FORM 1 (I) Basic Information S
Total Page:16
File Type:pdf, Size:1020Kb
S. K. Sarawagi & Co. Pvt. Ltd. Form-1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s M/s. S. K. Sarawagi & Co. Pvt. Ltd. 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be Other than fully mechanized handled/command area/lease area/number of wells to opencast method for maximum be drilled Manganese production of 44633 tons/annum. Quarry lease area is 15.72 ha. 4 New/Expansion/Modernization Expansion (Manganese production from 10000 TPA to 44633 TPA) Cost estimated for the project Rs. 1.0 Crore. 5 Existing Capacity/Area etc. Existing EC Capacity: 10000TPA 6 Category of Project i.e 'A' or 'B' B 7 Does it attract the general condition? If yes, please No specify 8 Does it attract the Specific condition? If yes, please No. specify. 9 Location Plot/Survey/Khasra No. Survey No. 3(P) Village Bankurvalasa Tehsil Bobbili District Vizianagaram State Andhra Pradesh. 10 Nearest railway station/airport along with distance in Railway Station: Donkinavalasa - 5.1 kms. km - SE 11 Nearest Town, City, District Headquarters along with Town: Salur - 11.2 km- NE distance in kms. District headquarters: Vizianagarm – 43 km - SE 12 Village Panchayats, ZillaParishad,Municipal Village Panchayat: Bankurvalasa Corporation, Local body (complete postal address with Zilla Parishad: Vizianagaram telephone nos. to be given) 13 Name of the Applicant Sri Asok Konda 14 Registered Address Sri Asok Konda M/s. S. K. Sarawagi & Co. Pvt. Ltd. Sarawagi House, Kaspa Street, Cheepurupalli – 532128 Vizianagaram District, Andhra Pradesh. Mobile No. +91 93471 38089 F-1 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 15 Address for Correspondence: Name Sri Asok Konda Designation(Owner/Partner/CEO) Owner Address Sri Asok Konda M/s. S. K. Sarawagi & Co. Pvt. Ltd. Sarawagi House, Kaspa Street, Cheepurupalli – 532128 Vizianagaram District, Andhra Pradesh. Mobile No. +91 93471 38089 Pin Code 532128 E-mail Telephone Number Mobile No. +91 93471 38089 Fax No. 16 Details of alternative Sites examined, if any. Location Village-District-State – of these sites should be shown on a topo sheet. -NA – Site specific project i.e. mining. 17 Interlinked Projects -NA- 18 Whether separate application of interlinked project No has been submitted? 19 If yes, date of submission -- 20 If no, reason -- 21 Whether the proposal involves approval/clearance No under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Order/Policy Yes – First renewal of the quarry relevant/relating to the site? lease deed was executed by the Assistant Director of Mines & Geology, vide Proceedings No. 2416/M1/99 dated 06.09.2000 for a period of 20 years from 23.01.2001 to 22.01.2021. 23 Forest land involved (hectares) No 24 Whether there is any location pending against the No project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No (c) Orders/directions of the Court, if any and its relevance with the proposed project. F-2 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary NO The Q.L area is almost flat and is change in land use, land cover surrounded by Agriculture lands. Present or topography including method of mining is Other than fully increase in intensity of land mechanized opencast and the active area use (with respect to local is 6.6457ha. land use plan) 1.2 Clearance of existing land, NO It is plain land vegetation and buildings? 1.3 Creation of new land uses? NO 1.4 Pre-construction investigations YES Survey completed, based on the soil e.g. bore houses, soil testing? quality temporary office cum rest shelter, first aid room and toilets will be constructed. 1.5 Construction works? YES Construction activity involves infrastructure only. Office cum rest shelter, first aid room and toilets will be constructed. 1.6 Demolition works? NO 1.7 Temporary sites used for NO Local villagers shall be employed. construction works or housing of construction workers? 1.8 Above ground buildings, YES Above ground building for the mine office structures or earthworks only. No major excavation activity including linear structures, cut involved. and fill or excavations 1.9 Underground works including NO The present method of mining is Other mining or tunneling? than fully mechanized opencast method for Manganese mine. 1.10 Reclamation works? YES The present mining depth is 36m. In the proposed period of Scheme of Mining , mining will be carried out up to a depth of 44 m. thus there is no scope for back filling as mineable ore is still existing in depth. 1.11 Dredging? NO 1.12 Offshore structures? NO 1.13 Production and manufacturing YES Mining by using Other than fully processes? mechanized opencast method. Annexure I F-3 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 1.14 Facilities for storage of goods NO or materials? 1.15 Facilities for treatment or YES During the plan period about 3.313 ha of disposal of solid waste or the lease area will be utilized for dumping liquid effluents? of waste material. (Annexure IV) Liquid waste i.e. effluent from the domestic source shall be sent to septic tank followed by soak pit. 1.16 Facilities for long term housing NO Local Villagers will be employed. of operational workers? 1.17 New road, rail or sea traffic NO No major construction involves, local during construction or villagers will be employed for construction operation? and operational purpose. The number of trips required for transportation of mineral is eight per day. 1.18 New road, rail, air waterborne NO or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing NO Very limited trucks are required. The transport routes or number of trips required for infrastructure leading to transportation of mineral is eight per day. changes in traffic movements? 1.20 New or diverted transmission NO There is no transmission line or pipeline lines or pipelines? passing through the lease area. 1.21 Impoundment, damming, NO The quarrying operation will be other culverting, realignment or than fully mechanized opencast method. other changes to the No change in hydrology due to proposed hydrology of watercourses or activity. aquifers? 1.22 Stream crossings? NO There is no stream crossing the lease area. 1.23 Abstraction or transfers of NO Water shall be drawn from local villages water form ground or surface for the purpose of domestic and water waters? sprinkling purpose. 1.24 Changes in water bodies or the NO There is no discharge from the quarrying land surface affecting drainage operations. or run-off? 1.25 Transport of personnel or NO Local villagers shall be employed. materials for construction, Manganese is sent away from the site, the operation or numbers of trips will be eight per day. decommissioning? 1.26 Long-term dismantling or NO Temporary structures will be constructed. F-4 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 decommissioning or restoration works? 1.27 Ongoing activity during NO There is no structure in the lease area, decommissioning which could mine office cum rest shelter will be have an impact on the constructed with temporary structures to environment? demolish after completion of workings. 1.28 Influx of people to an area in NO either temporarily or permanently? 1.29 Introduction of alien species? NO It is a plain flat terrain area. 1.30 Loss of native species or NO genetic diversity? 1.31 Any other actions? NO 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/No Details thereof (with approximate quantities /rates, wherever possible) Confirmation with source of information data 2.1 Land especially undeveloped YES The quarry lease area is 15.72 ha. The or agricultural land (ha) Q.L area is almost flat and is surrounded by Agriculture lands. 2.2 Water (expected source & YES 25.9 KLD, through tankers from competing users) unit: KLD nearby village. Annexure-III. 2.3 Minerals (MT) YES The present proposal is for Manganese mining and it is a mineral. 2.4 Construction material– stone, NA Quarry office and temporary rest aggregates, sand/soil(expected shelters will be constructed, no major source- construction involves. MT) 2.5 Forests and timber (source – MT) NO 2.6 Energy including electricity and YES Other than fully mechanized opencast fuels (source, competing users) mining; power shall be drawn from Unit: fuel (MT), energy (MW) nearby villages. 2.7 Any other natural resources (use NO appropriate standard units) F-5 S. K. Sarawagi & Co. Pvt. Ltd. Form-1 3.Use, storage, transport handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist. Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, NO There are no hazardous substances or which are hazardous (as per materials to human health or the MSIHC rules) to human health or environment.