S. K. Sarawagi & Co. Pvt. Ltd. Form-1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s M/s. S. K. Sarawagi & Co. Pvt. Ltd. 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be Other than fully mechanized handled/command area/lease area/number of wells to opencast method for maximum be drilled Manganese production of 44633 tons/annum. Quarry lease area is 15.72 ha. 4 New/Expansion/Modernization Expansion (Manganese production from 10000 TPA to 44633 TPA) Cost estimated for the project Rs. 1.0 Crore. 5 Existing Capacity/Area etc. Existing EC Capacity: 10000TPA 6 Category of Project i.e 'A' or 'B' B 7 Does it attract the general condition? If yes, please No specify 8 Does it attract the Specific condition? If yes, please No. specify. 9 Location Plot/Survey/Khasra No. Survey No. 3(P) Village Bankurvalasa Tehsil District State . 10 Nearest railway station/airport along with distance in Railway Station: Donkinavalasa - 5.1 kms. km - SE 11 Nearest Town, City, District Headquarters along with Town: - 11.2 km- NE distance in kms. District headquarters: Vizianagarm – 43 km - SE 12 Village Panchayats, ZillaParishad,Municipal Village Panchayat: Bankurvalasa Corporation, Local body (complete postal address with Zilla Parishad: Vizianagaram telephone nos. to be given) 13 Name of the Applicant Sri Asok Konda 14 Registered Address Sri Asok Konda M/s. S. K. Sarawagi & Co. Pvt. Ltd. Sarawagi House, Kaspa Street, – 532128 , Andhra Pradesh. Mobile No. +91 93471 38089

F-1 S. K. Sarawagi & Co. Pvt. Ltd. Form-1

15 Address for Correspondence: Name Sri Asok Konda Designation(Owner/Partner/CEO) Owner Address Sri Asok Konda M/s. S. K. Sarawagi & Co. Pvt. Ltd. Sarawagi House, Kaspa Street, Cheepurupalli – 532128 Vizianagaram District, Andhra Pradesh. Mobile No. +91 93471 38089 Pin Code 532128 E-mail Telephone Number Mobile No. +91 93471 38089 Fax No. 16 Details of alternative Sites examined, if any. Location Village-District-State – of these sites should be shown on a topo sheet. -NA – Site specific project i.e. mining. 17 Interlinked Projects -NA- 18 Whether separate application of interlinked project No has been submitted? 19 If yes, date of submission -- 20 If no, reason -- 21 Whether the proposal involves approval/clearance No under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Order/Policy Yes – First renewal of the quarry relevant/relating to the site? lease deed was executed by the Assistant Director of Mines & Geology, vide Proceedings No. 2416/M1/99 dated 06.09.2000 for a period of 20 years from 23.01.2001 to 22.01.2021. 23 Forest land involved (hectares) No 24 Whether there is any location pending against the No project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No (c) Orders/directions of the Court, if any and its relevance with the proposed project.

F-2 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary NO The Q.L area is almost flat and is change in land use, land cover surrounded by Agriculture lands. Present or topography including method of mining is Other than fully increase in intensity of land mechanized opencast and the active area use (with respect to local is 6.6457ha. land use plan) 1.2 Clearance of existing land, NO It is plain land vegetation and buildings? 1.3 Creation of new land uses? NO 1.4 Pre-construction investigations YES Survey completed, based on the soil e.g. bore houses, soil testing? quality temporary office cum rest shelter, first aid room and toilets will be constructed. 1.5 Construction works? YES Construction activity involves infrastructure only. Office cum rest shelter, first aid room and toilets will be constructed. 1.6 Demolition works? NO 1.7 Temporary sites used for NO Local villagers shall be employed. construction works or housing of construction workers? 1.8 Above ground buildings, YES Above ground building for the mine office structures or earthworks only. No major excavation activity including linear structures, cut involved. and fill or excavations 1.9 Underground works including NO The present method of mining is Other mining or tunneling? than fully mechanized opencast method for Manganese mine. 1.10 Reclamation works? YES The present mining depth is 36m. In the proposed period of Scheme of Mining , mining will be carried out up to a depth of 44 m. thus there is no scope for back filling as mineable ore is still existing in depth. 1.11 Dredging? NO 1.12 Offshore structures? NO 1.13 Production and manufacturing YES Mining by using Other than fully processes? mechanized opencast method. Annexure I

F-3 S. K. Sarawagi & Co. Pvt. Ltd. Form-1

1.14 Facilities for storage of goods NO or materials? 1.15 Facilities for treatment or YES During the plan period about 3.313 ha of disposal of solid waste or the lease area will be utilized for dumping liquid effluents? of waste material. (Annexure IV) Liquid waste i.e. effluent from the domestic source shall be sent to septic tank followed by soak pit. 1.16 Facilities for long term housing NO Local Villagers will be employed. of operational workers? 1.17 New road, rail or sea traffic NO No major construction involves, local during construction or villagers will be employed for construction operation? and operational purpose. The number of trips required for transportation of mineral is eight per day. 1.18 New road, rail, air waterborne NO or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing NO Very limited trucks are required. The transport routes or number of trips required for infrastructure leading to transportation of mineral is eight per day. changes in traffic movements? 1.20 New or diverted transmission NO There is no transmission line or pipeline lines or pipelines? passing through the lease area. 1.21 Impoundment, damming, NO The quarrying operation will be other culverting, realignment or than fully mechanized opencast method. other changes to the No change in hydrology due to proposed hydrology of watercourses or activity. aquifers? 1.22 Stream crossings? NO There is no stream crossing the lease area. 1.23 Abstraction or transfers of NO Water shall be drawn from local villages water form ground or surface for the purpose of domestic and water waters? sprinkling purpose. 1.24 Changes in water bodies or the NO There is no discharge from the quarrying land surface affecting drainage operations. or run-off? 1.25 Transport of personnel or NO Local villagers shall be employed. materials for construction, Manganese is sent away from the site, the operation or numbers of trips will be eight per day. decommissioning? 1.26 Long-term dismantling or NO Temporary structures will be constructed.

F-4 S. K. Sarawagi & Co. Pvt. Ltd. Form-1

decommissioning or restoration works? 1.27 Ongoing activity during NO There is no structure in the lease area, decommissioning which could mine office cum rest shelter will be have an impact on the constructed with temporary structures to environment? demolish after completion of workings. 1.28 Influx of people to an area in NO either temporarily or permanently? 1.29 Introduction of alien species? NO It is a plain flat terrain area. 1.30 Loss of native species or NO genetic diversity? 1.31 Any other actions? NO

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/No Details thereof (with approximate quantities /rates, wherever possible) Confirmation with source of information data

2.1 Land especially undeveloped YES The quarry lease area is 15.72 ha. The or agricultural land (ha) Q.L area is almost flat and is surrounded by Agriculture lands. 2.2 Water (expected source & YES 25.9 KLD, through tankers from competing users) unit: KLD nearby village. Annexure-III. 2.3 Minerals (MT) YES The present proposal is for Manganese mining and it is a mineral.

2.4 Construction material– stone, NA Quarry office and temporary rest aggregates, sand/soil(expected shelters will be constructed, no major source- construction involves. MT)

2.5 Forests and timber (source – MT) NO

2.6 Energy including electricity and YES Other than fully mechanized opencast fuels (source, competing users) mining; power shall be drawn from Unit: fuel (MT), energy (MW) nearby villages.

2.7 Any other natural resources (use NO appropriate standard units)

F-5 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 3.Use, storage, transport handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist. Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, NO There are no hazardous substances or which are hazardous (as per materials to human health or the MSIHC rules) to human health or environment. However drilling will be the environment (flora, fauna, carried out for mining.(Annexure-II) and water supplies) 3.2 Changes in occurrence of disease NO or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. YES The proposed project shall enhance the by changing living conditions? prospects of employment. Recruitment for the unskilled and semiskilled workers for the proposed project will be from the nearby villages 3.4 Vulnerable groups of people who NO The nearest village is Bankurvalasa could be affected by the project located at a distance of 0.3 km from the e.g. hospital patients, children, QL area in North direction. The project the elderly etc., shall not have any significant impact on vulnerable groups of people. 3.5 Any other causes NO

F-6 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine YES During the plan period about 3.313 ha of wastes the lease area will be utilized for dumping of waste material. 4.2 Municipal waste (domestic NO Domestic waste like paper will be disposed and or commercial off. wastes)

4.3 Hazardous wastes (as per NO Waste oil from equipment shall be sent to Hazardous Waste authorized recyclers. Management Rules)

4.4 Other industrial process NO wastes 4.5 Surplus product NO 4.6 Sewage sludge or other NO sludge from effluent treatment 4.7 Construction or demolition NO wastes 4.8 Redundant machinery or NO equipment 4.9 Contaminated soils or other NO materials 4.10 Agricultural wastes NO 4.11 Other solid wastes NO

F-7 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist Yes/No Details thereof (with Confirmation approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of NO fossil fuels from stationary or mobile sources

5.2 Emissions from production YES Dust emissions are anticipated processes from mining and transport activity. Water sprinkling and green belt development is proposed to reduce the dust. 5.3 Emissions from materials handling YES Dust may rise during mining, including storage or transport and transport. 5.4 Emissions from construction YES Dust may rise during transport activities including plant and of material and mining activity. equipment The dust emissions shall be mitigated by water spraying. 5.5 Dust or odours from handling of NO materials including construction materials, sewage and waste 5.6 Emissions from incineration of NO waste 5.7 Emissions from burning of waste NO in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources NO

F-8 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment YES Noise is anticipated during mining e.g. engines, ventilation plant, activity from drilling equipment, crushers transport vehicles. Wet drilling and water sprinkling system is provided to reduce the dust emissions. Personal protective equipments are provided to the workers to reduce the noise levels. 6.2 From industrial or similar NO processes 6.3 From construction or demolition YES Safety equipments shall be provided to the workers. 6.4 From blasting or piling YES Dust and noise may rise during drilling and transportation. Water sprinkling system is provided to control the dust emissions. PPE’s are provided to the workers. 6.5 From construction or operational YES The increased traffic shall not have traffic any significant impact. 6.6 From lighting or cooling systems NO 6.7 From any other sources NO

F-9 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of NO The material excavated is hazardous materials Manganese and is mineral. 7.2 From discharge of sewage or other NO Septic Tank followed by soak effluents to water or the land (expected pit shall be provided for mode and place of discharge) temporary toilets. 7.3 By deposition of pollutants emitted to air NO into the land or into water 7.4 From any other sources NO 7.5 Is there a risk of long term build up of NO pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc NO from storage, handling, use or production of hazardous substances 8.2 From any other causes NO 8.3 Could the project be affected by NO natural disasters causing Environmental damage (e.g. floods, earthquakes, landslides, Cloudburst etc)?

F-10 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting. YES The proposed project shall facilities, ancillary development or enhance the prospects of development stimulated by the project employment. Recruitment for which could have impact on the the unskilled and semiskilled environment e.g.: workers for the proposed •Supporting infrastructure (roads, project will be from the nearby power supply, waste or waste water villages. treatment, etc.)

•Housing development •Extractive industries • Supply industries • Other 9.2 Lead to after-use of the site, which NO could have an impact on the environment 9.3 Set a precedent for later developments NO 9.4 Have cumulative effects due to NO The baseline environmental proximity to other existing or planned status of the surrounding areas projects with similar effects is within the prescribed limits as observed from the secondary data.

F-11 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 (III) Environmental Sensitivity S.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary 1 Areas protected under international NO conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive YES Vegavati River is flowing at a for ecological reasons - Wetlands, distance of 2.4 km from the QL watercourses or other water bodies, area in N direction. Seasonal coastal zone, biospheres, mountains, nala Potulu Gedda is flowing at forests a distance of 7.6 km in SE direction. Seasonal nala Erra Gedda is flowing at a distance of 8.6 km in SW direction. Seasonal nala Eduvampula Gedda is flowing at a distance of 5.7km in SW direction. Seasonal nala Votti Gedda is flowing at a distance of 8.5 km in NW direction. Bobbili PF is at distance of 8.5 km in N direction. Peddakonda RF is at distance of 6.1 km in SW direction. Poramlova RF is at distance of 9.4 km in SW direction 3 Areas used by protected, important or NO sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground NO waters 5 State, National boundaries NO 6 Routes or facilities used by the public for NO access to recreation or other tourist, pilgrim areas 7 Defence installations NO

8 Densely populated or built-up area NO The project impact area has no urban or semi-urban area. The PIA consists of rural area with low agricultural activity.

F-12 S. K. Sarawagi & Co. Pvt. Ltd. Form-1

9 Areas occupied by sensitive man-made NO The PIA consists of community land uses (hospitals, schools, places of facilities in various villages, worship, community facilities) however no major impact is anticipated, as the mine is away from the residential area. 10 Areas containing important, high quality NO or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or NO The area is undeveloped and environmental damage. (those where consists of very few industries. existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which NO could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

F-13 S. K. Sarawagi & Co. Pvt. Ltd. Form-1

F-14