T2080vol3cp16.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LTD. (MSRDC) [GOVERNMENT OF MAHARASHTRA UNDERTAKING] SCHEDULES Request for Proposal (RFP) for Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in the State of Maharashtra on EPC mode for Construction Package 16, from Km. 664.479 to Km. 701.479 (Section - Village Birwadi to Village Amne) in District Thane. VOLUME – III Instructions to Bidders (ITB) July 2018 Corporate Office: Maharashtra State Road Development Corporation (MSRDC) Limited, Bandra Worli (Rajeev Gandhi) Sea Link Project Office, K.C. Marg, Opposite Bandra Reclamation Bus Depot, Bandra (West), Mumbai-400050, Maharashtra State, INDIA MSRDC Schedules SCHEDULE-A (See Clauses 2.1 and 8.1) SITE OF THE PROJECT EXPRESSWAY 1 The Site 1.1 Site of the Six-Lane Project Expressway shall include the land, buildings, structures and road works as described in Annex-I of this Schedule-A. 1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of this Schedule-A. 1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any other immovable property on, or attached to, the Site shall be prepared jointly by the Authority Representative and the Contractor, and such inventory shall form part of the memorandum referred to in Clause 8.2.1 of this Agreement. 1.4 The alignment plans of the Project Highway are specified in Annex-III. The proposed profile of the project highways shall be followed by the Contractor with minimum FRL as indicated in the alignment plan. The Contractor, however, improves / upgrade the Road Profile as indicated in Annex-III based on site/design requirement. 1.5 The status of the environment clearances obtained or awaited is given in Annex IV. Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 1 MSRDC Schedules Annex – I (Schedule-A) Site 1. Site 2 The site of the Six-Lane Project Expressway is forming part (package-16) of Nagpur- Mumbai Super Communication Expressway commencing from Khutadi village at Km 664.479 and ends at Amne village at Km 701.362 passing through green field area (refer Index Map given at Appendix A-1) in the state of Maharashtra. The land, carriageway and structures comprising the Site are described below: 2. Land The Site of the Project Expressway comprises the land (sum total of land already in possession and land to be possessed as described below: Chainage (km) Total Right of Sr. Village Way Remark No. From To (ROW) (m) Ratandhle, Lahe, Birwadi, 1 664.379 666.642 120.0 Saralambe, Khutadi Khutadi, Saralambe, 2 666.642 668.877 60.0 Kasgaon, Arjunali 3 Kasgaon, Shelwali 668.877 671.100 120.0 Shelwali, Sapgaon, 4 671.100 674.360 120.0 Khutghar 5 Khutghar, Andad, Hiv 674.360 678.110 90.0 6 Hiv 678.110 678.323 120.0 7 Hiv 678.323 678.884 90.0 8 Hiv, Ras, Shere, Shei, 678.884 694.260 120.0 Ambarje, Hal, Ushid, Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 2 MSRDC Schedules Chainage (km) Total Right of Sr. Village Way Remark No. From To (ROW) (m) Dabav, Phalegaon, Nadgaon, Utane, Pitambare Nagre Nadgaon, Chinchwali, 9 694.260 696.745 120.0 Raye, Gurawali, Nimbavali 10 Nimbavali 696.745 697.654 120.0 11 Chiradpada 697.654 699.054 60.0 Chiradpada, Pise, Vashere, 12 698.504 701.362 120.0 Amne 3. Carriageway The proposed Expressway is green field area where no carriageway exists. 4. Major Bridges The Site includes the following Major Bridges: Sr. No. Proposed Chainage (km) Length of Structure Remarks Nil 5. Road over-bridges (ROB)/ Road under-bridges (RUB) The Site includes the following ROB (road over railway line)/RUB (road under railway line Sr. No. Chainage (km) Length of Structure Remarks Nil 6. Grade Separator The Site includes the following grade separators: Sr. No. Chainage (km) Length of Structure Remarks Nil Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 3 MSRDC Schedules 7. Minor Bridges The Site includes the following minor bridges: Sr. No. Chainage (km) Length of Structure Remarks Nil 8. Railway Level Crossings The Site includes the following railway level crossings: Sr. No. Chainage (km) Remarks Nil 9. Underpasses/ Overpasses (Vehicular/Non-vehicular) The Site includes the following underpasses/Overpasses: Sr. No. Chainage (km) Length of Structure Remarks Nil 10. Culverts The Site has the following culverts: Sr. No. Chainage (km) Length of Structure Remarks Nil 11. Bus Bays The details of bus bays on the Site are as follows: Sr. No. Chainage (km) Dimension Location (Left/Right) Nil 12. Truck Bays The details of truck lay byes are as follows: Sr. No. Chainage (km) Dimension Location (Left/Right) Nil Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 4 MSRDC Schedules 13. Road Side Drains The details of the roadside drains are as follows: Chainage (km) Sr. No. Length of Structure Dimension From To Nil 14. Major Junctions The details of major cross roads on the Site are as follows: Sr. No. Road Type Chainage (km) 1 ODR 670.678 2 SH – 44 672.072 3 SH - 79 674.234 4 ODR 677.769 5 ODR 682.761 6 MDR 62 683.690 7 MDR 69 689.384 8 MDR 70 690.580 9 ODR 692.673 15. Minor Junctions The details of minor cross roads on the Site are as follows: Sr. No. Road Type Chainage (km) 1 Village Road 666.768 2 Village Road 690.123 3 Village Road 690.375 4 Village Road 694.115 5 Village Road 696.421 6 Village Road 698.931 Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 5 MSRDC Schedules Annex II (Schedule-A) DATES FOR PROVIDING RIGHT OF WAY The dates on which the Authority shall provide Right of Way to the Contractor on different parts of the Site are stated below: Design From Km to Km (Design Width Date of providing Sl. No Length Chainage) (m) ROW (Km) 1 2 3 4 5 (i) Full Right of Way RoW for 90% of project length shall be handed over on Appointed Date. (full width) (ii) Balance Right of RoW for balance 10% of project length shall be handed over within 150 Way (width) days from Appointed Date. Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 6 MSRDC Schedules Annex – III (Schedule-A) ALIGNMENT PLANS The plan and profile is available on e-portal of MSRDC website. Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 7 MSRDC Schedules Annex - IV (Schedule-A) Environment Clearances I. Tansa and Kalsubai Wildlife Sanctuary clearance is in process II. Forest Clearance is in process III. Environmental Clearance as per EIA Notification 2006 is in process. Construction of Nagpur- Mumbai Super Communication Expressway (Package-16) from Km 664.479 to Km 701.479 on EPC mode 8 MSRDC Schedules Appendix A-I Index map of Project Expressway Construction of Nagpur Mumbai Super Communication Expressway (Package 16) from km 664.479 to km 701.479 on EPC Mode 10 MSRDC Schedules SCHEDULE – B (See Clause 2.1) DEVELOPMENT OF THE PROJECT EXPRESSWAY 1. Development of the Project Expressway Development of the Project Expressway shall include design and construction of the six lanes (divided carriageway) expressway as described in this Schedule-B and in Schedule-C. General description of the Project Expressway is given at Annex-I of this Schedule-B 2. Specifications and Standards (i) The Project Expressway shall be designed and constructed in conformity with the Specifications and Standards specified in Annex-I of Schedule-D. (ii) The alignment plan of the Project Expressway is specified in Annex III of Schedule A. The proposed profile of the Project Expressway shall be followed by the Contractor with minimum FRL as indicated in alignment plan. The Contractor however, improve\upgrade the road profile as indicated in Annex – III based on site/design requirement. Construction of Nagpur Mumbai Super Communication Expressway (Package 16) from km 664.479 to km 701.479 on EPC Mode 10 MSRDC Schedules ANNEX - I (Schedule-B) Description of Project Expressway The Project Expressway is forming part (package-16) of Nagpur - Mumbai Super Communication Expressway and shall be Six Lane divided carriageway with fully access controlled. It is commencing from Khutadi village at Km 664.479 and ends at Amne village at Km 701.362 passing through Green Field area in the state of Maharashtra. The design length of the project Expressway (package-16) is 36.883 km. 1. Width of Carriageway Paved carriageway including paved shoulders and edge strips of Six lane Project Expressway shall be 30 m (carriageway width – 2 x 11.25 m, paved shoulders - 2x 3.00 m and edge strip – 2 x 0.75 m) wide in entire stretch. The paved carriageway in the approaches shall match with carriageway width of structures. 2. Geometric design and general features 2.1. General Geometric design and general features of the Project Expressway shall be in accordance with Section 2 of the Manual and Schedule D. 2.2. Design speed The design speed shall be minimum design speed of 150 km/hr. Acceleration and deceleration lengths proposed for entry/exit ramps on interchanges shall be as per Schedule B.