Map Key
Castle Rock Recommended Bicycle Plan 1
Proposed Bicycle Plan – Area A
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 2
1 Cost Relative
to
System Connectivity Importance
²
West Medium $$ South Medium $$ South
South Medium $
Side Medium $
Route Route Route Route Route N. N. N.
Widths Medium $$ both
on on on
on Construct Construct Construct
Road Low $$
East Medium $$
West Low $$
Completed Medium $$ Bike Bike Bike Bike Bike
with with with
Lane on South on
Path
when Path Path
New
are Extension Low $$ Extension Low $$ Extension Low $$
Add Add Add Add Add on
Use ‐ ‐ ‐ ‐ ‐ Path Use Use Dr. Dr. Dr. ‐ Path Sidewalk
‐ ‐
Sidewalk, Side Medium $$ Sidewalk, Sidewalk, Improvements with
Lanes
Signing Low $ Signing Medium $ Signing Medium $ Signing Medium $ Signing Medium $ Existing Path
Use Use ‐ Completed Completed Completed ‐ Multi
Multi Multi Roadway
Bike
Facility Facility
Facility Facility Facility
Use
‐ be be be Existing
Route
of
Existing Existing Existing
Multi Meadows Meadows Meadows Multi To To To Stripe Multi Bike Existing Existing Existing Existing Existing Halves Construct Widen Widen Widen
A Both Both Both Both
Both
Both
Both Both Both Both Both
Both Both Both Both Both Both Both
Path Path Path Path Path Path Path Path Path Path Path Path Path Path Bicycle
Sides Sides Sides Sides Sides Sides Sides Sides Sides Redistribute Sides Construct Sides Sides Construct Sides Sides Widen Sides Construct Sides Sides Sides Shoulder Shoulder Shoulder Shoulder Area Use Use Use Use Use Use Use Use Use Use Use Use Use Use
Facility
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Future Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Multi Usable Usable Usable Usable projects.
all
Table
R.O.W.
on
East East,
on on on Path
Both on
Both Both Both
Both
West West
North, East on
on
Use on on ‐ Path Path Path
on on require Bicycle
Path Path
Path Path construction.
Path Sidewalk South Path
needed Sides Sides Sides Sides Sides
Use North South Use Use North Shoulder ‐ ‐ ‐ 6' Use Use Use Multi Use Facility May
on ‐ ‐ ‐ ‐ be
Use path Use
‐ ‐ Sidewalk Sidewalk of
Sidewalk
Existing
Mulit Multi Multi will
Multi Multi Multi Multi 6' Usable North, 6' Partial Summary Multi
sources.
‐ ‐
I St. amount
‐
signing
Mist Dr. Dr.
widening.
N.
‐ ‐ Drive ‐
funding West ‐ Fell
Prairie small
Dr. Dr.
route ‐ ‐ Morning Rd.
Dr.
‐ Elegant Route Trailblazer
‐ Springbriar Trailside ‐ or
street ‐ ‐
Dr.
‐ Dr. Meadows Crossing Crossing
Drive Dr. Dr. None Way bike ‐
Dr.
Rd.
Rd.
Pkwy.
Dr. Dr.
special
Way View Dr.
St.
Castlegate Canyon minor
Dr. None
‐
Dr.
striping,
Bike Mist or
85
Meadows
however, possibly
25 None Castlegate Springmeadow Meadows Way N Happy Castlegate Way Pkwy. Multi Coachline Cherokee Butterfield Castlegate West Sidewalk Coachline Elegant Hawk Cherokee Dr. Dr. 6' Morning Springbriar View Trailblazer SH Trailside Springmeadow Meadows Butterfield
and/or
and UP
facilites;
and and
construction
signing
Dr. Dr. Dr. Dr. Dr.
planning
path Blvd. Blvd. Blvd. Blvd. Blvd. Blvd. Blvd. Fell Blvd. Blvd. Blvd. Blvd.
existing
Name Segment
term
RR N/A None for
Road
85 Meadows Meadows Meadows Meadows Meadows
requires long
miscellaneous BSNF RR N/A None N. N.
below
require
include Generally
shown
is Will
May cost.
Name Area Street cost.
signing cost.
capital Bridge Bridge
Route 1AMeadows 1AMeadows 1AMeadows 1AMeadows 1AMeadows Capital route
Route A,B New Route A Meadows
Route A Meadows Route A N.
Route A Meadows
Route A Meadows Route A Meadows
Route A N. Route A Meadows Route A N.
capital
bike High Treatment A Treatment A Special Special Bike
‐ Medium
‐ Small ‐ $$ $$$ $ New
1.
2. ID A3 Ring A4 Loop A8 Loop A6 Loop A1 Ring A5 Loop A9 Ring A7 Loop A2 Ring A15 Ring A17 A18 A16 Connector A US A11 Ring A13 Ring A10 Ring A14 Ring A12 Ring Segment
Castle Rock Recommended Bicycle Plan 3
Proposed Bicycle Plan – Area B
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 4
1 Cost Relative
to
System Connectivity Importance
²
West Medium $$$ Road Low $$$
Both Both Route Route Route Route Route Route Route Route Route Route Route
Widths Medium $$ Widths Low $$ New Median Medium $$
on
New Signing Medium $ Signing Low $ Signing Low $ Signing Low $ Bike
Bike Bike Bike Bike Bike Bike Bike Bike Bike Bike Path Path
Lane Lane with Signing Medium $
Path
and and and and Use with Use Add Road High $$$ Add Add Road High $$$ Add Add Add Add Add Add Add Add
Painted
‐
‐ Connection Medium $$
Use ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Lane of
Improvements Sides Medium $$$ Sides High $$$
Signing Medium $ Signing High $ Signing Medium $ Signing Medium $ Signing High $$ Signing Low $ Signing High $ Signing High $ Signing High $ Signing Medium $ Signing High $ Existing Existing
Multi Multi
Bike Multi
Completed Facility Facility Facility Facility Facility Facility Facility Facility Facility Facility Facility
Sharrows Sharrows Sharrows Sharrows
Width
Route Completed Be
Woodlands Be To
Construct Construct Bike Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing
B Both Both Both Both Both Both Both Both Both
Sides Sides Widen Sides To Sides Add Sides Sides Sides Widen
Both
Both
Both
Both Path Both Both Both Both Both Both Path Path Bicycle
Roadway Roadway Roadway
Sides Sides Sides Sides Sides Sides Sides Sides Sides Construct Sides Reduce Sides Redistribute Sides Redistribute Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder Area Use Use Use
Facility
‐ ‐ ‐ Lanes Lanes Lanes Lanes Lanes Lanes Lanes
Future Multi Multi Multi Usable Usable Usable Usable Usable Usable Usable Usable Usable projects.
all
Table R.O.W.
East Bike
East
Both Both on Sides Bike Sides Bike Sides Bike
on on
require Bicycle
Both Both Both
construction.
Path
needed Sides Bike Sides
Shoulder Shoulder May
Facility Shoulder be
Use path
‐
Lanes Lanes Lanes
of
Existing will
Usable Usable Summary
sources.
of
St. None
amount
signing
‐ ‐ ‐
Rd. Bike ‐
widening. Pkwy None Sharrows Add
‐ Dr. Bike
Scott Sante funding ‐ ‐ North Rd. Autum Black Rd. None Shared Front Blvd.
‐ ‐ small ‐
‐ Circle
Pkwy ‐ Crowfoot ‐ ‐ ‐
route
Diamond Fe ‐
Trail None TBD TBD Low $$$
‐ Founders Founders Route
St. Multi Trail
‐
‐ or Dr.
street Crimson Dr.
Liggett
‐
‐ Blvd Blvd. Blvd None Blvd.
Drive Trail bike Dr. Dr. Usable Dr. Pkwy Pkwy Pkwy.
Pl.
Pl. None
Pl. None Shared Valley Valley Pkwy. None Bike Pkwy. Pkwy.
Ridge
Ridge
special
Pointe Dr. None Sharrows Add
Drive
Founders
Woodlands
Woodlands
Dr. Sante
Sky
‐ ‐
‐
‐ Trail None Cloud
Hawk Existing Rd. None Sharrows Add minor
Pawnee Fe Pkwy None Sharrows Add
St. St. St. Feather
St.
St. Bike
striping,
E of Dr. None
Bike or ‐
Dr. None
Pawnee
25 however, possibly ‐
Copper Founders Crimson Beechnut Crowfoot Blvd None Woodlands Pkwy. None Bike Blvd. None End Sky Beechnut Knobcone Crowfoot Front Woodlands Founders Meadows Wolfensberger Diamond Knobcone Sapphire Sapphire Woodlands Sage Blvd. None Diamond Black Founders Woodlands Beechnut Front Castlegate Meadows Ridge Pkwy. None Shared Sapphire Valley Knobcone Feather Fe Prairie E. and/or
and
25 N/A None ‐ facilites; I
Rd. Rd.
Blvd construction
Pkwy Circle Pkwy
signing of
Trail
Dr and
planning
path Dr. Dr. Pkwy.
Pl. Pkwy Pkwy Valley Valley Pkwy Ridge Ridge Ridge
Pointe
Dr. Dr. Meadows
existing
Name Segment Hawk
term
Sun
Fe Fe St Allen St Sante
Feather Blvd.
St. Front
for
Segment
Road Road I
85
requires long
miscellaneous Woodlands New
below
BScott BNew require
include Generally
shown
Will is
May cost.
Name Area Street cost.
signing 3BWoodlands 3B 1 A,B,E Prairie 2BSante 3BWoodlands 3 B Founders 2BFront 2A,BUS cost.
capital Bridge
Run Run Run Run Run Run Run Run
Route 2BAllen 2BFront 3BCrowfoot 3BDiamond 3BDiamond 4B,CRising 2BBlack 3BDiamond 1A,BMeadows Capital route
Route B,E Founders Route B Knobcone
Route B Founders
Route B Crowfoot
Route B Beechnut
Route B Sapphire Route B New
capital
bike High Special Treatment B Sante Bike
‐ Medium
‐ Small ‐ $$$ $$ $ New
1. 2. B5 Ring B4 Loop B9 Loop B8 Loop B3 Ring B7 Loop B6 Ring B2 Ring B1 Ring ID B18 Castle B23 Ring B27 B17 Loop B14 Loop B16 Connector B25 Connector B22 Ring B20 Castle B13 Castle B11 Castle B24 Loop B19 Castle B21 Castle B12 Loop B15 Castle B26 Castle B10 Loop Segment
Castle Rock Recommended Bicycle Plan 5
Proposed Bicycle Plan – Area C
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 6
1 Cost Relative
to
System Connectivity Importance ²
and and and
Paved Medium $$ Paved Medium $$ Paved Medium $$
is is is
Signing Signing Signing
Road Road Road Road Medium $$$
Improvements
Striping Medium $ Striping Medium $ Striping Medium $ Route Route Route when when when
Bike Bike Bike
Route
Add Add Add Bike
C
Sides Sides Sides Construct Sides Sides Construct Sides Construct Sides Widen
Both Both Both Both Both Both Both Bicycle
Area Facility Lanes Lanes Lanes Lanes Lanes Lanes Lanes
Future projects.
all Table
R.O.W.
Both on Sides Bike Sides Bike
require Bicycle
Both Both
construction.
needed (Unpaved) Bike (Unpaved) Bike (Unpaved) Bike Sides Bike
Shoulder May Facility
be
path
Lanes Lanes
of
Existing will
Usable Summary
sources.
amount
signing
‐
widening.
Rocky Cherry
‐ funding Autum Blvd.
small Autum N. ‐ Rising route
‐ ‐ ‐
Dr. Castle
Route ‐ or
Trail street
St. St.
Dr.
Dr. bike
Pkwy. View special Pointe
Sage Sage Creek
Oaks minor
Sun
Dr. None Dr. Bike St. None St. None Bike
striping, Dr. Bike Bike
or
Rocky
however, possibly
Autum Sage Autum View Oaks Sun Rising Castle N. Creek None Sage Sapphire Cherry Founders and/or
and
facilites;
Rd. construction
signing
Dr. St. St. planning
Dr. Dr.
Dr.
path
Valley
existing Sky
Name Segment Sage Sage
term
Oaks Oaks Oaks
for
requires long
miscellaneous
below
require
include Generally shown
is Will
May cost.
Name Area Street cost.
signing
cost.
capital
Route 4C,FCastle 4C,FAutum 4CAutum 4B,CCrimson Capital route
capital
bike High Bike
‐ Medium
‐ Small ‐ $$ $$$ New $
2.
1.
C5 Loop C6 Connector C Castle C4 Loop C3 Loop C7 Connector C Castle ID C1 Connector B,C Crowfoot C2 Loop Segment
Castle Rock Recommended Bicycle Plan 7
Proposed Bicycle Plan – Area D
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 8
1 Cost Relative
to
System Connectivity Importance
² Widths, Widths,
Needed Medium $$ Needed Medium $$
as as Lane Lane
Inlets Inlets Improvements
Existing Existing
Route
Reconstruct Reconstruct Bike Redistribute Redistribute
D Both Both
Bicycle
Sides Sides Shoulder Shoulder Area Facility
Future Usable Usable projects.
all
Table R.O.W.
Both Both on
require Bicycle
construction.
needed Sides Sides
Shoulder Shoulder Facility
May be
path
of
Existing will
Usable Usable Summary
sources.
amount signing
widening.
funding ‐
small
route Rd.
Route or
street
‐ bike Pkwy.
special Dr. Dr.
minor
striping,
Bike or
however, possibly
Meadows Foothills Foothills Wolfensberger and/or
and
facilites;
construction
signing
planning
path Rd. Rd.
existing
Name Segment
term
for
requires long
miscellaneous
below
require
include Generally
shown
Will is
May cost.
Name Area Street cost.
signing cost.
capital
Route Capital route
Route A,D Coachline Route D Coachline
capital
bike High Bike
‐ Medium
‐ Small ‐ $$ $$$ $ New
1. 2. ID D1 Ring D2 Ring Segment
Castle Rock Recommended Bicycle Plan 9
Proposed Bicycle Plan – Area E
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 10
Bike Route Summary TableArea E Importance to Segment Existing Bicycle Future Bicycle Relative Bike Route Name Area Street Name Segment Bike Route Improvements² System ID Facility Facility Cost1 Connectivity Remove Median in Railroad Underpass to Accommodate Bike E1 Castle Run 1 E Wolfensberger Rd Prairie Hawk Dr‐Park St None Bike Lanes Both Sides Lanes High $$ Wolfensberger Rd‐Jerry E2 Castle Run 1EPark St St None Sharrows Add Sharrows and Signing High $ E3 Castle Run 1E5th St Jerry St‐Wilcox St None Sharrows Add Sharrows and Signing High $ E4 Castle Run 1E5th St Wilcox St‐Front St None Sharrows Add Sharrows and Signing High $ E5 Castle Run 2EPerry5th St‐1st St None Sharrows Add Sharrows and Signing High $ Construct 8' Multi‐Use Path on Multi‐Use Path Both West, Widen Existing Sidewalk to E6 Castle Run 2 E Perry 1st St‐Plum Creek Pkwy Multi‐Use Path on East Sides 8' on East Side High $$
E7 Castle Run 2EFront St Liggett Rd‐ Canyon Dr None Bike Lanes Both Sides Redistribute Existing Lane Widths High $$ Usable Shoulder Both Existing Facility ‐ Add Bike Route E8 Castle Run 3 E Woodlands Scott Blvd‐5th St None Sides Signing Medium $ E9 Castle Run 4E5th St Front St‐Gilbert St None Sharrows Add Sharrows and Signing High $ Gilbert St‐Woodlands To Be Completed With 5th St E10 Castle Run 4E5th St Blvd None Bike Lanes Both Sides Widening Medium $$$ Woodlands Blvd‐Valley To Be Completed With 5th St E11 Castle Run 4E5th St Dr None Bike Lanes Both Sides Widening Medium $$$ To Be Completed With 5th St E12 Castle Run 4E5th St Valley Dr‐Founders Pkwy None Bike Lanes Both Sides Widening Medium $$$ Usable Shoulder Both Usable Shoulder Both Existing Facility ‐ Add Bike Route E13 Castle Run 5 E Gilbert 5th St‐South St Sides Sides Signing High $ South St‐Plum Creek Existing Facility ‐ Add Bike Route E14 Castle Run 5 E Gilbert Pkwy Bike Lanes Both Sides Bike Lanes Both Sides Signing High $ Plum Creek Pkwy‐Crystal Usable Shoulder Both E15 Castle Run 5 E,H Gilbert Valley Pkwy None Sides Widen Road Medium $$$ E16 Castle Run 6EWilcox5th St‐2nd St None Sharrows Add Sharrows High $ Bike Lanes to be Added with New E17 Castle Run 6EWilcox2nd St‐Plum Creek Pkwy None Bike Lanes Both Sides Development High $$ Plum Creek Pkwy‐Crystal E18 Castle Run 6E,GEast Frontage Road Valley Pkwy None Bike Lanes Both Sides Widen Road Medium $$$ E19 Connector E Valley Dr. 5th St‐Hover Dr. None Sharrows Add Sharrows Low $ Hover Dr.‐Plum Creek E20 Connector E Valley Dr. Pkwy None Sharrows Add Sharrows Low $$ Wolfensberger Rd‐ E21 Connector E Prairie Hawk Dr. Atchison Way None Bike Lanes Both Sides Redistribute Existing Lane Widths Medium $$ Prairie Hawk Dr.‐Topeka E22 Connector E Atchison Way Blvd. None Bike Lanes Both Sides Redistribute Existing Lane Widths Low $$
New Frontage Rd. Atchison Way‐Crystal E23 Connector E,G Connection Valley Pkwy interchange None Bike Lanes Both Sides To be Constructed With New Road Low $$$ Plum Creek Pkwy‐Crystal Usable Shoulder Both Convert Existing Shoulder to Bike E24 Connector E Plum Creek Blvd. Valley Pkwy Sides Bike Lanes Both Sides Lanes High $ E25 Connector E South St. Gilbert St.‐Valley Dr. None Sharrows Add Sharrows and Signing High $ Plum Creek Pkwy‐Plum E26 Connector EEmerald Dr. Creek Blvd None Sharrows Add Sharrows and Signing Medium $ Wolfensberger Rd.‐New Bike Lanes to be Added when Plum E27 Ring Route D,E Plum Creek Pkwy Frontage Rd. None Bike Lanes Both Sides Creek Pkwy is Widened Medium $$ New Frontage Rd‐ Approximately 500' Bike Lanes to be Added when Plum E28 Ring Route E Plum Creek Pkwy West of I‐25 None Bike Lanes Both Sides Creek Pkwy is Widened Medium $$ Approximately 500' Multi‐Use Path Both Multi‐Use Path Both E29 Ring Route E Plum Creek Pkwy West of I‐25‐Wilcox St. Sides Sides No Change Medium $ Wilcox St.‐Plum Creek Multi‐Use Path Both E30 Ring Route E Plum Creek Pkwy Blvd Sidewalk Both Sides Sides Widen Existing Sidewalk to 8' Medium $$ Plum Creek Blvd‐ Partial Sidewalk North Multi‐Use Path Both Widen Existing Sidewalk to 8', E31 Ring Route E Plum Creek Pkwy Fairgrounds Dr. Side, Multi‐Use Path Sides Pave Multi‐Use Path on North Medium $$ Fairgrounds Dr.‐S Lake Multi‐Use Path Both Multi‐Use Path Both E32 Ring Route E Plum Creek Pkwy Gulch Rd. Sides Sides No Change Medium $ North of Copper Cloud Multi‐Use Path Both E33 Ring Route E Founders Pkwy St.‐5th St. Multi‐Use Path on West Sides Pave 8' Multi‐Use Path on East High $$ Topeka Blvd. to Construct Bike Lanes with New E34 Connector E New Road Wolfensberger Rd. None Bike Lanes Both Sides Street Low $$
Special Bridge Plum Creek Pkwy and Multi‐Use Path Both Widen Existing or Add E35 Treatment E UPRR N/A Sidewalk Both Sides Sides Independent Structures Both Sides Medium $$$
Special Bridge Widen South Side of I‐25 Bridge or E36 Treatment E Park St.‐I‐25 N/A None Bike Lanes Both Sides Build Independent Bike Structure High $$$ 1. $‐Small capital cost. May include miscellaneous signing and/or striping, or small amount of path construction. $$‐Medium capital cost. Generally requires path construction or minor street widening. $$$‐High Capital cost. Will require long term planning and possibly special funding sources. May require R.O.W. 2. New bike route signing is shown below for existing facilites; however, bike route signing will be needed on all projects.
Castle Rock Recommended Bicycle Plan 11
Proposed Bicycle Plan – Area F
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 12
1 Cost Relative
to
System Connectivity Importance
‐ ‐ ‐
4 4 4 ²
Road
Rd. Rd. Rd.
Route
Widths Low $$ Widths Low $$ Widths Low $$ Widths Medium $$ Paved Low $$ Paved Low $$$
is is
when
Bike Ridge Ridge Ridge
Lane ProjectLane Medium $$$ Project High $$$ Lane Lane Project High $$$
Road Road Road Low $$ Add
with with with
Added ‐
Improvements
Widened High $$$ Signing Medium $ be
Existing Existing Existing Existing
when when
is Widening Widening Widening to
Facility
Route
Completed Completed Completed Lane Lane Lane
Lanes
be be be
Bike Existing To To To Bike
F
Sides Construct Sides Construct SidesSides Redistribute Widen Sides Redistribute Sides Sides Sides Sides Redistribute Sides Redistribute Sides Sides Path
Use Both Both Both Both Both Both Both Both Both Both Both Both Bicycle ‐
Area Facility Multi
Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes
Future and Bike projects.
Table all
R.O.W.
on Sides Bike
require Bicycle
Both construction.
(Unpaved) Bike (Unpaved) Bike needed
Facility May be
path
Lanes
of
Existing will
Summary
sources.
amount 86 None Bike signing
Rd. None Bike
Blvd. None Bike widening.
St. None Bike Creek SH
‐
‐ ‐ Ridge funding ‐ Blvd. None Bike
small Autum High
Rd. None Bike route
‐ ‐ Dr.
Rd.
Route
or Rd. street
Plum St. None
Dr.
‐ Enderud Pkwy
‐
bike
Mitchell Mikelson Pkwy Blvd. None Bike View special ‐ ‐
View
Rd. St.
Sage Gulch
Enderud Oaks Mikelson minor
Rd. Rd.
‐
Rd. None ‐ Creek
St. Bike
striping,
Bike
St or
86
Valley
Valley
Lake
however, possibly
Castle Point Autum N. Mikelson Enderud Pkwy None Bike S Rd None Founders Sage Plum and/or
and
facilites;
construction
signing Rd.
St.
planning Dr. Pkwy.
Rd. N path
Blvd. Ridge Blvd. Mitchell
existing View Rd. SH Rd. Ridge
Cloud Name Segment
term Oaks
Rd. 5th Rd. Rd.
Creek for
Point
Valley requires long
miscellaneous
below
require
include Generally
shown
is Will
May
cost.
Name Area Street cost.
signing cost.
capital
Route 5 F Enderud 5FMikelson 5FMikelson 4 F Copper 5FRidge Capital route
Route E,F Ridge
Route F Ridge Route E,F Plum
capital
bike High Bike
‐ Medium
‐ Small ‐ $$ $$$ $ New
1. 2.
F3 Connector F N F6 Ring F5 Connector F Enderud F9 Loop F7 Ring F4 Connector F High F1 Loop F2 Connector F Castle F8 Loop ID F10 Loop F12 Ring F11 Loop Segment
Castle Rock Recommended Bicycle Plan 13
Proposed Bicycle Plan – Area G
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 14
1 Cost Relative
to
System Connectivity Importance
² is is is
4'
Road Low $$$
Sides
Design Both Route
Bridge Paved Low $$
in
Rd. Medium $$$
New is
Both
Bike Require Path
and
Pavement Pavement Pavement
on
With will Road Use Add
‐ Included ‐
Frontage
Improvements Sides Medium $ When When When
Signing Medium $ be E.
Overpass Low $$$
when Multi
to Reconstructed Low $$
Reconstructed Low $$ Reconstructed Low $$ Widening 25 Interchange
‐ Facility Shoulder
I
Added Added Added Route
of Constructed
Lanes Be Be Be New
be
Construct of Usable Bike To To To Existing Shoulder Bike
G Both
Both Sides Sides Sides Sides Construct Sides To
Both Both
Path Both Path Both Both Path Both Both Bicycle
Sides Sides Sides Sides Shoulder Area Use Use Facility
‐ ‐ Lanes Lanes Lanes Lanes Lanes Lanes
Future Multi Multi Bike Usable projects.
all
Table R.O.W.
on Both Both
require Bicycle
Path Path construction.
needed (Unpaved) Bike Sides Sides
Use Use Facility May ‐ ‐ be
path
of
Existing will
Multi Multi Summary
sources.
amount signing
‐ ‐ widening. of Crest Rd. None
‐
funding
small route
Blvd. Blvd Dawson Dr. None Bike Pine Route
Pkwy
‐ ‐ West
or
Ridge street ‐
Blvd.
Bridge bike Cir.
Rd.
special
Ridge Ridge Ridge
RR
Rd. None Valley
minor Bridge Blvd. None Bike
Creek
Crest striping, Dawson UP
Bike
‐ or ‐ RR
25 25 however, possibly ‐ ‐
Gambel Dawson Cir. None Bike Territorial Tomah Pine Ridge Crystal Dawson South None Bike UP Plum
and/or
and
and
facilites;
construction
signing Rd. Dr.
Rd.
Pkwy. Pkwy. I Pkwy.
planning
path Cir. Rd. I
existing Ridge
Ridge
Name Segment Valley Valley Valley
term
for Road
Crest Frontage
requires long
25 N/A None ‐ miscellaneous Crystal I
below
require
include Generally shown
Will is
May
cost.
Name Area Street cost.
signing 6GEast
cost.
capital Bridge
Run
Route 7GPine 7GDawson 7GGambel 7 G Territorial Capital route
capital
bike High Treatment G Special Bike
‐ Medium
‐ Small ‐ $$$ $$ New $
2. 1.
ID G4 Castle G9 G6 Loop G5 Loop G7 Loop G8 Connector G New G2 Connector G Crystal G1 Loop G3 Connector G,H Crystal Segment
Castle Rock Recommended Bicycle Plan 15
Proposed Bicycle Plan – Area H
*See Bike Route Summary Table
Castle Rock Recommended Bicycle Plan 16
1 Cost Relative
to
System Connectivity Importance
² Lake
Both Both Both
North
North
S. Limits Low $$$
Signing Low $ of
Path Path Path
Path
Path
Town
Use Use Use Use Use ‐ ‐ ‐ ‐ ‐ Side Medium $$ Side Medium $$ Improvements Sides Medium $$ Sides Medium $ Sides Medium $
Widening
Multi Multi Multi Route/Lane Beyond Multi
Multi
Rd.
Bike Route
Require
Gulch Construct Construct Construct Bike Construct Construct Will
H Both
Sides Add Both Both Both
Both Both
Path Path Path Both Path Path Bicycle
Sides Sides Sides Sides Sides Sides Shoulder Area Use Use Use Use Use Facility
‐ ‐ ‐ ‐ ‐ Lanes
Future Multi Multi Multi Multi Multi Usable projects.
all
R.O.W. Table
on Sides Bike
South South
require Bicycle
Both construction. Path
Path
Side needed Side
Facility May Use Use be ‐ ‐
path
Lanes
of
Existing will
Multi Multi Summary
‐
sources.
E. of amount
signing
S ‐ Blvd. ‐ ‐
widening. Gulch
Rd.
St. East
‐ funding
small
route
Pkwy. Pkwy. Bike Lake Creek Pkwy. Route
or Loop street
Paw
‐
Blvd None Blvd. S.
‐ bike St.
St. St. None special E.
Plum
Valley Valley Valley Lions
minor Rd. None
Creek of Creek Paw Rd.
of striping,
Bike or
however, possibly
Crystal Plum Loop Crystal Rd. None West Plum Lions Crystal Ridge East Idylwood and/or
and
facilites;
construction
signing
Pkwy. Idylwood Pkwy. Pkwy. Pkwy. Pkwy. Rd.
planning
path
existing
Name Segment Gulch Valley Valley Valley Valley Valley
term
for Rd.
Lake requires long
miscellaneous
below
require
include Generally shown
Will is
May cost.
Name Area Street cost.
signing 5HS.
cost.
capital
Run
Route 6HCrystal 6HCrystal 6 H Loop 6HCrystal Capital route
capital
bike High Bike
‐ Medium
‐ Small ‐ $$ $$$ New $
2. 1. ID H4 Loop H5 Loop H1 Connector H Crystal H2 Connector H Crystal H6 Loop H7 Castle H3 Loop Segment
Castle Rock Recommended Bicycle Plan 17