REQUEST FOR DEPUTY MAYOR FOR FIRE & RESILIENCE DECISION — DMFD4S

Title: Fire Brigade Museum Project

Executive Summary:

Report LFC-0265to the LondonFireCommissionerseeks approvalto award a contract of up to £3,031,000, includingcontingency,for the design and deliveryphases of the LondonFire Brigade Museum Project. Thiscontract appoints a single Museum DesignTeam and Project Manager to deliver the activitiesspecified in this Decision.

The contract willgive LFBaccessto the specificspecialistskillsand experience needed for this project over its lifetime.Notwithstandingthis, the contract includes a break clause as progress to the delivery phase is dependent on a successful National Lottery Heritage Fund funding applicationand permissionto start and uncontested planning approval. An overallbudget of £4,450,000 has been allocated for the London FireMuseum,of which£360,000 relates to the development phase and £4,090,000 to the deliveryphase. However,there are no other contracts within the Museum Project budget, in the development or deliveryphases, which have an estimated cost at or above £150,000. LFBofficerswillprovide an update the Deputy Mayorprior to the scheduled start of the deliveryphase in October 2021 on the project overall.

The London FireCommissionerGovernanceDirection2018 sets out a requirementfor the London Fire Commissionerto seek the prior approvalof the Deputy Mayorbefore “(aJcommitmentto expenditure (capital or revenue) of £750,000 or above as identifiedin accordance withnormal accounting practices...

Decision: The Deputy Mayorfor Fireand Resilienceapproves the expenditure by the LondonFireCommissionerof up to £3,031,000 for the award of a contract for the purpose of developing and deliveringthe London Fire BrigadeMuseum Project as set out in report LFC-0265to the Commissioner.

Deputy Mayor for Fire and Resilience

I confirmthat I do not have any disclosablepecuniary interests inthe proposed decision. The above request has myapproval.

Date: to

no

to

will

part

up to year

which by

are

in

the

the

has who number

with

and

the

action This

to

will

listed

London’s last

a

of —

was

fire

previous

form

external

2

an

for

close Station the

there accessibility

in

its

U+l

opportunity

needed —

Road

Brigade in

which

the

in

people

Museum,

local

by

Museum Museum. stands. Fire

Museum

following

the

Grade

was interest should

Embankment

existing

Fire

capacity

was

and the exhibition

since.

the

the

includes development

honouring

new point,

Prince interests

the

provision

additional

the

of

this

restricted

the

consultation

significant

Museum

public for

and

collection

room of

the

of Albert

for

the

currently that

wider

was

heritage London Black

including

Museum visitors S

Station, space, 2016,

the

of

turn,

the

inspirational

purpose

at

home

were

cultural a

side

of

home

In

of look

bays

commissioned to

MAYOR

permanent The site the

the

the

new Fire

as

the

this

England

A to

because Museum

Centre’

a

to

includes

for

more

There

reasons on thi5 include

upgraded

use

that disabled

for

original

corner

piazza.

the

December2018, closed

future. western

of

to

on

pre-application

summer

An

for

in

to

area,

the £2,400,000

its

the

DEPUTY deliver architects

Historic

adding

visiting officers

permanent complete.

the

was

partner

public

the

at

Southwark a redevelopment

at

is to

public

to

the of add three-vehicle

focusing

instance. Mobilising

decision

also

the

In

years’

1

and

considered

number THE

on be

from

in

decision

into to the

debate.

Museum

remembrance.

programme and a

for

enable

are

and

plus

was

two

collection

Hall

TO

published

will former

floors

the

Museum

for

for

the

being and Authority,

away

back

and

Museum.

STAGE

estimated Hall

(LEEPA)

the

activities

of space

the

over

footfall

2015.

decision

capital

possible

was

awaiting development

commitment

commitment

made

as

Hall onwards

(LFB)

Partners in

haven

RIBA ground visit

a

were

turned ADVICE development.

LFB entrance &

not

London Memorial

Strategy,

‘Command

clear

Council

This

public

Brigade dialogue

to site

better currently to

their

980s

and

evolved

Embankment

Memorial

the 1

Authority

the

LFEPA as

was

the

operation

LFEPA

were

storage,

AND

Fire Brigade

Arts

it

has

of

same

Memorial peaceful

long-term

former

contains

Pilbrow by

the

Museum Culture

Greater

U+l

Museum

a

The

the

LFBs station,

Fire Albert

within

the

pupils

S

the

by

report

landscaped

application

basement from

FACTS Planning meant

Embankment

The

fire

LFB’s

thought-provoking London

on encouraging

taken

of

development

Embankment, project,

opportunities

long-term

using

LFEPA’s

is

uncertainty

process.

poignant

the 2017—21

new

London’s

incorporating

London Lambeth,

budget

new school and Committee

with out

providing

of level. the appointed

a

collection.

Albert into

where

of

of the

of

building.

fit

S Albert

Plan

background the

planning Design

available

the

which

OJEU decision

collection

and

include

S safe,

2000

Museum

floor

Emergency

occupy

years

of

operational

the

supporting

the history an accreditation

within

Museum. LFEPA the

bring

of

the

and

placed

the

Museum

Mayor — Street,

an

this

space will

Museum for restricted over

be and Safety Resources

a plans

demonstrate benefits

for

in

Borough

House,

the

will

heroes and per

After

scheme.

to

in

was

LFB’s London

to The

ground

2016,

High

will the

The the

as the

Fire delivery and

for

through costs

headquarters

at

ongoing

the plans

which

of

next

was

held

1966.

kept

London

NON-CONFIDENTIAL

required

Museum

project engines

site,

London

the ways. be September2015 operation —

2015,

March

I

Introduction

In London Museum. home of support reached. The of In collection issues Winchester

fire redevelopment of until

the former Capital 2015 been to ensure In project

funding design encompasses building community Lambeth museum entrance

the illuminate

The station have The

PART Decision

1.2. 1.1.

1.3.

1.4.

1.5. 1.6.

1.7.

1.8. be located inthe adjacent area creating beneficiallinks.This project is part of a much larger Developmentwith significant regeneration benefits contributing to Lambeth’scultural renaissance.

1.9. The £2,400,000 placed in Museum budget withinthe LFBcapital programmeWas an estimate made in 2015 based on earlier plans to house the Museumwithinthe LFBHQat UnionStreet. U+lwere appointed as LFB’sprivate sector development in 2016, followinga full pan-European OJEUprocess. Four final bids were evaluated against specificrisk-based criteriaand the U+lscheme came out as a clear winner. One of the criteria this was measured on for museumfacilitiesto be fullycompliant with the LFBbrief, this is up to CategoryAstandard whichis defined inthe DevelopmentAgreement with U+land includesfloors, ceilingsand basicelectricalservices(up to this point is outside of this project).

1.10. It was only on completion of this process that the specificareas of the buildingavailablefor the new Museumwere known — the space provided by U+lwas 50 per cent largerthan the minimumspecified. It had alwaysbeen envisaged that a new home for the Museumwould make it possibleto explore new funding streams available,5uch as NationalLottery Heritage Fund. Asset out from paragraph 27 of report LFC-0265to the London Fire Commissioner,officers have developed a detailed budget in order to submit a bid.

1.11. The Museum project now has an estimated total deliverycost of £4,450,000, over a development phase between October 2019 and June 2021 (260,000) and a deliveryphase between October 2021 and Autumn2025 (4,090,000). The new Museumspace willoccupythe basement and ground floors of the western side of S Albert Embankmentincorporatingthe MemorialHalland three originalfire engine bays.

1.12. A new purpose-built home for the London FireBrigadeMuseumwillsecure the long-term future of the Museum,providinga permanent and accessiblehome to deliverits education work and a wealth of exciting,educational familyactivitiesto Lambeth and the capital as a whole.

2. Objectives and expected outcomes

2.1. The Museum’saims are: • to celebrate LFB’srich history by explainingthe majorevents which have shaped the fire and rescue servicein london; • to enhance the experience of diverse audience groups by using the collectionsfor the enjoyment of new and repeat visitors; • to protect the Collectionto make sure it is availablefor people now and in the future; and • to manage the Museum’sresourcesflexibly,efficientlyand effectively.

2.2. Withthe opportunity presented by the redevelopment of the 8 Albert Embankmentsite, the Museum finallyhas a chance to deliverthe above aims, reach its full potential and become a morevisible, important and significant player amongst London’smuseums.

2.3. Thi5willinclude activitiessuch as a significantlyexpanded programmeof events for the community and schools, accommodating up to 17,500 schoolchildrenper year across the Boroughand wider London.The Museum also providesan opportunity to hold activitiesfor communitygroups, hard-to- reach audiences and expand the Brigade’sworkwith localcharities,as wellas a new opportunity to work closelywith the MasseyShaw EducationTrust due to the riverfront location.

2.4. Maintaininga vital linkto the current , the Museumwilloffer visitorsa rare opportunity to see a fullyoperational fire station, alongside historicfire engines and other exhibits.The proposed design willenable the publicto learn about the historyof the Brigadethrough the Museum’s extensive collectionof artefacts from the Great Fireof Londonto present day and explores how the history has influenced the way the serviceworkstoday. The co-location of the Museum,on this scale, of

as

to for

its and to

It

to

the

was

of

space be as

LFC

us

an on U+l,

and

with

and

Historic

activities a

with home

the London

to

histories

been access with

better

be

block, LFB

maintain much.

is

element stories

of

by

has

to

actors,

to

the War,

also

report to

visited so has restoring oral

enable

Museum

also rear

touch Hall

in

is

those

ability

public to

visitors

exhibition

(available

recent

in range as

1

beginning

plan and

knowledge

will have need

of

a

development World

Drama

learnt

and

visitors

Museum a

important

Embankment,

Pop-up

recognised

keep collating knowledge, more

The

significance

and

an

and

sensitively detail provided known

is

Memorial focus

advice

of to

Workshop

people providing

long-term

the

It further

number

Second

temporary by visitors

be

developed Lambeth,

Albert

their

and you

Pop-up

(Appendix

at will

its

great Spectrum staff

8

more

The

to in

identified

the

the

The

had.

new

UK safety

of

5,000

in the interpretation

with

formally been

for

our

a and

Museum

Brigade’s

able

experience.

museum,

Century.

sharing

the disabled

Fire

volunteering,

session

have

and installation buildings

has

improve Museum museum

time during

2016

in with the Brigade

staff

curators The

increase for

for ever Almost an

we new

themes

to businesses.

their

building

19th achieved.

provide

for

partners plan

LFB The

the

Since be the development. was

outline Workshop,

visitors.

current

the

events

of

will hosts

. and

listed

offering of working about new amazing

It interactive

can the explore

on facilities

a

the The

curatorial

sessions.

start-up than

Museum

Museum’s

drill on

also

since

the

business in

to experience repeat of part

for

It history

substantially

that

its

Museum the and

opportunities

the

both

unique retired Brigade for

had

history,

collection.

development

A organisation. London

a

modern the will project feedback form

for

initial 1501000.

projections. how

service

access

with reflecting Museum the

of

with

the

collection,

be opened

London with

education

our

to

too!)

to heritage

plans visitors. in strategy

of

An

will

of

new

progress. of in film

charities leaders, encourage

Fire

the

will

Museum, was

with

as

the

the along

and

staff, Brigade’s

1918, provide

public

and

Brigade’s died explores

Museum

for of

Museum

war Fire

formal adults

and

of to

11,000 the

pride

learning

history

well the

the

Great accessible

the

session LFB of

the

interpretation. have

station

1

post as

more

fire

retired

indications space

opportunity

by

the Great

Museum

from sustainable. have

illustrate engagement

flexible

a

asked

enhances

the

the on

more fire

also an

giving who

exhibition

and

firefighters

to

museums

engagement

of

time,

organisations, of museum’s

Stage early

best significance

and

and

and Embankment

and

decade.

about

display

more

were

celebrating a art

(and

much

Pap-up

museum’s the the

first Key home part provided to

a

a other

working

be

and

financially

current is current spotlight

provides

learn

for

a Albert Museum

Embankment

the far, over

the schools’ be

intergenerational a

redevelopment

national

was

provides

B

used

firefighters developed

to schools

will

accommodate

in collection of

and

from of

preserves by

plan

also with

for children

its

equipment

into

will

larger

to the to engagement

be

All

consultation previous with

This

innovative venue

a

can the

organised Albert

part for

listed

difficulties. which time a

Pop-up

The

level was,

Brigade’s

and

Museum this of

can

II the visitors

an

views

objects

Museum scheme project. promoting

2017.

scheme

Brigade

of

first

the LFB of business received.

tragic

high

November2016

range

Creating with the museum integral loan which developed

0265). interpret The and for experiences

This Grade monument

the Overall Museum’s Fire learning

operationally request) This

the Pop-up in

enable audiences. part a

The the concluding vehicles provided Throughout the part since enthusiastic

well

2.5.

2.6.

2.7.

2.8.

2.9.

2.10.

2.11.

2.12. Ourlittle visuallyimpairedpupil wont stop talking about his trip and his teoching assistant from the VisionTeam here in Bromleycommented about how inclusiveand accessiblethe octivitieswere for him. Assistant Head Teacher,Southborough PrimarySchool,2019

2.13. The Pop-up Museum has also providedthe opportunity to host larger events than were possiblein the Museum’sprevioushome at WinchesterHouse. It has hosted large scale events includingthe Brigade’s150th wrap party, the FireEngine Festival,Immortalisedand London HistoryDay,in associationwith HistoricEngland, FamilyLearningFestivaland many smallerevents and photography exhibition5.The Museumteam have used the unique space to experiment with familylearning activities,such as green screen photography, virtual realityexperiences and events involvinglots of historicvehicles.

2.14. The LFBPop-Up Museum has been very popular with localcommunities.Atotal of approximately 60,000 people have visited the facility,with approximately35 pe cent of visitorsto majorevents comingfrom Lambeth and .The Pop-up Museum has enabled the continued provisional accreditation of the Museum by the Arts Council(see Appendix2 of report LFC-0265— Annualreport to Arts Council2018).

2.15. As wellas providingcrucialfeedback to help develop the new Museum,this clearlydemonstrates the potential for the LFBMuseumto help meet other corporate LFBobjectives,includingsharingfire safety messages and promoting inclusion.Appendix3 to that report is a table of allthe LFBMuseum led events, includingvisitor numbers. The feedback from this work and these events fed into the development of the successful NationalLottery Heritage Fund (NLHF)Grant bid by the Brigade.

3. Equality comments

3.1. The Public Sector Equality Duty — and the potential impacts of this decision on those with protected characteristics (age, disability, gender reassignment, pregnancy and maternity, race, gender, religion or belief, sexual orientation) — has been considered by the London FireCommissionerand the Deputy Mayorfor Fireand Resilienceat the Deputy Mayor’sFireand ResilienceBoardon 12 November2019.

3.2. The PublicSector EqualityDuty (PSED)applies to the London FireCommissionerwhen they make decisions.The duty requiresthem to have regard to the need to: • Eliminateunlawfuldiscrimination,harassment and victimisationand other behaviour prohibited by the Act. In summary,the Act makes discriminationetc. on the grounds of a protected characteristic unlawful. • Advanceequality of opportunity between people who 5hare a protected characteristicand those who do not. • Foster good relations between people who share a protected characteristicand those who do not includingtackling prejudiceand promoting understanding.

3.3. The protected characteristics are age, disability,gender reassignment, pregnancy and maternity, marriageand civilpartnership, race, religionor belief, sex, and sexual orientation. The Actstates that ‘marriageand civilpartnership’ is not a relevant protected characteristicfor (b) or (c) although it is relevant for (a).

3.4. All65,000 annual visitors (projectionfor first year of opening) to the revitalisedMuseumwillhave engaged with LFB’sheritage in the newfacilitythrough new exhibitions,interpretation and activities. Some 25,000 of people over the three-year activityperiod willhave taken part in a targeted, meaningful engagement activity, as opposed to being a general visitor,with an estimated 4,000 people from new/hard to reach audiences being attracted. The Museumwillhave deliveredan extensive communityengagement programmewhichwillhave successfullyreached over 11,000 local Lambeth people who were previouslyunaware of it, a

is

an

for

the

local

part the

career

with

that

this

to

when

with

a

be

for

planned,

with

of

LFB’s

planned

during

6,000 new

from

Refugee and

is

curiosity, will

including

under

via

the role

about

the

people been

post and would

heritage

learning ‘Reach responsible

in developed days

recruited,

with

up,

people for

the

further

statutory

introduced

be

be

the

be Portuguese

have

A think delivery

people

sparking

its

funded

Ethnic

Open unrepresented 20,000

of

firefighters

collaboration how to

staff,

to

make will

been the

and

young

Assistant

in

offering.

exhibition

would

staff

week.

young

structure

visitors

researchers

events,

with

stations.

have 1

aspect

known

meeting

further retired

Station

current

all

This

women

new

Minority

where

illustrate is

expected

an

Curators.

fire

are will

1,000

intergenerational

Museum

and Fire

Museum member Year

to

young community

with

IFS.

and exhibition

descriptions

are

LFC

for projects of

ease

(three

development

40

to

recruitment

again!’

new

there

term

ensuring

projected job

team

local

the community

place.

visitors

London

Black

a

encourage

Museum current

with

history)

staff

the

in

and

of

the of made

to promoting

and

fixed

each

new

project

Think,

of

where

and

available

stage

targeted two

women.

volunteers

find

oral put

experiences

taken.

involving

time

volunteer plan

photography and

programme

of

approach be

have

the

part be

needs

a

more.

can

history shows

and each new and

Brigade’s

5,000 full

reflects

its

Bexley

as

visitors

locally.

designed

at

will

activities the

in team

through

out

12-month

the and

the

‘Firemen?

150

would five

fairs, people

decisions a

and

planned

business histories targeted mean

of that stories

activities

for

closely

a and

find

of

Museum imagery

main

Foundation, and

the

groups

the disadvantaged

planned

its

local

oral

to

Museum address

black

existing

and

structure

that

example,

team

would new The

schemes

Museum

are installation

and

ensure

and

updated

Havering

the

study

stories,

Heroes

inform

contributors

For

creation activities

the

art to

team

new

An through

visitor-focused

general

through

knowledge,

events

firefighters of collating

of locations. Museum

These

an

will

the

people young curatorship;

diversity

LGBT

all

effectively

Black the

of

new

proposals

active

them.

Enfield,

in

support Museum

the

Plan.

of

mare a

volunteers. their

contributions of

analysis

for

historical

as

other range to

Phase.

and

management

local

to

role and

create

be

reached

more a

the

example,

young

offering

visit

to

analysis

and

the

level

involves 60

These

Brent,

career of

the

years Phase

will

a networking

core to

will developed.

for

will For

a

sharing

(using

Phase

been

a

Business

volunteering,

focus

such

equality

relevant

involved

and

offsite

years) Lambeth and has

Archives

travels

three

experience

them for

Project involve

the

will

in

and

have

celebrate

and

and

Schools

the

Delivery

in

Development two Newham, LFB groups. to service

Museum fairs

schemes

audiences.

Museum

achieving first

to

further involves

of

will

in

for

considerations visitor the

out

heritage

fire firefighters

the Cultural

development

on

encouraging

the new

new

new

exhibition

Museum

museum

part

Development

interest

set

the

the

the

of

LFB’s The community welcomed Museum As

encouraging (BAMER) Rlack targeting visitors archives

of

The

in the

Secondary Two

aspiration

Top’ women Over

In undergo

focus volunteer obligations, Other

Workforce

Museum

During

project The are the during retired

opportunities

The visitors.

3.5.

3.6.

3.7.

3.8.

3.9, 3.10.

4.

4.1.

4.2.

4.3. Timing

4.4. LFBapplied to NLHFbefore planning permissionon 8 Albert Embankment(RAE)was granted because

the Museumis part of the Phase 1 of the overall8AEdevelopment and so could be deliveredas soon 252022. The development phase of the project is crucial,and officerswanted to make sure there was enough time to complete this in a meaningfulway by consultingwith visitorsand non—visitorsto enable the localcommunityto feed into the design process and to test and pilot activities.

4.5. The Museumcollection has been in storage since 2016 and LFRwant to minimisethe further time the collectionis not availableto the public,particularlyonce the new Museumspace is available.The early application and decision also enable the Museumto begin fundraising as soon as possible (see paragraph 4.30 —4.33).Forthe same reasons of time constraints, advance delegated authority is required to ensure the deliveryof this project within both the NLHFtimescalesand the potential timescalesof the 8 Albert Embankmentproject. An important criterionof the funding isthat the project does not start before NLHFhave given permission,which, as wellas not havingsecured the funding, is whythis procurement could not have been started sooner.

Procurement of Museum Design Team and Project Manager

4.6. Duringthe development phase of the project a number of procurement exerciseswillbe carriedout. The most significant isthe Museum DesignTeam and Project Manager,whichwas started in November2019. Thiscontract coversthe project management exhibitiondesign and fit out of the Museum,and their serviceswillbe required inthe subsequent deliveryphase to ensure continuity of service.A break clause is includedto ensure that services can be discontinued if required, commencement is contingent upon the following: • a successful DeliveryPhase funding applicationwith the National LotteryHeritage Fund; • the Commissioner’ssatisfaction with the Supplier’sperformance duringthe Development Phase; and • the Commissioner’ssatisfaction with the Supplier’sproposed approach for the Delivery Phase.

4.7. The workshave been tendered in accordance with the LondonFireCommissioner’s(LFC)Standing Orders relating to Procurement.

4.8. The preferred supplierwas selected on the basis of the most economicallyadvantageous tender. With the overallbudget for the project already being determined the financialevaluationformed only a minorpart of the selection process. Supplierswere instead asked how they were to deliverthe individualelements of the requirements withinthe specificbudget (set out inTables 1 and 2 below).

4.9. Due to the value of the Museum DesignTeam and Project Manager contract (at £2,755,420) exceeding the OJEUthreshold, an open OJEUprocurement was carriedout to ensure a competitive process, which is compliantwith the PublicContracts Regulations2015.

4.10. Where possible, the LFCaimsto utilise a GLAcollaborativeprocurement approach or procure through existing national frameworks.It should be noted this approach was considered and was deemed not suitable for this project due to the unique nature of the requirements.

4.11. A competitive open OJEUprocurement was conducted via the Bluelighttender portal and bids were sought from all relevant and capable suppliers. Procurement officersconducted checks of the mandatory informationrequired to ensure that bids were compliant priorto the start of the evaluation.

4.12. Aspart of the LFC’sStanding Ordersrelating to Procurement the LFC’sDirectorof Corporate Services has authority to approve procurement initiation,accept a tender, award and enter into a contract in accordance with existingstanding orders. And, procurement authority also extends to any action a

and

and

and

notice

as

Lottery

been

skills

timescales

provides

manager,

soon

in

quality

giving

sought

has

as

or

on

Manager

are

further

advantageous table

breakdown

National

were

project

meeting

mark

requisite

made

the

price

Project

the

be

seeking

evaluated

to (E) following

overall

with

and

performance

and

have

performance

2,500 engineer,

tender 15,000 economically 1 44,772

20,000 20,000

10,000

39,000

The experience,

60,000 40,000 clarifications were 25,000

to

303,675 178,500 Cost 100,000

280,925

needs

Team

1,261,400

the

project

highest

below) most

they

service

of

2 contract

award.

the

the

the

however

and

to

Design

proposals, for

and

Manager

unsatisfactory

with

1

to

j

electrical

for

portal

those, contract

contract.

Communications

relating

comparison

in BIM

and

criteria:

Project

of

and Museum

submitted

a

tender

Tables

the

that

Fire

Phases.

in storage tender

and

(at the

The

15%

who

committed

actions

Toilets

@ Director,

Exhibition: deductions

Exhibition:

services) (at

racks),

enable

Assessor,

technical involved

variations

project.

Team Secondary

within

m2

archive to —.

mechanical

Manager,

and etc

Delivery

and

(e.g.

where included

to

Bluelight

supplier is

this

people/family

proposal. Costs

were

B)

schedule

661

B)

breakdown

(rolling

Establishment and

Assistant

the -—

the shop

Design

B)

(building

Method)

the

following services

works

stores),

except

evaluation

(CAT

via -

process (CAT

There frontage

surveyor,

tender

Ltd,

Decision contracts

the

LFC’s

Modelling)

(CAT

or

undertake

meet

archives

BISRIA

the

(open

Research

Preliminary estimated

glass

Museum

Access

the to

This

required manager

electrical_systems

galleries

financial

and

galleries

by

quantity Development

Assessment

Services

against spaces

the

existing

Office/Staff/Volunteers

paper

contracts), submitted

with

necessary.

the

formula

fees: cost)

acceptance.

construction

2020

off

and

a The

objects

of

the

Designer

for

of

reflected

any

project

and

Information (Building Phase

Surveyor

for (NLHF).

were

previously successfully Phase

store

award

for design Contractor

House

sign

reception/ticketing,

@S400/m2

where

with

@D,975/m2

to

both

March

designer, to

value.

of

permanent

Internal temporary

under

considered

Fund

m2

in

in

library

out:

LFC’s

is

Management

tenders

Design

Exhibition

Lighting/Engineer Service Mechanical Quantity Environmental

BREEAM Officer (Building

advice Consultation DDA/Autism/Dementia/Older Delivery

friendly General

New New accurately Technical Construction Back

371 New Racking

60m2

£425/m2 painting

for Equipment Signage Fit

breakdown

termination

social

[

decision

required and

Eight accordance comprehensiveness

exhibition information and against recommended

Cragg

they

experience

possible Heritage tender A

cost contract

4.13.

4.14.

4.15. Architecture 30,000 Project management 104,000 Designerfor exhibitiongalleries 83,148 Quantity Surveyor 37,500 LightingDesigner 10,000 M&E- services, 60,000 BREAM,BIMManager, FireOfficersign off and 20,000 BISRIAadvice Total: Design and Delivery Phases 2,755,420 Contingency@10% 275,580 Overall total including contingency 3,031,000

4.16. The total cost of the elements withinthe contract is£2,755,420. The budget also includesa contingency at 10 per cent of total costs. Thiscontingency is not included inthe contract which has specified levelsof cost but providesthe abilityto deliveroptional elements through the contract as the project progresses through the design process. The contingency is part of the project budget the NLHFgrant awardwas based on. A contingency of 10 per cent appliedto the contract equates to £275,580. Therefore, this Decisionseeks approvalfor expenditure of up to £3,031,000 for the servicesprovided by the contract for the Museum DesignTeam and Project Management.

4.17. In order to delivercommitmentsfor the development phase and ensure the project has access to the specificspecialistskillsand experience needed, this Decisionseeks approvalto award a single contract for the Museum DesignTeam and Project Managerfor the development and deliveryphase of the project.

4.18. There are other costs associated with the design and the deliveryof the project as set out in Appendix5 to Report LFC-0265.Together, these other costs, as wellas the Museum DesignTeam and Project Manager contract and contingency equate to the budget of £4,450,000 for the project. However,there are no other contracts within the Museum Project budget inthe development or deliveryphases, which have an estimated cost at or above £150,000.

4.19. The tender documentation did, and subsequent contract, willemphasisethe fact that although the awardof the contract willcover both the development and deliveryphases, the deliveryphase is not guaranteed and is dependent on a successfulfunding applicationand permissionto start, achieving planning approval, and LFB’ssatisfaction with the supplier’sproposalfor the deliveryphase and performance during the development phase. There are break clauses at RIBAStage 3 (NLHFRound 2 submission)to ensure that LFBcan discontinue the servicesif required.

4.20..Althoughthe deliveryphase is not guaranteed, the tasks and commitments required are currently defined enough that tenderers were able to address those requirements in their tender response and LFBevaluated both phases of the project to determine the successfultenderer.

4.21. A detailed evaluation plan addressing proposal, experience, project management plans and abilityto meet timescaleswillbe incorporated.

Sustainahilibj

4.22. LFB’sapproach to sustainable development has evolvedover the past decade with the introduction of an EnvironmentPolicyin 2004. LFBnow has a Sustainable DevelopmentStrategy 2016-2020 which sets out 45 actions across 10 objective areas to progress its sustainable development approach.

4.23. Forthe development project, a SustainabilityStatement underpinsthe Planning Application.The project has been designed to be highlysustainable and maximisethe potential carbon savingsthat can be achieved in accordance with the aims of the NPPF,The LondonPlan, the Mayor’sSustainable Designand ConstructionSPGand Lambeth’sLocalPlan. APIrefurbished areas are targeting a minimum is

on

is

to the

of are to

that

and

which also

That

2021

(so

subject

BREEAM

is

the

LFB

which

Pilbrow

seek

Jane

budget,

where

based

grant

zones

targeting

the

budget

schedule

for funding

Costs

have

funding:

the

services

the

receipts

campaign.

this the

by

funding

960,000 from

Project

October

years.

works

following or

of

has on

to

insurance

from

of

when develop applied of

minimum

at

delivery

calculation).

the progresses,

Project

within

eligible Project

to a

Museum:

design be

Percentage

fabric

and

LFB

payment cent fundraising,

correspondence

recent

services

as be

the alternative

A

phase

the

will

partnership

invoices

in

per

balance addition via

fundraising (between proposed NLHF

team

demand to

arrived

bid. for

Project

and

budget other

2016.

for

in

towards

be

56

from

Museum

£1,594,000

building the

the the the

in Payment progress is targeting

Approved

was

the

secure

up

order look

grants of applied.

sensors

will it

on

(donated from

provide grant

on are

are on

as

in lighting

is

to

This Museum

to

architectural

overall

but

Museum

This

lead

development

spaces. removed includes existing £4,090,000

officer.

the

makes

of

separate lottery

NLHF cent a

areas

with

made based

need

to

able

of

The Phase

the

a contributing

costs.

following are secured

opportunities

the

of

estimates

is Anniversary

manufacturers

quarterly

case

£670,000 per be

Architects

maintenance,

so

be

office are

of

be

up

the reduce

from

Photoelectric

pound

65 funding toy

time

would

phase

funding

will

to

£26,000

2023). worked

and

will and

grant

to

LFB challenging

150th

plan

NLHF

has

report

Application.

successful sponsor

the

further

is

made LFB

has

and

Partners a to

construction

The

our

time

NLHF

Preliminary

areas the

once

open performance.

Development

commissioned NLHF

lighting.

delivery LFB’s

Museum

needing autumn

and link. £106,000 when Phase for

suppliers,

and

£300,000 LFB volunteer and

a

new on

payments

all target

performance

The

specific is

Museum

way.

as the volunteer-in-kind

multi-million

that

in

all

the

been Still

ask

preservation

at

NLHF

arrears

and

and open

energy

This costs

energy

to

volunteer

this

£4,450,000

Brigade

to

in

programme advise

perimeter

with has

and to

will such

Pilbrow cash which

Delivery

percentage.

sponsors

historical in

thermal

of

low

raising

Brigade

to

Start

up

of

equipment

applied

Fire

2021)

and

90,000

looking an

the LFC-0265.

NLHF.

secured.

of

the to

Foundations:

from

Good

and/or

cost NLHF grant be

set Fire

capital

cent optimum addition

16-month

cent.

for

addition

and

November2018

building official

are

expenditure.

Bureau),

June

in

expected elements reached

and

from

1

our

In will

per

LFB

Very shares

report the

per

and

of

looked

London

record

Phase

as

and on

expenditure,

specifically

not

of

services to

eight

enhance

65

delivery percentage

London

firefighting

which the

100

LFB

to the

5

volunteer-in-kind

meetings award.

Permission is

Phase,

Trusts

incrementally track

control and

which

Heritage was

during

funding

the Museum

the

architects)

non-cash

documents

total with

contributions

rating

the Excellent. is

project evidence

refer

a

within

grant

Phase

to whom

funding

the

(the

include

of

of the grant

Giving work

follows:

appointed

non-residential

attracting

past

target

the Phase

sensitively

Architects has

quarterly

Appendix improvements

of

£101,000

as

secured

strategy

Development

to architectural in

will

which scheme with

NLHF the

(2014) October2019

with

part

in

was NLHF

Percentage significant

the

this

but

budget be

of the

Grant

rating non-cash

Daylighting

project a

are

as Development

providing the Delivery if

in

ascribed

the

programme,

the

pay

to

planning

Stancliffe

project

lit.

2025

.

has by

spaces Partners

the

the

success

LFB

BREEAM

(2014) actively

reasonable applicable

day All

Overall (between

and

provided The include

Payment which calculated

NLHF demonstrate values

agreed During

preparation to

through Fundraising

Stancliffe Jane For She

fundraising capital LFB £24,000

£200,000 For Museum

and

needs Development £1,700,000, initial our

required

sources worked companies,

4.24.

4.25.

4.26.

4.27.

4.28.

4.29.

4.30. • Individuals£60,000 • Companies/corporate; £200,000 • Publicappeal /community crowd-funding:£60,000 • Sponsored Fundraisingactivitiessuch as dinners and lectures: £50,000.

4.31. Adraft fundraising plan is being developed and it willbe deliveredwithinthe Brigade’s5ponsorship policy. Acampaign workstream of the Museum Projectwillbe set up to support and ensure the deliveryof the fundraisingcampaign.

NLHFgrant funding requirements

4.32. Adevelopment grant of £200,000 was awardedto the Brigadeby the NLHFLondonand South Committeein earlySeptember2019 for the applicationentitled London Are BrigadeMuseumSafely Home.The awardcovers an 18-month DevelopmentPhase and is also an NLHFFirst Round Pass for the total grant of £1,900,000 whichwould cover a subsequent three-year DeliveryPhase, subject to a successfulSecond Round applicationfor the DeliveryPhase, for decision inJune 2021 (submission March2021).

4.33. AllNLHFgrants over£250,000 are made up of the two phases. The first is a development phase, which is for the period,when applicants refine and further develop the project.The second is delivery phase grant award,whichiswhen development plans are put into action to deliverthe project. LFB Museum has been successful in securing a development phase grant of 000,000. This development grant willallowthe Brigadeto develop the designs for the new Museum,conduct audience research, and fine tune the details of the project. Thisworkwillhelp to progress the next stage of the applicationfor a further £1,700,000 towards the cost of fitting out the new Museumand setting up an ambitious and inclusiveactivityprogramme.Adevelopment phase grant awarddoes not guarantee a successful deliveryphase grant application,but it is an indicationthat NLHFbelievethat the project has potential to deliverhigh-quality outcomes and value for Lottery players’money.

4.34. NLHFwillcarry out checksthroughout the project to confirmthe Brigadeis deliveringthe outcomes identified inthe LFBMuseum NLHFGrant applicationform and the Approved Purpose set out inthe NLHFGrant NotificationLetter whichisthe production of all deliveryround application requirements. The deadline provided by NLHFfor them to receiveour DeliveryPhase Applicationis 9 September 2021.

4.35. The followingworkis required to be carriedout over the development period (October2019— March 2021): Designdevelopment to RIBAStage 3 • Drawup ConservationPlan (Collections)and Management & Maintenance Plan

• Drawup ActivityPlan — includingconsultation, on-going engagement with new audiences and existinggroups, holdingconsultation events to develop further an understanding of local need and opportunities • Staff training in volunteer management • Volunteer recruitment

• Volunteer and staff training — research skillsfor interpretation, audience development, conservation plan (collections),outreach work • Consultationand research projects:AccessibilityPlanning project; Older People; Families; Youth Board • Fundraising.

4.36. A key condition of receivinga NLHFgrant isthat the project does not start before they make a decisionto providefunding and permissionto start has been given.The LFBneeded to apply for permissionto start within six months of receivingconfirmationof the grant funding (whichwas 9 September 2019) and LFBapplied and received permissionto start on 22 October 2019. 3

at

the LFB

to

this

the

were

on

the

from

to

the

by

award

deliver

begin

for

this

of

gets

U+l

and obtain

whether that

a

clause

U+l

to beyond

discretion fully at to currently

grant’

peppercorn

made on

referral

Lambeth

contingency National

not

Government risk

direction

a

of meeting

spend

order

to are

2

approval

endeavour the Museum grant

out a when

£900,000 contract

from

a

years’

This

break

decide do

In a

the process

at phase

agreed fit

cent

a

at

elements The

being

Local carry

to

still LFB

progress The is

strategy

be

is

two

LFB 2017

Stage NLHF

lease

is

holding

as prevents

from are

if

will

and

not

planning still dependent utilised.

it As time

major

loper next

proposed

‘resolution

the

GI.A include delivery remaining services.

is

is expenditure

and

revenue/capital

a

capital Museum

a

there

approval

March

This

decision

2022—23. process.

that

the

authority

with

will the

the

(SoS)

would

procurement

would

999-year their the 17

is

while

to The and ended.

with

total

phase to a

repayable clause

of That

project

on

and

for £1,900,000 the

donated

them.

of

has

consent

the State

there

even planning

including

9—20 uncontested Communities favourable not

of

to

NLHF

contract progress

and a of

and

contract

Representations as

break is

delegated

application

secured.

direction

201

delivery

throughout

grant

respect and to

part

phase

the

assess

with

the

be

this

FEP2SB6

£2,755,420 in

Lambeth. time including

the

remaining

progressing

planning

that

the

granted if value

the grant

to

made.

programme to

in this from project

of

Housing, freehold start

of

in

this, timescales

to

holding

following Secretary

The

be

the

of than to

£4,450,000,

integral

possible

agreed have

the

costs

8AE

until

part

need

Council to

hold

sources

of

the the

an

period be of

achieved, capital LFEPA

expenditure

through it

a

even

project. volunteer

as

and

the

of current

will

been

rather

by Committee

progress

of

considered

of cost not the

for not

for was

sale of

uncontested LFB LFC

Ministry

lifted. recommends

the allow

situation, the

to as

is

Management

permission

withheld

him,

have

to be

Lambeth will

on additional

separate for

5,031,000.

the

effect

LFB

the

the over

this

is needed

scheme,

being

is it

this

sources by

to

to allows

back

by no

Notwithstanding

and

on

be

the

Planning within

of

informed

the

from

three

Embankment

estimated

be

which

10%

now

Project

timescales

2019,

timescales

to

planning

place

still lease

invoices

consented for

totalling

contributions practical

in

are

will

submission) last

were funding

resourcing and

Commissioner the

direction

of

total

contract

cost direction

fixed

2

abreast

direction’

0,400,000

Albert

triggered

proceed a

delivered.

project

The

determined

through the

B

application

the

would

dependent

of no Fire Lambeth’s

is

at

to

The

There

these

zero report

NLHF

Team

consent

is be December

Museum fully

the

of home. £1,700,000 within

together of

receipt

contract

internal are non-cash

at

previously

Round

6 Only

a

this

holding

of uncontested

work

this

‘holding

on

space

funded

needs

if of occupy

the

phase. On delay.

for

a

them Project and

funding which

in

London

was

the Fund,

Design

a

should

there cover

be

permission.

granting

progress purpose

will

(NLHF

phase

Phase. is

phase

Commissioner

that

Borough risk

for

out

completed the

need

and

3 keep

completed

075,580, will

a will arrears and

2019.

leaseback

Nfl-IF

issued

in comments

to

be

budget

The

Museum

set

that

is Embankment

Fire Without to

in

and

Museum

a

bids not

there

Heritage

risks

Museum to

SoS

The means

if

Stage is formally

the

fundraising

planning Museum

London procurement

U÷l

application

further

development

project out

LFB

the

the

Albert a

London

rent.

8 appointed.

The tender December (MHCLGJ

Major

The BAE decision. and

from of remains. the

development RIBA

once

This work point development

successful which Planning the collection awarded Development informed

planning.

continue LFC-0255 Financial

of Lottery for project

the £1,419,000 The

other proposals

sets

4.37.

4.38.

4.39.

4.40.

5.1. 5.

5.2. expenditure split, once that has been confirmedthe CapitalProgrammeand Budget for future years willbe updated accordingly.No additional funding is sought from the Greater LondonAuthority.

6. Legal comments

6.1. Under section 9 of the Policingand CrimeAct 2017, the London FireCommissioner(the “Commissioner”)is established as a corporation sole with the Mayorappointing the occupant of that office. Under section 327D of the GLAAct 1999, as amended by the Policingand CrimeAct2017, the Mayormay issueto the Commissionerspecific or general directions as to the manner inwhichthe holder of that office is to exercise hisor her functions.

6.2. Bydirection dated 1 April2018, the Mayorset out those matters, for whichthe Commissionerwould requirethe priorapproval of either the Mayoror the Deputy Mayorfor Fireand Resilience(the ‘DeputyMayor”).

6.3. Paragraph (b) of Part 2 of the said direction requiresthe Commissionerto seek the prior approval of the Deputy Mayorbefore “[a] commitmentto expenditure (capital or revenue) of £150,000 or above as identified in accordance with normalaccounting practices

6.4. The statutory basis for the actions proposed in this report is provided by sections 7 and 5Aof the Fire and RescueServicesAd 2004 r’FRSA2004”). Section 7 (2)(a) FRSA20014 the Commissionerhas the power to secure the provisionof personnel, servicesand equipment necessaryto efficientlymeet all normel requirements for firefighting and section SAallowsthe Commissionerto procure personnel, servicesand equipment they consider appropriate for purposes incidentalor indirectlyincidentalto their functional purposes.

6.5. GeneralCounselalso notes that the proposed servicehas been procured in compliancewith the Public Contracts Regulations2015 and the Commissioner’sScheme of Governance.

Appendices and supporting papers:

1. LFC-0265— ‘LondonFireBrigadeMuseum Project’ to

day

be

this

FOl

the

of

the

will

complete the

(/3

/

officer

to

after

the

to

working

and

kept

under

until

one

Act)

be

preparation

Drafting

confirm following

example,

(FOl

1.20

the

within

decision

in

should

(for

disclosure

with

non-publication.

2000

/

the

of referred for

from

Act

2020.

published

periods

be

decision

be

considered

to

Date

accordance

the

it

deferral

Yes March exempt

rationale

in

of

Deferral

for be 16

either

approval.

Information

and

to

legal

on

of

require

will

of

date.

LFC

1)

the

day appropriately

deferred?

satisfied

proposal.

Board

is

the

be

with

(Part

been specific

this

Freedom

considered

to

implementation

a and

approval.

from

working

on

the

form

expired.

have

Commissioner

the

for

until

to

one

advice

together Investment

input

has

This

Fire

or

approval

with

form,

within

subject

award

2

commented

facts

deferred Note:

this

following:

Resilience

documentation

implications

London

Corporate

be

of

the 1)15 Service

date.

compromising

report Part

the

have

and

1 the

the

the

website

of

can legal

3,

DECLARATION:

RESOURCES:

contract

thi5

of

Only

risks

it

(Part by

Fire

defer

Board

2020

Pail

necessary.

GLA

and

teams

the

for

separate

the confirms

of

form

reviewed

July

the

information

for

t-{.

drafted

on

1

agreed

the

Legal

interests reason:

and

OFFICER

strictly

on

process),

to

has

this

01

in

Mayor

has

financial

publication

DIRECTOR,

was

in

and

period

Investment

be

date:

Director/Head

what

officer

length

that

off

access

Deferral:

Confidentiality:

for

publication

available

Deputy

approval

1

what

2

procedures

commercial

decision

should

Finance

the

immediate

procurement

YES, the

Information

Public

made confirm If a

Pail after Is

shortest If

Until cooling Pail The

isthereapail2form—NO Act ORIGINATING

Drafting Richar4flsw

GLA

NiranMjahaci

Assistant

to Corporate Advice

I The

This report.

Signature

‘EXECUTIVE