Geotechnical Instrumentation for Landslide Monitoring

Total Page:16

File Type:pdf, Size:1020Kb

Geotechnical Instrumentation for Landslide Monitoring GEOTECHNICAL INSTRUMENTATION FOR LANDSLIDE MONITORING M. Melih Demirkan, Ph.D., P.E. RELIABLE INSTRUMENTATION & DATA MONITORING SOLUTIONS GEOTECHNICAL | GEODETIC | STRUCTURAL | ENVIRONMENTAL TYPICAL INSTRUMENTATION SCHEME – LANDSLIDE • Magnitude • Direction • Rate • Depth WHY? . WHY MONITORING? • OBSERVE ANY CHANGE • KNOW THE STATE OF THE SYSTEM • SAFETY AND PERFORMANCE . WHY VIBRATING WIRE? • DURABLE (MATERIAL, ASSEMBLY, CABLE, SEAL) • LONG TERM STABILITY –NO DRIFT • FREQUENCY OUTPUT - TRANSMIT OVER LONG DISTANCE • REAL TIME MONITORING GROUNDWATER LEVELS Vibrating wire piezometers, standpipe piezometers and automatic water level monitoring systems were installed around deep excavations-stations and shafts, adjacent to TBM bored tunnels to monitor change in groundwater pressure and level due to construction activities VW piezometer model EPP-30V (top left), EPP-40V (right) < Readout unit model EDI-51V < Automatic Water Level Monitoring System DISPLACEMENT, DEFORMATION . VIBRATING WIRE DISPLACEMENT TRANSDUCERS . LINEAR CRACK & JOINT METERS- ELECTRONIC & MECHANICAL . 3D CRACK METERS - ELECTRONIC & MECHANICAL DISPLACEMENT SENSOR CRACK METER IN-PLACE INCLINOMETERS Dasenbrock et. al. 2011 MPBX EXTENSOMETER Multi (three) Point Borehole extensometers were installed above bored tunnel alignments to monitor subsurface ground settlement at anchor depths using digital depth micro meter. Reference plate at the head of the MPBX were also surveyed using precise levelling methods MPBX model EDS-63-U/D and Digital Depth Micro meter DIGITAL INCLINOMETER THE IN-HOUSE DEVELOPED SOFTWARE THRU MOBILE PHONE DATALOGGER COMPACT SDI-INTERFACE DATALOGGER WITH INTEGRAL GSM/GPRS MODEM AUTOMATED MONITORING SYSTEM • AUTOMATED ROBOTIC TOTAL STATIONS USING TERRAMOVE SOFTWARE, TERRAMOVE CONTROL BOX. • HIGH MEASUREMENTS DENSITY, SIMULTANEOUS WIRELESS TRANSMISSION • CONTROLLED REMOTELY FROM ANYWHERE. DATABASE MANAGEMENT SYSTEMS Easy access to meaningful instrumentation data Enhanced graphical and numerical presentation Instant alerts via SMS or email to authorized personnel Fast access to different sensor data on one screen Create diagrams from any combination of parameters Multiple authorized users at different locations Simultaneous interactions of users Low operational cost User friendly on tablets and smartphones WEB BASED DATA MANAGEMENT HTTP://122.15.209.75:50015/DEMOWDMS/WEBDATALOGIN HTTPS://TERRAWEB.IQSOFT.XYZ/ MOVEMENT FROM INCLINOMETER DATA Deformation (mm) 10.0 36.0 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 38.0 40.0 42.0 44.0 46.0 48.0 50.0 52.0 54.0 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 ) -2.5 -3.5 DMD -4.5 -5.5 -6.5 -7.5 -8.5 (m Elevation -9.5 -10.5 -11.5 -12.5 -13.5 -14.5 -15.5 -16.5 -17.5 -18.5 -19.5 -20.5 -21.5 -22.5 VERTICAL INCLINOMETER-02 COMBINED GRAPH-INCLINOMETER & PIEZOMETER thank you [email protected] RITE GEOSYSTEMS INC. 1653 McFarland Rd., Pittsburgh PA 15216 +1 (412) 745 8300 www.ritegeosystems.com .
Recommended publications
  • Use of Inclinometer for Landslide Identification with Relevance to Mahawewa Landslide
    Use of Inclinometer for Landslide Identification with Relevance to Mahawewa Landslide M.P.N.C. Amarathunga National Building Research Organization, Jawaththa Road, Colombo 05 R.M.S. Bandara National Building Research Organization, Jawaththa Road, Colombo 05 ABSTRACT: Instrumentation can be used to characterize the location of shallow and deep failure planes as well as measure the direction of landslide movement. Subsurface movements or ground deformations can be characterized in a variety of ways using different sensor technologies and data acquisition methods. Inclinometer can acquire subsurface movements automatically at frequent time intervals and provide a useful tool for geologists and engineers to enhance subsurface characterization, improve geotechnical design, and monitor construction activities in real time. The Mahawewa landslide is a massive slope failure that is partial reactivation of ancient landslide in Walapane of Nuwaraeliya District. In January 2007 and February 2011 the landslide was reactivated. From July 2010 to present, we have conducted monitoring of installed instrument and general geological inspection. Ongoing monitoring has revealed that the landslide movement continues after the 2007 reactivation and still continues movement can observed. We have identified two slip surfaces at the head of the landslide according to the analyzed inclinometer data. The landslide head shows a slump and the toe part is a debris flow. Therefore this can be categorized as a complex landslide. Both the acceleration stage and the failure stage of this landslide show correlation to rainfall. Hence to control this landslide have to control both surface and subsurface water. 1 INTRODUCTON with JICA and automatic rain gauges, Strain The Mahawewa landslide is a massive slope failure gauges, extensometers, inclinometer and that is partial reactivation of ancient landslide in piezometer were installed in Mahawewa area for Walapane of Nuwaraeliya District.
    [Show full text]
  • Existing Critical Tunnel Online Monitoring
    INSTRUMENTATION & MONITORING OF CRITICAL TUNNELLING INFRASTRUCTURE IN URBAN ENVIRONS Mr. Amod Gujral1 and Mr. Prateek Mehrotra2 1 Managing Director, Encardio-rite Group of Companies, A-7 Industrial Estate, Talkatora Road, Lucknow, UP-226011, India, [email protected] 2 Vice President Technical, Encardio-rite Group of Companies, A-7 Industrial Estate, Talkatora Road, Lucknow, UP-226011, India, [email protected] ABSTRACT As megacities struggle to provide infrastructure, residential and commercial spaces to its increasing number of residents in a limited land mass, existing structures- both surface and underground are bound to get affected by new constructions. In such a scenario, implementing an effective instrumentation and monitoring (I&M) programme for the structures within the zone of influence of construction, becomes extremely essential. Benefits of a well-executed I&M program are manifold- from providing design verification to ensuring safety during and after the construction. In the paper, the author presents a case study of I&M program executed by his organization in a megacity in the Middle East. An existing metro and a busy road tunnel under water were located within the zone of influence of the project’s construction activities. Ensuring their safety during the construction was on the top propriety of all project stakeholders as well as the asset owners. The paper starts off with a brief overview of the project with salient features of the construction methodologies deployed, followed by the instrumentation & monitoring scheme finalized by the project designers. Details of key parameters to be monitored and which instruments were selected for the purpose, has been described.
    [Show full text]
  • Instrumentation for Monitoring Consolidation of Soft Soil 1
    ONE STOP MONITORING SOLUTIONS | HYDROLOGY | GEOTECHNICAL | STRUCTURAL | GEODETIC Over 50 years of excellence through ingenuity APPLICATION NOTE INSTRUMENTATION FOR MONITORING CONSOLIDATION OF SOFT SOIL 1. Introduction Considerable settlement may occur when constructing projects such as highway embankments, bridge approaches, dikes, dams, large storage areas, tanks, airport runways or buildings on soft compressible soil, due to the consolidation of soil under the superimposed load. To avoid serious and potentially expensive problems due to such settlement, it is desirable to cause the consolidation to occur at the outset of the project, and in the shortest possible time during construction period. Construction of a facility on top of a soft soil foundation will normally be delayed until there is assurance that it will not be damaged by settlement that occurs during subsequent consolidation. If the predicted delay is not acceptable, the time required for consolidation can be reduced by surcharging and/or by installation of vertical drains. 1.1 Consolidation In case a saturated soil experiences a steady pressure due to the weight of overlying soil or pre-loading from an embankment, its volume will decrease with time. Soil particles as well as the water in the voids being almost incompressible at the pressures encountered, any change in volume can only occur if the water between the voids is forced out. This reduces the size of the voids enabling the solid particles to become wedged closer together. The process is illustrated in figures 1.1 and 1.2 below: Im posed Stress h W a t e r Figure 1.1 Im posed Stress h W a t e r Figure 1.2 Surcharging (or pre-loading) involves placement of fill materials to a level higher than that required for the foundation or embankment, so that consolidation proceeds more quickly.
    [Show full text]
  • Piezometer Installation 2017
    Revision 2016-1-1 Copyright ©, 2016 by HMA Group. The information contained in this document is subject to change without prior notice. Contents 1. Introduction:................................................................................................................................................................ 3 2. Specifications: ............................................................................................................................................................. 4 3. Vibrating Wire Piezometer Operation .............................................................................................................. 5 4. Calibration and Interpreting Readings ............................................................................................................. 6 4.1 Electrical Connection ............................................................................................................................................. 6 4.2 Calibration Sheet Interpretation ...................................................................................................................... 7 4.3 Data Reduction ......................................................................................................................................................... 8 4.4 Pressure Head/Water Level Calculation ....................................................................................................... 9 4.5 Barometric Compensation .................................................................................................................................
    [Show full text]
  • Method 9100: Saturated Hydraulic Conductivity, Saturated Leachate
    METHOD 9100 SATURATED HYDRAULIC CONDUCTIVITY, SATURATED LEACHATE CONDUCTIVITY, AND INTRINSIC PERMEABILITY 1.0 INTRODUCTION 1.1 Scope and Application: This section presents methods available to hydrogeologists and and geotechnical engineers for determining the saturated hydraulic conductivity of earth materials and conductivity of soil liners to leachate, as outlined by the Part 264 permitting rules for hazardous-waste disposal facilities. In addition, a general technique to determine intrinsic permeability is provided. A cross reference between the applicable part of the RCRA Guidance Documents and associated Part 264 Standards and these test methods is provided by Table A. 1.1.1 Part 264 Subpart F establishes standards for ground water quality monitoring and environmental performance. To demonstrate compliance with these standards, a permit applicant must have knowledge of certain aspects of the hydrogeology at the disposal facility, such as hydraulic conductivity, in order to determine the compliance point and monitoring well locations and in order to develop remedial action plans when necessary. 1.1.2 In this report, the laboratory and field methods that are considered the most appropriate to meeting the requirements of Part 264 are given in sufficient detail to provide an experienced hydrogeologist or geotechnical engineer with the methodology required to conduct the tests. Additional laboratory and field methods that may be applicable under certain conditions are included by providing references to standard texts and scientific journals. 1.1.3 Included in this report are descriptions of field methods considered appropriate for estimating saturated hydraulic conductivity by single well or borehole tests. The determination of hydraulic conductivity by pumping or injection tests is not included because the latter are considered appropriate for well field design purposes but may not be appropriate for economically evaluating hydraulic conductivity for the purposes set forth in Part 264 Subpart F.
    [Show full text]
  • Inclinometer Monitoring System for Stability Analysis: the Western Slope of the Bełchatów Field Case Study
    Studia Geotechnica et Mechanica, Vol. 38, No. 2, 2016 DOI: 10.1515/sgem-2016-0014 INCLINOMETER MONITORING SYSTEM FOR STABILITY ANALYSIS: THE WESTERN SLOPE OF THE BEŁCHATÓW FIELD CASE STUDY MAREK CAŁA, JOANNA JAKÓBCZYK, KATARZYNA CYRAN AGH University of Science and Technology, Al. Mickiewicza 30, 30-059 Kraków, Poland, Phone: +48 12 617 46 95, e-mail: [email protected], [email protected]) Abstract: The geological structure of the Bełchatów area is very complicated as a result of tectonic and sedimentation processes. The long-term exploitation of the Bełchatów field influenced the development of horizontal displacements. The variety of factors that have impact on the Bełchatów western slope stability conditions, forced the necessity of complex geotechnical monitoring. The geotechnical monitoring of the western slope was carried out with the use of slope inclinometers. From 2005 to 2013 fourteen slope inclinometers were installed, however, currently seven of them are in operation. The present analysis depicts inclinometers situated in the north part of the western slope, for which the largest deformations were registered. The results revealed that the horizontal dis- placements and formation of slip surfaces are related to complicated geological structure and intensive tectonic deformations in the area. Therefore, the influence of exploitation marked by changes in slope geometry was also noticeable. Key words: slope inclinometer, geotechnical monitoring, horizontal displacement analysis, the exploitation influence, Bełchatów open pit mine 1. INTRODUCTION The aim of the borehole monitoring in the western slope of Bełchatów field was to measure the dis- placement values and their increments as with the The necessity of geotechnical monitoring in the function of the hole depth.
    [Show full text]
  • Retaining Walls and Earth Retention
    20 SE Licensure and 26 GeoLegend: 38 Nature Sides with 44 Soil Nailing in Partial Practice Laws Harry Poulos the Hidden Flaw the 2010s MARCH // APRIL 2016 Retaining Walls AND Earth Retention Proudly published by the Geo-Institute of ASCE SierraScape Vegetated Wall Whatever you’re facing, Tensar Geogrid primary reinforcement we’ll help you face it. Tensar Retaining Wall Systems conquer any type of site Reinforced fill Mesa Wall challenge by combining structural integrity with functionality Retained and aesthetics. We oer a variety of facing options including Granular fill fill stone, vegetated, and architectural because there is no such Finished grade thing as one-size-fits-all. For more information on our complete line of retaining walls and steepened slope solutions, visit Foundation tensarcorp.com or call 800-TENSAR-1. March // April 2016 Features 38 Nature Sides with the Hidden Flaw 66 Highway Retaining Walls Are Assets Lessons learned from failures of earth-support systems. A risk-based approach for managing them. By James W. Niehoff By Mo Gabr, Cedrick Butler, William Rasdorf, Daniel J. Findley, and Steven A. Bert 44 Soil Nailing in the 2010s Its evolution and coming of age. By Carlos A. Lazarte, Helen D. Robinson, ON THE COVER and Allen W. Cadden Clockwise from top left corner: Stabilization of loess bluff using soil nail, anchored, and MSE 52 Emergency Retaining Wall walls along Mississippi River in Natchez, MS Replacement (courtesy of Hayward Baker, Inc.); Permanent The East 26th Street slide repair in Baltimore, MD. soil nail wall in the mid-western U.S. (courtesy of By Joseph K.
    [Show full text]
  • 2 Basic Concepts and Definitions
    2 Basic concepts and definitions This chapter summarises some basic concepts and definitions of terms rele- vant to the hydraulic properties of water-bearing layers and the discussions which follow. 2.1 Types of water-bearing layers Water-bearing layers are classified according to their water-transmitting properties into aquifers, aquitards or aquicludes. With regard to the flow to pumped wells the following definitions are commonly used. -An aquifer is a water-bearing layer in which the vertical flow component is so small with respect to the horizontal flow component that it can be neg- lected. The groundwater flow in an aquifer is assumed to be predominantly horizontal. -An aquitard is a water-bearing layer in which the horizontal flow compo- nent is so small with respect to the vertical flow component that it can be neglected. The groundwater flow in an aquitard is assumed to be predomi- nantly vertical. - An aquiclude is a water-bearing layer in which both the horizontal and ver- tical flow components are so small that they can be neglected. The ground- water flow in an aquiclude is assumed to be zero. Common aquifers are geological formations of unconsolidated sand and gravel, sandstone, limestone, and severely fractured volcanic and crystalline rocks. Examples of common aquitards are clays, shales, loam, and silt. 2.2 Aquifer types The four types of aquifer distinguished (Figure 2.1) are: confined, unconfined, leaky and multi-layered. A confined aquifer is a completely saturated aquifer bounded above and below by aquicludes. The pressure of the water in confined aquifers is usually higher than atmospheric pressure, which is why when a well is bored into the aquifer the water rises up the well tube, to a level higher than the aquifer (Figure 2.1.A).
    [Show full text]
  • Horizontal Digitilt Inclinometer Probe Manual
    Horizontal Digitilt Inclinometer Probe 50302999 Copyright ©2004 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any errors or omissions in data, or the interpretation of data, are not the responsibility of Slope Indicator Company. The information herein is subject to change without notification. This document contains information that is proprietary to Slope Indicator company and is subject to return upon request. It is transmitted for the sole purpose of aiding the transaction of business between Slope Indi- cator Company and the recipient. All information, data, designs, and drawings contained herein are propri- etary to and the property of Slope Indicator Company, and may not be reproduced or copied in any form, by photocopy or any other means, including disclosure to outside parties, directly or indirectly, without permis- sion in writing from Slope Indicator Company. SLOPE INDICATOR 12123 Harbour Reach Drive Mukilteo, Washington, USA, 98275 Tel: 425-493-6200 Fax: 425-493-6250 E-mail: [email protected] Website: www.slopeindicator.com Contents Introduction . 1 Components . 2 Installation of Casing . 4 Taking Readings. 6 Data Reduction . 9 Maintenance. 12 Good Practices . 14 Horizontal Digitilt Inclinometer Probe, 2005/2/23 Introduction About Horizontal 85mm (3.34") Inclinometer casing is installed in a horizontal Inclinometers trench or borehole with one set of grooves aligned to vertical. When the far-end of the casing is not accessible, a dead-end pul- ley and cable-return pipe are installed along with the casing. The probe, control cable, pull-cable, and readout unit are used to survey the casing.
    [Show full text]
  • Installing Monitoring Wells in Soils Version 1.0 August 2008
    Installing Monitoring Wells in Soils Version 1.0 August 2008 USDA – Natural Resources Conservation Service National Soil Survey Center Lincoln, Nebraska Correct document citation: Sprecher, S.W. 2008. Installing monitoring wells in soils (Version 1.0). National Soil Survey Center, Natural Resources Conservation Service, USDA, Lincoln, NE. Cover Figure: Schematic diagram of a standard design for an installed water-table monitoring well. Use of trade or firm names is for reader information only, and does not constitute endorsement or recommended use by the U.S. Department of Agriculture of any commercial product or service. The United State Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs, and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at 202-720-2600 (Voice and TDD). To file a complaint, write the Secretary of Agriculture, U.S. Department of Agriculture, Washington, D.C. 20250 or call 1-800-245-6340 (voice) or (202) 720-1127 (TDD). USDA is an equal employment opportunity employer. Acknowledgements This technical note is a compilation of concepts and procedures that have been evolving within pedology and Soil Survey for at least three decades. Few of the ideas presented originated with myself. It is an honor to recognize and thank my main teachers concerning these procedures, Lawson Smith (US Army Engineer Waterways Experiment Station, Vicksburg, Mississippi, deceased) and Jim Richardson (North Dakota State University and NRCS National Soil Survey Center in Lincoln, Nebraska, retired).
    [Show full text]
  • Hvorslev (1951)
    TIME LAG AND SOIL PERMEABILITY IN GROUND-WATER OBSERVATIONS BULLETIN NO. 36 WATERWAYS EXPERIMENT STATION CORPS OF ENGINEERS, U. S. ARMY VICKSBURG, MISSISSIPPI TIME LAG AND SOIL PERMEABILITY IN GROUND-WATER OBSERVATIONS BULLETIN NO. 36 WATERWAYS EXPERIMENT STATION CORPS OF ENGINEERS, U. S. ARMY VICKSBURG, MISSISSIPPI APRIL 1951 ARMY - MRC VICKSBURG, MISS. 111 CONTENTS Page PREFACE . i ACKNOWLEDGEMENTS. ii NOTATION. v INTRODUCTION . 1 PART I: GROUND-WATER CONDITIONS AND OBSERVATIONS Irregularities and Variations. 3 Sources of Error in Measurements. 3 Hydrostatic time lag. 4 Stress adjustment time lag. 4 General instrument errors. 4 Seepage along conduits . 4 Interface of liquids. .. 6 Gas bubbles in open systems . 6 Gas bubbles in closed systems . 6 Gas bubbles in soil. 7 Sedimentation and clogging. 7 Erosion and development. 7 Summary comments . 8 PART II: THEORY OF TIME LAG The Basic Hydrostatic Time Lag . 9 Applications for Constant Ground-Water Pressure. 10 Applications for Linearly Changing Pressures . 13 Applications for Sinusoidal Fluctuating Pressures. 16 Corrections for Influence of the Hydrostatic Time Lag. 19 Influence of the Stress Adjustment Time Lag . 21 Initial disturbance and stress changes . 22 Transient consolidation or swelling of soil . 23 Volume changes of gas in soil . 26 Normal operating conditions. 28 iv CONTENTS (Cont’d) Page PART III: DATA FOR PRACTICAL DETERMINATION AND USE OF TIME LAG Flow through Intakes and Well Points . 30 Influence of Anisotropic Permeability . 32 Computation of Time Lag for Design Purposes . 35 Examples of Field Observations and Their Evaluation . 38 Logan International Airport, Boston. 38 Vicinity of Vicksburg, Mississippi. 39 Determination of Permeability of Soil in Situ .
    [Show full text]
  • Geotechnical Bulletin
    Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering GB 4 Geotechnical Bulletin GUIDELINES FOR THE USE OF GEOTECHNICAL INSTRUMENTATION May 30, 2008 Geotechnical Bulletin GB4 was developed by the Office of Geotechnical Engineering. This document is the first edition. This Geotechnical Bulletin is intended to provide information about the uses of the various different geotechnical instruments that are available so that designers will prescribe them whenever beneficial and so that construction personnel will utilize them properly. More specifically, this geotechnical bulletin is intended to offer guidance in terms of when exactly these instruments should be called for, which instruments should be prescribed, where to install them, how to read them and how to interpret and utilize the data. Geotechnical instruments can measure conditions in the subsurface and acquire data which can greatly aid not only the designer, but also the project engineer and the contractor. The designer benefits from this data which can help them pinpoint the problems in the subsurface and thereby design an appropriate and cost effective project. In terms of the construction of the project, although these instruments can get in the way of the heavy equipment, they provide data that is invaluable in terms of preventing a possible failure during or following construction as well as allowing the construction to proceed at the earliest possible date whenever waiting periods are necessary. Another important reason to use instrumentation is to monitor for any unsafe conditions and therefore to try to prevent an accident or injury. For example, monitoring a mine subsidence site may tell us at what point a highway facility is no longer safe and needs to be shut down.
    [Show full text]