50 CFR Ch. II (10–1–19 Edition)

Total Page:16

File Type:pdf, Size:1020Kb

50 CFR Ch. II (10–1–19 Edition) National Marine Fisheries Service/NOAA, Commerce § 223.101 System as now or hereafter con- FIGURE 13 TO PART 223—SINGLE GRID HARD stituted, shall be treated for purposes TED ESCAPE OPENING of section 7 of the Act as a threatened FIGURE 14a TO PART 223—MAXIMUM ANGLE OF species, and the provisions of section DEFLECTOR BARS WITH STRAIGHT BARS 7(a)(2) of the Act shall apply. ATTACHED TO THE BOTTOM OF THE FRAME (c) For purposes of section 7 of the FIGURE 14b TO PART 223—MAXIMUM ANGLE OF Act, any consultation on a proposed DEFLECTOR BARS WITH BENT BARS AT- TACHED TO THE BOTTOM OF THE FRAME Federal action that may affect both an FIGURE 15 TO PART 223—WEEDLESS TED experimental and a nonexperimental BRACE BAR DESCRIPTION population of the same species should FIGURE 16 TO PART 223—ESCAPE OPENING AND consider that species’ experimental and FLAP DIMENSIONS FOR THE DOUBLE COVER nonexperimental populations to con- FLAP TED stitute a single listed species for the FIGURE 17 TO PART 223—BOONE WEDGE CUT purposes of conducting the analyses ESCAPE OPENING under section 7 of the Act. FIGURES 18a, 18b AND 18c TO PART 223—LARGE FRAME TED ESCAPE OPENING; MINIMUM PART 223—THREATENED MARINE DIMENSIONS USING ALL-BAR CUTS (TRI- AND ANADROMOUS SPECIES ANGULAR CUTS); LARGE FRAME TED ES- CAPE OPENING; MINIMUM DIMENSIONS USING ALL-BAR CUTS AND LEADING EDGE Subpart A—General Provisions CUT; LARGE FRAME TED ESCAPE OPENING; Sec. MINIMUM DIMENSIONS USING ALL-POINTS 223.101 Purpose and scope. SIDE CUTS (RECTANGULAR CUT) 223.102 Enumeration of threatened marine FIGURES 19a AND 19b TO PART 223—CHAUVIN and anadromous species. SHRIMP DEFLECTOR INSTALLATION DE- TAILS Subpart B—Restrictions Applicable to AUTHORITY: 16 U.S.C. 1531 1543; subpart B, Threatened Marine and Anadromous § 223.201–202 also issued under 16 U.S.C. 1361 et Species seq.; 16 U.S.C. 5503(d) for § 223.206(d)(9). 223.201 Guadalupe fur seal. SOURCE: 43 FR 32809, July 28, 1978, unless 223.202 [Reserved] otherwise noted. Redesignated at 64 FR 14068, 223.203 Anadromous fish. Mar. 23, 1999. 223.204 Tribal plans. 223.205 Sea turtles. 223.206 Exceptions to prohibitions relating Subpart A—General Provisions to sea turtles. 223.207 Approved TEDs. § 223.101 Purpose and scope. 223.208 Corals. (a) The regulations contained in this 223.209 [Reserved] 223.210 Green sturgeon. part identify the species under the ju- 223.211 Atlantic sturgeon. risdiction of the Secretary of Com- 223.212 Southern DPS of spotted seal. merce that have been determined to be 223.213 Humpback whales. threatened species pursuant to section 223.214 Approaching threatened humpback 4(a) of the Act, and provide for the con- whales in Alaska. servation of such species by estab- 223.215–223.300 [Reserved] 223.301 Special rules—marine and anad- lishing rules and procedures to govern romous fishes. activities involving the species. FIGURES 1–2 TO PART 223 [RESERVED] (b) The regulations contained in this FIGURE 3 TO PART 223—MATAGORDA TED part apply only to the threatened spe- FIGURE 4 TO PART 223—GEORGIA TED cies enumerated in § 223.102. FIGURE 5 TO PART 223—NET DIAGRAM FOR THE (c) The provisions of this part are in EXCLUDER PANEL OF THE PARKER SOFT addition to, and not in lieu of, other TED regulations of parts 222 through 226 of FIGURE 6 TO PART 223—TED EXTENSION IN SUMMER FLOUNDER TRAWL this chapter which prescribe additional FIGURES 7–9b TO PART 223 [RESERVED] restrictions or conditions governing FIGURE 10 TO PART 223—FLOUNDER TED threatened species. FIGURE 11 TO PART 223—MODIFIED FLOUNDER TED [64 FR 14068, Mar. 23, 1999, as amended at 79 FIGURE 12 TO PART 223—ESCAPE OPENING & FR 20806, Apr. 14, 2014] COVER DIMENSIONS FOR 71-INCH TED 375 VerDate Sep<11>2014 11:43 Jul 22, 2021 Jkt 250244 PO 00000 Frm 00385 Fmt 8010 Sfmt 8010 Y:\SGML\250244.XXX 250244 rmajette on DSKBCKNHB2PROD with CFR § 223.102 50 CFR Ch. II (10–1–20 Edition) § 223.102 Enumeration of threatened in the FEDERAL REGISTER notice(s) marine and anadromous species. cited in the ‘‘Citation(s) for listing de- (a) The table below identifies the spe- termination(s)’’ column. cies under the jurisdiction of the Sec- (c) The ‘‘Citation(s) for listing deter- retary of Commerce that have been de- mination(s)’’ column provides ref- termined to be threatened pursuant to erence to the FEDERAL REGISTER no- section 4(a) of the Act, species treated tice(s) determining the species’ status as threatened because they are suffi- under the Act. The abbreviation ciently similar in appearance to ‘‘(SPR)’’ (significant portion of its threatened species, and experimental range) after a citation indicates that populations of threatened species. the species was listed based on its sta- (b) The columns entitled ‘‘Common tus in a significant portion of its range. name,’’ ‘‘Scientific name,’’ and ‘‘De- If a citation does not include the scription of listed entity’’ define the ‘‘(SPR)’’ notation, it means that the species within the meaning of the Act. species was listed based on its status In the ‘‘Common name’’ column, exper- throughout its entire range. For imental populations are identified as ‘‘(SPR)’’ listings, a geographical de- ‘‘XE’’ for essential populations or scription of the SPR may be found in ‘‘XN’’ for nonessential populations. the referenced FEDERAL REGISTER no- Species listed based on similarity of tice. The ‘‘(SPR)’’ notation serves an appearance are identified as ‘‘S/A.’’ Al- informational purpose only and does though a column for ‘‘Common name’’ not imply any limitation on the appli- is included, common names cannot be cation of the prohibitions or restric- relied upon for identification of any tions of the Act or implementing rules. specimen, because they may vary (d) The ‘‘Critical habitat’’ and ‘‘ESA greatly in local usage. The ‘‘Scientific rules’’ columns provide cross-ref- name’’ column provides the most re- cently accepted scientific name, rely- erences to other sections in this part ing to the extent practicable on the and part 226. The term ‘‘NA’’ appearing International Code of Zoological Nomen- in the ‘‘Critical habitat’’ column indi- clature. In cases in which confusion cates that there are no critical habitat might arise, a synonym(s) will be pro- designations for that species; similarly, vided in parentheses. The ‘‘Description the term ‘‘NA’’ appearing in the ‘‘ESA of listed entity’’ column identifies rules’’ column indicates that there are whether the listed entity comprises the no ESA rules for that species. However, entire species, a subspecies, or a dis- all other applicable rules in parts 222 tinct population segment (DPS) and through 226 and part 402 still apply to provides a description for any DPSs. that species. Also, there may be other Unless otherwise indicated in the ‘‘De- rules in this title that relate to such scription of listed entity’’ column, all wildlife. The ‘‘ESA rules’’ column is individual members of the listed entity not intended to list all Federal, state, and their progeny retain their listing tribal, or local governmental regula- status wherever found, including indi- tions that may apply to the species. viduals in captivity. Information re- (e) The threatened species under the garding the general range of the spe- jurisdiction of the Secretary of Com- cies, subspecies, or DPS may be found merce are: Species 1 Citation(s) for listing Critical ESA rules Common name Scientific name Description of listed entity determination(s) habitat Marine Mammals Dolphin, Hec- Cephalorhynchus Entire subspecies ................... 82 FR 43701, Sept. 19, NA NA tor’s. hectori hectori. 2017. 376 VerDate Sep<11>2014 11:43 Jul 22, 2021 Jkt 250244 PO 00000 Frm 00386 Fmt 8010 Sfmt 8010 Y:\SGML\250244.XXX 250244 rmajette on DSKBCKNHB2PROD with CFR National Marine Fisheries Service/NOAA, Commerce § 223.102 Species 1 Citation(s) for listing Critical ESA rules Common name Scientific name Description of listed entity determination(s) habitat Seal, bearded Erignathus Bearded seals originating from 77 FR 76740, Dec. 28, NA NA. (Beringia barbatus breeding areas in the Arctic 2012. DPS). nauticus. Ocean and adjacent seas in the Pacific Ocean between 145° E. Long. (Novosibirskiye) and 130° W. Long., and east of 157° E. Long. or east of the Kamchatka Peninsula. Seal, bearded Erignathus Bearded seals originating from 77 FR 76740, Dec. 28, NA NA. (Okhotsk barbatus breeding areas in the Pa- 2012. DPS). nauticus. cific Ocean west of 157° E. Long. or west of the Kamchatka Peninsula. Seal, Guada- Arctocephalus Entire species ......................... 50 FR 51252, Dec. 16, NA 223.201. lupe fur. townsendi. 1985. Seal, ringed Phoca (=Pusa) Entire subspecies ................... 77 FR 76706, Dec. 28, NA NA. (Arctic sub- hispida hispida. 2012. species). Seal, ringed Phoca (=Pusa) Entire subspecies ................... 77 FR 76706, Dec. 28, NA NA. (Baltic sub- hispida botnica. 2012. species). Seal, ringed Phoca (=Pusa) Entire subspecies ................... 77 FR 76706, Dec. 28, NA NA. (Okhotsk hispida 2012. subspecies). ochotensis. Seal, spotted Phoca largha ...... Spotted seals originating from 75 FR 65239, Oct. 22, NA 223.212. (Southern breeding areas in the Pa- 2010. DPS). cific Ocean south of 43° N. Lat. Whale, hump- Megaptera Humpback whales that breed 81 FR 62260, Sept. 8, NA 223.213. back (Mexico novaeangliae. or winter in the area of 2016. DPS). mainland Mexico and the Revillagigedos Islands, tran- sit Baja California, or feed in the North Pacific Ocean, primarily off California-Or- egon, northern Washington- southern British Columbia, northern and western Gulf of Alaska and East Bering Sea. Reptiles 2 Sea turtle, Chelonia mydas Green sea turtles originating 81 FR 20058, Apr. 6, NA 223.205, 223.206, green (Cen- from the Central North Pa- 2016.
Recommended publications
  • PAP-732 Control of Release Water Temperatures in Reclamation's
    PAP-732 Control of Release Water Temperatures in Reclamation's Central Valley Project by Perry L. Johnson Presented in Japan by Darrell W. Webber November 1991 HYDRAULICS BRANCH OFFICIAL FILE COPY CONTROL OF RELEASE WATER TEMPERATURES IN RECLAMATION'S CENTRAL VALLEY PROJECT by Darrell W. Webber Assistant Commissioner-Engineering and Research United States Bureau of Reclamation INTRODUCTION California's Central Valley Basin includes two major watersheds, the Sacramento River on the north and the San Joaquin River on the south (figure 1). The combined watersheds extend nearly 800 kilometers (500 miles) in a northwest-southeast direction and range from about 100 to 160 kilometers (60 to 100 miles) in width. The valley floor occupies about one-third of the basin; the other two thirds are mountainous. The Sacramento River and its tributaries flow southward, draining the northern part of the basin. The San Joaquin River and its tributaries flow northward, draining the central southern portion. These two river systems join at the Sacramento-San Joaquin Delta, flow into San Francisco Bay and the Pacific Ocean. The Central Valley Project, one of the United States major water developments, extends over much of the basin. Although developed primarily for irrigation, this multiple-purpose project also provides flood control, improves Sacramento River navigation, supplies domestic and industrial water, generates electric power, creates opportunities for recreation, controls salt water encroachment, and conserves fish and wildlife. The project annually delivers between 3.7 billion and 4.9 billion cubic meters (3 and 4 million acre-feet) of water for irrigation use on nearly 8 billion square meters (2 million acres) of land.
    [Show full text]
  • Carr Fire Incident Update
    CARR FIRE INCIDENT UPDATE Date: 8/4/2018 Time: 7:00 A.M. Info Line: Call 211 or visit www.211norcal.org @CAL_FIRE @CALFIRE Information Line: (530) 225-2510 Media Line: (530) 448-2466 @CALFIRESHU Incident Website: www.fire.ca.gov/current_incidents Email Updates (sign up): www.tinyurl.com/carrfire INCIDENT FACTS Incident Start Date: July 23, 2018 Incident Start Time: 1:15 p.m. Incident Type: Wildland Fire Cause: Mechanical Failure of a Vehicle Incident Location: Highway 299 and Carr Powerhouse Road CAL FIRE Unit: Shasta/Trinity Unified Command Agencies: CAL FIRE, National Park Service, Redding City Fire, US Forest Service Size: 141,825 acres Containment: 41% Expected Full Containment: Unknown Firefighter Injuries/Fatalities: 2 STRUCTURAL SUMMARY Structures Residential Structures Destroyed: 1,073 Commercial Structures Destroyed: 14 Other Destroyed: 492 Threatened: 1,358 Residential Structures Damaged: 190 Commercial Structures Damaged: 8 Other Damaged: 60 CURRENT SITUATION Situation Firefighters worked through the night to mitigate potential spot fires across control lines. Low humidity, winds, Summary: and an unstable atmosphere have increased fire activity. Red Flag Warning remains in effect until 9 p.m. Repopulation of residents in the areas affected by evacuations will continue as conditions permit. Evacuations: Shasta County: Community of French Gulch SR 299 west of Trinity Mountain Rd to the base of Buckhorn Summit Whiskey Creek Rd to include the boat launch/day use areas South along Swasey Dr from SR299 to Lower Springs Placer Road
    [Show full text]
  • Sacramento River Temperature Task Group
    Sacramento River Temperature Task Group Thursday, March 26, 2020 1:00 pm – 3:00 pm Conference Call Only: Join from PC, Mac, Linux, iOS or Android: https://meetings.ringcentral.com/j/5306224350 Or iPhone one-tap : US: +1(623)4049000,,5306224350# (US West) Or Telephone: Dial(for higher quality, dial a number based on your current location): US: +1(623)4049000 (US West) Meeting ID: 530 622 4350 International numbers available: https://meetings.ringcentral.com/teleconference Agenda 1. Introductions 2. Purpose and Objective 3. 2020 Meeting Logistics 4. Long Term Operations Implementation - Update 5. Hydrology Update 6. Operations Update and Forecasts a. Storage/Release Management Conditions b. Temperature Management 7. River Fish Monitoring: carcass surveys, redd counts, stranding and dewatering surveys and sampling at rotary screw traps 8. Fish Distribution/Forecasts: Estimated percentage of the population upstream of Red Bluff Diversion Dam for steelhead, winter-run and spring-run Chinook salmon, steelhead update and Livingston Stone Hatchery. 9. Seasonal Topics 10. Discussion 11. Review Action Items 12. Next Meeting Scheduling UNITED STATES DEPARTMENT OF THE INTERIOR U.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA DAILY CVP WATER SUPPLY REPORT MARCH 24, 2020 RUN DATE: March 25, 2020 RESERVOIR RELEASES IN CUBIC FEET/SECOND 15 YR RESERVOIR DAM WY 2019 WY 2020 MEDIAN TRINITY LEWISTON 318 303 303 SACRAMENTO KESWICK 10,188 4,569 3,798 FEATHER OROVILLE (SWP) 9,500 1,750 1,750 AMERICAN NIMBUS 4,887 1,516 1,516 STANISLAUS GOODWIN 4,504 206 428 SAN JOAQUIN FRIANT 2,987 0 286 STORAGE IN MAJOR RESERVOIRS IN THOUSANDS OF ACRE-FEET % OF 15 RESERVOIR CAPACITY 15 YR AVG WY 2019 WY 2020 YR AVG TRINITY 2,448 1,715 1,881 2,000 117 SHASTA 4,552 3,491 3,827 3,567 102 FOLSOM 977 602 681 466 77 NEW MELONES 2,420 1,562 2,025 1,892 121 FED.
    [Show full text]
  • Instream Flow Requirements in the Sacramento River Hydrologic Region Updated: November 2014
    Instream Flow Requirements in the Sacramento River Hydrologic Region Updated: November 2014 This briefing paper describes the existing instream flow requirements for the major rivers and streams in the Sacramento River hydrologic region. These requirements include provisions in State Water Resources Control Board (SWRCB) decisions, biological opinions, streamflow agreements, and other processes. New processes to develop different flow requirements should be aware of, and take into account, these existing flow requirements. Upper Sacramento River 1. 1960 MOA between Reclamation and DFG An April 5, 1960, Memorandum of Agreement (MOA) between Reclamation and the DFG originally established flow objectives in the Sacramento River for the protection and preservation of fish and wildlife resources. The agreement provided for minimum releases into the natural channel of the Sacramento River at Keswick Dam for normal and critically dry years (Table 1, below). Since October 1981, Keswick Dam has operated based on a minimum release of 3,250 cfs for normal years from September 1 through the end of February, in accordance with the MOA. This release schedule was included in Order 90-05 (described below), which maintains a minimum release of 3,250 cfs at Keswick Dam and Red Bluff Diversion Dam (RBDD) from September through the end of February in all water years, except critically dry years. The 1960 MOA provides that releases from Keswick Dam (from September 1 through December 31) are made with minimum water level fluctuation or change to protect salmon to the extent compatible with other operations requirements. Releases from Shasta and Keswick Dams are gradually reduced in September and early October during the transition from meeting Delta export and water quality demands to operating the system for flood control and fishery concerns from October through December.
    [Show full text]
  • Draft San Luis Reservoir Expansion Appraisal Report
    San Luis Reservoir Expansion Draft Appraisal Report Central Valley Project, California Mid-Pacific Region U.S. Department of the Interior Bureau of Reclamation December 2013 Mid-Pacific Region - Planning Division U.S. Department of the Interior Bureau of Reclamation December 2013 Mid-Pacific Region - Planning Division Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Cover Image: Aerial view, looking west, of B.F. Sisk Dam and San Luis Reservoir. Image courtesy of DWR. San Luis Reservoir Expansion Draft Appraisal Report Central Valley Project, California Mid-Pacific Region U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region - Planning Division San Luis Reservoir Expansion - Appraisal Report December 2013 Table of Contents 1.0 EXECUTIVE SUMMARY ............................................................................................... 1 2.0 INTRODUCTION.............................................................................................................. 4 2.1 Purpose of the Appraisal Study ........................................................................................ 4 2.2 Need for the Appraisal Study ..........................................................................................
    [Show full text]
  • Trinity Dam Operating Criteria Trinity River Division Central Valley Project-California
    ·rRlNITY ~IVER BASIN us RESOURCE LIBRARY BR TRINITY COUNTY LIBRARY T7 WEAVERVILLE, CALIFORNIA 1979 (c.l) Trinity Dam Operating Criteria Trinity River Division Central Valley Project-California TRINITY COUNTY JULY 1979 TRINITY RIVER BASIN RESOURC E LIBRARY TRINITY RIVER DIVISION CENTRAL VALLEY PROJECT CALIFORNIA Trinity Dam Operating Criteria Prepared for the Trinity River Basin Fish and Wildlife Task Force July 1979 United States Department of the Interior Bureau of Reclamation Mid-Pacific Region 1 ~ 7 5 122 R 1 W R 1 E 2 23° \ R 10 W ( T 38 N ----- ·-----]r------------r-CANADA ' I • I WA r NORTH ~ J SHINGTON ' \ ' DAKOTA ) ___ 1 • \.-.. ..-- .. J, ': M 0 N TAN A !___ - ----\ ' \ souTH : i ,----- - ~ ~~ ,o. 0 R EGON ( ,_---, : DAKOTA I : IOAHo 1 I __ __ \ \~' I W YOMING ·----- ~ -- -----, ___ , ,I \ ~ ~u I ~ 0 ; ------1 , NEBRASKA ', 1\ ~ I I ·--------'--, ~ I NEVA 1' 1: 0 ~1 : t------- -'.) I I J \_ DA UTAH COLORADO: ANSAS ' ~,J t -+- ---1--- .. - ', : : I K .\ ~ I . ---- .... ~ ' I 4!< l o ' ------·------ -- -~----- ', ~ -r' "::: rJ A ~ '!> ','\_r) i t---! OKLAHOMA\ -:- . I , , r/ / ;' ARIZONA I' NEW MEXICO. L ______ 1_ MALIN-ROUND MOUNTAIN 500 KV ~ . ' ,... 36 : , I l PACIFIC NW-PAC/FIC SW INTERTIE ---, ' ' ', I, ---~-E~~'-;:--·;;::<_-'r EX A_(S ---i- - ~ ~ - t \. .. _;··-....., ~ CLAIR ENGLE LAKE IN 0 EX M A P '._\_ ~.:.. (__j ~ ) I I / \ I - BUREAU OF RECLAMATION HASTAL~l WHISKEYTOWN-SHASTA( rr TRINITY [NAT . lj r COMPLETED OR AUTHORIZED WORKS 34 TRINITY DAM & POWERP~LANT~- ? ) RECrATION AREAS (~ ,- DAM AND RESERVOIR LEWISTON LAKE TRIINir/cARR 230 KV ? 0 I <=::? r ~-~~- _./ TUNNEL ~<";:1 r ~ -+ ---< - .r') d,):3_ -}N , ··- •J?:y,--.___ N CONDUIT - ~~ wcAv~~VIL' 7 __r~\.
    [Show full text]
  • 6Th 5-Year Review for Iron Mountain Mine Superfund Site, W/Appendices
    SEMS-RM DOCID # 100010569 SIXTH FIVE-YEAR REVIEW REPORT FOR IRON MOUNTAIN MINE SUPERFUND SITE SHASTA COUNTY, CALIFORNIA PREPARED BY United States Army Corps of Engineers, Seattle District FOR U.S. Environmental Protection Agency Region IX Ap~poved by: /2. Date ( _ tJa,r-1-w, '] -z_,,1 II ¥ Da Barton Assistant Director, Superfund Division California Site Cleanup and Enforcement Branch U.S. EPA, Region 9 [This page is intentionally left blank.] Executive Summary This is the sixth Five-Year Review (FYR) for the Iron Mountain Mine (IMM) Superfund Site (Site), located near Redding, California. The purpose of this FYR is to review information to determine if the interim remedies are, and will continue to be, protective of human health and the environment. The Iron Mountain Mine was mined from the 1860’s through 1963 for copper, gold, pyrite, silver, and zinc. Operations included open pit mining, adits and stoping inside Iron Mountain, milling, ore transportation via railroad and tramway, a cyanide leaching plant, cementation plants, ore roasting areas, and a smelter. Exposure of the mine workings, waste rock piles, and the open pit mine to oxygen and water have produced acid mine drainage (AMD) management issues. Numerous historical fish kills in the Sacramento River were attributed to AMD from the Main Mine Area. The Site was added to the National Priorities List in September 1983. The interim remedies for the Site consist of a combination of source control, AMD collection and treatment, and water management components, including clean water diversions and coordinated releases of contaminated surface water from Spring Creek Debris Dam (SCDD) into dilution flows from Shasta Dam.
    [Show full text]
  • Shasta Dam Fish Passage Evaluation Fact Sheet
    Bureau of Reclamation National Marine Mid-Pacific Region Fisheries Service Shasta Dam Fish Passage Evaluation Fact Sheet Background The Sacramento River is home to Central Valley steelhead and four runs of Chinook salmon. The National Marine Fisheries Service (NMFS) issued, on June 4, 2009, a Biological Opinion (BO) and Conference Opinion on the Long-Term Operation of the Central Valley Project (CVP) and State Water Project (SWP). The BO concluded that, as proposed, CVP and SWP operations were likely to jeopardize the continued existence of four federally-listed anadromous fish species: Sacramento River winter-run Chinook salmon, Central Valley spring-run Chinook salmon, California Central Valley steelhead, and Southern distinct population segment (DPS) of the North American green sturgeon. The BO set forth a Reasonable and Prudent Alternative (RPA) that allows continued operation of the CVP and SWP in compliance with the federal Endangered Species Act (ESA). For CVP operations, the RPA obligates the U.S. Department of Interior, Bureau of Reclamation (Reclamation) to evaluate the feasibility for the reintroduction of winter-run and spring-run Chinook salmon and steelhead upstream from Shasta, Folsom and New Melones dams. The Shasta Dam Fish Passage Evaluation is the first effort to be Coldwater habitat upstream of Shasta Lake launched. It features a Pilot Implementation Plan projected for completion in late 2014. Pilot Implementation Plan The Pilot Implementation Plan is a near-term experimental effort to determine the feasibility of reintroducing Chinook salmon to tributaries above Shasta Lake and transporting migrating juvenile fish to the Sacramento River below Keswick Dam. The Plan will evaluate possible approaches to capture, transport and release of fish at different life stages.
    [Show full text]
  • Sites Reservoir Project Public Draft EIR/EIS
    6. Surface Water Resources 6.1 Introduction This chapter describes Existing Conditions (the environmental setting) and Sites Reservoir Project (Project)-related changes to surface water resources in the Extended, Secondary, and Primary study areas. Detailed descriptions and maps of these three study areas are provided in Chapter 1 Introduction, and summarized descriptions are included in this chapter. Surface water resources generally include reservoirs, rivers, and diversions. Permits and authorizations for surface water resources are presented in Chapter 4 Environmental Compliance and Permit Summary. The regulatory setting for surface water resources is presented in Appendix 4A Environmental Compliance. This chapter also includes a description of the surface water supply facilities operations and resulting surface water resources characteristics of California’s major water systems that are relevant to the Project: the Central Valley Project (CVP), a federal project that is operated and maintained by the Bureau of Reclamation (Reclamation), the State Water Project (SWP), operated and maintained by the California Department of Water Resources (DWR), and associated tributary rivers and streams. A schematic showing the layout of these two water systems, with the relative location of the Project, is shown in Figures 6-1A, 6-1B, and 6-1C. A comparison of these characteristics has been made between the Existing Conditions/No Project/No Action Condition, and the four action alternatives (Alternatives A, B, C, and D). Unless noted, all numbers shown related to storages, flows, exports, and deliveries in this chapter are generated from the CALSIM II computer simulation model. Appendix 6A Modeling of Alternatives, Appendix 6B Water Resources System Modeling, and Appendix 6C Upper Sacramento River Daily River Flow and Operations Modeling describe the assumptions and the analytical framework used in the surface water modeling analyses.
    [Show full text]
  • Drought Brochure 2021 Update
    Drought In California January 2021 California Department of Water Resources | Natural Resources Agency | State of California Major Water Facilities Tule Lake Clear LLaakke Reservoir Trinity Reservoir Shasta Lake Whiskeytown Redding State Water Project Lake Antelope Federal Water Project Corning Canal Lake Tehama-ColuColussa Local Water Project Canal Frenchmmaan BlackBlack ButteButte LaLakke Lake Lake Lake Oroville Davis Stony GoGorgege Reservvoioir New BullBullaards East PaParrk Reservoivoir Bar Reservoir Lake Mennddoocincino Englebrightight Reservoivoir Indian Vaalleylley Reservoivoir Glenn-Colusa Canal Lake Sonoma Folsom Lake Lake Sacramento Auburn FolFolsom Sooututhh CCananaal Berryessa Putah S. CanaCanal Camanche Reservvoioir North Bay Aqueduct Mokelkeluummnne New Hogan Reservoir AqAquedueducuct New Meloelonnees LaLakke Contra Costa CCananal Stockton Los Vaqueros Reservoir Hetch Hetchyetchy Reservoir Don Pedro Lake San Francisco Lake McClure Lake Crowley Lake Hetch Hetchy Aqueduct Del Vaalllle South Bay Aqueduceduct Delta-Meendotandota Pachechecoo Conduit Canal Madera CaCanal Tinemaha Santa Clara CondConduiuit Millerton Lake Reservoir Hollister Condduuiit Pine Flat Reservoir San Luis Reeservvoioir Fresno San Luis Los Banos Reservoir Canal Lake Friant-Kern Kaweah Coalinga Canal Canal Haiwee Reservoir Lake Calif Success San Antonio Reservvoioir or Nacimientnto ni Isabella Reservoiir a Lake Los Angeles Cross Valley Aqueduct Canal California Aqueduct Twitchelwitchell Coastal Branch Reservoir Quail Lake Aq ued Pyramid LaLakke u ct Colorado
    [Show full text]
  • Key Issues: Climate Zone: Subjects: Effects: Project Name
    IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 05-08: Water Quality – Shasta Dam, U.S. Key Issues: 5- Water Quality 1-Biological Diversity Climate Zone: Cs: Temperate Subjects: - River Temperature Modification - Salmon Habitat Restoration - Hydropower Production Optimization Effects: - Improved habitat for salmon spawning and juvenile rearing - Additional Hydropower Generation - Role Model for other dams and power plants Project Name: Shasta Dam Temperature Control Device Country: Shasta County, California, United States of America Implementing Party & Period - Project: U.S. Bureau of Reclamation 1938-1945 (original construction)& 1995-1996 (modified) - Good Practice: U.S. Bureau of Reclamation 1996 - Present Key Words: Temperature Control Device, Hydropower Optimization, Endangered Species, Water Quality, Habitat Restoration, Selective Withdrawal, and Reservoir Stratification Abstract: This Good Practice illustrates a successful case study of habitat restoration and hydropower optimization. During the period of late 1980s to the mid-1990s, the Bureau of Reclamation spilled cold water through Shasta Dam’s low-level river outlets to provide proper water temperatures for salmon downstream, instead of passing water through the hydro turbines. A Temperature Control Device (TCD), with a unique selective withdrawal system that routes water through Shasta Powerhouse, has provided the answer to maintaining the required water temperature for fish and at the same time, generating clean inexpensive electricity. An aerial view of the TCD, Shasta Dam and power plant is shown in Figure 1. 1. Outline of the Project The Central Valley Project (CVP) in California, USA, developed, constructed and managed by the U.S. Department of the Interior’s Bureau of Reclamation (Reclamation), is one of the Nation’s major water resources developments and one of the largest water storage and conveyance systems in the world.
    [Show full text]
  • Trinity River Division Project History
    Trinity Division Central Valley Project Eric A. Stene Bureau of Reclamation 1996 Table of Contents Trinity River Division..........................................................2 Project Location.........................................................2 Historic Setting .........................................................2 Project Authorization.....................................................2 Construction History .....................................................3 Division Operation.................................................3 Trinity Dam......................................................4 Clear Creek Tunnel ................................................6 Clair A. Hill Whiskeytown Dam ......................................7 Spring Creek Power Conduit .........................................9 Lewiston Dam ....................................................9 Spring Creek Debris Dam ..........................................10 Cow Creek and Clear Creek Units....................................10 Post-Construction History................................................11 Buckhorn Dam ...................................................11 Settlement of the Project .................................................13 Uses of Project Water ...................................................13 Conclusion............................................................14 Table 1. Trinity River Division Powerplants and Capacities. ...........................15 Table 2. 1990 Crops and Total Value on the Trinity River Division.
    [Show full text]