Division 05 DRAFT STIP 2015 -2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY UNDER CONSTRUCTION Transition State Transportation Improvement Program (Construction Schedules) Developmental Program (Construction Schedules) Construction FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Unfunded B-4659 I-5311 B-5102 U-5500B AV-5700 B-4662 B-4516 B-4654 B-5145 B-5675 B-5682 B-5330 B-5684 B-5317B SR 1393 (BASS LAKE ROAD) I-440 / US 64 US 158 SR 1605 / SR 1615 (GREEN RALEIGH DURHAM SR 2308 (FOWLER ROAD) SR 1433 (PERSON ROAD) NC 50 SR 1343 (JOHN BREWER PULLEN ROAD SR 1400 (GRASSY CREEK - SR 1413 (SUTTON ROAD) US 401 (CAPITAL US 70 WB / NC 50 NB LEVEL WEST ROAD) INTERNATIONAL AIRPORT ROAD) VIRGILINA ROAD) BOULEVARD) (RDU) B-5113 I-5333B B-5121A U-5515 B-4655 B-4828 B-4833 B-4750 B-5673 B-5679 B-5683 B-5674 I-5870 I-5702A SR 1942 (OAK GROVE I-440 / US 1 US 70 / US 401 / NC 50 SR 1930 (STADIUM DRIVE) SR 1006 (OLD STAGE ROAD) SR 1526 (WELDONS MILL SR 2761 (WIMBERLY ROAD) SR 1719 (BRANNON ROAD) SR 1630 (GREEN LEVEL SR 1326 (KELLY ROAD) SR 1371 (LAKE WHEELER US 15 / US 501 I-440 / US 1 I‐40 CHURCH ROAD) SR 1933 (WEST NORTH ROAD) CHURCH ROAD) ROAD) NORTHBOUND AVENUE) B-5151 I-5338 B-5121B W-5323 B-4830 B-4831 I-5819 B-5512 B-5677 B-5680 B-5685 B-5676 TE-5205B I-5702B SR 1432 (HERMAN I-40 / US 64 US 70 / US 401 / NC 50 SR 1152 (HOLLY SPRINGS NC 97 SR 1152 (HOLLY SPRINGS - I-85 SR 1902 (KEMP ROAD) SR 1724 (NORTHSIDE SR 1633 (GOOD HOPE SR 1308 (NUTBUSH ROAD) SR 1670 (BLUE RIDGE DURHAM-ORANGE LIGHT I‐40 WILKERSON ROAD) ROAD) NEW HILL ROAD) ROAD) CHURCH ROAD) ROAD) RAIL LINE BD-5105 I-5338C B-5130 W-5515 B-4943 B-5322 R-5707 EB-5715 I-5707 B-5681 B-5687 U-5717 U-5825A I-5702C VARIOUS VARIOUS SR 1321 (AVENT FERRY SR 1518 (STEWART FARM SR 1616 (BAHAMA ROAD) SR 1343 (JOHN BREWER NC 56 US 501 BYPASS (NORTH I-40 SR 2713 (VANDORA SR 1620 (LICKSKILLET US 15 / US 501 SR 1010 (TEN-TEN ROAD) I‐40 ROAD) ROAD) ROAD) DUKE STREET) SPRINGS ROAD) ROAD) C-5163 P-4405 B-5157 B-4945 B-5323 U-4735 EB-5718 R-5705 I-5701 I-5704 U-5720A I-5703 CRABTREE CREEK VARIOUS SR 1304 (SUNSET ROAD) SR 1374 (ANDERSON SR 1442 (DAVE WINSTON VARIOUS SR 1012 (WESTERN NC 55 I-40 / US 64 I-40 US 70 (MIAMI BOULEVARD) I‐40 GREENWAY CREEK ROAD) ROAD) BOULEVARD) C-5164 P-5201 B-5171 B-5140 B-5326 U-5501 EB-5720 U-2901AC R-2828 U-5307A U-5720B R-2241B SMITH GREENWAY PIEDMONT CORRIDOR SR 1400 (WOLF PIT ROAD) SR 1001 (PEARCES ROAD) SR 2555 (RAYNOR ROAD) SR 1650 (REEDY CREEK BRYANT BRIDGE TRAIL NC 55 (WILLIAMS STREET) NEW ROUTE (FUTURE NC US 1 US 70 (MIAMI BOULEVARD) US 501 SANFORD CREEK ROAD) 540) GREENWAY C-5168 P-5500B B-5237 B-5161 EB-5708 U-5516 I-5700 U-2901B U-5301A U-5307B U-5774B R-2241C CRABTREE CREEK NCRR SR 2703 (NEW BETHEL SR 1162 (APEX BARBECUE NC 54 US 501 (ROXBORO ROAD) I-40 NC 55 (WILLIAMS STREET) US 64 US 1 NC 54 US 501 GREENWAY CHURCH ROAD) ROAD) C-5169 P-5500C B-5317A B-5166 I-5111A I-5708 U-5023 U-5301B U-5307C U-5774C R-2814C PARK-AND-RIDE LOT NCRR US 70 WB / NC 50 NB SR 1300 (CORNWALL ROAD) I-40 I-440 / US 1 VARIOUS US 64 US 1 NC 54 US 401

C-5170 R-2635D C-4928 B-5318 I-5111BA I-5843 U-5518A U-5301C U-5747 U-5774E R-2814D VARIOUS NC 540 (TRIANGLE SR 1317 (MORREENE SR 2044 (LIGON MILL ROAD) I-40 I-85 US 70 US 64 NC 54 NC 54 US 401 EXPRESSWAY) ROAD) C-5172 U-0071 C-5165 B-5320 I-5506 I-5844 U-5518B U-5744 U-5750 U-5774F R-2829 SR 1005 (SIX FORKS ROAD) NEW ROUTE SR 1615 (HIGH HOUSE SR 1139 (ENON ROAD) I-40 I-440 US 70 US 70 / NC 50 NC 54 I-40, NC 54 NEW ROUTE (FUTURE NC 540) ROAD) C-5178 U-3308 C-5166 B-5321 I-5787 I-5873 U-5518C U-5811 U-5774H U-4716D VARIOUS NC 55 (ALSTON AVENUE) NC 56 SR 1153 (OLD HOLLY I-85 I-40 US 70 SR 1002 (AVIATION NC 54 SR 1978 (HOPSON ROAD) SPRINGS - APEX ROAD) PARKWAY) C-5183A U-4432 C-5182 B-5327 U-2719 U-5302 U-5748 U-5825B U-5315C VARIOUS SR 1370 (TRYON ROAD) NC 751 (HOPE VALLEY SR 1300 (CONCORD I-440 / US 1 US 401 US 401 SR 1010 (TEN-TEN ROAD) MORRISVILLE PARKWAY ROAD) CHURCH ROAD) EXTENSION C-5183B U-4726 C-5567 B-5556 U-2719A U-5746 U-5751 U-5829 U-5500A NC 55 (ALSTON AVENUE) VARIOUS EAST LYON STATION LAKE DAM ROAD I-440 / US 1 US 401 US 401 26TH STREET SR 1605 / SR 1615 (GREEN LEVEL GREENWAY WEST ROAD) C-5504 U-4916 C-5568 EB-5703 U-4724 U-5823 U-5774D BUCK JONES ROAD SR 1321 SR 1165 (BECKFORD DRIVE) VARIOUS LASALLE STREET SR 1158 (CORNWALLIS WOODCROFT PARKWAY NC 54 (AVENT FERRY ROAD) SR ROAD) EXTENSION 2542 (ROCK QUARRY ROAD) C-5527 U-5118 C-5604 EB-5704 U-5745 U-5826 U-5774G SR 1229 (SOUTH MAIN VARIOUS VARIOUS RAYNOR STREET NC 751 (HOPE VALLEY SR 2000 (FALLS OF NEUSE NC 54 STREET) ROAD) ROAD) C-5569 U-5514 C-5605 EB-5709 U-5827 U-5774I VARIOUS US 1 (CAPITAL BOULEVARD) VARIOUS SR 4363 (MARTIN LUTHER SR 1632 (LOUIS STEPHENS NC 54 KING, JR. BOULEVARD) DRIVE) C-5570 U-5530 C-5610 R-2721 U-5828 U-5774J VARIOUS VARIOUS VARIOUS NEW ROUTE (FUTURE NC MCCRIMMON PARKWAY NC 54 540) E-5501 U-5537 EB-4707A TD-5264A VARIOUS SR 1521 (LAKE PINE DRIVE) SR 1838 / SR 2220 CARY TRANSIT / C-TRAN E-5502 I-5338B U-5749 BENNETT MEMORIAL ROAD I-40 / US 64 NC 55 BYPASS EB-4707B I-5710 W-5522 SR 2220 I-540 SR 1656 (TRINITY ROAD) EB-5513 I-5729 US 15 I-85 EB-5514 TD-4912 NC 751 / SR 1183 / SR 2220 / US 64 BUSINESS NON-SYSTEM (UNIVERSITY DRIVE) EB-5515 TD-5272 VARIOUS SOUTH WILMINGTON STREET I-0914BA U-5315A I-85 MORRISVILLE PARKWAY EXTENSION I-0914BB U-5315B I-85 MORRISVILLE PARKWAY EXTENSION FOOTNOTE * DOES NOT INCLUDE STATEWIDE PROGRAM TYPE ACTIVITIES OR OTHER STATEWIDE HOLDOUTS IN WHICH INDIVIDUAL PROJECTS HAVE YET TO BE DETERMINED NOTE: DETAILED SCHEDULES FOR ALL PHASES OF WORK AND FUNDING FOR THESE PROJECTS AND OTHER PROJECTS WITH NON CONSTRUCTION TYPE WORK ARE SHOWN ON THE ATTACHED PAGES CATEGORY FUNDING

DIV - Division APD - Appalachian Development EX - Exempt BOND (R) - Revenue Bond HF - State Dollars (Non-STI) C - City REG - Regional CMAQ - Congestion Mitigation SW - Statewide DP - Discretionary or Demonstration TRN - Transition Project ER - Emergency Relief Funds FBUS - Capital Program - Bus Earmark (5309) FED - Federal Rail Funds FEPD - Elderly and Persons with Disablity (5310) FF - Federal Ferry FLAP - Federal Lands Access Program FLPI - Federal Lands Program (Indian Reservation Roads) FMOD - Fixed Guideway Modifications FMPL - Metropolitan Planning (5303) FNF - New Freedom Program FNS - New Starts - Capital (5309) FNU - Non Urbanized Area Formula Program (5311) FSPR - State Planning and Research FUZ - Urbanized Area Formula Program (5307) HFB - Highway Fund Bridge Replacement Program HP - Federal-Aid High Priority HRRR - High Risk Rural Roads HSIP - Highway Safety Improvement Program JARC - Job Assistance and Reverse Commute (3037) L - Local NHP - National Highway Performance Program NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance) O - Others RR - Rail-Highway Safety RTAP - Rural Transit Assistance Program S - State S (M) - State Match SMAP - Operating Assistance and State Maintenance SRTS - Safe Routes to School STAT - State STHSR - Stimulus High Speed Rail STP - Surface Transportation Program STPDA - Surface Transportation Program - Direct Attributable STPE - Surface Transportation Program, Enhancements STPEB - Surface Transportation Program, Enhancements (Bike) STPOFF - Surface Transportation Program (Off System Bridge) STPON - Surface Transportation Program Bridge (On System Bridge) T - State Highway Trust Funds T2001 - State Rail Funds TAP - Transportation Alternatives Program TIGER DISC - TIGER Discretionary Grants Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED RALEIGH DURHAM INTERNATIONAL AIRPORT SW CAPITAL AREA MPO AV‐5700 (RDU) 5 WAKE RECONSTRUCT RUNWAY 5L‐23R. CONSTRUCTION T 500 SW CAPITAL AREA MPO AV‐5700 RALEIGH DURHAM INTERNATIONAL AIRPORT 5 WAKE RECONSTRUCT RUNWAY 5L‐23R. CONSTRUCTION O 99500

DIV KERR TAR RPO B‐4516 SR 1433 (PERSON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 52 OVER SANDY CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 200 DIV KERR TAR RPO B‐4516 SR 1433 (PERSON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 52 OVER SANDY CREEK. PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 3 DIV KERR TAR RPO B‐4516 SR 1433 (PERSON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 52 OVER SANDY CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 2000

DIV KERR TAR RPO B‐4522 SR 1150 (GOOCHS MILL ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 102 OVER TAR RIVER. UNDER CONSTRUCTION REPLACE BRIDGE NO. 69 OVER US 70 IN HF CAPITAL AREA MPO B‐4654 NC 50 5 WAKE GARNER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 720 HF CAPITAL AREA MPO B‐4654 NC 50 5 WAKE REPLACE BRIDGE NO. 69 OVER US 70 IN PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 7200

HF CAPITAL AREA MPO B‐4655 SR 1006 (OLD STAGE ROAD) 5 WAKE REPLACE BRIDGE NO. 277 OVER BLACK CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 90 HF CAPITAL AREA MPO B‐4655 SR 1006 (OLD STAGE ROAD) 5 WAKE REPLACE BRIDGE NO. 277 OVER BLACK CREEK. PLANNING / DESIGN IN PROGRESS MITIGATION HFB 12 HF CAPITAL AREA MPO B‐4655 SR 1006 (OLD STAGE ROAD) 5 WAKE REPLACE BRIDGE NO. 277 OVER BLACK CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 900 REPLACE BRIDGE NO. 373 OVER BASSAL CREEK DIV CAPITAL AREA MPO B‐4659 SR 1393 (BASS LAKE ROAD) 5 WAKE IN HOLLY SPRINGS. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPON 2100 REPLACE BRIDGE NO. 196 OVER MOCCASIN DIV CAPITAL AREA MPO B‐4662 SR 2308 (FOWLER ROAD) 5 WAKE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 60 DIV CAPITAL AREA MPO B‐4662 SR 2308 (FOWLER ROAD) 5 WAKE REPLACE BRIDGE NO. 196 OVER MOCCASIN PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 600 REPLACE BRIDGE NO. 80 OVER HAWTREE DIV KERR TAR RPO B‐4666 SR 1314 (WAVERLY THOMPSON ROAD) 5 WARREN CREEK. UNDER CONSTRUCTION

DIV CAPITAL AREA MPO B‐4748 SR 1147 (HOLDEN ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 2 OVER HORSE CREEK. UNDER CONSTRUCTION

DIV CAPITAL AREA MPO B‐4749 SR 1200 (WES SANDLING ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 27 OVER MIDDLE CREEK. UNDER CONSTRUCTION

HF CAPITAL AREA MPO B‐4750 SR 1719 (BRANNON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 90 OVER NORRIS CREEK. RIGHT‐OF‐WAY HFB 120 HF CAPITAL AREA MPO B‐4750 SR 1719 (BRANNON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 90 OVER NORRIS CREEK. MITIGATION HFB 4 HF CAPITAL AREA MPO B‐4750 SR 1719 (BRANNON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 90 OVER NORRIS CREEK. CONSTRUCTION HFB 1200 REPLACE BRIDGE NO. 24 OVER NORTH FLAT DIV KERR TAR RPO B‐4785 SR 1142 (PAYNES TAVERN ROAD) 5 PERSON RIVER. UNDER CONSTRUCTION

DIV KERR TAR RPO B‐4827 SR 1523 (SOUTHERLAND MILL ROAD) 5 VANCE REPLACE BRIDGE NO. 53 OVER SANDY CREEK. UNDER CONSTRUCTION

HF KERR TAR RPO B‐4828 SR 1526 (WELDONS MILL ROAD) 5 VANCE REPLACE BRIDGE NO. 56 OVER SANDY CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 110 HF KERR TAR RPO B‐4828 SR 1526 (WELDONS MILL ROAD) 5 VANCE REPLACE BRIDGE NO. 56 OVER SANDY CREEK. PLANNING / DESIGN IN PROGRESS MITIGATION HFB 3 HF KERR TAR RPO B‐4828 SR 1526 (WELDONS MILL ROAD) 5 VANCE REPLACE BRIDGE NO. 56 OVER SANDY CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1200 REPLACE BRIDGE NO. 20 OVER MOCCASIN HF CAPITAL AREA MPO B‐4830 NC 97 5 WAKE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 155 HF CAPITAL AREA MPO B‐4830 NC 97 5 WAKE REPLACE BRIDGE NO. 20 OVER MOCCASIN PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1550 REPLACE BRIDGE NO. 371 OVER WHITE OAK HF CAPITAL AREA MPO B‐4831 SR 1152 (HOLLY SPRINGS ‐ NEW HILL ROAD) 5 WAKE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 90 HF CAPITAL AREA MPO B‐4831 SR 1152 (HOLLY SPRINGS ‐ NEW HILL ROAD) 5 WAKE REPLACE BRIDGE NO. 371 OVER WHITE OAK PLANNING / DESIGN IN PROGRESS MITIGATION HFB 8 HF CAPITAL AREA MPO B‐4831 SR 1152 (HOLLY SPRINGS ‐ NEW HILL ROAD) 5 WAKE REPLACE BRIDGE NO. 371 OVER WHITE OAK PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 900 REPLACE BRIDGE NO. 376 OVER LITTLE BLACK DIV CAPITAL AREA MPO B‐4833 SR 2761 (WIMBERLY ROAD) 5 WAKE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 80 DIV CAPITAL AREA MPO B‐4833 SR 2761 (WIMBERLY ROAD) 5 WAKE REPLACE BRIDGE NO. 376 OVER LITTLE BLACK PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 12 DIV CAPITAL AREA MPO B‐4833 SR 2761 (WIMBERLY ROAD) 5 WAKE REPLACE BRIDGE NO. 376 OVER LITTLE BLACK PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 785 DURHAM‐CHAPEL HILL‐CARRBORO REPLACE BRIDGE NO. 20 OVER DIAL CREEK DIV MPO B‐4943 SR 1616 (BAHAMA ROAD) 5 DURHAM (LAKE MICHIE). PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 40 DIV DURHAM‐CHAPEL HILL‐CARRBORO B‐4943 SR 1616 (BAHAMA ROAD) 5 DURHAM REPLACE BRIDGE NO. 20 OVER DIAL CREEK PLANNING / DESIGN IN PROGRESS UTILITIES STPOFF 52 DIV DURHAM‐CHAPEL HILL‐CARRBORO B‐4943 SR 1616 (BAHAMA ROAD) 5 DURHAM REPLACE BRIDGE NO. 20 OVER DIAL CREEK PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 700

HF KERR TAR RPO B‐4945 SR 1374 (ANDERSON CREEK ROAD) 5 VANCE REPLACE BRIDGE NO. 36 OVER KERR LAKE. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 120 HF KERR TAR RPO B‐4945 SR 1374 (ANDERSON CREEK ROAD) 5 VANCE REPLACE BRIDGE NO. 36 OVER KERR LAKE. PLANNING / DESIGN IN PROGRESS MITIGATION HFB 8 HF KERR TAR RPO B‐4945 SR 1374 (ANDERSON CREEK ROAD) 5 VANCE REPLACE BRIDGE NO. 36 OVER KERR LAKE. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1225 BRIDGE PURCHASE ORDER REPLACE BRIDGE NO. 359 OVER BEAVER CREEK CONTRACT (BPOC) ‐ UNDER DIV CAPITAL AREA MPO B‐4991 SR 1163 (KELLY ROAD) 5 WAKE IN APEX. CONSTRUCTION PLANNING / DESIGN IN PROGRESS ‐ RIGHT OF WAY AND CONSTRUCTION TO BE FUNDED WITH STATE REPLACE BRIDGE NO. 11 OVER SOUTH HYCO HIGHWAY FUND (NON‐STIP) SW KERR TAR RPO B‐5102 US 158 5 PERSON CREEK. DOLLARS RIGHT‐OF‐WAY NHP 13 SW KERR TAR RPO B‐5102 US 158 5 PERSON REPLACE BRIDGE NO. 11 OVER SOUTH HYCO PLANNING / DESIGN IN PROGRESS ‐ UTILITIES NHP 67 SW KERR TAR RPO B‐5102 US 158 5 PERSON REPLACE BRIDGE NO. 11 OVER SOUTH HYCO PLANNING / DESIGN IN PROGRESS ‐ MITIGATION HFB 1 SW KERR TAR RPO B‐5102 US 158 5 PERSON REPLACE BRIDGE NO. 11 OVER SOUTH HYCO PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION HFB 3300

DIV CAPITAL AREA MPO B‐5113 SR 1942 (OAK GROVE CHURCH ROAD) 5 WAKE REPLACE BRIDGE NO. 157 OVER SMITHS CREEK. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPOFF 700

COORDINATE WITH B‐5317 ‐ REPLACE BRIDGE NO. 227 OVER PEACE STREET PLANNING / DESIGN IN PROGRESS ‐ REG CAPITAL AREA MPO B‐5121 US 70 / US 401 / NC 50 (CAPITAL BOULEVARD) 5 WAKE IN RALEIGH AND REVISE INTERCHANGE. PARTICIPATION BY CITY OF RALEIGH REPLACE BRIDGE NO. 227 OVER PEACE STREET REG CAPITAL AREA MPO B‐5121A US 70 / US 401 / NC 50 5 WAKE IN RALEIGH. RIGHT‐OF‐WAY NHPB 9900 REG CAPITAL AREA MPO B‐5121A US 70 / US 401 / NC 50 5 WAKE REPLACE BRIDGE NO. 227 OVER PEACE STREET UTILITIES NHPB 4300 REG CAPITAL AREA MPO B‐5121A US 70 / US 401 / NC 50 5 WAKE REPLACE BRIDGE NO. 227 OVER PEACE STREET CONSTRUCTION NHPB 11900 REVISE CAPTIAL BOULEVARD / PEACE STREET REG CAPITAL AREA MPO B‐5121B US 70 / US 401 / NC 50 5 WAKE INTERCHANGE. RIGHT‐OF‐WAY STPDA 1122 REG CAPITAL AREA MPO B‐5121B US 70 / US 401 / NC 50 5 WAKE REVISE CAPTIAL BOULEVARD / PEACE STREET RIGHT‐OF‐WAY L 6678 REG CAPITAL AREA MPO B‐5121B US 70 / US 401 / NC 50 5 WAKE REVISE CAPTIAL BOULEVARD / PEACE STREET CONSTRUCTION L 3500 REPLACE BRIDGE NO. 318 OVER LAKE JOHNSON DIV CAPITAL AREA MPO B‐5130 SR 1321 (AVENT FERRY ROAD) 5 WAKE IN RALEIGH. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPON 75 DIV CAPITAL AREA MPO B‐5130 SR 1321 (AVENT FERRY ROAD) 5 WAKE REPLACE BRIDGE NO. 318 OVER LAKE JOHNSON PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPON 600 REPLACE BRIDGE NO. 195 OVER MOCASSIN HF CAPITAL AREA MPO B‐5140 SR 1001 (PEARCES ROAD) 5 WAKE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 70 HF CAPITAL AREA MPO B‐5140 SR 1001 (PEARCES ROAD) 5 WAKE REPLACE BRIDGE NO. 195 OVER MOCASSIN PLANNING / DESIGN IN PROGRESS UTILITIES HFB 89 HF CAPITAL AREA MPO B‐5140 SR 1001 (PEARCES ROAD) 5 WAKE REPLACE BRIDGE NO. 195 OVER MOCASSIN PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 800

As of December 2014 1 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED REPLACE BRIDGE NO. 50 OVER SOUTH HYCO HF KERR TAR RPO B‐5145 SR 1343 (JOHN BREWER ROAD) 5 PERSON CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 300 HF KERR TAR RPO B‐5145 SR 1343 (JOHN BREWER ROAD) 5 PERSON REPLACE BRIDGE NO. 50 OVER SOUTH HYCO PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 3000 REPLACE BRIDGE NO. 215 OVER LITTLE GRASSY DIV KERR TAR RPO B‐5151 SR 1432 (HERMAN WILKERSON ROAD) 5 GRANVILLE CREEK. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPOFF 750

DIV KERR TAR RPO B‐5157 SR 1304 (SUNSET ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 178 OVER FOX CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 100 DIV KERR TAR RPO B‐5157 SR 1304 (SUNSET ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 178 OVER FOX CREEK. PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 2 DIV KERR TAR RPO B‐5157 SR 1304 (SUNSET ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 178 OVER FOX CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 1050 REPLACE BRIDGE NO. 362 OVER BEAVER CREEK DIV CAPITAL AREA MPO B‐5161 SR 1162 (APEX BARBECUE ROAD) 5 WAKE IN APEX. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 70 DIV CAPITAL AREA MPO B‐5161 SR 1162 (APEX BARBECUE ROAD) 5 WAKE REPLACE BRIDGE NO. 362 OVER BEAVER CREEK PLANNING / DESIGN IN PROGRESS MITIGATION HFB 5 DIV CAPITAL AREA MPO B‐5161 SR 1162 (APEX BARBECUE ROAD) 5 WAKE REPLACE BRIDGE NO. 362 OVER BEAVER CREEK PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 700

HF KERR TAR RPO B‐5166 SR 1300 (CORNWALL ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 138 OVER GRASSY CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 150 HF KERR TAR RPO B‐5166 SR 1300 (CORNWALL ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 138 OVER GRASSY CREEK. PLANNING / DESIGN IN PROGRESS MITIGATION HFB 9 HF KERR TAR RPO B‐5166 SR 1300 (CORNWALL ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 138 OVER GRASSY CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1575 REPLACE BRIDGE NO. 125 OVER CROOKED FORK DIV KERR TAR RPO B‐5171 SR 1400 (WOLF PIT ROAD) 5 GRANVILLE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 80 DIV KERR TAR RPO B‐5171 SR 1400 (WOLF PIT ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 125 OVER CROOKED FORK PLANNING / DESIGN IN PROGRESS MITIGATION HFB 4 DIV KERR TAR RPO B‐5171 SR 1400 (WOLF PIT ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 125 OVER CROOKED FORK PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 800 UNDER CONSTRUCTION ‐ BRIDGE REPLACE BRIDGE NO. 76 OVER SYCAMORE PURCHASE ORDER CONTRACT DIV KERR TAR RPO B‐5210 SR 1600 (EAST RIVER ROAD) 5 FRANKLIN CREEK. (BPOC) UNDER CONSTRUCTION ‐ BRIDGE REPLACE BRIDGE NO. 93 OVER AN UNNAMED PURCHASE ORDER CONTRACT DIV KERR TAR RPO B‐5220 SR 1536 (DENNY'S STORE ROAD) 5 PERSON CREEK. (BPOC) REPLACE BRIDGE NO. 248 OVER MAHLER'S DIV CAPITAL AREA MPO B‐5237 SR 2703 (NEW BETHEL CHURCH ROAD) 5 WAKE CREEK IN GARNER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 65 DIV CAPITAL AREA MPO B‐5237 SR 2703 (NEW BETHEL CHURCH ROAD) 5 WAKE REPLACE BRIDGE NO. 248 OVER MAHLER'S PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 12 DIV CAPITAL AREA MPO B‐5237 SR 2703 (NEW BETHEL CHURCH ROAD) 5 WAKE REPLACE BRIDGE NO. 248 OVER MAHLER'S PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 650 REPLACE BRIDGE NO. 213 OVER US 401 (CAPITAL BOULEVARD) IN RALEIGH AND REVISE COORDINATE WITH B‐5121 ‐ REG CAPITAL AREA MPO B‐5317 US 70 WESTBOUND / NC 50 NORTHBOUND 5 WAKE INTERCHANGE. PLANNING / DESIGN IN PROGRESS REPLACE BRIDGE NO. 213 OVER US 401 REG CAPITAL AREA MPO B‐5317A US 70 WB / NC 50 NB 5 WAKE (CAPITAL BOULEVARD). RIGHT‐OF‐WAY NHPB 300 REG CAPITAL AREA MPO B‐5317A US 70 WB / NC 50 NB 5 WAKE REPLACE BRIDGE NO. 213 OVER US 401 UTILITIES NHPB 1541 REG CAPITAL AREA MPO B‐5317A US 70 WB / NC 50 NB 5 WAKE REPLACE BRIDGE NO. 213 OVER US 401 CONSTRUCTION NHPB 11900 CAPITAL AREA MPO B‐5317B US 70 WB / NC 50 NB 5 WAKE REVISE INTERCHANGE AT WADE AVENUE. RIGHT‐OF‐WAY L 4500 CAPITAL AREA MPO B‐5317B US 70 WB / NC 50 NB 5 WAKE REVISE INTERCHANGE AT WADE AVENUE. UTILITIES L 3094 CAPITAL AREA MPO B‐5317B US 70 WB / NC 50 NB 5 WAKE REVISE INTERCHANGE AT WADE AVENUE. CONSTRUCTION L 9700 REPLACE BRIDGE NO. 126 OVER SMITHS CREEK DIV CAPITAL AREA MPO B‐5318 SR 2044 (LIGON MILL ROAD) 5 WAKE IN WAKE FOREST. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 180 DIV CAPITAL AREA MPO B‐5318 SR 2044 (LIGON MILL ROAD) 5 WAKE REPLACE BRIDGE NO. 126 OVER SMITHS CREEK PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 12 DIV CAPITAL AREA MPO B‐5318 SR 2044 (LIGON MILL ROAD) 5 WAKE REPLACE BRIDGE NO. 126 OVER SMITHS CREEK PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 1800

DIV KERR TAR RPO B‐5320 SR 1139 (ENON ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 96 OVER TAR RIVER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 300 DIV KERR TAR RPO B‐5320 SR 1139 (ENON ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 96 OVER TAR RIVER. PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 3 DIV KERR TAR RPO B‐5320 SR 1139 (ENON ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 96 OVER TAR RIVER. PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 2975

DIV CAPITAL AREA MPO B‐5321 SR 1153 (OLD HOLLY SPRINGS ‐ APEX ROAD) 5 WAKE REPLACE BRIDGE NO. 374 OVER LITTLE BRANCH. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 60 DIV CAPITAL AREA MPO B‐5321 SR 1153 (OLD HOLLY SPRINGS ‐ APEX ROAD) 5 WAKE REPLACE BRIDGE NO. 374 OVER LITTLE BRANCH. PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 17 DIV CAPITAL AREA MPO B‐5321 SR 1153 (OLD HOLLY SPRINGS ‐ APEX ROAD) 5 WAKE REPLACE BRIDGE NO. 374 OVER LITTLE BRANCH. PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 600 REPLACE BRIDGE NO. 51 OVER RICHLAND HF KERR TAR RPO B‐5322 SR 1343 (JOHN BREWER ROAD) 5 PERSON CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 135 HF KERR TAR RPO B‐5322 SR 1343 (JOHN BREWER ROAD) 5 PERSON REPLACE BRIDGE NO. 51 OVER RICHLAND PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1350 REPLACE BRIDGE NO. 143 OVER JOHNSTON HF KERR TAR RPO B‐5323 SR 1442 (DAVE WINSTON ROAD) 5 GRANVILLE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 238 HF KERR TAR RPO B‐5323 SR 1442 (DAVE WINSTON ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 143 OVER JOHNSTON PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1500

DIV KERR TAR RPO B‐5325 SR 1116 (CEDAR CREEK ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 12 OVER CEDAR CREEK. UNDER CONSTRUCTION REPLACE BRIDGE NO. 247 OVER WHITE OAK DIV CAPITAL AREA MPO B‐5326 SR 2555 (RAYNOR ROAD) 5 WAKE CREEK IN GARNER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 50 DIV CAPITAL AREA MPO B‐5326 SR 2555 (RAYNOR ROAD) 5 WAKE REPLACE BRIDGE NO. 247 OVER WHITE OAK PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 12 DIV CAPITAL AREA MPO B‐5326 SR 2555 (RAYNOR ROAD) 5 WAKE REPLACE BRIDGE NO. 247 OVER WHITE OAK PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 525 REPLACE BRIDGE NO. 49 OVER SOUTH HYCO HF KERR TAR RPO B‐5327 SR 1300 (CONCORD CHURCH ROAD) 5 PERSON CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 300 HF KERR TAR RPO B‐5327 SR 1300 (CONCORD CHURCH ROAD) 5 PERSON REPLACE BRIDGE NO. 49 OVER SOUTH HYCO PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 3000 REPLACE BRIDGE NO. 107 OVER DEVIL CRADLE DIV KERR TAR RPO B‐5330 SR 1413 (SUTTON ROAD) 5 FRANKLIN CREEK. RIGHT‐OF‐WAY STPOFF 135 DIV KERR TAR RPO B‐5330 SR 1413 (SUTTON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 107 OVER DEVIL CRADLE MITIGATION STPOFF 3 DIV KERR TAR RPO B‐5330 SR 1413 (SUTTON ROAD) 5 FRANKLIN REPLACE BRIDGE NO. 107 OVER DEVIL CRADLE CONSTRUCTION STPOFF 1350 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO B‐5512 SR 1902 (KEMP ROAD) 5 DURHAM REPLACE BRIDGE NO. 89 OVER LICK CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 100 DIV DURHAM‐CHAPEL HILL‐CARRBORO B‐5512 SR 1902 (KEMP ROAD) 5 DURHAM REPLACE BRIDGE NO. 89 OVER LICK CREEK. PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 2 DIV DURHAM‐CHAPEL HILL‐CARRBORO B‐5512 SR 1902 (KEMP ROAD) 5 DURHAM REPLACE BRIDGE NO. 89 OVER LICK CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 1050 PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF REPLACE BRIDGE 910490 OVER WALNUT CREEK RALEIGH ‐ MUNICIPAL BRIDGE DIV CAPITAL AREA MPO B‐5556 LAKE DAM ROAD 5 WAKE IN RALEIGH. PROJECT RIGHT‐OF‐WAY STPOFF 60 DIV CAPITAL AREA MPO B‐5556 LAKE DAM ROAD 5 WAKE REPLACE BRIDGE 910490 OVER WALNUT CREEK PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 15 DIV CAPITAL AREA MPO B‐5556 LAKE DAM ROAD 5 WAKE REPLACE BRIDGE 910490 OVER WALNUT CREEK PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPOFF 600 DIV CAPITAL AREA MPO B‐5556 LAKE DAM ROAD 5 WAKE REPLACE BRIDGE 910490 OVER WALNUT CREEK PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 150 REPLACE BRIDGE NO. 61 OVER KIT CREEK IN HF CAPITAL AREA MPO B‐5673 SR 1630 (GREEN LEVEL CHURCH ROAD) 5 WAKE CARY. RIGHT‐OF‐WAY HFB 130 HF CAPITAL AREA MPO B‐5673 SR 1630 (GREEN LEVEL CHURCH ROAD) 5 WAKE REPLACE BRIDGE NO. 61 OVER KIT CREEK IN CONSTRUCTION HFB 1310 DURHAM‐CHAPEL HILL‐CARRBORO REPLACE BRIDGE NO. 80 OVER SR 1308 REG MPO B‐5674 US 15 / US 501 NORTHBOUND 5 DURHAM (CORNWALLIS ROAD) IN DURHAM. RIGHT‐OF‐WAY NHPB 110 REG DURHAM‐CHAPEL HILL‐CARRBORO B‐5674 US 15 / US 501 NORTHBOUND 5 DURHAM REPLACE BRIDGE NO. 80 OVER SR 1308 CONSTRUCTION NHPB 2209 REPLACE BRIDGE NO. 533 OVER SR 1012 HF CAPITAL AREA MPO B‐5675 PULLEN ROAD 5 WAKE (WESTERN BOULEVARD) IN RALEIGH. RIGHT‐OF‐WAY HFB 200

As of December 2014 2 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED HF CAPITAL AREA MPO B‐5675 PULLEN ROAD 5 WAKE REPLACE BRIDGE NO. 533 OVER SR 1012 CONSTRUCTION HFB 2009 REPLACE BRIDGE NO. 494 OVER CRABTREE HF CAPITAL AREA MPO B‐5676 SR 1670 (BLUE RIDGE ROAD) 5 WAKE CREEK IN RALEIGH. RIGHT‐OF‐WAY HFB 740 HF CAPITAL AREA MPO B‐5676 SR 1670 (BLUE RIDGE ROAD) 5 WAKE REPLACE BRIDGE NO. 494 OVER CRABTREE CONSTRUCTION HFB 7400

HF CAPITAL AREA MPO B‐5677 SR 1724 (NORTHSIDE ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 42 OVER LEDGE CREEK. RIGHT‐OF‐WAY HFB 80 HF CAPITAL AREA MPO B‐5677 SR 1724 (NORTHSIDE ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 42 OVER LEDGE CREEK. CONSTRUCTION HFB 775

HF KERR TAR RPO B‐5679 SR 1326 (KELLY ROAD) 5 VANCE REPLACE BRIDGE NO. 70 OVER FLAT CREEK. RIGHT‐OF‐WAY HFB 130 HF KERR TAR RPO B‐5679 SR 1326 (KELLY ROAD) 5 VANCE REPLACE BRIDGE NO. 70 OVER FLAT CREEK. MITIGATION HFB 7 HF KERR TAR RPO B‐5679 SR 1326 (KELLY ROAD) 5 VANCE REPLACE BRIDGE NO. 70 OVER FLAT CREEK. CONSTRUCTION HFB 1300 REPLACE BRIDGE NO. 449 OVER CSX RAILROAD HF CAPITAL AREA MPO B‐5680 SR 1633 (GOOD HOPE CHURCH ROAD) 5 WAKE IN CARY. RIGHT‐OF‐WAY HFB 115 HF CAPITAL AREA MPO B‐5680 SR 1633 (GOOD HOPE CHURCH ROAD) 5 WAKE REPLACE BRIDGE NO. 449 OVER CSX RAILROAD CONSTRUCTION HFB 1150 REPLACE BRIDGE NO. 258 OVER US 70 IN HF CAPITAL AREA MPO B‐5681 SR 2713 (VANDORA SPRINGS ROAD) 5 WAKE GARNER. RIGHT‐OF‐WAY HFB 350 HF CAPITAL AREA MPO B‐5681 SR 2713 (VANDORA SPRINGS ROAD) 5 WAKE REPLACE BRIDGE NO. 258 OVER US 70 IN CONSTRUCTION HFB 3500

HF KERR TAR RPO B‐5682 SR 1400 (GRASSY CREEK ‐ VIRGILINA ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 129 OVER BEECH CREEK. RIGHT‐OF‐WAY HFB 75 HF KERR TAR RPO B‐5682 SR 1400 (GRASSY CREEK ‐ VIRGILINA ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 129 OVER BEECH CREEK. MITIGATION HFB 6 HF KERR TAR RPO B‐5682 SR 1400 (GRASSY CREEK ‐ VIRGILINA ROAD) 5 GRANVILLE REPLACE BRIDGE NO. 129 OVER BEECH CREEK. CONSTRUCTION HFB 720 REPLACE BRIDGE NO. 302 OVER YATES POND HF CAPITAL AREA MPO B‐5683 SR 1371 (LAKE WHEELER ROAD) 5 WAKE SPILLWAY. RIGHT‐OF‐WAY HFB 125 REPLACE BRIDGE NO. 302 OVER YATES POND HF CAPITAL AREA MPO B‐5683 SR 1371 (LAKE WHEELER ROAD) 5 WAKE SPILLWAY. CONSTRUCTION HFB 1250 REPLACE BRIDGE NO. 146 OVER CRABTREE SW CAPITAL AREA MPO B‐5684 US 401 (CAPITAL BOULEVARD) 5 WAKE CREEK IN RALEIGH. RIGHT‐OF‐WAY NHPB 430 SW CAPITAL AREA MPO B‐5684 US 401 (CAPITAL BOULEVARD) 5 WAKE REPLACE BRIDGE NO. 146 OVER CRABTREE CONSTRUCTION NHPB 4304 4303 HF KERR TAR RPO B‐5685 SR 1308 (NUTBUSH ROAD) 5 VANCE REPLACE BRIDGE NO. 89 OVER KERR LAKE. RIGHT‐OF‐WAY HFB 220 HF KERR TAR RPO B‐5685 SR 1308 (NUTBUSH ROAD) 5 VANCE REPLACE BRIDGE NO. 89 OVER KERR LAKE. CONSTRUCTION HFB 2200

HF KERR TAR RPO B‐5687 SR 1620 (LICKSKILLET ROAD) 5 WARREN REPLACE BRIDGE NO. 43 OVER SHOCCO CREEK. RIGHT‐OF‐WAY HFB 115 HF KERR TAR RPO B‐5687 SR 1620 (LICKSKILLET ROAD) 5 WARREN REPLACE BRIDGE NO. 43 OVER SHOCCO CREEK. MITIGATION HFB 7 HF KERR TAR RPO B‐5687 SR 1620 (LICKSKILLET ROAD) 5 WARREN REPLACE BRIDGE NO. 43 OVER SHOCCO CREEK. CONSTRUCTION HFB 1150 KERR TAR RPO, CAPITAL AREA MPO, DIVISION 5 PURCHASE ORDER CONTRACT DURHAM‐CHAPEL HILL‐CARRBORO DURHAM, WAKE, FRANKLIN, GRANVILLE, BRIDGE REPLACEMENT PROJECTS AT SELECTED IN PROGRESS ‐ BRIDGE PURCHASE DIV MPO BD‐5105 VARIOUS 5 PERSON, VANCE, WARREN LOCATIONS. ORDER CONTRACT (BPOC) RIGHT‐OF‐WAY STPOFF 200 DIV KERR TAR RPO, CAPITAL AREA MPO, BD‐5105 VARIOUS 5 DURHAM, WAKE, FRANKLIN, GRANVILLE, DIVISION 5 PURCHASE ORDER CONTRACT IN PROGRESS ‐ BRIDGE PURCHASE CONSTRUCTION STPOFF 1800 CITYWIDE UPGRADE OF SIGNAL SYSTEM IN EX CAPITAL AREA MPO C‐4923 VARIOUS 5 WAKE RALEIGH. IN PROGRESS BY CITY OF RALEIGH TRIANGLE J COUNCIL OF GOVERNMENTS (COG). DEVELOP A FLEXIBLE WORK SCHEDULE FOR EMPLOYEES AND ORGANIZATIONS IN TRIANGLE CAPITAL AREA MPO, DURHAM‐CHAPEL OZONE NON‐ATTAINMENT AREA FOR THREE IN PROGRESS BY TRIANGLE J EX HILL‐CARRBORO MPO C‐4924 TRIANGLE J COUNCIL OF GOVERNMENTS 5, 7 WAKE, DURHAM, ORANGE YEARS. COUNCIL OF GOVERNMENTS

CAPITAL AREA MPO, DURHAM‐CHAPEL DEVELOP FLEXIBLE WORK SCHEDULES FOR EX HILL‐CARRBORO MPO C‐4924A TRIANGLE J COUNCIL OF GOVERNMENTS 5, 7 WAKE, DURHAM, ORANGE EMPLOYEES IN CAPITAL AREA MPO (CAMPO) IN PROGRESS DEVELOP FLEXIBLE WORK SCHEDULES FOR CAPITAL AREA MPO, DURHAM‐CHAPEL EMPLOYEES IN DURHAM‐CHAPEL HILL‐ EX HILL‐CARRBORO MPO C‐4924B TRIANGLE J COUNCIL OF GOVERNMENTS 5, 7 WAKE, DURHAM, ORANGE CARRBORO (DCHC) IN PROGRESS NEAL ROAD TO SR 1320 (ERWIN ROAD) IN PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO DURHAM. CONSTRUCT BIKE LANES AND WAY / CONSTRUCTION BY CITY OF EX MPO C‐4928 SR 1317 (MORREENE ROAD) 5 DURHAM SIDEWALKS. DURHAM CONSTRUCTION CMAQ 444 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐4928 SR 1317 (MORREENE ROAD) 5 DURHAM NEAL ROAD TO SR 1320 (ERWIN ROAD) IN PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 111 SR 1333 (CHUB LAKE STREET) IN ROXBORO. UNDER CONSTRUCTION BY TOWN EX KERR TAR RPO C‐4943 RIDGE ROAD 5 PERSON CONSTRUCT TURN LANE. OF ROXBORO PLANNING, DESIGN, RIGHT OF WAY, AND CONSTRUCTION BY TOWN OF CONSTRUCT SPUR OF "HIKE AND BIKE" PROJECT CREEDMOOR ‐ UNDER EX CAPITAL AREA MPO C‐5114 NEW GREENWAY 5 GRANVILLE IN CREEDMOOR. CONSTRUCTION CROSS‐TOWN PEDESTRIAN‐BICYCLE SIDEWALK AND TRAIL IN CREEDMOOR. CONSTRUCT A UNDER CONSTRUCTION BY TOWN EX CAPITAL AREA MPO C‐5144 NEW MULTI‐USE TRAIL 5 GRANVILLE MULTI‐USE TRAIL. OF CREEDMOOR

CONSTRUCT A CONNECTOR BETWEEN CAPITAL AREA GREENWAY SYSTEM, CARY GREENWAY PLANNING / DESIGN / RIGHT OF SYSTEM AND THE MORRISVILLE GREENWAY WAY / CONSTRUCTION BY TOWN OF EX CAPITAL AREA MPO C‐5163 CRABTREE CREEK GREENWAY 5 WAKE SYSTEM AND THE PARK. CARY ‐ IN PROGRESS ENGINEERING CMAQ 467 EX CAPITAL AREA MPO C‐5163 CRABTREE CREEK GREENWAY 5 WAKE CONSTRUCT A CONNECTOR BETWEEN CAPITAL PLANNING / DESIGN / RIGHT OF ENGINEERING L 117 EX CAPITAL AREA MPO C‐5163 CRABTREE CREEK GREENWAY 5 WAKE CONSTRUCT A CONNECTOR BETWEEN CAPITAL PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 2492 EX CAPITAL AREA MPO C‐5163 CRABTREE CREEK GREENWAY 5 WAKE CONSTRUCT A CONNECTOR BETWEEN CAPITAL PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 623 CONSTRUCT TRAIL AND SIDEWALKS TO CONNECT MAJOR ACTIVITY CENTERS IN WAKE RIGHT OF WAY IN PROGRESS BY EX CAPITAL AREA MPO C‐5164 SMITH GREENWAY SANFORD CREEK GREENWAY 5 WAKE FOREST. TOWN OF WAKE FOREST CONSTRUCTION CMAQ 2054 EX CAPITAL AREA MPO C‐5164 SMITH GREENWAY SANFORD CREEK GREENWAY 5 WAKE CONSTRUCT TRAIL AND SIDEWALKS TO RIGHT OF WAY IN PROGRESS BY CONSTRUCTION L 514 PLANNING / DESIGN / RIGHT OF SR 3112 (CARY PARKWAY) IN CARY. WAY / CONSTRUCTION BY TOWN OF EX CAPITAL AREA MPO C‐5165 SR 1615 (HIGH HOUSE ROAD) 5 WAKE INTERSECTION IMPROVEMENTS. CARY ‐ IN PROGRESS RIGHT‐OF‐WAY CMAQ 960 EX CAPITAL AREA MPO C‐5165 SR 1615 (HIGH HOUSE ROAD) 5 WAKE SR 3112 (CARY PARKWAY) IN CARY. PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 240 EX CAPITAL AREA MPO C‐5165 SR 1615 (HIGH HOUSE ROAD) 5 WAKE SR 3112 (CARY PARKWAY) IN CARY. PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 1728 EX CAPITAL AREA MPO C‐5165 SR 1615 (HIGH HOUSE ROAD) 5 WAKE SR 3112 (CARY PARKWAY) IN CARY. PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 432

PLANNING / DESIGN / RIGHT OF GREENWAY IN CREEDMOOR. CONSTRUCT BIKE‐ WAY / CONSTRUCTION BY TOWN OF EX CAPITAL AREA MPO C‐5166 NC 56 5 GRANVILLE PEDESTRIAN TRAIL SYSTEM. CREEDMOOR ‐ IN PROGRESS RIGHT‐OF‐WAY CMAQ 48 EX CAPITAL AREA MPO C‐5166 NC 56 5 GRANVILLE GREENWAY IN CREEDMOOR. CONSTRUCT BIKE‐ PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 12 EX CAPITAL AREA MPO C‐5166 NC 56 5 GRANVILLE GREENWAY IN CREEDMOOR. CONSTRUCT BIKE‐ PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 1407 EX CAPITAL AREA MPO C‐5166 NC 56 5 GRANVILLE GREENWAY IN CREEDMOOR. CONSTRUCT BIKE‐ PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 352 GREENWAY IN CREEDMOOR ‐ EASTERN EX CAPITAL AREA MPO C‐5166A NC 56 5 GRANVILLE SECTION

As of December 2014 3 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED GREENWAY IN CREEDMOOR ‐ WESTERN EX CAPITAL AREA MPO C‐5166B NC 56 5 GRANVILLE SECTION CONSTRUCT A DEDICATED RIGHT TURN LANE ALONG EASTBOUND KNIGHTDALE BOULEVARD ONTO SOUTHBOUND SR 2233 (SMITHFIELD UNDER CONSTRUCTION BY TOWN EX CAPITAL AREA MPO C‐5167 US 64 BUSINESS (KNIGHTDALE BOULEVARD) 5 WAKE ROAD) IN KNIGHTDALE. OF KNIGHTDALE PLANNING / DESIGN / RIGHT OF CONSTRUCT GREENWAY CONNECTING EXISTING WAY / CONSTRUCTION BY TOWN OF EX CAPITAL AREA MPO C‐5168 CRABTREE CREEK GREENWAY 5 WAKE GREENWAY IN CARY WITH MORRISVILLE. CARY ‐ IN PROGRESS CONSTRUCTION CMAQ 2954 EX CAPITAL AREA MPO C‐5168 CRABTREE CREEK GREENWAY 5 WAKE CONSTRUCT GREENWAY CONNECTING EXISTING PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 739

NORTH CAROLINA STATE UNIVERSITY. PLANNING / DESIGN / RIGHT OF CONSTRUCT A ONE ACRE 170 SPACE LOT NEAR WAY / CONSTRUCTION BY NORTH EX CAPITAL AREA MPO C‐5169 PARK‐AND‐RIDE LOT 5 WAKE NC STATE UNIVERSITY CENTENNIAL CAMPUS. CAROLINA STATE UNIVERSITY CONSTRUCTION CMAQ 277 EX CAPITAL AREA MPO C‐5169 PARK‐AND‐RIDE LOT 5 WAKE STATE UNIVERSITY. PLANNING / DESIGN / RIGHT OF CONSTRUCTION O 69 PLANNING / DESIGN / RIGHT OF BICYCLE LANE STRIPING AND RESTRIPE VARIOUS WAY / CONSTRUCTION BY CITY OF EX CAPITAL AREA MPO C‐5170 VARIOUS 5 WAKE LANES WITHIN CITY OF RALEIGH. RALEIGH CONSTRUCTION CMAQ 894 EX CAPITAL AREA MPO C‐5170 VARIOUS 5 WAKE BICYCLE LANE STRIPING AND RESTRIPE VARIOUS PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 224 CONSTRUCT A FIVE FOOT SIDEWALK FROM PLANNING / DESIGN / RIGHT OF COLERIDGE DRIVE TO SR 2000 (WAKE FOREST WAY / CONSTRUCTION BY CITY OF EX CAPITAL AREA MPO C‐5172 SR 1005 (SIX FORKS ROAD) 5 WAKE ROAD) IN RALEIGH. RALEIGH RIGHT‐OF‐WAY CMAQ 174 EX CAPITAL AREA MPO C‐5172 SR 1005 (SIX FORKS ROAD) 5 WAKE CONSTRUCT A FIVE FOOT SIDEWALK FROM PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 43 EX CAPITAL AREA MPO C‐5172 SR 1005 (SIX FORKS ROAD) 5 WAKE CONSTRUCT A FIVE FOOT SIDEWALK FROM PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 186 EX CAPITAL AREA MPO C‐5172 SR 1005 (SIX FORKS ROAD) 5 WAKE CONSTRUCT A FIVE FOOT SIDEWALK FROM PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 47 CAMPUS WALK AVENUE, MORREENE ROAD TO LASALLE STREET AND LASALLE STREET, PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO KANGAROO DRIVE TO ERWIN ROAD IN WAY / CONSTRUCTION BY CITY OF EX MPO C‐5178 VARIOUS 5 DURHAM DURHAM. CONSTRUCT SIDEWALKS. DURHAM ‐ IN PROGRESS CONSTRUCTION CMAQ 269 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5178 VARIOUS 5 DURHAM CAMPUS WALK AVENUE, MORREENE ROAD TO PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 67 CONSTRUCT SIDEWALKS AND BIKE LANES PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO BETWEEN MLK, JR. PARKWAY AND US 15‐501 WAY / CONSTRUCTION BY CITY OF EX MPO C‐5182 NC 751 (HOPE VALLEY ROAD) 5 DURHAM BUSINESS IN DURHAM. DURHAM RIGHT‐OF‐WAY CMAQ 107 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5182 NC 751 (HOPE VALLEY ROAD) 5 DURHAM CONSTRUCT SIDEWALKS AND BIKE LANES PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 27 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5182 NC 751 (HOPE VALLEY ROAD) 5 DURHAM CONSTRUCT SIDEWALKS AND BIKE LANES PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 1002 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5182 NC 751 (HOPE VALLEY ROAD) 5 DURHAM CONSTRUCT SIDEWALKS AND BIKE LANES PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 250 PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO WAY / CONSTRUCTION BY CITY OF EX MPO C‐5183 VARIOUS 5 DURHAM CONSTRUCT SIDEWALKS IN DURHAM. DURHAM

DURHAM‐CHAPEL HILL‐CARRBORO NC 751 (CAMERON BOULEVARD), SR 1320 EX MPO C‐5183A VARIOUS 5 DURHAM (ERWIN ROAD) AND DUKE UNIVERSITY ROAD CONSTRUCTION CMAQ 778 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5183A VARIOUS 5 DURHAM NC 751 (CAMERON BOULEVARD), SR 1320 CONSTRUCTION L 194 DURHAM‐CHAPEL HILL‐CARRBORO CARPENTER FLETCHER ROAD TO SR 1102 / SR EX MPO C‐5183B NC 55 (ALSTON AVENUE) 5 DURHAM 1977 (SEDWICK ROAD) CONSTRUCTION CMAQ 1003 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5183B NC 55 (ALSTON AVENUE) 5 DURHAM CARPENTER FLETCHER ROAD TO SR 1102 / SR CONSTRUCTION L 251

I‐40 PEDESTRIAN IMPROVEMENT PROJECT IN RALEIGH. CONSTRUCT PEDESTRIAN IMPROVEMENTS AT BUCK JONES ROAD, SR PLANNING / DESIGN / RIGHT OF BUCK JONES ROAD SR 1321 (AVENT FERRY 1321 (AVENT FERRY ROAD), AND SR 2542 (ROCK WAY / CONSTRUCTION BY CITY OF EX CAPITAL AREA MPO C‐5504 ROAD) SR 2542 (ROCK QUARRY ROAD) 5 WAKE QUARRY ROAD) OVERPASSES OF I‐40. RALEIGH ‐ IN PROGRESS CONSTRUCTION CMAQ 1640 EX CAPITAL AREA MPO C‐5504 BUCK JONES ROAD SR 1321 (AVENT FERRY 5 WAKE I‐40 PEDESTRIAN IMPROVEMENT PROJECT IN PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 410 EXISTING SIDEWALK TO NC 56 WEST IN RIGHT OF WAY IN PROGRESS BY EX KERR TAR RPO C‐5527 SR 1229 (SOUTH MAIN STREET) 5 FRANKLIN LOUISBURG. CONSTRUCT SIDEWALK. TOWN OF LOUISBURG CONSTRUCTION CMAQ 473 EX KERR TAR RPO C‐5527 SR 1229 (SOUTH MAIN STREET) 5 FRANKLIN EXISTING SIDEWALK TO NC 56 WEST IN RIGHT OF WAY IN PROGRESS BY CONSTRUCTION L 118 TRIANGLE J COUNCIL OF GOVERNMENTS CAPITAL AREA MPO, DURHAM‐CHAPEL WAKE, DURHAM, ORANGE, JOHNSTON, TRANSPORTATION DEMAND MANAGEMENT EX HILL‐CARRBORO MPO C‐5565 VARIOUS 5, 7, 4, 8 FRANKLIN, CHATHAM, GRANVILLE PROGRAM ‐ PHASE II. CAPITAL AREA MPO, DURHAM‐CHAPEL DEVELOP FLEXIBLE WORK SCHEDULES IN EX HILL‐CARRBORO MPO C‐5565A VARIOUS 5, 4 WAKE, JOHNSTON, FRANKLIN CAMPO AREA. IMPLEMENTATION CMAQ 482 572 620 640 EX CAPITAL AREA MPO, DURHAM‐CHAPEL C‐5565A VARIOUS 5, 4 WAKE, JOHNSTON, FRANKLIN DEVELOP FLEXIBLE WORK SCHEDULES IN IMPLEMENTATION L 430 496 579 603 CAPITAL AREA MPO, DURHAM‐CHAPEL DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC HILL‐CARRBORO MPO C‐5565B VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM AREA. PLANNING / DESIGN / RIGHT OF TOWN OF BUTNER GREENWAY EXTENSION. WAY / CONSTRUCTION BY TOWN OF EX CAPITAL AREA MPO C‐5567 EAST LYON STATION GREENWAY 5 GRANVILLE CONSTRUCT MULTI‐USE PATH. BUTNER ENGINEERING CMAQ 28 EX CAPITAL AREA MPO C‐5567 EAST LYON STATION GREENWAY 5 GRANVILLE TOWN OF BUTNER GREENWAY EXTENSION. PLANNING / DESIGN / RIGHT OF ENGINEERING L 7 EX CAPITAL AREA MPO C‐5567 EAST LYON STATION GREENWAY 5 GRANVILLE TOWN OF BUTNER GREENWAY EXTENSION. PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY CMAQ 28 EX CAPITAL AREA MPO C‐5567 EAST LYON STATION GREENWAY 5 GRANVILLE TOWN OF BUTNER GREENWAY EXTENSION. PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 7 EX CAPITAL AREA MPO C‐5567 EAST LYON STATION GREENWAY 5 GRANVILLE TOWN OF BUTNER GREENWAY EXTENSION. PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 144 EX CAPITAL AREA MPO C‐5567 EAST LYON STATION GREENWAY 5 GRANVILLE TOWN OF BUTNER GREENWAY EXTENSION. PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 36 PLANNING / DESIGN / RIGHT OF TOWN OF LOUISBURG. CONSTRUCT SIDEWALKS WAY / CONSTRUCTION BY TOWN OF EX KERR TAR RPO C‐5568 VARIOUS 5 FRANKLIN AT VARIOUS LOCATIONS. LOUISBURG ENGINEERING CMAQ 56 EX KERR TAR RPO C‐5568 VARIOUS 5 FRANKLIN TOWN OF LOUISBURG. CONSTRUCT SIDEWALKS PLANNING / DESIGN / RIGHT OF ENGINEERING L 14 EX KERR TAR RPO C‐5568 VARIOUS 5 FRANKLIN TOWN OF LOUISBURG. CONSTRUCT SIDEWALKS PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 148 EX KERR TAR RPO C‐5568 VARIOUS 5 FRANKLIN TOWN OF LOUISBURG. CONSTRUCT SIDEWALKS PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 37 CITY OF OXFORD. CONSTRUCT SIDEWALK AND PLANNING / DESIGN / RIGHT OF CROSSWALK ENHANCEMENTS AT VARIOUS WAY / CONSTRUCTION BY CITY OF EX KERR TAR RPO C‐5569 VARIOUS 5 GRANVILLE LOCATIONS. OXFORD ‐ IN PROGRESS RIGHT‐OF‐WAY CMAQ 20 EX KERR TAR RPO C‐5569 VARIOUS 5 GRANVILLE CITY OF OXFORD. CONSTRUCT SIDEWALK AND PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 5 EX KERR TAR RPO C‐5569 VARIOUS 5 GRANVILLE CITY OF OXFORD. CONSTRUCT SIDEWALK AND PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 184 EX KERR TAR RPO C‐5569 VARIOUS 5 GRANVILLE CITY OF OXFORD. CONSTRUCT SIDEWALK AND PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 46

PLANNING / DESIGN / RIGHT OF TOWN OF STOVALL. CONSTRUCT SIDEWALKS AT WAY / CONSTRUCTION BY TOWN OF EX KERR TAR RPO C‐5570 VARIOUS 5 GRANVILLE STOVALL TOWN CENTER. STOVALL ‐ IN PROGRESS CONSTRUCTION CMAQ 68 EX KERR TAR RPO C‐5570 VARIOUS 5 GRANVILLE TOWN OF STOVALL. CONSTRUCT SIDEWALKS AT PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 17 WAKE, JOHNSTON, FRANKLIN, PROJECTS TO IMPROVE CONGESTION AND AIR EX CAPITAL AREA MPO C‐5604 VARIOUS 5, 4 GRANVILLE QUALITY IN THE CAPITAL AREA MPO. CONSTRUCTION CMAQ 5857 5838

As of December 2014 4 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED PROJECTS TO IMPROVE CONGESTION AND AIR DURHAM‐CHAPEL HILL‐CARRBORO QUALITY IN THE DURHAM / CHAPEL HILL / EX MPO C‐5605 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM CARRBORO MPO. CONSTRUCTION CMAQ 2515 2515 PROJECTS TO IMPROVE CONGESTION AND AIR EX KERR TAR RPO C‐5610 VARIOUS 5 GRANVILLE, FRANKLIN, PERSON QUALITY IN THE KERR‐TAR RPO. CONSTRUCTION CMAQ 545 545

ALBEMARLE RPO, UPPER COASTAL PLAIN RPO, BURLINGTON‐GRAHAM URBAN AREA MPO, DOWN EAST RPO, DURHAM‐CHAPEL HILL‐CARRBORO MPO, FRENCH BROAD RIVER MPO, MID‐ CAMDEN, CHOWAN, PASQUOTANK, EAST RPO, NEW BERN MPO, PEANUT WASHINGTON, ALAMANCE, BEAUFORT, BELT RPO, CAPE FEAR RPO, BRUNSWICK, BUNCOMBE, CRAVEN, WILMINGTON URBAN AREA MPO, 1, 2, 4, 7, 3, DARE, DURHAM, EDGECOMBE, FREEDOM ROADS. INSTALL INTERACTIVE TRN GREENSBORO URBAN AREA E‐5501 VARIOUS 5, 13 GUILFORD, HALIFAX, LENOIR, WAYNE WAYSIDE SIGNAGE FOR DESIGNATED SITES. CONSTRUCTION STPE 96 TRN ALBEMARLE RPO, UPPER COASTAL E‐5501 VARIOUS 1, 2, 4, 7, 3, CAMDEN, CHOWAN, PASQUOTANK, FREEDOM ROADS. INSTALL INTERACTIVE CONSTRUCTION O 128

BENNETT PLACE HISTORIC SITE IN DURHAM. RENOVATION OF VISITOR CENTER TO INCLUDE PLANNING / DESIGN / DURHAM‐CHAPEL HILL‐CARRBORO NEW EXHIBITS AND CLIMATE CONTROL SYSTEM, CONSTRUCTION BY DEPARTMENT TRN MPO E‐5502 BENNETT MEMORIAL ROAD 5 DURHAM AND RENOVATION OF GIFT SHOP. OF CULTURAL RESOURCES CONSTRUCTION STPE 73 TRN DURHAM‐CHAPEL HILL‐CARRBORO E‐5502 BENNETT MEMORIAL ROAD 5 DURHAM BENNETT PLACE HISTORIC SITE IN DURHAM. PLANNING / DESIGN / CONSTRUCTION L 18 US 15‐501 IN ORANGE COUNTY TO SR 1116 (GARRETT ROAD) IN DURHAM COUNTY. DIVISION DESIGN / CENTRAL LET; BICYCLE, PEDESTRIAN, AND TRANSIT STPDA PARTICIPATION FOR PART B DURHAM‐CHAPEL HILL‐CARRBORO SR 2220 (OLD CHAPEL HILL ROAD) SR 1838 (OLD IMPROVEMENTS; AND CONSTRUCTION OF NOT TO EXCEED $6.3 MILLION TRN MPO EB‐4707 DURHAM ROAD) 5, 7 DURHAM, ORANGE ROUNDABOUT. PENDING MPO APPROVAL DURHAM‐CHAPEL HILL‐CARRBORO US 15‐501 IN ORANGE COUNTY TO SR 1113 TRN MPO EB‐4707A SR 1838 / SR 2220 7, 5 ORANGE, DURHAM (POPE ROAD) IN DURHAM COUNTY RIGHT‐OF‐WAY L 2650 TRN DURHAM‐CHAPEL HILL‐CARRBORO EB‐4707A SR 1838 / SR 2220 7, 5 ORANGE, DURHAM US 15‐501 IN ORANGE COUNTY TO SR 1113 CONSTRUCTION L 3100 DURHAM‐CHAPEL HILL‐CARRBORO SR 1113 (POPE ROAD) TO SR 1116 (GARRETT TRN MPO EB‐4707B SR 2220 5 DURHAM ROAD) RIGHT OF WAY IN PROGRESS CONSTRUCTION S 250 TRN DURHAM‐CHAPEL HILL‐CARRBORO EB‐4707B SR 2220 5 DURHAM SR 1113 (POPE ROAD) TO SR 1116 (GARRETT RIGHT OF WAY IN PROGRESS CONSTRUCTION STPDA 3920 TRN DURHAM‐CHAPEL HILL‐CARRBORO EB‐4707B SR 2220 5 DURHAM SR 1113 (POPE ROAD) TO SR 1116 (GARRETT RIGHT OF WAY IN PROGRESS CONSTRUCTION L 980 EAST OF NEUSE RIVER BRIDGE TO SR 2233 (SMITHFIELD ROAD) IN KNIGHTDALE. CAPITAL AREA MPO EB‐5002 MINGO CREEK GREENWAY 5 WAKE CONSTRUCT MULTI‐USE PATH. PHASE I ‐ EAST OF NEUSE RIVER BRIDGE TO UNDER CONSTRUCTION BY CITY OF CAPITAL AREA MPO EB‐5002A MINGO CREEK GREENWAY 5 WAKE WEST OF SR 2516 (HODGE ROAD) RALEIGH PHASE II ‐ WEST OF SR 2516 (HODGE ROAD) TO UNDER CONSTRUCTION BY TOWN CAPITAL AREA MPO EB‐5002B MINGO CREEK GREENWAY 5 WAKE SR 2233 (SMITHFIELD ROAD) OF KNIGHTDALE

PLANNING / DESIGN / RIGHT OF TO NC 56 IN WAY / CONSTRUCTION BY TOWN OF TRN CAPITAL AREA MPO EB‐5513 US 15 5 GRANVILLE CREEDMOOR. CONSTRUCT SIDEWALK / PATH. CREEDMOOR ‐ IN PROGRESS CONSTRUCTION STPEB 560

SR 1116 (GARRETT ROAD) TO SR 1158 PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO NC 751 / SR 1183 / SR 2220 / NON‐SYSTEM (CORNWALLIS ROAD) IN DURHAM. ADD BICYCLE WAY / CONSTRUCTION BY CITY OF TRN MPO EB‐5514 (UNIVERSITY DRIVE) 5 DURHAM LANES AND PEDESTRIAN IMPROVEMENTS. DURHAM CONSTRUCTION STPEB 1025 INSTALLATION OF LOCAL WAYFINDING BICYCLE SIGNS AND BICYCLE RACK ‐ COMFORT STATIONS IMPLEMENTATION BY CITY OF TRN CAPITAL AREA MPO EB‐5515 VARIOUS 5 WAKE IN RALEIGH. RALEIGH CONSTRUCTION STPEB 125

UPPER NEUSE RIVER GREENWAY ‐ HORSESHOE BEND SECTION, WRAL SOCCER COMPLEX ON SR 2006 (PERRY CREEK ROAD) TO EXISTING SECTION WEST OF US 401 IN RALEIGH. UNDER CONSTRUCTION BY CITY OF TRN CAPITAL AREA MPO EB‐5545 MOUNTAINS‐TO‐SEA TRAIL 5 WAKE CONSTRUCT GREENWAY. RALEIGH KANGAROO DRIVE TO SPRUNT AVENUE IN DURHAM. CONSTRUCT SIDEWALKS ON BOTH SIDES FROM KANGAROO DRIVE TO US 70 BUSINESS (HILLSBOROUGH ROAD) AND ON ONE DURHAM‐CHAPEL HILL‐CARRBORO SIDE FROM HILLSBOROUGH ROAD TO SPRUNT DIV MPO EB‐5703 LASALLE STREET 5 DURHAM AVENUE. ENGINEERING TAP 69 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5703 LASALLE STREET 5 DURHAM KANGAROO DRIVE TO SPRUNT AVENUE IN ENGINEERING L 17 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5703 LASALLE STREET 5 DURHAM KANGAROO DRIVE TO SPRUNT AVENUE IN CONSTRUCTION TAP 420 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5703 LASALLE STREET 5 DURHAM KANGAROO DRIVE TO SPRUNT AVENUE IN CONSTRUCTION L 105 NORTH MIAMI BOULEVARD TO NORTH HARDEE DURHAM‐CHAPEL HILL‐CARRBORO STREET IN DURHAM. CONSTRUCT SIDEWALK ON DIV MPO EB‐5704 RAYNOR STREET 5 DURHAM ONE SIDE OF STREET. ENGINEERING TAP 40 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5704 RAYNOR STREET 5 DURHAM NORTH MIAMI BOULEVARD TO NORTH HARDEE ENGINEERING L 10 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5704 RAYNOR STREET 5 DURHAM NORTH MIAMI BOULEVARD TO NORTH HARDEE CONSTRUCTION TAP 200 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5704 RAYNOR STREET 5 DURHAM NORTH MIAMI BOULEVARD TO NORTH HARDEE CONSTRUCTION L 50 NC 55 TO RESEARCH TRIANGLE PARK WESTERN DURHAM‐CHAPEL HILL‐CARRBORO LIMIT IN DURHAM. CONSTRUCT SECTIONS OF DIV MPO EB‐5708 NC 54 5 DURHAM SIDEWALK ON SOUTH SIDE. ENGINEERING SRTS 50 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5708 NC 54 5 DURHAM NC 55 TO RESEARCH TRIANGLE PARK WESTERN CONSTRUCTION SRTS 250 SOUTH SAUNDERS STREET TO SR 1007 (POOLE SR 4363 (MARTIN LUTHER KING, JR. ROAD) IN RALEIGH. CONSTRUCT DEDICATED DIV CAPITAL AREA MPO EB‐5709 BOULEVARD) 5 WAKE BICYCLE LANES. ENGINEERING SRTS 100 DIV CAPITAL AREA MPO EB‐5709 SR 4363 (MARTIN LUTHER KING, JR. 5 WAKE SOUTH SAUNDERS STREET TO SR 1007 (POOLE CONSTRUCTION SRTS 900 MURRAY AVENUE TO US 501 BUSINESS (NORTH ROXBORO ROAD) IN DURHAM. CONSTRUCT DURHAM‐CHAPEL HILL‐CARRBORO SIDEWALK ON EAST SIDE TO FILL IN EXISTING DIV MPO EB‐5715 US 501 BYPASS (NORTH DUKE STREET) 5 DURHAM GAPS. ENGINEERING SRTS 170 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5715 US 501 BYPASS (NORTH DUKE STREET) 5 DURHAM MURRAY AVENUE TO US 501 BUSINESS (NORTH CONSTRUCTION SRTS 1154 CONSTRUCT BICYCLE / PEDESTRIAN TUNNEL IMMEDIATELY WEST OF SR 1321 (AVENT FERRY DIV CAPITAL AREA MPO EB‐5718 SR 1012 (WESTERN BOULEVARD) 5 WAKE ROAD) IN RALEIGH. ENGINEERING TAP 800 DIV CAPITAL AREA MPO EB‐5718 SR 1012 (WESTERN BOULEVARD) 5 WAKE CONSTRUCT BICYCLE / PEDESTRIAN TUNNEL ENGINEERING L 200 DIV CAPITAL AREA MPO EB‐5718 SR 1012 (WESTERN BOULEVARD) 5 WAKE CONSTRUCT BICYCLE / PEDESTRIAN TUNNEL CONSTRUCTION TAP 3200

As of December 2014 5 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DIV CAPITAL AREA MPO EB‐5718 SR 1012 (WESTERN BOULEVARD) 5 WAKE CONSTRUCT BICYCLE / PEDESTRIAN TUNNEL CONSTRUCTION L 800 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO EB‐5720 BRYANT BRIDGE TRAIL 5 DURHAM NC 55 TO KELLY BRYANT BRIDGE IN DURHAM. ENGINEERING TAP 139 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5720 BRYANT BRIDGE TRAIL 5 DURHAM NC 55 TO KELLY BRYANT BRIDGE IN DURHAM. ENGINEERING L 35 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5720 BRYANT BRIDGE TRAIL 5 DURHAM NC 55 TO KELLY BRYANT BRIDGE IN DURHAM. CONSTRUCTION TAP 849 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5720 BRYANT BRIDGE TRAIL 5 DURHAM NC 55 TO KELLY BRYANT BRIDGE IN DURHAM. CONSTRUCTION L 212 KERR TAR RPO, CAPITAL AREA MPO, DURHAM‐CHAPEL HILL‐CARRBORO DURHAM, WAKE, FRANKLIN, GRANVILLE, ECOSYSTEM ENHANCEMENT PROGRAM FOR MPO EE‐4905 VARIOUS 5 PERSON, VANCE, WARREN DIVISION 5 PROJECT MITIGATION. IN PROGRESS PARTS A‐D COMPLETE; PART E DURHAM‐CHAPEL HILL‐CARRBORO NC 54 IN DURHAM TO CHATHAM COUNTY LINE. UNDER CONSTRUCTION BY CITY OF MPO EL‐2921E AMERICAN TOBACCO TRAIL 5 DURHAM CONSTRUCT A MULTI‐PURPOSE TRAIL. DURHAM PLANNING, DESIGN, RIGHT OF WAY DEVELOPMENT OF PEDESTRIAN BIKE PATHS IN AND CONSTRUCTION BY TOWN OF CAPITAL AREA MPO EL‐4998 VARIOUS 5 WAKE CARY. CARY‐ IN PROGRESS

PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS PLANNING / DESIGN / RIGHT OF WAKE, JOHNSTON, FRANKLIN, IN THE CAPITAL AREA METROPOLITAN WAY / CONSTRUCTION BY OTHERS ‐ DIV CAPITAL AREA MPO EL‐5100 VARIOUS 5, 4, 6 GRANVILLE, HARNETT PLANNING ORGANIZATION (CAMPO). IN PROGRESS.

I‐40 FROM WEST OF SR 1728 (WADE AVENUE) NEAR CARY TO I‐440 / US 64 INTERCHANGE (EXIT 301) IN RALEIGH AND I‐440 FROM I‐495 / US 64 / US 264 INTERCHANGE TO I‐40 (EXIT 16) IN RALEIGH. UPGRADE CORRIDOR, INCLUDING ADDITIONAL GENERAL PURPOSE AND/OR CAPITAL AREA MPO FS‐1005A I‐40; I‐440 5 WAKE MANAGED LAN FEASIBILITY STUDY IN PROGRESS NC 540 IN MORRISVILLE TO NORTHWEST MAYNARD ROAD IN CARY. WIDEN TO MULTI‐ CAPITAL AREA MPO FS‐1005B NC 54 5 WAKE LANES. FEASIBILITY STUDY IN PROGRESS NC 540 IN MORRISVILLE TO NORTHWEST MAYNARD ROAD IN CARY. WIDEN TO MULTI‐ CAPITAL AREA MPO FS‐1005B NC 54 5 WAKE LANES. FEASIBILITY STUDY IN PROGRESS NC 86 IN ORANGE COUNTY TO SR 1728 (WADE DURHAM‐CHAPEL HILL‐CARRBORO AVENUE) IN WAKE COUNTY. CONSTRUCT MPO, CAPITAL AREA MPO FS‐1205A I‐40 5, 7 DURHAM, WAKE, ORANGE MANAGED LANES. FEASIBILITY STUDY IN PROGRESS SR 2044 (LIGON MILL ROAD) / SR 2224 (MITCHELL MILL ROAD) INTERSECTION IN CAPITAL AREA MPO FS‐1205B US 401 5 WAKE RALEIGH. CONSTRUCT INTERCHANGE. FEASIBILITY STUDY IN PROGRESS DURHAM‐CHAPEL HILL‐CARRBORO I‐40 TO EAST END CONNECTOR. WIDEN TO SIX MPO FS‐1205C NC 147 (DURHAM FREEWAY) 5 DURHAM LANES AND REHABILITATE PAVEMENT. FEASIBILITY STUDY IN PROGRESS I‐540 TO NORTH OF NC 98. WIDEN TO CAPITAL AREA MPO FS‐1205D NC 50 (CREEDMOOR ROAD) 5 WAKE MULTILANE DIVIDED ROADWAY. FEASIBILITY STUDY IN PROGRESS CAPITAL AREA MPO, DURHAM‐CHAPEL NC 54 TO US 64‐264. CONSTRUCT MANAGED HILL‐CARRBORO MPO FS‐1305A I‐540 NC 540 5 WAKE, DURHAM LANES. FEASIBILITY STUDY IN PROGRESS CAPITAL AREA MPO, DURHAM‐CHAPEL NC 54 TO US 64‐264. CONSTRUCT MANAGED HILL‐CARRBORO MPO FS‐1305A I‐540 NC 540 5 WAKE, DURHAM LANES. FEASIBILITY STUDY IN PROGRESS UPPER COASTAL PLAIN RPO, ROCKY SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY MOUNT MPO, MID‐EAST RPO, CAPITAL EDGECOMBE, NASH, MARTIN, WAKE, TO US 17 IN WILLIAMSTON. UPGRADE TO AREA MPO FS‐1504A US 64 4, 1, 5 FRANKLIN INTERSTATE STANDARDS. SCHEDULED FOR FEASIBILITY STUDY ROGERS ROAD (633905Y) IN WAKE FOREST. CONVERT AT‐GRADE CROSSING TO GRADE CAPITAL AREA MPO FS‐1505A CSX S LINE 5 WAKE SEPARATION. SCHEDULED FOR FEASIBILITY STUDY SR 1652 (HARRISON AVENUE) (CROSSING 734755X) IN CARY. CONVERT AT‐GRADE CAPITAL AREA MPO FS‐1505B NORFOLK SOUTHERN H LINE 5 WAKE CROSSING TO GRADE SEPARATION. SCHEDULED FOR FEASIBILITY STUDY

US 158 BUSINESS TO COBLE BOULEVARD IN KERR TAR RPO FS‐1505C SR 1162 (DABNEY DRIVE) 5 VANCE HENDERSON. UPGRADE EXISTING FACILITY. SCHEDULED FOR FEASIBILITY STUDY GARVEE BOND FUNDING $50 M FOR SEGMENT BA; PAYBACK FY 2015‐ US 158 (MILE POST 213.5) IN VANCE COUNTY 2026; GARVEE BOND FUNDING $25 TO VIRGINIA STATE LINE. PAVEMENT M FOR SEGMENT BB; PAYBACK FY TRN KERR TAR RPO I‐0914 I‐85 5 WARREN, VANCE REHABILITATION AND SIGN UPGRADES. 2015‐2026 KERR TAR RPO I‐0914A I‐85 5 WARREN, VANCE REFURBISH SIGNS AND SIGNPOSTS COMPLETE SOUTH OF US 158 IN VANCE COUNTY TO NORTH OF SR 1237 (MANSON DREWRY ROAD) TRN KERR TAR RPO I‐0914BA I‐85 5 VANCE, WARREN IN WARREN COUNTY RIGHT OF WAY IN PROGRESS CONSTRUCTION NHP 3258 3258 3258 3258 TRN KERR TAR RPO I‐0914BA I‐85 5 VANCE, WARREN SOUTH OF US 158 IN VANCE COUNTY TO RIGHT OF WAY IN PROGRESS CONSTRUCTION S(M) 4167 4167 4167 4166 TRN KERR TAR RPO I‐0914BA I‐85 5 VANCE, WARREN SOUTH OF US 158 IN VANCE COUNTY TO RIGHT OF WAY IN PROGRESS GARVEE NHP 5125 5125 5125 5125 5125 5125 5125 5125 5125 5125 5125 5125 NORTH OF SR 1237 (MANSON DREWRY ROAD) TRN KERR TAR RPO I‐0914BB I‐85 5 WARREN TO VIRGINIA STATE LINE RIGHT OF WAY IN PROGRESS CONSTRUCTION NHP 5792 5792 5792 5792 TRN KERR TAR RPO I‐0914BB I‐85 5 WARREN NORTH OF SR 1237 (MANSON DREWRY ROAD) RIGHT OF WAY IN PROGRESS CONSTRUCTION S(M) 2083 2083 2083 2083 TRN KERR TAR RPO I‐0914BB I‐85 5 WARREN NORTH OF SR 1237 (MANSON DREWRY ROAD) RIGHT OF WAY IN PROGRESS GARVEE NHP 2562 2562 2562 2562 2562 2562 2562 2562 2562 2562 2562 2562 TRN KERR TAR RPO I‐0914BC I‐85 5 WARREN, VANCE ITS DEPLOYMENT FOR PARTS BA AND BB UNDER CONSTRUCTION GRANVILLE COUNTY LINE (MILE POST 208.5) TO PROJECT COMPLETE ‐ GARVEE BOND US 158 BYPASS (MILE POST 213.5) IN VANCE FUNDING $26.7 MILLION; COUNTY. PAVEMENT AND BRIDGE CONSTRUCTION ‐ PAYBACK FY 2008 ‐ GARVEE TRN KERR TAR RPO I‐2810 I‐85 5 VANCE REHABILITATION. FY 2019 CONSTRUCTION NHP 3187 3187 3187 3187 3187 I‐85 IN ORANGE COUNTY TO NC 147 (DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM‐CHAPEL HILL‐CARRBORO DURHAM COUNTY. WIDEN TO SIX LANES AND MPO I‐3306 I‐40 7, 5 ORANGE, DURHAM INSTALL ITS. ORANGE COUNTY LINE TO NC 147 (DURHAM DURHAM‐CHAPEL HILL‐CARRBORO FREEWAY / TRIANGLE EXPRESSWAY) IN MPO I‐3306B I‐40 5 DURHAM DURHAM COMPLETE SR 1728 (WADE AVENUE) TO EAST OF I‐440 / US PROJECT COMPLETE ‐ GARVEE 64 (MILE POST 302). PAVEMENT REPAIR AND BOND FUNDING $8.8 MILLION; GARVEE TRN CAPITAL AREA MPO I‐4709 I‐40 5 WAKE RESURFACING. PAYBACK FY 2007 ‐ FY 2018 CONSTRUCTION NHP 998 998 998 998

As of December 2014 6 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED PROJECT COMPLETE ‐ GARVEE BOND SR 1728 (WADE AVENUE) TO I‐440 / US 1 / US FUNDING $42.2 MILLION; PAYBACK GARVEE TRN CAPITAL AREA MPO I‐4744 I‐40 5 WAKE 64. WIDEN TO SIX LANES. FY 2009 ‐ FY 2020 CONSTRUCTION NHP 4635 4635 4635 4635 4635 4635 SOUTH OF NC 39 (MILE POST 213.5) TO NORTH PROJECT COMPLETE ‐ GARVEE BOND OF US 1 (MILE POST 233.5). PAVEMENT FUNDING $8.7 MILLION; PAYBACK GARVEE TRN KERR TAR RPO I‐4904 I‐85 5 VANCE, WARREN REHABILITATION. FY 2007 ‐ FY 2018 CONSTRUCTION NHP 884 884 884 884 I‐440 / US 64 (EXIT 301) TO NC 42 (EXIT 312). ADDITIONAL LANES AND ITS DEPLOYMENT ON PLANNING / DESIGN IN PROGRESS ‐ ALTERNATE ROUTES FOR TRAFFIC COORDINATE WITH R‐2828 AND R‐ CAPITAL AREA MPO I‐5111 I‐40 5, 4 WAKE, JOHNSTON MANAGEMENT. 2829 I‐440 / US 64 (EXIT 301) TO US 70 BUSINESS SW CAPITAL AREA MPO I‐5111A I‐40 5 WAKE (EXIT 306) RIGHT‐OF‐WAY NHP 5000 SW CAPITAL AREA MPO I‐5111A I‐40 5 WAKE I‐440 / US 64 (EXIT 301) TO US 70 BUSINESS MITIGATION NHP 566 SW CAPITAL AREA MPO I‐5111A I‐40 5 WAKE I‐440 / US 64 (EXIT 301) TO US 70 BUSINESS CONSTRUCTION NHP 13250 13250 13250 13250 US 70 BUSINESS (EXIT 306) TO JOHNSTON SW CAPITAL AREA MPO I‐5111BA I‐40 5 WAKE COUNTY LINE RIGHT‐OF‐WAY NHP 7500 7500 SW CAPITAL AREA MPO I‐5111BA I‐40 5 WAKE US 70 BUSINESS (EXIT 306) TO JOHNSTON MITIGATION NHP 849 SW CAPITAL AREA MPO I‐5111BA I‐40 5 WAKE US 70 BUSINESS (EXIT 306) TO JOHNSTON CONSTRUCTION NHP 10750 10750 10750 10750

EAST OF I‐540 TO WADE AVENUE (EXIT 289) INCLUDING RAMPS, AND SR 1728 (WADE PROJECT COMPLETE ‐ GARVEE BOND AVENUE) FROM I‐40 TO SR 3009 (EDWARDS FUNDING $5.8 MILLION; MILL ROAD). MILL AND RESURFACE ROADWAY, CONSTRUCTION ‐ PAYBACK FY 2009‐ GARVEE TRN CAPITAL AREA MPO I‐5112 I‐40; SR 1728 (WADE AVENUE) 5 WAKE SHOULDERS AND RAMPS. 2020 CONSTRUCTION NHP 592 592 592 592 592 592 TRN CAPITAL AREA MPO I‐5112 I‐40; SR 1728 (WADE AVENUE) 5 WAKE EAST OF I‐540 TO WADE AVENUE (EXIT 289) PROJECT COMPLETE ‐ GARVEE BOND GARVEE STP 45 45 45 45 45 45 I‐40 IN DURHAM COUNTY TO NC 50 IN WAKE CAPITAL AREA MPO, DURHAM‐CHAPEL COUNTY. PAVEMENT REHABILITATION AND UNDER CONSTRUCTION ‐ LET WITH I‐ HILL‐CARRBORO MPO I‐5307 I‐540 5 WAKE, DURHAM SHOULDER SEALS. 5310 ‐ COST INCLUDES I‐5310 CAPITAL AREA MPO, DURHAM‐CHAPEL SR 1789 (PLEASANT GROVE CHURCH ROAD) TO HILL‐CARRBORO MPO I‐5307A I‐540 5 WAKE US 70. APPLY FRICTION COURSE.

NC 50 TO EAST OF US 1. PAVEMENT UNDER CONSTRUCTION ‐ LET WITH I‐ CAPITAL AREA MPO I‐5310 I‐540 5 WAKE REHABILITATION. 5307 ‐ COST REFLECTED IN I‐5307 I‐40 (EXIT 301) TO NORTH OF US 64‐US 264 (KNIGHTDALE BYPASS). PAVEMENT REHABILITATION AND ITS DEPLOYMENT ON ALTERNATE ROUTES FOR TRAFFIC UNDER CONSTRUCTION ‐ DESIGN‐ TRN CAPITAL AREA MPO I‐5311 I‐440 / US 64 5 WAKE MANAGEMENT. BUILD PROJECT; LET WITH I‐5338 CONSTRUCTION NHP 9996 9995 I‐40 TO SR 1728 (WADE AVENUE). PAVEMENT REPAIR, PATCHING, CRACK SEALING, AND SLAB TRN CAPITAL AREA MPO I‐5333 I‐440 / US 1 5 WAKE REPLACEMENT.

I‐40 TO SR 1728 (WADE AVENUE). PHASE 1 DIVISION PURCHASE ORDER CAPITAL AREA MPO I‐5333A I‐440 / US 1 5 WAKE REHABILITATION ACTIVITIES. CONTRACT ‐ UNDER CONSTRUCTION I‐40 TO SR 1728 (WADE AVENUE). PHASE 2 DIVISION PURCHASE ORDER TRN CAPITAL AREA MPO I‐5333B I‐440 / US 1 5 WAKE REHABILITATION ACTIVITIES. CONTRACT CONSTRUCTION NHPIM 850 WEST OF SR 1319 (JONES‐FRANKLIN ROAD) TO EAST OF I‐440 / US 64 (EXIT 301). PAVEMENT REHABILITATION, INCLUDING WIDENING FOR MAINTENANCE OF TRAFFIC (NO ADDITIONAL TRAVEL LANES), AND ITS DEPLOYMENT ON ALTERNATE ROUTES FOR TRAFFIC UNDER CONSTRUCTION ‐ DESIGN‐ TRN CAPITAL AREA MPO I‐5338 I‐40 / US 64 5 WAKE MANAGEMENT. BUILD PROJECT; LET WITH I‐5311 CONSTRUCTION NHP 27093 27093 TRN CAPITAL AREA MPO I‐5338A VARIOUS 5 WAKE ITS DEPLOYMENT COMPLETE WEST OF SR 1319 (JONES‐FRANKLIN ROAD) TO EAST SR 1371 (LAKE WHEELER ROAD). CONVERT SHOULDER TO AUXILIARY LANE (COORDINATE TRN CAPITAL AREA MPO I‐5338B I‐40 / US 64 5 WAKE WITH I‐5338). CONSTRUCTION NHP 500 TRAFFIC MITIGATION MEASURES, TO INCLUDE NEW AND EXPANDED TRANSIT ROUTES, VANPOOLS, AND BICYCLE / PEDESTRIAN TRN CAPITAL AREA MPO I‐5338C VARIOUS 5, 4 WAKE, JOHNSTON ELEMENTS. IN PROGRESS CONSTRUCTION NHP 500 500 TRAFFIC MITIGATION MEASURES, TO INCLUDE NEW AND EXPANDED TRANSIT ROUTES, VANPOOLS, AND BICYCLE / PEDESTRIAN TRN CAPITAL AREA MPO I‐5338C VARIOUS 5, 4 WAKE, JOHNSTON ELEMENTS. IN PROGRESS IMPLEMENTATION NHP 2375 2375 TRN CAPITAL AREA MPO I‐5338C VARIOUS 5, 4 WAKE, JOHNSTON TRAFFIC MITIGATION MEASURES, TO INCLUDE IN PROGRESS IMPLEMENTATION STP 125 125 SR 1002 (AVIATION PARKWAY) INTERCHANGE. CONSTRUCT LOOP RAMP IN NORTHWEST PLANNING / DESIGN IN PROGRESS ‐ SW CAPITAL AREA MPO I‐5506 I‐40 5 WAKE QUADRANT. COORDINATE WITH I‐5702B RIGHT‐OF‐WAY NHP 500 SW CAPITAL AREA MPO I‐5506 I‐40 5 WAKE SR 1002 (AVIATION PARKWAY) INTERCHANGE. PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION NHP 3100

SR 3015 (AIRPORT BOULEVARD). INTERCHANGE PLANNING / DESIGN IN PROGRESS ‐ SW CAPITAL AREA MPO I‐5700 I‐40 5 WAKE IMPROVEMENTS. COORDINATE WITH I‐5702B RIGHT‐OF‐WAY NHP 920 SW CAPITAL AREA MPO I‐5700 I‐40 5 WAKE SR 3015 (AIRPORT BOULEVARD). INTERCHANGE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION NHP 2875 2875 I‐440 / US 1 / US 64 TO SR 1370 (LAKE WHEELER COORDINATE WITH I‐5702C, I‐5703, SW CAPITAL AREA MPO I‐5701 I‐40 / US 64 5 WAKE ROAD) IN RALEIGH. ADD LANES. AND I‐5704 CONSTRUCTION NHP 8500 8500 8500 US 15 / US 501 IN DURHAM COUNTY TO I‐440 / CAPITAL AREA MPO, DURHAM‐CHAPEL US 64 IN WAKE COUNTY. CONSTRUCT HILL‐CARRBORO MPO I‐5702 I‐40 5 WAKE, DURHAM MANAGED LANES. CAPITAL AREA MPO, DURHAM‐CHAPEL COORDINATE WITH I‐5707 AND U‐ SW HILL‐CARRBORO MPO I‐5702A I‐40 5 DURHAM US 15 / US 501 TO NC 147. 5774F RIGHT‐OF‐WAY T 18995 18995 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702A I‐40 5 DURHAM US 15 / US 501 TO NC 147. COORDINATE WITH I‐5707 AND U‐ UTILITIES T 920 920 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702A I‐40 5 DURHAM US 15 / US 501 TO NC 147. COORDINATE WITH I‐5707 AND U‐ CONSTRUCTION T 457550 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702A I‐40 5 DURHAM US 15 / US 501 TO NC 147. COORDINATE WITH I‐5707 AND U‐ CONSTRUCTION BOND R 29400 NC 147 (DURHAM FREEWAY / TRIANGLE CAPITAL AREA MPO, DURHAM‐CHAPEL EXPRESSWAY) IN DURHAM COUNTY TO SR 1728 COORDINATE WITH I‐5506 AND I‐ SW HILL‐CARRBORO MPO I‐5702B I‐40 5 WAKE, DURHAM (WADE AVENUE) IN WAKE COUNTY. 5700 RIGHT‐OF‐WAY T 26480 26480 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702B I‐40 5 WAKE, DURHAM NC 147 (DURHAM FREEWAY / TRIANGLE COORDINATE WITH I‐5506 AND I‐ UTILITIES T 980 980 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702B I‐40 5 WAKE, DURHAM NC 147 (DURHAM FREEWAY / TRIANGLE COORDINATE WITH I‐5506 AND I‐ CONSTRUCTION T 671650 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702B I‐40 5 WAKE, DURHAM NC 147 (DURHAM FREEWAY / TRIANGLE COORDINATE WITH I‐5506 AND I‐ CONSTRUCTION BOND R 7230

As of December 2014 7 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED CAPITAL AREA MPO, DURHAM‐CHAPEL COORDINATE WITH I‐5701, I‐5703, SW HILL‐CARRBORO MPO I‐5702C I‐40 5 WAKE SR 1728 (WADE AVENUE) TO I‐440 / US 64. AND I‐5704 RIGHT‐OF‐WAY T 795 794 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702C I‐40 5 WAKE SR 1728 (WADE AVENUE) TO I‐440 / US 64. COORDINATE WITH I‐5701, I‐5703, UTILITIES T 600 600 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702C I‐40 5 WAKE SR 1728 (WADE AVENUE) TO I‐440 / US 64. COORDINATE WITH I‐5701, I‐5703, CONSTRUCTION T 439409 SW CAPITAL AREA MPO, DURHAM‐CHAPEL I‐5702C I‐40 5 WAKE SR 1728 (WADE AVENUE) TO I‐440 / US 64. COORDINATE WITH I‐5701, I‐5703, CONSTRUCTION BOND R 73380 I‐440 / US 1 / US 64 INTERCHANGE IN RALEIGH. COORDINATE WITH I‐5701, I‐5702C, SW CAPITAL AREA MPO I‐5703 I‐40 5 WAKE RECONSTRUCT INTERCHANGE. I‐5704 AND U‐2719 RIGHT‐OF‐WAY NHP 28334 28333 28333 SW CAPITAL AREA MPO I‐5703 I‐40 5 WAKE I‐440 / US 1 / US 64 INTERCHANGE IN RALEIGH. COORDINATE WITH I‐5701, I‐5702C, UTILITIES NHP 300 300 300 SW CAPITAL AREA MPO I‐5703 I‐40 5 WAKE I‐440 / US 1 / US 64 INTERCHANGE IN RALEIGH. COORDINATE WITH I‐5701, I‐5702C, CONSTRUCTION NHP 188900 WEST OF SR 1728 (WADE AVENUE) TO EAST OF I‐ 440 / US 1 / US 64. ADD LANES AND COORDINATE WITH I‐5701, I‐5702C SW CAPITAL AREA MPO I‐5704 I‐40 5 WAKE REHABILITATE PAVEMENT. AND I‐5703 CONSTRUCTION NHP 12578 12578 12578 NC 55 (ALSTON AVENUE) TO NC 147 (DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM‐CHAPEL HILL‐CARRBORO DURHAM. CONSTRUCT WESTBOUND PLANNING / DESIGN IN PROGRESS ‐ SW MPO I‐5707 I‐40 5 DURHAM AUXILIARY LANE. COORDINATE WITH I‐5702A RIGHT‐OF‐WAY NHP 268 SW DURHAM‐CHAPEL HILL‐CARRBORO I‐5707 I‐40 5 DURHAM NC 55 (ALSTON AVENUE) TO NC 147 (DURHAM PLANNING / DESIGN IN PROGRESS ‐ UTILITIES NHP 32 SW DURHAM‐CHAPEL HILL‐CARRBORO I‐5707 I‐40 5 DURHAM NC 55 (ALSTON AVENUE) TO NC 147 (DURHAM PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION NHP 15169 SR 2000 (WAKE FOREST ROAD) IN RALEIGH. SW CAPITAL AREA MPO I‐5708 I‐440 / US 1 5 WAKE INTERCHANGE IMPROVEMENTS. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHP 920 SR 2000 (WAKE FOREST ROAD) IN RALEIGH. SW CAPITAL AREA MPO I‐5708 I‐440 / US 1 5 WAKE INTERCHANGE IMPROVEMENTS. PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHP 2875 2875

SR 1829 (LEESVILLE ROAD) TO SR 2000 (FALLS OF NEUSE ROAD) IN RALEIGH. INSTALL RAMP SW CAPITAL AREA MPO I‐5710 I‐540 5 WAKE METERS AT VARIOUS INTERCHANGES. PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHP 600

0.5 MILES WEST OF US 501 TO 0.1 MILES EAST DURHAM‐CHAPEL HILL‐CARRBORO OF SR 1827 (MIDLAND TERRACE ROAD) IN SW MPO I‐5729 I‐85 5 DURHAM DURHAM. PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 5074

2 MILES NORTH OF SR 1127 (BROGDEN ROAD) TO 0.3 MILE NORTH OF SR 1132 (SANDERS SW KERR TAR RPO I‐5787 I‐85 5 GRANVILLE ROAD). PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 837

0.2 MILE NORTH OF US 15 TO VANCE COUNTY SW KERR TAR RPO I‐5819 I‐85 5 GRANVILLE LINE. PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 5210 1 MILE NORTH OF SR 1135 (SMITH RD.) TO 0.2 MILE NORTH OF US 15. PAVEMENT SW KERR TAR RPO I‐5843 I‐85 5 GRANVILLE REHABILITATION. CONSTRUCTION NHPIM 3245

0.6 MILE EAST OF SR 2921 (NORTH RALEIGH BOULEVARD) TO I‐495 / US 64 / US 264 IN SW CAPITAL AREA MPO I‐5844 I‐440 5 WAKE RALEIGH. PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 1962

WEST OF RIDGE ROAD TO EAST OF US 70 (GLENWOOD AVENUE) IN RALEIGH. CONSTRUCT NEW INTERCHANGE AT RIDGE ROAD TO CONNECT WITH CRABTREE VALLEY AVENUE, REALIGN I‐440 / US 1 INTERCHANGE WITH US 70 (GLENWOOD AVENUE), AND REALIGN AND SW CAPITAL AREA MPO I‐5870 I‐440 / US 1 5 WAKE WIDEN CRABTREE VALLEY AVENUE B RIGHT‐OF‐WAY T 1938 SW CAPITAL AREA MPO I‐5870 I‐440 / US 1 5 WAKE WEST OF RIDGE ROAD TO EAST OF US 70 CONSTRUCTION T 19038 38076 NC 54 IN RALEIGH. INTERCHANGE REG CAPITAL AREA MPO I‐5873 I‐40 5 WAKE IMPROVEMENTS. RIGHT‐OF‐WAY NHP 920 REG CAPITAL AREA MPO I‐5873 I‐40 5 WAKE NC 54 IN RALEIGH. INTERCHANGE CONSTRUCTION NHP 6384

CABARRUS‐ROWAN URBAN AREA MPO, HIGH POINT URBAN AREA MPO, ADDITIONAL PROJECT FUNDING DURHAM‐CHAPEL HILL‐CARRBORO INCLUDES ANTICIPATED $6.6 MPO, BURLINGTON‐GRAHAM URBAN MILLION / YR LEGISLATIVE AREA MPO, GREENSBORO URBAN AREA GUILFORD, DAVIDSON, ROWAN, TRAIN 74 / 75 OPERATIONS BETWEEN APPROPRIATION FROM STATE MPO, CAPITAL AREA MPO, CHARLOTTE ALAMANCE, CABARRUS, ORANGE, WAKE, CHARLOTTE AND RALEIGH, EQUIPMENT AND HIGHWAY FUND, TO BE USED FOR EX REGIONAL TPO P‐2918 PIEDMONT CORRIDOR 7, 9, 5, 10, 8 DURHAM, MECKLENBURG, RANDOLPH CAPITAL YARD MAINTENANCE FACILITY. OPERATIONS OPERATIONS CMAQ 3750 3750

CABARRUS‐ROWAN URBAN AREA MPO, HIGH POINT URBAN AREA MPO, DURHAM‐CHAPEL HILL‐CARRBORO MPO, BURLINGTON‐GRAHAM URBAN AREA MPO, GREENSBORO URBAN AREA CAPITAL YARD PHASE 1 IMPROVEMENTS ‐ MPO, CAPITAL AREA MPO, CHARLOTTE EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK REGIONAL TPO P‐2918H PIEDMONT CORRIDOR 5 WAKE 3IN PROGRESS

CABARRUS‐ROWAN URBAN AREA MPO, CAPITAL AREA MPO, CHARLOTTE REGIONAL TPO, GREENSBORO URBAN AREA MPO, BURLINGTON‐GRAHAM URBAN AREA MPO, DURHAM‐CHAPEL HILL‐CARRBORO MPO, HIGH POINT PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE URBAN AREA MPO, TRIANGLE AREA GUILFORD, ALAMANCE, CABARRUS, OR ENHANCE PROTECTION AT RAILROAD RPO, WINSTON‐SALEM URBAN AREA DAVIDSON, DURHAM, MECKLENBURG, CROSSINGS BETWEEN RALEIGH AND TRN MPO P‐4405 VARIOUS 7, 5, 9, 10 ORANGE, ROWAN, WAKE CHARLOTTE. IN PROGRESS ENGINEERING STHSR 64 TRN CABARRUS‐ROWAN URBAN AREA MPO, P‐4405 VARIOUS 7, 5, 9, 10 GUILFORD, ALAMANCE, CABARRUS, PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE IN PROGRESS RIGHT‐OF‐WAY STHSR 712 474 TRN CABARRUS‐ROWAN URBAN AREA MPO, P‐4405 VARIOUS 7, 5, 9, 10 GUILFORD, ALAMANCE, CABARRUS, PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE IN PROGRESS CONSTRUCTION STHSR 3000 3000 941 TRN CABARRUS‐ROWAN URBAN AREA MPO, P‐4405 VARIOUS 7, 5, 9, 10 GUILFORD, ALAMANCE, CABARRUS, PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE IN PROGRESS CONSTRUCTION O 881 880 PEANUT BELT RPO, CAPITAL AREA MPO, ROCKY MOUNT MPO P‐5005 CSXT RR 4, 5 HALIFAX, WAKE, NASH, EDGECOMBE CONGESTION MITIGATION CROSSOVERS. IN PROGRESS PEANUT BELT RPO, CAPITAL AREA MPO, TRN ROCKY MOUNT MPO P‐5005D VARIOUS 5 WAKE BOYLAN CROSSOVER IN RALEIGH UNDER CONSTRUCTION MORRISVILLE PARKWAY GRADE SEPARATION TRN CAPITAL AREA MPO P‐5201 PIEDMONT CORRIDOR 5 WAKE AND TRACK REALIGNMENT. UNDER CONSTRUCTION CONSTRUCTION CMAQ 2500

As of December 2014 8 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED

DP FUNDS ‐ FEDERAL TIGER GRANT; O FUNDS ‐ STATE LEGISLATIVE ALLOCATION FOR RAIL; PROJECT INCLUDES IN‐KIND PROPERTY RALEIGH UNION STATION PROJECT ‐ PHASE I. CONTRIBUTION BY TRIANGLE CONSTRUCT RALEIGH TRAIN STATION AND TRANSIT (CONTINGENT ON TT ASSOCIATED RAIL TRACK AND SIDING BOARD OF TRUSTEES APPROVAL) ‐ 4 IMPROVEMENTS TO INCREASE PASSENGER AND PARCELS TOTALING 3.5 ACRES WITH TRN CAPITAL AREA MPO P‐5500 NCRR 5 WAKE FREIGHT CAPACITY. TAX VALUE OF $2.9 MILLION

CSXT S‐LINE, TRACK AND SIGNAL DELETED ‐ WORK TO BE CAPITAL AREA MPO P‐5500A NCRR 5 WAKE IMPROVEMENTS ‐ BOYLAN WYE CROSSOVER ACCOMPLISHED UNDER P‐5005D. TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS ENGINEERING DP 365 122 122 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS ENGINEERING STHSR 271 90 90 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS ENGINEERING O 80 26 27 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS ENGINEERING L 80 27 26 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS CONSTRUCTION DP 5537 4430 1108 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS CONSTRUCTION STHSR 4104 3284 821 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS CONSTRUCTION O 2628 2103 526 TRN CAPITAL AREA MPO P‐5500B NCRR 5 WAKE STATION SITE WORK RIGHT OF WAY IN PROGRESS CONSTRUCTION L 2836 2269 567 TRN CAPITAL AREA MPO P‐5500C NCRR 5 WAKE TRACK IMPROVEMENTS RIGHT OF WAY IN PROGRESS ENGINEERING DP 383 128 127 TRN CAPITAL AREA MPO P‐5500C NCRR 5 WAKE TRACK IMPROVEMENTS RIGHT OF WAY IN PROGRESS ENGINEERING STHSR 284 95 95 TRN CAPITAL AREA MPO P‐5500C NCRR 5 WAKE TRACK IMPROVEMENTS RIGHT OF WAY IN PROGRESS ENGINEERING O 167 56 55 TRN CAPITAL AREA MPO P‐5500C NCRR 5 WAKE TRACK IMPROVEMENTS RIGHT OF WAY IN PROGRESS CONSTRUCTION DP 2684 2013 671 TRN CAPITAL AREA MPO P‐5500C NCRR 5 WAKE TRACK IMPROVEMENTS RIGHT OF WAY IN PROGRESS CONSTRUCTION STHSR 1989 1492 497 TRN CAPITAL AREA MPO P‐5500C NCRR 5 WAKE TRACK IMPROVEMENTS RIGHT OF WAY IN PROGRESS CONSTRUCTION O 1168 876 292 NC 49 IN ROXBORO TO THE VIRGINIA STATE LINE. WIDEN TO FOUR LANES WITH MEDIAN, KERR TAR RPO R‐2241 US 501 5 PERSON PART ON NEW LOCATION.

TRN KERR TAR RPO R‐2241A US 501 5 PERSON NC 49 IN ROXBORO TO SR 1521 (HALIFAX ROAD) UNDER CONSTRUCTION SR 1521 (HALIFAX ROAD) TO SR 1329 (OLD US KERR TAR RPO R‐2241B US 501 5 PERSON 501) RIGHT‐OF‐WAY STP 5820 KERR TAR RPO R‐2241B US 501 5 PERSON SR 1521 (HALIFAX ROAD) TO SR 1329 (OLD US MITIGATION STP 638 KERR TAR RPO R‐2241B US 501 5 PERSON SR 1521 (HALIFAX ROAD) TO SR 1329 (OLD US CONSTRUCTION STP 19300 SR 1329 (OLD NC 501) TO NORTH OF VIRGINIA KERR TAR RPO R‐2241C US 501 5 PERSON STATE LINE RIGHT‐OF‐WAY STP 3400 KERR TAR RPO R‐2241C US 501 5 PERSON SR 1329 (OLD NC 501) TO NORTH OF VIRGINIA MITIGATION STP 1104 KERR TAR RPO R‐2241C US 501 5 PERSON SR 1329 (OLD NC 501) TO NORTH OF VIRGINIA CONSTRUCTION STP 21600 TRIANGLE EXPRESSWAY (WESTERN WAKE FREEWAY / RALEIGH OUTER LOOP), NC 55 (SOUTH) TO NC 55 (NORTH). FREEWAY ON CAPITAL AREA MPO R‐2635 NC 540 5 WAKE NEW LOCATION. IN PROGRESS ‐ OPEN TO TRAFFIC INTERCHANGE WITH SR 1153 (OLD HOLLY SPRINGS‐APEX ROAD). CONSTRUCT INTERCHANGE AND CONVERT SHOULDER TO PLANNING / DESIGN IN PROGRESS ‐ TRN CAPITAL AREA MPO R‐2635D NC 540 (TRIANGLE EXPRESSWAY) 5 WAKE AUXILIARY LANE. DESIGN‐BUILD PROJECT RIGHT‐OF‐WAY T 4600 TRN CAPITAL AREA MPO R‐2635D NC 540 (TRIANGLE EXPRESSWAY) 5 WAKE INTERCHANGE WITH SR 1153 (OLD HOLLY PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION T 15000

SOUTHERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH PLANNING / DESIGN IN PROGRESS ‐ OUTER LOOP), NC 55 (SOUTH) TO US 401 NORTH CAROLINA TURNPIKE SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTH. FREEWAY ON NEW LOCATION. AUTHORITY DESIGN‐BUILD PROJECT RIGHT‐OF‐WAY T 20600 SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ RIGHT‐OF‐WAY BOND R 24600 SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ UTILITIES T 5000 SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ UTILITIES BOND R 6550 SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ MITIGATION BOND R 16576 SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION T 44400 44400 44400 SW CAPITAL AREA MPO R‐2721 NEW ROUTE (FUTURE NC 540) 5 WAKE SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION BOND R 54712 54712 54712

PLANNING / DESIGN IN PROGRESS ‐ SECTION B, GARVEE BOND FUNDING $15.8 MILLION FOR RIGHT OF WAY ‐ NORTH OF SR 2044 (LIGON MILL ROAD) TO NC PAYBACK FY 2009 ‐ FY 2020 AND 39 IN LOUISBURG. WIDEN TO FOUR‐LANE GARVEE BOND FUNDING $21.5 MEDIAN DIVIDED FACILITY, SOME NEW MILLION FOR CONSTRUCTION ‐ CAPITAL AREA MPO, KERR TAR RPO R‐2814 US 401 5 FRANKLIN, WAKE LOCATION. PAYBACK FY 2011 ‐ FY 2022 SR 2044 (LIGON MILL ROAD) TO NORTH OF SR CAPITAL AREA MPO, KERR TAR RPO R‐2814A US 401 5 WAKE 2225 (LOUISBURY ROAD) COMPLETE ROLESVILLE BYPASS, NORTH OF SR 2225 (LOUISBURY ROAD) TO NC 96 ON NEW GARVEE TRN CAPITAL AREA MPO, KERR TAR RPO R‐2814B US 401 5 WAKE LOCATION UNDER CONSTRUCTION CONSTRUCTION STP 2361 2361 2361 2361 2361 2361 2361 2361 TRN CAPITAL AREA MPO, KERR TAR RPO R‐2814B US 401 5 WAKE ROLESVILLE BYPASS, NORTH OF SR 2225 UNDER CONSTRUCTION GARVEE RIGHT‐OF‐ STP 1727 1727 1727 1727 1727 1727 NC 96 TO SR 1103 (FLAT ROCK CHURCH ROAD / CAPITAL AREA MPO, KERR TAR RPO R‐2814C US 401 5 FRANKLIN, WAKE CLIFTON POND ROAD) RIGHT‐OF‐WAY STP 9388 CAPITAL AREA MPO, KERR TAR RPO R‐2814C US 401 5 FRANKLIN, WAKE NC 96 TO SR 1103 (FLAT ROCK CHURCH ROAD / UTILITIES STP 973 CAPITAL AREA MPO, KERR TAR RPO R‐2814C US 401 5 FRANKLIN, WAKE NC 96 TO SR 1103 (FLAT ROCK CHURCH ROAD / MITIGATION STP 93 CAPITAL AREA MPO, KERR TAR RPO R‐2814C US 401 5 FRANKLIN, WAKE NC 96 TO SR 1103 (FLAT ROCK CHURCH ROAD / CONSTRUCTION STP 24600 SR 1103 (FLAT ROCK CHURCH ROAD / CLIFTON POND ROAD) TO SR 1700 (FOX PARK ROAD) CAPITAL AREA MPO, KERR TAR RPO R‐2814D US 401 5 FRANKLIN SOUTH OF LOUISBURG RIGHT‐OF‐WAY STP 2915 CAPITAL AREA MPO, KERR TAR RPO R‐2814D US 401 5 FRANKLIN SR 1103 (FLAT ROCK CHURCH ROAD / CLIFTON UTILITIES STP 1270 CAPITAL AREA MPO, KERR TAR RPO R‐2814D US 401 5 FRANKLIN SR 1103 (FLAT ROCK CHURCH ROAD / CLIFTON CONSTRUCTION STP 26400 SR 1700 (FOX PARK ROAD) SOUTH OF CAPITAL AREA MPO, KERR TAR RPO R‐2814E US 401 5 FRANKLIN LOUISBURG TO NC 39 IN LOUISBURG COMPLETE

As of December 2014 9 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED

SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH NORTH CAROLINA TURNPIKE OUTER LOOP), US 401 TO I‐40. CONSTRUCT AUTHORITY DESIGN‐BUILD PROJECT ‐ SW CAPITAL AREA MPO R‐2828 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON FREEWAY ON NEW LOCATION. COORDINATE WITH I‐5111 RIGHT‐OF‐WAY T 22800 SW CAPITAL AREA MPO R‐2828 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ RIGHT‐OF‐WAY BOND R 15300 SW CAPITAL AREA MPO R‐2828 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ UTILITIES T 2000 SW CAPITAL AREA MPO R‐2828 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ MITIGATION BOND R 30363 SW CAPITAL AREA MPO R‐2828 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION T 86367 86367 86366 SW CAPITAL AREA MPO R‐2828 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON SOUTHERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION BOND R 67917 67917 67916

EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH NORTH CAROLINA TURNPIKE OUTER LOOP), I‐40 TO US 64 / US 264 BYPASS. AUTHORITY PROJECT ‐ COORDINATE SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON FREEWAY ON NEW LOCATION. WITH I‐5111 RIGHT‐OF‐WAY T 18800 SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ RIGHT‐OF‐WAY BOND R 18800 SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ UTILITIES T 1550 SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ UTILITIES BOND R 1550 SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ MITIGATION BOND R 16273 SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION T 264434 SW CAPITAL AREA MPO R‐2829 NEW ROUTE (FUTURE NC 540) 5, 4 WAKE, JOHNSTON EASTERN WAKE FREEWAY / TRIANGLE PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION BOND R 150865 ANGIER NORTHERN TOWN LIMIT TO SOUTH OF SR 2791 (KENNEBEC CHURCH ROAD). WIDEN REG CAPITAL AREA MPO R‐5705 NC 55 5, 6 WAKE, HARNETT TO MULTI‐LANES. RIGHT‐OF‐WAY T 2685 REG CAPITAL AREA MPO R‐5705 NC 55 5, 6 WAKE, HARNETT ANGIER NORTHERN TOWN LIMIT TO SOUTH OF UTILITIES T 322 REG CAPITAL AREA MPO R‐5705 NC 55 5, 6 WAKE, HARNETT ANGIER NORTHERN TOWN LIMIT TO SOUTH OF CONSTRUCTION T 6699 US 15 AND NC 50 IN CREEDMOOR. REALIGN REG CAPITAL AREA MPO R‐5707 NC 56 5 GRANVILLE INTERSECTIONS. RIGHT‐OF‐WAY T 450 REG CAPITAL AREA MPO R‐5707 NC 56 5 GRANVILLE US 15 AND NC 50 IN CREEDMOOR. REALIGN CONSTRUCTION T 1875

DIVISION PURCHASE ORDER CAPITAL AREA MPO SF‐4905C NC 56 5 GRANVILLE ROBERTSON CREEK. GUARDRAIL INSTALLATION. CONTRACT ‐ UNDER CONSTRUCTION HF CAPITAL AREA MPO TA‐4818A TRIANGLE TRANSIT AUTHORITY 5 WAKE EXPANSION BUS CAPITAL FUZ 962 962 962 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐4818B TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE REPLACEMENT BUS CAPITAL FUZ 962 962 962 HF CAPITAL AREA MPO TA‐4903 CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS CAPITAL S 363 113 HF CAPITAL AREA MPO TA‐4903 CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS CAPITAL L 363 113 HF CAPITAL AREA MPO TA‐4903 CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS CAPITAL FBUS 2900 900 EX CAPITAL AREA MPO TA‐4903A CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS ‐ WEST RALEIGH CAPITAL CMAQ 1750 EX CAPITAL AREA MPO TA‐4903A CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS ‐ WEST RALEIGH CAPITAL S 229 EX CAPITAL AREA MPO TA‐4903A CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS ‐ WEST RALEIGH CAPITAL L 231 EX CAPITAL AREA MPO TA‐4903A CAPITAL AREA TRANSIT 5 WAKE REPLACEMENT BUS ‐ WEST RALEIGH CAPITAL FUZ 90 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO TA‐4923 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM REPLACEMENT BUS. ACQUISITION STPDA 3218 720 DIV DURHAM‐CHAPEL HILL‐CARRBORO TA‐4923 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM REPLACEMENT BUS. ACQUISITION L 805 180 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO TA‐5019A CHAPEL HILL TRANSIT 5 DURHAM REPLACEMENT PARATRANSIT VEHICLES. ACQUISITION STPDA 260 287 DIV DURHAM‐CHAPEL HILL‐CARRBORO TA‐5019A CHAPEL HILL TRANSIT 5 DURHAM REPLACEMENT PARATRANSIT VEHICLES. ACQUISITION L 67 71 HF CAPITAL AREA MPO TA‐5123A TRIANGLE TRANSIT AUTHORITY 5 WAKE EXPANSION BUS CAPITAL FUZ 1352 1621 1621 1621 1621 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5123B TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE EXPANSION BUS CAPITAL FUZ 1352 1621 1621 1621 1621 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5135 TRIANGLE TRANSIT AUTHORITY 5 DURHAM BUS REHABILITATION CAPITAL L 55 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5135 TRIANGLE TRANSIT AUTHORITY 5 DURHAM BUS REHABILITATION CAPITAL FBUS 222 HF CAPITAL AREA MPO TA‐5140 CAPITAL AREA TRANSIT 5 WAKE BUS REPLACEMENT CAPITAL S 645 270 270 HF CAPITAL AREA MPO TA‐5140 CAPITAL AREA TRANSIT 5 WAKE BUS REPLACEMENT CAPITAL L 645 270 270 270 HF CAPITAL AREA MPO TA‐5140 CAPITAL AREA TRANSIT 5 WAKE BUS REPLACEMENT CAPITAL FUZ 4750 1750 1750 1750 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5144 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM BATTERY REPLACEMENT ‐ HYBRID BUSES ‐ 20 CAPITAL L 160 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5144 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM BATTERY REPLACEMENT ‐ HYBRID BUSES ‐ 20 CAPITAL FBUS 640 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5145 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM BUS REFURBISHMENT ‐ 6 CAPITAL FBUS 98 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5146 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM BUS REPOWER ‐ 3 CAPITAL FBUS 177 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5147 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM BUS REFURBISHMENT ‐ 3 CAPITAL L 10 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5147 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM BUS REFURBISHMENT ‐ 3 CAPITAL FBUS 41 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5148 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE VANPOOL VANS ‐ REPLACEMENT (8) CAPITAL L 46 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5148 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE VANPOOL VANS ‐ REPLACEMENT (8) CAPITAL FBUS 178 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO TA‐5154 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE REPLACEMENT PARATRANSIT VEHICLES CAPITAL STPDA 215 DIV DURHAM‐CHAPEL HILL‐CARRBORO TA‐5154 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE REPLACEMENT PARATRANSIT VEHICLES CAPITAL L 54

HF KERR TAR RPO TA‐6129 KERR AREA TRANSPORTATION 5 FRANKLIN, GRANVILLE, VANCE, WARREN CAPITAL CAPITAL FNU 8366 HF KERR TAR RPO TA‐6133 PERSON COUNTY 5 PERSON CAPITAL CAPITAL FNU 223 WAKE COORDINATED TRANSPORTATION HF CAPITAL AREA MPO TA‐6136 SERVICE 5 WAKE CAPITAL CAPITAL FNU 1292 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐6246 DURHAM COUNTY ACCESS 5 DURHAM CAPITAL CAPITAL FNU 150

HF KERR TAR RPO TA‐6523 KERR TAR REGIONAL COUNCIL 5 FRANKLIN, GRANVILLE, VANCE, WARREN CAPITAL CAPITAL S 60 HF KERR TAR RPO TA‐6523 KERR TAR REGIONAL COUNCIL 5 FRANKLIN, GRANVILLE, VANCE, WARREN CAPITAL CAPITAL L 60 HF KERR TAR RPO TA‐6523 KERR TAR REGIONAL COUNCIL 5 FRANKLIN, GRANVILLE, VANCE, WARREN CAPITAL CAPITAL FEPD 480 HF CAPITAL AREA MPO TA‐6524 THE ARC OF WAKE COUNTY 5 WAKE CAPITAL CAPITAL S 5 HF CAPITAL AREA MPO TA‐6524 THE ARC OF WAKE COUNTY 5 WAKE CAPITAL CAPITAL L 5 HF CAPITAL AREA MPO TA‐6524 THE ARC OF WAKE COUNTY 5 WAKE CAPITAL CAPITAL FEPD 37 NEW HOPE ROAD IN RALEIGH. CONSTRUCT DIV CAPITAL AREA MPO TD‐4912 US 64 BUSINESS 5 WAKE TRANSFER FACILITY. CONSTRUCTION T 88 DIV CAPITAL AREA MPO TD‐4912 US 64 BUSINESS 5 WAKE NEW HOPE ROAD IN RALEIGH. CONSTRUCT CONSTRUCTION FED 704 DIV CAPITAL AREA MPO TD‐4912 US 64 BUSINESS 5 WAKE NEW HOPE ROAD IN RALEIGH. CONSTRUCT CONSTRUCTION L 88 HF CAPITAL AREA MPO TD‐4941 TRIANGLE TRANSIT AUTHORITY 5 WAKE FACILITY ‐ PARK & RIDE ‐ CAMPO FUNDED CAPITAL S

As of December 2014 10 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED HF CAPITAL AREA MPO TD‐4941 TRIANGLE TRANSIT AUTHORITY 5 WAKE FACILITY ‐ PARK & RIDE ‐ CAMPO FUNDED CAPITAL STPDA 189 HF CAPITAL AREA MPO TD‐4941 TRIANGLE TRANSIT AUTHORITY 5 WAKE FACILITY ‐ PARK & RIDE ‐ CAMPO FUNDED CAPITAL L 47 FACILITY ‐ TRANSIT CENTER ‐ MOORE SQUARE HF CAPITAL AREA MPO TD‐4943 CAPITAL AREA TRANSIT 5 WAKE STATION EXPANSION. CAPITAL L 683 HF CAPITAL AREA MPO TD‐4943 CAPITAL AREA TRANSIT 5 WAKE FACILITY ‐ TRANSIT CENTER ‐ MOORE SQUARE CAPITAL FUZ 2490 HF CAPITAL AREA MPO TD‐4943 CAPITAL AREA TRANSIT 5 WAKE FACILITY ‐ TRANSIT CENTER ‐ MOORE SQUARE CAPITAL FBUS 240 HF CAPITAL AREA MPO TD‐5116 CAPITAL AREA TRANSIT 5 WAKE FACILITY ‐ PARK & RIDE ‐ POOLE ROAD CAPITAL FUZ 876 1740 876 CONSTRUCT BUS MAINTENANCE FACILITY AT DIV CAPITAL AREA MPO TD‐5264A CARY TRANSIT / C‐TRAN 5 WAKE TOWERVIEW COURT IN CARY. CONSTRUCTION T 700 DIV CAPITAL AREA MPO TD‐5264A CARY TRANSIT / C‐TRAN 5 WAKE CONSTRUCT BUS MAINTENANCE FACILITY AT CONSTRUCTION FED 5600 DIV CAPITAL AREA MPO TD‐5264A CARY TRANSIT / C‐TRAN 5 WAKE CONSTRUCT BUS MAINTENANCE FACILITY AT CONSTRUCTION L 700 DIV CAPITAL AREA MPO TD‐5264B CARY TRANSIT/C‐TRAN 5 WAKE FACILITY‐OPERATIONS AND MAINTENANCE CAPITAL STPDA 1004 DIV CAPITAL AREA MPO TD‐5264B CARY TRANSIT/C‐TRAN 5 WAKE FACILITY‐OPERATIONS AND MAINTENANCE CAPITAL L 251 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TD‐5267 TRIANGLE TRANSIT AUTHORITY 5 DURHAM MAINTENANCE FACILITY RENOVATION CAPITAL L 19 HF DURHAM‐CHAPEL HILL‐CARRBORO TD‐5267 TRIANGLE TRANSIT AUTHORITY 5 DURHAM MAINTENANCE FACILITY RENOVATION CAPITAL FBUS 75 FACILITY ‐ TRANSIT CENTER. UNION STATION HF CAPITAL AREA MPO TD‐5269 CAPITAL AREA TRANSIT 5 WAKE BUS COMPONENT CAPITAL STPDA 1215 HF CAPITAL AREA MPO TD‐5269 CAPITAL AREA TRANSIT 5 WAKE FACILITY ‐ TRANSIT CENTER. UNION STATION CAPITAL L 604 300 300 300 HF CAPITAL AREA MPO TD‐5269 CAPITAL AREA TRANSIT 5 WAKE FACILITY ‐ TRANSIT CENTER. UNION STATION CAPITAL FUZ 1200 1200 1200 1200 PECAN ROAD IN RALEIGH. CONSTRUCT OFF‐ DIV CAPITAL AREA MPO TD‐5272 SOUTH WILMINGTON STREET 5 WAKE STREET TRANSFER FACILITY. CONSTRUCTION T 88 DIV CAPITAL AREA MPO TD‐5272 SOUTH WILMINGTON STREET 5 WAKE PECAN ROAD IN RALEIGH. CONSTRUCT OFF‐ CONSTRUCTION FED 704 DIV CAPITAL AREA MPO TD‐5272 SOUTH WILMINGTON STREET 5 WAKE PECAN ROAD IN RALEIGH. CONSTRUCT OFF‐ CONSTRUCTION L 88 TRIANGLE TRANSIT. ROUGEMONT PARK‐AND‐ DURHAM‐CHAPEL HILL‐CARRBORO RIDE. PROFESSIONAL SERVICES AND PROPERTY REG MPO TD‐5273 VARIOUS 5 DURHAM ACQUISITION. ACQUISITION STPDA 24 92 REG DURHAM‐CHAPEL HILL‐CARRBORO TD‐5273 VARIOUS 5 DURHAM TRIANGLE TRANSIT. ROUGEMONT PARK‐AND‐ ACQUISITION L 24 109 FACILITY ‐ PARA‐TRANSIT ‐ RENOVATION HF CAPITAL AREA MPO TD‐5274 CAPITAL AREA TRANSIT 5 WAKE CAT/WAKE COORDINATED CAPITAL STPDA 1040 HF CAPITAL AREA MPO TD‐5274 CAPITAL AREA TRANSIT 5 WAKE FACILITY ‐ PARA‐TRANSIT ‐ RENOVATION CAPITAL L 260 FIXED GUIDEWAY ‐ LIGHT RAIL SERVICE‐ added unfunded $1.5B to match HF CAPITAL AREA MPO TE‐4903A TRIANGLE TRANSIT AUTHORITY 5, 7 WAKE, DURHAM, ORANGE CARY/RALEIGH 2040 estimates CAPITAL FED 500000 500000 500000 FIXED GUIDEWAY ‐ COMMUTER RAIL SERVICE‐ added unfunded $666M to match HF CAPITAL AREA MPO TE‐4903B TRIANGLE TRANSIT AUTHOR 5 WAKE DURHAM/RALEIGH 2040 estimates CAPITAL FED 222 222 222 UNC HOSPITALS IN CHAPEL HILL TO NC 55 DURHAM‐CHAPEL HILL‐CARRBORO (ALSTON AVENUE) IN DURHAM. CONSTRUCT REG MPO TE‐5205 DURHAM‐ORANGE LIGHT RAIL LINE 5, 7 DURHAM, ORANGE LIGHT RAIL SYSTEM. DURHAM‐CHAPEL HILL‐CARRBORO ORANGE COUNTY LINE TO NC 55 (ALSTON REG MPO TE‐5205B DURHAM‐ORANGE LIGHT RAIL LINE 5 DURHAM AVENUE) IN DURHAM. RIGHT‐OF‐WAY T 7379 7379 7379 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205B DURHAM‐ORANGE LIGHT RAIL LINE 5 DURHAM ORANGE COUNTY LINE TO NC 55 (ALSTON RIGHT‐OF‐WAY L 7379 7379 7379 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205B DURHAM‐ORANGE LIGHT RAIL LINE 5 DURHAM ORANGE COUNTY LINE TO NC 55 (ALSTON RIGHT‐OF‐WAY FBUS 14759 14758 14758 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205B DURHAM‐ORANGE LIGHT RAIL LINE 5 DURHAM ORANGE COUNTY LINE TO NC 55 (ALSTON CONSTRUCTION T 55375 110750 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205B DURHAM‐ORANGE LIGHT RAIL LINE 5 DURHAM ORANGE COUNTY LINE TO NC 55 (ALSTON CONSTRUCTION L 55375 110750 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205B DURHAM‐ORANGE LIGHT RAIL LINE 5 DURHAM ORANGE COUNTY LINE TO NC 55 (ALSTON CONSTRUCTION FBUS 110752 221503 ROUTINE CAPITAL ‐ BUS STOP SHELTERS, DURHAM‐CHAPEL HILL‐CARRBORO BENCHES, SHOP EQUIPMENT, SPARE PARTS, EX MPO TG‐4738 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM ENGINES, SERVICE VEHICLES, ETC. CAPITAL CMAQ 260 ROUTINE CAPITAL ‐ BUS STOP SHELTERS, DURHAM‐CHAPEL HILL‐CARRBORO BENCHES, SHOP EQUIPMENT, SPARE PARTS, EX MPO TG‐4738 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM ENGINES, SERVICE VEHICLES, ETC. CAPITAL FUZ 1188 594 594 594 594 594 594 594 594 DURHAM‐CHAPEL HILL‐CARRBORO OPS FUNDED / HF MPO TG‐4738A DURHAM AREA TRANSIT AUTHORITY 5 DURHAM PREVENTIVE MAINTENANCE CAPITAL FUZ 7294 3750 3750 3750 3750 3750 3750 3750 3750

ROUTINE CAPITAL ‐ BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, HF CAPITAL AREA MPO TG‐4792 CAPITAL AREA TRANSIT 5 WAKE ENGINES, FAREBOX, SERVICE VEHICLES, ETC CAPITAL S 1000 500 500 500 HF CAPITAL AREA MPO TG‐4792 CAPITAL AREA TRANSIT 5 WAKE ROUTINE CAPITAL ‐ BUS STOP SHELTERS, CAPITAL FUZ 9000 4500 4500 4500 4250 4250 4250 4250 4250 HF CAPITAL AREA MPO TG‐4792B CAPITAL AREA TRANSIT 5 WAKE ADA PARATRANSIT SERVICE OPERATIONS FUZ 1250 625 625 625

ROUTINE CAPITAL ‐ BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, DURHAM‐CHAPEL HILL‐CARRBORO ENGINES, FAREBOX, SERVICE VEHICLES, ETC see March 2012 handout 2012‐2018 HF MPO TG‐4821B TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE INCLUDES ADA, PM AND SERVICE VEHICLES STIP CAPITAL FUZ 3548 1849 1909 1966 1969 1969 1969 1969 1969 OPS FUNDED / HF CAPITAL AREA MPO TG‐4935A CARY TRANSIT/C‐TRAN 5 WAKE ROUTINE CAPITAL ‐ COST OF CONTRACTING CAPITAL FUZ 9000 4600 4600 4600 4600 4600 4600 4600 4600

PASSENGER AMENITIES ‐ BUS STOP SHELTERS, DURHAM‐CHAPEL HILL‐CARRBORO BENCHES, SHOP EQUIPMENT, SPARE PARTS, HF MPO TG‐4958 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM ENGINES, SERVICE VEHICLES, ETC. CAPITAL L 54 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐4958 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM PASSENGER AMENITIES ‐ BUS STOP SHELTERS, CAPITAL FUZ 217 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TG‐5250 TRIANGLE TRANSIT AUTHORITY 5 DURHAM SHOP EQUIPMENT CAPITAL L 17 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5250 TRIANGLE TRANSIT AUTHORITY 5 DURHAM SHOP EQUIPMENT CAPITAL FBUS 70 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TG‐5251 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE ROUTINE CAPITAL CAPITAL L 55 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TG‐5251 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE ROUTINE CAPITAL CAPITAL FBUS 222 TRIANGLE TRANSIT ‐ ESTABLISH DURHAM‐CHAPEL HILL‐CARRBORO NEIGHBORHOOD TRANSIT CENTERS IN MPO TG‐5255 VARIOUS 5 DURHAM DURHAM. NEIGHBORHOOD TRANSIT CENTER IN SOUTH DURHAM‐CHAPEL HILL‐CARRBORO DURHAM IN CONNECTION WITH SOUTHPOINT REG MPO TG‐5255B VARIOUS 5 DURHAM PARK‐AND‐RIDE FACILITY. IMPLEMENTATION T 66 REG DURHAM‐CHAPEL HILL‐CARRBORO TG‐5255B VARIOUS 5 DURHAM NEIGHBORHOOD TRANSIT CENTER IN SOUTH IMPLEMENTATION FED 528 REG DURHAM‐CHAPEL HILL‐CARRBORO TG‐5255B VARIOUS 5 DURHAM NEIGHBORHOOD TRANSIT CENTER IN SOUTH IMPLEMENTATION L 66

NEIGHBORHOOD TRANSIT CENTER IN DURHAM‐CHAPEL HILL‐CARRBORO SOUTHWEST DURHAM IN CONNECTION WITH REG MPO TG‐5255E VARIOUS 5 DURHAM PATTERSON PLACE T PARK‐AND‐RIDE FACILITY. IMPLEMENTATION T 66 REG DURHAM‐CHAPEL HILL‐CARRBORO TG‐5255E VARIOUS 5 DURHAM NEIGHBORHOOD TRANSIT CENTER IN IMPLEMENTATION FED 528

As of December 2014 11 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED REG DURHAM‐CHAPEL HILL‐CARRBORO TG‐5255E VARIOUS 5 DURHAM NEIGHBORHOOD TRANSIT CENTER IN IMPLEMENTATION L 66

INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, BEAUFORT, PASQUOTANK, PITT, US 264, AND US 17 WITH STOPS AT RALEIGH, WILSON, BERTIE, CHOWAN, ROCKY MOUNT, WILSON, GREENVILLE, EDGECOMBE, FRANKLIN, MARTIN, NASH, WASHINGTON, WILLIAMSTON, EDENTON, AND HF STATEWIDE PROJECTS TI‐6104 GREYHOUND LINES 1, 4, 2, 5 PERQUIMANS, WAKE ELIZABETH CITY OPERATIONS FNU 3669 2312 2312 2312 2312 2312 2312 2312 2312 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TK‐6126 DURHAM COUNTY ACCESS 5 DURHAM ADMINISTRATION OPERATIONS FNU 265 63 63 63 63 63 63 63 63

HF KERR TAR RPO TK‐6139 KERR AREA TRANSPORTATION 5 FRANKLIN, GRANVILLE, VANCE, WARREN ADMINISTRATION OPERATIONS FNU 1022 512 512 512 512 512 512 512 512 HF KERR TAR RPO TK‐6153 PERSON COUNTY 5 PERSON ADMINISTRATION OPERATIONS FNU 382 166 166 166 166 166 166 166 166 WAKE COORDINATED TRANSPORTATION HF CAPITAL AREA MPO TK‐6170 SERVICE 5 WAKE ADMINISTRATION OPERATIONS FNU 790 395 395 395 395 395 395 395 395 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TM‐5304 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM CAPITAL ‐ TRAVEL TRAINING CAPITAL L 25 HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5304 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM CAPITAL ‐ TRAVEL TRAINING CAPITAL JARC 100

DURHAM‐CHAPEL HILL‐CARRBORO CITY OF DURHAM PLANNING AND PROGRAM HF MPO TM‐5307 CITY OF DURHAM 5 DURHAM ADMINISTRATION OF 5316 JARC PROJECTS ADMINISTRATION JARC 90 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TM‐5310 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM EXPANDED SERVICE TO BRIER CREEK OPERATIONS L 231 HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5310 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM EXPANDED SERVICE TO BRIER CREEK OPERATIONS JARC 231 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TM‐5311 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE SUNDAY ROUTES (400, 700, & 800) OPERATIONS L 235 HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5311 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE SUNDAY ROUTES (400, 700, & 800) OPERATIONS JARC 235

OPERATING ASSISTANCE ‐ JOB ACCESS / HF CAPITAL AREA MPO TM‐6109 TRIANGLE TRANSIT AUTHORITY 5 WAKE REVERSE COMMUTE ‐ NON‐URBAN SERVICE

HF KERR TAR RPO TM‐6129 KERR AREA TRANSPORTATION 5 FRANKLIN, GRANVILLE, VANCE, WARREN OPERATING ASSISTANCE OPERATIONS L 200 HF KERR TAR RPO TM‐6129 KERR AREA TRANSPORTATION 5 FRANKLIN, GRANVILLE, VANCE, WARREN OPERATING ASSISTANCE OPERATIONS JARC 200 DURHAM‐CHAPEL HILL‐CARRBORO OPERATING ASSISTANCE ‐ NEW FREEDOM ‐ HF MPO TN‐5102 DURHAM AREA TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE URBAN OPERATIONS FNF 252 126 126 126 126 126 126 126 126 DURHAM‐CHAPEL HILL‐CARRBORO CAPITAL‐ MEMBERSHIP IN GOTRIANGLE HF MPO TN‐5132 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM REGIONAL CALL CENTER CAPITAL L 26 HF DURHAM‐CHAPEL HILL‐CARRBORO TN‐5132 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM CAPITAL‐ MEMBERSHIP IN GOTRIANGLE CAPITAL FNF 105 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TN‐5133 DURHAM CENTER FOR SENIOR LIFE 5 DURHAM CAPITAL‐CONTINUATION OF TRAVEL TRAINING CAPITAL L 6 HF DURHAM‐CHAPEL HILL‐CARRBORO TN‐5133 DURHAM CENTER FOR SENIOR LIFE 5 DURHAM CAPITAL‐CONTINUATION OF TRAVEL TRAINING CAPITAL FNF 24 CITY OF DURHAM PLANNING AND PROGRAM DURHAM‐CHAPEL HILL‐CARRBORO ADMINISTRATION of 5317 NEW FREEDOM HF MPO TN‐5134 CITY OF DURHAM 5 DURHAM PROJECTS ADMINISTRATION FNF 14 WAKE COORDINATED TRANSPORTATION HF CAPITAL AREA MPO TN‐6116 SERVICE 5 WAKE OPERATING ASSISTANCE OPERATIONS L 60 HF CAPITAL AREA MPO TN‐6116 WAKE COORDINATED TRANSPORTATION 5 WAKE OPERATING ASSISTANCE OPERATIONS FNF 60 WAKE COORDINATED TRANSPORTATION HF CAPITAL AREA MPO TN‐6117 SERVICE 5 WAKE MOBILITY MANAGEMENT CAPITAL S 8 HF CAPITAL AREA MPO TN‐6117 WAKE COORDINATED TRANSPORTATION 5 WAKE MOBILITY MANAGEMENT CAPITAL L 8 HF CAPITAL AREA MPO TN‐6117 WAKE COORDINATED TRANSPORTATION 5 WAKE MOBILITY MANAGEMENT CAPITAL FNF 60 HF CAPITAL AREA MPO TO‐5128 CAPITAL AREA TRANSIT 5 WAKE OPERATING ASSISTANCE OPERATIONS SMAP 6000 3000 3000 3000 2572 2572 2572 2572 2572 HF CAPITAL AREA MPO TO‐5129 CARY TRANSIT/C‐TRAN 5 WAKE OPERATING ASSISTANCE OPERATIONS SMAP 362 181 181 181 181 181 181 181 181 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TO‐5130 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM OPERATING ASSISTANCE OPERATIONS SMAP 5612 2806 2806 2806 2806 2806 2806 2806 2806 DURHAM‐CHAPEL HILL‐CARRBORO EX MPO TO‐5130B DURHAM AREA TRANSIT AUTHORITY 5 DURHAM OPERATING ASSISTANCE ‐ NEW ROUTE OPERATIONS CMAQ 1185 HF CAPITAL AREA MPO TO‐5131 TRIANGLE TRANSIT AUTHORITY 5 WAKE OPERATING ASSISTANCE OPERATIONS SMAP 3904 1952 1952 1952 1952 1952 1952 1952 1952 OPERATING ASSISTANCE ‐ EXPRESS BUS HOLLY EX CAPITAL AREA MPO TO‐5131B TRIANGLE TRANSIT AUTHORITY 5 WAKE SPRINGS, APEX AND CARY OPERATIONS CMAQ 385 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TO‐5202 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM 5307 OPERATING ASSISTANCE OPERATIONS L 262 HF DURHAM‐CHAPEL HILL‐CARRBORO TO‐5202 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM 5307 OPERATING ASSISTANCE OPERATIONS FUZ 262 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TO‐5203 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM PARATRANSIT OPERATING (CAPITAL) CAPITAL FUZ 499

HF KERR TAR RPO TO‐6103 KERR AREA TRANSPORTATION 5 FRANKLIN, GRANVILLE, VANCE, WARREN OPERATING ASSISTANCE OPERATIONS FNU 264 132 120 120 120 120 120 120 120 DURHAM‐CHAPEL HILL‐CARRBORO see March 2012 handout 2012‐2018 HF MPO TP‐4732A TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE PLANNING ASSISTANCE STIP PLANNING/DESIGN FUZ 1332 696 717 738 738 738 738 738 738 see March 2012 handout 2012‐2018 HF CAPITAL AREA MPO TP‐4732B TRIANGLE TRANSIT AUTHORITY 5 WAKE PLANNING ASSISTANCE STIP PLANNING/DESIGN FUZ 1332 696 717 738 738 738 738 738 738 HF CAPITAL AREA MPO TP‐5100A CAPITAL AREA TRANSIT 5 WAKE PLANNING ASSISTANCE ‐ 5303 CAPITAL FMPL 787 468 468 342 342 342 342 342 342 HF CAPITAL AREA MPO TP‐5100B CAPITAL AREA TRANSIT 5 WAKE PLANNING ASSISTANCE ‐ 5307 CAPITAL FUZ 925 500 500 500 240 240 240 240 240 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TP‐5108 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM PLANNING ASSISTANCE ‐ 5303 CAPITAL FMPL 280 140 140 140 140 140 140 140 140 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TP‐5109 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM PLANNING ASSISTANCE ‐ 5307 CAPITAL FUZ 824 480 480 480 480 480 480 480 480 see amendment #1 to 2012‐2018 HF CAPITAL AREA MPO TP‐5112 CARY TRANSIT/C‐TRAN 5 WAKE PLANNING ASSISTANCE STIP PLANNING/DESIGN FUZ 130 66 66 66 66 66 66 66 66 DURHAM‐CHAPEL HILL‐CARRBORO RESERVATION, SCHEDULING SY AND MOBILITY HF MPO TQ‐3000 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM SERVICES CAPITAL L 27 HF DURHAM‐CHAPEL HILL‐CARRBORO TQ‐3000 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM RESERVATION, SCHEDULING SY AND MOBILITY CAPITAL FEPD 109 DURHAM‐CHAPEL HILL‐CARRBORO ONBOARD ACCESS ‐ PURCHASE OF DEMAND HF MPO TQ‐3001 DURHAM COUNTY ACCESS 5 DURHAM RESPONSE SERVICE CAPITAL L 25 HF DURHAM‐CHAPEL HILL‐CARRBORO TQ‐3001 DURHAM COUNTY ACCESS 5 DURHAM ONBOARD ACCESS ‐ PURCHASE OF DEMAND CAPITAL FEPD 100 DURHAM‐CHAPEL HILL‐CARRBORO OPERATING ASSISTANCE ‐ PURCHASE OF HF MPO TQ‐6158 DURHAM COUNTY ACCESS 5 DURHAM SERVICE CAPITAL S 46 HF DURHAM‐CHAPEL HILL‐CARRBORO TQ‐6158 DURHAM COUNTY ACCESS 5 DURHAM OPERATING ASSISTANCE ‐ PURCHASE OF CAPITAL L 46 HF DURHAM‐CHAPEL HILL‐CARRBORO TQ‐6158 DURHAM COUNTY ACCESS 5 DURHAM OPERATING ASSISTANCE ‐ PURCHASE OF CAPITAL FEPD 371 OPERATING ASSISTANCE ‐ PURCHASE OF HF KERR TAR RPO TQ‐6159 GRANVILLE COUNTY SENIOR SERVICES 5 GRANVILLE SERVICE CAPITAL S 29

As of December 2014 12 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED HF KERR TAR RPO TQ‐6159 GRANVILLE COUNTY SENIOR SERVICES 5 GRANVILLE OPERATING ASSISTANCE ‐ PURCHASE OF CAPITAL L 29 HF KERR TAR RPO TQ‐6159 GRANVILLE COUNTY SENIOR SERVICES 5 GRANVILLE OPERATING ASSISTANCE ‐ PURCHASE OF CAPITAL FEPD 230

HF KERR TAR RPO TQ‐6160 KERR TAR REGIONAL COUNCIL 5 FRANKLIN, GRANVILLE, VANCE, WARREN MOBILITY MANAGEMENT CAPITAL S 20 HF KERR TAR RPO TQ‐6160 KERR TAR REGIONAL COUNCIL 5 FRANKLIN, GRANVILLE, VANCE, WARREN MOBILITY MANAGEMENT CAPITAL L 20

HF KERR TAR RPO TQ‐6160 KERR TAR REGIONAL COUNCIL 5 FRANKLIN, GRANVILLE, VANCE, WARREN MOBILITY MANAGEMENT CAPITAL FEPD 160 HF CAPITAL AREA MPO TQ‐6161 THE ARC OF WAKE COUNTY 5 WAKE OPERATING ASSISTANCE OPERATIONS L 7 HF CAPITAL AREA MPO TQ‐6161 THE ARC OF WAKE COUNTY 5 WAKE OPERATING ASSISTANCE OPERATIONS FEPD 7 HF CAPITAL AREA MPO TQ‐6162 THE ARC OF WAKE COUNTY 5 WAKE MOBILITY MANAGEMENT CAPITAL S 2 HF CAPITAL AREA MPO TQ‐6162 THE ARC OF WAKE COUNTY 5 WAKE MOBILITY MANAGEMENT CAPITAL L 2 HF CAPITAL AREA MPO TQ‐6162 THE ARC OF WAKE COUNTY 5 WAKE MOBILITY MANAGEMENT CAPITAL FEPD 15 HF CAPITAL AREA MPO TQ‐6802 THE ARC OF WAKE COUNTY 5 WAKE OPERATING OPERATIONS L 5 HF CAPITAL AREA MPO TQ‐6802 THE ARC OF WAKE COUNTY 5 WAKE OPERATING OPERATIONS FEPD 5 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TQ‐7002 CITY OF DURHAM 5 DURHAM ADMINISTRATION OF SECTION 5310 PROGRAM ADMINISTRATION FEPD 28 HF CAPITAL AREA MPO TQ‐9005 THE ARC OF WAKE COUNTY 5 WAKE CAPITAL ‐ PURCHASE OF SERVICE CAPITAL S 6 HF CAPITAL AREA MPO TQ‐9005 THE ARC OF WAKE COUNTY 5 WAKE CAPITAL ‐ PURCHASE OF SERVICE CAPITAL L 6 HF CAPITAL AREA MPO TQ‐9005 THE ARC OF WAKE COUNTY 5 WAKE CAPITAL ‐ PURCHASE OF SERVICE CAPITAL FEPD 44 HF CAPITAL AREA MPO TS‐5104 CAPITAL AREA TRANSIT 5 WAKE SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 212 106 106 106 39 39 39 39 39 HF CAPITAL AREA MPO TS‐5105 CARY TRANSIT/C‐TRAN 5 WAKE SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 24 12 12 12 12 12 12 12 12 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TS‐5108 DURHAM AREA TRANSIT AUTHORITY 5 DURHAM SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 86 43 43 43 43 43 47 47 47 HF CAPITAL AREA MPO TS‐5118 TRIANGLE TRANSIT AUTHORITY 5 WAKE SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 35 22 19 19 19 19 19 19 19 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TS‐5119 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 34 22 19 19 19 19 2 2 2

HF CAPITAL AREA MPO TS‐5131 CAPITAL AREA TRANSIT 5 WAKE SAFETY & SECURITY ‐ SURVEILLANCE CAMERAS CAPITAL FUZ 120 120

EAST END CONNECTOR, NC 147 (DURHAM FREEWAY) TO NORTH OF NC 98 IN DURHAM. DURHAM‐CHAPEL HILL‐CARRBORO FOUR‐LANE DIVIDED FREEWAY WITH TRN MPO U‐0071 NEW ROUTE 5 DURHAM AUXILIARY LANES, PART ON NEW LOCATION. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPDA 238 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐0071 NEW ROUTE 5 DURHAM EAST END CONNECTOR, NC 147 (DURHAM RIGHT OF WAY IN PROGRESS CONSTRUCTION T 35175 35175 35175 35175 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐0071 NEW ROUTE 5 DURHAM EAST END CONNECTOR, NC 147 (DURHAM RIGHT OF WAY IN PROGRESS CONSTRUCTION L 59

SOUTH OF SR 1313 (WALNUT STREET) TO NORTH OF SR 1728 (WADE AVENUE) IN RALEIGH. WIDEN FROM FOUR TO SIX LANES, IMPROVE STORAGE AT LAKE BOONE TRAIL DESIGN‐BUILD PROJECT ‐ SW CAPITAL AREA MPO U‐2719 I‐440 / US 1 5 WAKE INTERCHANGE AND INSTALL RAMP METERS. COORDINATE WITH I‐5703 RIGHT‐OF‐WAY NHP 22208 SW CAPITAL AREA MPO U‐2719 I‐440 / US 1 5 WAKE SOUTH OF SR 1313 (WALNUT STREET) TO DESIGN‐BUILD PROJECT ‐ UTILITIES NHP 102 SW CAPITAL AREA MPO U‐2719 I‐440 / US 1 5 WAKE SOUTH OF SR 1313 (WALNUT STREET) TO DESIGN‐BUILD PROJECT ‐ MITIGATION NHP 244

SOUTH OF SR 1313 (WALNUT STREET) TO NORTH OF SR 1728 (WADE AVENUE) IN RALEIGH. WIDEN FROM FOUR TO SIX LANES, IMPROVE STORAGE AT LAKE BOONE TRAIL DESIGN‐BUILD PROJECT ‐ SW CAPITAL AREA MPO U‐2719 I‐440 / US 1 5 WAKE INTERCHANGE AND INSTALL RAMP METERS. COORDINATE WITH I‐5703 CONSTRUCTION NHP 21550 21550 21550 21550 SOUTH OF SR 1313 (WALNUT STREET) TO NORTH OF SR 1728 (WADE AVENUE) IN SW CAPITAL AREA MPO U‐2719A I‐440 / US 1 5 WAKE RALEIGH. INSTALL RAMP METERS CONSTRUCTION NHP 226 225 225 225

US 1 TO BRYAN DRIVE IN APEX. WIDEN TO A PROJECTS U‐2901AA AND AB CAPITAL AREA MPO U‐2901 NC 55 (WILLIAMS STREET) 5 WAKE MULTI‐LANE CURB AND GUTTER FACILITY. COMPLETE

US 1 TO APEX PEAKWAY. CONVERT CURRENT REG CAPITAL AREA MPO U‐2901AC NC 55 (WILLIAMS STREET) 5 WAKE MULTILANES TO MEDIAN DIVIDED SECTION RIGHT‐OF‐WAY T 757 REG CAPITAL AREA MPO U‐2901AC NC 55 (WILLIAMS STREET) 5 WAKE US 1 TO APEX PEAKWAY. CONVERT CURRENT UTILITIES T 91 REG CAPITAL AREA MPO U‐2901AC NC 55 (WILLIAMS STREET) 5 WAKE US 1 TO APEX PEAKWAY. CONVERT CURRENT CONSTRUCTION T 3227

APEX PEAKWAY TO BRYAN DRIVE. WIDEN REG CAPITAL AREA MPO U‐2901B NC 55 (WILLIAMS STREET) 5 WAKE REMAINING 2‐LANE SECTIONS TO MULTILANES. RIGHT‐OF‐WAY T 13 REG CAPITAL AREA MPO U‐2901B NC 55 (WILLIAMS STREET) 5 WAKE APEX PEAKWAY TO BRYAN DRIVE. WIDEN UTILITIES T 2 REG CAPITAL AREA MPO U‐2901B NC 55 (WILLIAMS STREET) 5 WAKE APEX PEAKWAY TO BRYAN DRIVE. WIDEN CONSTRUCTION T 2365

NC 147 (DURHAM FREEWAY) TO US 70 BUSINESS / NC 98 (HOLLOWAY STREET) IN DURHAM. WIDEN TO FOUR‐LANE DIVIDED FACILITY FROM NC 147 TO MAIN STREET AND REPLACE NORFOLK SOUTHERN RAILROAD DURHAM‐CHAPEL HILL‐CARRBORO BRIDGES. MODERNIZE FROM MAIN STREET TO TRN MPO U‐3308 NC 55 (ALSTON AVENUE) 5 DURHAM US 70 BUSINESS‐NC 98 (HOLLOWAY STRE RIGHT OF WAY IN PROGRESS CONSTRUCTION STP 15450 15450 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐3308 NC 55 (ALSTON AVENUE) 5 DURHAM NC 147 (DURHAM FREEWAY) TO US 70 RIGHT OF WAY IN PROGRESS CONSTRUCTION STPDA 229 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐3308 NC 55 (ALSTON AVENUE) 5 DURHAM NC 147 (DURHAM FREEWAY) TO US 70 RIGHT OF WAY IN PROGRESS CONSTRUCTION L 57

UNDER CONSTRUCTION BY TOWN CAPITAL AREA MPO U‐3802 VARIOUS 5 WAKE CARY SIGNAL SYSTEM. OF CARY ‐ NCDOT PARTICIPATION WEST OF BRIDGE NO. 259 OVER NORFOLK SOUTHERN RAILWAY TO US 70 / US 401 / NC 50 (WILMINGTON STREET) IN RALEIGH. ROADWAY IMPROVEMENTS, INCLUDING REPLACEMENT OF FUNDING PARTICIPATION BY CITY BRIDGE NO. 259 OVER NORFOLK SOUTHERN OF RALEIGH ‐ UNDER TRN CAPITAL AREA MPO U‐4432 SR 1370 (TRYON ROAD) 5 WAKE RAILWAY. CONSTRUCTION CONSTRUCTION L 867 866

As of December 2014 13 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED

VARIOUS ROUTES AND NORFOLK SOUTHERN RAILROAD‐NORTH CAROLINA RAILROAD IN DURHAM AND MORRISVILLE, SOUTH OF I‐40 TO NORTH OF MCCRIMMON PARKWAY. CONSTRUCT A GRADE SEPARATION AT SR 1978 DURHAM‐CHAPEL HILL‐CARRBORO (HOPSON ROAD), EXTEND CHURCH STREET TO MPO, CAPITAL AREA MPO U‐4716 VARIOUS PIEDMONT CORRIDOR 5 DURHAM, WAKE HOPSON ROAD, CLOSE CHURCH STREET C

NORFOLK SOUTHERN RAILROAD‐NORTH DURHAM‐CHAPEL HILL‐CARRBORO CAROLINA RAILROAD. CONSTRUCT RAILROAD MPO, CAPITAL AREA MPO U‐4716A SR 1978 (HOPSON ROAD) 5 DURHAM GRADE SEPARATION AND SHIFT RAIL LINE UNDER CONSTRUCTION

NORFOLK SOUTHERN RAILROAD / NC RAILROAD TO SR 1978 (HOPSON ROAD) REALIGN AND DURHAM‐CHAPEL HILL‐CARRBORO CLOSE CROSSING 734 748M OF THE NORFOLK MPO, CAPITAL AREA MPO U‐4716B SR 1980 (CHURCH STREET) 5 DURHAM SOUTHERN‐NORTH CAROLINA RAILROAD UNDER CONSTRUCTION DURHAM‐CHAPEL HILL‐CARRBORO CLEGG TO NELSON. CONSTRUCT PASSING MPO, CAPITAL AREA MPO U‐4716C NORFOLK‐SOUTHERN RAILROAD / NC RAILROAD 5 DURHAM, WAKE SIDING UNDER CONSTRUCTION SR 1978 (HOPSON ROAD), EAST OF SR 1999 DURHAM‐CHAPEL HILL‐CARRBORO (DAVIS DRIVE) TO NC 54, WIDEN TO MPO, CAPITAL AREA MPO U‐4716D SR 1978 (HOPSON ROAD) 5 DURHAM MULTILANES RIGHT‐OF‐WAY O 1126 SR 1978 (HOPSON ROAD), EAST OF SR 1999 DURHAM‐CHAPEL HILL‐CARRBORO (DAVIS DRIVE) TO NC 54, WIDEN TO MPO, CAPITAL AREA MPO U‐4716D SR 1978 (HOPSON ROAD) 5 DURHAM MULTILANES CONSTRUCTION O 3160 ROXBORO ROAD TO SR 1183 (UNIVERSITY PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO DRIVE) IN DURHAM. BIKE AND PEDESTRIAN WAY / CONSTRUCTION BY CITY OF TRN MPO U‐4724 SR 1158 (CORNWALLIS ROAD) 5 DURHAM FEATURES. DURHAM ENGINEERING STPDA 363 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐4724 SR 1158 (CORNWALLIS ROAD) 5 DURHAM ROXBORO ROAD TO SR 1183 (UNIVERSITY PLANNING / DESIGN / RIGHT OF ENGINEERING L 91 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐4724 SR 1158 (CORNWALLIS ROAD) 5 DURHAM ROXBORO ROAD TO SR 1183 (UNIVERSITY PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPDA 3854 TRN DURHAM‐CHAPEL HILL‐CARRBORO U‐4724 SR 1158 (CORNWALLIS ROAD) 5 DURHAM ROXBORO ROAD TO SR 1183 (UNIVERSITY PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 1124

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS ‐ DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) IN PROGRESS; TAP FUNDING MPO. BICYCLE, PEDESTRIAN, AND REFLECTS UNPROGRAMMED DURHAM‐CHAPEL HILL‐CARRBORO TRANSPORTATION ALTERNATIVES PROGRAM BALANCE ‐ PROGRAMMING SUBJECT DIV MPO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM (TAP) – ELIGIBLE PROJECTS. TO MPO APPROVAL ENGINEERING STPDA 304 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF ENGINEERING L 76 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPDA 2076 353 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF CONSTRUCTION TAP 277 277 277 277 277 277 277 277 277 277 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 519 88

DURHAM‐CHAPEL HILL‐CARRBORO METROPOLITAN PLANNING ORGANIZATION DURHAM‐CHAPEL HILL‐CARRBORO (DCHCMPO) PLANNING ALLOCATION AND DIV MPO U‐4727 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM UNIFIED WORK PROGRAM. IN PROGRESS ENGINEERING STPDA 1871 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4727 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO IN PROGRESS ENGINEERING L 468 CAPITAL AREA METROPOLITAN PLANNING WAKE, JOHNSTON, FRANKLIN, ORGANIZATION (CAMPO) STPDA FUNDS ‐ DIV CAPITAL AREA MPO U‐4735 VARIOUS 5, 4, 6 GRANVILLE, HARNETT RESERVED FOR FUTURE PROGRAMMING. CONSTRUCTION STPDA 7956 11113 11113 11113 11113 11113 11113

MCCRIMMON PARKWAY TO I‐40 IN RESEARCH DURHAM‐CHAPEL HILL‐CARRBORO NEW ROUTE / NC 147 (TRIANGLE EXPRESSWAY / TRIANGLE PARK AND MORRISVILLE. MULTI‐ MPO, CAPITAL AREA MPO U‐4763 TRIANGLE PARKWAY) 5 DURHAM, WAKE LANE FACILITY ON NEW LOCATION. DURHAM‐CHAPEL HILL‐CARRBORO MPO, CAPITAL AREA MPO U‐4763A NEW ROUTE 5 WAKE MCCRIMMON PARKWAY TO NC 540 ‐ 1.2 MILES SCHEDULED FOR REPRIORITIZATION IN PROGRESS / OPEN TO TRAFFIC ‐ DURHAM‐CHAPEL HILL‐CARRBORO TRIANGLE PARKWAY / TRIANGLE EXPRESSWAY, NORTH CAROLINA TURNPIKE MPO, CAPITAL AREA MPO U‐4763B NC 147 5 DURHAM, WAKE NC 540 TO I‐40 ‐ 3.5 MILES AUTHORITY PROJECT CAPITAL AREA METROPOLITAN PLANNING WAKE, JOHNSTON, FRANKLIN, ORGANIZATION (CAMPO) PLANNING (PL) DIV CAPITAL AREA MPO U‐4850 VARIOUS 5, 4, 6 GRANVILLE, HARNETT SUPPLEMENT. FORMERLY U‐9999B ‐ IN PROGRESS ENGINEERING STPDA 1200 1200 1200 1200 DIV CAPITAL AREA MPO U‐4850 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA METROPOLITAN PLANNING FORMERLY U‐9999B ‐ IN PROGRESS ENGINEERING L 300 300 300 300

RAVEN RIDGE ROAD TO NORTH OF NEUSE RIVER IN RALEIGH. WIDEN TO MULTILANES, PART ON NEW LOCATION INCLUDING NEW PLANNING, DESIGN AND CAPITAL AREA MPO U‐4901 SR 2000 (FALLS OF NEUSE ROAD) 5 WAKE STRUCTURE OVER THE NEUSE RIVER. CONSTRUCTION BY CITY OF RALEIGH IN PROGRESS BY CITY OF RALEIGH ‐ CAPITAL AREA MPO U‐4901A SR 2000 (FALLS OF NEUSE ROAD) 5 WAKE RAVEN RIDGE ROAD TO FONVILLE ROAD OPEN TO TRAFFIC

CAPITAL AREA MPO U‐4901B NEW FALLS OF NEUSE ROAD 5 WAKE FONVILLE ROAD TO NORTH OF NEUSE RIVER COMPLETE HARRISON STREET TO NORTH PARK DRIVE IN PLANNING / DESIGN / RIGHT OF HENDERSON. WIDEN TO THREE LANES WITH WAY / CONSTRUCTION BY CITY OF CURB AND GUTTER, STORM DRAINAGE, AND HENDERSON ‐ RIGHT OF WAY IN TRN KERR TAR RPO U‐4916 SR 1165 (BECKFORD DRIVE) 5 VANCE SIDEWALKS. PROGRESS CONSTRUCTION HP 679 DURHAM‐CHAPEL HILL‐CARRBORO METROPOLITAN PLANNING ORGANIZATION DURHAM‐CHAPEL HILL‐CARRBORO (DCHCMPO) STPDA FUNDS ‐ RESERVED FOR DIV MPO U‐5023 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM FUTURE PROGRAMMING. CONSTRUCTION STPDA 4288 4365 4365 4365 4365

WEST CHATHAM STREET TO SR 3081 (WEST DURHAM ROAD) IN CARY. WIDEN AND EXTEND ROADWAY, CONSTRUCT GRADE SEPARATION AT RIGHT OF WAY IN PROGRESS BY CAPITAL AREA MPO U‐5117 WALKER STREET 5 WAKE NC RAILROAD AND CONSTRUCT ROUNDABOUT. TOWN OF CARY PLANNING, DESIGN, RIGHT OF WAY WAKE, JOHNSTON, FRANKLIN, OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONSTRUCTION BY OTHERS ‐ DIV CAPITAL AREA MPO U‐5118 VARIOUS 5, 4, 6 GRANVILLE, HARNETT AND CONGESTION MITIGATION. IN PROGRESS. RIGHT‐OF‐WAY STPDA 500 100 DIV CAPITAL AREA MPO U‐5118 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, OPERATIONAL IMPROVEMENTS FOR SAFETY PLANNING, DESIGN, RIGHT OF WAY RIGHT‐OF‐WAY L 100 25 DIV CAPITAL AREA MPO U‐5118 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, OPERATIONAL IMPROVEMENTS FOR SAFETY PLANNING, DESIGN, RIGHT OF WAY CONSTRUCTION STPDA 4500 788

As of December 2014 14 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DIV CAPITAL AREA MPO U‐5118 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, OPERATIONAL IMPROVEMENTS FOR SAFETY PLANNING, DESIGN, RIGHT OF WAY CONSTRUCTION O 1125 197 WEST OF SR 1308 (LAURA DUNCAN ROAD) TO US 1 IN APEX AND CARY. CORRIDOR UPGRADE CAPITAL AREA MPO U‐5301 US 64 5 WAKE AND IMPROVEMENTS. PLANNING / DESIGN IN PROGRESS

SR 1306 (LAURA DUNCAN ROAD). CONVERT AT‐ REG CAPITAL AREA MPO U‐5301A US 64 5 WAKE GRADE INTERSECTION TO INTERCHANGE. RIGHT‐OF‐WAY NHP 4400 REG CAPITAL AREA MPO U‐5301A US 64 5 WAKE SR 1306 (LAURA DUNCAN ROAD). CONVERT AT‐ UTILITIES NHP 500 REG CAPITAL AREA MPO U‐5301A US 64 5 WAKE SR 1306 (LAURA DUNCAN ROAD). CONVERT AT‐ MITIGATION NHP 162 REG CAPITAL AREA MPO U‐5301A US 64 5 WAKE SR 1306 (LAURA DUNCAN ROAD). CONVERT AT‐ CONSTRUCTION NHP 11100 11100 11100 SR 1521 (LAKE PINE DRIVE). CONVERT AT‐ REG CAPITAL AREA MPO U‐5301B US 64 5 WAKE GRADE INTERSECTION TO INTERCHANGE. RIGHT‐OF‐WAY NHP 4800 REG CAPITAL AREA MPO U‐5301B US 64 5 WAKE SR 1521 (LAKE PINE DRIVE). CONVERT AT‐ UTILITIES NHP 200 REG CAPITAL AREA MPO U‐5301B US 64 5 WAKE SR 1521 (LAKE PINE DRIVE). CONVERT AT‐ CONSTRUCTION NHP 11300 11300 11300 SR 1306 (LAURA DUNCAN ROAD) TO US 1 INTERCHANGE. UPGRADE ROADWAY TO SW CAPITAL AREA MPO U‐5301C US 64 5 WAKE SUPERSTREET. RIGHT‐OF‐WAY NHP 800 SW CAPITAL AREA MPO U‐5301C US 64 5 WAKE SR 1306 (LAURA DUNCAN ROAD) TO US 1 CONSTRUCTION NHP 11800

NC 540 (TRIANGLE EXPRESSWAY) IN APEX TO US 1 / US 64 IN CARY. WIDEN FROM FOUR TO SIX CAPITAL AREA MPO U‐5301D US 64 5 WAKE LANES AND UPGRADE TO EXPRESSWAY.

SOUTH OF SR 2782 (LEGEND ROAD) TO PURSER REG CAPITAL AREA MPO U‐5302 US 401 5 WAKE DRIVE IN GARNER. CONVERT TO SUPERSTREET. RIGHT‐OF‐WAY NHP 850 REG CAPITAL AREA MPO U‐5302 US 401 5 WAKE SOUTH OF SR 2782 (LEGEND ROAD) TO PURSER CONSTRUCTION NHP 2100 I‐540 TO SOUTH OF NC 98 IN RALEIGH AND WAKE FOREST. UPGRADE ROADWAY TO CAPITAL AREA MPO U‐5307 US 1 5 WAKE CONTROLLED ACCESS FACILITY. PLANNING / DESIGN IN PROGRESS I‐540 TO NORTH OF SR 2006 (DURANT ROAD) IN SW CAPITAL AREA MPO U‐5307A US 1 5 WAKE RALEIGH. RIGHT‐OF‐WAY NHP 10300 10300 SW CAPITAL AREA MPO U‐5307A US 1 5 WAKE I‐540 TO NORTH OF SR 2006 (DURANT ROAD) IN MITIGATION NHP 193 SW CAPITAL AREA MPO U‐5307A US 1 5 WAKE I‐540 TO NORTH OF SR 2006 (DURANT ROAD) IN CONSTRUCTION NHP 20534 20533 20533

NORTH OF SR 2006 (DURANT ROAD) IN RALEIGH TO NORTH OF SR 2045 (BURLINGTON MILLS SW CAPITAL AREA MPO U‐5307B US 1 5 WAKE ROAD) IN WAKE FOREST. RIGHT‐OF‐WAY NHP 3500 SW CAPITAL AREA MPO U‐5307B US 1 5 WAKE NORTH OF SR 2006 (DURANT ROAD) IN RALEIGH CONSTRUCTION NHP 19034 19033 19033

NORTH OF SR 2045 (BURLINGTON MILLS ROAD) SW CAPITAL AREA MPO U‐5307C US 1 5 WAKE TO SOUTH OF NC 98 IN WAKE FOREST. RIGHT‐OF‐WAY NHP 8300 8300 SW CAPITAL AREA MPO U‐5307C US 1 5 WAKE NORTH OF SR 2045 (BURLINGTON MILLS ROAD) CONSTRUCTION NHP 15367 15367 15366

SR 1600 / SR 1625 (GREEN LEVEL CHURCH ROAD) TO EAST OF NC 55 IN CARY. MULTI‐LANE FACILITY ON NEW LOCATION, INCLUDING INTERCHANGE AT NC 540 (TRIANGLE CAPITAL AREA MPO U‐5315 MORRISVILLE PARKWAY EXTENSION 5 WAKE EXPRESSWAY / WESTERN WAKE FREEWAY). PLANNING / DESIGN IN PROGRESS WEST OF HIGHCROFT DRIVE TO EAST OF MILLS PARK DRIVE IN CARY. CONSTRUCT 2‐LANE DIV CAPITAL AREA MPO U‐5315A MORRISVILLE PARKWAY EXTENSION 5 WAKE FACILITY ON 4‐LANE RIGHT OF WAY. RIGHT‐OF‐WAY L 2050 DIV CAPITAL AREA MPO U‐5315A MORRISVILLE PARKWAY EXTENSION 5 WAKE WEST OF HIGHCROFT DRIVE TO EAST OF MILLS CONSTRUCTION STPDA 3000 DIV CAPITAL AREA MPO U‐5315A MORRISVILLE PARKWAY EXTENSION 5 WAKE WEST OF HIGHCROFT DRIVE TO EAST OF MILLS CONSTRUCTION L 3000

NC 540 (TRIANGLE EXPRESSWAY / WESTERN DIV CAPITAL AREA MPO U‐5315B MORRISVILLE PARKWAY EXTENSION 5 WAKE WAKE FREEWAY). CONSTRUCT INTERCHANGE. RIGHT‐OF‐WAY BOND R 4000 DIV CAPITAL AREA MPO U‐5315B MORRISVILLE PARKWAY EXTENSION 5 WAKE NC 540 (TRIANGLE EXPRESSWAY / WESTERN CONSTRUCTION L 10302 DIV CAPITAL AREA MPO U‐5315B MORRISVILLE PARKWAY EXTENSION 5 WAKE NC 540 (TRIANGLE EXPRESSWAY / WESTERN CONSTRUCTION BOND R 8500 SR 1600 / SR 1625 (GREEN LEVEL CHURCH ROAD) TO EAST OF NC 55 IN CARY. WIDEN TO 4 CAPITAL AREA MPO U‐5315C MORRISVILLE PARKWAY EXTENSION 5 WAKE LANES WITH LANDSCAPED MEDIAN. CONSTRUCTION L 7900 NC 55 (NORTH BROAD STREET) TO NC 42 (WEST PROGRAMMED FOR PLANNING AND ACADEMY STREET) IN FUQUAY‐VARINA, WAKE ENVIRONMENTAL STUDY ONLY BY COUNTY. MULTI‐LANE FACILITY ON NEW TOWN OF FUQUAY‐VARINA ‐ IN DIV CAPITAL AREA MPO U‐5317 NORTH JUDD PARKWAY 5 WAKE LOCATION. PROGRESS UTILITIES L 650 SR 1101 (PINEY GROVE‐WILBON ROAD) AND SR 1114 (RALPH STEVENS ROAD) IN HOLLY SR 1101 (PINEY GROVE‐WILBON ROAD); SR SPRINGS. REALIGNMENT OF INTERSECTION, RIGHT OF WAY IN PROGRESS BY DIV CAPITAL AREA MPO U‐5318 1114 (RALPH STEVENS ROAD) 5 WAKE SOME NEW LOCATION. TOWN OF HOLLY SPRINGS

SR 1003 (ROLESVILLE ROAD‐EAGLE ROCK ROAD) PROGRAMMED FOR PLANNING AND IN WENDELL. CONNECTIVITY AND ACCESS ENVIRONMENTAL STUDY ONLY BY REG CAPITAL AREA MPO U‐5323 US 64 BUSINESS (WENDELL BOULEVARD) 5 WAKE IMPROVEMENTS AND SAFETY ENHANCEMENTS. TOWN OF WENDELL ‐ IN PROGRESS SR 1600 (GREEN LEVEL CHURCH ROAD) TO NC PLANNING / DESIGN / RIGHT OF 55 IN CARY. WIDEN FROM TWO TO FOUR WAY / CONSTRUCTION BY TOWN OF DIV CAPITAL AREA MPO U‐5500 SR 1605 / SR 1615 (GREEN LEVEL WEST ROAD) 5 WAKE LANES. CARY

SR 1600 (GREEN LEVEL CHURCH ROAD) TO NC 540 IN CARY. WIDEN TO 4‐LANE DIVIDED CAPITAL AREA MPO U‐5500A SR 1605 / SR 1615 (GREEN LEVEL WEST ROAD) 5 WAKE FACILITY WITH 4 ‐ FOOT PAVED SHOULDERS. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY L 1558 CAPITAL AREA MPO U‐5500A SR 1605 / SR 1615 (GREEN LEVEL WEST ROAD) 5 WAKE SR 1600 (GREEN LEVEL CHURCH ROAD) TO NC PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 5565 NC 540 TO NC 55 IN CARY. WIDEN TO 4‐LANE DIVIDED FACILITY WITH WIDE OUTSIDE LANES DIV CAPITAL AREA MPO U‐5500B SR 1605 / SR 1615 (GREEN LEVEL WEST ROAD) 5 WAKE AND SIDEWALKS. PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 4400 NC 54 (NE MAYNARD ROAD) TO SR 1652 (HARRISON AVENUE) IN CARY. WIDEN TO MULTI‐LANES, TO INCLUDE PEDESTRIAN AND PLANNING / DESIGN IN PROGRESS DIV CAPITAL AREA MPO U‐5501 SR 1650 (REEDY CREEK ROAD) 5 WAKE SAFETY ENHANCEMENTS. BY TOWN OF CARY RIGHT‐OF‐WAY L 500 DIV CAPITAL AREA MPO U‐5501 SR 1650 (REEDY CREEK ROAD) 5 WAKE NC 54 (NE MAYNARD ROAD) TO SR 1652 PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 6000

As of December 2014 15 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED NC 55 TO SR 3014 (MORRISVILLE‐CARPENTER ROAD) IN CARY. REALIGN ROADWAY AND CONSTRUCT GRADE SEPARATION AT CSX PLANNING / DESIGN IN PROGRESS DIV CAPITAL AREA MPO U‐5502 SR 1624 (CARPENTER FIRE STATION ROAD) 5 WAKE RAILROAD. BY TOWN OF CARY WEST OF SR 1613 (DAVIS DRIVE) TO EAST OF OLD SAVANNAH DRIVE IN MORRISVILLE. PLANNING, DESIGN, AND RIGHT OF CONSTRUCT TURN LANE, REALIGN WAY BY TOWN OF MORRISVILLE ‐ INTERSECTION AND PROVIDE PEDESTRIAN AND DIVISION PURCHASE ORDER CAPITAL AREA MPO U‐5503 SR 3014 (MORRISVILLE‐ CARPENTER ROAD) 5 WAKE SAFETY ENHANCEMENTS. CONTRACT ‐ UNDER CONSTRUCTION SR 1009 / SR 1370 (TRYON ROAD) TO SR 4746 (CENTENNIAL PARKWAY) IN RALEIGH. CONSTRUCT TURN LANES, SIDEWALK, MULTI‐ USE PATH, AND PEDESTRIAN SAFETY UNDER CONSTRUCTION BY CITY OF CAPITAL AREA MPO U‐5504 SR 1009 (LAKE WHEELER ROAD) 5 WAKE ENHANCEMENTS. RALEIGH SR 2041 (SPRING FOREST ROAD) TO SR 3555 (OLD WAKE FOREST ROAD) IN RALEIGH. IMPROVEMENTS TO INCLUDE: SIDEWALKS, LIGHTING, LANDSCAPING, AND TRANSIT PLANNING / DESIGN IN PROGRESS SW CAPITAL AREA MPO U‐5514 US 1 (CAPITAL BOULEVARD) 5 WAKE AMENITIES. BY CITY OF RALEIGH CONSTRUCTION STPDA 413 SW CAPITAL AREA MPO U‐5514 US 1 (CAPITAL BOULEVARD) 5 WAKE SR 2041 (SPRING FOREST ROAD) TO SR 3555 PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 103

SR 1930 (STADIUM DRIVE), US 1 TO SR 1954 (NORTH WINGATE STREET) IN WAKE FOREST. COMPLETE STREETS IMPROVEMENTS TO INCLUDE: WIDEN TO THREE‐LANE CURB AND GUTTER SECTION, CONSTRUCT SIDEWALK, SR 1930 (STADIUM DRIVE) SR 1933 (WEST MULTIUSE PATH, BICYCLE LANES, AND PLANNING / DESIGN IN PROGRESS DIV CAPITAL AREA MPO U‐5515 NORTH AVENUE) 5 WAKE PEDESTRIAN / TRANSIT AMENITIES. BY TOWN OF WAKE FOREST RIGHT‐OF‐WAY L 300 DIV CAPITAL AREA MPO U‐5515 SR 1930 (STADIUM DRIVE) SR 1933 (WEST 5 WAKE SR 1930 (STADIUM DRIVE), US 1 TO SR 1954 PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 3000

SR 1448 (LATTA ROAD) / SR 1639 (INFINITY PLANNING / DESIGN IN PROGRESS ‐ DURHAM‐CHAPEL HILL‐CARRBORO ROAD) INTERSECTION IN DURHAM. RIGHT OF WAY ACQUISITION REG MPO U‐5516 US 501 (ROXBORO ROAD) 5 DURHAM INTERSECTION IMPROVEMENTS. FUNDED BY CITY OF DURHAM RIGHT‐OF‐WAY L 2000 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5516 US 501 (ROXBORO ROAD) 5 DURHAM SR 1448 (LATTA ROAD) / SR 1639 (INFINITY PLANNING / DESIGN IN PROGRESS ‐ CONSTRUCTION NHP 2100 WEST OF SR 3067 (T.W. ALEXANDER DRIVE) TO I‐ 540 IN RALEIGH. UPGRADE ROADWAY TO IMPROVE CAPACITY, SAFETY AND TRAFFIC OPERATIONS INCLUDING INTERCHANGES AT PLANNING / DESIGN IN PROGRESS ‐ CAPITAL AREA MPO U‐5518 US 70 (GLENWOOD AVENUE) 5 WAKE VARIOUS LOCATIONS. COORDINATE WITH U‐5720 WEST OF SR 3067 (T.W. ALEXANDER DRIVE) TO I‐ SW CAPITAL AREA MPO U‐5518A US 70 5 WAKE 540. CORRIDOR UPGRADE. CONSTRUCTION NHP 3300 3300 3300 3300

SR 3067 (T. W. ALEXANDER DRIVE). CONVERT COST PARTICIPATION BY CITY OF REG CAPITAL AREA MPO U‐5518B US 70 5 WAKE AT‐GRADE INTERSECTION TO INTERCHANGE. DURHAM RIGHT‐OF‐WAY NHP 4400 REG CAPITAL AREA MPO U‐5518B US 70 5 WAKE SR 3067 (T. W. ALEXANDER DRIVE). CONVERT COST PARTICIPATION BY CITY OF RIGHT‐OF‐WAY L 5600 REG CAPITAL AREA MPO U‐5518B US 70 5 WAKE SR 3067 (T. W. ALEXANDER DRIVE). CONVERT COST PARTICIPATION BY CITY OF CONSTRUCTION NHP 5100 5100 5100 5100 SR 3100‐SR 3109 (BRIER CREEK PARKWAY) IN RALEIGH. CONVERT AT‐GRADE INTERSECTION SW CAPITAL AREA MPO U‐5518C US 70 5 WAKE TO INTERCHANGE. RIGHT‐OF‐WAY NHP 100 SW CAPITAL AREA MPO U‐5518C US 70 5 WAKE SR 3100‐SR 3109 (BRIER CREEK PARKWAY) IN MITIGATION NHP 425 SW CAPITAL AREA MPO U‐5518C US 70 5 WAKE SR 3100‐SR 3109 (BRIER CREEK PARKWAY) IN CONSTRUCTION NHP 3325 3325 3325 3325

GARNER ‐ CONSTRUCT IMPROVEMENTS ON I‐40 / US 70 EASTBOUND RAMP TO US 70 BUSINESS WESTBOUND; ADD THROUGH AND TURN LANES ON US 70 BUSINESS WESTBOUND BETWEEN SR 2547 / SR 5220 INTERSECTION AND I‐40 / US 70 I‐40 / US 70; US 70 BUSINESS; SR 2547 (WHITE INTERCHANGE; CONSTRUCT THROUGH LANE UNDER CONSTRUCTION BY TOWN CAPITAL AREA MPO U‐5520 OAK ROAD); SR 5220 (JONES SAUSAGE ROAD) 5 WAKE ON SR 2547 SOUTH OF GARNER CABARRUS STREET TO MARTIN STREET IN RALEIGH. EXTEND WEST STREET ON NEW LOCATION, WITH GRADE SEPARATION AT PROGRAMMED FOR PLANNING AND NORTH CAROLINA RAILROAD / NORFOLK ENVIRONMENTAL STUDY ONLY BY DIV CAPITAL AREA MPO U‐5521 WEST STREET 5 WAKE SOUTHERN "H" LINE. CITY OF RALEIGH ‐ IN PROGRESS

WEST OF SR 1101 (PINEY GROVE ‐ WILBON PLANNING / DESIGN / RIGHT OF ROAD) TO VILLAGE WALK DRIVE IN HOLLY WAY / CONSTRUCTION BY TOWN OF DIV CAPITAL AREA MPO U‐5529 SR 1115 (AVENT FERRY ROAD) 5 WAKE SPRINGS. OPERATIONAL IMPROVEMENTS. HOLLY SPRINGS ‐ IN PROGRESS RIGHT‐OF‐WAY STPDA 80 DIV CAPITAL AREA MPO U‐5529 SR 1115 (AVENT FERRY ROAD) 5 WAKE WEST OF SR 1101 (PINEY GROVE ‐ WILBON PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 20 PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY LOCAL GOVERNMENT AGENCIES; TAP CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, FUNDING INCLUDES TRANSIT, AND TRANSPORTATION UNPROGRAMMED BALANCE ‐ WAKE, JOHNSTON, FRANKLIN, ALTERNATIVES PROGRAM (TAP) ‐ ELIGIBLE PROGRAMMING SUBJECT TO MPO DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 GRANVILLE, HARNETT PROJECTS. APPROVAL ENGINEERING STPDA 418 418 418 418 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF ENGINEERING TAP 88 88 88 88 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF ENGINEERING L 126 126 126 126 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY STPDA 836 836 836 836 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY TAP 179 179 179 179 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 254 254 254 254 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPDA 2924 2924 2924 2924 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF CONSTRUCTION TAP 626 1161 1161 1161 535 535 535 535 535 535 535 DIV CAPITAL AREA MPO U‐5530 VARIOUS 5, 4, 6 WAKE, JOHNSTON, FRANKLIN, CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 887 887 887 887

WIDEN TO 3 LANES ‐ NORTH OF MACGREGOR PINES ROAD TO NORTH OF VERSAILLES DRIVE. PLANNING / DESIGN / RIGHT OF INCL. 10 FT MULTIUSE PATH EAST SIDE; 5 FT WAY / CONSTRUCTION BY TOWN OF DIV CAPITAL AREA MPO U‐5537 SR 1521 (LAKE PINE DRIVE) 5 WAKE SIDEWALK WEST SIDE. APEX ‐ IN PROGRESS RIGHT‐OF‐WAY STPDA 56 DIV CAPITAL AREA MPO U‐5537 SR 1521 (LAKE PINE DRIVE) 5 WAKE WIDEN TO 3 LANES ‐ NORTH OF MACGREGOR PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 24 DIV CAPITAL AREA MPO U‐5537 SR 1521 (LAKE PINE DRIVE) 5 WAKE WIDEN TO 3 LANES ‐ NORTH OF MACGREGOR PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPDA 668

As of December 2014 16 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DIV CAPITAL AREA MPO U‐5537 SR 1521 (LAKE PINE DRIVE) 5 WAKE WIDEN TO 3 LANES ‐ NORTH OF MACGREGOR PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 167

VARIABLE MESSAGE SIGNS FOR TRAFFIC PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO MANAGEMENT ON MAJOR CORRIDORS IN WAY / CONSTRUCTION BY TOWN OF REG MPO U‐5543 VARIOUS 7, 5 ORANGE, DURHAM CHAPEL HILL. CHAPEL HILL ‐ IN PROGRESS SR 1116 (GARRETT ROAD) IN DURHAM. DURHAM‐CHAPEL HILL‐CARRBORO CONVERT AT‐GRADE INTERSECTION TO SW MPO U‐5717 US 15 / US 501 5 DURHAM INTERCHANGE. RIGHT‐OF‐WAY NHP 4620 SW DURHAM‐CHAPEL HILL‐CARRBORO U‐5717 US 15 / US 501 5 DURHAM SR 1116 (GARRETT ROAD) IN DURHAM. CONSTRUCTION NHP 19250 LYNN ROAD IN DURHAM TO WEST OF ALEXANDER DRIVE IN RALEIGH. UPGRADE TO CONTROLLED‐ACCESS FACILITY AND CONVERT DURHAM‐CHAPEL HILL‐CARRBORO AT‐GRADE INTERSECTION WITH SR 1811 / SR MPO, CAPITAL AREA MPO U‐5720 US 70 (MIAMI BOULEVARD) 5 DURHAM, WAKE 1959 TO INTERCHANGE. DURHAM‐CHAPEL HILL‐CARRBORO LYNN ROAD TO SR 1959 (SOUTH MIAMI REG MPO, CAPITAL AREA MPO U‐5720A US 70 (MIAMI BOULEVARD) 5 DURHAM BOULEVARD) / SR 1811 (SHERRON ROAD). RIGHT‐OF‐WAY T 27067 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5720A US 70 (MIAMI BOULEVARD) 5 DURHAM LYNN ROAD TO SR 1959 (SOUTH MIAMI UTILITIES T 3248 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5720A US 70 (MIAMI BOULEVARD) 5 DURHAM LYNN ROAD TO SR 1959 (SOUTH MIAMI CONSTRUCTION T 26235 26235 26235

SR 1959 (SOUTH MIAMI BOULEVARD) / SR 1811 DURHAM‐CHAPEL HILL‐CARRBORO (SHERRON ROAD) INTERSECTION. CONVERT AT‐ SW MPO, CAPITAL AREA MPO U‐5720B US 70 (MIAMI BOULEVARD) 5 DURHAM GRADE INTERSECTION TO INTERCHANGE. RIGHT‐OF‐WAY T 2190 SW DURHAM‐CHAPEL HILL‐CARRBORO U‐5720B US 70 (MIAMI BOULEVARD) 5 DURHAM SR 1959 (SOUTH MIAMI BOULEVARD) / SR 1811 CONSTRUCTION T 22914 SR 1959 (SOUTH MIAMI BOULEVARD) / SR 1811 DURHAM‐CHAPEL HILL‐CARRBORO (SHERRON ROAD) TO SR 1906 (LEESVILLE MPO, CAPITAL AREA MPO U‐5720C US 70 5 DURHAM ROAD). SR 1906 (LEESVILLE ROAD) IN DURHAM COUNTY DURHAM‐CHAPEL HILL‐CARRBORO TO WEST OF ALEXANDER DRIVE IN WAKE MPO, CAPITAL AREA MPO U‐5720D US 70 5 DURHAM, WAKE COUNTY. SR 2026 (HAMMOND ROAD) / SR 2812 (TIMBER DRIVE) IN GARNER. CONVERT AT‐GRADE REG CAPITAL AREA MPO U‐5744 US 70 / NC 50 5 WAKE INTERSECTION TO INTERCHANGE. RIGHT‐OF‐WAY NHP 2190 REG CAPITAL AREA MPO U‐5744 US 70 / NC 50 5 WAKE SR 2026 (HAMMOND ROAD) / SR 2812 (TIMBER CONSTRUCTION NHP 15048

DURHAM‐CHAPEL HILL‐CARRBORO SR 1183 (UNIVERSITY DRIVE) INTERSECTION IN REG MPO U‐5745 NC 751 (HOPE VALLEY ROAD) 5 DURHAM DURHAM. CONSTRUCT ROUNDABOUT. COORDINATE WITH EB‐5514 RIGHT‐OF‐WAY T 150 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5745 NC 751 (HOPE VALLEY ROAD) 5 DURHAM SR 1183 (UNIVERSITY DRIVE) INTERSECTION IN COORDINATE WITH EB‐5514 CONSTRUCTION T 855 FUTURE NC 540 TO SR 1010 (TEN‐TEN ROAD). COORDINATE WITH R‐2721 ‐ DESIGN‐ REG CAPITAL AREA MPO U‐5746 US 401 5 WAKE ADD LANES. BUILD PROJECT RIGHT‐OF‐WAY NHP 10953 REG CAPITAL AREA MPO U‐5746 US 401 5 WAKE FUTURE NC 540 TO SR 1010 (TEN‐TEN ROAD). COORDINATE WITH R‐2721 ‐ DESIGN‐ UTILITIES NHP 1314 REG CAPITAL AREA MPO U‐5746 US 401 5 WAKE FUTURE NC 540 TO SR 1010 (TEN‐TEN ROAD). COORDINATE WITH R‐2721 ‐ DESIGN‐ CONSTRUCTION NHP 7718 SR 1635 (MCCRIMMON PARKWAY) IN MORRISVILLE. CONVERT AT‐GRADE INTERSECTION TO GRADE SEPARATION, INCLUDING GRADE SEPARATION OF NORTH REG CAPITAL AREA MPO U‐5747 NC 54 5 WAKE CAROLINA RAILROAD. RIGHT‐OF‐WAY T 3600 REG CAPITAL AREA MPO U‐5747 NC 54 5 WAKE SR 1635 (MCCRIMMON PARKWAY) IN CONSTRUCTION T 5000 5000 5000 SR 2044 (LIGON MILL ROAD) / SR 2224 (MITCHELL MILL ROAD) INTERSECTION IN REG CAPITAL AREA MPO U‐5748 US 401 5 WAKE RALEIGH. CONSTRUCT INTERCHANGE. RIGHT‐OF‐WAY T 2190 REG CAPITAL AREA MPO U‐5748 US 401 5 WAKE SR 2044 (LIGON MILL ROAD) / SR 2224 CONSTRUCTION T 11514 NC 55 (EAST WILLIAMS STREET) IN HOLLY REG CAPITAL AREA MPO U‐5749 NC 55 BYPASS 5 WAKE SPRINGS. INTERSECTION IMPROVEMENTS. RIGHT‐OF‐WAY T 45 REG CAPITAL AREA MPO U‐5749 NC 55 BYPASS 5 WAKE NC 55 (EAST WILLIAMS STREET) IN HOLLY CONSTRUCTION T 188 NC 540 TO PERIMETER PARK DRIVE IN REG CAPITAL AREA MPO U‐5750 NC 54 5 WAKE MORRISVILLE. ADD LANES. RIGHT‐OF‐WAY T 1964 REG CAPITAL AREA MPO U‐5750 NC 54 5 WAKE NC 540 TO PERIMETER PARK DRIVE IN UTILITIES T 236 REG CAPITAL AREA MPO U‐5750 NC 54 5 WAKE NC 540 TO PERIMETER PARK DRIVE IN CONSTRUCTION T 9601

NC 55 IN FUQUAY‐VARINA. CONVERT INTERSECTION TO TRUMPET INTERCHANGE, TO INCLUDE CONVERSION OF NC 55 / NC 42 REG CAPITAL AREA MPO U‐5751 US 401 5 WAKE INTERSECTION TO INTERCHANGE. COORDINATE WITH R‐2609 RIGHT‐OF‐WAY NHP 1380

NC 55 IN FUQUAY‐VARINA. CONVERT INTERSECTION TO TRUMPET INTERCHANGE, TO INCLUDE CONVERSION OF NC 55 / NC 42 REG CAPITAL AREA MPO U‐5751 US 401 5 WAKE INTERSECTION TO INTERCHANGE. COORDINATE WITH R‐2609 CONSTRUCTION NHP 5750

DURHAM‐CHAPEL HILL‐CARRBORO US 15 / US 501 IN CHAPEL HILL TO NC 55 IN PARTS A THROUGH F ON EXPANDED MPO U‐5774 NC 54 5, 7 DURHAM, ORANGE DURHAM. UPGRADE ROADWAY CORRIDOR. NHS US 15 / US 501 IN ORANGE COUNTY TO SR 1110 (BARBEE CHAPEL ROAD) IN DURHAM COUNTY, UPGRADE ROADWAY CORRIDOR AND CONVERT DURHAM‐CHAPEL HILL‐CARRBORO AT‐GRADE INTERSECTION WITH SR 1110 TO REG MPO U‐5774B NC 54 7, 5 ORANGE, DURHAM INTERCHANGE. RIGHT‐OF‐WAY NHP 4620 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5774B NC 54 7, 5 ORANGE, DURHAM US 15 / US 501 IN ORANGE COUNTY TO SR 1110 UTILITIES NHP 554 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5774B NC 54 7, 5 ORANGE, DURHAM US 15 / US 501 IN ORANGE COUNTY TO SR 1110 CONSTRUCTION NHP 13466 13466 DURHAM‐CHAPEL HILL‐CARRBORO SR1110 (BARBEE CHAPEL ROAD) TO I‐40. REG MPO U‐5774C NC 54 5 DURHAM UPGRADE ROADWAY CORRIDOR. RIGHT‐OF‐WAY NHP 500 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5774C NC 54 5 DURHAM SR1110 (BARBEE CHAPEL ROAD) TO I‐40. CONSTRUCTION NHP 4300 4300 DURHAM‐CHAPEL HILL‐CARRBORO FALCONBBRIDGE ROAD. CONVERT AT‐GRADE MPO U‐5774D NC 54 5 DURHAM INTERSECTION TO INTERCHANGE. RIGHT‐OF‐WAY NHP 3600 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774D NC 54 5 DURHAM FALCONBBRIDGE ROAD. CONVERT AT‐GRADE CONSTRUCTION NHP 9800

DURHAM‐CHAPEL HILL‐CARRBORO SR 1110 (FARRINGTON ROAD). CONVERT AT‐ REG MPO U‐5774E NC 54 5 DURHAM GRADE INTERSECTION TO GRADE SEPARATION. RIGHT‐OF‐WAY NHP 450 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5774E NC 54 5 DURHAM SR 1110 (FARRINGTON ROAD). CONVERT AT‐ CONSTRUCTION NHP 1875 DURHAM‐CHAPEL HILL‐CARRBORO SW MPO U‐5774F I‐40, NC 54 5 DURHAM I‐40 / NC 54 INTERCHANGE IMPROVEMENTS RIGHT‐OF‐WAY NHP 160 SW DURHAM‐CHAPEL HILL‐CARRBORO U‐5774F I‐40, NC 54 5 DURHAM I‐40 / NC 54 INTERCHANGE IMPROVEMENTS CONSTRUCTION NHP 1000

As of December 2014 17 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 5 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DURHAM‐CHAPEL HILL‐CARRBORO I‐40 TO NC 751. UPGRADE ROADWAY MPO U‐5774G NC 54 5 DURHAM CORRIDOR. RIGHT‐OF‐WAY T 1800 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774G NC 54 5 DURHAM I‐40 TO NC 751. UPGRADE ROADWAY UTILITIES T 800 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774G NC 54 5 DURHAM I‐40 TO NC 751. UPGRADE ROADWAY CONSTRUCTION T 29400 DURHAM‐CHAPEL HILL‐CARRBORO NC 751 TO SR 1118 (FAYETTEVILLE ROAD). DIV MPO U‐5774H NC 54 5 DURHAM UPGRADE ROADWAY CORRIDOR. RIGHT‐OF‐WAY T 5900 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5774H NC 54 5 DURHAM NC 751 TO SR 1118 (FAYETTEVILLE ROAD). UTILITIES T 2500 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5774H NC 54 5 DURHAM NC 751 TO SR 1118 (FAYETTEVILLE ROAD). CONSTRUCTION T 6600 6600 SR 1118 (FAYETTEVILLE ROAD) TO SR 1106 DURHAM‐CHAPEL HILL‐CARRBORO (BARBEE ROAD). UPGRADE ROADWAY MPO U‐5774I NC 54 5 DURHAM CORRIDOR. RIGHT‐OF‐WAY T 2500 SR 1118 (FAYETTEVILLE ROAD) TO SR 1106 DURHAM‐CHAPEL HILL‐CARRBORO (BARBEE ROAD). UPGRADE ROADWAY MPO U‐5774I NC 54 5 DURHAM CORRIDOR. UTILITIES T 10700 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774I NC 54 5 DURHAM SR 1118 (FAYETTEVILLE ROAD) TO SR 1106 CONSTRUCTION T 33600 DURHAM‐CHAPEL HILL‐CARRBORO SR 1106 (BARBEE ROAD) TO NC 55. UPGRADE MPO U‐5774J NC 54 5 DURHAM ROADWAY CORRIDOR. RIGHT‐OF‐WAY T 3200 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774J NC 54 5 DURHAM SR 1106 (BARBEE ROAD) TO NC 55. UPGRADE UTILITIES T 12600 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774J NC 54 5 DURHAM SR 1106 (BARBEE ROAD) TO NC 55. UPGRADE CONSTRUCTION T 30600 NC 54 TO I‐40 IN MORRISVILLE. WIDEN TO MULTILANES WITH INTERCHANGE DIV CAPITAL AREA MPO U‐5811 SR 1002 (AVIATION PARKWAY) 5 WAKE MODIFICATIONS AT I‐40. RIGHT‐OF‐WAY T 2558 DIV CAPITAL AREA MPO U‐5811 SR 1002 (AVIATION PARKWAY) 5 WAKE NC 54 TO I‐40 IN MORRISVILLE. WIDEN TO UTILITIES T 307 DIV CAPITAL AREA MPO U‐5811 SR 1002 (AVIATION PARKWAY) 5 WAKE NC 54 TO I‐40 IN MORRISVILLE. WIDEN TO CONSTRUCTION T 8474 8474 8474

SR 1116 (GARRETT ROAD) TO NC 751 (HOPE DURHAM‐CHAPEL HILL‐CARRBORO VALLEY ROAD) IN DURHAM. CONSTRUCT STI FUNDING ELIGIBILITY DIV MPO U‐5823 WOODCROFT PARKWAY EXTENSION 5 DURHAM ROADWAY ON NEW ALIGNMENT. DETERMINATION PENDING RIGHT‐OF‐WAY T 376 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5823 WOODCROFT PARKWAY EXTENSION 5 DURHAM SR 1116 (GARRETT ROAD) TO NC 751 (HOPE STI FUNDING ELIGIBILITY UTILITIES T 45 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5823 WOODCROFT PARKWAY EXTENSION 5 DURHAM SR 1116 (GARRETT ROAD) TO NC 751 (HOPE STI FUNDING ELIGIBILITY CONSTRUCTION T 1798 APEX PEAKWAY IN APEX TO KILDAIRE FARM CAPITAL AREA MPO U‐5825 SR 1010 (TEN‐TEN ROAD) 5 WAKE ROAD IN CARY. WIDEN TO MULTILANES.

DIV CAPITAL AREA MPO U‐5825A SR 1010 (TEN‐TEN ROAD) 5 WAKE APEX PEAKWAY TO RELIANCE AVENUE IN APEX. RIGHT‐OF‐WAY T 2389 DIV CAPITAL AREA MPO U‐5825A SR 1010 (TEN‐TEN ROAD) 5 WAKE APEX PEAKWAY TO RELIANCE AVENUE IN APEX. UTILITIES T 287 DIV CAPITAL AREA MPO U‐5825A SR 1010 (TEN‐TEN ROAD) 5 WAKE APEX PEAKWAY TO RELIANCE AVENUE IN APEX. CONSTRUCTION T 6612 6612 RELIANCE AVENUE TO KILDAIRE FARM ROAD IN DIV CAPITAL AREA MPO U‐5825B SR 1010 (TEN‐TEN ROAD) 5 WAKE CARY. RIGHT‐OF‐WAY T 2937 DIV CAPITAL AREA MPO U‐5825B SR 1010 (TEN‐TEN ROAD) 5 WAKE RELIANCE AVENUE TO KILDAIRE FARM ROAD IN UTILITIES T 352 DIV CAPITAL AREA MPO U‐5825B SR 1010 (TEN‐TEN ROAD) 5 WAKE RELIANCE AVENUE TO KILDAIRE FARM ROAD IN CONSTRUCTION T 11970

DIV CAPITAL AREA MPO U‐5826 SR 2000 (FALLS OF NEUSE ROAD) 5 WAKE I‐540 TO SR 2006 (DURANT ROAD). ADD LANES. RIGHT‐OF‐WAY T 2782 DIV CAPITAL AREA MPO U‐5826 SR 2000 (FALLS OF NEUSE ROAD) 5 WAKE I‐540 TO SR 2006 (DURANT ROAD). ADD LANES. UTILITIES T 334 DIV CAPITAL AREA MPO U‐5826 SR 2000 (FALLS OF NEUSE ROAD) 5 WAKE I‐540 TO SR 2006 (DURANT ROAD). ADD LANES. CONSTRUCTION T 7682

POPLAR PIKE LANE IN MORRISVILLE TO SR 2123 (LITTLE DRIVE) IN RESEARCH TRIANGLE PARK. DIV CAPITAL AREA MPO U‐5827 SR 1632 (LOUIS STEPHENS DRIVE) 5 WAKE CONSTRUCT ROADWAY ON NEW LOCATION. RIGHT‐OF‐WAY T 160 DIV CAPITAL AREA MPO U‐5827 SR 1632 (LOUIS STEPHENS DRIVE) 5 WAKE POPLAR PIKE LANE IN MORRISVILLE TO SR 2123 UTILITIES T 19 DIV CAPITAL AREA MPO U‐5827 SR 1632 (LOUIS STEPHENS DRIVE) 5 WAKE POPLAR PIKE LANE IN MORRISVILLE TO SR 2123 CONSTRUCTION T 2577

SR 3015 (AIRPORT BOULEVARD) TO SR 1002 (AVIATION PARKWAY) IN MORRISVILLE. WIDEN STI FUNDING ELIGIBILITY DIV CAPITAL AREA MPO U‐5828 MCCRIMMON PARKWAY 5 WAKE TO MULTILANES, PART ON NEW LOCATION. DETERMINATION PENDING RIGHT‐OF‐WAY T 2502 DIV CAPITAL AREA MPO U‐5828 MCCRIMMON PARKWAY 5 WAKE SR 3015 (AIRPORT BOULEVARD) TO SR 1002 STI FUNDING ELIGIBILITY UTILITIES T 300 DIV CAPITAL AREA MPO U‐5828 MCCRIMMON PARKWAY 5 WAKE SR 3015 (AIRPORT BOULEVARD) TO SR 1002 STI FUNDING ELIGIBILITY CONSTRUCTION T 11870

NORTHWEST OF SR 1107 (WILKINS ROAD) TO SR 1104 (EAST LYON STATION ROAD) IN BUTNER. UPGRADE AND EXTEND ROADWAY, INCLUDING STI FUNDING ELIGIBILITY DIV KERR TAR RPO, CAPITAL AREA MPO U‐5829 26TH STREET 5 GRANVILLE GRADE SEPARATION OVER I‐85. DETERMINATION PENDING RIGHT‐OF‐WAY T 551 DIV KERR TAR RPO, CAPITAL AREA MPO U‐5829 26TH STREET 5 GRANVILLE NORTHWEST OF SR 1107 (WILKINS ROAD) TO SR STI FUNDING ELIGIBILITY UTILITIES T 66 DIV KERR TAR RPO, CAPITAL AREA MPO U‐5829 26TH STREET 5 GRANVILLE NORTHWEST OF SR 1107 (WILKINS ROAD) TO SR STI FUNDING ELIGIBILITY CONSTRUCTION T 6902

SR 4701 (CYPRESS FORD ROAD) TO QUARRY ROCK DRIVE IN HOLLY SPRINGS. CUT VERTICAL CREST, IMPROVE SUPER‐ELEVATION, INSTALL A LEFT TURN LANE AND IMPROVECROSS‐SLOPE CAPITAL AREA MPO W‐5137 SR 1301 (SUNSET LAKE ROAD) 5 WAKE SOUTH OF CURVE. UNDER CONSTRUCTION KERR TAR RPO, CAPITAL AREA MPO, DIVISION 5 RUMBLE STRIPS, GUARDRAIL, DURHAM‐CHAPEL HILL‐CARRBORO DURHAM, WAKE, FRANKLIN, GRANVILLE, SAFETY AND LIGHTING IMPROVEMENTS AT DIVISION PURCHASE ORDER MPO W‐5205 VARIOUS 5 PERSON, VANCE, WARREN SELECTED LOCATIONS. CONTRACT (DPOC) ‐ IN PROGRESS SR 1135 (WALL ROAD) IN FRANKLIN COUNTY TO US 1 BUSINESS IN VANCE COUNTY. INSTALL CAPITAL AREA MPO, KERR TAR RPO W‐5317 US 1 5 FRANKLIN, VANCE MEDIAN BARRIER. UNDER CONSTRUCTION

SR 1385 (LILLY ATKINS ROAD) TO SR 1383 DIV CAPITAL AREA MPO W‐5323 SR 1152 (HOLLY SPRINGS ROAD) 5 WAKE (CAMPBELL ROAD). WIDEN TO 3‐LANE SECTION. RIGHT OF WAY IN PROGRESS CONSTRUCTION HSIP 500

FRANKLINTON TOWN LIMITS TO LOUISBURG CAPITAL AREA MPO, KERR TAR RPO W‐5509 SR 1211 (WEST RIVER ROAD) 5 FRANKLIN TOWN LIMITS. CONSTRUCT PAVED SHOULDERS. UNDER CONSTRUCTION HENDERSON CITY LIMIT TO SR 1515 (SOUTH COKESBURY ROAD). CONSTRUCT PAVED DIV KERR TAR RPO W‐5515 SR 1518 (STEWART FARM ROAD) 5 VANCE SHOULDERS. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HSIP 135 DIV KERR TAR RPO W‐5515 SR 1518 (STEWART FARM ROAD) 5 VANCE HENDERSON CITY LIMIT TO SR 1515 (SOUTH PLANNING / DESIGN IN PROGRESS CONSTRUCTION HSIP 1350

SR 1658 (YOUTH CENTER DRIVE) INTERSECTION IN RALEIGH. CONSTRUCT PEDESTRIAN TUNNEL DIV CAPITAL AREA MPO W‐5522 SR 1656 (TRINITY ROAD) 5 WAKE UNDER SR 1656 (TRINITY ROAD). PLANNING / DESIGN IN PROGRESS CONSTRUCTION HSIP 3200

As of December 2014 18 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE B-5171

I-0914BB 903 DRAFT STIP FY 2015-2025 49 B-5151 501 STI Projects 57 VANCE I-0914BA 96 1 158

B-5102 WARREN DIVISION 5 PERSON

B-5157 39 158 BRIDGES FUNDED THROUGH STI Henderson I-5819 GRANVILLE 158 W-5515 STATEWIDE AVIATION 157 B-5320 58 REGIONAL AVIATION I-5843 401

DIVISION AVIATION B-5330 I-5787 B-4516

B-4943 15 DIVISION FERRY 85 REGIONAL RAIL DURHAM U-5829 561 DIVISION RAIL

501 R-5707 REGIONAL TRANSIT

56 DIVISION TRANSIT

U-5516 FRANKLIN SAFETY TRANSITION * 50 EB-5715 TRANSITION * I-5729 INTERSTATE MAINTENANCE EB-5703 39 EB-5704 1 STATEWIDE HIGHWAY B-5674 U-3308 B-5113 U-0071 Durham B-5512 Wake 401 REGIONAL HIGHWAY U-5720A Forest 98 U-5717 U-5745 EB-5720 DIVISON HIGHWAY U-5307C EB-4707B B-5318 DIVISION BIKE/PEDESTRIAN U-5823 U-5720B 70 U-5518A I-5710 U-5518C U-5307B INTERSTATE ROUTE U-5774E I-5702A I-5707 B-4662 U-5518B 540 U-5748 96 US ROUTE U-5774C EB-5708 40 U-5826 TG-5255B AV-5700 U-5774F NC ROUTE U-5774H I-5700 Morrisville U-5307A SECONDARY ROAD U-5828 Raleigh WAKE U-5750 I-5702B W-5522 I-5870 I-5506 MUNICIPAL BOUNDARIES U-5827 U-5747 U-5811 I-5708 P-5201 I-5844 TD-4912 MILITARY BASE B-5684 I-5873 U-2719 NCDOT DIVISION BOUNDARY Knightdale U-2719A EB-5709 I-5703 COUNTY BOUNDARY 540 I-5704 EB -5718 Cary 440 64 WATER FEATURES U-5301A U-5301C I-5702C B-5161 I-5701 Apex U-5301B I-5111A TD-5272 U-4432 U-2901B U-5825B * Note: Reflects 108 of the Major Transition Projects U-5825A U-5744 Garner R-2829 R-2635D Note: FY 2015 projects represent major projects not U-5749 U-5302 U-2901AC R-2721 B-5326 let as of November 2014 B-5321 B-5237

Holly B-4659 W-5323 U-5746 Springs I-5111BA 401 R-2828 50 U-5751

Fuquay-Varina

0 3.75 7.5 15 R-5705 Miles