish. PRESTASI ASIA (M) SDN. BHD. TNB 91,875.00 27/07/2007

129. NGV Petronas. PRESTASI ASIA (M) SDN. BHD. TNB 9,437.40 27/07/2007

130. Jalan Teratai Ampang. PRESTASI ASIA (M) SDN. BHD. TNB 7,350.00 27/07/2007 PRESTASI ASIA (M) SDN. BHD.

PHOTO OF PROJECT

ROADWORK / MILL&PAVE / HIGHWAY PRESTASI ASIA (M) SDN. BHD.

PHOTO OF PROJECT

RESERVOIR EARTHWORK PRESTASI ASIA (M) SDN. BHD.

PHOTO OF PROJECT

DRAINAGE / PIPE LANDSCAPE PRESTASI ASIA (M) SDN. BHD.

PHOTO OF PROJECT

BRIDGE AIRPORT PRESTASI ASIA (M) SDN. BHD.

PHOTO OF PROJECT

Menaiktaraf Jalan Putrajaya ke Simpang 3 Jenderam melalui RKT Sungai Membina Dan Menyiapkan 3 Blok Bangunan Sekolah 4 Tingkat Di Sekolah Merab, Sepang Selangor Darul Ehsan. Kebangsaan Cheras Jaya, Daerah Hulu Langat Selangor.

Pembinaan Tangki Air Konkrit 2.2 MGD Beserta Rumah Pam Dan Tangki Sedutan di Cadangan Membina dan Menyiapkan Persimpangan Keluar Masuk ke Pembangunan Antara Gapi, Daerah Hulu Selangor. Lebuhraya Shapadu dan lain-lain Kerja Berkaitan di Fasa 4, Bandar Sultan Suleiman, Pelabuhan Klang.

Pemasangan 750mm Paip Air Keluli dari Bukit Chandang Batang Kali ke Pembangunan Antara Gapi, Daerah Hulu Selangor. Cadangan Kerja-kerja Landskap Membina Sebuah Dataran Awam (Dataran Melinium) di SS13, Subang Jaya Fasa 1 dan Fasa 2, Subang Jaya Selangor.

Membina Jambatan Kampung Sawah Dan Menaiktaraf Jalan Telok Panglima Garang ke Pekan Banting, Daerah Kuala Langat Selangor. KLETTER AWARDEDJ