For discussion PWSC(2021-22)15 on 12 May 2021

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

HEAD 703 – BUILDINGS

Recreation, Culture and Amenities – Cultural Facilities 61RE – Renovation and improvement project for the Civic Centre 62RE – Facility Upgrading of Tai Po Civic Centre 63RE – Renovation of Tsuen Wan Public Library

Members are invited to recommend to the Finance Committee the upgrading of 61RE, 62RE and 63RE to Category A at estimated costs of $280.6 million, $516.5 million and $143.8 million in money-of-the-day prices respectively.

PROBLEM

2. We need to carry out the above cultural works projects to support the development of culture and the arts as well as to better serve the needs of the community.

PROPOSAL

3. The Director of Architectural Services, with the support of the Secretary for Home Affairs, proposes to upgrade the following projects to Category A –

/(a)…….

PWSC(2021-22)15 Page 2

(a) 61RE at an estimated cost of $280.6 million in money- of-the-day (MOD) prices for the renovation and improvement of the Sai Wan Ho Civic Centre;

(b) 62RE at an estimated cost of $516.5 million in MOD prices for the facility upgrading of Tai Po Civic Centre; and

(c) 63RE at an estimated cost of $143.8 million in MOD prices for the renovation of Tsuen Wan Public Library.

PROJECT SCOPE AND NATURE

4. Details of the three projects above are provided at Enclosures 1 to 3 respectively.

------

Home Affairs Bureau May 2021

Enclosure 1 to PWSC(2021-22)15

61RE - Renovation and improvement project for the Sai Wan Ho Civic Centre

PROJECT SCOPE AND NATURE

The project site is the existing site of the Sai Wan Ho Civic Centre (SWHCC), located at 111 , .

2. The proposed scope of works of the project comprises –

Major facilities (a) refurbishment of the Theatre, including (i) replacement of stage equipment and backstage facilities, and lighting and sound systems; and (ii) provision of an audio description room and a quiet room1;

(b) refurbishment of the Cultural Activities Hall (CA Hall);

Ancillary facilities (c) refurbishment of one Art Studio and two Music Practice Rooms, and conversion of another Art Studio into a rehearsal room;

(d) face-lifting of the foyer and improvement of public facilities, including provision of a babycare room and toilet facilities;

(e) improvement and upgrading of the existing barrier- free access and facilities;

Building services (f) replacement of building services installations, including air-conditioning and mechanical ventilation, fire service, electrical, lighting, plumbing and drainage installations; and /(g) …..

1 A quiet room in a theatre is a soundproofed room for watching performance. It is specially designed for audience, who are overwhelmed during performance, to settle down without affecting others in the auditorium. Enclosure 1 to PWSC(2021-22)15 Page 2

(g) replacement of the three existing passenger lifts, conversion of the existing cargo lift into two smaller passenger-goods lifts, and provision of two lifting platforms.

3. A site and location plan, floor plans, a sectional drawing, an artist’s impression and a plan of barrier-free access are at Annexes 1 to 7 to Enclosure 1 respectively.

4. We plan to commence the proposed works upon obtaining funding approval from the Finance Committee for target completion in about two years2.

JUSTIFICATION

5. The Government announced in the 2018 Policy Address its policy objective to support the development of culture and the arts, and set aside $20 billion in the 2018-19 Budget for the improvement and development of cultural facilities3 in the coming ten years to align with the long-term development need of culture and the arts in Hong Kong. At present, the Leisure and Cultural Services Department (LCSD) is actively planning six performance venue-related projects 4 , and one of which is the renovation and improvement project for SWHCC set out in this Enclosure.

6. The Chief Executive advocated in the 2019 Policy Address the incorporation of advanced innovative technology into the East Kowloon Cultural Centre now under construction, and mentioned in the 2020 Policy Address that the integration of arts and innovative technologies has become a new trend in arts /development …..

2 Under the current agreement of the Venue Partnership Scheme of SWHCC, the partner arts group could use the venue up to March 2022. Therefore, we plan to commence the construction works in April 2022 and it will take about two years to complete.

3 Paragraph 156 of the 2018-19 Budget Speech reads, “In order to continuously upgrade our cultural hardware, I will set aside $20 billion for the improvement and development of cultural facilities. Projects to be rolled out in the coming 10 years include the construction of the New Territories East Cultural Centre and the Heritage Conservation and Resource Centre; the expansion of the Hong Kong Science Museum, Hong Kong Museum of History and ; and the renovation of the Hong Kong Cultural Centre.”

4 The five remaining performance venue-related projects are the expansion and renovation of the Hong Kong City Hall, renovation of the Hong Kong Cultural Centre, Phase II development of the Yau Ma Tei Theatre, construction of the New Territories East Cultural Centre and facility upgrading of the Tai Po Civic Centre. The last project is the subject of Enclosure 2 to this paper. Enclosure 1 to PWSC(2021-22)15 Page 3

development. To align with the objectives mentioned above, we will introduce appropriate innovative technologies when planning for facility upgrading of performance venues to meet the requirements of the performing arts sector and their aspiration for professional performance venues. Examples of the innovative technologies include immersive projection and sound systems, projection mapping system, tracking enabled audio-visual-light system, and 4K live streaming system.

7. At present, the Theatre’s stage facilities, such as the counterweight flying system, fails to meet the requirements of professional performance on operation and stage effects. The CA Hall also fails to optimise its flexibility in stage configurations typical of a multi-purpose hall as only very basic technical equipment is provided. Aging problem of the building services installations (including passenger lifts) in SWHCC continues to worsen as a result of prolonged use, and causes suspension of service from time to time. Improvement to the building services installations is therefore required. The cargo lift is essential for the transportation of scenery, props and equipment. As the supply of some spare parts of the existing cargo lift has already discontinued, replacement by a new lift is required to ensure smooth operation of the venue. While the absence of rehearsal facilities and a babycare room needs to be addressed, improvement is also required for the barrier-free access facilities that connect the foyer on the ground floor with the Theatre’s main entrances and the auditorium with the stage.

8. Upon completion of the project, the performance facilities of SWHCC will be provided with professional stage facilities supporting innovative technologies to cater for the needs of performances in different art forms. The user-friendly public facilities and pleasant environment thus provided will enhance visitor experience.

FINANCIAL IMPLICATIONS

9. We estimate the capital cost of the project to be $280.6 million in money-of-the-day (MOD) prices, broken down as follows –

/(a) ……

Enclosure 1 to PWSC(2021-22)15 Page 4

$million (in MOD prices)

(a) Site works 0.2

(b) Building 91.0

(c) Building services 73.2

(d) Professional stage facilities 5 64.4

(e) Additional energy 1.0 conservation features

(f) Furniture and equipment 7.9 (F&E)6

(g) Consultants’ fees for 6.6 (i) contract administration 6.0 (ii) management of resident 0.6 site staff (RSS)

(h) Remuneration of RSS 10.9

(i) Contingencies 25.4

Total 280.6

10. We propose to engage consultants to undertake contract administration and site supervision of the project. A detailed breakdown of the estimate for consultants’ fees and RSS costs by man-months is at Annex 8 to Enclosure 1. The construction floor area (CFA) of the project is about 4 840 square metres (m2). The estimated construction unit cost of this project, represented by building and building services costs, is $33,933 per m2 of CFA in MOD prices. We consider this unit cost comparable to that of similar projects built by the Government. /11. …..

5 Professional stage facilities include design, supply and installation of stage lighting, stage machineries, sound systems, audio & visual equipment, and innovative arts technology equipment and systems as quoted in paragraph 6 above, etc.

6 The estimated cost is based on an indicative list of F&E items and their estimated prices. Enclosure 1 to PWSC(2021-22)15 Page 5

11. Subject to funding approval, we plan to phase the expenditure as follows –

$ million Year (in MOD prices)

2022 – 23 11.0

2023 – 24 59.9

2024 – 25 147.6

2025 – 26 22.9

2026 – 27 21.3

2027 – 28 17.9 ———— 280.6 ————

12. We have derived the MOD estimates on the basis of the Government’s latest set of assumptions on the trend rate of change in the prices of public sector building and construction output for the period 2022 to 2028. We will deliver the construction works through a lump-sum contract as we can clearly define the scope of the works in advance. The contract will provide for price adjustment.

13. We estimate the additional annual recurrent expenditure arising from this project to be $3.1 million. The capital and recurrent costs arising from the project will be taken into consideration when reviewing the fees and charges in future.

PUBLIC CONSULTATION

14. We consulted the District Facilities Management Committee and the Facilities Management, Culture and Leisure Committee of the Eastern District Council in September 2009 and June 2020 respectively. Both committees greatly supported the project and urged for its early implementation. From May to November 2020, we also gauged the views of various stakeholders, including LCSD’s Committee on Venue Partnership, venue partner of SWHCC, district arts groups and organisations for people with disabilities. The stakeholders unanimously supported the project. /15. ….. Enclosure 1 to PWSC(2021-22)15 Page 6

15. We consulted the Legislative Council Panel on Home Affairs on 8 April 2021. The Panel supported the project and did not raise any objection to the submission of the funding proposal to the Public Works Subcommittee.

ENVIRONMENTAL IMPLICATIONS

16. The project is not a designated project under the Environmental Impact Assessment Ordinance (Cap. 499). The project will not cause long-term environmental impacts. We have included in the project estimates the cost to implement suitable mitigation measures to control short-term environmental impacts.

17. During construction, we will control noise, dust and site run-off nuisances to within established standards and guidelines through the implementation of mitigation measures in the contract. These measures include the use of silencers, mufflers, acoustic linings or shields and the building of barrier walls for noisy construction activities, frequent cleaning and watering of the site, and the provision of wheel-washing facilities.

18. At the planning and design stages, we have considered measures to reduce the generation of construction waste where possible (e.g. using metal site hoardings and signboards so that these materials can be recycled or reused in other projects). In addition, we will require the contractor to reuse inert construction waste (e.g. use of excavated materials for filling within the site) on site or in other suitable construction sites as far as possible, in order to minimise the disposal of inert construction waste at public fill reception facilities (PFRFs)7. We will encourage the contractor to maximise the use of recycled or recyclable inert construction waste, and the use of non-timber formwork to further reduce the generation of construction waste.

19. At the construction stage, we will require the contractor to submit for approval a plan setting out the waste management measures, which will include appropriate mitigation means to avoid, reduce, reuse and recycle inert construction waste. We will ensure that the day-to-day operations on site comply with the approved plan. We will require the contractor to separate the inert portion from non-inert construction waste on site for disposal at appropriate /facilities …..

7 PFRFs are specified in Schedule 4 of the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N). Disposal of inert construction waste in PFRFs requires a licence issued by the Director of Civil Engineering and Development. Enclosure 1 to PWSC(2021-22)15 Page 7

facilities. We will control the disposal of inert and non-inert construction waste at PFRFs and landfills respectively through a trip-ticket system.

20. We estimate that the project will generate in total about 850 tonnes of construction waste. Of these, we will deliver 30 tonnes (3.5%) of inert construction waste to PFRFs for subsequent reuse. We will dispose of the remaining 820 tonnes (96.5%) of non-inert construction waste at landfills. The total cost for disposal of construction waste at PFRFs and landfill sites is estimated to be $0.2 million for this project (based on a unit charge rate of $71 per tonne for disposal at PFRFs and $200 per tonne at landfills as stipulated in the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N)).

HERITAGE IMPLICATIONS

21. This project will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites/buildings, sites of archaeological interest and government historic sites identified by the Antiquities and Monuments Office.

LAND ACQUISITION

22. This proposed project does not require any land acquisition8.

ENERGY CONSERVATION FEATURES

23. This project will adopt various forms of energy efficient features, in particular –

(a) demand control of supply air; and

(b) heat energy reclaim of exhaust air.

/24. …..

8 With a view to providing more female toilet cubicles in SWHCC, it is proposed to enlarge the existing 1/F female toilet by making use of the existing void in between G/F and 1/F. This proposal involves clarification of "Government Accommodation" under the Assignment of the subject premises and the Deed of Mutual Covenant (DMC) of the subject development. As the clarification may involve a legal process, a longer handling time is expected. The proposal will not be carried out in case the said void is not the “Government Accommodation” under the Assignment and DMC. Enclosure 1 to PWSC(2021-22)15 Page 8

24. The total estimated additional cost for adoption of the above features is around $1.0 million, which has been included in the cost estimate of this project. The energy efficient features will achieve 3.5% energy savings in the annual energy consumption with a payback period of about eight years.

BACKGROUND INFORMATION

25. We upgraded 61RE to Category B in September 2010. We engaged consultants to undertake various services including computational survey, asbestos survey, lead consultancy for schematic and detailed design, tender documentation and quantity surveying services at a total cost of about $11.7 million. The services and works provided by the consultants were funded under block allocation Subhead 3100GX “Project feasibility studies, minor investigations and consultants’ fees for items in Category D of the Public Works Programme”. The consultants have completed all the above services except for tender documentation and quantity surveying services.

26. This proposed project will not involve any tree removal or planting proposal.

27. We estimate that the proposed works will create about 60 jobs (50 for labourers and ten for professional/technical staff) providing a total employment of 1 250 man-months.

------

TAI HONG HOUSE

T EE TR IS S L A N N O TAI ON D ALDRICH I E BAY PARK A BUILDING A S T T E ET R E N R ST C N O O R AI R T ID O R

FELICITY SAI WAN HO GARDEN MTR STATION FELICITY GARDEN

FU ON BUILDING ET S H E H AT TR A SITE P S U SS N K O O TAI CHUNG E R G I C IN BUILDING W LY SH A O S N H A R I W O A A D N T H E O E S R T T R S E E G T KO MONG IN N BUILDING I O H

RENOVATION AND IMPROVEMENT PROJECT FOR THE SAI WAN HO CIVIC CENTRE (UNDER THE PODIUM OF FELICITY GARDEN)

S H A TAI CHUNG U BUILDING K E I W A N R O A D H AT P SS RO C LY HO

YOUTH OUTREACH JOCKEY CLUB BUILDING

WEALTHY PLAZA SHAU KEI WAN ROAD

上層建築界線 BUILDING LINE ABOVE

上層建築界線 BUILDING LINE ABOVE MAIN ENTRANCE

REHEARSAL ROOM FOYER

RECEPTION 上層建築界線 ROOM BOX OFFICE BUILDING

H LINE ABOVE T A P

S T S E E O R R

副入口 T C

S

REAR Y L ENTRANCE N O O

I H A

ENQUIRY T COUNTER

上層建築界線 BUILDING LINE ABOVE THEATRE

DRESSING VOID VOID ROOM

DRESSING FEMALE TOILET MALE TOILET ROOM TO EXISTING COVERED FOOTBRIDGE

CULTURAL ACTIVITIES HALL VOID ABOVE THEATRE

ART STUDIO

THEATRE MUSIC PRACTICE ROOM 女洗手間 QUIET FEMALE ROOM TOILET

MALE TOILET

AUDIO DESCRIPTION ROOM FELICITY GARDEN

VOID VOID VOID

QUIET THEATRE ROOM

FEMALE TOILET VOID

FOYER SAI WAN HO MARKET AND COOKED FOOD CENTRE

A-A

T EE TAI HONG TR S HOUSE NG ON MING O I H MANSION TA

東 區 走 廊

IS L A N TAI ON D E A BUILDING S ALDRICH MILLENNIUM T E BAY PARK COURT R N C O R R ID SUN LEE T O EE BUILDING R R ST T N EE I O TR TA S G IN I N TA YIP NING BUILDING TAI HING BUILDING

OI SH UN FU ON ET R E OA BUILDING TR SITE D S HING MAN STREET REFUSE N O COLLECTION POINT G IN TAI CHUNG S H H FU SHING S BUILDING T A E MANSION U E K R E T I S W 徑 E 字 E A 十 Y N 聖 I T O A S R A O I S I A H W D OI YEE STREET E A T K N E CAR PARK S H E T O R R S T HI E S NG E T HOI NING M T R G AN E N E KO MONG STREET I ST T N HING ON RE BUILDING SITTING-OUT I ET O BUILDING BISHOP LEI AREA H PASTORAL CENTRE Annex 8 to Enclosure 1 to PWSC(2021-22)15

61RE - Renovation and improvement project for the Sai Wan Ho Civic Centre

Breakdown of the estimates for consultants’ fees and resident site staff costs (in September 2020 prices)

Average Estimated MPS* Estimated man- salary fee months point Multiplier ($ million) (Note 1)

(a) Consultants’ fees Professional – – – 2.7 for contract Technical – – – 2.2 administration _____ (Note 2) Sub-total 4.9#

(b) Resident site staff Professional – – – – (RSS) costs (Note 3) Technical 196 14 1.6 9.5 _____ Sub-total 9.5

Comprising -

(i) Consultants’ fees 0.5# for management of RSS

(ii) Remuneration of 9.0# RSS _____ Total 14.4 _____

* MPS = Master Pay Scale

Notes 1. A multiplier of 1.6 is applied to the average MPS salary point to estimate the cost of RSS supplied by the consultants (as at now, MPS salary point 14 = $30,235 per month). 2. The consultants’ fees for contract administration are calculated in accordance with the existing consultancy agreement for contract administration and site supervision of 61RE. The assignment will only be executed subject to the Finance Committee’s funding approval to upgrade the project to Category A. 3. The consultants’ fees and staff cost for site supervision is based on the estimate prepared by the Director of Architectural Services. We will only know the actual man-months and actual costs after completion of the construction works.

Annex 8 to Enclosure 1 to PWSC(2021-22)15 Page 2

Remarks The cost figures in this Annex are shown in constant prices to correlate with the MPS salary point of the same year. The cost figures marked with # are shown in money-of- the-day prices in paragraph 9 of Enclosure 1.

Enclosure 2 to PWSC (2021-22)15

62RE - Facility upgrading of Tai Po Civic Centre

PROJECT SCOPE AND NATURE

The project site is the existing Tai Po Civic Centre (TPCC) located at 12 On Pong Road, Tai Po, occupying an area of around 5 650 square metres (m2).

2. The proposed scope of works of the project comprises –

Major facilities (a) expansion of the Auditorium and enhancement of related facilities, including (i) provision of about 700 raked seats for improved sightline and comfort;

(ii) upgrading of stage machinery, and lighting and sound equipment; and (iii) extension of back-of-house area and improvement of related facilities;

(b) expansion of the Black Box Theatre (BBT), including (i) enlargement of the performance space; (ii) provision of variable stage modes; (iii) addition of stage lighting equipment; and (iv) extension of back- of-house area and improvement of related facilities;

Ancillary facilities (c) reprovisioning of two function rooms;

(d) expansion of the foyer and addition of toilet facilities, a babycare room, passenger lifts and an escalator;

(e) provision of barrier-free access and facilities; and

Outdoor facilities (f) enhancement of outdoor landscaping to create an artistic and cultural ambience.

3. A site and location plan, floor plans, a sectional drawing, an artist’s impression and a plan of barrier-free access are at Annexes 1 to 7 to Enclosure 2 respectively. /4. ….. Enclosure 2 to PWSC(2021-22)15 Page 2

4. We plan to commence the proposed works upon obtaining funding approval from the Finance Committee for target completion in about two and a half years.

JUSTIFICATION

5. The Government announced in the 2018 Policy Address its policy objective to support the development of culture and the arts, and set aside $20 billion in the 2018-19 Budget for the improvement and development of cultural facilities1 in the coming ten years to align with the long-term development need of culture and the arts in Hong Kong. At present, the Leisure and Cultural Services Department (LCSD) is actively planning six performance venue-related projects2, and one of which is the facility upgrading of TPCC set out in this Enclosure.

6. The Chief Executive advocated in the 2019 Policy Address the incorporation of advanced innovative technology into the East Kowloon Cultural Centre now under construction, and mentioned in the 2020 Policy Address that the integration of arts and innovative technologies has become a new trend in arts development. To align with the objectives mentioned above, we will introduce appropriate innovative technologies when planning for facility upgrading of performance venues to meet the requirements of the performing arts sector and their aspiration for professional performance venues. Examples of the innovative technologies include immersive projection and sound systems, projection mapping system, tracking enabled audio-visual-light system, and 4K live streaming system.

7. TPCC was modified from the assembly hall of the former Tai Po Government Secondary School (TPGSS), which was completed in 1985 with the provision of an Auditorium with a maximum of 756 seats and two function rooms. Owing to spatial and structural constraints of TPCC, the stage installations and facilities at the Auditorium can only cater for school events and very basic theatre productions, which falls below the standard of a professional performance venue. /Currently …..

1 Paragraph 156 of the 2018-19 Budget Speech reads, “In order to continuously upgrade our cultural hardware, I will set aside $20 billion for the improvement and development of cultural facilities. Projects to be rolled out in the coming ten years include the construction of the New Territories East Cultural Centre and the Heritage Conservation and Resource Centre; the expansion of the Hong Kong Science Museum, Hong Kong Museum of History and Hong Kong City Hall; and the renovation of the Hong Kong Cultural Centre.”

2 The five remaining performance venue-related projects are the expansion and renovation of the Hong Kong City Hall, renovation of the Hong Kong Cultural Centre, Phase II development of the Yau Ma Tei Theatre, construction of the New Territories East Cultural Centre and renovation and improvement of the Sai Wan Ho Civic Centre. The last project is the subject of Enclosure 1 to this paper. Enclosure 2 to PWSC(2021-22)15 Page 3

Currently, the Auditorium of TPCC lacks a flying system for use during performances and a cargo lift for delivery of scenery and stage technical equipment while the back-of-house area and storage space are gravely insufficient. As some seats are not raked, sightline and comfort of the audience are also being affected. Due to space limitation, the BBT which was converted from one of the function rooms in 2017 is only provided with minimal performance space and a single end stage mode, thus failing to optimise its flexibility in stage configurations typical of a BBT. Improvements are also required to address the issues such as the foyer being small as well as lack of passenger lifts and barrier- free access facilities. With this facility upgrading project, TPCC seeks to provide a pleasant environment by upgrading its stage facilities, and secure public safety by improving TPCC’s equipment and building services installations to comply with the latest statutory requirements.

8. We envisaged that upon the facility upgrading, TPCC will generate synergy with the Tai Po Arts Centre (TPAC). TPAC was retrofitted from the former TPGSS premises under the Signature Project Scheme of Tai Po District Council (TPDC) and was officially opened in September 2019 with performing arts groups as its major tenants. Apart from providing performance space for tenants of TPAC, TPCC may also join hands with TPAC to establish a cultural landmark in the Tai Po district in order to attract visitors and users.

FINANCIAL IMPLICATIONS

9. We estimate the capital cost of the project to be $516.5 million in money-of-the-day (MOD) prices, broken down as follows -

$million (in MOD prices)

(a) Site works 6.3

(b) Foundation 17.6

(c) Building3 205.3

(d) Building services 80.6

(e) Drainage 7.2

/(f) …..

3 Building works include demolition, alteration and addition works to TPCC. Enclosure 2 to PWSC(2021-22)15 Page 4

(f) External works 13.8

(g) Professional stage facilities 4 84.9

(h) Additional energy 8.7 conservation, green and recycled features

(i) Furniture and equipment 15.0 (F&E)5

(j) Consultants’ fees for 14.5 (i) contract administration 12.8 (ii) management of resident 1.7 site staff (RSS)

(k) Remuneration of RSS 15.7

(l) Contingencies 46.9

Total 516.5

10. We propose to engage consultants to undertake contract administration and site supervision of the project. A detailed breakdown of the estimate for consultants’ fees and RSS costs by man-months is at Annex 8 to Enclosure 2. The construction floor area (CFA) of the project is about 7 538 m2. The estimated construction unit cost of this project, represented by building and building services costs, is $37,928 per m2 of CFA in MOD prices. We consider this unit cost comparable to that of similar projects built by the Government.

11. Subject to funding approval, we plan to phase the expenditure as follows –

/Year …..

4 Professional stage facilities include design, supply and installation of stage lighting, stage machineries, sound systems, audio & visual equipment, and innovative arts technology equipment and systems as quoted in paragraph 6 above, etc.

5 The estimated cost is based on an indicative list of F&E items and their estimated prices. Enclosure 2 to PWSC(2021-22)15 Page 5

$ million Year (in MOD prices)

2021 – 22 5.2

2022 – 23 82.3

2023 – 24 139.4

2024 – 25 176.6

2025 – 26 69.9

2026 – 27 33.2

2027 – 28 9.9

———— 516.5 ————

12. We have derived the MOD estimates on the basis of the Government’s latest set of assumptions on the trend rate of change in the prices of public sector building and construction output for the period 2021 to 2028. We will deliver the construction works through a lump-sum contract because we can clearly define the scope of the works in advance. The contract will provide for price adjustment.

13. We estimate the additional annual recurrent expenditure arising from this project to be $30.0 million. The capital and recurrent costs arising from the project will be taken into consideration when reviewing the fees and charges in future.

PUBLIC CONSULTATION

14. We consulted the District Facilities Management Committee (DFMC) of TPDC on the proposed scope of works and conceptual design of the project in July 2009 and November 2018 respectively. In December 2018, a site visit was also arranged for the DFMC members. DFMC supported the project and urged for its early implementation.

/15. ….. Enclosure 2 to PWSC(2021-22)15 Page 6

15. In view of a large number of new councillors in TPDC at its new term commencing in 2020, we arranged another site visit for members of its District Facilities Management and Culture, Recreation and Sports Committee in November 2020 to brief them on the project. Members participating in the visit expressed their support for the project.

16. From November 2018 to January 2019, we also gauged the views of various stakeholders, including LCSD’s Committee on Venue Partnership, Art Form Panels under the Programme and Development Committee, major arts groups of various art forms, district arts groups, major users of TPCC and organisations for people with disabilities. The stakeholders unanimously supported the project.

17. We consulted the Legislative Council Panel on Home Affairs on 15 March 2021. The Panel supported the project and did not raise any objection to the submission of the funding proposal to the Public Works Subcommittee.

ENVIRONMENTAL IMPLICATIONS

18. The project is not a designated project under the Environmental Impact Assessment Ordinance (Cap. 499). The project will not cause long-term environmental impacts. We have included in the project estimates the cost to implement suitable mitigation measures to control short-term environmental impacts.

19. During construction, we will control noise, dust and site run-off nuisances to within established standards and guidelines through the implementation of mitigation measures in the contract. These measures include the use of silencers, mufflers, acoustic linings or shields and the building of barrier walls for noisy construction activities, frequent cleaning and watering of the site, and the provision of wheel-washing facilities to prevent dust nuisance.

20. At the planning and design stages, we have considered measures to reduce the generation of construction waste where possible (e.g. using metal site hoardings and signboards so that these materials can be recycled or reused in other projects). In addition, we will require the contractor to reuse inert construction waste (e.g. use of excavated materials for filling within the site) on site or in other suitable construction sites as far as possible, in order to minimise

/the ….. Enclosure 2 to PWSC(2021-22)15 Page 7

the disposal of inert construction waste at public fill reception facilities (PFRFs)6. We will encourage the contractor to maximise the use of recycled or recyclable inert construction waste, and the use of non-timber formwork to further reduce the generation of construction waste.

21. At the construction stage, we will require the contractor to submit for approval a plan setting out the waste management measures, which will include appropriate mitigation means to avoid, reduce, reuse and recycle inert construction waste. We will ensure that the day-to-day operations on site comply with the approved plan. We will require the contractor to separate the inert portion from non-inert construction waste on site for disposal at appropriate facilities. We will control the disposal of inert and non-inert construction waste at PFRFs and landfills respectively through a trip-ticket system.

22. We estimate that the project will generate in total about 15 600 tonnes of construction waste. Of these, we will reuse about 200 tonnes (1.3%) of inert construction waste on site and deliver 12 970 tonnes (83.1%) of inert construction waste to PFRFs for subsequent reuse. We will dispose of the remaining 2 430 tonnes (15.6%) of non-inert construction waste at landfills. The total cost for disposal of construction waste at PFRFs and landfill sites is estimated to be $1.4 million for this project (based on a unit charge rate of $71 per tonne for disposal at PFRFs and $200 per tonne at landfills as stipulated in the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N)).

HERITAGE IMPLICATIONS

23. This project will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites/buildings, sites of archaeological interest and government historic sites identified by the Antiquities and Monuments Office.

LAND ACQUISITION

24. This proposed project does not require any land acquisition.

/ENERGY …..

6 PFRFs are specified in Schedule 4 of the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N). Disposal of inert construction waste in PFRFs requires a licence issued by the Director of Civil Engineering and Development. Enclosure 2 to PWSC(2021-22)15 Page 8

ENERGY CONSERVATION, GREEN AND RECYCLED FEATURES

25. This project will adopt various forms of energy efficient features and renewable energy technologies, in particular -

(a) variable speed drive for chillers;

(b) demand control of supply air;

(c) heat energy reclaim of exhaust air; and

(d) photovoltaic system.

26. For greening features, we will provide landscaping and greening features on ground, podium levels and rooftop surfaces of TPCC as appropriate for environmental and amenity benefits.

27. For recycled features, we will adopt a rainwater harvesting system for landscape irrigation with a view to conserving water.

28. The total estimated additional cost for adoption of the above features is around $8.7 million (including $2.8 million for energy efficient features), which has been included in the cost estimate of this project. The energy efficient features will achieve 11.0% energy savings in the annual energy consumption with a payback period of about eight years.

BACKGROUND INFORMATION

29. We upgraded 62RE to Category B in October 2010. We engaged consultants to undertake various services including topographical survey, asbestos survey, utility mapping, ground investigation, lead consultancy for schematic and detailed design, tender documentation and quantity surveying services at a total cost of about $19.8 million. The services and works provided by the consultants were funded under block allocation Subhead 3100GX “Project feasibility studies, minor investigations and consultants’ fees for items in Category D of the Public Works Programme”. The consultants have completed all the above services except for tender documentation and quantity surveying services.

/30. ….. Enclosure 2 to PWSC(2021-22)15 Page 9

30. Of the 61 trees within the project boundary, six trees will be retained. The proposed works will involve the removal of 55 trees, including 45 trees to be felled and ten trees to be replanted within the project site. All trees to be felled are not important trees7. We will incorporate planting proposals as part of the project, including the planting of 55 trees, 1 073 shrubs and 15 970 groundcovers.

31. We estimate that the proposed works will create about 130 jobs (110 for labourers and 20 for professional/technical staff) providing a total employment of 2 800 man-months.

------

7 “Important trees” refer to trees in the Register of Old and Valuable Trees, or any other trees that meet one or more of the following criteria – (a) trees of 100 years old or above; (b) trees of cultural, historical or memorable significance e.g. Fung Shui tree, tree as landmark of monastery or heritage monument, and trees in memory of an important person or event; (c) trees of precious or rare species; (d) trees of outstanding form (taking account of overall tree sizes, shape and any special features) e.g. trees with curtain like aerial roots, trees growing in unusual habitat; or (e) trees with trunk diameter equal or exceeding 1.0 metre (measured at 1.3 metres above ground level), or with height/canopy spread equal or exceeding 25 metres. 圖例 LOCATION PLAN 位置圖 工地平面圖 SITE PLAN 大埔舊墟公立學校 EXISTING AT-GRADEPEDESTRIANCROSSING PEDESTRIAN ENTRANCE/EXIT PHOTOVOLTAIC PANEL EXTENSION AREA RENOVATION AREA BARRIER-FREE ENTRANCE/EXIT 車輛出入口 改建範圍 工地界線 現有行人過路處 行人出入口 無障礙出入口 現有有蓋行人天橋 現有隧道 露天埸地 /通道 地面綠化 太陽能光伏板 EXISTING COVEREDFOOTBRIDGE EXISTING SUBWAY OPEN SPACE/CIRCULATION LANDSCAPED ROOF 天台綠化 新建範圍 SITE BOUNDARY VEHICULAR INGRESS/EGRESS AT-GRADE GREENING TAI POOLDMARKET LEGEND PUBLIC SCHOOL

安祥路 ON CHEUNG ROAD FORTUNE PLAZA 50m 昌運中心 工地 SITE TAI POARTSCENTRE 大埔藝術中心 TAI POWOROAD LAM TSUENRIVER 大埔太和路 0m 林村河 20m 安邦路 ON PONGROAD TAI POCENTRE 大埔中心 100m TAI POCENTRE 大埔中心 150m FACILITY UPGRADING OFTAIPOCIVIC CENTRE 大埔文娛中心設施提升工程 62RE

安祥路

ON CHEUNG ROAD

單車徑 BICYCLE TRACK BICYCLE BLACKBOX THEATRE 黑盒劇埸

FORTUNE PLAZA

昌運中心

TAI PO TAI WO ROAD WO TAI PO TAI 大埔太和路

AUDITORIUM 演奏廳

TAI PO ARTS CENTRE 附件2 附錄1 大埔藝術中心

10m ON PONG ROAD PONG ON ANNEX 1TOENCLOSURE2 0m 安邦路 5m 15m

安慈路 ON CHEE ROAD N 35m 附件2 附錄2 ANNEX 2 TO ENCLOSURE 2

昌運中心 圖例LEGEND FORTUNE PLAZA N 工地界線 A SITE BOUNDARY 無障礙通道 BARRIER-FREE ACCESS 緊急車輛通道 副入口 暢通易達停車位 EMERGENCY REAR VEHICULAR ACCESS ACCESSIBLE PARKING SPACE 黑盒劇埸 ENTRANCE 公用空間 / 通道 BLACKBOX PUBLIC SPACE / CIRCULATION THEATRE 露天埸地 / 通道 OPEN SPACE / CIRCULATION 地面綠化 男洗手間 AT-GRADE GREENING 主入口 MALE MAIN TOILET 供租用人使用的空間 ENTRANCE 女洗手間 SPACE FOR HIRER FEMALE 暢通易達升降機 TOILET ACCESSIBLE LIFT 附屬設施 ANCILLARY FACILITIES 機房 大堂 PLANT ROOM FOYER 活動室 FUNCTION 育嬰室 ROOM BABYCARE ROOM 暢通易達洗手間 ACCESSIBLE TOILET 通用洗手間 單車徑 UNIVERSAL TOILET 活動室 逃生樓梯 FUNCTION MEANS OF ESCAPE STAIRCASE ROOM BICYCLE TRACK 車輛出入口 緊急車輛通道 VEHICULAR INGRESS / EGRESS EMERGENCY VEHICULAR ACCESS 無障礙出入口 BARRIER-FREE ENTRANCE / EXIT 行人出入口 A PEDESTRIAN ENTRANCE / EXIT 大埔藝術中心 TAI PO ARTS CENTRE

10m 0m 5m 10m 20m

62RE 地下平面圖 大埔文娛中心設施提升工程 GROUND FLOOR PLAN FACILITY UPGRADING OF TAI PO CIVIC CENTRE 附件2 附錄3 ANNEX 3 TO ENCLOSURE 2 圖例LEGEND 中空 N VOID 工地界線 SITE BOUNDARY 無障礙通道 BARRIER-FREE ACCESS 公用空間 / 通道 PUBLIC SPACE / CIRCULATION 夾層平面圖 天台綠化 LANDSCAPED ROOF MEZZANINE FLOOR PLAN 供租用人使用的空間 A SPACE FOR HIRER 暢通易達升降機 ACCESSIBLE LIFT 附屬設施 ANCILLARY FACILITIES 機房 PLANT ROOM 暢通易達洗手間 ACCESSIBLE TOILET 逃生樓梯 MEANS OF ESCAPE STAIRCASE 輪椅座位 舞台 WHEELCHAIR SEATS STAGE 室外平台 PODIUM 演奏廳 GARDEN AUDITORIUM

大堂 FOYER

男洗手間 MALE TOILET

女洗手間 FEMALE TOILET A 一樓平面圖 FIRST FLOOR PLAN

10m 0m 5m 10m 20m

夾層及一樓平面圖 62RE MEZZANINE AND 大埔文娛中心設施提升工程 FIRST FLOOR PLAN FACILITY UPGRADING OF TAI PO CIVIC CENTRE 附件2 附錄4 ANNEX 4 TO ENCLOSURE 2 圖例LEGEND N A 工地界線 SITE BOUNDARY 無障礙通道 BARRIER-FREE ACCESS 公用空間 / 通道 PUBLIC SPACE / CIRCULATION 天台綠化 LANDSCAPED ROOF 供租用人使用的空間 SPACE FOR HIRER 暢通易達升降機 ACCESSIBLE LIFT 附屬設施 舞台上空 ANCILLARY FACILITIES VOID ABOVE STAGE 機房 PLANT ROOM 暢通易達洗手間 ACCESSIBLE TOILET 演奏廳上空 太陽能光伏板 VOID ABOVE AUDITORIUM PHOTOVOLTAIC PANEL 演奏廳 逃生樓梯 AUDITORIUM MEANS OF ESCAPE STAIRCASE 輪椅座位 WHEELCHAIR SEATS

A

10m 0m 5m 10m 20m

62RE 二樓平面圖 大埔文娛中心設施提升工程 SECOND FLOOR PLAN FACILITY UPGRADING OF TAI PO CIVIC CENTRE 附件2 附錄5 ANNEX 5 TO ENCLOSURE 2 圖例LEGEND

工地界線 SITE BOUNDARY 公用空間 PUBLIC SPACE 地面綠化 AT-GRADE GREENING 天台綠化 LANDSCAPED ROOF 供租用人使用空間 SPACE FOR HIRER 附屬設施 ANCILLARY FACILITIES 機房 PLANT ROOM

UR/F 上層天台

R/F 天台 大埔藝術中心 機房 TAI PO PLANT ROOM ARTS CENTRE 2/F 二樓

舞台 演奏廳 STAGE AUDITORIUM

洗手間 1/F 一樓 TOILET

M/F 夾層 緊急車輛通道 EMERGENCY VEHICULAR 活動室 活動室 ACCESS 洗手間 FUNCTION FUNCTION TOILET ROOM ROOM G/F 地下

5m 0m 5m 10m 20m

62RE 剖面圖 A-A 大埔文娛中心設施提升工程 SECTION A-A FACILITY UPGRADING OF TAI PO CIVIC CENTRE 附件2 附錄6 ANNEX 6 TO ENCLOSURE 2

從安祥路望向大埔文娛中心的構思透視圖 PERSPECTIVE VIEW FROM ON CHEUNG ROAD (ARTIST'S IMPRESSION)

構思圖 62RE 大埔文娛中心設施提升工程 ARTIST'S IMPRESSION FACILITY UPGRADING OF TAI PO CIVIC CENTRE 附件2 附錄7 ANNEX 7 TO ENCLOSURE 2 圖例 LEGEND N 工地界線 SITE BOUNDARY 八號花園 大埔中心 無障礙通道 BARRIER FREE ACCESS EIGHTLAND TAI PO CENTRE 車輛出入口 GARDENS VEHICULAR INGRESS / EGRESS 昌運中心

無障礙出入口 FORTUNE PLAZA 安慈路 BARRIER-FREE ENTRANCE / EXIT 無障礙出入口 ON CHEE ROAD BARRIER-FREE ENTRANCE / EXIT 現有巴士站 安浩里 EXISTING BUS STOP ON HO LANE 現有小巴站 安邦路 ON PONG ROAD EXISTING MINIBUS STOP 現有行人過路處 EXISTING AT-GRADE PEDESTRIAN CROSSING 現有有蓋行人天橋 大埔舊墟 工地 EXISTING COVERED FOOTBRIDGE 公立學校 SITE 大埔中心 現有隧道 安祥路 TAI PO OLD TAI PO CENTRE EXISTING SUBWAY MARKET 單車徑 PUBLIC ON CHEUNG ROAD SCHOOL BICYCLE TRACK 大埔藝術中心 TAI PO ARTS CENTRE

大埔太和路 TAI PO TAI WO ROAD

單車徑 BICYCLE TRACK 單車徑 BICYCLE TRACK

林村河 LAM TSUEN RIVER 10m 0m 25m 50m 75m

62RE 無礙障通道平面圖 大埔文娛中心設施提升工程 PLAN OF BARRIER-FREE ACCESS FACILITY UPGRADING OF TAI PO CIVIC CENTRE Annex 8 to Enclosure 2 to PWSC (2021-22)15

62RE - Facility upgrading of Tai Po Civic Centre

Breakdown of the estimates for consultants’ fees and resident site staff costs (in September 2020 prices)

Average Estimated MPS* Estimated man- salary fee months point Multiplier ($ million) (Note 1)

(a) Consultants’ fees for Professional – – – 5.3 contract Technical – – – 5.5 administration (Note 2) _____ Sub-total 10.8#

(b) Resident site staff Professional 23 38 1.6 3.2 (RSS) costs (Note 3) Technical 235 14 1.6 11.4 _____ Sub-total 14.6

Comprising -

(i) Consultants’ fees 1.4# for management of RSS

(ii) Remuneration of 13.2# RSS _____ Total 25.4 _____

* MPS = Master Pay Scale

Notes 1. A multiplier of 1.6 is applied to the average MPS salary point to estimate the cost of RSS supplied by the consultants (as at now, MPS salary point 38 = $85,870 per month and MPS salary point 14= $30,235 per month). 2. The consultants’ fees for contract administration are calculated in accordance with the existing consultancy agreement for contract administration and site supervision of 62RE. The assignment will only be executed subject to the Finance Committee’s funding approval to upgrade the project to Category A. 3. The consultants’ fees and staff cost for site supervision is based on the estimate prepared by the Director of Architectural Services. We will only know the actual man-months and actual costs after completion of the construction works.

Annex 8 to Enclosure 2 to PWSC(2021-22)15 Page 2

Remarks The cost figures in this Annex are shown in constant prices to correlate with the MPS salary point of the same year. The cost figures marked with # are shown in money-of- the-day prices in paragraph 9 of Enclosure 2.

Enclosure 3 to PWSC(2021-22)15

63RE - Renovation of Tsuen Wan Public Library

PROJECT SCOPE AND NATURE

The project site is located on 3/F to 7/F of the Lower Block of Tsuen Wan Government Offices (TWGO), 38 Sai Lau Kok Road, Tsuen Wan.

2. The proposed scope of works of the project comprises –

(a) alteration of 6/F and 7/F of the Lower Block of TWGO to provide more library spaces;

(b) refurbishment of 3/F to 5/F of the existing Tsuen Wan Public Library (TWPL); and

(c) addition of a passenger lift.

3. A site and location plan, floor plans, a sectional drawing, an artist’s impression and a plan of barrier-free access are at Annexes 1 to 7 to Enclosure 3 respectively.

4. We plan to commence the proposed works upon obtaining funding approval from the Finance Committee for target completion in about three and a half years.

JUSTIFICATION

5. According to the Planning Department, the projected population of Tsuen Wan district is about 315 700 in 2021. Currently, there are one major library (TWPL), one small library (Shek Wai Kok Public Library) and seven mobile library stops in Tsuen Wan district providing free library services to members of the public.

6. TWPL, opened in July 1993, is located on 3/F to 5/F of the Lower Block of TWGO. It is a major library with a total floor area of around 3 000 square metres (m2). Apart from the provision of standard library services and a students’ study room, TWPL has a reference library offering comprehensive reference materials to meet the lifelong learning and information needs of the public. /7. ….. Enclosure 3 to PWSC(2021-22)15 Page 2

7. To provide a more spacious and comfortable reading environment and to accommodate more seats, we propose to convert the areas on 6/F and 7/F of the Lower Block of TWGO, originally used for office and backend support, into spaces to accommodate library facilities for public use, and further refurbish the areas on 3/F to 5/F of TWPL through a full scale renovation. Upon completion of the renovation, TWPL will occupy five floors, with a net operating floor area increased to around 3 600 m2.

8. While TWPL has continuously improved and upgraded its facilities through minor works since its opening, some of the facilities no longer conform to the current design standards. Thus, it is necessary to refurbish the existing library on 3/F to 5/F and implement a full scale renovation to enhance the building services (for example improve barrier-free access) as well as add toilets, a babycare room and drinking water dispensers. Moreover, through renovation and increase of space, facilities will be re-organised and added, such as providing a leisure reading area in the adult library, setting up an activity space in the children’s library, and integrating the multimedia library and the computer and information centre to form an e-Zone. Upon completion of the renovation, there will be more reading space and seating facilities to address the public demand on library facilities and reading environment. With the development of the Smart Library System to bring in more diversified and self-service equipment, the facilities of TWPL will be enhanced as a whole and the services will be upgraded to better meet the needs of the public.

9. In addition, we propose to provide an additional passenger lift serving from 3/F to 7/F of TWPL to improve barrier-free access.

10. The renovation works of 3/F to 5/F of TWPL will be carried out in phases. During the works period, services including borrowing and returning of library materials, newspapers and periodicals, Internet, access to reference materials and the students’ study room will be maintained on a limited scale. To reduce the impact of the renovation works on library services, more mobile services will be arranged to maintain library services for the Tsuen Wan community. All facilities will be reopened to the public once the works are completed.

FINANCIAL IMPLICATIONS

11. We estimate the capital cost of the project to be $143.8 million in money-of-the-day (MOD) prices, broken down as follows –

/(a) ….. Enclosure 3 to PWSC(2021-22)15 Page 3

$million (in MOD prices)

(a) Site works 1.2

(b) Building 57.9

(c) Building services 45.6

(d) Additional energy 1.0 conservation and green features

(e) Furniture and equipment 8.9 (F&E)1

(f) Consultants’ fees for 6.0 (i) contract administration 5.1 (ii) management of resident 0.9 site staff (RSS)

(g) Remuneration of RSS 10.1

(h) Contingencies 13.1

Total 143.8

12. We propose to engage consultants to undertake contract administration and site supervision of the project. A detailed breakdown of the estimate for consultants’ fees and RSS costs by man-months is at Annex 8 to Enclosure 3. The construction floor area (CFA) of the project is about 4 597 m2. The estimated construction unit cost of this project, represented by building and building services costs, is $22,515 per m2 of CFA in MOD prices. We consider the unit cost comparable to that of similar projects built by the Government.

13. Subject to funding approval, we plan to phase the expenditure as follows – /Year …..

1 The estimated cost is based on an indicative list of F&E items and their estimated prices. Enclosure 3 to PWSC(2021-22)15 Page 4

$ million Year (in MOD prices)

2021 – 22 11.5

2022 – 23 39.5

2023 – 24 34.6

2024 – 25 25.4

2025 – 26 14.0

2026 – 27 12.0

2027 – 28 6.8

———— 143.8 ————

14. We have derived the MOD estimates on the basis of the Government’s latest set of assumptions on the trend rate of change in the prices of public sector building and construction output for the period 2021 to 2028. We will deliver the construction works through a lump-sum contract because we can clearly define the scope of the works in advance. The contract will provide for price adjustment.

15. We estimate the additional annual recurrent expenditure arising from this project to be $7.1 million. The capital and recurrent costs arising from the project will be taken into consideration when reviewing the fees and charges in future.

PUBLIC CONSULTATION

16. We consulted the District Facilities Management Committee (DFMC) of the Tsuen Wan District Council on the scope of works and conceptual layout of the project in July 2009 and May 2019 respectively. DFMC supported the project and urged for its early implementation.

/17. ….. Enclosure 3 to PWSC(2021-22)15 Page 5

17. We consulted the Legislative Council Panel on Home Affairs on 8 February 2021. The Panel supported the project and did not raise any objection to the submission of the funding proposal to the Public Works Subcommittee .

ENVIRONMENTAL IMPLICATIONS

18. The project is not a designated project under the Environmental Impact Assessment Ordinance (Cap. 499). The project will not cause long-term environmental impacts. We have included in the project estimates the cost to implement suitable mitigation measures to control short-term environmental impacts.

19. During construction, we will control noise, dust and site run-off nuisances to within established standards and guidelines through the implementation of mitigation measures in the contract. These measures include the use of silencers, mufflers, acoustic linings or shields and the building of barrier walls for noisy construction activities, frequent cleaning and watering of the site.

20. At the planning and design stages, we have considered measures to reduce the generation of construction waste where possible (e.g. using metal site hoardings and signboards so that these materials can be recycled or reused in other projects). In addition, we will require the contractor to reuse inert construction waste on site or in other suitable construction sites as far as possible, in order to minimise the disposal of inert construction waste at public fill reception facilities (PFRFs)2. We will encourage the contractor to maximise the use of recycled or recyclable inert construction waste, and the use of non-timber formwork to further reduce the generation of construction waste.

21. At the construction stage, we will require the contractor to submit for approval a plan setting out the waste management measures, which will include appropriate mitigation means to avoid, reduce, reuse and recycle inert construction waste. We will ensure that the day-to-day operations on site comply with the approved plan. We will require the contractor to separate the inert portion from non-inert construction waste on site for disposal at appropriate facilities. We will control the disposal of inert and non-inert construction waste at PFRFs and landfills respectively through a trip-ticket system.

/22. …..

2 PFRFs are specified in Schedule 4 of the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N). Disposal of inert construction waste in PFRFs requires a licence issued by the Director of Civil Engineering and Development. Enclosure 3 to PWSC(2021-22)15 Page 6

22. We estimate that the project will generate in total about 390 tonnes of construction waste. Of these, we will deliver about 30 tonnes (7.7%) of inert construction waste to PFRFs for subsequent reuse. We will dispose of the remaining 360 tonnes (92.3%) of non-inert construction waste at landfills. The total cost for disposal of construction waste at PFRFs and landfill sites is estimated to be $0.1 million for this project (based on a unit charge rate of $71 per tonne for disposal at PFRFs and $200 per tonne at landfills as stipulated in the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N)).

HERITAGE IMPLICATIONS

23. The project will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites/buildings, sites of archaeological interest and government historic sites identified by the Antiquities and Monuments Office.

LAND ACQUISITION

24. This proposed project does not require any land acquisition.

ENERGY CONSERVATION AND GREEN FEATURES

25. This project will adopt various forms of energy efficient features, in particular demand control of supply air.

26. For greening features, we will provide landscaping and greening features on 6/F green roof for environmental and amenity benefits.

27. The total estimated additional cost for adoption of the above features is around $1.0 million (including $0.9 million for energy efficient features), which has been included in the cost estimate of this project. The energy efficient features will achieve 5.5% energy savings in the annual energy consumption with a payback period of about eight years.

/BACKGROUND ….. Enclosure 3 to PWSC(2021-22)15 Page 7

BACKGROUND INFORMATION

28. We upgraded 63RE to Category B in September 2010. We engaged consultants to undertake various services including lead consultancy for schematic and detailed design, tender documentation and quantity surveying services at a total cost of about $6.0 million. The services and works provided by the consultants were funded under block allocation Subhead 3100GX “Project feasibility studies, minor investigations and consultants’ fees for items in Category D of the Public Works Programme”. The consultants have completed all the above services except for tender documentation and quantity surveying services.

29. The proposed project will not involve any tree removal. We will incorporate planting proposals as part of the project, including the planting of about 1 619 groundcovers within the site boundary.

30. We estimate that the proposed works will create about 25 jobs (20 for labourers and five for professional/technical staff) providing a total employment of 720 man-months.

------

附件 3 附錄 1 ANNEX 1 TO ENCLOSURE 3 CHEUNG PEI SHAN ROAD 象鼻山路 時貿中心 N MEGA TRADE 荃灣車廠 TSUEN WAN CENTRE DEPOT 網球場 時貿中心 荃灣車廠電子工場二 TENNIS 美港貨倉 MEGA TSUEN WAN DEPOT CENTRAL ELECTRONIC MASS TRANSIT RAILWAY (MTR) - TSUEN WAN LINE MAYKONG TRADE 荃灣政府合署 COURT CENTRE WORKSHOP 2 GODOWN TSUEN WAN 新領域廣場 GOVERNMENT GRAND 西樓角路OFFICES 新領域廣場 CITY 荃灣車廠電子工場 地下鐵路- 荃灣線 PLAZA SAI LAU KOK ROAD GRAND CITY TSUEN WAN DEPOT ELECTRONIC PLAZA 荃錦中心 WORKSHOP TSUEN KAM CENTRE SAI LAU KOK ROAD 青山公路-荃灣段 港鐵荃灣站 西樓角路 TSUEN WAN MTR STATION CASTLE PEAK ROAD工地 - TSUEN WAN THE SITE 荃灣電話機樓 南豐中心 福來邨 TSUEN WAN NAN FUNG FUK LOI ESTATE TELEPHONE CENTRE 昌華大廈 EXCHANGE BUILDING CHEONG LO TAK路德圍 COURTWAH 運通洋樓 TAI HO ROAD NORTH BUILDING WINNING HEIGHTS 荃灣政府合署 大河道北 西樓角路 TSUEN WAN 地下出入口 GOVERNMENT OFFICES GROUND FLOOR 位置圖 LOCATION PLAN ENTRANCE / EXIT SAI LAU KOK ROAD 圖例 LEGEND

工地界線 SITE BOUNDARY 行人天橋出入口 荃灣政府合署範圍 ENTRANCE / EXIT TSUEN WAN GOVERNMENT FROM FOOTBRIDGE OFFICES BOUNDARY 車輛出入口 VEHICULAR INGRESS / EGRESS

行人出入口 PEDESTRIAN ENTRANCE / EXIT

荃錦中心 荃灣公共圖書館 無障礙出入口 TSUEN KAM CENTRE TSUEN WAN BARRIER-FREE ENTRANCE / EXIT PUBLIC LIBRARY 現有有蓋行人天橋 EXISTING COVERED 行人天橋出入口 FOOTBRIDGE ENTRANCE / EXIT 小巴站 MINIBUS STOP CASTLE PEAK ROAD - TSUEN WAN FROM FOOTBRIDGE 青山公路-荃灣段 巴士站 BUS STOP

南豐中心 (下層巴士總站) NAN FUNG CENTRE

(BUS TERMINAL BELOW) 0m 5m 10m 20m

63RE 工地平面圖 ARCHITECTURAL 荃灣公共圖書館修繕工程 SERVICES SITE PLAN RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 附件 3 附錄 2 ANNEX 2 TO ENCLOSURE 3

辦公室 N GENERAL OFFICE

中空 VOID 中空 中央書庫 VOID CENTRAL A BOOK STACK 中空 A 中空 VOID VOID

參考圖書館 女職員洗手間 FEMALE STAFF TOILET REFERENCE LIBRARY 報刊閱覽區 圖例 LEGEND 男職員洗手間 NEWSPAPER AND MALE STAFF TOILET PERIODICALS 工地界線 SECTION SITE BOUNDARY 非修繕範圍 NON-RENOVATED AREA 男洗手間 三樓平面圖 MALE TOILET 擴建範圍 THIRD FLOOR PLAN EXTENSION AREA 女洗手間 FEMALE TOILET 無障礙通道 BARRIER-FREE ACCESS 無障礙出入口 A BARRIER-FREE ENTRANCE / EXIT 行人出入口 中空 PEDESTRIAN ENTRANCE / EXIT VOID 暢通易達升降機 部份二樓平面圖 - 暢通易達升降機 ACCESSIBLE LIFT 及二樓連接現有有蓋行人天橋 暢通易達洗手間 PART OF SECOND FLOOR ACCESSIBLE TOILET PLAN - ACCESSIBLE LIFT AND 圖書館 SECOND FLOOR LINKING THE EXISTING COVERED LIBRARY A FOOTBRIDGE 附屬設施 ANCILLARY FACILITIES SAI LAU西樓角路 KOK ROAD 通用洗手間 UNIVERSAL TOILET 行人路 公共地方/通道 PAVEMENT 上層建築界線 PUBLIC AREA / CIRCULATION BUILDING LINE ABOVE 逃生樓梯 部份地下平面圖 - 暢通易達升降機 MEANS OF ESCAPE STAIRCASES 及地下連接西樓角路 機房 PART OF GROUND FLOOR PLANT ROOM A A PLAN - ACCESSIBLE LIFT AND 現有有蓋行人天橋 GROUND FLOOR LINKING 0m 5m 10m 20m EXISTING COVERED FOOTBRIDGE SAI LAU KOK ROAD

部份地下、部份二樓及三樓平面圖 63RE ARCHITECTURAL PART OF GROUND FLOOR, PART OF 荃灣公共圖書館修繕工程 SERVICES SECOND FLOOR AND THIRD FLOOR PLANS RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 附件 3 附錄 3 ANNEX 3 TO ENCLOSURE 3

N

A 中空 VOID 推廣活動室 EXTENSION ACTIVITIES AREA

中空 A VOID

中空 兒童圖書館 VOID CHILDREN'S LIBRARY

五樓平面圖 FIFTH FLOOR PLAN 女洗手間 FEMALE TOILET 男洗手間 MALE TOILET

圖例 LEGEND

工地界線 A 咖啡閣 SITE BOUNDARY COFFEE CORNER 非修繕範圍 顧客服務台 NON-RENOVATED AREA CUSTOMER SERVICE COUNTER 無障礙通道 BARRIER-FREE ACCESS 中空 A 暢通易達升降機 VOID ACCESSIBLE LIFT 暢通易達洗手間 圖書館入口 辦公室 ACCESSIBLE TOILET LIBRARY GENERAL 圖書館 ENTRANCE OFFICE LIBRARY 學生自修室 附屬設施 STUDENTS' STUDY ROOM ANCILLARY FACILITIES 部份四樓平面圖 公共地方/通道 PART OF FOURTH FLOOR PLAN PUBLIC AREA / CIRCULATION 女洗手間 逃生樓梯 FEMALE TOILET 特快歸還服務 MEANS OF ESCAPE STAIRCASES 男洗手間 EXPRESS CHECK-IN AREA 機房 MALE TOILET 0m 5m 10m 20m PLANT ROOM

部份四樓及五樓平面圖 63RE ARCHITECTURAL PART OF FOURTH FLOOR AND 荃灣公共圖書館修繕工程 SERVICES FIFTH FLOOR PLANS RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 附件 3 附錄 4 ANNEX 4 TO ENCLOSURE 3

N

A

A

天台平面圖 ROOF FLOOR PLAN

A

多媒體資料圖書館 圖例 LEGEND A MULTIMEDIA LIBRARY 工地界線 SITE BOUNDARY 非修繕範圍 NON-RENOVATED AREA 七樓平面圖 擴建範圍 SEVENTH FLOOR PLAN EXTENSION AREA 電腦資訊中心 無障礙通道 COMPUTER AND BARRIER-FREE ACCESS INFORMATION CENTRE 暢通易達升降機 ACCESSIBLE LIFT 暢通易達洗手間 A ACCESSIBLE TOILET 圖書館 LIBRARY 成人圖書館 附屬設施 A ADULT LIBRARY ANCILLARY FACILITIES 天台綠化 休閒閱讀區 LANDSCAPED ROOF LEISURE 公共地方/通道 READING AREA 六樓平面圖 PUBLIC AREA / CIRCULATION SIXTH FLOOR PLAN 逃生樓梯 女洗手間 MEANS OF ESCAPE STAIRCASES FEMALE TOILET 機房 男洗手間 0m 5m 10m 20m PLANT ROOM MALE TOILET

六樓至天台平面圖 63RE ARCHITECTURAL 荃灣公共圖書館修繕工程 SIXTH TO ROOF FLOOR PLANS SERVICES RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 附件 3 附錄 5 ANNEX 5 TO ENCLOSURE 3

四樓至二十九樓 - 其他政府部門辦公室 4/F TO 29/F - OTHER GOVERNMENT OFFICES

天台 +38.88 R/F

多媒體資料圖書館 七樓 +35.03 MULTIMEDIA LIBRARY 7/F 3850

成人圖書館 六樓 +31.18 ADULT LIBRARY 6/F 3850 女洗手間 兒童圖書館 FEMALE 五樓 +26.98 TOILET CHILDREN'S LIBRARY 5/F 4200 男洗手間 學生自修室 圖書館入口 MALE STUDENTS' 四樓 +22.78 TOILET STUDY ROOM LIBRARY ENTRANCE 4/F 4200 報刊閱覽區 中央書庫 參考圖書館 NEWSPAPER AND 三樓 +18.97 CENTRAL BOOK STACK REFERENCE LIBRARY PERIODICALS SECTION 3/F 3810 其他政府部門辦公室 二樓 +15.31 OTHER GOVERNMENT OFFICES 2/F 3660

其他政府部門辦公室 一樓 +11.07 西樓角路 OTHER GOVERNMENT OFFICES 1/F 4240 SAI LAU KOK ROAD +6.75 停車場 低層地下 5340 +5.73 CARPARK LG/F

圖例 LEGEND

工地界線 暢通易達升降機 公共地方/通道 SITE BOUNDARY ACCESSIBLE LIFT PUBLIC AREA / CIRCULATION 非修繕範圍 圖書館 現有有蓋行人天橋 NON-RENOVATED AREA LIBRARY EXISTING COVERED FOOTBRIDGE 擴建範圍 附屬設施 機房 0m 5m 10m 20m EXTENSION AREA ANCILLARY FACILITIES PLANT ROOM

剖面圖 A-A 63RE ARCHITECTURAL 荃灣公共圖書館修繕工程 SECTION A - A SERVICES RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 附件 3 附錄 6 ANNEX 6 TO ENCLOSURE 3

成人圖書館的構思透視圖 PERSPECTIVE VIEW FROM ADULT LIBRARY (ARTIST'S IMPRESSION) 63RE 構思圖 ARCHITECTURAL 荃灣公共圖書館修繕工程 SERVICES ARTIST'S IMPRESSION RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 附件 3 附錄 7 ANNEX 7 TO ENCLOSURE 3 MASS TRANSIT RAILWAY (MTR) - TSUEN WAN LINE N 圖例 LEGEND 網球場 工地界線 地下鐵路- 荃灣線 TENNIS SITE BOUNDARY

COURT 荃灣政府合署範圍 TSUEN WAN GOVERNMENT OFFICES BOUNDARY 荃灣車廠電子工場二 行人出入口 TSUEN WAN DEPOT PEDESTRIAN CENTRAL ELECTRONIC ENTRANCE / EXIT WORKSHOP 2 無障礙出入口 BARRIER-FREE ENTRANCE / EXIT

無障礙通道 (街道水平) BARRIER-FREE ACCESS 荃灣政府合署 地下出入口 (STREET LEVEL) TSUEN WAN GROUND FLOOR 無障礙出入口 (行人天橋水平) ENTRANCE / EXIT BARRIER-FREE ACCESS GOVERNMENT OFFICES (FOOTBRIDGE LEVEL) 荃灣車廠電子工場 現有行人過路處 EXISTING AT-GRADE 行人天橋出入口 TSUEN WAN DEPOT PEDESTRIAN CROSSING ENTRANCE / EXIT ELECTRONIC WORKSHOP 現有有蓋行人天橋 FROM FOOTBRIDGE EXISTING COVERED FOOTBRIDGE

小巴站 MINIBUS STOP

巴士站 荃錦中心 荃灣公共圖書館 BUS STOP TSUEN KAM CENTRE 港鐵站出入口 TSUEN WAN MTR STATION PUBLIC LIBRARY ENTRANCE / EXIT 暢通易達升降機 ACCESSIBLE LIFT

港鐵荃灣站 SAI LAU西樓角路 KOK ROAD TSUEN WAN MTR STATION

CASTLE PEAK ROAD - TSUEN WAN 青山公路-荃灣段

南豐中心 (下層巴士總站) NAN FUNG CENTRE (BUS TERMINAL BELOW) 福來邨 FUK LOI ESTATE 荃灣電話機樓 路德圍 TSUEN WAN TELEPHONE 0m 10m 20m 40m LO TAK COURT EXCHANGE BUILDING 63RE 無障礙通道平面圖 ARCHITECTURAL 荃灣公共圖書館修繕工程 SERVICES PLAN OF BARRIER-FREE ACCESS RENOVATION OF TSUEN WAN PUBLIC LIBRARY DEPARTMENT 建築署 Annex 8 to Enclosure 3 to PWSC(2021-22)15

63RE – Renovation of Tsuen Wan Public Library

Breakdown of the estimates for consultants’ fees and resident site staff costs (in September 2020 prices)

Average Estimated MPS* Estimated man- salary fee months point Multiplier ($ million) (Note 1)

(a) Consultants’ Professional – – – 3.4 fees for Technical – – – 0.9 contract _____ administration (Note 2) Sub-total 4.3#

(b) Resident site Professional – – – – staff (RSS) Technical 192 14 1.6 9.3 costs (Note 3) _____ Sub-total 9.3

Comprising -

(i) Consultants’ 0.8# fees for management of RSS

(ii) Remuneration 8.5# of RSS _____ Total 13.6 _____

* MPS = Master Pay Scale

Notes

1. A multiplier of 1.6 is applied to the average MPS salary point to estimate the cost of RSS supplied by the consultants (as at now, MPS salary point 14 = $30,235 per month). 2. The consultants’ fees for contract administration are calculated in accordance with the existing consultancy agreement for contract administration and site supervision of 63RE. The assignment will only be executed subject to the Finance Committee’s funding approval to upgrade the project to Category A. 3. The consultants’ fees and staff cost for site supervision is based on the estimate prepared by the Director of Architectural Services. We will only know the actual man-months and actual costs after completion of the construction works. Annex 8 to Enclosure 3 to PWSC(2021-22)15 Page 2

Remarks The cost figures in this Annex are shown in constant prices to correlate with the MPS salary point of the same year. The cost figures marked with # are shown in money-of-the- day prices in paragraph 11 of Enclosure 3.