Summary Initial Environmental Examination

Summary Initial Environmental Examination Project Number: 40682-013 May 2018

People’s Republic of : Integrated Renewable Biomass Energy Development Project – Shandong Taiyu industry Co., Ltd

Prepared by: Environmental Protection Office of Bin for Shandong Province For: Technology-Introduction Office of Shandong Provincial Department of Agriculture

This Summary Initial Environmental Examination Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

泰裕非核心子项目环评报告摘要 Summary of Non-core subproject IEE for Taiyu 1.项目名称Name of project: Binzhou Taiyu Wheat industry Co., LTD uses Asian Development Bank Loan ( grant ) to build China's rural energy ecology Project ( phase Ⅱ) 2.项目位置Location of project: The projects in Wawuzhang village, Renma and Shixiying village of Qinhuangtai township, Binzhou, Shandong Province 3.鉴定单位Evaluation unit: School of Environmental Protection, Shandong Province

4.项目投资规模Project investment, US$ 汇率exchange rate:1 US$ = 6.1 CNY 总投资Total investment cost, RMB:11.4 million

亚行贷款ADB loan amount, RMB:5.7 million 配套资金Counterpart fund, RMB:5.7million 5.建设内容Construction content: (1) location, type and scale of farm, and the amount of waste(位置,农场类型和 规模和废物的数量) Location: The projects in Wawuzhang village, Renma and Shixiying village of Qinhuangtai township, Binzhou, Shandong Province Type and scale of the farm: 30,000 live pig farms in the year Amount of waste: After the completion of the project, it can dispose 21,600-ton Livestock and poultry waste, and also produce methane 1,095,000 m³ , biogas slurry fertilizer 94,300 t and biogas residue fertilizer 82,200 t annually. (2) type of biogas plant, equipment used, 沼气厂和使用设备的类型 Type of biogas plant: The 3,000m³ CSTR anaerobic tank , the 200 m³ adjusting tank, the 3,000 m³ HDPE black membrane pool and the 3.6 km biogas slurry conveying pipeline. Type of the equipment: Biogas purification device. (3) amount of biogas generated, uses of biogas, uses of slurry and sludge沼气产 量,沼气的使用,沼渣沼液的使用 Annual production capacity of 1,095,000 of methane, the annual output of biogas fertilizer 176,500 tons, (4) construction and operational period建设期和运作期 The project construction period is one year and the project will run for 20 years. 6. Major environmental impacts主要环境影响 In the process of construction and operation of this project, it is required to strictly implement the "three simultaneity" regulation and put the suggestions proposed from report into practice. During the operation period of the project, the waste water mainly consists of workers' domestic waste water and biogas slurry generated by the project. The domestic waste water is decomposed by septic tank precipitation and then discharged into the sewage of the factory area, and finally enters the biogas facilities for biogas production. Biogas slurry through biogas slurry pipeline to vegetables base, surrounding farmland , and increasing production and income. The malodorous gas is generated in the process of biogas production (including pretreatment and anaerobic fermentation stage).Through sealing the buildings, strengthening the greening of the production area to ensure that the odor at the factory boundary reaches the standard. As for the noise, caused by the operation of mixers, solid-liquid separators, fans, pumps and other equipment. Many effective measures have been taken to eliminate or reduce the generation to ensure that the noise at the factory boundary meets the emission standards.The domestic waste and grid residue generated by the project will be transported and transported by the transposition department on a regular basis. the generated biogas residue can be directly used in ecological agricultural gardens instead of some chemical fertilizers and will not be discharged into the outside. 7. Environmental management plan and staff to implement the plan环境管理计 划和执行人员分工 The project has developed a complete EMP, detailed planning of environmental mitigation measures, environmental management, environmental supervision, environmental monitoring and other aspects. The EIA administration agencies are as follows: Environmental Protection Office of Shandong Province: In accordance with the requirements of relevant domestic laws and regulations, is responsible for project supervision of the whole process; Binzhou Municipal Environmental Protection Bureau: In accordance with the requirements of the Office of Environmental Protection, Shandong Province, the project supervision of the whole process; Bincheng Environmental Monitoring and Supervision Agency: help build a party responsible for to supervise the implementation of environmental protection measures on the construction site, while assist the project to develop the environmental management guidelines for routine environmental monitoring during operation of the biogas plant; Environmental staff: Besides the monitoring and supervision from the governmental agencies, 2 technicians from the Binzhou TaiYu Wheat industry Co., LTD will be engaged for implementation of the environmental management plan to monitor and mitigate the impacts of the environmental pollutions during the periods of project construction and operation. 8. IEE approval date and agency (attach a photocopy of the approval letter)初步 环评批复日期和机构名称上批复信的复印件 IEE approval date:May. 21, 2018 Agency: Environmental Protection Office of Bin Cheng 注:建设期:指项目启动到完工;运行期:指项目建设结束投入实运行至还款结束的期间; 执行人员指:负责环境管理与监测的人员