STATE: PUNJAB SUMMARY ANNUAL ACTION PLAN 2013-14 DISTRICT : BORDER AREA DEVELOPMENT PROGRAMME- 13TH FC (Rs. in lacs)

Power Sector Road Sector Health Sector Water Supply Total Name of Block Sr.No. Work Amount Work Amount Work Amount Work Amount Work Amount 2 3 4 7 8 5 6 7 8 9 10

1 Dera Baba Nanak 20 31.56 10 279.62 2 9.05 1 30.09 33 350.32

2 Dinnanagar 0 0.00 17 250.30 2 44.70 0 0.00 19 295.00

3 6 6.50 5 169.74 0 0.00 0 0.00 11 176.24

4 Gurdaspur 0 0.00 10 332.64 0 0.00 0 0.00 10 332.64

5 Kalanaur 37 43.77 1 54.47 0 0.00 0 0.00 38 98.24

Total 63 81.83 43 1086.77 4 53.75 1 30.09 111 1252.44

BADP-13FC- 2013-14(Gurdaspur-final)) SUMMARY 1 STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Block Dera Baba Nanak Health 1 Const.of lab room in Govt. Hospital Dera Baba Gurdaspur Dera Baba Dera Baba 2 1.80 6 months New 1.80 0.48 Nanak Nanak Nanak 2 1 ECG machine,1 X-ray plant Dera Baba Gurdaspur Dera Baba 12 7.25 3 months New 7.25 1.07 machine,1 semi autoanalyser Nanak Nanak TOTAL 9.05 9.05 1.55 Infrastructure 3 Const. of new link road -Dera Dera Baba Gurdaspur Dera Baba Kahlanwali 3 36.96 6 months New 36.96 5.74 Baba Nanak road to vill.Kahlanwali Nanak Nanak

4 Special repair of link road Ghonewal Dera Baba Gurdaspur Dera Baba Mansoor 2 31.86 6 months New 31.86 11.11 Road to village Mansoor Nanak Nanak 5 Const. of new link road village Dera Baba Gurdaspur Dera Baba Pakhoke 1 9.74 6 months New 9.74 2.27 Pakhoke Talhi Sahib road Nanak Nanak 6 Upgradation (12') of link Road Dera Baba Gurdaspur Dera Baba Talwandi 3 37.70 6 months New 37.70 0.71 Jhangi to Talwandi Hinduan Nanak Nanak Hinduan 7 Const. of Bus stand balance work Dera Baba Gurdaspur Dera Baba Dhianpur 12 6.43 3 months Old 2012-13 8.00 6.43 1.13 Nanak Nanak 8 New link road Hardarwal to Kot Dera Baba Gurdaspur Dera Baba Hardarwal 6 74.90 6 months 44.90 14.54 Molvi Nanak Nanak 9 New link road Pracha to Kot Molvi Dera Baba Gurdaspur Dera Baba Paracha 14 24.50 6 months 24.50 1.45 Nanak Nanak 10 Const.of new link road Focal Point Dera Baba Gurdaspur Dera Baba Hardarwal 6 47.36 6 months 47.36 15.34 Handarwal to Railway Station Nanak Nanak Fethgarh Churian-Ramdas Road (1.30 km.) 11 Upgradation of circular road of vill. Dera Baba Gurdaspur Dera Baba Thetherke 3 52.38 6 months 33.35 1.04 Thetherke upto Dera Baba Nanak Nanak Nanak Ramdas road STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 Const. of new link approach road Dera Baba Gurdaspur Dera Baba Bhagtana 3 6.82 6 months 6.82 0 Govt.Elementary School Bhagtana Nanak Nanak Boharwala Boharwala Total 328.65 8.00 279.62 53.33 Water Supply and Sanitation 13 Installation of new water supply Dera Baba Gurdaspur Dera Baba Talwandi 3 30.09 6 months 30.09 0.57 scheme Nanak Nanak Hinduan WS and Sanitation Total 30.09 30.09 0.57 Power 14 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Ranseeke 8 0.98 3 months 0.98 0.25 H/O Surit Singh Nanak Nanak 15 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 4 0.55 3 months 0.55 0 H/O Paras Ram Nanak Nanak Goraya 16 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 0.55 3 months 0.55 0.04 H/O Bhagwant Singh Nanak Nanak Jajan 17 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 0.91 3 months 0.91 0.07 H/O Ajit Singh Nanak Nanak Jajan 18 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Ratta 5 1.20 3 months 1.20 0 H/O Baljinder Singh Nanak Nanak 19 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Talwandi 3 0.77 3 months 0.77 0 H/O Kawaljit Singh Nanak Nanak Hinduan 20 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Udhowali 10 0.83 3 months 0.83 0.28 H/O Dalwinder Singh Nanak Nanak Kalan 21 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shikar 8 1.18 3 months 1.18 0.10 H/O Balwant Singh Nanak Nanak Massian 22 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 1.20 3 months 1.20 0.10 H/O Azad Singh Nanak Nanak Jajan 23 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 1.38 3 months 1.38 0.12 H/O Chain Singh Nanak Nanak Jajan STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 24 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Khode Bst 6 0.89 3 months 0.89 0.02 H/O Balwant Singh Nanak Nanak 25 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 1.63 3 months 1.63 0.14 H/O Pishora Singh Nanak Nanak Jajan 26 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 1.20 3 months 1.20 0.10 H/O Mahinder Singh Nanak Nanak Jajan 27 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Udhowali 10 0.79 3 months 0.79 0.27 H/O Balwinder Singh Nanak Nanak Kalan 28 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Udhowali 10 0.83 3 months 0.83 0.28 H/O Sawaran Singh Nanak Nanak Kalan 29 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Ghanie-ke 1 12.29 3 months 12.29 0.36 H/O Nanak Nanak Bet 30 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Talwandi 8 1.20 3 months 1.20 0.16 H/O Hardev Singh Nanak Nanak 31 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 1.20 3 months 1.20 0.1 H/O Dalbir Singh Nanak Nanak Jajan 32 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Udhowali 10 0.78 3 months 0.78 0.27 H/O Sukhwant Singh Nanak Nanak Kalan 33 Provision of electric connection to Dera Baba Gurdaspur Dera Baba Shahpur 8 1.20 3 months 1.20 0.10 H/O Davinder Singh Nanak Nanak Jajan Total 31.56 31.56 2.76 Total Block Dera Baba Nanak 399.35 8.00 350.32 58.21 Block Kalanaur Infrastructure 34 Upgradation of link road Kalanaur to Dera Baba Gurdaspur Kalanaur Kalanaur 6 54.47 6 months Old 54.47 6.40 Malakpur bridge via Mian Kot, Nanak Dalerpur, Rasoolpur and Arli Bhan (Length 6.39 KM) Total 54.47 54.47 6.40 Power STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 35 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 1.60 3 months 1.60 0.18 H/O Harpal Singh Nanak 36 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kotla 8 1.11 3 months 1.11 0.32 H/O Amrik Singh Nanak Mugal 37 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 1.54 3 months 1.54 0.18 H/O Gulzar Singh Nanak 38 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Ruriana 2 0.70 3 months 0.70 0 H/O gurnam Singh Nanak 39 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 1.75 3 months 1.75 0.2 H/O Sarabjit Singh Nanak 40 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Dostpur 2 0.75 3 months 0.75 0.03 H/O Prittam Singh Nanak 41 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Dostpur 2 0.60 3 months 0.60 0.08 H/O Subag Singh Nanak 42 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Dehriwal 5 1.25 3 months 1.25 0.18 H/O BAldevSIngh Nanak Kiran 43 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Dostpur 2 1.10 3 months 1.10 0.15 H/O Jaspal Singh Nanak 44 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Gawara 3 1.58 3 months 1.58 0 H/O Sukhwinder Singh Nanak 45 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Rahimabad 8 1.65 3 months 1.65 0.03 H/O Nishan Singh Nanak 46 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 0.78 3 months 0.78 0.09 H/O Santokh Singh Nanak 47 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Rahimabad 8 1.36 3 months 1.36 0.02 H/O Baljit Singh Nanak STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 48 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Lopa 1 0.73 3 months 0.73 0 H/O Harbhajan Singh Nanak 49 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Sarje 3 1.10 3 months 1.10 0.03 H/O Bikram Singh Nanak Chack 50 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 0.72 3 months 0.72 0.08 H/O Satwant Singh Nanak 51 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Panwan 12 1.30 3 months 1.30 0.01 H/O Gurnam Singh Nanak 52 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Bishankott 5 1.17 3 months 1.17 0.09 H/O Sucha Singh Nanak 53 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 1.77 3 months 1.77 0.21 H/O Nishan Singh Nanak 54 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Lakhan 5 1.64 3 months 1.64 0.13 H/O Joginder Singh Nanak Kalan 55 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 1.33 3 months 1.33 0.15 H/O Gurbax Singh Nanak 56 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Rehimabad 8 0.85 3 months 0.85 0 H/O Harbhajan Singh Nanak 57 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Dostpur 2 0.70 3 months 0.70 0.09 H/O Guedeep Singh Nanak 58 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Lopa 1 1.45 3 months 1.45 0.02 H/O Gulab singh Nanak 59 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Serje 3 1.27 3 months 1.27 0.03 H/O Mohinder Singh Nanak Chack 60 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 2.29 3 months 2.29 0.27 H/O Manjit Singh Nanak 61 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Shahur 12 1.43 3 months 1.43 0.09 H/O Kartar Singh Nanak Kalan STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 62 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Chandu 0.50 1.06 3 months 1.06 0.09 H/O Geja Singh Nanak Wadala 63 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Aluna 3 0.95 3 months 0.95 0.14 H/O Hardeep Singh Nanak 64 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Alinangal 3 1.02 3 months 1.02 0 H/O Bhagwan Singh Nanak 65 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Chaura 1 0.74 3 months 0.74 0.23 H/O Kulwant Singh Nanak Khurd 66 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kotla 8 1.32 3 months 1.32 0.38 H/O Prittam Singh Nanak Mugal 67 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Serje 3 1.45 3 months 1.45 0.04 H/O Gurpreet Singh Nanak Chack 68 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Dostpur 2 0.90 3 months 0.90 0.12 H/O Harjinder Singh Nanak 69 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 0.82 3 months 0.82 0.09 H/O Kartar Singh Nanak 70 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Chandu 0.50 1.11 3 months 1.11 0.10 H/O Nirmal Singh Nanak Wadala 71 Provision of electric connection to Dera Baba Gurdaspur Kalanaur Kalanaur 6 0.88 3 months 0.88 0.10 H/O Rashpal Singh Nanak Power Total 43.77 43.77 3.95 Total Block Kalanaur 98.24 98.24 10.35 Block Dinanagar Health 72 Const./ Renovation Govt.sub center Dinanagar Gurdaspur Dinanagar Dodwan 9 29.70 29.70 10.61 Dodwan 73 Const./ Renovation Govt.sub center Dinanagar Gurdaspur Dinanagar Jhabkra 2 15.00 6 months New 15.00 3.38 Jhabkra STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Total Health 44.70 44.70 13.99 Infrastructure 74 Cons.t of balance length of road vill. Dinanagar Gurdaspur Dinanagar Jago Chack 2 6.00 6 months New 6.00 1.56 Jagochack Tanda road Tanda (Jhabkra) 75 Kothe Elahi Baksh road to Dinanagar Dinanagar Dinanagar Kothe Ilahi 4 12.00 6 months New 12.00 3.00 Jkharpindi road Baksh 76 Const of link road from Chhtou Nath Dinanagar Gurdaspur Dinanagar Bharth 6 12.00 6 months 12.00 4.8 Ka Mandir to Dodwan to Bharth Qazi chack road 77 New Const.of link road Lahri Veeran Dinanagar Gurdaspur Dinanagar Lahri 17 22.00 6 months 22.00 11.99 to Dera Sawraj Singh & Abadi (1.15 Veeran km) 78 Speical Repair of link road Dinanagar Gurdaspur Dinanagar Paniar 10 15.50 6 months 15.50 6.7 A.P.K.road to Paniar (0.86 km) 79 New Const.of link road village Dinanagar Gurdaspur Dinanagar Magian 6 15.50 6 months 15.50 2.48 Magian(0.76 km) 80 Const. new link road f Phirni Village Dinanagar Gurdaspur Dinanagar 11 9.00 6 months 9.00 3.37 Rauwal (0.55 km) 81 Const. of new link road Jakrian Dinanagar Gurdaspur Dinanagar Rauwal 11 17.80 6 months 17.80 6.66 bridge Anadpur to Rauwal (0.96 km)

82 Const. of new link road Dinanagar Gurdaspur Dinanagar Mahasahan 7 8.75 6 months 8.75 1.54 Shamshanghat Kotha Kalichpur Kullian Mahasahan Kullian (0.42 km) 83 New Const. of new link road Dinanagar Gurdaspur Dinanagar Mahasahan 7 11.70 6 months 11.70 2.06 Dhamrai bridge to Dere Mahasha Kullian Kullian (0.55 km) 84 Const.of new link road along kool Dinanagar Gurdaspur Dinanagar Jandi 22 10.05 6 months 10.05 2.08 (1.2 km) STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 85 New const of link road jandi Mirpur Dinanagar Gurdaspur Dinanagar Jandi 22 16.00 6 months 16.00 3.04 road to Dere Bajigar and Bhutto Mirpur Jattan (0.9 km) 86 New const. of new link road Chack Dinanagar Gurdaspur Dinanagar Bajigar 9 22.10 6 months 22.10 7.26 Alai to Bajigar Kullain (1.12 km) Kullian 87 New const. of link road Chaunta Dinanagar Gurdaspur Dinanagar Chaunta 22 10.05 6 months 10.05 3.58 jhandi road to Basti Gujjran Chaunta Jhandi up to sikandar Road (0.65 km)

88 Const. of new link road Phirni village Dinanagar Gurdaspur Dinanagar Sammucha 12 7.95 6 months 7.95 5.15 Sammuchack ck 89 Const. of new link road Daburji Dinanagar Gurdaspur Dinanagar Daburji 2 24.00 6 months 24.00 6.2 Sham Singh to Bhatoa (1.25 km) 90 Const. of New Link road from Dinanagar Gurdaspur Dinanagar Bhawra 11 32.60 6 months 29.90 23.64 village Bhawra to Sehowal Total 253.00 250.30 95.11 Total Block Dinanagar 295.00 295.00 109.10 Block Dorangla Power 91 Provision of electric connection to Dinanagar Gurdaspur Dorangla Thundi 1 1.75 3 months 1.75 0.58 H/O Gurdial Singh 92 Provision of electric connection to Dinanagar Gurdaspur Dorangla Qadianwali 4 0.92 3 months 0.92 0 H/O Lubha Masih 93 Provision of electric connection to Dinanagar Gurdaspur Dorangla Qadianwali 4 0.78 3 months 0.78 0 H/O Davinder Singh 94 Provision of electric connection to Dinanagar Gurdaspur Dorangla Dorangla 1 0.78 3 months 0.78 0.08 H/O Bawa Singh STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 95 Provision of electric connection to Dinanagar Gurdaspur Dorangla Wazirpur 4 1.71 3 months 1.71 0.30 H/O Kashmir Singh

96 Provision of electric connection to Dinanagar Gurdaspur Dorangla Dorangla 1 0.56 3 months 0.56 0.06 H/O Ranjit Singh Total 6.50 6.50 1.02 Infrastructure 97 Balance Const.of road from Dinanagar Gurdaspur Dorangla Behrampur 4 72.00 6 months 58.74 21.25 Behrampur Harijen Basti to Bhagokawan-Ucha Dhakala road (2.90) 98 Const.of link Road vill.Dugri (1.45 Dinanagar Gurdaspur Dorangla Dugri 1 30.50 6 months 30.50 4.7 km) 99 Const.of link Road Kathgarh to Dinanagar Gurdaspur Dorangla Bains 1 28.00 6 months 28.00 5 Bains (1.35 km) 100 Const.of link Road Dorangla- Dinanagar Gurdaspur Dorangla Talwandi 5 25.00 6 months 25.00 4.13 Talwandi Baba Shri Chand ji Tahali Sahib (1.55 km) 101 Special Repair of link road kathiali to Dinanagar Gurdaspur Dorangla Kathiali 3 27.50 6 months 27.50 9.07 Ucha Dhakala (1.52 km) TOTAL 183.00 169.74 44.15 Total Block Dorangla 189.50 176.24 45.17 Infrastructure 102 Const. of link road vill. Heer to Jaura Gurdaspur Gurdaspur Gurdaspur Heer 13 32.40 6 months New 32.40 0

103 Const. of circular road village Gurdaspur Gurdaspur Gurdaspur Purowal 16 27.00 6 months New 27.00 5.34 Purowal Rajputan Rajputan 104 Const. of road Babbehali to UBDC Gurdaspur Gurdaspur Gurdaspur Babbehali 17 36.90 6 months New 36.90 11.26 STATE : PUNJAB SUMMARY ANNEXURE- __ DISTRICT : Gurdaspur Border Area Development programme 2013-14 ANNUAL ACTION PLAN 2013-14 (Rs. lacs) Whether Scheme is Distance Approved Target for Location ongoing from the from Outlay of the Completion Funds Required Sr. Name of the Sector and Old/New Previous Year SC Internat- Scheme for of the in Curerent Year No. Scheme/Project Scheme component ional the Current Scheme Year of Funds 2013-14 Constituency District Block Village Border Year (Months) Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 105 Const. of new link road from Gurdaspur Gurdaspur Gurdaspur Babehali 17 23.40 6 months New 23.40 7.93 Babehali to abadies of (Kali Balwinder Singh . Jujhar Singh, Gurnam Singh etc. (1.40 km.) 106 Const. of culvert and road from Gurdaspur Gurdaspur Gurdaspur Talwandi 23 28.60 6 months New 28.60 1.22 Talwandi Rattowal to Mahadev Khurd 107 Const. of Bridge at UBDC Gurdaspur Gurdaspur Gurdaspur Babehali 17 130.00 12 months New 70.00 23.73 108 New Construction of link road Gurdaspur Gurdaspur Gurdaspur Purana 20 34.00 6 months New 34.00 1.66 Purana Shala Kalghidhar school to Shala Bhagtana Palace (1.25 km)

109 New Const. of link road Gazikott to Gurdaspur Gurdaspur Gurdaspur Gazikot 20 25.00 6 months New 25.00 1.35 Dere Swaran singh, Lakhbir singh via Govt. school (1.30 km) 110 Const. of new link road from nadala Gurdaspur Gurdaspur Gurdaspur Nadal 27 31.00 6 months New 31.00 10.67 Shamshanghat to Abadi Jheuran 111 New Const. of link road Nawa Pind Gurdaspur Gurdaspur Gurdaspur Nawa Pind 17 58.00 6 months New 24.34 1.33 Bahadur to Gazilott (2.50 km) Bahadur Total Infrastructure 426.30 332.64 64.49 Total Block Gurdaspur 426.30 332.64 64.49 Grand Total (Gurdaspur) 1408.39 1252.44 287.32