Delegated Decisions.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
HARROGATE BOROUGH COUNCIL PLANNING COMMITTEE LIST OF APPLICATIONS DETERMINED BY THE CHIEF PLANNER UNDER THE SCHEME OF DELEGATION CASE NUMBER: 19/02410/FUL WARD: Falls Within 2 Or More CASE OFFICER: Mark Williams DATE VALID: 07.06.2019 GRID REF: E 427266 TARGET DATE: 02.08.2019 N 468676 REVISED TARGET: DECISION DATE: 19.07.2019 APPLICATION NO: 6.500.79.M.FUL LOCATION: Fountains Abbey Visitors Centre Swanley Grange Fountains Ripon North Yorkshire HG4 3DZ PROPOSAL: Installation of lead statue mounted on a stone plinth. APPLICANT: National Trust APPROVED subject to the following conditions:- 1 The development hereby permitted shall be begun on or before 3 years from the date of this permission. 2 The development hereby permitted shall not be carried out otherwise than in strict accordance with the submitted details. 3 The stonework of the proposed plinth shall match the stonework of the existing plinth the statue of ‘The Wrestlers’ within the Studley Royal Water Garden to the satisfaction of the Local Planning Authority. Reasons for Conditions:- 1 To ensure compliance with Sections 91-94 of the Town and Country Planning Act 1990. 2 In order to ensure compliance with the approved drawings. 3 In the interests of visual amenity and in order to harmonise with the existing building. CASE NUMBER: 18/03573/DISCON WARD: Bishop Monkton & Newby CASE OFFICER: Alex Robinson DATE VALID: 28.08.2018 GRID REF: E 439081 TARGET DATE: 23.10.2018 N 467569 REVISED TARGET: DECISION DATE: 12.07.2019 APPLICATION NO: 6.56.171.DISCON LOCATION: Poultry Houses Leeming Lane Langthorpe North Yorkshire PROPOSAL: Application for approval of details required under Conditions 3 (Materials), 4 (Contamination), 5 (Noise breakout), 10 (Foul & surface water drainage), 11 (Development flow run-off), 12 (Maintenance & management of SUDS), 13 (Exceedance flow plan), 14 (Finished floor level), 16 (Landscaping), 18 (Tree protection plan), 19 (Engineering drawings) and 21 (Non highway areas) of planning permission 17/03952/FULMAJ - Erection of 34 dwellings, garages, walls and fences, installation of gates and formation of associated access, hardstanding and landscaping. APPLICANT: Berkeley DeVeer PART confirmation of discharge of condition(s) CONFIRMATION OF DISCHARGE TO PART BELOW: Condition 16 REFUSAL OF DISCHARGE TO PART BELOW: Conditions 3, 4 A,B and C, 5, 10, 11, 12, 13, 14, 18, 19 and 21 Reasons for refusal: 1 Conditions 3 ,4 A and B, 5, 10, 11, 12, 13, 14, 18, 19 and 21 require discharge prior to commencement of development. As work on the site is underway, they cannot be discharged. 2 Condition 4 part C has not had the required information submitted and cannot be discharged. INFORMATIVES 1 The information submitted on this application is acceptable and therefore it is not expedient to take enforcement action. 2 Condition 4 Part D (unexpected contamination) must remain in place until the development is complete. CASE NUMBER: 18/04050/DVCON WARD: Bishop Monkton & Newby CASE OFFICER: Mark Danforth DATE VALID: 02.10.2018 GRID REF: E 443081 TARGET DATE: 27.11.2018 N 471416 REVISED TARGET: 30.04.2019 DECISION DATE: 19.07.2019 APPLICATION NO: 6.36.6.E.DVCON LOCATION: Thornton Manor Farm Thornton Bridge North Yorkshire PROPOSAL: Variation of conditions 3 (site access), 4 (visibility splays), 5 (access/parking) and 6 (parking) of planning permission 12/03921/DVCON to allow alterations to access and parking. APPLICANT: FCFM Group Properties 2 REFUSED. Reason(s) for refusal:- 1 The proposed is substandard as it doesn't achieve the required visibility splays and in the absence of an appropriate and acceptable traffic calming scheme, which would reduce the speed of vehicles approaching the site, the use of the access would cause a danger to highway users. It is therefore not possible to vary the conditions of 12/03921/DVCON. The proposal would be contrary to saved Core Strategy policy SG4 and NPPF policies 109 and 110. CASE NUMBER: 19/00449/DVCMAJ WARD: Bishop Monkton & Newby CASE OFFICER: Alex Robinson DATE VALID: 31.01.2019 GRID REF: E 439081 TARGET DATE: 02.05.2019 N 467569 REVISED TARGET: 19.07.2019 DECISION DATE: 17.07.2019 APPLICATION NO: 6.56.171.A.DVCMAJ LOCATION: Poultry Houses Leeming Lane Langthorpe North Yorkshire PROPOSAL: Variation of permission 18/04442/DVCMAJ condition 2 approved plans, condition 8 hours of working and condition 22 widening of footpath as proposed APPLICANT: C/o Agent APPROVED subject to the following conditions:- 1 The development hereby permitted shall be begun on or before 20.07.2021. 2 The development hereby permitted shall not be carried out otherwise than in strict accordance with the submitted details, as listed: BDV.10.01A Location Plan A3 BDV.10.02 Rev P Planning Layout BDV.10.03 Street Scenes BDV.10.04 1.8 m high timber fence BDV.10.05 Gates BDV.10.A6.01 A6 Triple Elevations BDV.10.A6.02 A6 Triple Floor Plans BDV.10.A6.03 Double BDV.10.A6+.01 Elevations BDV.10.A6+.02 Floor Plans BDV.10.B1 1Bed-AS BDV.10.G01 Single Garage BDV.10.T2.01 The Dashwood BDV.10.T3.01 The Churchill BVD.10.T4+.01 The Elton John BVD.10.T10.01 The Blake BVD.10.T11.01 TheMontgomery BVD.10.T15.01 TheJenner Elevations BDV.10.T15.02 The Jenner Floor Plans BDV.10.T401.01 Rev A The Windsor BDV.10.T1Alt Rev A The Bertram 3 Details approved under 18/04862/DISCON Development shall be carried out in strict accordance with the approved details. 4 Part A Discharged through 18/03573/DISCON Part B Discharged through 18/03573/DISCON Part C. IMPLEMENTATION OF APPROVED REMEDIATION SCHEME The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise approved in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. Part D. REPORTING OF UNEXPECTED CONTAMINATION In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirement of section A, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of section B, which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with section C. 5 Details approved under 18/03573/DISCON Where necessary suitable noise mitigation measures will be employed. 6 The approved acoustic fencing adjacent to the existing play area shall be constructed in accordance with the agreed details and implemented prior to first occupation. 7 The developer should install electric vehicle charging points for each new dwelling on the development site. 8 Details approved under 18/04862/DISCON. All measures as approved must be adopted and adequately maintained throughout the duration of the ground works and construction phase. No ground works or construction activities should take place outside of the hours of 07:30 to 18:00 Hours Monday to Friday, 08:00 to 13:00 on Saturday with nothing on a Sunday or statutory holiday. 9 Unless amended by other conditions in this consent, the development hereby approved shall be carried out in accordance with submitted drawing 1006-002 (revision A) dated 19/12/2017 prepared by Fortem and contained within the submitted FRA dated December 2017. The development shall be constructed in accordance with drawing 1006-002 (revision A) dated 19/12/2017 and the submitted Flood Risk Assessment. 10 Details approved under 18/03573/DISCON The works shall be implemented in accordance with the approved phasing. No part or phase of the development shall be brought into use until the drainage works approved for that part or phase has been completed. 11 Details approved under 18/03573/DISCON No part of the development shall be brought into use until the development flow restriction works comprising the approved scheme has been completed. 12 Details approved under 18/03573/DISCON 13 Details approved under 18/03573/DISCON 14 Details approved under 18/03573/DISCON The development shall be carried out in accordance with the approved scheme satisfying this condition. 15 Details approved under 18/04862/DISCON The details must be implemented as approved. 16 Details approved under 18/03573/DISCON The landscaping scheme shall be implemented in strict accordance with details as approved by the Local Planning Authority. 17 In the event of failure or removal of any trees or shrubs, planted in accordance with any scheme approved by the Local Planning Authority, to survive for a period of five years from the date of the completion of implementation of that scheme, such trees or shrubs shall be replaced by the developer with such live specimens of such species in such number as may be approved by the Local Planning Authority. 18 Details approved under 18/03573/DISCON The approved details will be maintained throughout the construction phase. 19 Details approved under 18/03573/DISCON The development shall be carried out in full compliance with the approved drawings and details.