2".-1r'neeting of DEiAA held at the Chamber of District Collector, • on 32.201'7 at '4.00 pm. The Chair person F~District Collector welcomed the , f1':l~rY~ bees and initiated the proceedings of the COt nmittee.

1. Envirortmental clearance for the building-stone quarry project in R.S.No. 40/1K in Parappa Village Vellarikundu Taluk, by Sri. C' Narayanan for M/S Ceeyen Stone Crusher (File NO.A/6439/2016 of DEIAA) 2:. Environmental clearance for the removal, of' ordinary earth in R.S.No:. 191/1A/1E/15 in Kayyur Village, , Kasaragod District by Sri. K. . \ . , . Babura], 5/0. Karunakaran, Madhumandhiram"Aravanchal(PO) .

The following members attended the meeting

1.' Sri. Ieevan Babu. K, lAS, District Collector & Chairperson 2. Dr'. F, K. Javasree, RDO & Secretary 3. Prof. v. Gopinathan ( Expert member) 4, RCijeevafl. M,Divlsional Forest Officer, Kasaragod. :~"c. P3dhakrishnanNalr, EE inspection (Chair cerson DEAC) 6 Ragh"avan;M, Geologist, Kasaragod.

Two cases recommended by DEAC were considered in the DEIAA meeting,

(I) Sri. C. Narayanan, Managing Partner, ,MIS Ceeyen Stone Crusher, Cinlsh Nivas, Chayoth, Kinanur Village, Vellarikundu Taluk, Kasaragod.District has applied for environmental clearance, for the building stone quarry project in R.S.No. 40/1K in Parappa, village, Vellarikund,u Taluk. The

quarry lease 4.732~; Heet. belong to 6 partners, formed as d partnership firm in the name of MIS Ceeven Stone Crusher. There isan existing, quarry on the southern side of the [ease area, ' The lease applied area exhibits hilly terrain with' highest' elevation' 170 M and , lowest elevation 90 M from MSL. The proposed. area and buffer zone , an:;.:fare demarcated with pillars. No residential building is, located within 100M from lease area: AsmaU non perennial stream flowing in: thesouth eastern sidf~and south weslt~in,side are emerging in the lower . part of mining ~re,il which· will not affect the mining retaining wall. is al(e~dy constructed by the ,pwner; Hydro there Js no damage anticipated due to proposed mining, as , pian .. The lease area corl~ists of rocks, ~~ilges arid grad.i

di rectlons, The lease area IS found establl~hed· by house ...... ·.rta . support good plant & tree growthin betweenjoutcrops then

The proposal was considered in the' .~nd ~eeting· of 06.01:2017 and .DEIAA was appraised the same 'based on e details provided. ,by the, applicant and site lnspection condu ~y the . . .' . . .

members,_ 'OfDEAC'on 29.12.201.6. The DEAC,. irecommended- ~. of .envlronmental clearance with general coridltions for mini and some specific conditions as per the.site conditlon.

Ihe committee discussed the pfopos a I'in Idetail and opi that the '~n:"ironrnental clearance can be issued for thle project inc~ general conditions and specific conditions.

(ii)' Sri. K. Babura], Slo Karunakaran, MadhurJ,andirami· has applied for e,nvironment~i clearance for t removal of ordinary earth for aquantitv of l04'84rvP (27250MT), . a lease area of Acre of land in R.S.No. 191/l.A/IE/15 Ka .Village, 1.bO , '. . .\ ,"! '. ._ in Hosdurg ,Ta'luk for the reconstruction ~f..Railway . Ii and Nileshwar stations of southern Railway. owner Sri. Sunilkuar. V.R, ?/o. Sukumaran, Neelambari, Val Kasaragod has given 'consent for the removal of ordlnarv

2.96 Acres of land under his possession. Tht north and E! land is possessed by Sri Padihare Madathil G~ngadharan,. .. ~_ .,.' I . . consent to remove earth to the appllcant, '1he w-est.and so of the land is possessed by the originallanddwner., The pro] a small barren hill sloping towards south with a.nelevation fv1SL.: No residential building, public roadsj and public st noticed within 50 M· of lease area. The outer surface of Ian . . ": :. ", :', soil, which can be removed easilv. ,The .surrounding area. covered with rubber plantation The proposal was considered in the z= meeting of DEACon 6.1.2017 • and DEIAA was appraised based on the details provided by the applicant and site inspection conducted by the members of DEACon'29.12.2'016. The DEAC recommended for issuance of environmental clearance for

mining of 7200M3 of ordinary earth as against 10484M3 applied, taking to account the elevation in the contour map submitted by the applicant. The' removal of earth should be in terraced manner with. Maximum depth of 30 M only.

The committee discussedthe proposal in detail and opined that .the Environmental clearance car) be issued with general condition and specific condition.

1. Environmental clearance for the building stone quarry

The Authority approved for, issuance of environmental clearance for the building stone quarry project to C. Narayanan, Managing Partner, MIS Ceeyen Stone Crusher, Cinish Nivas, Chavoth, Kinanur Vif!age subject to the general condition and the followlng'speciflc conditions.

1) Barbed wire fencing should be provided all around lease area to prevent any mishap. 2) Benching method should be strictly practiced with terrace height not more than SM and terrace width not less than 5.00Mfor each bench. 3kDust suppression mechanism with adequate water storage and sprinkling shari be adoptedto avoid anv dust pollution in the viclnitv.. ' 4) Transportation of products, powder etc must be with .sufflclent wetting and adequately covered. The list of vehicles used should be submitted to correspond] ng Station HC'LiSf2 Officer and this office. No vehicle other than the listed should be used. 5) Sound and Air pollution control measures as required shall be maintained. . ' 6) The blasting times must be displayed and strictlv adhered to between 6AM r to 6PM. No night time blasting is allowed. 7) Gully plug shall be constructed and ms.ntained to ensure recharge of ground water. \ \

.' ~ &j The completion of each bench terrace st'(\lild re~otted toGe ogist and . '. .' ..,. JI ROO. Only after inspection should be next fenci~g be done.

2. Erwironmentalclearance for the removal (If or I. earth

The Authority approved for issuance, of ertvir<:>1mentalclearar~ for the

r~rnov31 ,~~ ordin,ary earth of nOOM3 in res,~ec,t of t, h,t :bove project tile condition that the' removal should be In a terr~ced manner I,. iting the . . maximum depth of 3.00M only .strlctlv adhering general conditio and the' following specific conditions.

t. 1M wide buffer zone from the fenced boundarvlshould be left u isturbed

all around the lease area. . . I 2. Re~o~"1 aired earth should be in 3 benches Wit a m~ximum d. th of 3M anu Width of fence should not be less than SM. I . . 3. Adequate water'stor~ge and watersprlnkling shqold arranged .. " . . l be ,~. \tVind breaking arrangement is to be provided to centro' dust.poll 5, Th(::.minlng operationshould be during day timEt only preferably PM. I . 6, Transportation should with sufficient W'l~t't!!'lgan~ 'proper covera :'rhe list of vehicles used ~hould be submitted' to correspondlng Stati

orncet and this office. No vehicle other than the J listed.should be' t. T.f~t.('~.~'{cavationof ordinary earth s,hciuld r:ot bt con~ucted du i e heavy

rdl:lY·,eCS()r1. ~' .d, ,,,,rh'!' completion of each bench pits of 1 fee depth is to b aken of

.spaclng of 2m x Zm 0(1 the benc~es.and plant soc al forestry seedl 1 . The rnpf.~tii1gwas conclude at 5.00PM. i ;}40\ Sr.l. Jeevan Babu, K, JAS

& D....li.··;(r,;"i-•.-.('~_L"!:""ct'or".. . I' Kasars:l. ago'd & Revenue Di~jsio"I'Jalofficer, . saragod I