Castle Rock Recommended Bicycle Plan 1 Map
Total Page:16
File Type:pdf, Size:1020Kb
Map Key Castle Rock Recommended Bicycle Plan 1 Proposed Bicycle Plan – Area A *See Bike Route Summary Table Castle Rock Recommended Bicycle Plan 2 Castle Bike Route Summary TableArea A Importance to Segment Existing Bicycle Future Bicycle Relative Rock Bike Route Name Area Street Name Segment Bike Route Improvements² System ID Facility Facility Cost1 Connectivity Cherokee Dr.‐Trailside Multi‐Use Path on Multi‐Use Path Both Construct Multi‐Use Path on South A1 Ring Route A Meadows Blvd. Dr. North Sides Side Medium $$ Recommended 6' Sidewalk on North, Trailside Dr.‐ Partial Multi‐Use Path Multi‐Use Path Both Widen Existing Sidewalk, Construct A2 Ring Route A Meadows Blvd. Springmeadow Dr. on South Sides Multi‐Use Path on South Side Medium $ Springmeadow Dr.‐N. Multi‐Use Path Both Multi‐Use Path Both Existing Facility ‐ Add Bike Route A3 Ring Route A Meadows Blvd. Meadows Dr. Sides Sides Signing Medium $ N Meadows Dr.‐Fell Mist Mulit‐Use Path on Multi‐Use Path Both A4 Loop 1AMeadows Blvd. Way North Sides Construct Multi‐Use Path on South Medium $$ Multi‐Use Path Both Multi‐Use Path Both Existing Facility ‐ Add Bike Route A5 Loop 1AMeadows Blvd. Fell Mist Way‐Elegant St. Sides Sides Signing Medium $ Elegant St.‐Meadows Multi‐Use Path Both Bicycle A6 Loop 1AMeadows Blvd. Pkwy. Multi‐Use Path on East Sides Construct Multi‐Use Path on West Medium $$ Trailblazer Way‐Prairie Usable Shoulder Both A7 Loop 1AMeadows Blvd. Hawk Dr. None Sides Redistribute Existing Lane Widths Medium $$ Coachline Rd.‐Trailblazer Multi‐Use Path Both Multi‐Use Path Both Existing Facility ‐ Add Bike Route A8 Loop 1AMeadows Blvd. Way Sides Sides Signing Medium $ Plan Multi‐Use Path on Morning View Dr.‐ North, 6' Sidewalk on Multi‐Use Path Both A9 Ring Route A Meadows Blvd. Coachline Rd. South Sides Widen Existing Sidewalk on South Medium $ Springbriar Dr.‐Morning Multi‐Use Path Both Multi‐Use Path Both Existing Facility ‐ Add Bike Route A10 Ring Route A Meadows Blvd. View Dr. Sides Sides Signing Medium $ Cherokee Dr.‐Springbriar Multi‐Use Path Both Widen Existing Sidewalk, Construct A11 Ring Route A Meadows Blvd. Dr. 6' Sidewalk on West Sides Multi‐Use Path on East Medium $$ Meadows Pkwy.‐ Multi‐Use Path on East, Multi‐Use Path Both Stripe Bike Lanes when both A12 Ring Route A N. Meadows Dr. Butterfield Crossing Dr. 6' Sidewalk on West Sides Halves of Roadway are Completed Medium $$ Butterfield Crossing Dr.‐ Multi‐Use Path Both A13 Ring Route A N. Meadows Dr. Castlegate Dr. None Sides Construct with New Road Low $$ SH 85‐ Castlegate Drive Multi‐Use Path Both Widen Existing Sidewalk, Construct A14 Ring Route A N. Meadows Dr. West Sidewalk on East Sides Multi‐Use Path on West Low $$ Castlegate Drive West‐I‐ Multi‐Use Path Both To be Completed with N. A15 Ring Route A,B New Road 25 None Sides Meadows Dr. Extension Low $$ Happy Canyon Rd.‐ Usable Shoulder Both Usable Shoulder Both Existing Facility ‐ Add Bike Route A16 Connector A US 85 Castlegate Dr. Sides Sides Signing Low $ Special Bridge N. Meadows Dr. and Usable Shoulder Both To be Completed with N. A17 Treatment A BSNF RR N/A None Sides Meadows Dr. Extension Low $$ Special Bridge N. Meadows Dr. and UP Usable Shoulder Both To be Completed with N. A18 Treatment A RR N/A None Sides Meadows Dr. Extension Low $$ 1. $‐Small capital cost. May include miscellaneous signing and/or striping, or small amount of path construction. $$‐Medium capital cost. Generally requires path construction or minor street widening. $$$‐High Capital cost. Will require long term planning and possibly special funding sources. May require R.O.W. 2. New bike route signing is shown below for existing facilites; however, bike route signing will be needed on all projects. 3 Proposed Bicycle Plan – Area B *See Bike Route Summary Table Castle Rock Recommended Bicycle Plan 4 Bike Route Summary TableArea B Importance to Castle Segment Existing Bicycle Future Bicycle Relative Bike Route Name Area Street Name Segment Bike Route Improvements² System ID Facility Facility Cost1 Connectivity B1 Ring Route B New Road I‐25‐E Pawnee Trail None TBD TBD Low $$$ E. Pawnee Trail‐Crowfoot B2 Ring Route B Sapphire Pointe Blvd Valley Rd. None Sharrows Add Sharrows and Signing Low $ Rock Sapphire Pointe Blvd.‐ B3 Ring Route B Crowfoot Valley Rd. Knobcone Dr. Usable Shoulder on East Bike Lanes Both Sides Widen Road High $$$ Knobcone Dr.‐Founders B4 Loop 3BCrowfoot Valley Rd. Pkwy. None Bike Lanes Both Sides Widen Road High $$$ Recommended Crowfoot Valley Rd.‐ Existing Facility ‐ Add Bike Route B5 Ring Route B Knobcone Dr. Beechnut Pl. None Shared Roadway Signing High $ Knobcone Dr.‐Founders Existing Facility ‐ Add Bike Route B6 Ring Route B Beechnut Pl. Pkwy. None Shared Roadway Signing High $ Sapphire Drive‐Diamond B7 Loop 3BDiamond Ridge Pkwy Ridge Pkwy None Sharrows Add Sharrows and Signing Low $ Diamond Ridge Pkwy‐ B8 Loop 3BDiamond Ridge Circle Sapphire Dr. None Sharrows Add Sharrows and Signing Low $ Diamond Ridge Circle‐ Existing Facility ‐ Add Bike Route B9 Loop 3BDiamond Ridge Pkwy Crowfoot Valley Rd. None Shared Roadway Signing Medium $ Prairie Hawk Dr.‐Sante Usable Shoulder Both Bicycle B10 Loop 1A,BMeadows Pkwy. Fe Dr. None Sides Redistribute Existing Lane Widths Low $$ Castlegate Drive‐ Usable Shoulder Both Usable Shoulder Both Existing Facility ‐ Add Bike Route B26 Castle Run 2A,BUS 85 Meadows Pkwy. Sides Sides Signing Low $ Usable Shoulder Both B11 Castle Run 2BSante Fe Dr. Meadows Pkwy‐Front St. None Sides Redistribute Existing Lane Widths Medium $$ Front St.‐Woodlands Usable Shoulder Both Existing Facility ‐ Add Bike Route Plan B12 Loop 2BBlack Feather Trail Blvd. None Sides Signing High $$ Meadows Pkwy‐ Usable Shoulder Both B13 Castle Run 1 A,B,E Prairie Hawk Dr Wolfensberger Sides Bike Lanes Both Sides Add Bike Lane Signing Medium $ Existing Facility ‐ Add Bike Route B14 Loop 2BFront St Allen St.‐Sante Fe Dr. Bike Lanes Both Sides Bike Lanes Both Sides Signing High $ Existing Facility ‐ Add Bike Route B15 Castle Run 2BFront St Sante Fe Dr.‐Liggett Rd. Bike Lanes Both Sides Bike Lanes Both Sides Signing High $ Front St.‐Woodlands Usable Shoulder Both Existing Facility ‐ Add Bike Route B16 Connector BScott Blvd. Blvd. None Sides Signing Medium $ B17 Loop 2BAllen St. Front St.‐Founders Pkwy None Sharrows Add Sharrows and Signing Medium $ Founders Pkwy.‐Black Usable Shoulder Both Existing Facility ‐ Add Bike Route B18 Castle Run 3BWoodlands Feather Trail None Sides Signing High $ Black Feather Trail‐ Usable Shoulder Both Existing Facility ‐ Add Bike Route B19 Castle Run 3BWoodlands Woodlands Blvd None Sides Signing Medium $ End of Existing New Segment of Woodlands Blvd‐Scott Usable Shoulder Both To Be Completed with New B20 Castle Run 3BWoodlands Blvd None Sides Woodlands Connection Medium $$ Woodlands Blvd.‐ Multi‐Use Path Both Construct Multi‐Use Path Both B21 Castle Run 3 B Founders Pkwy Beechnut Pl. None Sides Sides High $$$ Beechnut Pl.‐Crimson Multi‐Use Path Both Construct Multi‐Use Path Both B22 Ring Route B Founders Pkwy Sky Dr. None Sides Sides Medium $$$ Crimson Sky Dr.‐North of Multi‐Use Path Both B23 Ring Route B,E Founders Pkwy Copper Cloud St. Multi‐Use Path on East Sides Construct Multi‐Use Path on West Medium $$$ Founders Pkwy.‐Autum Existing Facility ‐ Add Bike Route B24 Loop 4B,CRising Sun Dr. Sage St. Bike Lanes Both Sides Bike Lanes Both Sides Signing Medium $ Woodlands Blvd.‐ B25 Connector BNew Road Founders Pkwy. None Bike Lanes Both Sides To Be Completed with New Road Low $$$ Special Bridge Usable Shoulder Both B27 Treatment B Sante Fe Dr. and I‐25 N/A None Sides Reduce Width of Painted Median Medium $$ 1. $‐Small capital cost. May include miscellaneous signing and/or striping, or small amount of path construction. $$‐Medium capital cost. Generally requires path construction or minor street widening. 5 $$$‐High Capital cost. Will require long term planning and possibly special funding sources. May require R.O.W. 2. New bike route signing is shown below for existing facilites; however, bike route signing will be needed on all projects. Proposed Bicycle Plan – Area C *See Bike Route Summary Table Castle Rock Recommended Bicycle Plan 6 Castle Rock Bike Route Summary TableArea C Importance to Segment Existing Bicycle Future Bicycle Relative Bike Route Name Area Street Name Segment Bike Route Improvements² System Recommended ID Facility Facility Cost1 Connectivity Sapphire Pointe Blvd.‐ Usable Shoulder Both C1 Connector B,C Crowfoot Valley Rd. Cherry Creek Trail Sides Bike Lanes Both Sides Widen Road Medium $$$ Founders Pkwy.‐Autum Add Bike Route Signing and C2 Loop 4B,CCrimson Sky Dr. Sage St. None Bike Lanes Both Sides Striping Medium $ Castle Oaks Dr.‐Rising Add Bike Route Signing and C3 Loop 4CAutum Sage St. Sun Dr. Bike Lanes Both Sides Bike Lanes Both Sides Striping Medium $ Rising Sun Dr.‐Castle Add Bike Route Signing and C4 Loop 4C,FAutum Sage St. Oaks Dr. Bike Lanes Both Sides Bike Lanes Both Sides Striping Medium $ Autum Sage St.‐Autum Bicycle C5 Loop 4C,FCastle Oaks Dr. Sage St. None (Unpaved) Bike Lanes Both Sides Construct when Road is Paved Medium $$ Autum Sage St.‐N. Rocky C6 Connector C Castle Oaks Dr. View Dr. None (Unpaved) Bike Lanes Both Sides Construct when Road is Paved Medium $$ N. Rocky View Dr.‐Cherry C7 Connector C Castle Oaks Dr. Creek None (Unpaved) Bike Lanes Both Sides Construct when Road is Paved Medium $$ Plan 1. $‐Small capital cost. May include miscellaneous signing and/or striping, or small amount of path construction. $$‐Medium capital cost. Generally requires path construction or minor street widening. $$$‐High Capital cost. Will require long term planning and possibly special funding sources. May require R.O.W.