Map Key

Castle Rock Recommended Bicycle Plan 1

Proposed Bicycle Plan – Area A

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 2

1 Cost Relative

to

System Connectivity Importance

²

West Medium $$ South Medium $$ South

South Medium $

Side Medium $

Route Route Route Route Route N. N. N.

Widths Medium $$ both

on on on

on Construct Construct Construct

Road Low $$

East Medium $$

West Low $$

Completed Medium $$ Bike Bike Bike Bike Bike

with with with

Lane on South on

Path

when Path Path

New

are Extension Low $$ Extension Low $$ Extension Low $$

Add Add Add Add Add on

Use ‐ ‐ ‐ ‐ ‐ Path Use Use Dr. Dr. Dr. ‐ Path Sidewalk

‐ ‐

Sidewalk, Side Medium $$ Sidewalk, Sidewalk, Improvements with

Lanes

Signing Low $ Signing Medium $ Signing Medium $ Signing Medium $ Signing Medium $ Existing Path

Use Use ‐ Completed Completed Completed ‐ Multi

Multi Multi Roadway

Bike

Facility Facility

Facility Facility Facility

Use

‐ be be be Existing

Route

of

Existing Existing Existing

Multi Meadows Meadows Meadows Multi To To To Stripe Multi Bike Existing Existing Existing Existing Existing Halves Construct Widen Widen Widen

A Both Both Both Both

Both

Both

Both Both Both Both Both

Both Both Both Both Both Both Both

Path Path Path Path Path Path Path Path Path Path Path Path Path Path Bicycle

Sides Sides Sides Sides Sides Sides Sides Sides Sides Redistribute Sides Construct Sides Sides Construct Sides Sides Widen Sides Construct Sides Sides Sides Shoulder Shoulder Shoulder Shoulder Area Use Use Use Use Use Use Use Use Use Use Use Use Use Use

Facility

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ­ Future Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Usable Usable Usable Usable projects.

all

Table

R.O.W.

on

East East,

on on on Path

Both on

Both Both Both

Both

West West

North, East on

on

Use on on ‐ Path Path Path

on on require Bicycle

Path Path

Path Path construction.

Path Sidewalk South Path

needed Sides Sides Sides Sides Sides

Use North South Use Use North Shoulder ‐ ‐ ‐ 6' Use Use Use Multi Use Facility May

on ‐ ‐ ‐ ‐ be

Use path Use

‐ ‐ Sidewalk Sidewalk of

Sidewalk

Existing

Mulit Multi Multi will

Multi Multi Multi Multi 6' Usable North, 6' Partial Summary Multi

sources.

‐ ‐

I St. amount

signing

Mist Dr. Dr.

widening.

N.

‐ ‐ Drive ‐

funding West ‐ Fell

Prairie small

Dr. Dr.

route ‐ ‐ Morning Rd.

Dr.

‐ Elegant Route Trailblazer

‐ Springbriar Trailside ‐ or

street ‐ ‐

Dr.

‐ Dr. Meadows Crossing Crossing

Drive Dr. Dr. None Way bike ‐

Dr.

Rd.

Rd.

Pkwy.

Dr. Dr.

special

Way View Dr.

St.

Castlegate Canyon minor

Dr. None

Dr.

striping,

Bike Mist or

85

Meadows

however, possibly

25 None Castlegate Springmeadow Meadows Way N Happy Castlegate Way Pkwy. Multi Coachline Cherokee Butterfield Castlegate West Sidewalk Coachline Elegant Hawk Cherokee Dr. Dr. 6' Morning Springbriar View Trailblazer SH Trailside Springmeadow Meadows Butterfield

and/or

and UP

facilites;

and and

construction

signing

Dr. Dr. Dr. Dr. Dr.

planning

path Blvd. Blvd. Blvd. Blvd. Blvd. Blvd. Blvd. Fell Blvd. Blvd. Blvd. Blvd.

existing

Name Segment

term

RR N/A None for

Road

85 Meadows Meadows Meadows Meadows Meadows

requires long

miscellaneous BSNF RR N/A None N. N.

below

require

include Generally

shown

is Will

May cost.

Name Area Street cost.

signing cost.

capital Bridge Bridge

Route 1AMeadows 1AMeadows 1AMeadows 1AMeadows 1AMeadows Capital route

Route A,B New Route A Meadows

Route A Meadows Route A N.

Route A Meadows

Route A Meadows Route A Meadows

Route A N. Route A Meadows Route A N.

capital

bike High Treatment A Treatment A Special Special Bike

‐ Medium

‐ Small ‐ $$ $$$ $ New

1.

2. ID A3 Ring A4 Loop A8 Loop A6 Loop A1 Ring A5 Loop A9 Ring A7 Loop A2 Ring A15 Ring A17 A18 A16 Connector A US A11 Ring A13 Ring A10 Ring A14 Ring A12 Ring Segment

Castle Rock Recommended Bicycle Plan 3

Proposed Bicycle Plan – Area B

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 4

1 Cost Relative

to

System Connectivity Importance

²

West Medium $$$ Road Low $$$

Both Both Route Route Route Route Route Route Route Route Route Route Route

Widths Medium $$ Widths Low $$ New Median Medium $$

on

New Signing Medium $ Signing Low $ Signing Low $ Signing Low $ Bike

Bike Bike Bike Bike Bike Bike Bike Bike Bike Bike Path Path

Lane Lane with Signing Medium $

Path

and and and and Use with Use Add Road High $$$ Add Add Road High $$$ Add Add Add Add Add Add Add Add

Painted

‐ Connection Medium $$

Use ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Lane of

Improvements Sides Medium $$$ Sides High $$$

Signing Medium $ Signing High $ Signing Medium $ Signing Medium $ Signing High $$ Signing Low $ Signing High $ Signing High $ Signing High $ Signing Medium $ Signing High $ Existing Existing

Multi Multi

Bike Multi

Completed Facility Facility Facility Facility Facility Facility Facility Facility Facility Facility Facility

Sharrows Sharrows Sharrows Sharrows

Width

Route Completed Be

Woodlands Be To

Construct Construct Bike Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing

B Both Both Both Both Both Both Both Both Both

Sides Sides Widen Sides To Sides Add Sides Sides Sides Widen

Both

Both

Both

Both Path Both Both Both Both Both Both Path Path Bicycle

Roadway Roadway Roadway

Sides Sides Sides Sides Sides Sides Sides Sides Sides Construct Sides Reduce Sides Redistribute Sides Redistribute Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Area Use Use Use

Facility

‐ ‐ ‐ ­ Lanes Lanes Lanes Lanes Lanes Lanes Lanes

Future Multi Multi Multi Usable Usable Usable Usable Usable Usable Usable Usable Usable projects.

all

Table R.O.W.

East Bike

East

Both Both on Sides Bike Sides Bike Sides Bike

on on

require Bicycle

Both Both Both

construction.

Path

needed Sides Bike Sides

Shoulder Shoulder May

Facility Shoulder be

Use path

Lanes Lanes Lanes

of

Existing will

Usable Usable Summary

sources.

of

St. None

amount

signing

‐ ‐ ‐

Rd. Bike ‐

widening. Pkwy None Sharrows Add

‐ Dr. Bike

Scott Sante funding ‐ ‐ North Rd. Autum Black Rd. None Shared Front Blvd.

‐ ‐ small ‐

‐ Circle

Pkwy ‐ Crowfoot ‐ ‐ ‐

route

Diamond Fe ‐

Trail None TBD TBD Low $$$

‐ Founders Founders Route

St. Multi Trail

‐ or Dr.

street Crimson Dr.

Liggett

‐ Blvd Blvd. Blvd None Blvd.

Drive Trail bike Dr. Dr. Usable Dr. Pkwy Pkwy Pkwy.

Pl.

Pl. None

Pl. None Shared Valley Valley Pkwy. None Bike Pkwy. Pkwy.

Ridge

Ridge

special

Pointe Dr. None Sharrows Add

Drive

Founders

Woodlands

Woodlands

Dr. Sante

Sky

‐ ‐

‐ Trail None Cloud

Hawk Existing Rd. None Sharrows Add minor

Pawnee Fe Pkwy None Sharrows Add

St. St. St. Feather

St.

St. Bike

striping,

E of Dr. None

Bike or ‐

Dr. None

Pawnee

25 however, possibly ‐

Copper Founders Crimson Beechnut Crowfoot Blvd None Woodlands Pkwy. None Bike Blvd. None End Sky Beechnut Knobcone Crowfoot Front Woodlands Founders Meadows Wolfensberger Diamond Knobcone Sapphire Sapphire Woodlands Sage Blvd. None Diamond Black Founders Woodlands Beechnut Front Castlegate Meadows Ridge Pkwy. None Shared Sapphire Valley Knobcone Feather Fe Prairie E. and/or

and

25 N/A None ‐ facilites; I

Rd. Rd.

Blvd construction

Pkwy Circle Pkwy

signing of

Trail

Dr and

planning

path Dr. Dr. Pkwy.

Pl. Pkwy Pkwy Valley Valley Pkwy Ridge Ridge Ridge

Pointe

Dr. Dr. Meadows

existing

Name Segment Hawk

term

Sun

Fe Fe St Allen St Sante

Feather Blvd.

St. Front

for

Segment

Road Road I

85

requires long

miscellaneous Woodlands New

below

BScott BNew require

include Generally

shown

Will is

May cost.

Name Area Street cost.

signing 3BWoodlands 3B 1 A,B,E Prairie 2BSante 3BWoodlands 3 B Founders 2BFront 2A,BUS cost.

capital Bridge

Run Run Run Run Run Run Run Run

Route 2BAllen 2BFront 3BCrowfoot 3BDiamond 3BDiamond 4B,CRising 2BBlack 3BDiamond 1A,BMeadows Capital route

Route B,E Founders Route B Knobcone

Route B Founders

Route B Crowfoot

Route B Beechnut

Route B Sapphire Route B New

capital

bike High Special Treatment B Sante Bike

‐ Medium

‐ Small ‐ $$$ $$ $ New

1. 2. B5 Ring B4 Loop B9 Loop B8 Loop B3 Ring B7 Loop B6 Ring B2 Ring B1 Ring ID B18 Castle B23 Ring B27 B17 Loop B14 Loop B16 Connector B25 Connector B22 Ring B20 Castle B13 Castle B11 Castle B24 Loop B19 Castle B21 Castle B12 Loop B15 Castle B26 Castle B10 Loop Segment

Castle Rock Recommended Bicycle Plan 5

Proposed Bicycle Plan – Area C

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 6

1 Cost Relative

to

System Connectivity Importance ²

and and and

Paved Medium $$ Paved Medium $$ Paved Medium $$

is is is

Signing Signing Signing

Road Road Road Road Medium $$$

Improvements

Striping Medium $ Striping Medium $ Striping Medium $ Route Route Route when when when

Bike Bike Bike

Route

Add Add Add Bike

C

Sides Sides Sides Construct Sides Sides Construct Sides Construct Sides Widen

Both Both Both Both Both Both Both Bicycle

Area Facility ­ Lanes Lanes Lanes Lanes Lanes Lanes Lanes

Future projects.

all Table

R.O.W.

Both on Sides Bike Sides Bike

require Bicycle

Both Both

construction.

needed (Unpaved) Bike (Unpaved) Bike (Unpaved) Bike Sides Bike

Shoulder May Facility

be

path

Lanes Lanes

of

Existing will

Usable Summary

sources.

amount

signing

widening.

Rocky Cherry

‐ funding Autum Blvd.

small Autum N. ‐ Rising route

‐ ‐ ‐

Dr. Castle

Route ‐ or

Trail street

St. St.

Dr.

Dr. bike

Pkwy. View special Pointe

Sage Sage Creek

Oaks minor

Sun

Dr. None Dr. Bike St. None St. None Bike

striping, Dr. Bike Bike

or

Rocky

however, possibly

Autum Sage Autum View Oaks Sun Rising Castle N. Creek None Sage Sapphire Cherry Founders and/or

and

facilites;

Rd. construction

signing

Dr. St. St. planning

Dr. Dr.

Dr.

path

Valley

existing Sky

Name Segment Sage Sage

term

Oaks Oaks Oaks

for

requires long

miscellaneous

below

require

include Generally shown

is Will

May cost.

Name Area Street cost.

signing

cost.

capital

Route 4C,FCastle 4C,FAutum 4CAutum 4B,CCrimson Capital route

capital

bike High Bike

‐ Medium

‐ Small ‐ $$ $$$ New $

2.

1.

C5 Loop C6 Connector C Castle C4 Loop C3 Loop C7 Connector C Castle ID C1 Connector B,C Crowfoot C2 Loop Segment

Castle Rock Recommended Bicycle Plan 7

Proposed Bicycle Plan – Area D

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 8

1 Cost Relative

to

System Connectivity Importance

² Widths, Widths,

Needed Medium $$ Needed Medium $$

as as Lane Lane

Inlets Inlets Improvements

Existing Existing

Route

Reconstruct Reconstruct Bike Redistribute Redistribute

D Both Both

Bicycle

Sides Sides Shoulder Shoulder Area Facility

­ Future Usable Usable projects.

all

Table R.O.W.

Both Both on

require Bicycle

construction.

needed Sides Sides

Shoulder Shoulder Facility

May be

path

of

Existing will

Usable Usable Summary

sources.

amount signing

widening.

funding ‐

small

route Rd.

Route or

street

‐ bike Pkwy.

special Dr. Dr.

minor

striping,

Bike or

however, possibly

Meadows Foothills Foothills Wolfensberger and/or

and

facilites;

construction

signing

planning

path Rd. Rd.

existing

Name Segment

term

for

requires long

miscellaneous

below

require

include Generally

shown

Will is

May cost.

Name Area Street cost.

signing cost.

capital

Route Capital route

Route A,D Coachline Route D Coachline

capital

bike High Bike

‐ Medium

‐ Small ‐ $$ $$$ $ New

1. 2. ID D1 Ring D2 Ring Segment

Castle Rock Recommended Bicycle Plan 9

Proposed Bicycle Plan – Area E

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 10

Bike Route Summary Table­Area E Importance to Segment Existing Bicycle Future Bicycle Relative Bike Route Name Area Street Name Segment Bike Route Improvements² System ID Facility Facility Cost1 Connectivity Remove Median in Railroad Underpass to Accommodate Bike E1 Castle Run 1 E Wolfensberger Rd Prairie Hawk Dr‐Park St None Bike Lanes Both Sides Lanes High $$ Wolfensberger Rd‐Jerry E2 Castle Run 1EPark St St None Sharrows Add Sharrows and Signing High $ E3 Castle Run 1E5th St Jerry St‐Wilcox St None Sharrows Add Sharrows and Signing High $ E4 Castle Run 1E5th St Wilcox St‐Front St None Sharrows Add Sharrows and Signing High $ E5 Castle Run 2EPerry5th St‐1st St None Sharrows Add Sharrows and Signing High $ Construct 8' Multi‐Use Path on Multi‐Use Path Both West, Widen Existing Sidewalk to E6 Castle Run 2 E Perry 1st St‐Plum Creek Pkwy Multi‐Use Path on East Sides 8' on East Side High $$

E7 Castle Run 2EFront St Liggett Rd‐ Canyon Dr None Bike Lanes Both Sides Redistribute Existing Lane Widths High $$ Usable Shoulder Both Existing Facility ‐ Add Bike Route E8 Castle Run 3 E Woodlands Scott Blvd‐5th St None Sides Signing Medium $ E9 Castle Run 4E5th St Front St‐Gilbert St None Sharrows Add Sharrows and Signing High $ Gilbert St‐Woodlands To Be Completed With 5th St E10 Castle Run 4E5th St Blvd None Bike Lanes Both Sides Widening Medium $$$ Woodlands Blvd‐Valley To Be Completed With 5th St E11 Castle Run 4E5th St Dr None Bike Lanes Both Sides Widening Medium $$$ To Be Completed With 5th St E12 Castle Run 4E5th St Valley Dr‐Founders Pkwy None Bike Lanes Both Sides Widening Medium $$$ Usable Shoulder Both Usable Shoulder Both Existing Facility ‐ Add Bike Route E13 Castle Run 5 E Gilbert 5th St‐South St Sides Sides Signing High $ South St‐Plum Creek Existing Facility ‐ Add Bike Route E14 Castle Run 5 E Gilbert Pkwy Bike Lanes Both Sides Bike Lanes Both Sides Signing High $ Plum Creek Pkwy‐Crystal Usable Shoulder Both E15 Castle Run 5 E,H Gilbert Valley Pkwy None Sides Widen Road Medium $$$ E16 Castle Run 6EWilcox5th St‐2nd St None Sharrows Add Sharrows High $ Bike Lanes to be Added with New E17 Castle Run 6EWilcox2nd St‐Plum Creek Pkwy None Bike Lanes Both Sides Development High $$ Plum Creek Pkwy‐Crystal E18 Castle Run 6E,GEast Frontage Road Valley Pkwy None Bike Lanes Both Sides Widen Road Medium $$$ E19 Connector E Valley Dr. 5th St‐Hover Dr. None Sharrows Add Sharrows Low $ Hover Dr.‐Plum Creek E20 Connector E Valley Dr. Pkwy None Sharrows Add Sharrows Low $$ Wolfensberger Rd‐ E21 Connector E Prairie Hawk Dr. Atchison Way None Bike Lanes Both Sides Redistribute Existing Lane Widths Medium $$ Prairie Hawk Dr.‐Topeka E22 Connector E Atchison Way Blvd. None Bike Lanes Both Sides Redistribute Existing Lane Widths Low $$

New Frontage Rd. Atchison Way‐Crystal E23 Connector E,G Connection Valley Pkwy interchange None Bike Lanes Both Sides To be Constructed With New Road Low $$$ Plum Creek Pkwy‐Crystal Usable Shoulder Both Convert Existing Shoulder to Bike E24 Connector E Plum Creek Blvd. Valley Pkwy Sides Bike Lanes Both Sides Lanes High $ E25 Connector E South St. Gilbert St.‐Valley Dr. None Sharrows Add Sharrows and Signing High $ Plum Creek Pkwy‐Plum E26 Connector EEmerald Dr. Creek Blvd None Sharrows Add Sharrows and Signing Medium $ Wolfensberger Rd.‐New Bike Lanes to be Added when Plum E27 Ring Route D,E Plum Creek Pkwy Frontage Rd. None Bike Lanes Both Sides Creek Pkwy is Widened Medium $$ New Frontage Rd‐ Approximately 500' Bike Lanes to be Added when Plum E28 Ring Route E Plum Creek Pkwy West of I‐25 None Bike Lanes Both Sides Creek Pkwy is Widened Medium $$ Approximately 500' Multi‐Use Path Both Multi‐Use Path Both E29 Ring Route E Plum Creek Pkwy West of I‐25‐Wilcox St. Sides Sides No Change Medium $ Wilcox St.‐Plum Creek Multi‐Use Path Both E30 Ring Route E Plum Creek Pkwy Blvd Sidewalk Both Sides Sides Widen Existing Sidewalk to 8' Medium $$ Plum Creek Blvd‐ Partial Sidewalk North Multi‐Use Path Both Widen Existing Sidewalk to 8', E31 Ring Route E Plum Creek Pkwy Fairgrounds Dr. Side, Multi‐Use Path Sides Pave Multi‐Use Path on North Medium $$ Fairgrounds Dr.‐S Lake Multi‐Use Path Both Multi‐Use Path Both E32 Ring Route E Plum Creek Pkwy Gulch Rd. Sides Sides No Change Medium $ North of Copper Cloud Multi‐Use Path Both E33 Ring Route E Founders Pkwy St.‐5th St. Multi‐Use Path on West Sides Pave 8' Multi‐Use Path on East High $$ Topeka Blvd. to Construct Bike Lanes with New E34 Connector E New Road Wolfensberger Rd. None Bike Lanes Both Sides Street Low $$

Special Bridge Plum Creek Pkwy and Multi‐Use Path Both Widen Existing or Add E35 Treatment E UPRR N/A Sidewalk Both Sides Sides Independent Structures Both Sides Medium $$$

Special Bridge Widen South Side of I‐25 Bridge or E36 Treatment E Park St.‐I‐25 N/A None Bike Lanes Both Sides Build Independent Bike Structure High $$$ 1. $‐Small capital cost. May include miscellaneous signing and/or striping, or small amount of path construction. $$‐Medium capital cost. Generally requires path construction or minor street widening. $$$‐High Capital cost. Will require long term planning and possibly special funding sources. May require R.O.W. 2. New bike route signing is shown below for existing facilites; however, bike route signing will be needed on all projects.

Castle Rock Recommended Bicycle Plan 11

Proposed Bicycle Plan – Area F

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 12

1 Cost Relative

to

System Connectivity Importance

‐ ‐ ‐

4 4 4 ²

Road

Rd. Rd. Rd.

Route

Widths Low $$ Widths Low $$ Widths Low $$ Widths Medium $$ Paved Low $$ Paved Low $$$

is is

when

Bike Ridge Ridge Ridge

Lane ProjectLane Medium $$$ Project High $$$ Lane Lane Project High $$$

Road Road Road Low $$ Add

with with with

Added ‐

Improvements

Widened High $$$ Signing Medium $ be

Existing Existing Existing Existing

when when

is Widening Widening Widening to

Facility

Route

Completed Completed Completed Lane Lane Lane

Lanes

be be be

Bike Existing To To To Bike

F

Sides Construct Sides Construct SidesSides Redistribute Widen Sides Redistribute Sides Sides Sides Sides Redistribute Sides Redistribute Sides Sides Path

Use Both Both Both Both Both Both Both Both Both Both Both Both Bicycle ‐

Area Facility ­ Multi

Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes

Future and Bike projects.

Table all

R.O.W.

on Sides Bike

require Bicycle

Both construction.

(Unpaved) Bike (Unpaved) Bike needed

Facility May be

path

Lanes

of

Existing will

Summary

sources.

amount 86 None Bike signing

Rd. None Bike

Blvd. None Bike widening.

St. None Bike Creek SH

‐ ‐ Ridge funding ‐ Blvd. None Bike

small Autum High

Rd. None Bike route

‐ ‐ Dr.

Rd.

Route

or Rd. street

Plum St. None

Dr.

‐ Enderud Pkwy

bike

Mitchell Mikelson Pkwy Blvd. None Bike View special ‐ ‐

View

Rd. St.

Sage Gulch

Enderud Oaks Mikelson minor

Rd. Rd.

Rd. None ‐ Creek

St. Bike

striping,

Bike

St or

86

Valley

Valley

Lake

however, possibly

Castle Point Autum N. Mikelson Enderud Pkwy None Bike S Rd None Founders Sage Plum and/or

and

facilites;

construction

signing Rd.

St.

planning Dr. Pkwy.

Rd. N path

Blvd. Ridge Blvd. Mitchell

existing View Rd. SH Rd. Ridge

Cloud Name Segment

term Oaks

Rd. 5th Rd. Rd.

Creek for

Point

Valley requires long

miscellaneous

below

require

include Generally

shown

is Will

May

cost.

Name Area Street cost.

signing cost.

capital

Route 5 F Enderud 5FMikelson 5FMikelson 4 F Copper 5FRidge Capital route

Route E,F Ridge

Route F Ridge Route E,F Plum

capital

bike High Bike

‐ Medium

‐ Small ‐ $$ $$$ $ New

1. 2.

F3 Connector F N F6 Ring F5 Connector F Enderud F9 Loop F7 Ring F4 Connector F High F1 Loop F2 Connector F Castle F8 Loop ID F10 Loop F12 Ring F11 Loop Segment

Castle Rock Recommended Bicycle Plan 13

Proposed Bicycle Plan – Area G

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 14

1 Cost Relative

to

System Connectivity Importance

² is is is

4'

Road Low $$$

Sides

Design Both Route

Bridge Paved Low $$

in

Rd. Medium $$$

New is

Both

Bike Require Path

and

Pavement Pavement Pavement

on

With will Road Use Add

‐ Included ‐

Frontage

Improvements Sides Medium $ When When When

Signing Medium $ be E.

Overpass Low $$$

when Multi

to Reconstructed Low $$

Reconstructed Low $$ Reconstructed Low $$ Widening 25 Interchange

‐ Facility Shoulder

I

Added Added Added Route

of Constructed

Lanes Be Be Be New

be

Construct of Usable Bike To To To Existing Shoulder Bike

G Both

Both Sides Sides Sides Sides Construct Sides To

Both Both

Path Both Path Both Both Path Both Both Bicycle

Sides Sides Sides Sides Shoulder Area Use Use Facility

‐ ‐ ­ Lanes Lanes Lanes Lanes Lanes Lanes

Future Multi Multi Bike Usable projects.

all

Table R.O.W.

on Both Both

require Bicycle

Path Path construction.

needed (Unpaved) Bike Sides Sides

Use Use Facility May ‐ ‐ be

path

of

Existing will

Multi Multi Summary

sources.

amount signing

‐ ‐ widening. of Crest Rd. None

funding

small route

Blvd. Blvd Dawson Dr. None Bike Pine Route

Pkwy

‐ ‐ West

or

Ridge street ‐

Blvd.

Bridge bike Cir.

Rd.

special

Ridge Ridge Ridge

RR

Rd. None Valley

minor Bridge Blvd. None Bike

Creek

Crest striping, Dawson UP

Bike

‐ or ‐ RR

25 25 however, possibly ‐ ‐

Gambel Dawson Cir. None Bike Territorial Tomah Pine Ridge Crystal Dawson South None Bike UP Plum

and/or

and

and

facilites;

construction

signing Rd. Dr.

Rd.

Pkwy. Pkwy. I Pkwy.

planning

path Cir. Rd. I

existing Ridge

Ridge

Name Segment Valley Valley Valley

term

for Road

Crest Frontage

requires long

25 N/A None ‐ miscellaneous Crystal I

below

require

include Generally shown

Will is

May

cost.

Name Area Street cost.

signing 6GEast

cost.

capital Bridge

Run

Route 7GPine 7GDawson 7GGambel 7 G Territorial Capital route

capital

bike High Treatment G Special Bike

‐ Medium

‐ Small ‐ $$$ $$ New $

2. 1.

ID G4 Castle G9 G6 Loop G5 Loop G7 Loop G8 Connector G New G2 Connector G Crystal G1 Loop G3 Connector G,H Crystal Segment

Castle Rock Recommended Bicycle Plan 15

Proposed Bicycle Plan – Area H

*See Bike Route Summary Table

Castle Rock Recommended Bicycle Plan 16

1 Cost Relative

to

System Connectivity Importance

² Lake

Both Both Both

North

North

S. Limits Low $$$

Signing Low $ of

Path Path Path

Path

Path

Town

Use Use Use Use Use ‐ ‐ ‐ ‐ ‐ Side Medium $$ Side Medium $$ Improvements Sides Medium $$ Sides Medium $ Sides Medium $

Widening

Multi Multi Multi Route/Lane Beyond Multi

Multi

Rd.

Bike Route

Require

Gulch Construct Construct Construct Bike Construct Construct Will

H Both

Sides Add Both Both Both

Both Both

Path Path Path Both Path Path Bicycle

Sides Sides Sides Sides Sides Sides Shoulder Area Use Use Use Use Use Facility

‐ ‐ ‐ ‐ ‐ ­ Lanes

Future Multi Multi Multi Multi Multi Usable projects.

all

R.O.W. Table

on Sides Bike

South South

require Bicycle

Both construction. Path

Path

Side needed Side

Facility May Use Use be ‐ ‐

path

Lanes

of

Existing will

Multi Multi Summary

sources.

E. of amount

signing

S ‐ Blvd. ‐ ‐

widening. Gulch

Rd.

St. East

‐ funding

small

route

Pkwy. Pkwy. Bike Lake Creek Pkwy. Route

or Loop street

Paw

Blvd None Blvd. S.

‐ bike St.

St. St. None special E.

Plum

Valley Valley Valley Lions

minor Rd. None

Creek of Creek Paw Rd.

of striping,

Bike or

however, possibly

Crystal Plum Loop Crystal Rd. None West Plum Lions Crystal Ridge East Idylwood and/or

and

facilites;

construction

signing

Pkwy. Idylwood Pkwy. Pkwy. Pkwy. Pkwy. Rd.

planning

path

existing

Name Segment Gulch Valley Valley Valley Valley Valley

term

for Rd.

Lake requires long

miscellaneous

below

require

include Generally shown

Will is

May cost.

Name Area Street cost.

signing 5HS.

cost.

capital

Run

Route 6HCrystal 6HCrystal 6 H Loop 6HCrystal Capital route

capital

bike High Bike

‐ Medium

‐ Small ‐ $$ $$$ New $

2. 1. ID H4 Loop H5 Loop H1 Connector H Crystal H2 Connector H Crystal H6 Loop H7 Castle H3 Loop Segment

Castle Rock Recommended Bicycle Plan 17