Federal Register / Vol. 73, No. 242 / Tuesday, December 16, 2008 / Notices 76437

be available to the public at cost of Decision Date: May 28, 2008. Acquire snow plow blade. reproduction. Copies will also be kept FOR FURTHER INFORMATION CONTACT: Brief Description of Withdrawn on file for public inspection at the Thomas Schauer, Bismarck Projects: following locations: Tennessee Valley District Office, (701) 323–7383. Vehicle purchase. radios. Authority, 400 W. Summit Hill Drive, Public Agency: City of Valdosta, Security upgrades. WT3D–K, Knoxville, TN 37902, and on Georgia. Replace aircraft rescue and the Web at http://www.tva.com/purpa. Application Number: 08–09–C–00– firefighting equipment. Dated: December 8, 2008. VLD. Expand aircraft rescue and firefighting Maureen H. Dunn, Application Type: Impose and use a building. Acquire snow removal equipment. Executive Vice President and General PFC. Counsel. PFC Level: $3.00. Overlay taxiway A. Date of Withdrawal: October 23, 2008. [FR Doc. E8–29713 Filed 12–15–08; 8:45 am] Total PFC Revenue Approved in This Decision: $30,300. Decision Date: October 29, 2008. BILLING CODE 8120–01–P Earliest Charge Effective Date: August FOR FURTHER INFORMATION CONTACT: 1, 2009. Chris Schaffer, Denver Airports District Estimated Charge Expiration Date: DEPARTMENT OF TRANSPORTATION Office, (303) 342–1258. December 1, 2009. Public Agency: County of Humboldt, Federal Aviation Administration Class of Air Carriers Not Required To Eureka, California. Collect PFCs: None. Application Number: 08–09–C–00– Notice of Passenger Facility Charge Brief Description of Projects Approved ACV. (PFC) Approvals and Disapprovals for Collection and Use: Application Type: Impose and use a Rehabilitate airfield lighting/signs PFC. AGENCY: Federal Aviation phase I (design). PFC Level: $4.50. Administration (FAA), DOT. Rehabilitate airfield lighting/signs Total PFC Revenue Approved in This ACTION: Monthly Notice of PFC phase II (construction). Decision: $926,450. Approvals and Disapprovals. In Airfield drainage rehabilitation. Earliest Charge Effective Date: March November 2008, there were six PFC application development. 1, 2009. applications approved. This notice also Brief Description of Withdrawn Estimated Charge Expiration Date: includes information on four Projects: May 1, 2011. applications, one approved in May 2008 Expand commercial ramp. Class of Air Carriers Not Required To and the other three approved in October Design new air traffic control tower. Collect PFCs: Non-scheduled, on 2008, inadvertently left off the May Build new air traffic control tower. demand air carriers filing FAA Form 2008 and October 2008 notices, Demolition and removal of old 1800–31. respectively. Additionally, 10 approved pavements. Determination: Approved. Based on amendments to previously approved Date of Withdrawal: October 27, 2008. information contained in the public applications are listed. Decision Date: October 29, 2008. agency’s application, the FAA has FOR FURTHER INFORMATION CONTACT: determined that the approved class SUMMARY: The FAA publishes a monthly Anna Guss, Atlanta Airports District accounts for less than 1 percent of the notice, as appropriate, of PFC approvals Office, (404) 305–7146. total annual enplanements at Arcata and disapprovals under the provisions Public Agency: City of Cody, Airport (ACV). of the Aviation Safety and Capacity Wyoming. Brief Description of Projects Approved Expansion Act of 1990 (Title IX of the Application Number: 08–06–C–00– for Collection at ACV and Use at ACV: Omnibus Budget Reconciliation Act of COD. Terminal improvements. 1990) (Pub. L. 101–508) and Part 158 of Application Type: Impose and use a Install/upgrade airfield guidance the Federal Aviation Regulations (14 PFC. signs. CFR Part 158). This notice is published PFC Level: $4.50. safety area enhancements, pursuant to paragraph d of § 158.29. Total PFC Revenue Approved in This design. PFC Applications Approved Decision: $79,500. Rehabilitate runway lighting, design. Public Agency: Grand Forks Regional Earliest Charge Effective Date: Construct aircraft rescue and Airport Authority, Grand Forks, North February 1, 2011. firefighting building, design. Dakota. Estimated Charge Expiration Date: PFC administration costs. Application Number: 08–07–C–00– January 1, 2013. Brief Description of Project Approved GFK. Class of Air Carriers Not Required To for Collection at ACV and Use at Application Type: Impose and use a Collect PFCs: On-demand, non- Garberville Airport (016): Rehabilitate/ PFC. scheduled air taxi/commercial expand apron, design. PFC Level: $4.50. operators. Brief Description of Project Approved Total PFC Revenue Approved in This Determination: Approved. Based on for Collection at ACV and Use at Decision: $362,368. information contained in the public Rohnerville Airport (FOT): Rehabilitate Earliest Charge Effective Date: January agency’s application, the FAA has apron, design. 1, 2009. determined that the approved class Brief Description of Project Approved Estimated Charge Expiration Date: accounts for less than 1 percent of the for Collection at ACV (For and Future February 1, 2010. total annual enplanements at Use at 016): Install automated weather Class of Air Carriers Not Required To Yellowstone Regional Airport. observing system. Collect PFCs: None. Brief Description of Projects Approved Brief Description of Projects Approved Brief Description of Projects Approved for Collection and Use: for Collection at ACV (For Future Use at for Collection and Use: Purchase land Taxiway B rehabilitation. Murray Field): Install automated for runway protection zone. Security plan. weather observing system. Install Construct east/west runway. Gate relocation. perimeter fencing.

VerDate Aug<31>2005 17:09 Dec 15, 2008 Jkt 217001 PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 E:\FR\FM\16DEN1.SGM 16DEN1 sroberts on PROD1PC70 with NOTICES 76438 Federal Register / Vol. 73, No. 242 / Tuesday, December 16, 2008 / Notices

Brief Description of Project Approved total annual enplanements at McClellan- acquisition for airport expansion for Collection at ACV (For Future Use at Palomar Airport. projects. Carrolton Schools replacement FOT): Install automated weather Brief Description of Projects Approved facility. observing system. for Collection and Use: Program management (includes Brief Description of Project Approved Construct taxiway C. program management/airport for Collection at ACV (For Future Use at Construct terminal apron. development program consultant fees). Kneeland Airport): Erosion control/ Enhance runway safety area and Site development and roadway stabilization, design. infield drainage. infrastructure. Decision Date: October 30, 2008. Construct blast fence. New runway. FOR FURTHER INFORMATION CONTACT: Ron Construct access road. New Runway: Taxiways. Biaoco, San Francisco Airports District Enhance airport security system. New Runway: Perimeter Road. Office, (650) 876–2778, extension 626. Construct passenger movement New Runway: Security Fences. Public Agency: Parish of East Baton facility (elevators and bridge). New west aircraft rescue and Rouge, City of Baton Rouge, Louisiana. Design and construct terminal firefighting building. Application Number: 09–07–C–00– building. Taxiway Delta improvements. Decision Date: November 24, 2008. BTR. Acquire aircraft rescue and Application Type: Impose and use a firefighting vehicle. FOR FURTHER INFORMATION CONTACT: PFC. PFC administrative costs. Mark Schenkelberg, Central Region PFC Level: $4.50. Decision Date: November 24, 2008. Airports Division, (816) 329–2645. Total PFC Revenue Approved in This FOR FURTHER INFORMATION CONTACT: Public Agency: County of Routt, Decision: $25,627,674. Darlene Williams, Los Angeles Airports Hayden, Colorado. Earliest Charge Effective Date: March District Office, (310) 725–3625. Application Number: 09–08–C–00– 1, 2024. Public Agency: City of Saint Louis HDN. Estimated Charge Expiration Date: Airport Authority, Saint Louis, Application Type: Impose and use a July 1, 2031. Missouri. PFC. Class of Air Carriers Not Required To Application Number: 08–09–C–00– PFC Level: $4.50. Total PFC Revenue Approved in This Collect PFCs: Part 135 on-demand air STL. Decision: $1,691,312. taxi/commercial operators. Application Type: Impose and use a Earliest Charge Effective Date: August Determination: Approved. Based on PFC. 1, 2012. information contained in the public PFC Level: $4.50. Estimated Charge Expiration Date: agency’s application, the FAA has Total PFC Revenue Approved in This determined that the approved class September 1, 2015. Decision: $783,625,492. Class of Air Carriers Not Required To accounts for less than 1 percent of the Charge Effective Date: May 1, 2002. total annual enplanements at Baton Collect PFCs: None. Estimated Charge Expiration Date: Brief Description of Projects Approved Rouge Metropolitan Airport. February 1, 2022. for Collection and Use: Brief Description of Projects Approved Class of Air Carriers Not Required to Acquire aircraft rescue and for Collection and Use: Collect PFCs: Air taxi/commercial firefighting truck. Terminal atrium expansion. operators filing FAA Form 1800–31. Taxiway A rehabilitation. Acquisition of property for Determination: Approved. Based on Master plan update. development. information contained in the public Snow removal equipment building. Taxiway fillet construction. agency’s application, the FAA has Emergency generator. Ticket lobby expansion. determined that the approved class Fingerprint equipment. Decision Date: November 12, 2008. accounts for less than 1 percent of the PFC application and administrative FOR FURTHER INFORMATION CONTACT: Ilia total annual enplanements at Lambert- fees. Quinones, Louisiana/New Mexico St. Louis International Airport. Snow removal equipment. Airports Development Office, (817) 222– Brief Description of Projects Approved Decision Date: November 25, 2008. 5646. for Collection and Use at a $3.00 PFC FOR FURTHER INFORMATION CONTACT: Public Agency: County of San Diego, Level: Chris Schaffer, Denver Airports District El Cajon, California. Terminal improvement program. Office, (303) 342–1258. Application Number: 09–01–C–00– Emergency generators. Public Agency: County of Clinton, CRQ. Runways 12R/30L and 12L130R Plattsburgh, New York. Application Type: Impose and use a centerline panels. Application Number: 09–01–C–00– PFC. Taxiway reconstruction (D and S). PBG. PFC Level: $4.50. Relocation of McDonnell Boulevard, Application Type: Impose and use a Total PFC Revenue Approved in This phases I and II. PFC. Decision: $4,947,065. Part 150 study. PFC Level: $4.50. Earliest Charge Effective Date: January Master plan update—phase II. Total PFC Revenue Approved in This 1, 2009. Perimeter security fence. Decision: $732,355. Estimated Charge Expiration Date: Expansion of 800 Mhz radio system. Earliest Charge Effective Date: January February 1, 2043. Noise monitoring system upgrade. 1, 2009. Class of Air Carriers Not Required to Terminal improvements (Federal Estimated Charge Expiration Date: Collect PFCs: Nonscheduled/on-demand Inspection Services). December 1, 2012. air carriers, filing FAA Form 1800–31. Brief Description of Project Approved Class of Air Carriers Not Required to Determination: Approved. Based on for Collection at a $3.00 PFC Level: Collect PFCs: None. information contained in the public Taxiway reconstruction (F and V). Brief Description of Projects Approved agency’s application, the FAA has Brief Description of Projects Approved for Collection and Use: determined that the approved class for Collection and Use at a $4.50 PFC Relocate runway lighting, remarking, accounts for less than 1 percent of the Level: Balance of real property and airfield signage.

VerDate Aug<31>2005 17:09 Dec 15, 2008 Jkt 217001 PO 00000 Frm 00109 Fmt 4703 Sfmt 4703 E:\FR\FM\16DEN1.SGM 16DEN1 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 73, No. 242 / Tuesday, December 16, 2008 / Notices 76439

Runway 17/35 rehabilitation. Application Number: 09–07–C–00– Rehabilitate pavement markings. Taxiway lighting and marking. GCC. Rehabilitate airfield signs. Passenger terminal building. Application Type: Impose and use a Perimeter fencing. PFC. Remodel terminal security screening Runway 17/35 navigational aids. PFC Level: $4.50. area. Acquire aircraft rescue and Total PFC Revenue Approved in This Rehabilitate south general aviation firefighting vehicle. Decision: $433,172. apron. PFC application. Earliest Charge Effective Date: March Decision Date: November 25, 2008. 1, 2010. PFC administration. FOR FURTHER INFORMATION CONTACT: Estimated Charge Expiration Date: Decision Date: November 25, 2008. Andrew Brooks, New York Airports July 1, 2014. FOR FURTHER INFORMATION CONTACT: District Office, (516) 227–3816. Class of Air Carriers Not Required to Public Agency: County of Campbell/ Collect PFCs: None. Chris Schaffer, Denver Airports District Gillette-Campbell County Airport Board, Brief Description of Projects Approved Office, (303) 342–1258. Gillette, Wyoming. for Collection and Use: Amendment to PFC Approvals:

Original ap- Amended ap- Original esti- Amended esti- Amendment No., city, state Amendment proved net proved net mated charge mated charge approved date PFC revenue PFC revenue exp. date exp. date

00–07–C–03–MDW Chicago, IL ...... 10/29/08 $795,708,154 $807,154,315 04/01/34 04/01/34 02–09–C–02–MDW Chicago, IL ...... 10/29/08 181,326,845 187,374,819 08/01/38 08/01/38 06–11–C–01–MDW Chicago, IL ...... 10/29/08 1,300,000 0 09/01/38 09/01/38 02–06–C–06–MSY New Orleans, LA ...... 10/31/08 255,936,769 276,286,494 09/01/16 12/01/17 96–05–C–05–MDW Chicago, IL ...... 11/03/08 178,087,493 180,380,371 11/01/16 11/01/16 05–07–C–02–FLL Fort Lauderdale, FL ...... 11/05/08 146,549,617 110,428,401 11/01/08 11/01/08 06–11–C–01–MHT Manchester, NH* ...... 11/12/08 17,257,727 24,553,090 12/01/22 12/01/22 07–12–U–01–MHT Manchester, NH ...... 11/12/08 NA NA 12/01/22 12/01/22 06–07–C–02–BUR Burbank, CA ...... 11/14/08 26,793,195 27,193,195 09/01/12 04/01/13 04–07–C–02–CMH Columbus, OH ...... 11/14/08 80,836,858 77,072,441 02/01/10 10/01/09 Notes: The amendment denoted by an asterisk (*) includes a change to the PFC level charged from $3.00 per enplaned passenger to $4.50 per enplaned passenger. For Manchester, NH this change is effective on January 1, 2021.

Issued in Washington, DC on December 5, commercial motor vehicle (CMV) comments, go to http:// 2008. drivers. www.regulations.gov at any time or Joe Hebert, DATES: This decision is effective January Room W12–140 on the ground level of Manager, Financial Analysis and Passenger 14, 2009. Comments must be received the West Building, 1200 New Jersey Facility Charge Branch. on or before January 15, 2009. Avenue, SE., Washington, DC, between [FR Doc. E8–29522 Filed 12–15–08; 8:45 am] 9 a.m. and 5 p.m., Monday through ADDRESSES: You may submit comments BILLING CODE 4910–13–M bearing the Federal Docket Management Friday, except Federal holidays. The System (FDMS) Docket ID FMCSA–04– FDMS is available 24 hours each day, 365 days each year. If you want DEPARTMENT OF TRANSPORTATION 19477, using any of the following methods. acknowledgment that we received your comments, please include a self- Federal Motor Carrier Safety • Federal eRulemaking Portal: Go to addressed, stamped envelope or Administration http://www.regulations.gov. Follow the on-line instructions for submitting postcard or print the acknowledgment [Docket No. FMCSA–04–19477] comments. page that appears after submitting • comments on-line. Qualification of Drivers; Exemption Mail: Docket Management Facility; Applications; Vision U.S. Department of Transportation, 1200 Privacy Act: Anyone may search the New Jersey Avenue, SE., West Building electronic form of all comments AGENCY: Federal Motor Carrier Safety Ground Floor, Room W12–140, received into any of our dockets by the Administration (FMCSA), DOT. Washington, DC 20590–0001. name of the individual submitting the • ACTION: Notice of renewal of Hand Delivery or Courier: West comment (or of the person signing the exemptions; request for comments. Building Ground Floor, Room W12–140, comment, if submitted on behalf of an 1200 New Jersey Avenue, SE., association, business, labor union, etc.). SUMMARY: FMCSA announces its Washington, DC, between 9 a.m. and 5 You may review the DOT’s complete decision to renew the exemptions from p.m., Monday through Friday, except Privacy Act Statement in the Federal the vision requirement in the Federal Federal Holidays. • Register published on April 11, 2000 Motor Carrier Safety Regulations for 13 Fax: 1–202–493–2251. (65 FR 19476). This information is also individuals. FMCSA has statutory Each submission must include the available at http://DocketInfo.dot.gov. authority to exempt individuals from Agency name and the docket number for the vision requirement if the this Notice. Note that DOT posts all FOR FURTHER INFORMATION CONTACT: Dr. exemptions granted will not comments received without change to Mary D. Gunnels, Director, Medical compromise safety. The Agency has http://www.regulations.gov, including Programs, (202)-366–4001, concluded that granting these any personal information included in a [email protected], FMCSA, exemption renewals will provide a level comment. Please see the Privacy Act Department of Transportation, 1200 of safety that is equivalent to, or greater heading below. New Jersey Avenue, SE., Room W64– than, the level of safety maintained Docket: For access to the docket to 224, Washington, DC 20590–0001. without the exemptions for these read background documents or Office hours are from 8:30 a.m. to 5 p.m.

VerDate Aug<31>2005 17:09 Dec 15, 2008 Jkt 217001 PO 00000 Frm 00110 Fmt 4703 Sfmt 4703 E:\FR\FM\16DEN1.SGM 16DEN1 sroberts on PROD1PC70 with NOTICES